IT Solutions Life Cycle Management. Pension Benefit Guaranty Corporation Dated: November 1, 2012 v1.2
|
|
|
- Ernest McKinney
- 9 years ago
- Views:
Transcription
1 IT Solutions Life Cycle Pension Benefit Guaranty Corporation Dated: November 1, 2012 v1.2
2 IT Solutions Life Cycle Pension Benefit Guaranty Corporation ITSLCM
3 External Processes IT Standards (S) & Guidance (G) Deliverables (F) - Final (P) Preliminary (U) - Update Reviews Gates Information Technology Solutions Life Cycle (ITSLCM) Architect Invest Implement Need/Concept Planning Solution Implementation (Requirements, Design, Build, Test, Deploy) Operations & Maintenance Disposition TRB CAB (s) TRB CAB AO/CIO/SAISO (ATO/Go Live) Program Charter Review PMP/Schedule/Cost Review Requirements (Technology Solution Review) Design (Technology Solution Review) Production Readiness Validation Review & Update Annually Disposition Review Program Charter Program Plan (PgMP) Business Need Analysis Document (e.g. Segment Architecture, Architectural Analysis or White Paper) IT Synopsis IT Program Release Plan Review & Update Annually Project Plan (PMP) OMB Exhibit 300 Deployment and Disposition Plan (P) Security Registration Document Security Risk Assessment (P) System Security Plan (P) Requirements Document Lessons Learned Document Design and COTS Configuration System Security Plan (F) Document Security Risk Assessment (F) Deployment and Disposition MOUs, SLAs, and/or Intra-agency Plan (U) Agreements User Manual Security Authorization Package Execute selected Implementation & Training Plan Program/Investment development Performance Reports approach Operational Analysis Deployment and Disposition Plan (U) Update & Maintain Iteratively Deployment and Disposition Plan (F) Program Charter (S) IT Program/Investment (G) IT Program/Investment (G) Business Need Analysis (S) Total Cost of Ownership (G) IT Product and Technology (S) IT Program Release Plan (S) Project (G) Project Plan (S) Solution Development Approach (G) Deployment and Disposition Plan (S) Enterprise Information Security (S)* Requirements Document (S) Design and COTS Configuration Document (S) System Development (S) Data (S) IT Software Services (S) Implementation & Training Plan (S) Lessons Learned Document (S) Enterprise Information Security (S)* Operational Analysis (S) Enterprise Information Security (S)* Enterprise Information Security (S)* IT Risk Budget Formulation & Execution IT Risk Business Needs Analysis Configuration Change Configuration Release IT Risk IT Service/Incident/Problem Change Configuration IT Risk IT Service/Incident/ Problem Change Configuration IT Risk *Refer to OIT Policy & Process Library for Complete List
4 ITSLCM Phase 1: Need/Concept Need/Concept Gates Reviews (IT Portfolio Registration Review) Program Charter Review Roles Business Program Manager IT Program Manager Chief Architect Business Owner/Sponsor External Processes IT Risk Deliverables Program Charter (PgC) IT Standards & Guidance Program Charter (PgC) (S) IT Program/Investment (G)
5 ITSLCM Phase 1: Need/Concept Streams Program/Investment Analyze business need within the program solutions Analyze business need across enterprise solutions o EXISTING: Obtain access to existing solution (STOP) Tasks o ENHANCE EXISTING: Develop Independent Government Cost Estimate (IGCE) to modify and use existing solution, inform, and submit to Program CCB o NEW: Form Integrated Program Team (IPgT), Develop IGCE for performing Planning Phase tasks, finalize sponsorship and Program Charter (PgC), and submit for Review Project No Stream Tasks Technology Solution No Stream Tasks Enterprise Information Security No Stream Tasks Acquisition No Stream Tasks
6 ITSLCM Phase 2: Planning (Pre- Review & Recommendation) Planning (Pre- Review & Recommendation) Gates (IT Synopsis Review & Recommendation) Reviews Roles Business Program Manager IT Program Manager Integrated Program Team (IPgT) Business Project Manager IT Project Manager Integrated Project Team (IPT) Business Owner/Sponsor IT Investment Owner Contracting Officer s Representative Contracting Officer Authorizing Official Information System Owner/Information Owner Information System Security Officer Privacy Officer External Processes Business Needs Analysis IT Risk Budget Formulation & Execution Configuration Deliverables Program Plan (PgMP) Business Need Analysis Document (e.g. Segment Architecture, Architectural Analysis or White Paper) IT Program Release Plan IT Synopsis IT Standards & Guidance IT Program/Investment (G) Business Need Analysis (S) Total Cost of Ownership (G)
7 ITSLCM Phase 2: Planning (Pre- Review & Recommendation) Streams Program/Investment Tasks Build Program Plan (PgMP) with IPgT: o Identify IPgT and define Roles and Responsibilities o Perform Business Needs Analysis (BNA), Business Process Assessment, and identify business and IT gaps, including system replacements o Determine strategic alignment (e.g. Legislative, Audit, Strategic Plan, etc.) o Conduct Alternatives Analysis and Cost Benefit Analysis (including Information Security considerations) o Develop IGCE, including impacts to other programs o Develop Acquisition Strategy o Develop Risk, Issue, Quality, Configuration, Communication Plans and Matrices o Define program reporting/oversight o Prioritize program requirements and program schedule with IPgT stakeholders (Business, EA, IT Security and Infrastructure, etc.) Finalize PgMP with IPgT Develop IT Program Release Plan Submit IT Synopsis for the Program/Investment Reflect IGCE in departmental budget formulation/request Review & Update Annually Project No Stream Activities Technology Solution No Stream Activities Enterprise Information Security No Stream Activities Acquisition Develop and submit Advanced Procurement Plan for planning tasks
8 ITSLCM Phase 2: Planning (Post- Review & Recommendation) Planning (Post- Review & Recommendation) Gates Reviews TRB (Product Selection Review) PMP/Schedule/Cost Review Roles Business Program Manager IT Program Manager Integrated Program Team (IPgT) Business Project Manager IT Project Manager Integrated Project Team (IPT) Business Owner/Sponsor IT Investment Owner Contracting Officer s Representative Contracting Officer Authorizing Official Information System Owner/Information Owner Information System Security Officer Privacy Officer External Processes Business Needs Analysis IT Risk Budget Formulation & Execution Configuration Deliverables Project Plan (PMP) OMB Exhibit 300 Deployment and Disposition Plan (P) Security Registration Document Security Risk Assessment (P) System Security Plan (P) IT Standards & Guidance IT Product and Technology (S) Project Plan (S) IT Program Release Plan (S) Project (G) Solution Development Approach (G) Deployment and Disposition Plan (S) Enterprise Information Security (S) (Refer to OIT Policy and Process Library for complete list)
9 ITSLCM Phase 2: Planning (Post- Review & Recommendation) Streams Program/Investment Tasks Establish Program CCB Update IT Program Release Plan Update PgMP with results of product selection and refined IGCE Develop OMB Exhibit 300 for Major investment Review & Update Annually Project Select development approach Develop Project Plan (PMP), if necessary, to address exceptions in the PgMP Technology Solution Conduct Product and Technology Selection Document high level requirements in Deployment and Disposition Plan mapped to BNA results Develop high level design from high level requirements, including integration with other systems, and submit for CAB review Refine IGCE Enterprise Information Security Perform Security Registration Process Begin Security Assessment & Authorization (SA&A) Acquisition Develop and submit Advanced Procurement Plans Obtain products/services
10 ITSLCM Phase 3: Solution Implementation Gates Reviews Roles CAB (Infrastructure Resources Review) Requirements (Technology Solution Review) Business Program Manager IT Program Manager Integrated Program Team (IPgT) Review(s) Design (Technology Solution Review) Solution Implementation (Requirements, Design, Build, Test, Deploy) Business Project Manager IT Project Manager Integrated Project Team (IPT) Steering/Oversight Committee TRB (Requirements & Design Review) Production Readiness Validation CAB (Production/COOP Deployment Review) AO/CIO/SAISO (ATO/Go Live) Contracting Officer s Representative Release Manager Contracting Officer Authorizing Official Information System Security Officer Information System Owner/Information Owner External Processes Configuration Release Change IT Risk IT Service/Incident/Problem Deliverables Requirements Document Design and COTS Configuration Document Deployment and Disposition Plan (U) User Manual Implementation & Training Plan Program/Investment Performance Report Lessons Learned Document System Security Plan (F) Security Risk Assessment (F) MOUs, SLAs, and/or Inter-Agency Agreements Security Authorization Package IT Standards & Guidance Requirements Documents (S) Design and COTS Configuration Document (S) System Development (S) Data (S) IT Software Services (S) Implementation & Training Plan (S) Lessons Learned Document (S) Enterprise Information Security (S) (Refer to OIT Policy and Process Library for complete list)
11 ITSLCM Phase 3: Solution Implementation Streams Program/Investment Project Tasks Execute according to the PgMP Perform program and investment monitoring and reporting o For Major: Monthly steering committee reporting (cost and schedule performance using EV), recurring Program/Investment Implementation Progress reviews OMB, IT Dashboard reporting o For Non-Major: Monthly steering committee reporting of cost and schedule, Program/Investment Implementation Progress reviews Execute according to the IT Program Release Plan, PMP and corrective actions (manage scope, cost, schedule, and risk using EVM) Develop Implementation Strategy and Training Plan in coordination with HR Department Execute selected Obtain approvals from Reviews and Gates development Execute Implementation Strategy and Training Plan in coordination with HR Department approach Document Lessons Learned and Project Closeout Technology Solution Analyze and document detailed requirements (functional, technical, etc.) Develop design specifications Develop/configure solution Conduct testing tasks (functional, system, performance) Document operations and maintenance needs Deploy solution to production/coop Stabilize the solution Grant access to users Set up service desk support Transition to O&M Enterprise Information Security Conduct Security Impact Analysis Complete Security Assessment & Authorization (SA&A) Obtain Authority to Operate Acquisition Conduct ongoing acquisition management administration Develop MOUs, SLAs, and Intra-Agency Agreements, as needed Alternate Project-Type Solution Implementation Views Available for: COTS, Hosted, Enhancement
12 ITSLCM Phase 4: Operations & Maintenance Operations & Maintenance Gates Reviews (Post Implementation Review) (Annual Operational Analysis) Roles Business Program Manager IT Program Manager Integrated Program Team (IPgT) Business Project Manager IT Project Manager Integrated Project Team (IPT) Contracting Officer s Representative Contracting Officer Steering/Oversight Committee Authorizing Official Information System Owner/Information Owner Information System Security Officer Release Manager External Processes Configuration IT Risk Change IT Service/Incident/Problem Deliverables Operational Analysis Deployment and Disposition Plan (U) IT Standards & Guidance Operational Analysis (S) Enterprise Information Security (S) (Refer to OIT Policy and Process Library for complete list)
13 ITSLCM Phase 4: Operations & Maintenance Streams Streams Tasks Program/Investment Perform program and investment monitoring and reporting o For Major: Monthly steering committee reporting (cost and schedule performance), reporting, OMB IT Dashboard reporting Review & o For Non-Major: Monthly steering committee reporting of cost and schedule, reporting Update Conduct Operational Analysis Annually o Perform Post Implementation Review to validate that the solution aligns with business needs and closes performance gaps o Perform Annual Operational Analysis Review to determine whether solution should be continued, modified, or terminated Update PgMP with annual maintenance/steady state tasks including results of Operational Analysis Project No Stream Tasks Technology Solution Execute annual maintenance/steady state tasks Update Deployment and Disposition Plan Update & Maintain Iteratively Enterprise Information Security Continuous Monitoring Acquisition Conduct ongoing acquisition management administration
14 ITSLCM Phase 5: Disposition Disposition Gates Reviews (Deselect IT Program from Portfolio) Disposition Review Roles Business Program Manager IT Program Manager Integrated Program Team (IPgT) Authorizing Official Information System Owner/Information Owner Contracting Officer s Representative Contracting Officer External Processes Change Configuration IT Risk Deliverables Deployment and Disposition Plan (F) IT Standards & Guidance Enterprise Information Security (S) (Refer to OIT Policy and Process Library for complete list)
15 ITSLCM Phase 5: Disposition Streams Tasks Program/Investment Receive authorization to dispose of solution Update Deployment and Disposition Plan Close out program/investment Project No Stream Tasks Technology Solution Execute Deployment and and Disposition Plan Plan Conduct solution disposition reviews reviews Enterprise Information Security No Stream Tasks Acquisition No Stream Tasks No Stream Tasks
16 This page intentionally left blank
17 ADDITIONAL Solution/Project TYPE VIEWS (Used in the Solution Implementation Phase)
18 REQUIRED IF APPLICABLE ITSLCM Phase 3: Solution Implementation COTS VIEW Solution Implementation (Requirements, Design, Build, Test, Deploy) Gates CAB (Infrastructure Resources Review) Review(s) TRB (Requirements & Design Review) CAB (Production/COOP Deployment Review) AO/CIO/SAISO (ATO/Go Live) Reviews Requirements (Technology Solution Review) Design (Technology Solution Review) Production Readiness Validation Roles Business Program Manager IT Program Manager Integrated Program Team (IPgT) Business Project Manager IT Project Manager Integrated Project Team (IPT) Steering/Oversight Committee Contracting Officer s Representative Release Manager Contracting Officer Authorizing Official Information System Security Officer Information System Owner/Information Owner External Processes Configuration Release Change IT Risk IT Service/Incident/Problem Deliverables Requirements Document Deployment and Disposition Plan (U) Program/Investment Performance Report Lessons Learned Document Design and COTS Configuration Document User Manual Implementation & Training Plan MOUs, SLAs, and/or Inter-Agency Agreements System Security Plan (F) Security Risk Assessment (F) Security Authorization Package IT Standards & Guidance Requirements Documents (S) Design and COTS Configuration Document (S) System Development (S) Data (S) IT Software Services (S) Implementation & Training Plan (S) Lessons Learned Document (S) Enterprise Information Security (S) (Refer to OIT Policy and Process Library for complete list)
19 ITSLCM Phase 3: Solution Implementation COTS VIEW Streams Program/Investment REQUIRED Tasks Execute according to the PgMP Perform program and investment monitoring and reporting o For Major: Monthly steering committee reporting (cost and schedule performance using EV), reporting, OMB IT Dashboard reporting o For Non-Major: Monthly steering committee of cost and schedule recurring Program Investment Implementation Progress Reviews. IF APPLICABLE Tasks Project Technology Solution Execute according to the IT Program Release Plan, PMP and corrective actions (manage scope, cost, schedule, and risk using EVM) Obtain approvals from Reviews and Gates Document Lessons Learned and Project Closeout Execute selected Analyze and document detailed requirements (functional, technical, etc.) Conduct testing tasks (functional, system, performance) Deploy solution to production/coop Grant access to users development approach Develop Implementation Strategy and Training Plan in coordination with HR Department Execute Implementation Strategy and Training Plan in coordination with HR Department Develop/configure solution Develop design specifications Stabilize the solution Set up service desk support Document operations and maintenance needs Transition to O&M Enterprise Information Security Conduct Security Impact Analysis Complete Security Assessment & Authorization (SA&A) Obtain Authority to Operate Acquisition Conduct ongoing acquisition management administration Develop MOUs, SLA and Inter agency Agreement as needed
20 REQUIRED IF APPLICABLE ITSLCM Phase 3: Solution Implementation HOSTED VIEW Solution Implementation (Requirements, Design, Build, Test, Deploy) Gates CAB (Infrastructure Resources Review) Review(s) TRB (Requirements & Design Review) CAB (Production/COOP Deployment Review) AO/CIO/SAISO (ATO/Go Live) Reviews Requirements (Technology Solution Review) Design (Technology Solution Review) Production Readiness Validation Roles Business Program Manager IT Program Manager Integrated Program Team (IPgT) Business Project Manager IT Project Manager Integrated Project Team (IPT) Steering/Oversight Committee Contracting Officer s Representative Release Manager Contracting Officer Authorizing Official Information System Security Officer Information System Owner/Information Owner External Processes Configuration Release Change IT Risk IT Service/Incident/Problem Deliverables Requirements Document Deployment and Disposition Plan (U) Program/Investment Performance Report Lessons Learned Document Design and COTS Configuration Document User Manual Implementation & Training Plan MOUs, SLAs, and/or Inter-Agency Agreements System Security Plan (F) Security Risk Assessment (F) Security Authorization Package Standards & Guidance Requirements Documents (S) Design and COTS Configuration Document (S) System Development (S) Data (S) IT Software Services (S) Implementation & Training Plan (S) Lessons Learned Document (S) Enterprise Information Security (S) (Refer to OIT Policy and Process Library for complete list)
21 ITSLCM Phase 3: Solution Implementation HOSTED VIEW Streams Program/Investment REQUIRED Tasks Execute according to the PgMP Perform program and investment monitoring and reporting o For Major: Monthly steering committee reporting (cost and schedule performance using EV), reporting, OMB IT Dashboard reporting o For Non-Major: Monthly steering committee reporting of cost and schedule, reporting IF APPLICABLE Tasks Project Execute according to the IT Program Release Plan, PMP and corrective actions (manage scope, cost, schedule, and risk using EVM) Obtain approvals from Reviews and Gates Document Lessons Learned and Project Closeout Execute selected development approach Develop Implementation Strategy and Training Plan in coordination with HR Department Execute Implementation Strategy and Training Plan in coordination with HR Department Technology Solution Analyze and document detailed requirements (functional, technical, etc.) Conduct testing tasks (functional, system, performance) Grant access to users Develop design specifications Develop/configure solution Document operations and maintenance needs Deploy solution to production/coop Stabilize the solution Set up service desk support Transition to O&M Enterprise Information Security Conduct Security Impact Analysis Obtain Authority to Operate Complete Security Assessment & Authorization (SA&A) Acquisition Conduct ongoing acquisition management administration Develop MOUs, SLAs, and Intra-agency Agreements, as needed
22 New Required Update Required IF APPLICABLE ITSLCM Phase 3: Solution Implementation ENHANCEMENT VIEW Solution Implementation (Requirements, Design, Build, Test, Deploy) Gates CAB (Infrastructure Resources Review) Review(s) TRB (Requirements & Design Review) CAB (Production/COOP Deployment Review) AO/CIO/SAISO (ATO/Go Live) Reviews Requirements (Technology Solution Review) Design (Technology Solution Review) Production Readiness Validation Roles Business Program Manager IT Program Manager Integrated Program Team (IPgT) Business Project Manager IT Project Manager Integrated Project Team (IPT) Steering/Oversight Committee Contracting Officer s Representative Release Manager Contracting Officer Authorizing Official Information System Security Officer Information System Owner/Information Owner External Processes Configuration Release Change IT Risk IT Service/Incident/Problem Deliverables Program/ Investment Performance Report Requirements Document Design and COTS Configuration Document Deployment and Disposition Plan Lessons Learned Document User Manual Implementation & Training Plan System Security Plan (F) Security Risk Assessment (F) MOUs, SLAs, and/or Inter-Agency Agreements Security Authorization Package IT Standards & Guidance Requirements Documents (S) Design and COTS Configuration Document (S) System Development (S) Data (S) IT Software Services (S) Implementation & Training Plan (S) Lessons Learned Document (S) Enterprise Information Security (S) (Refer to OIT Policy and Process Library for complete list)
23 ITSLCM Phase 3: Solution Implementation ENHANCEMENT VIEW Streams Program/Investment Project REQUIRED Tasks Execute according to the PgMP Perform program and investment monitoring and reporting o For Major: Monthly steering committee reporting (cost and schedule performance using EV), recurring Progress Investment Implementation Program Reviews, OMB IT Dashboard reporting o For Non-Major: Monthly steering committee reporting of cost and schedule, recurring Progress Investment Implementation Program Reviews. Execute according to the Release Plan, PMP and corrective actions (manage scope, cost, schedule, and risk using EVM) Obtain approvals from Reviews and Gates Document Lessons Learned and Project Closeout IF APPLICABLE Tasks Develop Implementation Strategy and Training Plan in coordination with HR Department Execute Implementation Strategy and Training Plan in coordination with HR Department Technology Solution Analyze and document detailed requirements (functional, technical, etc.) Develop design specifications Develop/configure solution Conduct testing tasks (functional, system, performance) Document operations and maintenance needs Deploy solution to production/coop Stabilize the solution Transition to O&M Grant access to users Execute selected development approach Set up service desk support Enterprise Information Security Acquisition Conduct Security Impact Analysis Conduct ongoing acquisition management administration Complete Security Assessment & Authorization (SA&A) Obtain Authority to Operate Develop MOUs, SLAs, and/or Intra-agency Agreements
Enterprise Performance Life Cycle Management. Guideline
Enterprise Performance Life Cycle Management Guideline Version 2.1 PREPARED BY THE ENTERPRISE PROGRAM MANAGEMENT OFFICE MAY 2011 Table of Contents Document Control...i 1. Introduction... 2 1.1 Purpose...
IT SYSTEM LIFE-CYCLE AND PROJECT MANAGEMENT
United States Department of Agriculture Agricultural Marketing Service Directive 3130.8 IT SYSTEM LIFE-CYCLE AND PROJECT MANAGEMENT I. PURPOSE... 1 II. POLICY... 1 III. DEFINITIONS... 1 IV. DOCUMENTATION
Manag. Roles. Novemb. ber 20122
Information Technology Manag gement Framework Roles and Respo onsibilities Version 1.2 Novemb ber 20122 ITM Roles and Version History Version ed By Revision Date Approved By Approval Date Description of
Program Management Professional. PgMP
Program Management Professional PgMP COURSE BACKGROUND COURSE LENGTH: 3 days (2.1 CEUs / 21 PDUs) COURSE DESCRIPTION: The Program Management course addresses the essential aspects or Program selection,
UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET
Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Release: 1-1718 Date: MANUAL TRANSMITTAL SHEET Subject 1265 Information Technology Investment Management (ITIM)
A. This Directive applies throughout DHS, unless exempted by statutory authority.
I. Purpose Department of Homeland Security DHS Directives System Directive Number: 103-02 Revision Number: 00 Issue Date: 6/19/2014 ENTERPRISE ARCHITECTURE MANAGEMENT This Directive establishes the Department
OPM System Development Life Cycle Policy and Standards. Table of Contents
Table of Contents 1. INTRODUCTION... 4 1.1 Purpose... 4 1.1.1 OPM SDLC Policy... 4 1.1.2 Key Concepts and Principles... 4 1.2 Scope and Applicability... 5 1.3 Compliance, Enforcement and Exceptions...
Enterprise Performance Life Cycle Framework
United States Department of Health & Human Services Office of the Chief Information Officer Office of the Assistant Secretary for Resources and Technology Department of Health and Human Services (HHS)
U.S. Department of Education Federal Student Aid
U.S. Department of Education Federal Student Aid Lifecycle Management Methodology Stage Gate Review Process Description Version 1.3 06/30/2015 Final DOCUMENT NUMBER: FSA_TOQA_PROC_STGRW.NA_001 Lifecycle
Advanced Topics for TOGAF Integrated Management Framework
Instructor: Robert Weisman MSc, PEng, PMP CD [email protected] Advanced Topics for TOGAF Integrated Management Framework ROBERT WEISMAN CEO BUILD THE VISION, INC. WWW.BUILDTHEVISION.CA EMAIL:
Department of Veterans Affairs VA DIRECTIVE 6071
Department of Veterans Affairs VA DIRECTIVE 6071 Washington, DC 20420 Transmittal Sheet PROJECT MANAGEMENT ACCOUNTABILITY SYSTEM (PMAS) 1. REASON FOR ISSUE. To set forth policies and responsibilities for
Total Cost of Ownership
Protecting America's Pensions Office of Information Technology IT Investment Owner's Guide to Total Cost of Ownership Version 1.0 Last Updated Date: January 25, 2011 Revision History Document Version Release
Project Type Guide. Project Planning and Management (PPM) V2.0. Custom Development Version 1.1 January 2014. PPM Project Type Custom Development
Project Planning and Management (PPM) V2.0 Project Type Guide Custom Development Version 1.1 January 2014 Last Revision: 1/22/2014 Page 1 Project Type Guide Summary: Custom Development Custom software
U.S. Department of Education. Office of the Chief Information Officer
U.S. Department of Education Office of the Chief Information Officer Investment Review Board (IRB) CHARTER January 23, 2013 I. ESTABLISHMENT The Investment Review Board (IRB) is the highest level IT investment
MNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
Guide to IT Capital Planning and Investment Control (CPIC)
U.S. Department of Energy Guide to IT Capital Planning and Investment Control (CPIC) September 2010 Office of the Chief Information Officer TABLE OF CONTENTS 1.0 Preface... 1 2.0 Introduction... 2 2.1
United States Department of Health & Human Services Enterprise Architecture Program Management Office. HHS Enterprise Architecture Governance Plan
United States Department of Health & Human Services Enterprise Architecture Program Management Office HHS Enterprise Architecture Governance Plan Version 3.0 February 2007 Approvals The Health and Human
U.S. Department of Education Federal Student Aid
U.S. Department of Education Federal Student Aid Lifecycle Management Methodology Version 1.3 06/30/15 Final DOCUMENT NUMBER: FSA_TOQA_PROC_STGRW.NA_001 Update History Lifecycle Management Methodology
Open Group SOA Governance. San Diego 2009
Open Group SOA Governance San Diego 2009 SOA Governance Aspects A comprehensive view of SOA Governance includes: People Organizational structures Roles & Responsibilities Processes Governing processes
PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development
PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development December 2015 1. Getting Started with PPM Life Cycle 2. PPM Life Cycle Process 3. PPM V2.0 and Project Types
Roles & Grades Rate Cards and Applicable SFIA Skills
Roles & s Rate Cards and Applicable Consultant Day Rate Card Consultant Day Rate Lead 900.00 Senior 800.00 Junior 0.00 CLAS Consultant and Competencies Lead CLAS Consultant Lead CLAS Consultant IT Governance
SLCM Framework (Version 2003.1) Roles and Responsibilities As of January 21, 2005
SLCM Framework (Version 2003.1) Roles and Responsibilities As of January 21, 2005 ROLE RESPONSIBILITY REVIEW SIGN- OFF CTO Manage IT assets to meet corporate goals Establish and chair the Information Technology
DATE REVISION xxxbyxxx. IT Modernization: EA Information Management. DATE: September 2003 AUTHOR: Enterprise Architecture Team
DATE REVISION xxxbyxxx IT Modernization: EA Information Management DATE: September 2003 AUTHOR: Enterprise Architecture Team 1.0 Introduction It is the policy of the United States Government that executive
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business
Capital Planning and Investment Control Guide
Department of Homeland Security Capital Planning and Investment Control Guide Version 4.0 May 2007 Prepared by the Office of the Chief Information Officer Document Version History Document Version Version
ITIL 2011 Lifecycle Roles and Responsibilities UXC Consulting
ITIL 2011 Lifecycle Roles and Responsibilities UXC Consulting Date November 2011 Company UXC Consulting Version Version 1.5 Contact [email protected] http://www.uxcconsulting.com.au This summary
A Project Manager s Guide to ITIL
A Project Manager s Guide to ITIL Erika Flora, PMP, PgMP, ITIL Expert [email protected] Training Consulting Assessments (866) 856-3117 toll-free Agenda Introduction Why ITIL? PMBOK Guide and ITIL
DIRECTIVE TRANSMITTAL
U.S. NUCLEAR REGULATORY COMMISSION DIRECTIVE TRANSMITTAL TN: DT-07-08 To: Subject: Purpose: Office and Division of Origin: NRC Management Directives Custodians Transmittal of Management Directive 2.8,
CMS Policy for Information Technology (IT) Investment Management & Governance
Chief Information Officer Office of Information Services Centers for Medicare & Medicaid Services CMS Policy for Information Technology (IT) Investment Management & Governance May 17, 2007 Document Number:
IT Project Governance Manual Version 1.1
IT Project Governance Manual Version 1.1 A Mandatory Reference for ADS Chapter 577 New Reference: 04/13/2010 Responsible Office: CIO File Name: 577mak_041310 UNITED STATES AGENCY FOR IT Project Goverance
ISEB MANAGER S CERTIFICATE IN ITIL INFRASTRUCTURE MANAGEMENT. Guidelines for candidates who are taking the ICT Infrastructure Examination
ISEB MANAGER S CERTIFICATE IN ITIL INFRASTRUCTURE MANAGEMENT Guidelines for candidates who are taking the ICT Infrastructure Examination This qualification is based on ITIL Infrastructure Management as
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
Value to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB
Value to the Mission FEA Practice Guidance Federal Enterprise Program Management Office, OMB November 2007 FEA Practice Guidance Table of Contents Section 1: Overview...1-1 About the FEA Practice Guidance...
Which statement about Emergency Change Advisory Board (ECAB) is CORRECT?
ITIL Foundation mock exam 4 1. Which of the following is NOT a purpose of Service Transition? A) To ensure that a service can be managed, operated and supported B) To provide training and certification
Positive Train Control (PTC) Program Management Plan
Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information
Integrating Project Management and Service Management
Integrating Project and Integrating Project and By Reg Lo with contributions from Michael Robinson. 1 Introduction Project has become a well recognized management discipline within IT. is also becoming
!"#$%&'(%)*$+ :%;$)*%<&%6 4.7&68'9"/6")& 0)1.%$2.3*%./'4"55*)6 ,&+-%$+./ !"#$%&##'()*+&## Figure 1: Five OSP Dimensions
!""#!$%&'(#)$*+,(-*(.&%/# &0*$1!"#$%&'(%)*$+ :%;$)*%
Concept of Operations for Line of Business Initiatives
Concept of Operations for Line of Business Initiatives Version 1.0 Office of E-Gov and IT, OMB March 2006 Table of Contents FOREWORD...2 1 OBJECTIVES OF THE LINES OF BUSINESS CONCEPT OF OPERATIONS...3
Blend Approach of IT Service Management and PMBOK for Application Support Project
Blend Approach of IT Service and PMBOK for Application Support Project Introduction: This paper addresses the process area, phases and documentation to be done for Support Project using Project and ITSM
Federal Enterprise Architecture Using EA to Design Future-Ready Agencies and Implement Shared Services
Federal Enterprise Architecture Using EA to Design Future-Ready Agencies and Implement Shared Services Scott A. Bernard, Ph.D. [email protected] Federal Chief Enterprise Architect Executive Office
IT Project Management Methodology. Project Execution Support Guide. Version 0.3
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Execution Support Guide Version 0.3 Table of Contents 1 INTRODUCTION... 4 1.1 When should Project Execution
Using PRINCE2 to Manage US Federal Government IT Projects
For Portfolio, Programme, Project, Risk and Service Management Using PRINCE2 to Manage US Federal Government IT Projects Applying the PRINCE2 project management method to support Capital Planning and Investment
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004)
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004) is the processes required to ensure that the various elements of the project are properly coordinated. the processes required to ensure
Information Systems Security Line of Business (ISS LoB)
Information Systems Security Line of Business (ISS LoB) Information Security and Privacy Advisory Board George Washington University Washington, DC March 22, 2007 Agenda Background Status Next Steps Background
Asset management guidelines
Asset management guidelines 1 IT asset management (ITAM) overview Objective Provide a single, integrated view of agency assets in order to allow agencies to identify the asset location and assess the potential
Federal Enterprise Architecture Framework
Resource Optimization Reporting January 29, 2013 Federal Enterprise Architecture Framework Version 2 Service Delivery Governance Current Views Human Capital Mgmt. (KSAs) Enterprise Strategic Plan/Goals
GEOSPATIAL LINE OF BUSINESS PROGRAM MANAGEMENT OFFICE CONCEPT OF OPERATIONS
GEOSPATIAL LINE OF BUSINESS PROGRAM MANAGEMENT OFFICE CONCEPT OF OPERATIONS March 2007 Adjudicated Draft TABLE OF CONTENTS 1 INTRODUCTION 3 2 VALUE PROPOSITION 3 3 ORGANIZING FRAMEWORK 3 31 PMO Organizational
Complimentary Relationship Between ITIL and PMBOK
CSC NORTH AMERICAN PUBLIC SECTOR Complimentary Relationship Between ITIL and PMBOK August Chantilly Luncheon Linda Budiman, PMP ITIL Business Process Architect ITIL Service Manager, COBIT certified 8/20/2008
ITIL Roles Descriptions
ITIL Roles s Role Process Liaison Incident Analyst Operations Assurance Analyst Infrastructure Solution Architect Problem Manager Problem Owner Change Manager Change Owner CAB Member Release Analyst Test
PHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
WHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101
WHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101 Prepared by: Phillip Bailey, Service Management Consultant Steve Ingall, Head of Service Management Consultancy 60 Lombard Street London EC3V 9EA
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
Project Initiation. ProPath. Office of Information and Technology
Project Initiation ProPath Office of Information and Technology Table of Contents Project Initiation Process Maps... 1 Process: Project Initiation... 10 Project Initiation and Goals... 12... 12 Goals...
HHS OCIO Policy for Information Technology (IT) Enterprise Performance Life Cycle (EPLC)
Office of the Chief Information Officer Office of the Assistant Secretary for Resources and Technology Department of Health and Human Services HHS OCIO Policy for Information Technology (IT) Enterprise
CMS Expedited Life Cycle Process: Detailed Description
Department of Health and Human Services Centers for Medicare & Medicaid Services CMS Expedited Life Cycle Process: Detailed Description Version 3.3 November 21, 2014 Record of Changes # Date Reference
Sound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
Project Management Professional (PMP)
Project Management Professional (PMP) Duration: 5 days Course Objectives: PMI s Project Management Professional (PMP) credential is the most important industry-recognized certification for project managers.
FSIS DIRECTIVE 1306.3
UNITED STATES DEPARTMENT OF AGRICULTURE FOOD SAFETY AND INSPECTION SERVICE WASHINGTON, DC FSIS DIRECTIVE 1306.3 REVISION 1 12/13/12 CONFIGURATION MANAGEMENT (CM) OF SECURITY CONTROLS FOR INFORMATION SYSTEMS
ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 5 PROJECT CLOSEOUT PHASE Table of Contents Introduction... 3 Project Closeout Phase... 3 Activities and Documents in the Closeout Phase... 4 Project Closeout Task...
Project Management Office Best Practices
Project Management Office Best Practices Agenda Maturity Models (Industry & PMO) PMO Areas of Expertise (Scale & Scope) Project Management Office Process Model Project Management Framework PMO Implementation
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning
October 7, 2011. Presented to. The PMI Washington DC Chapter. Pedro Agosto. Director of Client Services, XA Systems, LLC. pedro.agosto@xasystems.
October 7, 2011 Presented to The PMI Washington DC Chapter By Pedro Agosto Director of Client Services, XA Systems, LLC [email protected] Introduction Re-evaluating IT Services Today s Challenges
PMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
Applying Business Architecture to the Cloud
Applying Business Architecture to the Cloud Mike Rosen, Chief Scientist Mike.Rosen@ WiltonConsultingGroup.com Michael Rosen Agenda n What do we mean by the cloud? n Sample architecture and cloud support
Syllabus 2nd Edition
Syllabus 2nd Edition 2 Introductory Certificate Syllabus 2nd Edition 2nd Edition Introductory Certificate syllabus All of the syllabus elements should be taken within the context of a project and project.
Overview of Florida Information Technology Project Management and Oversight Standards. Jason M. Allison, Executive Director
Overview of Florida Information Technology Project Management and Oversight Standards Jason M. Allison, Executive Director AGENCY FOR STATE TECHNOLOGY Statutory duties and responsibilities of AST: Establish
1 Why should monitoring and measuring be used when trying to improve services?
1 Why should monitoring and measuring be used when trying to improve services? a) To validate, direct, justify and intervene b) To validate, measure, monitor and change c) To validate, plan, act and improve
Development, Acquisition, Implementation, and Maintenance of Application Systems
Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of
ITIL Service Lifecycle Stream
ITIL Lifecycle Stream Syllabus at a Glance Strategy Design Transition Operation Continual Improvement Introduction to service strategy Introduction to service design Introduction to service transition
INFORMATION TECHNOLOGY PROJECT EXECUTION MODEL GUIDE FOR SMALL AND MEDIUM PROJECTS
NOT MEASUREMENT SENSITIVE DOE G 415.1-2 INFORMATION TECHNOLOGY PROJECT EXECUTION MODEL GUIDE FOR SMALL AND MEDIUM PROJECTS [This Guide describes acceptable, but not mandatory means for complying with requirements.
PHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
The ITIL Foundation Examination Sample Paper A, version 5.1
The ITIL Foundation Examination Sample Paper A, version 51 Multiple Choice Instructions 1 All 40 questions should be attempted 2 All answers are to be marked on the answer grid provided 3 You have 60 minutes
Whitepaper Data Governance Roadmap for IT Executives Valeh Nazemoff
Whitepaper Data Governance Roadmap for IT Executives Valeh Nazemoff The Challenge IT Executives are challenged with issues around data, compliancy, regulation and making confident decisions on their business
CIOP CHAPTER 1351.40 Common Operating Environment (COE) Services Management Policy TABLE OF CONTENTS. Section 40.1. Purpose
CIOP CHAPTER 1351.40 Common Operating Environment (COE) Services Management Policy TABLE OF CONTENTS Section 40.1. Purpose... 1 Section 40.2. Background... 2 Section 40.3. Scope and Applicability... 3
Solution Architecture Framework Toolkit
Solution Architecture Framework Toolkit Health and Human Services Agency, Revision History REVISION HISTORY REVISION/WORKSITE # DATE OF RELEASE OWNER SUMMARY OF CHANGES Initial Release (v1.0) December
Management (PPM) V2.0 Project Type Guide
Project Planning PPM Project Type Software-as-a-Service and Management (PPM) V2.0 Project Type Guide Software-as-a-Service Version 1.1 January 2014 Last Revision: 2/12/2014 Page 1 Project Type Guide Summary:
Internal Use Software Implementation Guide Draft
Internal Use Software Implementation Guide Draft Summary This implementation guidance promotes an understanding of organizational considerations that affect the application of accounting standards to internal
Allison Stanton, Director of E-Discovery U.S. Department of Justice, Civil Division. U.S. Department of Agriculture
Allison Stanton, Director of E-Discovery U.S. Department of Justice, Civil Division Benjamin Young, Assistant General Counsel U.S. Department of Agriculture 1 Disclaimer The views expressed in this presentation
Shared IT Services Strategy Information Briefing
Shared IT Services Strategy Information Briefing Joseph Klimavicz NOAA Chief Information Officer and Director for High Performance Computing and Communications April 19, 2012 IT Reform Agenda 25 Point
Frequently Asked Questions (FAQs) about GRS 3.1, General Technology Management Records
Frequently Asked Questions (FAQs) about GRS 3.1, General Technology Management Records INTRODUCTION 1. What is the purpose of GRS 3.1? This schedule provides disposition authority for records related to
Subject: 1268-1 Information Technology Configuration Management Manual
Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Release 1-1741 Date MANUAL TRANSMITTAL SHEET 06/19/2012 Subject: 1268-1 Information Technology Configuration Management
5.1 4.1 4.2 4.3 PROCESS GROUP: PLANNING PROCESS GROUP: INITIATION. Oracle Projects. PMBOK Oracle Mapping. Scope Planning. Develop Project Charter
Develop Project Charter Develop Preliminary Project Scope Statement Develop Project Management Plan Scope Planning PROCESS GROUP: INITIATION 4.1 The project charter serves as the input document for the
ID Task Name Time Pred
0 UC Modernization Project Plan 1115 d 1 1 Phase I - Business Case Development and Competitive Procurement 205 d 2 1.1 Complete Initial Feasibility Study 55 d 3 1.2 Prepare and Issue LBR 30 d 2 4 1.3 Competitive
PMI Standard for Portfolio Management
Project : how organizations can measure and improve their performance PMI Standard for Milan, April 20th 2011 Walter Ginevri, PMP, PgMP Agenda 2 Evolution of PMI standard of PfM PfM definition and high-level
Program Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
