1 Performance and Resources Board meeting, 21 January 2016 Agenda item: 10 Report title: Report by: Considered by: Action: Update on development of the GMC Standards app Faye Cranfield, Project manager Standards team, Performance and Resources Board To note Executive summary Work is on track to develop and deliver the GMC Standards app at the end of March 2016, for 54,000 (excluding VAT) which is within the original budget of 75,000. This paper provides details of the progress made to date, our planned next steps and information about possible future work. Recommendation The Performance and Resources Board is asked to note the progress of the project to date.

2 Performance and Resources Board meeting, 21 January 2016 Agenda item 10 Update on development of the GMC Standards app Background 1 At its meeting on 18 June 2015, the Performance and Resources Board considered a business case for developing a GMC standards app. The Board supported the principle of developing an app but asked for further information to be provided on the business case, including on the level of any additional funding that would be required above the 75,000 budget. Following the meeting, a proposal was developed to deliver the project for 54,000 (excluding VAT), which was within the original budget. This proposal was sent to the Chief Operating Officer (COO) on 31 July 2015 and the COO gave permission for the work to proceed, without the need for further consideration by the Board. 2 The Chief Operating Officer agreed that the app would allow users to access all our guidance on- and offline, search our guidance by a search function or through an A-Z of our guidance, and provide links to Good Medical Practice in Action. 3 The Chief Operating Officer also agreed that by December 2015 we would: establish a project team spanning Information Systems (IS), Standards and Strategy and Communications hold a design workshop to map out the requirements of the app issue a tender for an external partner to design and build the app begin building the app for 54,000 (excluding VAT). Progress to date 4 On 9 September 2015 the project team attended a design workshop. The workshop was facilitated by CDS Digital (who currently work with us on the web content management, and are experienced in the design and building of apps). Outputs from the day were collated into a design specification document and this was used as a basis for the Project Initiation Document (PID) and the app s wireframes. 5 The PID and Business Requirement Specification documents were signed off by the Project sponsor in early November The Project team meets weekly and the first project board meeting took place on Friday 13 November Although we originally expected to issue a tender for the development of the app, this work will now be undertaken in-house as IS were able to bring forward the recruitment of an in-house developer (they started in post on Monday 14 December 2015). 7 We contracted CDS Digital to assist us with finalising the app design and wireframes to check the app fully complies with Equality and Diversity and Information Access requirements. 2

3 Performance and Resources Board meeting, 21 January 2016 Agenda item 10 Update on development of the GMC Standards app 8 A user group made up of ten doctors at various stages of their careers, from various specialities and with varying knowledge of and familiarity with the GMC, were asked to test and feedback on the wireframes and proposed designs for the homepage (see Annex A for visuals). They were also asked to respond to a number of questions on the features of the app. 9 The results from the user group mean we now have an agreed layout and design for the homepage, confirmation that offering alternative approaches for searching the guidance is well liked, and positive feedback for the other features on the app. 10 The testing flagged the importance of ensuring the app is compatible with a range of old and new operating systems. We will make sure the app is available to as many users as possible, which is something we learnt from feedback and ratings of the Continuing Professional Development (CPD) app. Planned next steps 11 We are aiming to have an initial test version available in the week commencing 18 January Initial testing and remediation should be completed by the end of January. 12 We will hold another project board on 20 January 2016 and we ll work with Communications to agree a plan for go live activities and promotion. We are on track for a soft launch in mid-february, with a full launch at the end of March. Future work 13 Feedback from the user testing has highlighted some additional features and potential ideas for a second phase for the app. These include: allowing users to share content, either for personal archiving or dissemination and comment; tailoring content to the user; and linking the GMC standards app to the CPD tracker app. 14 IS have allocated funds for future development. We plan to monitor feedback and usage of the app in Quarter 2 and we will consider any future updates in the context of: The GMC s digital media strategy, including the interface with a new Content Management System. What further potential savings could be made as a result of further development? How it might be possible, and what we might charge, for these additional features through in-app purchases and/or subscriptions. 15 We will provide a further update to the Board at its meeting on 23 June

4 Performance and Resources Board meeting, 21 January Update on development of the GMC Standards app 10 Annex A Standards app initial basic designs 1 This annex shows some of the initial basic designs of the Standards app: a Example 1 shows the app s homepage. b Examples 2, 3 and 4 show how the 0-18 guidance will be presented at a top level, and then drilled down to show the paragraphs and sub sections.

5 Performance and Resources Board meeting, 21 January 2016 Agenda item 10 Update on development of the GMC Standards app EXAMPLE 1 The app s homepage A2

6 Performance and Resources Board meeting, 21 January 2016 Agenda item 10 Update on development of the GMC Standards app EXAMPLE 2 - The main page of the 0-18 guidance A3

7 Performance and Resources Board meeting, 21 January 2016 Agenda item 10 Update on development of the GMC Standards app EXAMPLE 3 The paragraphs in the 0-18 guidance A4

8 Performance and Resources Board meeting, 21 January 2016 Agenda item 10 Update on development of the GMC Standards app EXAMPLE 4 The subsections of the 0-18 guidance A5

Andrew Bratt, Assistant Director Human Resources, Resources and Quality Assurance [email protected], 0161 923 6215

Andrew Bratt, Assistant Director Human Resources, Resources and Quality Assurance abratt@gmc-uk.org, 0161 923 6215 Agenda item: 21 Report title: Report by: Action: People Strategy- Leadership and Management Andrew Bratt, Assistant Director Human Resources, Resources and Quality Assurance [email protected], 0161 923

More information

Electronic Prescription. Service. Services offered by HSCIC to support EPS

Electronic Prescription. Service. Services offered by HSCIC to support EPS Electronic Prescription Service Services offered by HSCIC to support EPS NHS England through its Area Teams (ATs) is responsible for the planning and implementation of EPS. The purpose of this document

More information

Note: This App is under development and available for testing on request. Note: This App is under development and available for testing on request. Note: This App is under development and available for

More information

Supporting information for appraisal and revalidation

Supporting information for appraisal and revalidation Supporting information for appraisal and revalidation During their annual appraisals, doctors will use supporting information to demonstrate that they are continuing to meet the principles and values set

More information

TECHNICAL DESCRIPTION WEB DESIGN

TECHNICAL DESCRIPTION WEB DESIGN TECHNICAL DESCRIPTION WEB DESIGN WorldSkills International TD17 v4.0 WSC2013 WorldSkills International, by a resolution of the Technical Committee and in accordance with the Constitution, the Standing

More information

THE ROAD SAFETY AUDIT TOOKIT

THE ROAD SAFETY AUDIT TOOKIT THE ROAD SAFETY AUDIT TOOKIT Lisa Boschert Research Engineer, ARRB Group ABSTRACT The Road Safety Audit (RSA) Toolkit is an on-line tool to assist practitioners carry out road safety audits. The Toolkit

More information

Training Management Guidelines

Training Management Guidelines Training Management Guidelines February 2009 Training Management Guidelines - February 2009 These guidelines provide a strategic approach to training and skills development in the construction industry

More information

Managing ICT contracts in central government. An update

Managing ICT contracts in central government. An update Managing ICT contracts in central government An update Prepared by Audit Scotland June 2015 Auditor General for Scotland The Auditor General s role is to: appoint auditors to Scotland s central government

More information

Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010

Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010 Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010 This report has been prepared on the basis of the limitations set out on page 16. Contents Page

More information

Web Redesign Project Manager (24 months Fixed Term Contract) Candidate Information Brief. August 2015

Web Redesign Project Manager (24 months Fixed Term Contract) Candidate Information Brief. August 2015 Web Redesign Project Manager (24 months Fixed Term Contract) Candidate Information Brief August 2015 Dear Candidate, Re: Web Redesign Project Manager (24 months Fixed Term Contract) Thank you for expressing

More information

Marketing Sponsorship Rate Card

Marketing Sponsorship Rate Card Marketing Sponsorship Rate Card Previous Sponsors Web Sponsorship Web Banner 416.25 (pcm) or 4,445 (annual) +VAT Be one of the first companies to be seen by Gadget Show Live web visitors. This is a great

More information

Website for American Job Center Southwest Connecticut REQUEST FOR PROPOSAL (RFP) WEBSITE DESIGN and DEVELOPMENT

Website for American Job Center Southwest Connecticut REQUEST FOR PROPOSAL (RFP) WEBSITE DESIGN and DEVELOPMENT Website for American Job Center Southwest Connecticut Published by The WorkPlace Southwestern Connecticut s Regional Workforce Development Board REQUEST FOR PROPOSAL (RFP) WEBSITE DESIGN and DEVELOPMENT

More information

A Framework of Quality Assurance for Responsible Officers and Revalidation

A Framework of Quality Assurance for Responsible Officers and Revalidation A Framework of Quality Assurance for Responsible Officers and Revalidation Supporting responsible officers and designated bodies in providing assurance that they are discharging their statutory responsibilities.

More information

Welcome to the HFMA Online Academy

Welcome to the HFMA Online Academy Welcome to the HFMA Online Academy Making the best use of NHS resources for patients on a limited budget is challenging. So ensuring NHS money is managed effectively is more important than ever. Here at

More information

Project title (in Chinese) 項 目

Project title (in Chinese) 項 目 II Project Information Project title (in English) Project title (in Chinese) HKCAAVQ IT Infrastructure Development 香 港 學 術 及 職 業 資 歷 評 審 局 資 訊 系 統 基 建 發 展 Project 項 目 Project summary (Please provide an

More information

Human Resources and Training update

Human Resources and Training update 4 November 2014 Performance and Resources Board 11 To consider Human Resources and Training update Issue 1 This report provides an update on policy developments relating to Human Resources and Training.

More information

The Education Fellowship Trust. Review of financial management and governance

The Education Fellowship Trust. Review of financial management and governance The Education Fellowship Trust Review of financial management and governance April 2014 Contents Executive Summary 3 Background to the Trust 5 Findings 6 Governance 6 Risk and Financial Control Framework

More information

Supporting information for appraisal and revalidation

Supporting information for appraisal and revalidation Supporting information for appraisal and revalidation During their annual appraisals, doctors will use supporting information to demonstrate that they are continuing to meet the principles and values

More information

Website business plan outline

Website business plan outline Website business plan outline www.unitedfocus.com.au Purpose of this Document Whether creating a new website or re-developing an existing one it is important to have addressed the business case underpinning

More information

REVIEW OF STCW PASSENGER SHIP-SPECIFIC SAFETY TRAINING. Proposed Amendments to the STCW Convention passenger ship specific safety training

REVIEW OF STCW PASSENGER SHIP-SPECIFIC SAFETY TRAINING. Proposed Amendments to the STCW Convention passenger ship specific safety training E SUB-COMMITTEE ON HUMAN ELEMENT, TRAINING AND WATCHKEEPING 3rd session Agenda item 10 HTW 3/10 30 October 2015 Original: ENGLISH REVIEW OF STCW PASSENGER SHIP-SPECIFIC SAFETY TRAINING Proposed Amendments

More information

APEC WEBSITE GUIDELINES

APEC WEBSITE GUIDELINES APEC WEBSITE GUIDELINES APEC Secretariat December 2007 1 INTRODUCTION Today, websites play a pivotal role in disseminating news, communicating messages, hosting resources and publicizing and facilitating

More information

DECISION BOOK. The decision book is open to public inspection at the Civic Offices between 9.00 am and 5.00 pm, Mondays to Fridays.

DECISION BOOK. The decision book is open to public inspection at the Civic Offices between 9.00 am and 5.00 pm, Mondays to Fridays. DECISION BOOK Issue: 451 Date: 2 May 2014 Decisions set out in the book have been made under delegated powers by the Managing Director, Corporate Directors or the Chief Finance Officer and Monitoring Officer,

More information

To join Achilles UVDB, visit www.achilles.com/uvdb, call +44 (0)1235 861118 or email [email protected]

To join Achilles UVDB, visit www.achilles.com/uvdb, call +44 (0)1235 861118 or email enquiries@achilles.com UVDB Achilles UVDB FAQ s About Achilles UVDB What is the Achilles UVDB Supplier Information Management Service? Achilles UVDB is the community for the UK utilities industry. It enables the utilities sector

More information

Requirements Management Database

Requirements Management Database Project Whitepaper Compliance with Pragmatic Marketing s That Work, LLC Project Whitepaper - Pragmatic Marketing's That Work Page 1 of 16 Introduction The Database has been designed for maximum flexibility

More information

Quality Impact Assessment. Executive summary

Quality Impact Assessment. Executive summary Report to Public Trust Board 28 th February 2013 Title Sponsoring Executive Director Author(s) Purpose Previously considered by Quality Impact Assessment Director of Quality and Safety/ Chief Nurse Director

More information

1. Build core capability at all levels to improve organisational and individual performance;

1. Build core capability at all levels to improve organisational and individual performance; Graduate Development Program Australian Bureau of Statistics Workshop on Human Resources Management and Training Budapest 5-7 September 2012 Day 1 Session 4(a) Recruitment and training of new staff members

More information

EMERGENCY PREPAREDNESS POLICY

EMERGENCY PREPAREDNESS POLICY EMERGENCY PREPAREDNESS POLICY CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: Policy Emergency Planning PURPOSE This document sets out the strategic framework for the management of emergency preparedness

More information

Oil and Gas Project Survey Project Execution Phase (Onshore Support)

Oil and Gas Project Survey Project Execution Phase (Onshore Support) Oil and Gas Project Survey Project Execution Phase (Onshore Support) Who am I??? Currently been in the offshore industry for 10 years Graduate (BSC) in Computer Programming Graduate/Trainee Survey Engineer

More information

Entrepreneurs Programme - Business Growth Grants

Entrepreneurs Programme - Business Growth Grants Entrepreneurs Programme - Business Growth Grants Version: 15 July 2015 Contents 1 Purpose of this guide... 4 2 Programme overview... 4 2.1 Business Management overview... 4 3 Business Growth Grant... 5

More information

The Graduate School:

The Graduate School: The Graduate School: A Model to Enhance Quantity and Quality in PhD Production Maresi Nerad South African PhD Panel Report October 2009 South Africa s universities are confronted with two major challenges.

More information

UCDHR. HR Strategy Implementation & Quality Improvement Plan: 2012-2015

UCDHR. HR Strategy Implementation & Quality Improvement Plan: 2012-2015 UCDHR HR Strategy Implementation & Quality Improvement Plan: 2012-2015 HR Strategy Implementation Plan and Quality Improvement Plan Introduction This Action Plan is a combination of the HR Strategy Implementation

More information

Ministry Of Health Registration of Interest

Ministry Of Health Registration of Interest Ministry Of Health Registration of Interest Intermediaries Social Bond Pilot(s) Part 1 Instructions and Supporting Information What s inside? Introduction to Social Bonds Purpose of the ROI Instructions

More information

Brixton Live: Web development brief

Brixton Live: Web development brief Brixton Live: Web development brief 1. Context: Project overview and partners Kettle Partnership has been awarded a grant by Arts Council England to deliver Brixton Live, a website and mobile application

More information

The Continuum of Need. Information & guidance for services providing early help

The Continuum of Need. Information & guidance for services providing early help The Continuum of Need Information & guidance for services providing early help Why do we need a continuum? Teams have told us they want support with managing risk The Continuum of Need is being made available

More information

Performance & Talent Management

Performance & Talent Management Performance & Talent Management SuccessFactors Integrated Applications Analytics and Reporting 6 5. How are my people doing relative to our goals? Drill down to see who is in on target and who is behind..

More information

Internal Audit Quality Assessment Framework

Internal Audit Quality Assessment Framework Internal Audit Quality Assessment Framework May 2013 Internal Audit Quality Assessment Framework May 2013 Crown copyright 2013 You may re-use this information (excluding logos) free of charge in any format

More information

Incident Management Process Report Q1, 2011

Incident Management Process Report Q1, 2011 Incident Management Process Report Q1, 2011 Robert Gormley, Acting Process Owner 6 th April 2011 Our Incident Management process has been in place since November, supported by the UniDesk application.

More information

Youth Business International. Monitoring Evaluation and Learning Consultancy

Youth Business International. Monitoring Evaluation and Learning Consultancy Youth Business International Monitoring Evaluation and Learning Consultancy Youth Business International (YBI) is recruiting an experienced Monitoring, Evaluation and Learning Consultant to work on two

More information

ANNEX I TO REQUEST FOR PROPOSALS N PTD/09/032 TERMS OF REFERENCE FOR A

ANNEX I TO REQUEST FOR PROPOSALS N PTD/09/032 TERMS OF REFERENCE FOR A ANNEX I TO REQUEST FOR PROPOSALS N PTD/09/032 FOR A TRAINING PROGRAM TO IMPROVE ORGANIZATIONAL AND INDIVIDUAL PERFORMANCE WITHIN WIPO July 2009 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. STAKEHOLDERS INVOLVEMENT...

More information

Project Acronym: CRM ACCORD Version: 2 Contact: Joanne Child, Doncaster College Date: 30 April 2010. JISC Final Report CRM ACCORD

Project Acronym: CRM ACCORD Version: 2 Contact: Joanne Child, Doncaster College Date: 30 April 2010. JISC Final Report CRM ACCORD Project Acronym: CRM ACCORD JISC Final Report CRM ACCORD Page 1 of 22 Document title: JISC Final Report Last updated: April 2007 Table of Contents Acknowledgements... 3 Executive Summary... 4 Background...

More information

07 Our people and our corporate governance

07 Our people and our corporate governance 07 Our people and our corporate governance The department is committed to creating a capable, agile and innovative workforce to meet current and future business needs. To achieve this, the department has

More information

Good Practice Guidelines for Appraisal

Good Practice Guidelines for Appraisal Good Practice Guidelines for Appraisal Dr Laurence Mynors Wallis Dr David Fearnley February 2010 1 Contents Page Introduction 3 Link between appraisal and revalidation 4 Preparation for the appraisal meeting

More information

Second CRM Startup Pack

Second CRM Startup Pack Second CRM Startup Pack An Introduction Making Businesses Profitable www.secondcrm.com /secondcrm CRM for Startups Early stage Startups only focus on the idea and product and customer development is usually

More information

Section 15 Postgraduate Research Degree Regulations

Section 15 Postgraduate Research Degree Regulations Section 15 Postgraduate Research Degree Regulations Section15 (Approved at Academic Council 29 November 2013 Page 1 of 31 Table of Contents Page 1. Purpose 3 2. Scope 3 3. Background 3 4. Award Standards

More information

protect k ur yo id User Manual

protect k ur yo id User Manual protect User Manual Thank you for choosing protect your kid This user manual is intended to help you with the initial set-up of the app. The following pages provide precise, step-by-step instructions for

More information

QUALITY ASSURANCE OPERATIONAL FRAMEWORK. University of Liverpool. Liverpool, L69 7ZX. And. Laureate

QUALITY ASSURANCE OPERATIONAL FRAMEWORK. University of Liverpool. Liverpool, L69 7ZX. And. Laureate QUALITY ASSURANCE OPERATIONAL FRAMEWORK The University of Liverpool Liverpool, L69 7ZX And INTRODUCTION Laureate The Institutional Agreement is between (1) the University of Liverpool ( UoL ) whose registered

More information

OIST ERP Systems Renewal. April 2015

OIST ERP Systems Renewal. April 2015 OIST ERP Systems Renewal April 2015 ERP Systems at OIST The current OIST ERP (HR & Finance) systems are an impediment to the research, education, promotion and administrative activities of the University;

More information

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives Research and information management strategy 2015-18 Using research and managing information to ensure delivery of the Commission s objectives 1 1. Introduction This strategy sets out a range of research

More information

Guidance. Injection: Crafts Council s business development scheme Guidelines for Applicants. Crafts Council Registered Charity Number 280956

Guidance. Injection: Crafts Council s business development scheme Guidelines for Applicants. Crafts Council Registered Charity Number 280956 Guidance Injection: Crafts Council s business development scheme Guidelines for Applicants Crafts Council Registered Charity Number 280956 01 Injection: Crafts Council s business development scheme Guidelines

More information

Diploma of Project Management

Diploma of Project Management June August 2014 For Course Fees Regular Fee $4,950 Skills for All eligible $4,550* participants *Skills for All subsidy available for eligible participants. Check your eligibility at www.skills.sa.gov.au

More information

Best Practices for Helping All Students Get Ready for the SAT. Prepared for Idaho SDE January 2014

Best Practices for Helping All Students Get Ready for the SAT. Prepared for Idaho SDE January 2014 Best Practices for Helping All Students Get Ready for the SAT Prepared for Idaho SDE January 2014 SAT Readiness Program Agenda: SAT Introduction SAT Preparation The Official SAT Online Course PSAT Participation

More information

Student Research Experience Questionnaire (SREQ) Reports. Communication strategies for disseminating SREQ reports

Student Research Experience Questionnaire (SREQ) Reports. Communication strategies for disseminating SREQ reports GRADUATE STUDIES OFFICE Student Research Experience Questionnaire (SREQ) Reports 2010 Faculty responses Summary report 2 Communication strategies for disseminating SREQ reports Contents Introduction...

More information

Electricity Market Reform:

Electricity Market Reform: Electricity Market Reform: Consultation on Low Carbon Contracts Company s and Electricity Settlements Company s operational costs 2015/16 Government Response January 2015 Crown copyright 2015 URN 15D/001

More information

IT Governance Charter

IT Governance Charter Version : 1.01 Date : 16 September 2009 IT Governance Network South Africa USA UK Switzerland www.itgovernance.co.za [email protected] 0825588732 IT Governance Network, Copyright 2009 Page 1 1 Terms

More information

1. This Notice is issued pursuant to sections 35TA and 64(2) of the Insurance Act (Cap. 142) [ the Act ] and

1. This Notice is issued pursuant to sections 35TA and 64(2) of the Insurance Act (Cap. 142) [ the Act ] and Training Competency Requirement: Health Insurance 1 Notice No : MAS 117 Issue Date : 26 January 2004 Last revised on: 28 December 2015* TRAINING AND COMPETE NCY REQUIREMENT: HEALTH INSURANCE Introduction

More information

Unit ID: 482 Domain AUTOMOTIVE ELECTRICAL AND ELECTRONICS Title: Install and repair electrical lighting system of vehicles Level: 2 Credits: 6

Unit ID: 482 Domain AUTOMOTIVE ELECTRICAL AND ELECTRONICS Title: Install and repair electrical lighting system of vehicles Level: 2 Credits: 6 Unit ID: 482 Domain AUTOMOTIVE ELECTRICAL AND ELECTRONICS Title: Install and repair electrical lighting system of vehicles Level: 2 Credits: 6 Purpose This unit standard specifies the competencies required

More information

Policies, Procedures, Guidelines and Protocols

Policies, Procedures, Guidelines and Protocols Policies, Procedures, Guidelines and Protocols Document Details Title Complaints and Compliments Policy Trust Ref No 1353-29025 Local Ref (optional) N/A Main points the document This policy and procedure

More information

Quality Assurance of Medical Appraisers

Quality Assurance of Medical Appraisers Quality Assurance of Medical Appraisers Recruitment, training, support and review of medical appraisers in England www.revalidationsupport.nhs.uk Contents 1. Introduction 3 2. Purpose and overview 4 3.

More information

EXECUTIVE SUMMARY FRONT SHEET

EXECUTIVE SUMMARY FRONT SHEET EXECUTIVE SUMMARY FRONT SHEET Agenda Item: Meeting: Quality and Safety Forum Date: 09.07.2015 Title: Monthly Board Report- Publication of Nursing and Midwifery Staffing Levels June 2015 Exception Report

More information

Our Process: Website Design & Development

Our Process: Website Design & Development Our Process: Website Design & Development HOW WE BUILD YOUR VIRTUAL HABITAT The process for building your website is a lot like building a new home. Like any good architect, this means asking questions

More information

Page 1 of 12. 12 Research Degrees. Quality Handbook Chapter 12: Research Degrees QAP 0147

Page 1 of 12. 12 Research Degrees. Quality Handbook Chapter 12: Research Degrees QAP 0147 Page 1 of 12 12 Page 2 of 12 Contents 12.1 Purpose and scope of this chapter 4 12.2 Principles of research degrees 5 12.3 Processes for research degrees 6 12.3.1 Development and approval 6 12.3.2 Recruitment

More information

Establishing a Regulatory Framework for Credentialing

Establishing a Regulatory Framework for Credentialing 18 March 2013 Strategy and Policy Board 5 For decision Establishing a Regulatory Framework for Credentialing Issue 1. In 2012 Council agreed that the GMC should develop a regulatory framework for introducing

More information

Review of Non-Emergency Patient Transport Service in Bassetlaw

Review of Non-Emergency Patient Transport Service in Bassetlaw BASSETLAW DISTRICT COUNCIL Agenda Item No. HEALTH AND PUBLIC SERVICES SUB-COMMITTEE 10 MARCH 2014 Review of Non-Emergency Patient Transport Service in Bassetlaw The Health & Public Services Sub Committee

More information

RIBA Chartered Practice Helping you to make the most of your membership

RIBA Chartered Practice Helping you to make the most of your membership RIBA Chartered Practice Helping you to make the most of your membership Benefits and Services Handbook About this handbook The following pages in this handbook will take you through the practical benefits

More information

Hospice UK. Conference 2015. The Largest Annual Hospice Conference in the UK Sponsorship, Exhibition and Branding Opportunities

Hospice UK. Conference 2015. The Largest Annual Hospice Conference in the UK Sponsorship, Exhibition and Branding Opportunities Hospice UK Conference 2015 The Largest Annual Hospice Conference in the UK Sponsorship, Exhibition and Branding Opportunities November 10-12 ACC, Liverpool We are delighted to offer you the opportunity

More information

Online Store order process within SAP 2 nd December 2013

Online Store order process within SAP 2 nd December 2013 Information Systems Services Online Store order process within SAP 2 nd December 2013 Contents Overview of functionality within SAP... 2 Store transaction / order reporting... 2 Printing invoices... 3

More information

Supplier & Contract Management System (SCMS)

Supplier & Contract Management System (SCMS) Meeting of the Executive Member for Corporate Services and Advisory Panel 30 October 2007 Report of the Assistant Director Audit and Risk Management Supplier & Contract Management System (SCMS) Summary

More information

4a Revalidation: Guidance on Colleague and Patient Questionnaires Annex A. Revalidation: Guidance on Colleague and Patient Questionnaires

4a Revalidation: Guidance on Colleague and Patient Questionnaires Annex A. Revalidation: Guidance on Colleague and Patient Questionnaires 4a Revalidation: Guidance on Colleague and Patient Questionnaires Annex A Revalidation: Guidance on Colleague and Patient Questionnaires The document is intended to provide guidance for those involved

More information

StepStone PRODUCTS & PRICES. The job market of choice.

StepStone PRODUCTS & PRICES. The job market of choice. StepStone PRODUCTS & PRICES The job market of choice. THE JOB MARKET OF CHOICE CONTENTS 04 Job Listings 08 Additional Listing Products & Services 09 Employer Branding 12 DirectSearch 13 International Recruiting

More information

Palliative Care Link Nurse Program

Palliative Care Link Nurse Program Palliative Care Link Nurse Program Mallee Division 2009-2010 DRAFT V2 MDGP acknowledges the funding support from the Australian Government Department of Health and Ageing for this program. Table of Contents

More information

The PIRUS Code of Practice for recording and reporting usage at the individual article level

The PIRUS Code of Practice for recording and reporting usage at the individual article level PIRUS A COUNTER Standard The PIRUS Code of Practice for recording and reporting usage at the individual article level (Note: this draft is for public consultation only and is not yet ready for full implementation)

More information

QLS and FLPA Family Law Residential 2016 Sponsorship Prospectus

QLS and FLPA Family Law Residential 2016 Sponsorship Prospectus QLS and FLPA Family Law Residential 2016 Sponsorship Prospectus 10 21-23 July 2016 Sheraton Mirage Resort & Spa, Gold Coast Leading Queensland s legal profession Queensland Law Society (QLS) provides a

More information