1 Solving a Hard Problem For The NYC DOT With a High Performance Thin Overlay NEAUPG Annual Meeting Portsmouth, NH October 24, 2013 Ronald Corun Director- Asphalt Technical Services NuStar Asphalt LLC

2

3 1 st Avenue in NYC 1 st Avenue in Manhattan is 30 year old 18 thick PCC pavement Pavement was built with huge fanfare in 1983 projecting 40 year life Utilities beneath the pavement Gas lines Water lines Sewer lines Steam line

4 1 st Avenue in NYC Removing the PCC would most likely damage the utilities NYC DOT tries not to use compaction with vibration when paving streets After paving projects are completed NYC DOT tests utilities for leaks Funding not available to replace PCC pavement and the utilities

5 1st Avenue in NYC PCC pavement is in very poor condition Curb clearances prevent use of a thick overlay

6 1st Avenue in NYC NYC is planning to improve bus service with an new bus lane on 1 st Avenue Question How to Rehabilitate 1 st Avenue? To come up with an answer you certainly must Think Harder

7 1st Avenue in NYC

8 1st Avenue in NYC

9 1st Avenue in NYC

10 1st Avenue in NYC

11 1st Avenue in NYC NYC DOT contacted NuStar Asphalt and asked for suggestions Research at Rutgers University had developed a High Performance Thin Overlay (HPTO) Mix

12 Paulsboro HPTO 5 years old Original After 5 years

13 NJ I-295 HPTO Project

14 NJ I-295 HPTO Project

15 NJ I-295 HPTO Project

16 1st Avenue in NYC Search to improve HPTO performance under severe conditions by beefing up the asphalt binder Highly Modified Asphalt (HiMA) developed by Kraton Polymers Specialty SBS material with lower viscosity increase Allows up to 7.5% polymer loading with workability

17 1st Avenue in NYC Research at Rutgers University comparing HPTO mix with conventional PMA binder and Highly Modified Asphalt (HiMA)

18 1st Avenue in NYC Conventional PMA binder had continuous grade of PG HiMA binder had a continuous grade of PG

19 Flow Number 2,500 2,000 AMPT Flow Number (cycles) 1,500 1,000 1, , NuStar Flexgard (Unaged) NuStar HiMA (Unaged) NuStar Flexgard (Aged) NuStar HiMA (Aged)

20 Texas Overlay Tester

21 Texas Overlay Tester Hot Mix Asphalt Overlaid on PCC PCC PCC Horizontal Tensile Stress due to Expansion/Contraction of PCC from Temperature Horizontal Stress/Strain is modeled using Overlay Tester

22 Texas Overlay Tester 6,000 Overlay Tester Fatigue Life (cycles) 5,000 4,000 3,000 2,000 1,000 > 5,000 4,750 2,541 1,665 - STOA LTOA STOA LTOA HiMA Flexgard Binder and Aging Condition

23 Flexural Beam Fatigue Flexural Beam Fatigue Testing Measure number of cycles to failure

24 Flexural Beam Fatigue Fatigue Life, N f,50% (Cycles) 100,000,000 10,000,000 1,000, ,000 10,000 N f,50% = k1 1 ε Flexgard - LTOA HiMA - LTOA 2 k 3 O 12.5mm PG LTOA t k 1 E 1, ,000 10,000 Micro-strain (µs)

25 1st Avenue in NYC HPTO mix containing each binder was placed on 1 st Avenue on September 25, 2012 HiMA placed between 100 th and 101 st Street Conventional PMA placed between 101 st and 102 nd Street 1 1/2 thick overlay

26 1st Avenue in NYC

27 1st Avenue in NYC

28 1st Avenue in NYC Both sections performed well through August 2013 NYC DOT selected HiMA based on laboratory testing and field performance

29 1st Avenue in NYC Rehabilitation Design Micro-mill existing PCC pavement Patch areas as required Crack seal as required Place PG tack coat and Mirafi PGMG4 fabric Overlay with 1 ½ HPTO mix with HiMA asphalt binder Added Evotherm warm mix additive to lower mix temperatures and improve workability Produced mix at 300 F

30 1 st Avenue Micro-Milling

31 1 st Avenue Micro-Milling

32 1 st Avenue Micro-Milling

33 1 st Avenue Crack Sealing and Patching

34 1 st Avenue Crack Sealing and Patching

35 1 st Avenue Tack Coat and Fabric

36 1 st Avenue Tack Coat and Fabric

37 1 st Avenue Paving

38 1 st Avenue Paving

39 1 st Avenue Paving

40 1 st Avenue Paving

41 1 st Avenue Finished Pavement

42 1 st Avenue Finished Pavement

43 1 st Avenue Finished Pavement

44 1st Avenue Finished Pavement

45 Summary Combination of HPTO mix and HiMA gives a thin overlay solution for hard pavement rehabilitations NYC DOT and NuStar Asphalt will monitor pavement performance

46 Questions?

47

Recycling with CRM. John D Angelo D Angelo Consulting, LLC Phone 571-218-9733 johndangelo@dangeloconsultingllc.com

Recycling with CRM. John D Angelo D Angelo Consulting, LLC Phone 571-218-9733 johndangelo@dangeloconsultingllc.com Recycling with CRM John D Angelo D Angelo Consulting, LLC Phone 571-218-9733 johndangelo@dangeloconsultingllc.com Tire Rubber Crumb Rubber Modifier There are several different processes used to with CRM.

More information

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt

More information

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt

More information

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished

More information

USE OF HIGHLY POLYMER MODIFIED HMA (HiMA) Ohio Asphalt Paving Conference Columbus, Ohio February 4, 2015 Bob Kluttz, Kraton Polymers

USE OF HIGHLY POLYMER MODIFIED HMA (HiMA) Ohio Asphalt Paving Conference Columbus, Ohio February 4, 2015 Bob Kluttz, Kraton Polymers USE OF HIGHLY POLYMER MODIFIED HMA (HiMA) Ohio Asphalt Paving Conference Columbus, Ohio February 4, 2015 Bob Kluttz, Kraton Polymers Outline Introduction SBS and Highly Modified Asphalt Material Properties

More information

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti

More information

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form (NETTCP) Course Registration Form Interim Certification (Cost $300 members / $425 non-members) HMA Plant Technician* HMA Paving Inspector* Soils & Aggregate Inspector* Soils & Aggregate Lab Technician*

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E.

AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E. Louisiana Case Study: Implementation of CRM Binder in PG specification. AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E. My Story Background Approach Phase I Evaluation:

More information

A View From The Bureau of Materials & Physical Research. IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation

A View From The Bureau of Materials & Physical Research. IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation A View From The Bureau of Materials & Physical Research IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation HMA Issues HMA Issues HMA Issues HMA Issues a Technical Opinion Cautious HMA

More information

Asphaltic Wedge Paving

Asphaltic Wedge Paving OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local

More information

New Jersey Micro-Surface Pavement Noise Evaluation Submitted on: August 29, 2014

New Jersey Micro-Surface Pavement Noise Evaluation Submitted on: August 29, 2014 New Jersey Micro-Surface Pavement Noise Evaluation Submitted on: August 29, 2014 John Hencken* Research Engineer Edwin Haas Graduate Assistant Michael Tulanowski Research Assistant Thomas Bennert, Ph.D.

More information

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance Abstract Testing and appraisal of polymer effect as an additive on asphalt mixture performance Hamid Sabbagh mollahosseini*,golazin Yadollahi**, Ershad Amoosoltani*** *, ***Executive of Engineering and

More information

CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE

CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE NCAT Report No. 97-5 CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE by Prithvi S. Kandhal Larry Lockett September 1997 CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE

More information

STUDY OF THE BEHAVIOUR OF BITUMINOUS MIXTURES RESISTANT TO FUEL

STUDY OF THE BEHAVIOUR OF BITUMINOUS MIXTURES RESISTANT TO FUEL STUDY OF THE BEHAVIOUR OF BITUMINOUS MIXTURES RESISTANT TO FUEL INTRODUCTION Evaluation of the performance of asphalt mixtures applied on wearing courses of road and airport pavements when subjected to

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced

More information

Pace s plant had minimal problems producing warm-mix asphalt for the paving project.

Pace s plant had minimal problems producing warm-mix asphalt for the paving project. Pace s plant had minimal problems producing warm-mix asphalt for the paving project. 22 Hot Mix Asphalt Technology SEPTEMBER/OCTOBER 2006 By Chuck MacDonald Tractor-trailer trucks crawled along an open

More information

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1). Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State

More information

Introduction. Emulsify with water. Asphalt Emulsions 101. Asphalt Binder Properties. Why Heat Asphalt? So It Can Be:

Introduction. Emulsify with water. Asphalt Emulsions 101. Asphalt Binder Properties. Why Heat Asphalt? So It Can Be: Asphalt Emulsions 101 Introduction Chris Lubbers Technical Sales and Marketing Mgr Kraton Polymers, LLC 50 TH Annual Idaho Asphalt Conference Moscow, ID October 28, 2010 Semi Solid Liquid Asphalt Binder

More information

Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.

Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.org History Performance Graded Binders MDOT Local Agency Guide NAPA Guide Outline Other Considerations For each there are: Right

More information

Transportation Infrastructure Asset Management

Transportation Infrastructure Asset Management 2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory

More information

Comparison of Results of SHRP and Conventional Binder Tests on Paving Asphalts

Comparison of Results of SHRP and Conventional Binder Tests on Paving Asphalts International Journal of Applied Science and Engineering 2004. 2, 3: 245-256 Comparison of Results of SHRP and Conventional Binder Tests on Paving Asphalts Ming-Gin Lee a, Chui-Te Chiu b, Yu-Cheng Kan

More information

Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective -

Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective - Pavement Rehabilitation Using Hot Mix Asphalt - National Perspective - Rehabilitation Process Evaluate Existing Pavement and Conditions Evaluate Options Construct Project Monitor Performance Evaluate Existing

More information

Reduced Thickness Asphalt Rubber Concrete Leads to Cost Effective Pavement Rehabilitation

Reduced Thickness Asphalt Rubber Concrete Leads to Cost Effective Pavement Rehabilitation Reduced Thickness Asphalt Rubber Concrete Leads to Cost Effective Pavement Rehabilitation By Jack Van Kirk Director of Asphalt Technology Basic Resources Inc. 3050 Beacon Blvd. Suite 205 West Sacramento,

More information

PERFORMANCE EVALUATION SYSTEM FOR BITUMINOUS BINDERS

PERFORMANCE EVALUATION SYSTEM FOR BITUMINOUS BINDERS PERFORMANCE EVALUATION SYSTEM FOR BITUMINOUS BINDERS A. Vanelstraete, W. Teugels, Belgian Road Research Centre, Belgium, Nynas Bitumen, Belgium Abstract Understanding the behaviour and performance of bituminous

More information

Florida s Experience with Crumb Rubber

Florida s Experience with Crumb Rubber Florida s Experience with Crumb Rubber Jim Warren Executive Director Asphalt Contractors Association of Florida, Inc. www.floridaridesonus.org Slides Courtesy of FDOT State Materials Office Background

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE

More information

APPENDIX B. I. Background Information

APPENDIX B. I. Background Information APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement

More information

Laboratory Evaluation of Asphalt Concrete Mixtures from Rt.33 in Rochester, NY

Laboratory Evaluation of Asphalt Concrete Mixtures from Rt.33 in Rochester, NY Laboratory Evaluation of Asphalt Concrete Mixtures from Rt.33 in Rochester, NY by Michael P. Wagoner, M.S.C.E., E.I.T. Graduate Research Assistant William G. Buttlar, Ph.D., P.E. Associate Professor of

More information

Strain Measurement in Pavements with a Fibre Optics Sensor Enabled Geotextile

Strain Measurement in Pavements with a Fibre Optics Sensor Enabled Geotextile Strain Measurement in Pavements with a Fibre Optics Sensor Enabled Geotextile Olivier Artières 1, Matteo Bacchi 2, Paolo Bianchini 1, Pierre Hornych 3 and Gerrit Dortland 1 1 TenCate Geosynthetics France,

More information

Greening our Roads. Approach

Greening our Roads. Approach Greening our Roads Approach To create a Sustainable Future for the world, by achieving Resource Extension economically, by reducing usage of limiting resources and extending life cycle Ensuring Green Roads

More information

Reinforcement HUESKER. HaTelit. Engineering with geosynthetics

Reinforcement HUESKER. HaTelit. Engineering with geosynthetics HUESKER Engineering with geosynthetics rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr SKER HUESKER HUESKER Asphalt HUESKER HUESKER HUESKERHUES Reinforcement - the answer to reflective cracking in asphalt

More information

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Interim Advice Note 96/07 INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Summary This interim advice note provides guidance on improving

More information

Track Research Sponsors

Track Research Sponsors Preservation Update Track Research Sponsors Washington Montana Oregon Idaho Wyoming Nevada Utah Colorado California New Mexico Arizona Pre-2012, 2012, 2015 North Dakota South Dakota Nebraska Kansas Oklahoma

More information

SKER HUESKER HUESKER HUESKER HUESKER HUESKERHUES

SKER HUESKER HUESKER HUESKER HUESKER HUESKERHUES rhuesker HUESKER HaTelit HUESKER HUESKER HUESKER HUESKERr SKER HUESKER HUESKER Asphalt HUESKER HUESKER HUESKERHUES SKER HUESKERHUES HUESKERr SKER HUESKERHUES rhueskerreinforcement HUESKERr Long-term retardation

More information

TOWN OF LEXINGTON DEPARTMENT OF PUBLIC WORKS/ENGINEERING REQUIREMENTS FOR PAVING CONTRACTORS 2. APPLY FOR PERMIT TO OPEN OR OCCUPY STREET/SIDEWALK

TOWN OF LEXINGTON DEPARTMENT OF PUBLIC WORKS/ENGINEERING REQUIREMENTS FOR PAVING CONTRACTORS 2. APPLY FOR PERMIT TO OPEN OR OCCUPY STREET/SIDEWALK TOWN OF LEXINGTON DEPARTMENT OF PUBLIC WORKS/ENGINEERING REQUIREMENTS FOR PAVING CONTRACTORS 1. BE ON APPROVED PAVING CONTRACTORS LIST 2. APPLY FOR PERMIT TO OPEN OR OCCUPY STREET/SIDEWALK A "Permit to

More information

OHIO ASPHALT PAVING CONFERENCE

OHIO ASPHALT PAVING CONFERENCE OHIO ASPHALT PAVING CONFERENCE 38 th Annual Conference Wednesday, 2/6/2013 Fawcett Center Campus of The Ohio State University 2400 Olentangy River Road Columbus, Ohio 43210 REHAB STRATEGIES FOR LOCAL

More information

SEAUPG Annual Meeting Williamsburg, VA Thursday, November 19, 2015

SEAUPG Annual Meeting Williamsburg, VA Thursday, November 19, 2015 LADOTD Balanced Mixture Design Samuel Cooper III, Ph.D., P.E. Southeastern Asphalt User Producer Group November 6 9, 25 Williamsburg, Va. Acknowledgements LTRC Asphalt Research Group Jeremy Icenogle, Patrick

More information

Policy and Scrutiny Open Report on behalf of Richard Wills, Executive Director for Environment and Economy. Highways and Transport Scrutiny Committee

Policy and Scrutiny Open Report on behalf of Richard Wills, Executive Director for Environment and Economy. Highways and Transport Scrutiny Committee Agenda Item 9 Policy and Scrutiny Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Date: 01 June 2015 Subject: Decision Key decision? Reference: Summary:

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Best Practices for RAP Management. 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI

Best Practices for RAP Management. 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI Best Practices for RAP Management 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI Outline Current RAP usage and practices Motivations for using

More information

Case Studies - Concrete Overlays

Case Studies - Concrete Overlays Case Studies - Concrete Overlays Lessons Learned - Concrete Overlays Purdue Road School March 6, 2013 Today s Topic 1. Overlays 2. New Full-depth 3. Pervious 4. Roller Compacted 5. Full Depth Patching

More information

700 Life-Cycle Cost Analysis... 700-1

700 Life-Cycle Cost Analysis... 700-1 Table of Contents 700 Life-Cycle Cost Analysis... 700-1 701 Introduction... 700-1 701.1 Discount Rate... 700-1 702 Initial Construction... 700-1 703 Future Rehabilitation... 700-1 703.1 Introduction...

More information

Pavement Management Office

Pavement Management Office Department of Transportation and Public Works Puerto Rico Pavement Management Office PAVEMENT PRESERVATION SEPPP 1 GOALS AND OBJECTIVES PRHTA has been collecting data for more than twenty (20) years with

More information

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan Date: Location: September 14, 2011, 9:45a.m. start East side of street in front of 4656 Maura Lane, West Bloomfield Participants: Oakland County Michelle Belanger, Rick Hall, Matt Mountain, Gary Flounory,

More information

Expected Service Life and Performance Characteristics of HMA Pavements in LTPP

Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Submitted to: Asphalt Pavement Alliance Prepared

More information

Field Density Determination of Asphalt Concrete by the Coring Method

Field Density Determination of Asphalt Concrete by the Coring Method Field Density Determination of Asphalt Concrete by the Coring Method 1. Scope: This procedure is for determining the density of in place asphalt concrete pavement. 2. Apparatus: 2.1 Scale or balance having

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

CHAPTER I. INTRODUCTION

CHAPTER I. INTRODUCTION CHAPTER I. INTRODUCTION 1.1 Background There is a national need to develop asphalt wearing surfaces for modern timber bridges that are not only skid resistant, but also limit the transport of moisture

More information

Asphalt Institute Technical Bulletin. Laboratory Mixing and Compaction Temperatures

Asphalt Institute Technical Bulletin. Laboratory Mixing and Compaction Temperatures ASPHALT INSTITUTE EXECUTIVE OFFICES AND RESEARCH CENTER Research Park Drive P.O. Box 14052 Lexington, KY 40512-4052 USA Telephone 859-288-4960 FAX No. 859-288-4999 Asphalt Institute Technical Bulletin

More information

Proposed Revision to Bridge Design & Drafting Manual

Proposed Revision to Bridge Design & Drafting Manual INTEROFFICE MEMO TECHNICAL SERVICES Bridge Engineering Section Office Phone: (503) 986-4200 Fax Number: (503) 986-3407 DATE: February 5, 2014 TO: Scott Liesinger Bridge Design Standards Engineer FROM:

More information

EVALUTATION OF BOND STRENGTH AT ASPHALT INTERFACES MAURICE WHEAT B.S. CIVIL ENGINEERING, KANSAS STATE UNIVERSITY B.S GEOLOGY, KANSAS STATE UNIVERSITY

EVALUTATION OF BOND STRENGTH AT ASPHALT INTERFACES MAURICE WHEAT B.S. CIVIL ENGINEERING, KANSAS STATE UNIVERSITY B.S GEOLOGY, KANSAS STATE UNIVERSITY EVALUTATION OF BOND STRENGTH AT ASPHALT INTERFACES by MAURICE WHEAT B.S. CIVIL ENGINEERING, KANSAS STATE UNIVERSITY B.S GEOLOGY, KANSAS STATE UNIVERSITY A REPORT submitted in partial fulfillment of the

More information

EVALUATION OF OPEN-GRADED FRICTION COURSES: CONSTRUCTION, MAINTENANCE, AND PERFORMANCE

EVALUATION OF OPEN-GRADED FRICTION COURSES: CONSTRUCTION, MAINTENANCE, AND PERFORMANCE EVALUATION OF OPEN-GRADED FRICTION COURSES: CONSTRUCTION, MAINTENANCE, AND PERFORMANCE Report No. FHWA-SC-12-04 Final Report October 2012 Sponsor Agency: South Carolina Department of Transportation In

More information

Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis. Arnar Agustsson Sulton Azamov

Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis. Arnar Agustsson Sulton Azamov Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis Arnar Agustsson Sulton Azamov Contents 1. Perpetual Asphalt Pavement 2. Scope 3. Methodology 4. Performance 5. Alternatives

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

PAVEMENT STRUCTURE DESIGN GUIDELINES

PAVEMENT STRUCTURE DESIGN GUIDELINES PAVEMENT STRUCTURE DESIGN GUIDELINES Technical Circular T- 01/15 (Replaces Technical Circular T-01/04) Final Update: Jan. 26, 2015 Geotechnical, Materials and Pavement Engineering TABLE OF CONTENTS 1.0

More information

High-Speed Nondestructive Testing and Intelligent Construction Systems

High-Speed Nondestructive Testing and Intelligent Construction Systems High-Speed Nondestructive Testing and Intelligent Construction Systems 1st International Conference on Transportation Construction Management February 9-11, 9 2008 Orlando, Florida Ted Ferragut, P.E. NDT

More information

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on

More information

Performance Evaluation of Jet Fuel Resistant Polymer-Modified Asphalt for Airport Pavements

Performance Evaluation of Jet Fuel Resistant Polymer-Modified Asphalt for Airport Pavements Performance Evaluation of Jet Fuel Resistant Polymer-Modified Asphalt for Airport Pavements By: Ronald C. van Rooijen (Email: rvrooijen@ooms.nl) Manager R&D Laboratory, Ooms Avenhorn Holding The Netherlands

More information

ASPHALT RUBBER USAGE GUIDE

ASPHALT RUBBER USAGE GUIDE ASPHALT RUBBER USAGE GUIDE State of Division of Engineering Services Materials Engineering and Testing Services-MS #5 Office of Flexible Pavement Materials 5900 Folsom Boulevard Sacramento, CA 95819-4612

More information

EVALUATION OF ASPHALT BINDER CHARACTERISTICS OF TYPICAL ONTARIO SUPERPAVE CRM AND RAP-HMA MIXTURES

EVALUATION OF ASPHALT BINDER CHARACTERISTICS OF TYPICAL ONTARIO SUPERPAVE CRM AND RAP-HMA MIXTURES EVALUATION OF ASPHALT BINDER CHARACTERISTICS OF TYPICAL ONTARIO SUPERPAVE CRM AND RAP-HMA MIXTURES Sina Varamini, Ph.D. Candidate and Graduate Research Assistant Centre for Pavement and Transportation

More information

COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE GYRATORY COMPACTOR (SGC)

COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE GYRATORY COMPACTOR (SGC) Test Procedure for COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE TxDOT Designation: Tex-241-F Effective Date: December 2015 1. SCOPE 1.1 Use this test method to: compact cylindrical specimens of

More information

CHAPTER 2 LCCA APPROACHES

CHAPTER 2 LCCA APPROACHES 2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2

More information

Methodology and rules for design and rehabilitation of road pavement using new hot and cold recycled asphalt mixtures

Methodology and rules for design and rehabilitation of road pavement using new hot and cold recycled asphalt mixtures Deliverable 8 Methodology and rules for design and rehabilitation of road pavement using new hot and cold recycled asphalt mixtures CONTRACT N : G1RD-CT2000-00374 PROJECT N : GRD1-2000-25168 ACRONYM: PARAMIX

More information

AFFINITY BETWEEN BITUMEN AND AGGREGATES: IMPROVEMENT OF THE EN STATIC TEST METHOD

AFFINITY BETWEEN BITUMEN AND AGGREGATES: IMPROVEMENT OF THE EN STATIC TEST METHOD A5EE-141 AFFINITY BETWEEN BITUMEN AND AGGREGATES: IMPROVEMENT OF THE EN STATIC TEST METHOD Martin Hugener 1, Francoise Beltzung 2, Christian Angst 2 1 Laboratory for Road Engineering / Sealing Components,

More information

New Road 11.0m Asphalt 23m ROW

New Road 11.0m Asphalt 23m ROW New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or

More information

Asphalt-Rubber Chip Seal (SAM and SAMI) applications have been Main Stream since 1985! By: Jeff Smith

Asphalt-Rubber Chip Seal (SAM and SAMI) applications have been Main Stream since 1985! By: Jeff Smith Asphalt-Rubber Chip Seal (SAM and SAMI) applications have been Main Stream since 1985! By: Jeff Smith Background Asphalt-rubber binder and asphalt-rubber pavement preservation systems have been utilized

More information

Definitions...1. Asphalt Rubber Makeup...1. Wet Process High viscosity...1 Wet Process No Agitation...2 Dry Process...2

Definitions...1. Asphalt Rubber Makeup...1. Wet Process High viscosity...1 Wet Process No Agitation...2 Dry Process...2 Introduction to Rubberized Asphalt Concrete Usage RAC-101 Index Definitions...1 Asphalt Rubber Makeup...1 Wet Process High viscosity...1 Wet Process No Agitation...2 Dry Process...2 Asphalt Rubber Binder

More information

Pavement Design. Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION. 1005 Terminal Way, Suite 125 Reno, Nevada 89502

Pavement Design. Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION. 1005 Terminal Way, Suite 125 Reno, Nevada 89502 Pavement Design Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION ENGINEERS,, INC. I 1005 Terminal Way, Suite 125 Reno, Nevada 89502 Topics Introduction Design Factors Pavement Types Fundamentals

More information

National Center for Asphalt Technology. Pavement Test Track Research Findings

National Center for Asphalt Technology. Pavement Test Track Research Findings National Center for Asphalt Technology Pavement Test Track Research Findings 2000 2010 Overview The NCAT Pavement Test Track, a world-renowned accelerated pavement-testing facility, has been operating

More information

Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009

Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009 Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009 Presented by Willie Gonwa, P.E., Ph.D. West Allis, Wisconsin Porous

More information

Application of the Endurance Limit Premise in Mechanistic-Empirical Based Pavement Design Procedures

Application of the Endurance Limit Premise in Mechanistic-Empirical Based Pavement Design Procedures Application of the Endurance Limit Premise in Mechanistic-Empirical Based Pavement Design Procedures Text Word Count: 5,409 Tables & Figures: 3,250 Total Word Count: 8,659 By: 102 Northwest Drive, Suite

More information

Evaluation of Fiber-Reinforced Asphalt Mixtures Using Advanced Material Characterization Tests

Evaluation of Fiber-Reinforced Asphalt Mixtures Using Advanced Material Characterization Tests Evaluation of Fiber-Reinforced Asphalt Mixtures Using Advanced Material Characterization Tests By Kamil E. Kaloush, Ph.D., P.E., Associate Professor Arizona State University Department of Civil and Environmental

More information

Final Report Evaluation of I-Pave Low Volume Road Design Software

Final Report Evaluation of I-Pave Low Volume Road Design Software Final Report Evaluation of I-Pave Low Volume Road Design Software May 2015 Michael I Darter, William R. Vavrik, Dinesh Ayyala 2015 2014 Applied Research Associates, Inc. 1 Objectives 1. Obtain all documentation

More information

EMULSION BASICS. Midwestern Pavement. Adam Redman Heritage Research Group October 28, 2010 Des Moines, Iowa

EMULSION BASICS. Midwestern Pavement. Adam Redman Heritage Research Group October 28, 2010 Des Moines, Iowa EMULSION BASICS Midwestern Pavement Preservation Partnership Adam Redman Heritage Research Group October 28, 2010 Des Moines, Iowa OVERVIEW History Testing Description Storage and Handling Performance

More information

LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS

LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS HEIN, David K., P.Eng. Applied Research Associates, Inc., 5401 Eglinton Avenue West, Suite 105, Toronto, ON, CANA- DA, M9C 5K6. Tel: 416-621-9555

More information

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902 External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water

More information

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs Long Life Concrete Pavement Joint Performance Joint Rehabilitation Gary Fick, Trinity Construction Management Services, Inc. Representing the National CP Tech Center Driving Forces for Concrete Pavement

More information

The use of Warm Mix Asphalt EAPA Position Paper

The use of Warm Mix Asphalt EAPA Position Paper The use of Warm Mix Asphalt EAPA Position Paper 1 European Asphalt Pavement Association Rue du Commerce 77 1040 Brussels, Belgium www.eapa.org info@eapa.org January 2010 2 Summary Since the mid 1990s a

More information

ASPHALT PAVEMENT RECYCLING

ASPHALT PAVEMENT RECYCLING HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD ASPHALT PAVEMENT RECYCLING Hot In-Place alt ec cl n The Energy Saving Method! HIGHWAY REHAB CORP Highway Rehab Corp 2258 Route 22 Brewster, NY 10509 Tel

More information

Performance Graded Asphalt Binders Bob Horan, P.E. Consulting Engineer Mechanicsville, VA

Performance Graded Asphalt Binders Bob Horan, P.E. Consulting Engineer Mechanicsville, VA Performance Graded Asphalt Binders Bob Horan, P.E. Consulting Engineer Mechanicsville, VA October 30, 2003 T3S - Superpave for Low Volume Roads - R. Horan 1 What is Asphalt? October 30, 2003 T3S - Superpave

More information

Laboratory Evaluation of Asphalt Rubber Mixtures Using the Dynamic Modulus (E*) Test

Laboratory Evaluation of Asphalt Rubber Mixtures Using the Dynamic Modulus (E*) Test Laboratory Evaluation of Asphalt Rubber Mixtures Using the Dynamic Modulus (E*) Test By Kamil E. Kaloush, Ph.D., P.E. (corresponding author) Assistant Professor Arizona State University Department of Civil

More information

Hello viewers welcome to lesson 4.7 which is on pavement materials part IV and in this lesson we will be covering bituminous binders.

Hello viewers welcome to lesson 4.7 which is on pavement materials part IV and in this lesson we will be covering bituminous binders. Introduction to Transportation Engineering Prof. K. Sudhakar Reddy Department of Civil Engineering Indian Institute of Technology, Kharagpur Lecture - 30 Pavement Materials IV Hello viewers welcome to

More information

Ultrasonic Reference Blocks

Ultrasonic Reference Blocks Ultrasonic Reference Blocks Custom and Standard Test Blocks for Nondestructive Testing Introduction 3 IIW Type 1 Calibration Block 4 Miniature Angle Beam (ROMPAS) Calibration Block 4 Distance Calibration

More information

UPDATE TO THE AUSTRALIAN STANDARD FOR BITUMEN (AS 2008 1997)

UPDATE TO THE AUSTRALIAN STANDARD FOR BITUMEN (AS 2008 1997) UPDATE TO THE AUSTRALIAN STANDARD FOR BITUMEN (AS 2008 1997) Mr Kym Neaylon, ARRB Group, Australia ABSTRACT Bitumen is recognised as a key component in the maintenance of Australia s road transport network,

More information

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial

More information

A H M 531 Penetration & Ring & Ball & Ductility & Flash & Fire point By: Mu'men Al-Otoom

A H M 531 Penetration & Ring & Ball & Ductility & Flash & Fire point By: Mu'men Al-Otoom The Civil Engineering Center 1 Visit www.ahm531.com for more lecture notes and E-book! The Civil Engineering Center 2 Visit www.ahm531.com for more lecture notes and E-book! Introduction : The grades of

More information

How To Get A Street Opening Permit In Belham

How To Get A Street Opening Permit In Belham TOWN OF BELLINGHAM STREET OPENING SPECIFICATION December 2004 - Revisions I. GENERAL A. Definitions and Abbreviations: Town Street shall mean a Town owned right of way or public travel way that the Town

More information

Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors. Paper No.: 02-2876

Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors. Paper No.: 02-2876 Eul-Bum Lee Page 1 Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors Submitted to A2F05 - CONSTRUCTION MANAGEMENT Paper No.: 02-2876 Eul-Bum Lee* Assistant

More information

Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks

Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Schedule What is Fly Ash Slurry Injection (FASI) Thermal Cracks and Why They Depress Pavement Rehab Strategies Special Provisions Upcoming Projects

More information

FHWA Update. AASHTO Subcommittee On Construction 2013 Annual Meeting Detroit, MI

FHWA Update. AASHTO Subcommittee On Construction 2013 Annual Meeting Detroit, MI FHWA Update AASHTO Subcommittee On Construction 2013 Annual Meeting Detroit, MI Butch Wlaschin, P.E. Director, Office of Asset Management, Pavements & Construction HOT TOPICS - from Butch s Desk MAP-21

More information

Bitumen and foaming properties. October 15, NABin 2013, Grand Hotel Oslo, Helene Odelius, Nynas AB

Bitumen and foaming properties. October 15, NABin 2013, Grand Hotel Oslo, Helene Odelius, Nynas AB Bitumen and foaming properties October 15, NABin 2013, Grand Hotel Oslo, Helene Odelius, Nynas AB Content Bitumen foaming; why, when and how? Foaming characterisation of binders Laboratory asphalt evaluation

More information

Assessment of a Hot-in-Place Recycling Process

Assessment of a Hot-in-Place Recycling Process Tamkang Journal of Science and Engineering, Vol. 4, No. 4, pp. 265-276 (21) 265 Assessment of a Hot-in-Place Recycling Process Dar-Hao Chen and John Bilyeu Department of Transportation Material and Pavements

More information

(T indicates a Tropicalised version with extended workability. No change has been made to the formulation)

(T indicates a Tropicalised version with extended workability. No change has been made to the formulation) 928 T (T indicates a Tropicalised version with extended workability. No change has been made to the formulation) High strength, non-shrink cementitious grout Description 928 T is a ready to use product

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia

Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia International Concrete Repair Institute Spring Convention Reno, Nevada March 20, 2014 Michael Sprinkel, PE.,

More information