Example of Tollgate-Based Project Management Template from Industry
|
|
|
- Corey Park
- 10 years ago
- Views:
Transcription
1 Example of Tollgate-Based Project Management Template from Industry Tollgate Project Management Process: Define tollgates and checklist items to be completed for each tollgate Project reviews are based on checklist items at each tollgate Example Discussion: The example on the next page shows a 10-tollgate template. The number of tollgates used can be changed. For this example items 1-6 correspond to Defining the problem and Formulating solutions, plus numerous project management tasks. Tollgates 7, 8 and 9 correspond to detailed design and development Tollgate 10 covers field support, a very important component of a realworld product development project Chart supplied by Terry Russell, OU ME Advisory Board Chairman
2 GE Aircraft Engines Key Elements GE GP7000 Tollgate Completion Schedule (9/17/96) 1 (9/30/96) (10/18/96) (11/30/96) (1/10/97) (3/31/97) (9/97) (4/98) (12/99) (12/00) Launch Idea Strategize Get Consensus Feedback Propose - Prepare detailed plan Prepare Launch Design Develop Validate Produce & Support 100% + Need identified for NPI Process. + Establish Senior Leadership Team. + Identify Leadership Team. + Establish NPI Team. + Evaluate business impact. + Define initial program + Conceptual designs evaluated. + Tollgate 1 checklist review completed. + Define key technical + Brainstorm issues. + Develop risk assessment criteria. + Hold conceptual design & program cross functional + Finalize alternative approaches (strategy). + Identify manufacturing approaches. + Perform risk assessment. + Selling price established, target cost reviewed, current capability cost defined. + Prepare prelim. program plan. + Tollgate 2 checklist review completed. +Expand team membership. + Begin risk abatement plans. + Generate preliminary approach. + Obtain stakeholder feedback and revise approach as required. + Vendor partners identified. + Identify installation impacts. + Customer study deck complete. + Engine operability & deterioration requirements defined. + Detailed maintenance cost rolled up. + Airframer acceptance of design. + Confirm all technologies on hand. + Review Tollgate 3 + Conduct Tollgate 3 + Establish program launch scenario. + Communicate status of program direction. + Define detailed customer + Initiate QFD to identify top-level CTQ s. + Prepare detailed program plans. + Baseline configuration frozen. + Commercial engine aircraft system specs completed and signed. + Approve plan to close target cost/current cost gap. + Tollgate 4 checklist review completed. + Finalize technical + Update business and technical plans. Business plan approved by business council. + Identify NPI Scorecard metrics. + Establish launch + Confirm funding, participants, and facilities available. + Sources selected & approved by source board. +Cycle,flowpath& configuration frozen, cycle audited. + Nacelle & fan reverser supplier specs issued. + Revenue sharing participant agreements finalized and plans completed. + Process capability (Cp/Cpk) known for all CTQs. + Configuration Mgt system defined. +UG Master Model components selected. + Tollgate 5 checklist review completed. + Tech Reqmnts issued. + Performance stack up complete. + ICD approved. + Quote deck delivered. + Preliminary Type Board held. + CERT/QUAL plan reviewed. + Block test configuration defined. + Program funding finalized. + Update integrated program master plans/identify critical path elements. + Configuration Mgt. plan frozen. + Finalize make/buy decisions. + Finalize manufacturing processes. + Identify design review & program scorecards review schedules. + Identify Review Tollgate 6 + Conduct Tollgate 6 + Launch program. + Refine critical path elements/schedule. +IdentifyCTQ s. + Initiate concurrent detail design & manufacturing process planning. + Hold detailed design + Finalize detail design/test definition. + Review Tollgate 7 + Conduct Tollgate 7 + Procure/manufacture hardware. + Validate process capability. + Finalize detailed cert/qual test plans. + Prepare test hardware. + Review Tollgate 8 + Conduct Tollgate 8 + Complete component tests, engine, and flight testing as required. + Confirm all program requirements are met, and complete documentation. + Obtain customer/agency approval. + Review Tollgate 9 + Conduct Tollgate 9 + Review producibility data. + Review field data. + Identify ongoing improvements. + Hold periodic Tollgate 10 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Percent Tollgate Checklist Items Complete 10% 20% 40% 70% 95% 100% Percent Overall NPI Program Complete July 2000, Version 1.0 GEES Japan.ppt Mission: Develop and certify by December 1999 the GE-P&W Engine Alliance GP7000 engine for the airplane with airplane certification by December 2000 to satisfy our customers and shareholders with world class products and services. GE Proprietary Information Unauthorized Reproduction Prohibited Page 3
3 Close up view of Design through production tollgates (9/97) (4/98) (12/99) (12/00) Design Develop Validate Produce & Support + Launch program. + Refine critical path elements/schedule. + Identify CTQ s. + Initiate concurrent detail design & manufacturing process planning. + Hold detailed design + Finalize detail design/test definition. + Review Tollgate 7 + Procure/manufacture hardware. + Validate process capability. + Finalize detailed cert/qual test plans. + Prepare test hardware. + Review Tollgate 8 + Conduct Tollgate 8 + Complete component tests, engine, and flight testing as required. + Confirm all program requirements are met, and complete documentation. + Obtain customer/agency approval. + Review Tollgate 9 + Conduct Tollgate 9 + Review producibility data. + Review field data. + Identify ongoing improvements. + Hold periodic Tollgate 10 + Conduct Tollgate 7 Chart supplied by Terry Russell, OU ME Advisory Board Chairman
4 1. Tollgate 1 Conceptual and Preliminary Design a. Sufficient problem definition, development of design specifications, and investigation of alternatives b. Sufficient/correct analysis of alternatives c. Sufficient justification provided for selection of best design concept d. Sufficient/correct development of preliminary design to show feasibility with respect to ability to meet design specifications e. Sufficient project management planning and scheduling has been completed
5 Tollgate 2 Experimental prototyping, testing, simulation, analysis, and system-level design refinement a. Fully developed hardware configuration based on sufficient/correct prototyping, testing, analysis and simulation Appropriate types/methods of analysis & simulation were used; parameters in simulations were based on experimental data for the actual system; analysis & simulations were completed correctly and documented well. Appropriate prototypes were built and experiments were based on a clear need for information; experiments were designed, planned, and conducted well; data was analyzed correctly and the process was documented well. b. Design methods (DFX, FMEA, Value Engineering, ) were used appropriately and applied correctly to refine/improve the design
6 Tollgate 3 Design refinement and performance validation via prototype testing a. Prototype performance shows that final design can adequately meet all critical design specifications b. Performance predictions from dynamic simulations correlated/compared to actual performance results and all significant discrepancies corrected c. Adequate cost/manufacturability analysis has been completed
7 Tollgate 4: Pre-Production Review a. Final design includes refinements based on prototype testing and simulations b. Final design characteristics (dimensions, materials, etc.) have been developed based on failure analysis with respect to all potential failure modes, and proper design factors of safety were achieved c. Project documentation package is completed, including a complete and correct set of properly dimensioned and toleranced engineering drawings d. Final design has been evaluated for form/fit/function, manufacturability, assembly, safety, reliability, cost, patent infringement, and environmental impact, and results of these evaluations are clearly documented
8 For all tollgates: a. The design report and formal presentation associated with each design review must be acceptable b. All group members must exhibit sufficient mastery of the Professional Skills and Tools associated with the current phase of the design process
9 Notes on Proceeding From Preliminary to Final Design Preliminary Design A preliminary design defines 1 Basic configuration (how things fit together) 2 Sizing (scale) of the system (realistic bounds on values for key design parameters) 3 Possible/reasonable alternatives for design components 4 Basic functions and how they will be provided/satisfied by the design Creating and Gathering Information/Embodiment Design/Design Refinement To progress from a preliminary design to a final design requires information This information comes from the analysis and testing that you do to create and evaluate your design Prototyping and testing Research Simulation and Analysis Application of Design Methods to simplify/modify/improve design Most decisions must be made before we have all of the information we would like to have One challenge is learning to deal with uncertainty and still make good and timely decisions Final Design A near-optimal (or at least acceptable) final design requires Definition of nominal values and tolerances for all design parameters Sizing/selection of mechanical elements to o Satisfy requirements for form/fit/function o Avoid common failure modes o Address important design issues
Mechanical Engineering Department Senior Design Project
Mechanical Engineering Department Senior Design Project Effective Project Teams and Project Management Tools and Techniques Terry Russell OU ME Advisory Board Chairman Ten Common Group Problems 1. Floundering
Leveraging CMMI framework for Engineering Services
Leveraging CMMI framework for Engineering Services Regu Ayyaswamy, Mala Murugappan Tata Consultancy Services Ltd. Introduction In response to Global market demand, several OEMs adopt Global Engineering
A Privacy Officer s Guide to Providing Enterprise De-Identification Services. Phase I
IT Management Advisory A Privacy Officer s Guide to Providing Enterprise De-Identification Services Ki Consulting has helped several large healthcare organizations to establish de-identification services
Body of Knowledge for Six Sigma Lean Sensei
Body of Knowledge for Six Sigma Lean Sensei What to Prepare For: The following is the Lean Six Sigma Certification Body of Knowledge that the exam will cover. We strongly encourage you to study and prepare
How To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
BODY OF KNOWLEDGE CERTIFIED SIX SIGMA YELLOW BELT
BODY OF KNOWLEDGE CERTIFIED SIX SIGMA YELLOW BELT The topics in this Body of Knowledge include additional detail in the form of subtext explanations and the cognitive level at which test questions will
System Engineering Plan
Project Documentation Document SPEC-0064 Revision A System Engineering Plan Rob Hubbard, Jeremy Wagner, Larry Daggert, Larry Stepp, Christoph Keller Systems Engineering / Project Management 5 October 2006
PRODUCT DEVELOPMENT BEST PRACTICES AND ASSESSMENT
PRODUCT DEVELOPMENT BEST PRACTICES AND ASSESSMENT Kenneth Crow DRM Associates 310-377-5569 [email protected] BEST PRACTICES Multi-year effort by consortium to identify best practices of product
DMAIC PHASE REVIEW CHECKLIST
Project Name Project Lead Champion Kick-Off Date: _mm / dd / yyyy Project CTQ & Target D-M-A-I-C: DEFINE Project Identification: Big Y linkage identified Customer(s) & Customer type identified Voice of
ASAP- Accelerated SAP
ASAP- Accelerated SAP Vanessa Hong What is ASAP? What is ASAP Methodology? ASAP, accelerated SAP implement, means to go through the SAP implementation process efficiently. Accelerated SAP Methodology is
Certified Six Sigma Yellow Belt
Certified Six Sigma Yellow Belt Quality excellence to enhance your career and boost your organization s bottom line asq.org/cert The Global Voice of Quality TM Certification from ASQ is considered a mark
Micron Quality Manual
Micron Quality Manual The Quality Management System (QMS) is an integral component in allowing Micron to achieve the next level in Quality Control and in delivering Total Quality Excellence to our customers.
Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
Advanced Project Management Incl. MS Projects 5 DAYS
Imsimbi Training proudly presents Advanced Project Management Incl. MS Projects 5 DAYS Imsimbi Training is a fully accredited training provider with the Services Seta, number 2147, as well as a Level 2
The Enterprise Project Tollgate Process
McMaster University Xerox Centre for Engineering Entrepreneurship and Innovation xceei.mcmaster.ca The Enterprise Project Tollgate Process June 2014 Contents Enterprise Project Tollgate Process... 2 Appendix
Quick Reference Guide Interactive PDF Project Management Processes for a Project
Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process
System Development Life Cycle Guide
TEXAS DEPARTMENT OF INFORMATION RESOURCES System Development Life Cycle Guide Version 1.1 30 MAY 2008 Version History This and other Framework Extension tools are available on Framework Web site. Release
Quality at GE Energy
Quality at GE Energy Table of Contents GE Energy and Quality Visions 2 Our Customer Commitments 3-5 The Quality Organization and Policy 6-8 Quality Management System 9-11 Key Business Processes 12-16
AN EXAMPLE FORMAT FOR DESIGN PROJECT REPORTS [ADAPTED FROM ASME GUIDELINES FOR STUDENT DESIGN COMPETITION] TITLE (TIMES NEW ROMAN, 12, BOLD)
AN EXAMPLE FORMAT FOR DESIGN PROJECT REPORTS [ADAPTED FROM ASME GUIDELINES FOR STUDENT DESIGN COMPETITION] TITLE (TIMES NEW ROMAN, 12, BOLD) Team Name (Times New Roman, 12) First Author (Times New Roman,
Design for Six Sigma +Lean Toolset
Stephan Lunau (Ed.) Christian Staudter Jens-Peter Mollenhauer Renata Meran Olin Roenpage Clemens von Hugo Alexis Hamalides Design for Six Sigma +Lean Toolset Implementing Innovations Successfully 4y Springer
Sound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
Overview of how to test a. Business Continuity Plan
Overview of how to test a Business Continuity Plan Prepared by: Thomas Bronack Phone: (718) 591-5553 Email: [email protected] BRP/DRP Test Plan Creation and Exercise Page: 1 Table of Contents BCP/DRP Test
Criteria for Flight Project Critical Milestone Reviews
Criteria for Flight Project Critical Milestone Reviews GSFC-STD-1001 Baseline Release February 2005 Approved By: Original signed by Date: 2/19/05 Richard M. Day Director, Independent Technical Authority
ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM
ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM Domain I: Feasibility Study - identify, scope and justify the automation project Task 1: Define the preliminary scope through currently
Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
IT Risk & Security Specialist Position Description
Specialist Position Description February 9, 2015 Specialist Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level
Role and Skill Descriptions. For An ITIL Implementation Project
Role and Skill Descriptions For An ITIL Implementation Project The following skill traits were identified as fairly typical of those needed to execute many of the key activities identified: Customer Relationship
Project Management for IT/IS Projects
Project Management for IT/IS Projects The Course Design, Outline and Behavior Objectives: Project Management for IT/IS Projects is consistent with the PMI Project Management Body of Knowledge, PMBOK. To
Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) 7917134922 E-Mail: [email protected].
Edwin Lindsay Principal Consultant, Tel: + 44 (0) 7917134922 E-Mail: [email protected] There were no guidelines/ regulations There was no training No Procedures No Inspectors Inform All staff of
Unit 1: Introduction to Quality Management
Unit 1: Introduction to Quality Management Definition & Dimensions of Quality Quality Control vs Quality Assurance Small-Q vs Big-Q & Evolution of Quality Movement Total Quality Management (TQM) & its
Practice Overview. REQUIREMENTS DEFINITION Issue Date: <mm/dd/yyyy> Revision Date: <mm/dd/yyyy>
DEPARTMENT OF HEALTH AND HUMAN SERVICES ENTERPRISE PERFORMANCE LIFE CYCLE FRAMEWORK PRACTIICES GUIIDE REQUIREMENTS DEFINITION Issue Date: Revision Date: Document
Lecture 8. Systems engineering L E C T U R E. SIMILAR process. Zuzana Bělinová. Faculty of Transportation Sciences, CTU in Prague
L E C T U R E 8 SIMILAR process LECTURE 8 - OVERVIEW Theoretical foundations of many methodologies - Typical SE process SYSTEMS ENGINEERING BASIC FACTS Systems Engineering is responsible for creating a
Strategic Planning Process Map
Advancing Statewide Spatial Data Infrastructures in Support of the National Spatial Data Infrastructure (NSDI) Strategic Planning Process Map For use by all Stakeholders in the Geospatial Community Produced
WORKGROUP-LEVEL OVERVIEW. Learning Objectives Upon completion of this session, you will be able to:
WORKGROUP-LEVEL OVERVIEW Performance Scorecards provide an organized, proven method of defining key business outcomes and data, and should be an integral part of your planning process. Included with this
Program Update June 2015. G500, G600 Program Update 06.15
Program Update June 2015 G500, G600 Program Update 06.15 All-New Gulfstream G500 and G600 All new, best-in-class aircraft that build upon Gulfstream s technology leadership Unmatched high-speed range capability
DRAFT (Public comments phase August 2006) Date: XX/XX/XX. Initiated by: ANE-110
(Public comments phase August 2006) Advisory Circular Subject: PROPOSED DRAFT Turbine Engine Repairs and Alterations Approval of Technical and Substantiation Data Date: XX/XX/XX Initiated by: ANE-110 AC
Camar Aircraft Products Co. QUALITY MANUAL Revision D
QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)
44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam
44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION
The Power of Two: Combining Lean Six Sigma and BPM
: Combining Lean Six Sigma and BPM Lance Gibbs and Tom Shea Lean Six Sigma (LSS) and Business Process Management (BPM) have much to contribute to each other. Unfortunately, most companies have not integrated
System Engineering Data Repository
System Data Repository 09:00 data in the MBSE life-cycle 09:20 EGS-CC in the system context 09:40 Conceptual Modelling and ECSS 10:00 ecascade 10:20 A snapshot of systems engineering data management in
STAGE 1 COMPETENCY STANDARD FOR ENGINEERING ASSOCIATE
STAGE 1 STANDARD FOR ENGINEERING ASSOCIATE ROLE DESCRIPTION THE MATURE ENGINEERING ASSOCIATE The following characterises the senior practice role that the mature, Engineering Associate may be expected
IT Project: System Implementation Project Template Description
2929 Campus Drive Suite 250 IT Project: System Implementation Project Template Description Table of Contents Introduction... 2 Project Phases... 3 Initiation & Requirements Gathering Milestone... 3 Initiation
Ensuring Reliability in Lean New Product Development. John J. Paschkewitz, P.E., CRE
Ensuring Reliability in Lean New Product Development John J. Paschkewitz, P.E., CRE Overview Introduction and Definitions Part 1: Lean Product Development Lean vs. Traditional Product Development Key Elements
How To Deploy And Sustain Data Governance by John Ladley
How To Deploy And Sustain Data Governance by John Ladley All rights reserved. Reproduction in whole or part prohibited except by written permission. Product and company names mentioned herein may be trademarks
CDC UNIFIED PROCESS PRACTICES GUIDE
Document Purpose The purpose of this document is to provide guidance on the practice of Requirements Definition and to describe the practice overview, requirements, best practices, activities, and key
Business Continuity Position Description
Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 2 Career Path... 3 Explanation of Proficiency Level Definitions... 8 Summary
The Total Economic Impact Of SAS Customer Intelligence Solutions Real-Time Decision Manager
A Forrester Total Economic Impact Study Commissioned By SAS Project Director: Dean Davison May 2014 The Total Economic Impact Of SAS Customer Intelligence Solutions Real-Time Decision Manager Table Of
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
A Practical Guide to e-learning Development Project Management
A Practical Guide to e-learning Development Project Management Organizations are now, for the first time ever, experiencing the widest complexity of learning needs ever with four different generations
Automation Sales/Marketing Professional
Automation Sales/Marketing Professional Alternate Titles: Inside sales: Customer Service Representative, Inside Sales Engineer, Technical Support Specialist Outside sales: Field Sales, Automation Product
Certification Exam Objectives: PK0-003
Certification Exam Objectives: PK0-003 INTRODUCTION The CompTIA Project + examination is designed for business professionals involved with projects. This exam will certify that the successful candidate
Design Failure Modes and Effects Analysis DFMEA with Suppliers
Design Failure Modes and Effects Analysis DFMEA with Suppliers Copyright 2003-2007 Raytheon Company. All rights reserved. R6σ is a Raytheon trademark registered in the United States and Europe. Raytheon
Evaluability Assessment Template
Evaluability Assessment Template Evaluability Assessment Template An Evaluability Assessment examines the extent to which a project or a programme can be evaluated in a reliable and credible fashion. An
Lean Six Sigma Black Belt-EngineRoom
Lean Six Sigma Black Belt-EngineRoom Course Content and Outline Total Estimated Hours: 140.65 *Course includes choice of software: EngineRoom (included for free), Minitab (must purchase separately) or
Table of Contents. CHAPTER 1 Web-Based Systems 1. CHAPTER 2 Web Engineering 12. CHAPTER 3 A Web Engineering Process 24
Table of Contents CHAPTER 1 Web-Based Systems 1 The Web 1 Web Applications 2 Let s Introduce a Case Study 3 Are WebApps Really Computer Software? 4 Are the Attributes of WebApps Different from the Attributes
ECE Senior Design Capstone Project Guidelines
What is Senior Design Project? Senior Design Project is a set of two required courses that Electrical Engineering students usually take in their last two semesters of study. The Fall semester (ECE 480)
Risk Management Primer
Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders
Software Engineering/Courses Description Introduction to Software Engineering Credit Hours: 3 Prerequisite: 0306211(Computer Programming 2).
0305203 0305280 0305301 0305302 Software Engineering/Courses Description Introduction to Software Engineering Prerequisite: 0306211(Computer Programming 2). This course introduces students to the problems
Enhancing Law Enforcement Response to Victims:
Enhancing Law Enforcement Response to Victims: Strategy Implementation Checklist Enhancing Law Enforcement Response to Victims is a new professional standard developed by the International Association
Project Aim 2020. Appendix C - Project Plan, Gap Analysis, and Approach
Appendix C - Project Plan, Gap Analysis, and Approach In the fall of 2013 and spring of 2014, the senior leadership meetings created awareness among the leaders about necessary improvements in planning,
1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects
1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects b) The path to Service Delivery and Service Support for efficient and effective
Our Lady of Holy Cross College. Ed. D. Executive Leadership Program Course of Study
Our Lady of Holy Cross College Ed. D. Executive Leadership Program Course of Study First Semester (Fall) Course 1 EDD 801 Applied and Action Research (3) credit hours This course explores action research
PHASE 1: INITIATION PHASE
PHASE 1: INITIATION PHASE The Initiation Phase begins when agency management determines that a business function requires enhancement through an agency information technology (IT) project and investment
Rx-360 Supply Chain Security White Paper: Audits and Assessments of Third Party Warehousing and Distribution Facilities
Rx-360 Supply Chain Security White Paper: Audits and Assessments of Third Party Warehousing and Distribution Facilities 6 June 2012 INTRODUCTION Today s global corporations frequently outsource various
PHASE 5: DESIGN PHASE
PHASE 5: DESIGN PHASE During the Design Phase, the system is designed to satisfy the requirements identified in the previous phases. The requirements identified in the Requirements Analysis Phase are transformed
Introduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs
HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing
PROPS Manual for Project Managers
PROPS Manual for Project Managers 1 PROPS Manual for Project Managers CONTENTS INTRODUCTION... 3 PROJECT MANAGEMENT MODEL... 7 PRESTUDY PHASE... 11 PHASE START-UP AND TEAMBUILDING... 17 COACHING, INTEGRATION
ENOVIA Semiconductor Accelerator for Enterprise Project Management
ENOVIA Semiconductor Accelerator for Enterprise Project Management Product overview ENOVIA Semiconductor Accelerator for Enterprise Project Management enables companies to manage global IC development
SOFTWARE PERFORMANCE TESTING SERVICE
SOFTWARE PERFORMANCE TESTING SERVICE Service Definition GTS s performance testing services allows customers to reduce the risk of poor application performance. This is done by performance testing applications
JOURNAL OF OBJECT TECHNOLOGY
JOURNAL OF OBJECT TECHNOLOGY Online at www.jot.fm. Published by ETH Zurich, Chair of Software Engineering JOT, 2006 Vol. 5. No. 8, November-December 2006 Requirements Engineering Tasks Donald Firesmith,
PROJECT RISK MANAGEMENT
PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized
Applying Integrated Risk Management Scenarios for Improving Enterprise Governance
Applying Integrated Risk Management Scenarios for Improving Enterprise Governance János Ivanyos Trusted Business Partners Ltd, Budapest, Hungary, [email protected] Abstract: The term of scenario is used
PROJECT AUDIT METHODOLOGY
PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit
2 Day In House Demand Planning & Forecasting Training Outline
2 Day In House Demand Planning & Forecasting Training Outline On-site Corporate Training at Your Company's Convenience! For further information or to schedule IBF s corporate training at your company,
Aerion and Airbus Group, Inc. Announce New Agreement, Expanded Collaboration
P R E S S I N F O R M A T I O N Aerion and Airbus Group, Inc. Announce New Agreement, Expanded Collaboration More North American-based Airbus Group, Inc. resources made available to bring the supersonic
Product Development and Commercialization Lifecycle
Product Development and Commercialization Lifecycle TM Product Development Life Cycle Definition Phase TM 1. Product Alignment with Company Strategy and Roadmap 2. Competitive Analysis Lessons/feedback
NCOE whitepaper Master Data Deployment and Management in a Global ERP Implementation
NCOE whitepaper Master Data Deployment and Management in a Global ERP Implementation Market Offering: Package(s): Oracle Authors: Rick Olson, Luke Tay Date: January 13, 2012 Contents Executive summary
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
Request for Proposal for Application Development and Maintenance Services for XML Store platforms
Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...
Highlights & Next Steps
USG Cloud Computing Technology Roadmap Highlights & Next Steps NIST Mission: To promote U.S. innovation and industrial competitiveness by advancing measurement science, standards, and technology in ways
Integrating Project Management and Service Management
Integrating Project and Integrating Project and By Reg Lo with contributions from Michael Robinson. 1 Introduction Project has become a well recognized management discipline within IT. is also becoming
ABBVIE PURCHASING AND SUPPLIER MANAGEMENT SUPPLIER PERFORMANCE PROGRAM
ABBVIE PURCHASING AND SUPPLIER MANAGEMENT SUPPLIER PERFORMANCE PROGRAM SUPPLIER PERFORMANCE PROGRAM Without question, supplier relationships have a significant impact on AbbVie s corporate success. AbbVie
Abbott Global Purchasing Services. Supplier Performance Program
Abbott Global Purchasing Services Supplier Performance Program SUPPLIER PERFORMANCE PROGRAM Without question, supplier relationships have a significant impact on Abbott s corporate success. Abbott Global
AC 20-148 REUSABLE SOFTWARE COMPONENTS
AC 20-148 REUSABLE SOFTWARE COMPONENTS December 7, 2004 12/7/04 AC 20-148 CONTENTS Paragraph Title Page 1. Purpose....1 2. Motivation for this Guidance....1 3. Document Overview...1 4. General Guidelines
Enhance State IT Contract Expertise
Enhance State IT Contract Expertise Chris Estes State Chief Information Officer Office of Information Technology Services March 2015 1 P a g e Table of Contents 1. Legislative Request... 3 2. Introduction...
INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE
PREFERRED RELIABILITY PRACTICES PRACTICE NO. PD-ED-1228 PAGE 1 OF 6 INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE Practice: To produce high quality, reliable software, use Independent Verification
Performance Audit Concurrent Review: ERP Pre-Solicitation
Performance Audit Concurrent Review: ERP Pre-Solicitation April 2002 City Auditor s Office City of Kansas City, Missouri 24-2001 April 10, 2002 Honorable Mayor and Members of the City Council: We conducted
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor