KAREN E. RUSHING. Clerk of the Circuit Court and County Comptroller. Audit Services. Karen E. Rushing

Size: px
Start display at page:

Download "KAREN E. RUSHING. Clerk of the Circuit Court and County Comptroller. Audit Services. Karen E. Rushing"

Transcription

1 KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller AUDIT OF Sarasota County s Computerized Maintenance Management System (Maximo) Audit Services Karen E. Rushing Clerk of the Circuit Court and County Comptroller Ex Officio County Auditor Lori Brooks, CPA, CIA, CGAP, CRMA Director of Internal Audit Audit Team Jody Maxwell, CPA, CIA, CFE Senior Internal Auditor May 2013

2 TABLE OF CONTENTS Page Summary and Results 3 Opportunities for Improvement: A. Authorized Access to The System 5 B. Appropriate Level of Access in The System 6 C. Optimizing System Capabilities 7 EXHIBIT A Detailed Management Response 8

3 Summary and Results The Internal Audit Department has completed an audit of the access and utilization of the Maximo system. The audit was included in the FY Internal Audit Plan approved by the Clerk of the Circuit Court and County Comptroller. We conducted the audit in accordance with Government Auditing Standards. These standards require we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions based on our audit objectives. We believe the evidence obtained provides a reasonable basis for our findings and conclusions based on our audit objectives. Background Maximo is a computerized maintenance management system (CMMS) designed for asset management. The term asset management is defined as systematic and coordinated activities and practices through which an organization optimally and sustainably manages its assets and asset systems, their associated performance, risks and expenditures over their life cycles for the purpose of achieving its organizational strategic plan. 1 It is used by County staff to schedule and track work performed on County assets. By managing organizational assets on a common platform, Maximo provides a single point of control over all types of assets, including production, infrastructure, facilities, transportation and communications. The platform allows sharing and enforcement of best practices, inventory, resources and personnel; thus, enabling management to optimize the performance of assets and maximize return on investment. The following summarizes the volume of work orders processed in the Maximo System during FY2013 as of March 14, 2013 by major service group. Parks & Recreation 10,848 20% Work Orders by Service Group Potable Water 14,571 27% SCAT 2,294 4% Facilities Management 9,101 17% Other 984 2% Waste Water 11,026 20% Storm Water 2,995 6% Transportation 2,348 4% 1 IBM Understanding the impact and value of enterprise asset management Page 3

4 Synopsis There appears to be adequate controls in place to ensure required work will be performed in a timely and proficient manner; however, we have identified opportunities to improve the efficiency and effectiveness of processing work orders within Maximo, as detailed in the Opportunities for Improvement section of this report. Objective, Scope and Methodology The objective of this audit was to determine if there is reasonable assurance that Maximo is being utilized effectively and efficiently to process, record, and maintain records of repairs and maintenance performed on County assets. The scope of the audit was to review the processing of work orders within Maximo focusing on access and monitoring controls utilized by staff personnel. To meet the objectives of the audit, the following methodology was exercised: 1) Performed inquiries of a cross-section of County personnel who utilize the system; 2) Obtained an understanding of the County s work order management process; 3) Examined a listing of employees access to the system; 4) Examined reports available to Managers and Supervisors to monitor the progress of work orders initiated in the Maximo System; 5) Identified opportunities for improvement of the process. Overall Results As a result of the review, Internal Audit concluded the following: Timely updating of staff changes and system access requirements should be performed. Timely review and updating of access by user group should be performed. Implementation of current in-progress and outstanding projects, regarding revision and integration of related processes, practices and systems, should be actively pursued and accomplished. Page 4

5 Opportunities for Improvement The audit identified certain policies, procedures and practices that could be improved. This audit was neither designed nor intended to be a detailed study of every relevant system, procedure or transaction. Accordingly, the Opportunities for Improvement presented in this report do not encompass all areas related to the Maximo System where improvements may be needed. Observations and recommendations were made in the following areas: A. Authorized access to the system B. Appropriate level of access in the system C. Optimizing system capabilities A. Authorized Access to the System Access to the Maximo system is not always disabled timely upon an individual s termination of employment with the county. Audit Observation: A listing of all active Maximo users was compared to a list of all active employees as of February 26, The listing of active Maximo users included three persons who had ceased employment between October and November Of the users, one had access to perform data input and update functions, and the remaining two had view-only capabilities. Audit recommendations: 1. Established policies and procedures that provide for the routine reconciliation of active employees to active users of the Maximo system should be enforced. 2. Likewise, access to the Maximo system should be reviewed and updated as soon as possible, upon a county employee s change in job position or responsibilities or upon termination. Management Response Management has reviewed current procedures with staff; and they are developing a procedure within Maximo that will alert the System Administrator upon the termination of an active user. This is scheduled to be completed and implemented by July 31, Page 5

6 B. Appropriate Level of Access in The System Persons outside designated user groups were found to have atypical access to the Maximo system. Employees access to the Maximo system should be routinely reviewed and updated according to current job functions. Audit Observation: A listing of all Maximo users having edit access and ability to close finalized work orders was reviewed to verify that only persons with intended authority and need were granted this level of access. The listing disclosed employees in three business units, not related to the administration of the MAXIMO system, having administrative access. The business units were EU-Integrated Water, Public Safety, and EIT Operations. Audit Recommendation: 3. Policies and procedures should be established and enforced, providing for the routine review and update of all employees system access, to align with their current job functions and responsibilities. Management Response Management is developing a procedure within Maximo that will compare an individual user s ability to perform certain actions to the administrator group membership; and alert the System Administrator when there are exceptions. This is scheduled to be completed and implemented by July 31, Page 6

7 C. Optimizing System Capabilities Standardization and integration of various systems, processes and procedures is needed to optimize the county s investment and ensure the Maximo system is utilized to its maximum potential. Audit Observations: While management has implemented the Maximo system with the goal of effectively processing work orders and managing its assets and related systems and technology, there are opportunities to more fully utilize the system s capabilities. Management continues to make progress in this area and is currently progressing with many critical projects, which will allow for a more comprehensive and extensive use of the Maximo system. In summary, the successful completion of these projects will: 1. Integrate Maximo with a Geographic Information System (GIS) allowing: a. Work orders to be tied to a specific asset b. A comprehensive history of work performed on individual assets c. Visual mapping of assets and work orders enabling increased efficiency in scheduling work routes. 2. Provide a documented comprehensive collection of county assets. Currently many County assets, such as the numerous miles of ditches and swales with related structures, grates, catch basins, etc. remain undocumented in a geographical mapping system. 3. Integrate the use of mobile devices in the field to instantaneously record and update asset activity linked directly to work orders in Maximo. Audit Recommendation: 4. Evaluate and integrate, update or revise current systems, processes and practices to ensure overall optimization of the effectiveness and efficiency of the county s use of the Maximo system. Management Response Management is in the process of updating and integrating various systems, processes, records and devices with the Maximo asset management system. These are scheduled to be completed by the end of fiscal year For further details, please see Detailed Management Response and Action Plan following this report. Page 7

8 Exhibit A DETAILED MANAGEMENT RESPONSE AND ACTION PLAN Audit Recommendations: 1. Established Policies And Procedures That Provide For The Routine Reconciliation Of Active Employees To Active Users Of The Maximo System Should Be Enforced. 2. Access To The Maximo System Should Be Reviewed And Updated As Soon As Possible, Upon A County Employee s Change In Job Position Or Responsibilities Or Upon Termination. Management Response and Action Plan (provided by Management) Current procedures were reviewed with staff. Additionally, an escalation will be developed within Maximo to alert the System Administrator when a person s record has been tagged as separated, and an active user account exists. This is scheduled to be completed and implemented by July 31, Recommendation: 3. Policies And Procedures Should Be Established And Enforced, Providing For The Routine Review And Update Of All Employees System Access, To Align With Their Current Job Functions And Responsibilities. Management Response and Action Plan (provided by Management) An escalation will be developed to compare Close capability to administrator group membership, and alert System Administrator when the groups are not in synch. This is scheduled to be completed and implemented by July 31, Recommendation: 4. Evaluate And Integrate, Update Or Revise Current Systems, Processes And Practices To Ensure Overall Optimization Of The Effectiveness And Efficiency Of The County s Use Of The Maximo System. Management Response and Action Plan (provided by Management) This is scheduled to be completed and implemented by the end of Fiscal Year Geographic Information System (GIS) Integration GIS provides the ability to accurately map and identify assets at precise locations. To integrate GIS and Maximo, the Page 8

9 County purchased the Maximo connector to GIS, referred to as Maximo Spatial, and is in the process of implementation. This add-on product spatially enables four key Maximo functions: service requests, work orders, assets and locations. All County staff will be able to see Maximo service request and work order information via GIS. Maximo users will be able to utilize GIS data and tools within the service request and work order modules, thereby streamlining their use of both systems. All reporting for maintenance will be enhanced by being spatially located and reconciled using GIS means. The project involves all Systems & Controls staff, all users, GIS, and Enterprise Information Technology (EIT). A contractor is being used, via General Services Administration (GSA), to assist the Maximo and GIS administrators in the configuration of the integration points. Implementation for the Asset and Location modules of Maximo is the more critical component of integrating Maximo with GIS, and will afford planning and maintenance staff the full benefits of utilizing GIS to manage their assets and work, by the linking of service requests and work orders to actual GIS features. County management, capital projects, and replacement and rehabilitation will also benefit by being able to spatially query on asset maintenance history, projections, and current condition. The interface automates the creation of assets/locations in the Maximo system when new features are added in GIS, and allows for, as the business process requires, non-spatial attribute data to be updated in GIS via the Maximo asset and location applications. Mobile Solutions most field staff in charge of maintaining infrastructure need the ability to update both GIS and Maximo. Coordination with GIS is integral, and an Advanced Geographic Information System (ArcGIS) Mobile platform is anticipated to be the most commonly used tool. For efficiency sake, differing business requirements utilize slightly different user interfaces for field staff, which will require the County to develop several ArcGIS Mobile interfaces. While varied at the user interface level, the technical processes behind the solutions are anticipated to be the same with data flowing from GIS and Maximo to the field, updates being captured electronically, and data flowing back to the respective system. In addition to the in-house needs of maintenance staff, the ability to integrate data from capital, repair & replacement (R&R) and other contracted maintenance projects is essential in order to keep both systems data up to date. There are currently several inter-departmental projects underway to collect asset data, which require coordination with the System & Controls group, the service/business owner, GIS, capital project managers and EIT: Storm Water Asset Condition and Data Collection the County s Flood Protection deliverable to the Sarasota community resides in the proper development and maintenance of the storm water control system. This system is geographically and operationally vast, covering over 700 square miles and consisting of hundreds of thousands of assets, and is permitted by the Department of Environmental Protection agency. The permit requires the County to inspect 10% of all storm water infrastructure over a ten year cycle. The storm Page 9

10 water business unit has been contracting with vendors to collect asset data for many years, but much of the County has not yet been covered. A final project to finish collecting asset data is scheduled to begin this spring. While maintenance programs exist for canal and pollution control structures, which have smaller inventories and are relatively well defined in GIS, inspection programs for Ditch/Swale, pipe, major outfalls, and all remaining structures (inlets, grates, catch basins) need to be developed, routed and set up on a 10 year inspection schedule. In order to schedule the inspections in Maximo, the implementation of Maximo Spatial for Assets and Locations is crucial. A Request for Proposal (RFP) is currently in process for consulting services to assist the County with developing the necessary business and technical processes for utilizing GIS data via Maximo Spatial the most efficiently. It is anticipated that the business processes resulting from this RFP will be applicable to the other business units maintaining and inspecting infrastructure. A mobile solution to keep the new data up to date as moves and changes occur, and to quickly record thousands of inspection results, will be needed in the very near future and should be procured as soon as the necessary business and technical processes have been completed via the RFP. Utilities Asset Condition and Data there are two major contracts underway that will result in new utilities asset data in GIS: Valve Exercising and Gravity Main cleaning and televising. A pilot for the valve exercising program began in March. A contractor is receiving water and wastewater valve data from the County GIS layers, verifying the Global Positioning System (GPS) coordinates, exercising the valves, and updating the County GIS attribute data for approximately 1,500 valves in the Lake Sarasota area. In order to meet the maintenance service levels, assets and routes need to created from the GIS data in Maximo and scheduled for the next maintenance cycle. This effort again requires the coordination of Environmental Utilities project managers, GIS, the Maximo asset coordinator for utilities, and Field Services; and will be most efficiently accomplished utilizing Maximo Spatial for assets and locations once the Storm water RFP has been awarded and the business process development completed. A contract for the televising and cleaning of storm water and gravity main is also being solicited. The process for collecting the data, updating GIS, and setting up the required maintenance cycles via Maximo are similar to the valve collection project and will require the same levels of effort from the stakeholders in the various business units. In addition to the two contracts mentioned, ongoing data cleanup projects for utilities have been underway for several years. Hydrants are in GIS and Maximo; those records need to be linked in order to be spatially useable. Meters should be entered into Maximo so replacement programs can be created, executed and tracked. Utilities treatment plants have been very pro-active in creating their asset databases and setting up preventive maintenance plans. The next step for these locations is to start predictive maintenance programs based on Page 10

11 actual asset conditions, such as thermal image readings for electrical control panels, and vibration and decibel readings for large motors. These efforts will require coordination with asset staff, planners and plant operators. Transportation Asset data is scarce in relation to sidewalks, guardrail, bike paths, and road segments. Different business units responsible for the maintenance of the transportation system use a different Computerized Maintenance Management System (CMMS). Cartegraph is used for pavement management and sign inventory. Maximo is used for all repairs to bridges, pavement, guardrail, sidewalk, and Right of Way (ROW). Cartegraph is being linked to the enterprise GIS system, which will allow the two systems to work more seamlessly. With Spatial, maintenance of the road pavement will be able to be linked to pavement inventory, allowing engineers to better analyze pavement performance and future rehab needs. A project with Systems & Controls, Field Services and EIT, is also currently underway to enhance the contracted maintenance process. Further analysis and development is needed for the business owner to capture corrective maintenance performed in-house and to set up routine maintenance programs for transportation assets. Parks Horticulture Parks horticulture needs a simple, passive, mobile solution for collecting daily routine maintenance rounds; it is crucial for the simplification of their use of work orders. The number of parks, the volume of daily activities, and the skill level of the staff responsible for these activities dictate a simple, passive solution for capturing time and location at the employee level. While Maximo can effortlessly generate work orders, getting data back into the system has proven to be unmanageable using the current paper-based processes. Parks, Systems & Controls and Facilities Maintenance staffs are currently evaluating the options of using the employee badge readers to track rounds. Should this prove cost prohibitive, a RFP should be developed for the solicitation of a solution. In addition, Parks Horticulture has purchased two GPS devices to begin an irrigation asset data collection project. Working with GIS and Systems & Controls, a GIS layer will be established and asset/feature data collected. Once the features are created, Maximo Spatial for assets and locations will be required to create the necessary links in Maximo so routes and maintenance plans can be established. A mobile interface will be needed for maintenance staff to be able to record changes/additions to the GIS layers as well as completing their work orders, as in the storm water and utilities projects. Facilities Maintenance Facilities Maintenance currently uses Maximo to record user request and maintenance via service requests and work orders. Facilities Maintenance contracts much of their routine maintenance. These contracts are usually based on lump sum, monthly prices per building for things like heating, ventilation, and air conditioning (HVAC) filter changes, fire extinguisher, elevator, roof, and automated external defibrillator (AED) inspections and do not lend themselves well to charges gathered per asset due to the frequency and volume of work. However, as in Parks, the costs of these contracted services Page 11

12 are needed to produce the proper reports for budgeting. Work orders needed to capture this information at an asset level, in a paper format, prohibit their use. Temporary procedures have been implemented which allow staff to capture of costs without a work order but still require significant time on the time of the lead planners and technical staff. Information related to the work and condition of these assets generally resides in a vendor database, out of reach of much of County staff and GIS. Facilities Planning uses another system to manage space called Archibus. Archibus is a well known facilities maintenance and space planning software and has a number of features previously not available in Maximo such as the conversion of Computer-aided design (CAD) drawings to assets. Archibus also markets a connector to GIS, which would convert CAD drawings to GIS layers, and could then be used to create Maximo assets for work and asset management, while exposing space, asset and work management information to other GIS users and applications. IBM has recently acquired the Tririga software, which is a competitor of Archibus, and integrates features previously missing into the Maximo software, further analysis should be completed to properly address Facilities Maintenance and Planning needs and a recommended course forward. Page 12

KAREN E. RUSHING. Clerk of the Circuit Court and County Comptroller. AUDIT OF Fixed Asset Inventory. Audit Services. Karen E.

KAREN E. RUSHING. Clerk of the Circuit Court and County Comptroller. AUDIT OF Fixed Asset Inventory. Audit Services. Karen E. KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller AUDIT OF Audit Services Karen E. Rushing Clerk of the Circuit Court and County Comptroller Ex Officio County Auditor Patricia J. Entsminger,

More information

Data Management Practices for Intelligent Asset Management in a Public Water Utility

Data Management Practices for Intelligent Asset Management in a Public Water Utility Data Management Practices for Intelligent Asset Management in a Public Water Utility Author: Rod van Buskirk, Ph.D. Introduction Concerned about potential failure of aging infrastructure, water and wastewater

More information

The Leading Reward of Maintenance Management

The Leading Reward of Maintenance Management Halting the Cycle of Break & Fix: The Leading Reward of Maintenance Management Eric Hancock Practice Leader for Operations & Asset Management Jacobs Engineering Group Inc. Best Maintenance Strategies t

More information

KAREN E. RUSHING. FOLLOW UP of. Fixed Asset Inventory. Issued January 2013

KAREN E. RUSHING. FOLLOW UP of. Fixed Asset Inventory. Issued January 2013 KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller FOLLOW UP of Fixed Asset Inventory Issued January 2013 Audit Services Karen E. Rushing Clerk of the Circuit Court and County Comptroller

More information

KAREN E. RUSHING. AUDIT OF Human Capital Management System (HCMS) Application Controls

KAREN E. RUSHING. AUDIT OF Human Capital Management System (HCMS) Application Controls KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller AUDIT OF Human Capital Management System (HCMS) Application Controls Audit Services Karen E. Rushing Clerk of the Circuit Court and County

More information

KAREN E. RUSHING. Audit of Purchasing Card Program

KAREN E. RUSHING. Audit of Purchasing Card Program KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller Audit of Purchasing Card Program Audit Services Jeanette L. Phillips, CPA, CGFO, CIG Director of Internal Audit and Inspector General

More information

REQUEST FOR PROPOSAL (RFP) Facility Condition Assessment Services and Capital Planning and Management Software (CPMS)

REQUEST FOR PROPOSAL (RFP) Facility Condition Assessment Services and Capital Planning and Management Software (CPMS) REQUEST FOR PROPOSAL (RFP) Facility Condition Assessment Services and Capital Planning and Management Software (CPMS) East Bay Regional Park District 2950 Peralta Oaks Court Oakland, CA 94605 RFP DUE Date:

More information

Hillsborough County Water

Hillsborough County Water 0407 FWRJ 3/20/07 4:23 PM Page 54 Selecting & Implementing a Comprehensive Asset Management System Celine A. Hyer Hillsborough County Water Resource Services (WRS) provides water, wastewater, and reclaimed

More information

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike

More information

Addendum #4 to Spotsylvania County RFP #15-10-36 for Enterprise Asset Management System Software June 10, 2015

Addendum #4 to Spotsylvania County RFP #15-10-36 for Enterprise Asset Management System Software June 10, 2015 Addendum #4 to Spotsylvania County RFP #15-10-36 for Enterprise Asset Management System Software June 10, 2015 Addendum #4 for Request for Proposal #15-10-36 is issued in accordance with the RFP Terms

More information

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Enhancing Asset Management with a GIS Program. Lori A. Burkert, P.G. lburkert@entecheng.com 610-373-6667

Enhancing Asset Management with a GIS Program. Lori A. Burkert, P.G. lburkert@entecheng.com 610-373-6667 Enhancing Asset Management with a GIS Program Lori A. Burkert, P.G. lburkert@entecheng.com 610-373-6667 presentation overview Definitions Its all about your assets Components of a GIS Why use GIS for asset

More information

Organically Growing an Asset Management System in the City of Novi, Michigan

Organically Growing an Asset Management System in the City of Novi, Michigan Organically Growing an Asset Management System in the City of Novi, Michigan IMAGIN Conference 2015 Traverse City, Michigan City of Novi, Michigan - Location 2 1 City of Novi, Michigan Vital Statistics

More information

Request for Statement of Qualifications and Information (RFQI) Public Works Enterprise Asset Management / Work Order Software.

Request for Statement of Qualifications and Information (RFQI) Public Works Enterprise Asset Management / Work Order Software. Request for Statement of Qualifications and Information (RFQI) Public Works Enterprise Asset Management / Work Order Software. RFQI Submittals Due Thursday, April 28, 2016 by 4:00 PM CONTACT: Chris Bethel,

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

University of Arizona THE CAMPUS SPATIAL DATA INITIATIVE

University of Arizona THE CAMPUS SPATIAL DATA INITIATIVE University of Arizona THE CAMPUS SPATIAL DATA INITIATIVE Presentation Review 1. Background on Campus Mapping and Spatial Data 2. The Campus Spatial Data Users Research / Teaching / Outreach Administration

More information

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water

More information

Asset and Lifecycle Management

Asset and Lifecycle Management Campbell Robertson, Worldwide Public Sector Solution Leader, IBM ECM August 2014 Asset and Lifecycle Management With enterprise content management from IBM The asset lifecycle Concept Design Tender Build

More information

The Corporation of the Municipality of Callander. Asset Management Plan

The Corporation of the Municipality of Callander. Asset Management Plan The Corporation of the Municipality of Callander Asset Management Plan April 2014 1 Index A) Executive Summary P. 3 B) Introduction P. 4 C) State of Local Infrastructure P. 7 D) Expected Levels of Service

More information

The Redwood City Public Works Services (PWS) Department is comprised of four operating divisions:

The Redwood City Public Works Services (PWS) Department is comprised of four operating divisions: City of Redwood City, Public Works Services (PWS) Work Process Needs Assessment By: Russell Narahara, Management Analyst II The purpose of this document is to provide an overview of how field work is currently

More information

SAN JOSE CAPITAL OF SILICON VALLEY

SAN JOSE CAPITAL OF SILICON VALLEY T&E Committee: 11/03/2014 Item: (d) (5) CITY OF SAN JOSE CAPITAL OF SILICON VALLEY TO: TRANSPORTATION AND ENVIRONMENT COMMITTEE SUBJECT: SEE BELOW Memorandum FROM: Keme Romanow DATE: October 17,2014 Approved

More information

{ { { Meeting Date 08/03/10. City of Largo Agenda Item 24. Leland Dicus, P.E., City Engineer

{ { { Meeting Date 08/03/10. City of Largo Agenda Item 24. Leland Dicus, P.E., City Engineer City of Largo Agenda Item 24 Form Revision Date: 10/19/09: Meeting Date 08/03/10 Presenter: Leland Dicus, P.E., City Engineer Department: CD Community Development TITLE: GIS PROGRAM UPDATE The implementation

More information

Management Assessment of the Public Works and Plant and Facilities Departments TOWN OF ANDOVER, MASSACHUSETTS

Management Assessment of the Public Works and Plant and Facilities Departments TOWN OF ANDOVER, MASSACHUSETTS Management Assessment of the Public Works and TOWN OF ANDOVER, MASSACHUSETTS 122 Cherry Street Shrewsbury, Massachusetts 01545 v.508.887.6564 December, 2011 TABLE OF CONTENTS Page Number 1. INTRODUCTION

More information

Water and Wastewater Services Inventory Process Review

Water and Wastewater Services Inventory Process Review Water and Wastewater Services Inventory Process Review May 30, 2006 Report No. 06-15 Evan A. Lukic, CPA County Auditor Executive Summary This report summarizes our review of central warehouse inventory

More information

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Achieve greater efficiency in asset management by managing all your asset types on a single platform. Asset solutions To support your business objectives Achieve greater efficiency in asset by managing all your asset types on a single platform. Obtain an entirely new level of asset awareness Every company

More information

Office of the City Auditor. Audit Report. AUDIT OF MONTHLY BANK RECONCILIATIONS (Report No. A08-014) May 16, 2008. City Auditor. Craig D.

Office of the City Auditor. Audit Report. AUDIT OF MONTHLY BANK RECONCILIATIONS (Report No. A08-014) May 16, 2008. City Auditor. Craig D. CITY OF DALLAS Dallas City Council Office of the City Auditor Audit Report Mayor Tom Leppert Mayor Pro Tem Dr. Elba Garcia AUDIT OF MONTHLY BANK RECONCILIATIONS (Report No. A08-014) Deputy Mayor Pro Tem

More information

Using GIS to Track and Prioritize Your Assets

Using GIS to Track and Prioritize Your Assets Using GIS to Track and Prioritize Your Assets What is GIS?? Geographic Information System Geographic Location of an asset Information Characteristics of an asset System Software that allows connection

More information

APPA DEED Student Internship

APPA DEED Student Internship City of Gillette APPA DEED Student Internship Schedule for HVAC & Related GIS Based Inventory and Depreciation of Equipment James Rundel-Sustainability Intern Michael Foote- Sustainability Coordinator;

More information

White Paper. www.geodecisions.com

White Paper. www.geodecisions.com White Paper www.geodecisions.com A Geo Spatial Total Asset Management System (TAMS) To Improve Asset Management Decision Making Fall 2013 Abstract This paper describes a Geospatial Total Asset Management

More information

City of Berkeley. Prepared by:

City of Berkeley. Prepared by: City of Berkeley Berkeley Public Library Purchasing and Accounts Payable Audit Prepared by: Ann-Marie Hogan, City Auditor, CIA, CGAP Teresa Berkeley-Simmons, Audit Manager, CIA, CGAP Frank Marietti, Senior

More information

FISCAL YEAR 2013 / WORK PLAN

FISCAL YEAR 2013 / WORK PLAN work plan City of Eugene Central Services Department Facility Management Division FISCAL YEAR 2013 / WORK PLAN City of Eugene Central Services Department Facility Management Division 210 Cheshire Avenue

More information

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Achieve greater efficiency in asset management by managing all your asset types on a single platform. Asset solutions To support your business objectives Achieve greater efficiency in asset by managing all your asset types on a single platform. Obtain an entirely new level of asset awareness Every company

More information

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward.

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward. HALDIMAND COUNTY Report PW-GM-01-2014 of the General Manager of Public Works For Consideration by RE: 2014 Asset Management Plan OBJECTIVE: To present Council with an Asset Management Plan and recommended

More information

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville A Small City s Story of Implementing a Work Order and Asset Management System American Public Works Association 2013 Congress August 28, 2013 Introductions Public Works Department City of Colleyville,

More information

Public Works Department Organizational and Operational Analysis TOWN OF SAUGUS, MASSACHUSETTS

Public Works Department Organizational and Operational Analysis TOWN OF SAUGUS, MASSACHUSETTS Public Works Department Organizational and Operational Analysis TOWN OF SAUGUS, MASSACHUSETTS OCTOBER 2013 TABLE OF CONTENTS Page Number 1. INTRODUCTION AND EXECUTIVE SUMMARY 1 2. MANAGEMENT SYSTEMS AND

More information

Contracting Opportunities Vendor Day May 17, 2011

Contracting Opportunities Vendor Day May 17, 2011 Customer Care Team Contracting Opportunities Vendor Day May 17, 2011 Customer Care Team: What We Do Team Office customer advocacy and contracting Customer Relations Group call centers, claims, special

More information

Office of the City Auditor. Audit of the Department of Public Works and Public Utilities Inventory/Storerooms

Office of the City Auditor. Audit of the Department of Public Works and Public Utilities Inventory/Storerooms Audit of the Department of Public Works and Public Utilities Report Date: March 21, 2016 Office of the City Auditor 2401 Courthouse Drive, Room 344 Virginia Beach, Virginia 23456 757.385.5870 Promoting

More information

Facilities Maintenance Standards rev 9-1-2015

Facilities Maintenance Standards rev 9-1-2015 Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will

More information

KAREN E. RUSHING AUDIT OF. Fuel Tax Refunds

KAREN E. RUSHING AUDIT OF. Fuel Tax Refunds KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller AUDIT OF Fuel Tax Refunds Audit Services Karen E. Rushing Clerk of the Circuit Court and County Comptroller Jeanette L. Phillips, CPA,

More information

Austin Fire Department Worker Safety Audit

Austin Fire Department Worker Safety Audit City of Austin AUDIT REPORT A Report to the Austin City Council Mayor Lee Leffingwell Mayor Pro Tem Sheryl Cole Austin Fire Department Worker Safety Audit Council Members Chris Riley Mike Martinez Kathie

More information

Request for Proposal Public Works Asset Management System

Request for Proposal Public Works Asset Management System Request for Proposal Public Works Asset Management System Revision: 16 December 2014 The City is seeking proposals for the purchase and setup support for an Asset Management System for the Public Works

More information

CITY OF SAN ANTONIO OFFICE OF THE CITY AUDITOR. Audit of Contract Procurement and Monitoring. HD Supply Facilities Management Contract

CITY OF SAN ANTONIO OFFICE OF THE CITY AUDITOR. Audit of Contract Procurement and Monitoring. HD Supply Facilities Management Contract CITY OF SAN ANTONIO OFFICE OF THE CITY AUDITOR Audit of Contract Procurement and Monitoring Project No. AU10-011 March 4, 2011 Audit of Contract Procurement and Monitoring Executive Summary As part of

More information

Audit Schedule July 1, 2016 through June 30, 2017

Audit Schedule July 1, 2016 through June 30, 2017 Audit Schedule July 1, 2016 through June 30, 2017 Office of the City Auditor 2401 Courthouse Drive, Room 344 Virginia Beach, Virginia 23456 757.385.5870 Promoting Accountability and Integrity in City Operations

More information

INTERNAL AUDIT REPORT REVIEW OF PHYSICAL FACILITIES MAINTENANCE AND REPAIRS

INTERNAL AUDIT REPORT REVIEW OF PHYSICAL FACILITIES MAINTENANCE AND REPAIRS INTERNAL AUDIT REPORT REVIEW OF PHYSICAL FACILITIES MAINTENANCE AND REPAIRS FAIRFAX COUNTY, VIRGINIA INTERNAL AUDIT OFFICE M E M O R A N D U M TO: Anthony H. Griffin DATE: March 22, 2001 County Executive

More information

3.1. Broad Use. 3.2. Presence

3.1. Broad Use. 3.2. Presence City of Asheville Specifications Enterprise Asset Management RFP # 298-WaterAssetManagement July 1, 2016 Jade Dundas, Water Resources Director (828) 259-5955 Table of Contents 1. Introduction... 2 2. General

More information

Managing the integrity of pipeline assets

Managing the integrity of pipeline assets ROSEN Integrity Solutions Managing the integrity of pipeline assets Pipeline Integrity Services ROSEN: Leading the way in integrity management The safe and efficient operation of major transmission pipe

More information

Appendix D Water Services Use Cases

Appendix D Water Services Use Cases RFP No. 850-2015 Page 1 of 10 Water Services Use Cases Request Service/Manage Event Request Service / Manage Event WS Supervisor Manage Service/ Manage Event Temporary Emergent Location Customer WS Foreman

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

Types of Data. Features. Getting Started. Integrated Roadway Asset Management System

Types of Data. Features. Getting Started. Integrated Roadway Asset Management System 3-2014 GIS-based Asset Management System Optimize Maintenance Manage Signs Analyze Safety Roadsoft is a roadway management system for collecting, storing, and analyzing data associated with transportation

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

9/22/2011. Growing population Expanding number of businesses Aging infrastructure. Multiple databases (conflicting, redundant or hardto-find

9/22/2011. Growing population Expanding number of businesses Aging infrastructure. Multiple databases (conflicting, redundant or hardto-find Tips, Tools and Tales for Intelligent, Automated Infrastructure Maintenance Keith Alvis Maintenance Management Systems Coordinator City of Westminster, CO - PW/U Topics Westminster PW/U: overview, history,

More information

Implementing a Workflow Solution Leveraging SCADA and GIS/CMMS at the Waterford Township DPW. Charter Township of Waterford Oakland County, Michigan

Implementing a Workflow Solution Leveraging SCADA and GIS/CMMS at the Waterford Township DPW. Charter Township of Waterford Oakland County, Michigan Implementing a Workflow Solution Leveraging SCADA and GIS/CMMS at the Waterford Township DPW Charter Township of Waterford Oakland County, Michigan DPW Assets 360 Miles of Water Main and Appurtenances

More information

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT FOLLOW UP REVIEW TO AUDIT OF COURTROOM AUTOMATION Karleen F. De Blaker Clerk of the Circuit Court Ex officio County Auditor Robert W. Melton, CPA*, CIA,

More information

Department of Public Utilities Facilities Maintenance Operations

Department of Public Utilities Facilities Maintenance Operations REPORT # 2010-02 LIMITED REVIEW of the Facilities Maintenance Operations September 2009 TABLE OF CONTENTS Executive Summary..... i Comprehensive List of Recommendations v Introduction, Scope, Objective

More information

STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON

STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON Theresa Cloake, P.Eng. Infrastructure Analyst and K.L. Siu, P.Eng. Senior Infrastructure Officer Office

More information

OFFICE OF THE CITY AUDITOR

OFFICE OF THE CITY AUDITOR OFFICE OF THE CITY AUDITOR PERFORMANCE AUDIT OF THE CITIZEN REQUEST MANAGEMENT SYSTEM Thomas M. Taylor, CPA City Auditor Prepared by: Paul T. Garner, CCP, CSP Senior Audit Manager David Henley, CPA Auditor

More information

Many water and wastewater utilities

Many water and wastewater utilities Designing an Asset Management System Michael P. Smith, Michael W. Lovett, and John T. Caldwell Many water and wastewater utilities in Florida are beginning to understand the need to develop a good asset

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

Road Drainage Asset Management in Pierce County

Road Drainage Asset Management in Pierce County Photo Road Drainage Asset Management in Pierce County 2014 Road & Street Maintenance Supervisors Conference About Pierce County Asset Management Questions Who knows what Asset Management is? Is anyone

More information

Facility Manager TM a Computerized Maintenance Management System. Developed by CTL Engineering, Inc.

Facility Manager TM a Computerized Maintenance Management System. Developed by CTL Engineering, Inc. Facility Manager TM a Computerized Maintenance Management System Developed by CTL Engineering, Inc. Facility Manager TM Overview: Developing and implementing a Facility Management System is an effective

More information

Audit # 2014-02 Vehicle Purchase and Sale Agreement

Audit # 2014-02 Vehicle Purchase and Sale Agreement Audit # 2014-02 Vehicle Purchase and Sale Agreement Department of Inspector General Stacy M. Butterfield, CPA Clerk of the Circuit Court and County Comptroller Stacy M. Butterfield, CPA Clerk ef the Circuit

More information

ACTIVITY & LOCATION BASED ANALYTICS APPLICATIONS

ACTIVITY & LOCATION BASED ANALYTICS APPLICATIONS ACTIVITY & LOCATION BASED ANALYTICS APPLICATIONS SEAMLESS, REAL TIME MERGING OF GIS AND ERP SYSTEMS ALLOWING THE VISUALIZATION OF RELATIONSHIPS, CONNECTIONS AND PATTERNS IN THE DATA FOR INTELLIGENT, INFORMED

More information

Pipeline Engineering. Natural Gas Distribution

Pipeline Engineering. Natural Gas Distribution R Pipeline Engineering Natural Gas Distribution Gas Distribution Engineering Services Our team of professionals at EN Engineering has been designing, upgrading and maintaining distribution system assets

More information

IBM asset and service management solutions White paper. Asset and service management for Departments of Transportation.

IBM asset and service management solutions White paper. Asset and service management for Departments of Transportation. IBM asset and service management solutions White paper Asset and service management for Departments of Transportation. March 2007 Page 2 Contents 2 Executive summary 3 Introduction 4 Unifying asset management

More information

Engineering & Construction Management Fees Audit No. A2012-02

Engineering & Construction Management Fees Audit No. A2012-02 Engineering & Construction Management Fees Audit No. A2012-02 Issued by the February 20, 2012 EXECUTIVE SUMMARY The has concluded its audit of Engineering & Construction Management Fees. Based on the results

More information

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations Purpose and Objective The FWEA Utility Council formed the SSO Sub-Workgroup to provide a venue to discuss the increase

More information

City of West Palm Beach Internal Audit Department

City of West Palm Beach Internal Audit Department POST AUDIT REVIEW OF THE WAREHOUSE AND INVENTORY Report No. PAR 16-02 October 26, 2015 City of West Palm Beach Internal Audit Department Roger Strout, City Internal Auditor, CIA, CRMA, CFE, CICA Elena

More information

Data Sets That Enable the Plan II: Storm Water Project Tracking By Brian K. McMahan and Amy Rockwell, Charlotte Storm Water Services

Data Sets That Enable the Plan II: Storm Water Project Tracking By Brian K. McMahan and Amy Rockwell, Charlotte Storm Water Services Data Sets That Enable the Plan II: Storm Water Project Tracking By Brian K. McMahan and Amy Rockwell, Charlotte Storm Water Services Abstract In a utility focused on customer service, maintaining and improving

More information

Asset Management Highway Division Plan

Asset Management Highway Division Plan Asset Management Highway Division Plan 3/17/15 Leading the Nation in Transportation Excellence 1 U.S. Transportation Agencies Challenges Rising Costs Higher customer demand for better and safer roads Highly

More information

Asset Management Guidance for Wastewater and Stormwater Systems

Asset Management Guidance for Wastewater and Stormwater Systems Asset Management Guidance for Wastewater and Stormwater Systems What is Asset Management? Wastewater and stormwater systems are made up of assets; some are buried assets and invisible, while the rest are

More information

Avantis Enterprise Asset Management Suite

Avantis Enterprise Asset Management Suite Avantis Enterprise Asset Management Suite The Avantis Enterprise Asset Management Suite (EAM) of offerings represent the core of the Asset Performance Management (APM) solution set. APM will help you deliver

More information

Home Repair Program. December 2007 Housing and Community. Development. Home Repair Program

Home Repair Program. December 2007 Housing and Community. Development. Home Repair Program Home Repair Program Housing and Community Development Home Repair Program Table of Contents Transmittal Letter... 2 Introduction... 2 Scope... 3 Opinion... 3 Corrective Action Plan... 4 Internal Control

More information

GENERAL SERVICES AGENCY GOALS, OBJECTIVES AND ACCOMPLISHMENTS FISCAL YEAR 2007-2008

GENERAL SERVICES AGENCY GOALS, OBJECTIVES AND ACCOMPLISHMENTS FISCAL YEAR 2007-2008 GENERAL SERVICES AGENCY GOALS, OBJECTIVES AND ACCOMPLISHMENTS FISCAL YEAR 2007-2008 GSA Mission Statement The General Services Agency assists in providing the foundation upon which County Government is

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

MAXIMO 7 TRAINING GUIDE PURCHASING & RECEIVING FLORIDA INTERNATIONAL UNIVERSITY. P 202.262.2500 3451 NE 1 st Ave M1008 Miami, FL 33137

MAXIMO 7 TRAINING GUIDE PURCHASING & RECEIVING FLORIDA INTERNATIONAL UNIVERSITY. P 202.262.2500 3451 NE 1 st Ave M1008 Miami, FL 33137 MAXIMO 7 TRAINING GUIDE PURCHASING & RECEIVING FLORIDA INTERNATIONAL UNIVERSITY P 202.262.2500 3451 NE 1 st Ave M1008 Miami, FL 33137 Table of Contents I CHAPTER 1 THE PURCHASING MODULES...5 1.1 Objectives...

More information

Making the Right CMMS Selection for Users: Durham Water Management s Experience

Making the Right CMMS Selection for Users: Durham Water Management s Experience Making the Right CMMS Selection for Users: Durham Water Management s Experience C. Jeff Adkins, PE 1, Martin Nona, PE 2, Chris Hollifield, PE 2, Dennis Mulacek 1 1 Brown and Caldwell, 5430 Wade Park Blvd,

More information

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH Dr. Petros Kolovopoulos (Hydro-Comp Enterprises Ltd, Cyprus), Dr Dinos Constantinides (Hydro-Comp Enterprises Ltd, Cyprus) Key words: Asset Management,

More information

CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX

CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX In reference to the Request for Proposals for Geographic

More information

Maximizing return on plant assets

Maximizing return on plant assets Maximizing return on plant assets Manufacturers in nearly every process industry face the need to improve their return on large asset investments. Effectively managing assets, however, requires a wealth

More information

Strategic Planning for Asset Management and Facility Maintenance?

Strategic Planning for Asset Management and Facility Maintenance? Strategic Planning for Asset Management and Facility Maintenance? Do you know the book value and dollar value of Assets that the company owns and responsible for? Example: Now that you have determined

More information

Improved Decision-Making Through Effective Asset Management

Improved Decision-Making Through Effective Asset Management Improved Decision-Making Through Effective Asset Management Rob Corazzola, P.Eng., Hansen Canada Co-authored by Jon Poli, PE, Hansen Paper prepared for presentation At the Roadway Inventory and Condition

More information

Capital Improvement Program: Public Input and the Need for a Multi-year Plan

Capital Improvement Program: Public Input and the Need for a Multi-year Plan Attachment 1 OFFICE OF THE INDEPENDENT BUDGET ANALYST REPORT Date Issued: September 21, 2012 IBA Report Number: 12-39 Budget and Finance Committee Docket Date: September 26, 2012 Item Number: 8 OVERVIEW

More information

PERFORMANCE AUDIT REPORT CITY OF BALTIMORE DEPARTMENT OF FINANCE - PURCHASES INVENTORY CONTROL AUGUST 2003

PERFORMANCE AUDIT REPORT CITY OF BALTIMORE DEPARTMENT OF FINANCE - PURCHASES INVENTORY CONTROL AUGUST 2003 PERFORMANCE AUDIT REPORT CITY OF BALTIMORE DEPARTMENT OF FINANCE - PURCHASES INVENTORY CONTROL AUGUST 2003 City of Baltimore Department of Audits CITY OF BALTIMORE MARTIN O MALLEY, Mayor DEPARTMENT OF

More information

RFP 15-0102. for Fort Worth Water Utility Migration to Maximo 7

RFP 15-0102. for Fort Worth Water Utility Migration to Maximo 7 RFP 15-0102 for Fort Worth Water Utility Migration to Maximo 7 Register your firm s interest in this procurement by sending an email to eryck.walker@@forthworthtexas.gov. The subject line RFP 15-0102 Fort

More information

STATE OF NEW JERSEY OFFICE OF THE STATE COMPTROLLER

STATE OF NEW JERSEY OFFICE OF THE STATE COMPTROLLER STATE OF NEW JERSEY OFFICE OF THE STATE COMPTROLLER CITY OF CAMDEN A PERFORMANCE AUDIT OF THE MANAGEMENT SERVICES AGREEMENT FOR THE CITY OF CAMDEN S WATER AND WASTEWATER COLLECTION SYSTEMS A. Matthew Boxer

More information

An integrated approach to managing today s energy and utility assets

An integrated approach to managing today s energy and utility assets IBM Software Thought Leadership White Paper September 2011 An integrated approach to managing today s energy and utility assets IBM Maximo Asset Management addresses physical, human and technology challenges

More information

Integrating GIS-Based Videolog and Asset Data With Commonly Used Systems Provides Major Benefits With Minimal Effort

Integrating GIS-Based Videolog and Asset Data With Commonly Used Systems Provides Major Benefits With Minimal Effort Integrating GIS-Based Videolog and Asset Data With Commonly Used Systems Provides Major Benefits With Minimal Effort Presented By: Debbie Burns, GIS Manager Michael Nieminen, Project Manager Introduction

More information

KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller

KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller 2000 Main Street P.O. Box 3079.Sarasota, FL 34230-3079 Phone: 941-861-7400 www.sarasotaclerk.com TO: Sue Marcinko, Executive Director,

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

John Keel, CPA State Auditor. An Audit Report on The Dam Safety Program at the Commission on Environmental Quality. May 2008 Report No.

John Keel, CPA State Auditor. An Audit Report on The Dam Safety Program at the Commission on Environmental Quality. May 2008 Report No. John Keel, CPA State Auditor An Audit Report on The Dam Safety Program at the Commission on Environmental Quality Report No. 08-032 An Audit Report on The Dam Safety Program at the Commission on Environmental

More information

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District Sewer System Management Plan (SSMP) 2009 Eastern Municipal Water District Table of Contents 1.0 SSMP Goals... 3 Goal 1A:... 3 Goal 1B:... 3 2.0 Organizational Structure... 3 3.0 Legal Authority... 4 4.0

More information

Audit Report: Most Contracts Executed Timely but Contract Project Managers Could Use Better Tools and Guidance

Audit Report: Most Contracts Executed Timely but Contract Project Managers Could Use Better Tools and Guidance Office of the City Auditor CONSENT CALENDAR October 6, 2015 To: From: Honorable Mayor and Members of the City Council Ann-Marie Hogan, City Auditor Submitted by: Ann-Marie Hogan, City Auditor Subject:

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

Department of Veterans Affairs

Department of Veterans Affairs Audit Report Department of Veterans Affairs December 2013 OFFICE OF LEGISLATIVE AUDITS DEPARTMENT OF LEGISLATIVE SERVICES MARYLAND GENERAL ASSEMBLY This report and any related follow-up correspondence

More information

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE 4-1-1 SHORT TITLE... 1 4-1-2 INTENT... 1 4-1-3 DEFINITIONS... 1 4-1-4 WATERING RESTRICTIONS... 4 4-1-5 WATER WASTE... 5 4-1-6 SPECIAL PERMITS... 6 4-1-7 VARIANCES, EXEMPTIONS AND APPEALS... 7 4-1-8 FEES;

More information

IBM Tivoli Asset Management for IT

IBM Tivoli Asset Management for IT Cost-effectively manage the entire life cycle of your IT assets IBM Highlights Help control the costs of IT assets with a single product installation that tracks and manages hardware, software and related

More information

KAREN E. RUSHING. Ghost Employee Audit

KAREN E. RUSHING. Ghost Employee Audit KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller Ghost Employee Audit Audit Services Karen E. Rushing Clerk of the Circuit Court and County Comptroller Jeanette L. Phillips, CPA, CGFO,

More information