Stick Together. 3 6 th grade and 3 7 th /8 th grade TEAMS PER CENTER
|
|
|
- Homer Daniels
- 9 years ago
- Views:
Transcription
1 Stick Together MESA DAY CONTEST RULES LEVEL: Grades 6-8 TYPE OF CONTEST: COMPOSITION OF TEAMS: NUMBER OF TEAMS: SPONSOR: Team 1-2 students per team 3 6 th grade and 3 7 th /8 th grade TEAMS PER CENTER (Strength to weight winners only advance) Larry Lim, USC Overview: Students will use math and Science to implement engineering concepts in the design and construction of a model bridge from your own plans that will carry a maximum load while using as few craftsticks as possible; stressing neatness, craftsmanship, and creativity. Materials: 1. Only solid untreated (no manufactured notches or holes), natural wood craftsticks (e.g. popsicle sticks) with the following approximate dimensions may be used: Length= 4 ½ inches (11.4cm) Width = 3/8 inches (0.95cm) Thickness = 1/16 inches (0.2cm) 2. Maximum number of sticks allowed, including partial sticks, is 200. Each piece of stick, regardless of size, will be counted as one structural member. 3. Only water soluble Elmer s-type white glue must be used.
2 Rules For Bridge Size: 1. Maximum horizontal length 17 inches (43.2cm) 2. Maximum width 5 inches (12.7cm) 3. Maximum height above top of roadway 7 inches (17.78cm) 4. Maximum depth below top of roadway 3.5 inches (8.89cm) 5. Minimum horizontal length 15 inches (38.1 cm) 6. Minimum width at every point. 4 inches (10.16cm) 7. Minimum width of open roadway 3.5 inches (8.89cm) (running entire length of bridge) RULES FOR CONSTRUCTION: 1. Stick Together structures should be labeled with team members names, school, and MESA Center. There will be a 10% penalty in the strength to weight score for improper labeling. 2. No kits are allowed 3. A maximum of 50% of a craftstick s total wide/flat surface may be glued. Both sides of each stick can be considered in the 50% calculation. e.g. 100% of side 1 and 0% of side 2; 75% of side 1 and 25% of side Glue (water soluble Elmer s type white glue) must only be used at joints, and must not be used on the surface of the roadway. 5. No coatings of any kind, including glue, paint, cement, epoxy; etc. may be applied to any surface of the bridge. The Bridge will be disqualified if it is coated with any substance. 6. The bridge must be open at the top to allow insertion of testing apparatus. 7. The bridge must have a clear and unobstructed roadway at least 3 ½ inches wide, running the full length of the bridge, as if automobile traffic were going to cross it. The roadway shall be considered a roadway if a toy model car or truck freely rolls from one end to the other. The toy car/truck can be provided by the entrant. If a car is not provided by the entrant, a standard Hot Wheels or Matchbox car will be used.
3 8. The bridge may not have a roof, covering or any other object that will interfere with the 3½ x 3½ inch test plate that is placed directly on roadway at midspan to apply the force for load bearing capacity. 9. I-beams are illegal. 10. T-sections and longitudinal lamination may be used on the roadway only. 11. The bridge must rest on the tester support blocks in a stable manner, i.e. bridge substructure may NOT interfere with testing apparatus. 12) Project must be the original work of student(s). Judges may ask questions to confirm provenance. 13) Please remember that the purpose of this contest is to use creativity to build the best structure within the framework of the rules. The purpose is not to break the rules and see if you can get away with it. SPECIFICATION CHECK: 1. The bridge is examined and measured by the judges to check whether it conforms to contest rules and specifications. 2. Any bridge that does not meet the requirements will be disqualified. 3. The bridge is weighed and its weight recorded. Judging: 1. The bridges are judged for neatness, craftsmanship, and creativity by a team selected by the Host Center prior to testing. 2. The bridge will be supported by two wide blocks (each >1 inch) 14 inches apart (see attachment #1) 3. A 3½ x 3½ inch test plate is lowered onto the bridge at midspan so that it rests on the roadway. 4. The test plate is loaded until a point of maximum load is reached as determined by judges. The maximum load recorded by the load testing machine will be used as the load capacity of the bridge, regardless of when failure begins. 5. Individuals bridges are not limited in the number of categories they may win.
4 6. Disqualified bridges are not eligible for awards in any category; however, they may be tested, time permitting. AWARDS: Awards are given in each of the following two categories:* 1. Strength to weight Ratio: Determined by dividing maximum load at failure by weight of bridge. Bridge with greatest load bearing capacity compared to its weight wins. Example: Maximum load = pounds Bridge weight = 50.0 grams Ratio = * [220 pounds x 454g/pound)/50g] 2. Creativity: Finest workmanship, including neatness and innovation of design. 3. Awards will be given in two divisions; 6 th graders, and 7 th and 8 th graders. *Although awards will be presented in two categories, bridges qualifying for MESA Regional finals will be determined by strength to Weight Ratio only. Safety: Appropriate safety measures will be used in testing. Attachments: 1. Testing set-up and Apparatus 2. Stick Together Bridge Specification Checklist *subtract 10% if structure is improperly labeled: e.g (1997.8x0.10) = =
5 STICK TOGETHER ATTACHMENT #1: TESTING SET-UP and APPARATUS LOAD 3½ x 3½ inch test plate >1 >1 Bridge 14 inches
6 STICK TOGETHER Bridge MUST rest on tester support blocks; Bridge substructure may NOT interfere with testing apparatus 14 inches
7 I-beam & T-section drawings I-beam T-section
8 Stick Together Specification Checklist This checklist is provided for you to pre-inspect your bridge to ensure that it meets the rules specification. Please check-off each item after you have compared your bridge s dimensions with the rules rules used Bridge is properly labeled with team members names, school, and MESA Center Material is solid, natural wood craftsticks (popsicle sticks) Glue is water soluble Elmer s-type white glue Maximum length 17 inches (43.2 cm) Maximum width 5 inches (12.7 cm) Maximum height above top of roadway 7 inches (17.78 cm) Maximum depth below top of roadway 3.5 inches (8.89 cm) Minimum length 15 inches (38.1 cm) Minimum width 4 inches (10.16 cm) Minimum width of roadway 3.5 inches (8.89 cm) Roadway runs entire length of bridge Maximum number of members (sticks and/or partial sticks) 200 Glue only at the joints Each stick glued 50% No I-beams T-sections on roadway only Sticks are not painted or treated Bridge open at the top (no roof or covering) Bridge has open 3½ inch area for placement of the test plate on roadway Bridge has supports suitable for placement on testing fixture Bridge substructure does not interfere with testing fixture
2016 MDOT Bridge Competition Guidelines Grades 11 and 12
2016 MDOT Bridge Competition Guidelines Grades 11 and 12 The Transportation and Civil Engineering (TRAC) Program THE PURPOSE OF TRAC: The TRAC program is an inventive way of introducing students to the
2015 MDOT Bridge Competition Guidelines Grades 9 and 10
2015 MDOT Bridge Competition Guidelines Grades 9 and 10 The TRAnsportation and Civil Engineering (TRAC) Program THE PURPOSE OF TRAC: The TRAC program is an inventive way of introducing students to the
How to Access Bentley MicroStation PowerDraft Step by Step Instructions:
How to Access Bentley MicroStation PowerDraft Step by Step Instructions: Insert Bentley DVD into the computers D drive. Go to my computer and then right click on the D Drive and select OPEN. You will see
2016 Bridge Competition Guidelines Grades 9 and 10
2016 Bridge Competition Guidelines Grades 9 and 10 The TRAnsportation and Civil Engineering (TRAC) Program THE PURPOSE OF TRAC: The TRAC program is a new and inventive way of introducing students to the
TRAC Cable-stayed Bridge Competition Guidelines Grades 11 and 12 2012-2013
TRAC Cable-stayed Bridge Competition Guidelines Grades 11 and 12 2012-2013 The TRAnsportation and Civil Engineering (TRAC) Program THE PURPOSE OF TRAC: The TRAC program is a new and inventive way of introducing
20th. Annual Bridge. Building Contest. Open to Students from Grade 4-12. March is...
20th Annual Bridge Building Contest Open to Students from Grade 4-12 March is... Bridge Building Contest Scholarships for Grade 12 Students Engineers PEI will grant two (2) $500 Scholarship annually to
Egg Crash Cars-basics
Egg Crash Cars-basics 1) EGG WILL BE INSERTED INTO A ZIP LOCK BAG BEFORE IT GOES INTO THE SEAT. PLAN ACCORDINGLY. 2) TEACHERS PLEASE COME WITH THE RUBRIC FILLED OUT AND EVALUATED BY YOU FOR THE CRITERIA.
Introduction. The Contest. The challenge can be stated quite simply.
Introduction As you may be aware, the year s TechnoChallenge includes a popsicle stick bridge building contest. This is a fun and easy event to run in your classroom, and it connects to well to the science
2016 IDEERS Rules for Graduate Teams. The List of Rule Revisions
1 of 12 The List of Rule Revisions Version No. Date Remarks V1 None 2 of 12 The content presented below serves as primary rules for this contest. However, if there are disputes that are not covered or
30 minutes in class, 2 hours to make the first time
Asking questions and defining problems Developing and using models Planning and carrying out investigations 30 minutes in class, 2 hours to make the first time 3 12 x 24 x ¾ inch plywood boards 1 x 12
Poster Contest Rules
Poster Contest Rules Posters should be no larger than 24 X 36 inches. Pictures or other materials may be mounted on the posters, if mounted securely. Only materials that are flat or create a two-dimensional
How to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
Team Skills Challenge Event # 1 Plant Layout Score Sheet
Team Skills Challenge Event # 1 Plant Layout Score Sheet State Name: Team Members: 1. 2. 3. 4. Placement of Plant Material 25 Deduct 5 points/plant not placed within 6 inches +/- of correct placement to
SURFACE TREATMENT BOND TEST
Test Procedure for SURFACE TREATMENT BOND TEST Effective Date: March 2011 Published: February 2012 1. SCOPE 1.1. This test procedure is used to determine the bond strength characteristics of the interfaces
2.9 WINDOW & DOOR BUCKS
2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place
Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12)
Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12) Design Criteria AASHTO LRFD Bridge Design Specifications, 6th Edition; Structures Detailing Manual (SDM); Structures Design Guidelines (SDG)
Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES
Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Page 1 Table of Contents WHAT IS REFLECTEX TM?... 2 STORAGE AND HANDLING... 3 SITE PREPARATION... 3 PREPARATION OF EXISTING
RZ Guardrail System Installation Manual
TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand
Solving Geometric Applications
1.8 Solving Geometric Applications 1.8 OBJECTIVES 1. Find a perimeter 2. Solve applications that involve perimeter 3. Find the area of a rectangular figure 4. Apply area formulas 5. Apply volume formulas
Archdiocese of San Antonio Department of Catholic Schools
DATE: AUGUST 2015 TO: FROM: SUBECT: THEME: CATHOLIC SCHOOLS IN ARCHDIOCESE OF SAN ANTONIO VERONICA MONTALVO, DIRECTOR OF ENRICHMENT PROGRAMS 2016 CATHOLIC CREATIVE ARTS CONTEST GOD S MERCY IN MY LIFE GOD
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
Bracing Webs in Trusses that have Dissimilar Configurations
Bracing Webs in Trusses that have Dissimilar Configurations Released April 25, 2006 Issue: Truss Design Drawings (TDD) that are prepared in accordance with ANSI/TPI 1, National Design Standard for Metal
Technical Regulations 2015-2016
F1 in Schools - 2014 World Finals Technical Regulations Technical Regulations 2015-2016 2013 - F1 in Schools Ltd. Page 1 of 27 3 September 2015 CONTENTS PREFACE SUMMARY OF MAIN REVISIONS FROM 2013 REGULATIONS...
WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.
Model: Document Number: 64058111 Kit Number: 64058112 Revision: 02 Description: Release Date: 04/08 Introduction This kit allows a PS90 scale to be integrated into a standard gravity conveyor. The kit
F1 in Schools - 2014 World Finals Technical Regulations. 2014 WORLD FINALS Technical Regulations
2014 WORLD FINALS Technical Regulations Refer also to the 2014 World Finals Competition Regulations. For World Finals use only. 2013 - F1 in Schools Ltd. Page 1 of 23 13 August 2014 Front Cover A1 Racing
Lab 6: Paper Chromatography. Pages145-154 Pre-lab page 151 No Post lab Chromatogram must be turned in attached to lab report
Lab 6: Paper Chromatography Pages145-154 Pre-lab page 151 No Post lab Chromatogram must be turned in attached to lab report Chromatography Chromatography is an analytical technique used to separate the
Testing Packaged Products Weighing up to 150 Lbs.
Testing Packaged Products Weighing up to 150 Lbs. We recommend a series of pre-shipment tests to simulate FedEx air and ground shipping environments. Follow our instructions or let us do the testing for
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
Lessons 6 and 7 Foam Bridge Experiment- Forces and Stresses Lab
Lessons 6 and 7 Foam Bridge Experiment- Forces and Stresses Lab 1. Background All industrial and building materials undergo forces that they must withstand to function as designed. Concrete is strong under
The JIG is UP Or A couple hours up front pays in the long run.
Ed Simon Page 1 of 5 The JIG is UP Or A couple hours up front pays in the long run. A large part of the fun of beekeeping is the construction and assembly of the equipment. Since it is a hobby, I decided
STAIR TREAD & RISER INSTALLATION GUIDELINES
STAIR TREAD & RISER INSTALLATION GUIDELINES ARTISTIC FINISHES DOES NOT WARRANTY THE COMPLETENESS OR ACCURACY OF ANY INSTALLATION. THE INSTALLATION CONTRACTER MUST HAVE THE EXPERIENCE AND KNOWLEDGE TO COMPLETE
CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION
CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION 1 This item shall consist of furnishing and erecting Chain-Link fence in accordance with these specifications and the details shown on the plans and in
Simple machines provide a mechanical advantage that makes our work faster and easier, and they are all around us every day.
LEARNING MODULE: SIMPLE MACHINES Pre-Visit Activities We suggest that you use these pre-visit classroom acitivites to prepare your students for a rewarding Museum visit. Before your visit, introduce your
Rockets: Taking Off! Racing Balloon
Rockets: Taking Off! For every action there is an equal and opposite reaction. Rockets and Balloons What happens when you blow up a balloon then let it go? Does the balloon move through the air? Did you
The Hive Bodies. In the Beekeeper s Work Shop. Building a Bee Hive: The Hive Bodies. by Stephen E. Tilmann
The Hive Bodies In the Beekeeper s Work Shop The hive body is the heart of a managed bee hive colony (Figure 1). It is where the queen lays her eggs, the house bees raise the brood and the workers store
Mobile Home Pre-Inspection Checklist
Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING
Bridge Type Selection
Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when
Chapter 6 ROOF-CEILING SYSTEMS
Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;
Micro. Pitts Special for the RFFS-100 by Chris O Riley
Micro Pitts Special for the RFFS-100 by Chris O Riley F1 F2 F3 F4 1 2 3 4 All wood 1/32 inch sheet unless otherwise stated. F1 F2 F3 F4 Small balsa blocks for LG reinforcement Small balsa blocks for LG
Prestressed Concrete I-Beam and TxGirder Haunch Design Guide
Prestressed Concrete I-Beam and TxGirder Haunch Design Guide Components of the Haunch Camber: Camber is the upward deflection in the beam after release of the prestressing strands due to the eccentricity
Construction of Quality Hot Mix Asphalt Pavements
59 th Annual Asphalt Paving Conference Outline Best Practices for Pavement Construction Placement Best Practices Surface Prep Project planning Understanding the paver Factors affecting the screed Screed
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
Chapter 10 - Scaffolding Systems
Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5
Lathe Milling Attachment
Lathe Milling Attachment By L C. MASON BY CLEVERLY stacking cold-rolled flat stock together, T-slots and slide for this lathe milling attachment are made without costly machinery. In fact, only two tools,
Design and Construction of a Spaghetti Bridge. Michael Karweit Department of Chemical Engineering Johns Hopkins University
Design and Construction of a Spaghetti Bridge Michael Karweit Department of Chemical Engineering Johns Hopkins University Why build a spaghetti bridge? 1) To take math and science out of the textbook and
2. A painted 2 x 2 x 2 cube is cut into 8 unit cubes. What fraction of the total surface area of the 8 small cubes is painted?
Black Surface Area and Volume (Note: when converting between length, volume, and mass, 1 cm 3 equals 1 ml 3, and 1 ml 3 equals 1 gram) 1. A rectangular container, 25 cm long, 18 cm wide, and 10 cm high,
4. Write a mixed number and an improper fraction for the picture below.
5.5.1 Name Grade 5: Fractions 1. Write the fraction for the shaded part. 2. Write the equivalent fraction. 3. Circle the number equal to 1. A) 9 B) 7 C) 4 D) 7 8 7 0 1 4. Write a mixed number and an improper
F1 in Schools - 2015 World Finals Technical Regulations
2013 - F1 in Schools Ltd. Page 1 of 24 25 March 2015 Front Cover Colossus F1 2014 World Champions F1 Car, Robert May's School, Hampshire, England Amendments made on [Date] are indicated thus (using red
Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair
49 Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair In this chapter: The Over-the-Post Balustrade System Determining the Rail Centerline Using Rail Bolts Making a Pitch Block Laying Out
SEGMENTED WOODTURNING
Notes on: SEGMENTED WOODTURNING Malcolm Tibbetts www.tahoeturner.com [email protected] (530) 541-6135 MATHEMATICAL FORMULAS AND CONCEPTS: A circle contains 360 Circumference = Diameter x π(3.1416)
Roller Coaster Project December 6, 2008. Tommy Wulz Carson Barnes Aaron Morris Joe Yantis Julianne Swafford
Roller Coaster Project December 6, 2008 Tommy Wulz Carson Barnes Aaron Morris Joe Yantis Julianne Swafford Abstract Our roller coaster, How the West was Won, is made out of plastic tubing that is ½ inch
RULE 1. The Field of Play
RULE 1 The Field of Play 1.1 Dimensions 1.1.1 The field of play shall be rectangular, the width of which shall not be more than 75 yards [68.58 m] or less than 70 yards [64.01 m] and shall not exceed the
Videos for Safety Meetings
Videos for Safety Meetings 2474 2005, ERI Safety Videos OPERATING ELECTRIC PALLET JACKS SAFELY This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are:
Grade 12 Consumer Mathematics Standards Test. Written Test Student Booklet
Grade 12 Consumer Mathematics Standards Test Written Test Student Booklet January 2011 Manitoba Education Cataloguing in Publication Data Grade 12 Consumer Mathematics Standards Test : Written Test Student
21 st Century STEM Challenge
21 st Century STEM Challenge May 2, 2014 21 st Century STEM Challenge May 2, 2014 Location of local competition Magnet Cove High School Gym, Magnet Cove AR Begins at 9:00 am Pre-Challenge Meeting @ 8:45
How to Install GoBoard:
How to Install GoBoard: A Step-by-Step Guide Durable, Ultra-Lightweight, Waterproof Tile Backer Board Introducing GoBoard Every tiling project requires a durable, waterproof surface under the tile, called
PUMP JACK SYSTEM AND ACCESSORIES
Pump Jack Model # 2200 A low cost, easy to operate, safe, portable scaffolding built of rugged steel. It's perfect for shingling, siding, sheathing, insulating, painting, building, roofing, home repair
The following Rules and Regulations apply to all Pinewood Derby Race Events.
Pinewood Derby Rules GENERAL RULES & REGULATIONS The following Rules and Regulations apply to all Pinewood Derby Race Events. NOTE: Each Scout is responsible for understanding and following all rules.
CHAPTER 6 CONSTRUCTION TYPES
CHAPTER 6 CONSTRUCTION TYPES SECTION 601 GENERAL 601.1 Scope. Provisions of this chapter shall govern the classification of construction type by materials and fire resistance of its elements and the use
Two most common lock nut groups: 1-Prevailing Torque Type Lock Nuts:
Two most common lock nut groups: 1. PREVAILING TORQUE a design feature of the lock nut produces friction between threads of mated components thereby increasing the force needed to tighten as well as loosen
Freightliner Semi FULL-SIZE WOOD TOY PLAN SET. Free Wood Toy Plan. For more toy plans and how to s Visit Us at www.toymakingplans.com.
Freightliner Semi 25-/2 L x 8-/ W x 8-7/8 H with trailer FULL-SIZE WOOD TOY PLAN SET It s all quick and easy to make with no fancy joints or cuts. Build it using common tools and with easy to find materials
The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35
Packaged-Products for Less-Than-Truckload (LTL) Shipment ISTA 3 Series General Simulation Performance Test PROCEDURE VERSION DATE Last TECHNICAL Change: NOVEMBER 2012 Last EDITORIAL Change: JANUARY 2013
How to Build Your Own CornHole Game
How to Build Your Own CornHole Game DIMENSIONS Here is a diagram with the basic measurements for the Cornhole board game. SUPPLIES 1/2 thick sheet of plywood one 4 x4 or two 2 x4 s 8 long 2 4 s (4) 4 1/2
Owner s Guide to Understanding Checks in Glued Laminated Timber
Owner s Guide to Understanding Checks in Glued Laminated Timber ENGINEERED WOOD SYSTEMS Checking In Glued Laminated Timber Glued laminated timber (glulam) is an engineered wood product that is used in
MOVIEtube CR. Cinematography Rig. Setup Camera Sony PDW-F3 (MTCR-P-10-01) Version 03-2011 / English
MOVIEtube CR Cinematography Rig (MTCR-P-10-01) Setup Camera Sony PDW-F3 Version 03-2011 / English Step by step assembly instruction 1) The MOVIEtube CR (MTCR-P-10-01) is supplied as shown in the picture
TEACHING TOMORROW S INDUSTRY LEADERS TODAY. Manufacturing Small Parts on Machining Centers
TEACHING TOMORROW S INDUSTRY LEADERS TODAY Tech Tip # 14 July 2007 Written by: Phil Rasey, Stiles Education s Machining Center Specialist Audience: Introductory Machine \ Process: CNC Machining Centers
This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.
Residential Decks Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org
3 Pocket Purse by Sherry Titzer - http://www.atimetostitch.com
3 Pocket Purse by Sherry Titzer - http://www.atimetostitch.com Purse size - 10 H x 12 ½ W (3 1/2 wide flat bottom) See text file for supply list & cutting instructions Both Front curved side pockets designs
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
North Carolina FFA Association Agricultural Mechanics Career Development Event
North Carolina FFA Association Three (3) of the following Agricultural Mechanics Performance Skills will be selected for the state competition. North Carolina FFA Association Agricultural Mechanics Performance
New Printhead. Properly Maintained Printhead Over 1 Million Inches
Thermal Printhead Life The printhead is the most critical component of your printer and one of the most delicate. Most print quality problems are a direct result of improper care of the printhead. A consumable
Generate Your Own Hydropower
Generate Your Own Hydropower Objectives The student will do the following: 1 Build a water wheel. 2 Build a simple galvanometer. 3. Build a simple hydropower generator 4. Detect the electricity generated
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
DIY CABINET REFACING INSTALLATION GUIDE
DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products
BUILDINGA 1/10 SCALE FLATBED TRAILER
VOLUME 1, ISSUE 1 BUILDINGA 1/10 SCALE FLATBED TRAILER BUILT, DESIGNED & WRITTEN BY NATHAN MYERS MATERIALS: FEATURES: While the design was kept simple to allow anyone to be able to build their own trailer,
Optimising plate girder design
Optimising plate girder design NSCC29 R. Abspoel 1 1 Division of structural engineering, Delft University of Technology, Delft, The Netherlands ABSTRACT: In the design of steel plate girders a high degree
Formwork for Concrete
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:
Virginia Christmas Tree & Wreath Contest Entry Form
383 Coal Hollow Rd, Christiansburg, VA 24073-6721 Ph: 540-382-7310 Fax: 540-382-2716 [email protected] Virginia Christmas Tree & Wreath Contest Entry Form Entrant s Name: Farm/Business
SECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
Ladder Shelf Plans Final dimensions: 25 L x 21 W x 72 H
Ladder Shelf Plans Final dimensions: 25 L x 21 W x 72 H Copyright 2011. MLCS Woodworking. Page 1 Router bits and supplies needed: 3/8 Rabbeting bit (#10691) 1 Bottom Cleaning bit (#7941) Top and Bottom
necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the
Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final
Chapter 3: Fall Protection/ Scaffolding Safety
Chapter 3: Fall Protection/ Scaffolding Safety Learning Objectives In this chapter you will learn to: recognize the hazards commonly associated with work on or around scaffolds; be aware of common scaffold-related
POST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
T 549. WORKING GROUP CHAIRMAN N/A; reaffirmed SUBJECT RELATED
NOTICE: This is a DRAFT of a TAPPI Standard in ballot. Although available for public viewing, it is still under TAPPI s copyright and may not be reproduced or distributed without permission of TAPPI. This
Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION
Sikadur-Combiflex REVISED JULY 2002 Sealing system for cracks and problem joints with large movements Construction DESCRIPTION USES ADVANTAGES The Sikadur-Combiflex joint sealing system consists of two
So here are the instructions after combining some web searches and the bindings that I have.
Installing Salomon SNS Pilot Sport Classic Cross Country Ski Bindings I have some old x-country skis with 3 pin nordic bindings that I no longer have the boots for. As such, I decided to get new boots
Measurement. Customary Units of Measure
Chapter 7 Measurement There are two main systems for measuring distance, weight, and liquid capacity. The United States and parts of the former British Empire use customary, or standard, units of measure.
How to re-string & re-cable the Genesis Compound bow. Step by step, picture by picture Right hand models ONLY
How to re-string & re-cable the Genesis Compound bow. Step by step, picture by picture Right hand models ONLY Introduction and Terminology Inspect all bows prior to use. Once a string or cable has become
ECONOMIC COMMISSION OF EUROPE (ECE) BRANDING
Much like the U.S. Department of Transportation, The Economic Commission of Europe, or ECE, regulates the manufacturing of vehicle components. To receive ECE branded approval, tires must meet set standards
PITCHED ROOF STRUCTURES
PITCHED ROOF STRUCTURES for framed and frameless photovoltaic modules Needed tools and materials: cordless screwdriver 10mm and 13mm spanners 5mm Allen key bolts, screws and tools for fixing the system
MANDATORY RULES MEETING 9:00 AM.
Texas Regional Utility Locate Rodeo Official Rules, Regulations & Information May 9, 2015 University of Texas Arlington Continuing Education / Workforce Development 140 W. Mitchell Street, Arlington, TX
Buoyancy Boats Florida Sunshine State Science Standards: Objectives Engage: Explore:
Buoyancy Boats Florida Sunshine State Science Standards: SC.C.2.3.1 The student knows that many forces act at a distance. SC.C.2.3.2 The student knows common contact forces. SC.C.2.3.3 The student knows
