Mechanical Engineering Department Senior Design Project
|
|
|
- Charleen Harrison
- 9 years ago
- Views:
Transcription
1 Mechanical Engineering Department Senior Design Project Effective Project Teams and Project Management Tools and Techniques Terry Russell OU ME Advisory Board Chairman
2 Ten Common Group Problems 1. Floundering 2. Overbearing participants 3. Dominating participants 4. Reluctant participants 5. Unquestioned acceptance of opinions as facts 6. Rush to accomplishment 7. Attribution 8. Discounts and plops 9. Wanderlust: digression and tangents 10. Feuding members Page 5
3 Nine Ingredients for a Successful Team 1. Clarity in team goals 2. Use of the scientific approach 3. Clearly defined roles 4. Clear communication 5. Beneficial team behaviors 6. Well-defined decision procedures 7. Balanced participation 8. Established group rules 9. Awareness of the group process Page 6
4 Values & Beliefs That Support Good Communication in Work Teams Each person is worthy of being treated with respect. Conflict can be managed to support win/win solutions. Disagreement is normal and a natural part of communication between any two people. Feelings should be dealt with as facts for the purpose of understanding the other person. Feedback should be given when requested or solicited (especially if critical). Members receiving feedback should feel free to ask any question they have concerning the feedback they receive. You can reject what the person says without rejecting the person. Dumping may feel good, but it rarely leads to improved communication between people and should be avoided. Rigid value positions and critical character judgments prevent good communication. A willingness to consider new information, input and an openness to be persuaded to another way of thinking, acting, etc., is necessary if high level consensus decisions are to be reached. Page 15
5 Decision Tree AUTOCRATIC WITH INPUT Decision-maker gets Information(not suggestions) from Individuals then makes the decision. One on one. COOPERATIVE The problem is shared with Individuals not as a group; suggestions are asked for, then the decision-maker makes the decision. No meeting COOPERATIVE WITH MEETING Problem is shared with whole group; collective suggestions are asked for; the decision-maker makes the decision. Must explain the decision back to people. AUTOCRATIC Decision is made alone by the decision-maker A DECISION NEEDS TO BE MADE CONSENSUS Problem is shared with the whole group; the decision is based on consensus. Page 16
6 Decision Tree (cont.) Questions to consider in the choice of a method for making decisions 1. Is one decision more likely to produce results than another, or will any do, as long as something is decided? 2. Does the leader have enough information to decide alone? (If no, autocratic mode is unwise.) 3. Does the success of the decision depend upon acceptance by the group? (If yes, drive for consensus) 4. Are members of the group likely to be in conflict? (If yes, consensus could be difficult.) 5. Can the members be depended upon to put the interests of the team ahead of self interests? (If no, consensus could be difficult). Agree on on Decision-making methods as as a team ground rule rule Page 17
7 Team Operating Procedures Team operating procedures form the backbone of team norms and expectations for new team members who will work together. These procedures require a significant amount of discussion, often raising points of ambiguity and conflicting assumptions among team members, and between team members and management. Before developing the operating principles, it should be decided by the chartering person or team which of the procedures have room for negotiation and which are fixed. For example, if it is expected that meetings will occur each week, then the team will not be deciding frequency of meetings. In this vein, try to facilitate the team to decide for themselves on the most effective principles (that confidentiality of discussions is a good idea, for example), and dictate no more than absolutely necessary. Remember, the process of developing the operating procedures is as important as the operating principles themselves are. Page 20
8 Team Operating Procedures To Specify Agenda: Attendance: Meetings: Decision Process: Minutes and Reports: Leader Role: Behavioral Norms: Confidentiality: Guests: Meeting Audits: Facilitator: Conflict: Recommendations, Suggestions: Commitments Outside Meetings: Who sets? When published? Input invited, etc. Excused absences, handling latecomers Times, frequency, place Consensus? Collaborative? Majority? Select a recorder, how? How are minutes approved? Where posted? Who types them? How are they distributed? How is it defined? How is leader selected? Expectations of the leader. Listening, interruptions, giving and receiving feedback, empathy. What goes outside the group? How are they invited? How excused? How frequent? Who is responsible? How selected? Expectations? Expected? How managed? How initiated? How routed? Who is informed? Expectations for follow-through on commitments for studies, information, data analysis, word processing, etc. Page 21
9 Example: Meeting Procedures and Ground Rules Team leader will monitor and control meeting to assure members have ability to participate without interruption. Minimal cross talk will be permitted and domination by any group of members is prohibited. Team recorder can interrupt for clarity. Team members are expected to: Be honest, open and caring. Come prepared to fully participate. Be prompt. Honor confidentiality. Notify team leader of impending absences No substitutes permitted. Meeting Logistics Meeting will be scheduled in advance as to date, time, and location, and be scheduled to allow sufficient time for member preparation. Meeting will start on time. No smoking permitted in meeting room. Refreshments to be provided and accessible during meeting. Maximum meeting length to be announced. Agenda and Minutes Preparation Planning worksheet will be used to establish agenda. Agenda of next meeting will be established at end of current meeting. Minutes and next meeting agenda to be issued in a timely manner. Page 22
10 Example: Meeting Procedures and Ground Rules (cont.) Conduct of Meeting 70% of member attendance is required for a quorum. Agenda to be review at start of meeting. Role of team leader, facilitator, recorder, timer are to be recognized and respected. Breaks to occur at a minimum of every 90 minutes with desired intervals of 60 minutes. Evaluate meeting at end for improvement ideas. Respect all input from members. Sense of humor is OK and fun is desired. OK to disagree Team consensus to be used to resolve issues. Action items. to be clearly defined with identified responsibilities. Feedback is at the option of the member. Process checks will be conducted at a frequency determined by team leader and members. Seven-step model is desired approach to problem solving and process improvement. Social Interaction is Desired Page 23
11 A Meeting is a Process that Can be Improved MEETING PROCESS PLANNING MEETING MANAGEMENT TOOLS MEETING PLANNING SHEET AND AGENDA CONDUCTING AGENDA ENSURING FOLLOW-UP ACTION REGISTER EVALUATING PROCESS CHECK Page 24
12 Example Meeting Agenda Team: EDCP Implementation Date: September 10, 2007 Time: 11:00 a.m.-12:00 p.m. Location: Evendale: ESD&I Conference Room Lynn: Paula Wright s Office Roles: Leader: Mike Smith Facilitator: Tim Jones AGENDA ITEM DESIRED OUTCOME TIME ALLOTTED WHO RESPONSIBLE 1. Agenda Review Consensus on agenda 11:00-11:05 Tim 2. Action Items Status on 04/25 action items/pcb operation discussion 11:05-11:15 Tim/Jeff/Team 3. Communication QMI Ideas and suggestions for Communications Team/EDCP 11:15-11:25 George/Paula/Team article publication schedule 4. Training QMI Update on Training Team activities 11:25-11:35 Moses/Team 5. EDCP Implementation Metrics Continued discussion of proposed metrics and action 11:35-11:55 Team plan for implementation 6. Wrap-up Summary of action items/agenda for meeting 11:55-12:00 Tim/Team 7. Adjourn 12:00 Put Put Team Meeting Agendas in in this this Format Page 26
13 Example Action Register Team: EDCP Implementation Date: September 10, 2007 Team Leader: Mike Smith Action Item Who Is Going To Do What? When Completed 1. J. Martin Discuss PCB Operation 05/02 Status 2. J. Stow Check with Al Heyson for the existence of 0502 Readiness Review documents 3. M. Moore Set up training team review of GCRB Team 05/02 building concerns with G. Villena and D. Newcomb 4. B. Bessom Support formation of Best Practices and Lessons 05/23 Herzner meeting 04/25 Learned Database Team 5. Resource Meet with all other sub-teams to ensure that the 05/23 Sub-team meetings in Sub-Team identified EDC resource barriers are addressed preparation 6. T. Russell Terry to get Tollgate Review and Target Costing 05/23 Delayed pending modules scheduled for all VP s completion of Tollgate Review module 7. T. Kinne Integrate Lynn LM1600 Quality System Review with 05/23 P. Wright activities of Roger Pfalzgraf Team 8. T. Russell Work with Al Parker to integrate ISO /30 requirements into EDCP checklists 9. Team Submit difficulties with using WAIS to Bob Bessom On-going Closed temporarily Page 28
14 Team Process Check Circle the number of each dimension which reflects your rating of the group process. No agenda or did not follow the agenda A few key members dominating and some members not participating More than one person talks at a time; repetitions, interruptions, and side conversations No attempts to bring the team back on track and encourage equal participation Team decisions were inferior to individual assessments ON-TRACK PARTICIPATION LISTENING LEADERSHIP DECISION QUALITY FUN Followed the agenda - no digressions Everyone contributes and is involved in team decisions One person talks at a time; clarifying and building of ideas Team leader and team intervene to keep the team on track and actively manage equal participation Team expertise and decisions were superior to individual judgments Page 30
15 Project Management Tools and Techniques Scorecards Project Plan Risk Rating Criteria Risk Management Process
16 Scorecards Display of Project Quantifiable Measurements in Visual Form Initiated at Beginning of Project Used to Track Project Progress to Defined Goals over Time Provide Project Reviewers Quick and Efficient Tracking Ability Used During Reviews Throughout Project Duration A Good Good Set Set of of Scorecards Displays Key Key Project Challenges, Requirements, Schedule and and Cost Cost Goals; and and the the Team s Progress to to the the Goals Goals
17 Scorecards Should Be Related to: Critical To Quality Characteristics (CTQs) Project Cycle Time Error Free Processes Cost and/ or Cost Reduction Program Risks Others...
18 Engine Weight Scorecard ENGINE WEIGHT IN LBS T25 SENSOR FUEL DELIVERY SYS. RADIAL AUGMENTOR -129 AVG. CIP EXHAUST NOZZLE LCBF ROTOR REDUCED DRAG NOZZLE FRONT FRAME (BLADE OUT) REVISED TECH REQUIREMENTS TECH REQUIREMENTS DP REVISION FOR BLADE OUT CHEM MILL + $8K COMPOSITE FAN DUCT -$5K EJECTOR NOZZLE 3880 Aug-07 Oct-07 Dec-07 Feb-08 Apr-08 TIME Jun-08 Aug-08 Oct-08 WEIGHT RISK ABATEMENT
19 Tollgate Completion Status Scorecard The basic chart shown here and the activities included under each tollgate are to be adapted by each NPI Team to suit the mission and deliverables of the team. Key Elements NPI PROJECT TITLE TITLE Tollgate Completion Schedule (Month/Yr) (Month/Yr) (Month/Yr) (Month/Yr) Idea Strategize Get Consensus Feedback Propose - Prepare detailed plan (Month/Yr) 6 Prepare Launch Launch (Month/Yr) (Month/Yr) (Month/Yr) (Month/Yr) Design Develop Validate Produce & Support 100% + Need identified for NPI Process. + Establish Senior Leadership Team. + Identify Leadership Team. + Establish NPI Team. + Evaluate business impact. + Define initial program requirements. + Conduct Tollgate 1 review. + Define key technical requirements. + Brainstorm issue. + Develop risk assessment criteria. + Finalize alternative approaches (strategy). + Identify manufacturing approaches. + Perform risk assessment + Prepare prelim. program plan + Conduct Tollgate 2 review. + Expand team membership. + Begin risk abatement plans. + Generate preliminary approach. + Obtain stakeholder feedback and review approach as required. + Review Tollgate 3 checklist. + Conduct Tollgate 3 review. + Establish program strategy. + Communicate status of program direction. + Define detailed customer requirements. + Initiate QFD to identify top-level CTQs. + Prepare detailed proposal/ program plans. + Obtain customer buy-in. + Conduct Tollgate 4 review. + Finalize technical requirements + Update business and technical plans. + Identify NPI metrics. + Establish launch requirements. + Confirm funding, participants, and facilities available. + Conduct Tollgate 5 review. + Issue launch documents. + Identify critical path elements. + Finalize best options. + Finalize manufacturing processes. + Identify design review schedule. + Review Tollgate 6 checklist. + Conduct Tollgate 6 review. + Launch program. + Refine critical path elements/ schedule. + Identify CTQs. + Initiate concurrent detail design & manufacturing process planning. + Hold detailed design reviews. + Finalize detail design/test definition. + Review Tollgate 7 checklist. + Conduct Tollgate 7 review. + Procure/manufacture hardware. + Validate process capability. + Finalize detailed cert/ qual test plans. + Prepare test hardware. + Review Tollgate 8 checklist. + Conduct Tollgate 8 review. + Complete component tests, engine, and flight testing as required. + Confirm all program requirements are met, and complete documentation. + Obtain customer/ agency approval. + Review Tollgate 9 checklist. + Conduct Tollgate 9 review. + Review producibility data. + Review field data. + Identify ongoing improvements. + Hold periodic Tollgate 10 reviews. 90% 80% 70% 60% 50% 40% 30% Percent Tollgate Checklist Items Complete 20% 10% 1% 2% 5% 8% 10% 20% 40% 70% 95% 100% 0% Percent Overall NPI Program Complete NPI Team Team Mission Mission
20 Project Plan Documents Activities Required for the Execution and Control of a Project Provides Precise Details on What Needs to be Done, When it needs to be Complete, What it will Cost, and Who is Responsible to Keep Project Participants Informed Project Plan Advances a Product from Generation of of Product Idea Through Transition into Continuous Operations
21 Value of the Project Plan Provides Project Completion Date Based on Logical Flow of Work and Duration of Work Tasks Provides Early Warning for Quick Intervention of Problems Allows Teams to Assess the Impact of Problems and Make Necessary Adjustments to the Project Plan Allows for the Recording and Tracking of Risk Abatements Provides the Project Team with a Vehicle for Consistently Communicating Project Status with Business and Customer
22 Critical Path Schedule Method THE CRITICAL PATH - A sequence of activities in the network having the longest total duration of the project. Activities along the Critical Path have zero or negative slack/float. The Critical Path can be shown on any type of network and/or Gantt Chart.
23 Links with Team Concept Facilitates all functions understanding how and when they interact with one another Allows teams to focus on the process and make improvements from a common understanding of what the process is Allows and facilitates early involvement of suppliers/manufacturers in the design stages Facilitates risk assessment/ abatement based on knowledge of the process: Helps eliminate missed, redundant, inconsistent analysis and/ or effort When teams meet, the critical path schedule provides a focal point for agenda items Helps teams manage their own processes and provides a tool for reducing cycle and establishing best practice templates
24 Example Critical Path Schedule (Microsoft Project) ID Task Name /6 (Aero/Mechanical Test) /7 (Aero/Performance Test) /7B (Radial Aug Demo test) 4 Qualification Program Definition /8 (Aeromech. Even /8 (Aeromech /9 (Perf/Oper Qual-100 Hrs) /3 (Endurance Qual-4300 TAC) 9 LCBF Component Tests 10 Radial Augmentor Component Tests 11 Qualification Reports to USAF 12 USAF Agreement on Reports 13 Qualification Complete 14 Support Equipment Dev't 15 Repair Development 16 Tech Data Definition 17 Deliver 1st EFE Flt Test Eng & Spare 18 EFE Flight Test Program 19 EFE Production Engine Deliveries Start Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 11/6 2/29 6/22 10/8 11/22 1/10 5/2 9/24 2/1 3/1 3/2 6/30 12/2 9/16 2/10 4/12 3/10 8/25 1/1 6/30 9/1 4/1 8/26 10/27 10/28 12/8 12/9 1/1 12/31 7/1 11/3 6/30 7/31 8/1 5/31 5/30
25 What is Risk? The probability of an undesirable event occurring and the impact of that event to the project or program
26 Risk Management Process Technique Used to Manage Negative Events that Could Occur in the Execution of a Project Provides Valuable Information to the Business and Customer for Reducing Risks Involved in Changing a Project Specifies Early in the Project What is Needed to Reduce Risks to an Acceptable Level Initial Identification, Quantification and Prioritization of Risk Statements at Beginning of Poject Risk Abatement Plans are Monitored Throughout the Project The The Purpose of of Performing the the Risk Risk Management Process is is to to Identify all all the the Events that that Could Could Prevent Project Team Team Success
27 What is The Value of Using The Risk Management Process? Reduces overall program costs and schedule impact by stimulating up-front team planning to reduce or eliminate program risk Allows business to formally share in the risk decisions Some customers require it It increases customer confidence in our ability to identify and manage risks
28 Risk Rating Criteria Start of Risk Management Process Guidelines for Judging Risk Items so that Risks can be Rated from High to Low Removes Uncertainty from the Risk Impact Evaluation and Ensures Teams are Rating the Risk Items Consistent with Leadership Risk Tolerance Developed by Faculty and Project Team Establishing Definitions of of High, Medium and Low for for Probability and Impact Ratings is is the the Most Important Outcome of of Risk Rating Criteria Development
29 Risk Rating Criteria Risk criteria to consider for High, Medium, or Low: Probability that Risk Issues will Occur: High Medium Low Likely occurrence to happen Major uncertainties/unknowns exist Unlikely to occur but could Significant uncertainties exist Very unlikely to occur Almost no uncertainties exist
30 Example of Risk Rating Criteria Manufacturing Process Improvement Project Impact of Risk on Project Mission TECHNICAL REQUIREMENTS SCHEDULE COST HIGH RISK Implementation of Project Improvements Require Major Re-Design and Modifications Implementation of Improvements that Exceeds the 9 Month Schedule by 6 Months Implementation Costs that Exceed Target Cost by $50K MEDIUM RISK Implementation of Project Improvements Require Some Significant Re- Design and Modifications Implementation of Improvements that Exceeds the 9 Month Schedule by 3-6 Months Implementation Costs That Exceed Target Cost by $25K to $50K LOW RISK Implementation of Project Improvements Require Minor Re-Design and Modifications Implementation of Improvements that Meet the 9 Month Schedule Implementation Costs Less than $25K or Meets Target Cost
31 Risk Prioritization Matrix Probability H H M L High Risk 6-9 Medium Risk 3-4 Low Risk 1-2 L M H Impact Risk Risk Rating = Probability x Impact
32 Key Steps of the Risk Management Process 1. Identify Risk Rating Criteria 2. Obtain Agreement on Risk Rating Criteria 3. Develop Risk Statements and Combine into Logical Risk Categories 4. Quantify the Risk Statements 5. Select Risks Needing Abatement 6. Define and Document All Needed Risk Abatements 7. Prepare Risk Management Summary Report 8. Obtain Approval of Risk Abatement Plan 9. Track and Monitor Risk Abatement 10. Identify and Evaluate Additional Risks 11. Communicate Risk Management Status
33 Potential Risk Issue Examples Technical program requirements have not been defined Assigned technical team lacks experience New or unfamiliar technical approach has not been defined New suppliers lack of technical experience will cause delays Inadequate technical analysis methods will cause problems Little or no recovery time in the schedule will cause delays Resources or technology not available in time Schedule of tasks has not been communicated Little or no recovery in the budget will cause cost constraints Changing requirements will increase costs Missed schedules will increase costs Poor process capability will impact parts and inspection cost
34 Risk Abatement Plan Develop the Abatement (Risk Reduction) Plans for the High or Medium Rated Risks as Identified For Elements of High Risk Consider the Following: Assure that if implemented, the risk level of associated element is reduced to medium or low The risks are documented on the Risk Report Matrix The Risk Abatement Plan is written Responsibility for the risk plan implementation, measurement, tracking and documentation is identified and included in the Critical Path Schedule If no effective abatement plan can be identified consider dropping the project For Elements of Medium Risk Consider the Following: Create a Scorecard to monitor the risk over time. The NPI Project team will decide if a Risk Abatement Plan is required
35 Risk Abatement Plans Technical Abatement Plan Examples: Clarify and strengthen the technical requirements. Be very specific Identify limitations early in the design process by a test...analysis Involve manufacturing sources early in the design/mfg. process Conduct producibility studies early Identify and provide technical tools that increase productivity Conduct Concept Reviews Implement a technical freeze and technical change process Apply performance modeling, simulation, and analysis early in the design process Conduct periodic technical reviews tied to milestones
36 Risk Abatement Plans Schedule Abatement Plan Examples: Include the duration of Technical Abatement Plans in the Critical Path Schedule. Negotiate additional schedule relief as required. Strengthen and clarify the definition of tasks, milestones, and deliverables Implement formal schedule freeze and schedule change process Schedule critical resources and technology within acceptable windows of the Critical Path Schedule Define and implement periodic supplier reviews. Ensure that suppliers are utilizing adequate scheduling and monitoring tools. Include suppliers as part of the scheduling, design, and team Evaluate serial vs. parallel task; increase resource levels performing the tasks
37 Risk Abatement Plans Cost Abatement Plan Examples: Include the cost of Schedule and Technical Abatement Plans in the budget baseline; negotiate a new budget if required Validate the budget by use of Team Reviews of bottom-up estimates Define a clear statement of work (SOW), program requirements etc. Get commitments that control or stabilize cost benefit assumptions Decrease technical scope; reduce and manage cost via earned value management methods; conduct periodic cost performance reviews Use Design to Cost and/ or Target Costing methods
38 Risk Example Risk Category : Lack of Plan Risk Issue : Late hardware deliveries will delay assembly and test schedules Cause of Risk : Changes as a result of program changes, process capability, supplier selections, or cost reduction Probability of Event: 3 Risk Rating : (P*IT)+(P*IS)+(P*IC) = T Impact on Technical Impact on Schedule Impact on Cost Total Score (3x1) + (3x3) + (3x1) = 15 Abatement Plan Owner: Approach: Deliverables & Date(s): Status: (R, Y, G) Senior Design Project Team Progress Y Cost (9-6) Schedule (9-6) Technical (9-6) Complete program CPS planning up front, select suppliers early and weigh project changes against cost and schedule impact Program plan by 1 October 2008 Supplier selection by 15 November 2008 Project change process defined by 22 November 2008 Effectiveness Y
39 Program Risk Scorecard BOTTOMS UP ASSESSMENT CLEANUP BY NPI TEAM LEADERS TEMPERATURE PROFILE & STG 1&2 DISK LCF ADDED ASSESSMENT 800 TG 6 PLAN 700 ~ 7 NEW RISKS ADDED 600 TMF SCORE 500 FETT FIRST BOTTOMS UP RISK ASSESSMENT LOOKING AT MORE THAN NEW PORTIONS NEW RISKS CEO REVIEWS TOPS DOWN RISK ASSESSMENT COMPARING ONLY NEW FEATURES SETT PRODUCTION A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O
Example of Tollgate-Based Project Management Template from Industry
Example of Tollgate-Based Project Management Template from Industry Tollgate Project Management Process: Define tollgates and checklist items to be completed for each tollgate Project reviews are based
Body of Knowledge for Six Sigma Lean Sensei
Body of Knowledge for Six Sigma Lean Sensei What to Prepare For: The following is the Lean Six Sigma Certification Body of Knowledge that the exam will cover. We strongly encourage you to study and prepare
Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
Body of Knowledge for Six Sigma Green Belt
Body of Knowledge for Six Sigma Green Belt What to Prepare For: The following is the Six Sigma Green Belt Certification Body of Knowledge that the exam will cover. We strongly encourage you to study and
CHANGE MANAGEMENT PLAN WORKBOOK AND TEMPLATE
CHANGE MANAGEMENT PLAN WORKBOOK AND TEMPLATE TABLE OF CONTENTS STEP 1 IDENTIFY THE CHANGE... 5 1.1 TYPE OF CHANGE... 5 1.2 REASON FOR THE CHANGE... 5 1.3 SCOPE THE CHANGE... 6 1.4 WHERE ARE YOU NOW?...
PROJECT PLAN FOR. Project Name Here
PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project
PROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
The Enterprise Project Tollgate Process
McMaster University Xerox Centre for Engineering Entrepreneurship and Innovation xceei.mcmaster.ca The Enterprise Project Tollgate Process June 2014 Contents Enterprise Project Tollgate Process... 2 Appendix
Business Continuity Position Description
Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 2 Career Path... 3 Explanation of Proficiency Level Definitions... 8 Summary
Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute
Certificate In Project Management (CIPM)
Conceptualize Plan Plan & Deliver Organize Implement Control Change if Required Integrate Deliver & Closeout Knowledge Leverage Certificate In Project Management (CIPM) Course Overview The Certificate
McKINSEY & COMPANY NONPROFIT BOARD SELF ASSESSMENT TOOL OVERVIEW
OVERVIEW The Nonprofit Board Self Assessment Tool is designed to help nonprofit organizations assess their board's and identify priorities for board activities going forward. We believe this combination
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
The Plan s Journey From Scope to WBS to Schedule
The Plan s Journey From Scope to WBS to Schedule Presented by: Rick Clare, CBAP, PMP, OCP, CSM PM Centers USA, LLC. 2013 Company Background Consulting and Training (Virtual, Public and Private Training)
PROJECT RISK MANAGEMENT
PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized
MODULE TWO PROJECT MANAGEMENT BACKGROUND & COMMUNICATION
Syed Quadri, PMP Region 5 RPM MODULE TWO PROJECT MANAGEMENT BACKGROUND & COMMUNICATION 0 Project Management Background Topics to be covered: Benefits of using PM tools PMI and PMBOK Strategic Project Management
<project name> COMMUNICATIONS PLAN
COMMUNICATIONS PLAN Version [n.n Month Day, Year] Project Sponsor: [Name of Business Sponsor] Project Manager: [Name of Project Manager] Project Number: [Number Assigned to the Project] Document History
Board Self-Evaluation Questionnaire
Board Self-Evaluation Questionnaire A Tool for Improving Governance Practice For Voluntary and Community Organizations Guidelines Non-Profit Sector Leadership Program College of Continuing Education VERSION
PROJECT MANAGEMENT PLAN <PROJECT NAME>
PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
IT Service Provider and Consumer Support Engineer Position Description
Engineer Position Description February 9, 2015 Engineer Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
How To Monitor A Project
Module 4: Monitoring and Reporting 4-1 Module 4: Monitoring and Reporting 4-2 Module 4: Monitoring and Reporting TABLE OF CONTENTS 1. MONITORING... 3 1.1. WHY MONITOR?... 3 1.2. OPERATIONAL MONITORING...
pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage
Business Analyst Position Description
Analyst Position Description September 4, 2015 Analysis Position Description September 4, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
PMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
Project Knowledge Areas
From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.
1 Project Management Methodology
1 Artech s is intended to promote the delivery of quality products that meet customers needs and results in projects that are completed on time and within budget The objective of the methodology is to
Leadership Development Best Practices. By Russel Horwitz
Leadership Development Best Practices By Russel Horwitz 1 December 2014 Contents The case for leadership development 4 Creating a strategy 4 Best practices 5 1. Align to organizational strategy 5 Begin
TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.
Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide
Project Management Office (PMO)
Contents I. Overview of Project Management...4 1. Project Management Guide (PMG)...4 1.1 Introduction...4 1.2 Scope...6 1.3 Project Types...6 2. Document Overview, Tailoring, and Guidance...7 3. The Project
POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections
POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections Policy Subject: Policy Number: Project Management 1.1.5 Date of Issue: Authority: Effective Date: May 29, 2009 Signature on File
Shared Solutions: An Overview Special Education Policy and Programs Branch Ministry of Education
Shared Solutions: An Overview Special Education Policy and Programs Branch Ministry of Education Table of Contents 1. Shared Solutions: Overview 2. Understanding Conflict 3. Preventing Conflicts 4. Video:
Abar Solutions Petroleum Consultancy & Training Qualified From KPC Training & Consulting Services Provider. Code Period Language Start End Location
Training Course : Project Management Skills & Estimation Development Training Course For One Week In Canada, Montreal, Hyatt Regency Montreal Which Be Held As Under Details : Tel. : 00965 22610021 99600277,
Essential Elements for Any Successful Project
In this chapter Learn what comprises a successful project Understand the common characteristics of troubled projects Review the common characteristics of successful projects Learn which tools are indispensable
Minnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
Program theory and logic models Evaluation resources from Wilder Research
Wilder Research Program theory and logic models Evaluation resources from Wilder Research All human service programs are designed to make a difference in the lives of people or to improve our society.
Project Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
Managing IT Projects. Chapter 2 The PMI Framework
Managing IT Projects Chapter 2 The PMI Framework The PMI Framework The Project Management Institute,USA is an internationally acclaimed organization Devoted to Creation & sharing of knowledge in the area
Chapter 3 Managing the Information Systems (IS) Project
Content Chapter 3 Managing the Information Systems (IS) Project Process of managing IS projects Skills required to be an effective project manager Skills and activities of a project manager during project
American Society for Quality (ASQ) CERTIFIED SIX SIGMA GREEN BELT (CSSGB) BODY OF KNOWLEDGE 2014
American Society for Quality (ASQ) CERTIFIED SIX SIGMA GREEN BELT (CSSGB) BODY OF KNOWLEDGE 2014 Included in this body of knowledge (BOK) are explanations (subtext) and cognitive levels for each topic
EXHIBIT 2-2-C PROGRESS SCHEDULES
EXHIBIT 2-2-C PROGRESS SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The work specified in this section consists of furnishing transportation, labor, materials, equipment and incidentals necessary for preparation,
The Fast Track Project Glossary is organized into four sections for ease of use:
The Fast Track Management Glossary provides a handy reference guide to the fast track management model, encompassing the concepts, steps and strategies used to manage successful projects even in the face
Crosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
Effective Project Kick-off Meetings
Effective Project Kick-off Meetings Purpose: Understand how, when and why to conduct a project kickoff meeting Audience: Project managers and team members Learning Objectives: Identify and assemble the
Project Management Framework
Information Services Project Management Framework October 2003 Document ID No. Page 1 of 1 Contents 1. Introduction Page 3 2. Use of Framework Page 3 3. Project Register and Monitoring Page 4 4. Project
Program Management Toolkit Concept and Contents
Program Management Toolkit Concept and Contents Audrey Taub Charlene McMahon 15 Feb 2001 Organization: W063 Project: 01CCG100 Purpose of PM Toolkit The purpose of the this Toolkit is to provide convenient
Every Student I Every Day I Every Possibility
For the Facilities Master Plan March 4, 2015 1 Introduction This has been prepared to describe a proposed process to be implemented in order to develop comprehensive Facility Master Plans for all schools
PROJECT AUDIT METHODOLOGY
PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit
Conducting Effective Change Management for Your Oracle E-Business Suite Implementation. Robert E. Henry AST Corporation
Conducting Effective Change Management for Your Oracle E-Business Suite Implementation Robert E. Henry AST Corporation TOPICS The necessity of change management Change management methodology Successful
HIMMELMAN Consulting 210 Grant Street West, Suite 422 Minneapolis, MN 55403-2245 612/998-5507 [email protected]
HIMMELMAN Consulting 210 Grant Street West, Suite 422 Minneapolis, MN 55403-2245 612/998-5507 [email protected] COLLABORATION FOR A CHANGE (revised January 2002) Definitions, Decision-making models,
OVERVIEW. Microsoft Project terms and definitions
PROJECT 2003 DISCLAIMER: This reference guide is meant for experienced Microsoft Project users. It provides a list of quick tips and shortcuts for familiar features. This guide does NOT replace training
Customer Satisfaction Using Surveys
Introduction Customer Satisfaction is the measure that indicates current and can be a leading indicator for future performance. Although each individual or organization may have their own expectations,
Project Management Planning
The Project Plan Template The Project Plan The project plan forms the basis for all management efforts associated with the project. A project plan template is included in this document. The information
Step by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
For Articulation Purpose Only.
E328 Project Management (4 Modular Credits) This document addresses the content related abilities, with reference to the module. Abilities of thinking, learning, problem solving, team work, communication,
JAD Guidelines. Description
Joint Application Development (JAD) sessions are highly structured, facilitated workshops that bring together customer decision makers and IS staff to produce high-quality deliverables in a short time
Module 1 Diploma of Project Management
Module 1 Diploma of Project Management Project Management Fundamentals in association with This two day course takes participants through all aspects of Project Management and provides in depth examination
Project Execution - PM Elements
Performance Initial Release 1. Introduction to Project Tracking and Reviewing Once a project has advanced to the phase of performance, the consistent and constant flow of information on the true status
Unit 1: Introduction to Quality Management
Unit 1: Introduction to Quality Management Definition & Dimensions of Quality Quality Control vs Quality Assurance Small-Q vs Big-Q & Evolution of Quality Movement Total Quality Management (TQM) & its
Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness
General Information Company: Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness Employee No: Detail Job Title: Coordinator of Data Reporting
Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500
Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: [email protected] Phone:
Ingredients for Effective Meetings and Team Communication
Ingredients for Effective Meetings and Team Communication Grace L. Duffy and John W. Moran (Originally published in Applications and Tools for Creating and Sustaining Healthy Teams, 2011) Working effectively
MNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
Project Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project
Principles of Supervision MGT 2220 Chapter 8 The Supervisor as Leader
Principles of Supervision MGT 2220 Chapter 8 The Supervisor as Leader If people see you looking out only for your own best interests, they will not follow you. - Carlos Gutierrez, U.S. Secretary of Commerce
CONDUCTING EFFECTIVE MEETINGS WORKBOOK A BASIC BUSINESS VICTORY GUIDE
CONDUCTING EFFECTIVE MEETINGS WORKBOOK A BASIC BUSINESS VICTORY GUIDE This book was developed by James H. Saylor Copyright 2006. All rights reserved. Printed in the United States of America. Except as
Board Charter. May 2014
May 2014 Document History and Version Control Document History Document Title: Board Charter Document Type: Charter Owner: Board [Company Secretary] Description of content: Corporate Governance practices
Introduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
Best Practices for Managing and Working with Virtual Teams. Discussion Question
Best Practices for Managing and Working with Virtual Teams Gina Abudi, MBA Discussion Question What are your challenges managing and working on virtual (remote) teams? 2 Copyright 2014 Abudi Consulting
TEAM PRODUCTIVITY DEVELOPMENT PROPOSAL
DRAFT TEAM PRODUCTIVITY DEVELOPMENT PROPOSAL An initial draft proposal to determine the scale, scope and requirements of a team productivity development improvement program for a potential client Team
CPM -100: Principles of Project Management
CPM -100: Principles of Project Management Lesson E: Risk and Procurement Management Presented by Sam Lane [email protected] Ph: 703-883-7149 Presented at the IPM 2002 Fall Conference Prepared by the Washington,
Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs
HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing
Program Step III: Evaluate HIV Quality Management Program.
69 Program Step III: Evaluate HIV Quality Management Program. The Big Picture Project Cycle Program Cycle In the same way clinical aspects of care are routinely reviewed and changed, the HIV quality program
pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development
Input, Output and Tools of all Processes
1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) [email protected] 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /
FUNCTIONAL ANALYSIS AND ALLOCATION
Functional Analysis Allocation CHAPTER 5 FUNCTIONAL ANALYSIS AND ALLOCATION 5.1 INTRODUCTION The purpose of this systems engineering process activity is to transform the functional, performance, interface
Sample Two-Day Project Management Training with Simulation
Merit Systems LLC 125 Strafford Avenue, Suite 222 Wayne, PA 19087-3333 610-225-0193 FAX 610-225-0194 www.meritsystemsllc.net Sample Two-Day Project Management Training with Simulation Planned Module or
Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects
Project Time Management Chapter 6 Importance of Project Schedules Managers often cite delivering projects on time as one of their biggest challenges Time has the least amount of flexibility; it passes
THE PROJECT MANAGEMENT KNOWLEDGE AREAS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human
Project Management Certificate (IT Professionals)
Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.
Information Technology Project Oversight Framework
i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11
Project Management Planning
Overview of Project Scheduling Following the definition of project activities, the activities are associated with time to create a project schedule. The project schedule provides a graphical representation
INFORMATION TECHNOLOGY PROJECT MANAGEMENT ANALYST I / II / III
Monterey County INFORMATION TECHNOLOGY PROJECT MANAGEMENT ANALYST I / II / III DEFINITION Under direction, plans, organizes, communicates and manages information technology projects to meet customer expectations
Overview. The Concept Of Managing Phases By Quality and Schedule
The Project Management Dashboard: A Management Tool For Controlling Complex Projects Project Management White Paper Series--#1001 John Aaron, Milestone Planning And Research, Inc. 5/14/01 Overview The
Project Management. An Overview for IT. Author: Kevin Martin & Denise Reeser
Project Management An Overview for IT Author: Kevin Martin & Denise Reeser Agenda Best Practices (5 min) Preliminary Assessment (10 min) The Need for Project Management (15 min) Involvement of EPMO (10
Centre for Learning and Development
The Leadership and Management Development Strategy was developed to endorse learning and development opportunities to strengthen the leadership and management capacity of the Newfoundland and Labrador
TenStep Project Management Process Summary
TenStep Project Management Process Summary Project management refers to the definition and planning, and then the subsequent management, control, and conclusion of a project. It is important to recognize
Conducting an Effective Neighborhood Association Meeting. Adapted from City of Arlington, Texas
Conducting an Effective Neighborhood Association Meeting Adapted from City of Arlington, Texas Making Your Meetings the Best Select a neutral place to meet. Plan your meeting. Always start and end on time.
IT Project: System Implementation Project Template Description
2929 Campus Drive Suite 250 IT Project: System Implementation Project Template Description Table of Contents Introduction... 2 Project Phases... 3 Initiation & Requirements Gathering Milestone... 3 Initiation
Project Charter Client: IPS
Project Summary Project* IPS Integration with Global Financials Client* Mercer IPS Primary Contact Chi Swain Engagement Manager* Project Manager* Tracking/Billing Code* Description* Irene Spyke Joy Wallace
Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.
INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing
Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK
Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK Lewis Gray, Ph.D., PMP Abelia Fairfax, Virginia USA www.abelia.com Copyright 2002 by Abelia Corporation. All rights reserved
Certification Exam Objectives: PK0-003
Certification Exam Objectives: PK0-003 INTRODUCTION The CompTIA Project + examination is designed for business professionals involved with projects. This exam will certify that the successful candidate