1 work plan City of Eugene Central Services Department Facility Management Division FISCAL YEAR 2013 / WORK PLAN City of Eugene Central Services Department Facility Management Division 210 Cheshire Avenue Eugene, Oregon Phone Fax July 2012

2 City of Eugene FACILITY MANAGEMENT DIVISION FY13 WORK PLAN - MAJOR PROJECTS and FY12 ACCOMPLISHMENTS FY13 WORK PLAN Work Plan Project Detail Targeted Completion Date City Hall Project o Present City Hall Advisory Committee findings to City Council. July 2012 o Relocation of Offices to facilitate City Hall Project Provide project management for design and construction, working with architect, Lane County representatives and departmental design teams for the City Manager, City Attorney and City Prosecutor office moves to the Lane County Public Service Building. September 2012 o Continue work to develop options for a new or renovated City Hall. Fall 2012 Police Headquarters Building (300 Country Club Road) o Complete renovation of 300 Country Club Road for new Police Headquarters Building o EPD will move from City Hall to 300 Country Club Road over a three week period o Work with EPD to develop a facility emergency flood response plan July/ Eugene Downtown Library Book Return System o Preventative maintenance of Automatic Book Return System HI_IQ and delivery systems Eugene Depot Passenger Platform and Train Layover Project o Partner with Amtrak, Union Pacific and ODOT-Rail Division for infrastructure improvements. Current funding is for Preliminary Engineering and NEPA approval. Ongoing (ODOT is the lead) Energy Management o Continue to develop pilot project thermostat training for department users Establish price agreements for the following goods and services o Paper and plastic supplies o Custodial cleaning chemicals o Custodial cleaning supplies o Window cleaning contract

3 Hult Center Lobby Lighting Improvements o Installation of redesigned Hult Lobby lighting to improve light quality, dramatic effect, safety and energy efficiency, with the goal that the new system be easier to access for maintenance and save ongoing cost. Exterior Repairs o Hult Center building exterior envelope and skylight repairs December 2012 Fire Inspection Notice (FIN) Requirements o Coordinate Hult Center and Facilities response to items that need to be addressed in order to bring the facility into compliance with Fire Protection codes, as outlined in the FIN. December 2012 Eugene Airport Terminal Siding o Replace deteriorated exterior siding on the main terminal building September 2012 Baggage Screening System Remodel o Coordinate with Public Works Airport and Transportation Security Administration staff to complete the design contract documents. Obtain construction bids. Spring 2013 Various Capital Improvement Program Projects, including: o LRCS o Construct new Sheldon Pool water supply piping system o Replace Echo Hollow pool windows o Library interior painting and exterior cleaning o Flooring projects, including Library, Amazon Community Center o Hult Center Silva Stage Repairs o Cuthbert Amphitheater shell repairs o Fire/EMS o Fire Station 9 rebuild parking lot and drives o Fire Stations 6 & 10 vehicle bays radiant heating o Fire Station 7 flooring o EPD o Downtown Public Safety Station tenant improvement at new LCC Building June 2013 DESP Action Item 4.4: Re-Examine space, furnishings, layout, etc. of City facilities to ensure they are accessible and culturally inclusive o Facilities staff will work with Facilities Board and departments to evaluate City facilities serving the public using the Culturally Inclusive Environment self-assessment tool and will report findings to the Equity and Human Rights Board annually for next three years. June 2014 Downtown Safety o Partner with EPD, PDD, POS, and LRCS to implement public safety measures Ongoing

4 FACILITY MANAGEMENT DIVISION FY12 ACCOMPLISHMENTS City Hall Project o Began the design process for a new or renovated City Hall o Worked with consultants, local AIA and City Hall Advisory Committee to develop design options o Developed City Hall mothball plans for fencing, security, vegetation and parking. o Relocation of Offices to facilitate City Hall Project o Provided project management for design and construction, working with architect, consultant and departmental design teams for Police Department, Human Resources, Risk Services, City Manager s, City Attorney s and City Prosecutor s Offices facility moves. 1. Human Resources and Risk Services Divisions moved to Woolworth Building April Municipal Court moved to Roberts Building June Service Profile and Performance Measure Update o Updated Public Buildings and Facilities service profile and performance measures. Customer Service Survey: o Conducted customer service surveys o for completed capital projects, custodial and maintenance customer service DESP Action Item 4.4: Re-Examine space, furnishings, layout, etc. of City facilities to ensure they are accessible and culturally inclusive o Worked with the University of Oregon, Equity and Human Rights Program staff and the Facilities Board to develop the Culturally Inclusive Environment self-assessment tool and departmental work plans for assessing City facilities that serve the public. Established contracts for all Landscape Maintenance services o Completed RFQ for commercial LS maintenance services at Fire Stations & 2CC o Established contract for all spraying (pesticide) services o Established contract for all arborist services Echo Hollow & Sheldon Pool Energy Saving Upgrades o Worked with Energy Trust of Oregon to identify energy saving measures o Solicited proposals for Design/Build Contractors o Implemented several energy saving measures at each pool, including LED lighting upgrades, automatic pool blankets, HVAC control optimization Downtown Park Blocks (east) o Completed Phase 2 and 3 of electrical upgrades adding additional electrical outlets for food cart vendors Energy Efficiency and Conservation Block Grants (EECBG) Projects o Completed Remaining Steam Conversion projects at the Atrium building and Parcade parking facility and the multiple facility HVAC equipment replacement project. (57 units replaced or retrofitted in 20 facilities. 86 Thermostats replaced in 25 facilities)

5 Hult Center Fire Inspection Notice (FIN) Requirements o Coordinated Hult Center and Facilities response to items that need to be addressed in order to bring the facility into compliance with Fire Protection codes, as outlined in the FIN. Completed items include: o Assisted Hult Staff with completion of a temporary plan for emergencies while F.I.N. deficiencies are addressed. o Coordinated completion of a Smoke Control evaluation for Silva Hall o Coordinated completion of a comprehensive life safety analysis for the Hult Center o Tested heat detectors and fire curtain in Silva Hall o Evaluation of emergency egress lighting completed Hult Lobby Lighting Improvements o Re-designed Hult Lobby lighting with emphasis on light quality, dramatic effect, safety and energy efficiency, with the goal that the new system be easier to access for maintenance and save ongoing cost. Re-bid project. Automated and Streamlined Administrative Functions o Facilities contracts now on-line on CESHARE for easy access o Electronic project funding requests and approvals o Electronic project funding reports and self-serve data query for project managers Developed New Hire Packet for New SelecTemp Custodial Employees Zero Waste Plan o Assisted with the RFP development and proposal evaluation o Worked with Purchasing and PDD to develop organizational plan and take lead responsibility for contract administration Various Capital Improvement Program Projects, including: o Sheldon Pool doors & windows and Natatorium windows replaced o Hult Center Metal/Glass Roof repaired o Sheldon Pool water supply piping design completed and bid awarded o Shelton-McMurphey-Johnson House front staircase o Installation of new generator and HVAC system for Facility Management office Pool shells painting and resurfacing o Amazon o Echo Hollow o Sheldon Program Documentation o Created documentation for MAXIMO (Computerized Maintenance Management System) and Access Control systems Energy Management o Began posting quarterly energy usage reports on CESHARE o Developed training on the Energy Management Program and reports available on CESHARE

The following terms should be understood prior to review of the Services Policy:

The following terms should be understood prior to review of the Services Policy: 1.0 BACKGROUND AND PURPOSE The Department of Facilities Management (FM) at the Colorado School of Mines has developed a Services policy to define for the campus community the types of services provided

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows: Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-2194 ADDENDUM NUMBER ONE January 24, 2014 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Bond Priorities. Repairs and Maintenance. School Safety. Capacity Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.

More information

CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES. Proposal Due Date: April 13, 2016

CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES. Proposal Due Date: April 13, 2016 CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Proposal Due Date: April 13, 2016 The City of Kalama (CITY) invites proposals for the services of a registered architect and their team

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

Eligibility and Application Guidelines for the Low Interest Loan Program for the Downtown Historic District (DHD)

Eligibility and Application Guidelines for the Low Interest Loan Program for the Downtown Historic District (DHD) Eligibility and Application Guidelines for the Low Interest Loan Program for the Downtown Historic District (DHD) GOAL: To attract new businesses and investors, to provide private property owners access

More information

Benchmarking Questionnaire on Facility Management Costs and Business Practices

Benchmarking Questionnaire on Facility Management Costs and Business Practices Benchmarking Questionnaire on Facility Management Costs and Business Practices April 21, 2004 Introduction KPMG has been contracted by Hydro Quebec s Facility Management Division to perform a benchmark

More information

KAREN E. RUSHING. Clerk of the Circuit Court and County Comptroller. Audit Services. Karen E. Rushing

KAREN E. RUSHING. Clerk of the Circuit Court and County Comptroller. Audit Services. Karen E. Rushing KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller AUDIT OF Sarasota County s Computerized Maintenance Management System (Maximo) Audit Services Karen E. Rushing Clerk of the Circuit Court

More information

Key energy-efficient features of your new home

Key energy-efficient features of your new home Key energy-efficient features of your new home Your thermal envelope The thermal envelope, or shell, of your home (walls, roof and floor) is designed to keep you dry and comfortable. It protects you from

More information

Description of Project Statewide Student Data Warehouse

Description of Project Statewide Student Data Warehouse Description of Project Statewide Student Data Warehouse The Department of Education (DE) uses Rebuild Iowa Infrastructure Fund funding to support critical components of Iowa s Statewide Longitudinal Data

More information

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004 HOWARD UNIVERSITY Policy Number: 300-004 Policy Title: ASSET CAPITALIZATION Responsible Officer: Chief Financial Officer Responsible Offices: Office of the Controller, Departments of Strategic Sourcing

More information

The work has continued on final Phase 4 and is nearing completion.

The work has continued on final Phase 4 and is nearing completion. Updates-January 22, 2013 29369-Rehab Plaza Deck/Drainage Budget: $18,000,000, constr. Start 8/2009 The work has continued on final Phase 4 and is nearing completion. The main plaza area of phase 4 is now

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA

More information

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx. [email protected] Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be

More information

City of Ashland Downtown Central Business District. Downtown Revitalization Grant Program APPLICATION PACKAGE

City of Ashland Downtown Central Business District. Downtown Revitalization Grant Program APPLICATION PACKAGE City of Ashland Downtown Central Business District Downtown Revitalization Grant Program APPLICATION PACKAGE The following includes the Downtown Revitalization Grant Program Description and Grant Application

More information

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all

More information

Planning and Construction Management Services

Planning and Construction Management Services Planning and Construction Management Services Construction Project Management Services New construction, major renovations or improvements to building structures and systems are part of the Department's

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011 Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction

More information

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management

More information

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT

More information

Core & Shell Construction. Rules and Regulations

Core & Shell Construction. Rules and Regulations Core & Shell Construction Rules and Regulations 1. Protection: During the construction Contractor shall endeavor to protect all areas of work from damage caused by workers, weather or equipment. 2. Permits

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Virginia American Recovery and Reinvestment Act 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair/Replace Bathrooms in Wilcox Barracks Army

More information

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning Understanding the Hospital Planning, Design, and Construction Process Introduction California s acute care hospitals are an essential health care resource that serve a wide range of patients during times

More information

MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK

MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK MUNICIPAL HOUSING REHABILITATION PROGRAM HANDBOOK For further information or inquiries please write or call your municipality s Small Cities Consultants: Lisa Low & Associates 293 Riggs Street Oxford,

More information

GENERAL SERVICES AGENCY GOALS, OBJECTIVES AND ACCOMPLISHMENTS FISCAL YEAR 2007-2008

GENERAL SERVICES AGENCY GOALS, OBJECTIVES AND ACCOMPLISHMENTS FISCAL YEAR 2007-2008 GENERAL SERVICES AGENCY GOALS, OBJECTIVES AND ACCOMPLISHMENTS FISCAL YEAR 2007-2008 GSA Mission Statement The General Services Agency assists in providing the foundation upon which County Government is

More information

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) If your home or business is located within a 100-year floodplain and it was constructed through a County Building

More information

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT

More information

FACILITIES MANAGEMENT - MAINTENANCE, REPAIR, AND RENOVATION

FACILITIES MANAGEMENT - MAINTENANCE, REPAIR, AND RENOVATION Page 1 Policy: XIII.B.1 Issued: February 9, 1994 Owner: Chief Facilities Officer Latest Revision: FACILITIES MANAGEMENT - MAINTENANCE, REPAIR, AND RENOVATION 1.0 Purpose 2.0 Policy 2.1 Facilities Maintenance

More information

Midway Lifescape Villas

Midway Lifescape Villas Annual Meeting October 21, 2013 Welcome!! Call to Order Establish Quorum Proof of Notice Welcome and Introductions Board of Directors : Renee Gower, Janice Taylor, Deanna Soltis, Chris Pedison, Karen Smiley

More information

Frequently Asked Questions

Frequently Asked Questions Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district

More information

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following: ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL

More information

Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan

Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan 1. Introduction 2. Commemorative Integrity Statement/Statement of Purpose 3. Contacts Staff City Contacts Ambulance Cold Storage

More information

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT PROJECT MANAGEMENT / SUPPORT Capital Cost Savings Construction Monitoring and Assistance In-Plant Production Assistance In-Plant Maintenance Assistance Procurement Assistance Project Cost Estimating o

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015)

PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015) PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015) August 2014 These procedures are available for download at: http://www.pscp.state.md.us Applications for this program must be submitted

More information

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088

More information

Every Student I Every Day I Every Possibility

Every Student I Every Day I Every Possibility For the Facilities Master Plan March 4, 2015 1 Introduction This has been prepared to describe a proposed process to be implemented in order to develop comprehensive Facility Master Plans for all schools

More information

A Quick Guide to Facility Management Services

A Quick Guide to Facility Management Services A QUICK GUIDE TO FACILITY MANAGEMENT SERVICES PROVIDED BY CGS CGS is responsible for the provision of Facility Management services under its Facility Management Program to ensure corporate and regulatory

More information

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY FAÇADE AND BUSINESS SITE IMPROVEMENT PROGRAM FAÇADE & BUSINESS SITE IMPROVEMENT Program Policies and Procedures I. Purpose The Façade & Business Site Improvement

More information

This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+.

This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+. TAME+ Guidebook This guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in TAME+. November 2015 Contents 1.0 Program Overview...

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

City of Richmond Capital Planning and Asset Management

City of Richmond Capital Planning and Asset Management 2006 UBCM Community Excellence Awards Leadership & Innovation Large Community City of Richmond Capital Planning and Asset Management Summary The City of Richmond is realizing significant cost savings in

More information

Single Family Residential Building Permit Questions & Answers

Single Family Residential Building Permit Questions & Answers Single Family Residential Building Permit Questions & Answers Prepared by Dept. of Public Works Revised 07/01/13 200 East Park Street Edwardsville, IL 62025 (618) 692-7535 (618) 692-7505(Fax) Hours: Monday

More information

How school facilities managers and business officials are reducing operating costs and saving money

How school facilities managers and business officials are reducing operating costs and saving money Energy-Smart Building Choices How school facilities managers and business officials are reducing operating costs and saving money Smart Energy Choices Free Up Dollars for Capital Improvements Operating

More information

General Fire Code Requirements Within Commercial Tenant Spaces

General Fire Code Requirements Within Commercial Tenant Spaces FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding

More information

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist

More information

Capital Projects Town Hall Meeting

Capital Projects Town Hall Meeting Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning

More information

Public Building Commission of Chicago. Board Meeting August 20, 2013

Public Building Commission of Chicago. Board Meeting August 20, 2013 Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting

More information

Preventative Maintenance

Preventative Maintenance Preventative Maintenance Safety Committee To have a preventative maintenance plan, you should have a Safety Committee. Designate persons involved with day to day operations and grounds control. Use your

More information

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT The South Carolina Code of Laws (Title 27, Chapter 50, Article 1) requires that an owner of residential real property (single

More information

Before You Start an Energy Efficiency Retrofit The Building Envelope

Before You Start an Energy Efficiency Retrofit The Building Envelope ABOUT YOUR HOUSE Before You Start an Energy Efficiency Retrofit The Building Envelope The building envelope is the outer layer of the building that separates the indoor living space from the outdoor environment,

More information

Cedar Rapids. Air and Water Purification Systems TLC Technology Group, 309.788.8301, 309.269.3885 Appliances

Cedar Rapids. Air and Water Purification Systems TLC Technology Group, 309.788.8301, 309.269.3885 Appliances Cedar Rapids Ruhl&Ruhl Home Services offers a wide range of home related products and services provided by Home Service Vendors who meet our high quality standards. They have been recommended by satisfied

More information

Facilities Construction and Maintenance. Charlotte County, Florida

Facilities Construction and Maintenance. Charlotte County, Florida Facilities Construction and Maintenance Charlotte County, Florida When did you last use a Charlotte County government service, and what was that service? Facilities Construction and Maintenance is an internal-service

More information

Commercial Building Permit Application & Submittal Guidelines

Commercial Building Permit Application & Submittal Guidelines Building Inspection Department 1625 13 th Street, Suite 106 Lubbock, Texas 79457 (806) 775-2087 (806) 775-2088 http://buildinsp.ci.lubbock.tx.us/ Commercial Building Permit Application & Submittal Guidelines

More information

ACCOUNTING BY GOVERNMENTAL ENTITIES ACCOUNTING AND CONTROL OF FIXED ASSETS OF STATE GOVERNMENT, ACCOUNTING FOR ACQUISITIONS AND ESTABLISHING CONTROLS

ACCOUNTING BY GOVERNMENTAL ENTITIES ACCOUNTING AND CONTROL OF FIXED ASSETS OF STATE GOVERNMENT, ACCOUNTING FOR ACQUISITIONS AND ESTABLISHING CONTROLS This rule was filed as 1 NMAC 1.2.1. TITLE 2 CHAPTER 20 PART 1 PUBLIC FINANCE ACCOUNTING BY GOVERNMENTAL ENTITIES ACCOUNTING AND CONTROL OF FIXED ASSETS OF STATE GOVERNMENT, ACCOUNTING FOR ACQUISITIONS

More information

Financing Options to support Energy Efficiency & Contractors

Financing Options to support Energy Efficiency & Contractors Financing Options to support Energy Efficiency & Contractors Renovation Loan Overview Renovation Loans offer a buyer the opportunity to buy a property and close as-is, financing both the purchase and repair

More information

CITY COMMISSION LARGO, FLORIDA REQUEST FOR QUALIFICATIONS (RFQ) FOR DATA CENTER DESIGN SERVICES. RFQ #: 11-Q-375 DATE: July 8, 2011

CITY COMMISSION LARGO, FLORIDA REQUEST FOR QUALIFICATIONS (RFQ) FOR DATA CENTER DESIGN SERVICES. RFQ #: 11-Q-375 DATE: July 8, 2011 CITY COMMISSION LARGO, FLORIDA REQUEST FOR QUALIFICATIONS (RFQ) FOR DATA CENTER DESIGN SERVICES RFQ #: 11-Q-375 DATE: July 8, 2011 The City of Largo is accepting "Statements of Qualifications" (SOQ) from

More information

HUMAN RESOURCES. Management & Employee Services Organizational Development

HUMAN RESOURCES. Management & Employee Services Organizational Development Management & Employee Services Organizational Development Human Resources Department FY 2014-15 BUDGETED POSITIONS DIRECTOR.90 FTE * Human Resources Business Partner 1 FTE Human Resources Business Partner

More information

Sample Reserve Fund Study Analysis

Sample Reserve Fund Study Analysis Sample Reserve Fund Study Analysis This example illustrates a typical scenario of a reserve fund study. Two key pieces of information are the opening balance of the reserve fund and the current level of

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

CITY OF SANTA MONICA RESIDENTIAL REHABILITATION PROGRAM GUIDELINES

CITY OF SANTA MONICA RESIDENTIAL REHABILITATION PROGRAM GUIDELINES CITY OF SANTA MONICA RESIDENTIAL REHABILITATION PROGRAM GUIDELINES Proposed June 2014 TABLE OF CONTENTS Page l. MULTIFAMILY REHABILITATION... 1 II. OWNER-OCCUPIED REHABILITATION... 2 III. ELIGIBLE REPAIRS/IMPROVEMENTS...

More information

ADMINISTRATIVE PROCEDURE

ADMINISTRATIVE PROCEDURE Categories of Fixed Assets 1. Land -Land as well as the costs incurred in preparing the land for its intended purpose. These costs include, but are not limited to, purchase costs, real estate commissions,

More information

NOTICE TO CONTRACTORS

NOTICE TO CONTRACTORS NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification

More information

REQUEST FOR PROPOSALS FOR LEASED OFFICE SPACE

REQUEST FOR PROPOSALS FOR LEASED OFFICE SPACE REQUEST FOR PROPOSALS FOR LEASED OFFICE SPACE Date Issued: August 29, 2011 Date Due: September 16, 2011 Page 1 of 11 TABLE OF CONTENTS Advertisement RFP Advertisement Public Notice of a Request for Proposal

More information

HERITAGE BUILDING REHABILITATION PROGRAM

HERITAGE BUILDING REHABILITATION PROGRAM City of Regina Heritage Property Incentive HERITAGE BUILDING REHABILITATION PROGRAM What incentives are available? o A tax exemption may be granted to a maximum value equivalent to 50% of eligible work

More information

BOROUGH OF HADDONFIELD CAMDEN COUNTY NEW JERSEY ARCHITECTURAL SERVICES RELATED TO THE HADDONFIELD LIBRARY REQUEST FOR PROPOSAL

BOROUGH OF HADDONFIELD CAMDEN COUNTY NEW JERSEY ARCHITECTURAL SERVICES RELATED TO THE HADDONFIELD LIBRARY REQUEST FOR PROPOSAL BOROUGH OF HADDONFIELD CAMDEN COUNTY NEW JERSEY ARCHITECTURAL SERVICES RELATED TO THE HADDONFIELD PUBLIC LIBRARY REQUEST FOR PROPOSAL Project Name: ARCHITECTURAL SERVICES RELATED TO THE HADDONFIELD PUBLIC

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 [email protected] Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

Department of General Services

Department of General Services Department of General Services History Government Center Compared to the 400 years of history of Henrico, the Department of General Services is in its infancy. Some of the functions and services which

More information

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Sample Service Level Agreement

Sample Service Level Agreement Sample Service Level Agreement Building Name Management Company Date Table of Contents: I. Purpose II. Rent Setting III. Initiatives IV. General Information V. Management Company - Services VI. Occupant

More information

Request for Proposal for Architectural Services Scope of Work and Design Documents for

Request for Proposal for Architectural Services Scope of Work and Design Documents for 10400 Detrick Avenue Kensington, Maryland 20895-2484 Telephone (240) 627-9786 Fax (301) 949-1286 www.hocmc.org RFP #1968 Request for Proposal for Architectural Services Scope of Work and Design Documents

More information

REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL ARCHITECTURAL/ENGINEERING AND CONSULTING SERVICES FOR Fiscal Years 2015 2018

REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL ARCHITECTURAL/ENGINEERING AND CONSULTING SERVICES FOR Fiscal Years 2015 2018 REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL ARCHITECTURAL/ENGINEERING AND CONSULTING SERVICES FOR Fiscal Years 2015 2018 Solicitation No.: BFZ1523 1. Mission Statement and General Information 1.1.

More information