The Cost of a Pipeline Failure. Presented by Penn West
|
|
|
- Charla Bradford
- 10 years ago
- Views:
Transcription
1 The Cost of a Pipeline Failure Presented by Penn West
2 The Cost of a Pipeline Failure Failure Statistics Cost of a Failure Failure Causes Integrity Management Plan Risk Assessment 2
3 Annual Cumulative Pipeline Failures We have had a reduction in pipeline failures of 46% from
4 Penn West Costs per Pipeline Failure 2013 Total of 93 pipeline failures in pipeline failures in 2012 Three large spills one resulted in an AER news release Largest failure has a $4.3 million cost incurred to date Second highest cost for clean-up was $1.2 million and a third spill at $600,000 The average clean-up cost of failures this year with the three largest failures taken out $85,000 4
5 Environmental Costs 2013 Clean-up The cumulative environmental clean-up cost for 2013 was $18.7 million 2012 clean-up costs were $23.7 million 21% reduction in environmental clean-up costs corresponding to a 20% reduction in pipeline failures from 2012 to
6 Pipeline Failure Causes 2013 Pipeline Failures by Cause Mechanical Damage 1% Girth Weld Failure 2% Equipment Failure 1% Damage by Others 7% Valve or Fitting Failure 2% Overpressure Valve Leak Failure Pig Trap 1% 1% 1% Earth Movement 1% Pipe Failure 1% Mechanical Joint Failure 2% Unknown 9% Operator Error 4% Miscellaneous 5% Corrosion Internal 33% Corrosion External 27% *The Unknown cause of failures are failures still being investigated. 6
7 Components: Penn West s Pipeline Integrity Management Plan (PL-IMP) 1. Pipeline Integrity Management Plan Corporate commitment Purpose of the PL-IMP Why do we need a PL-IMP? Manual distribution Roles and responsibilities 2. Management Program and Processes Implementation Work processes and record keeping Pipeline engineering assessments 3. Pipeline Operating and Maintenance Overview of activities Highlights 4. Pipeline Acts and Regulations Pipeline acts Regulations Directives and notification 7
8 What is Risk? Likelihood or Probability Probability or chance of something happening Consequence The effect, result, or outcome of something occurring Risk Likelihood x Consequence Risk Assessment Process to assess risk (Likelihood and Consequence) Risk Management Decisions on resource allocation 8
9 Pipeline Risk Management Prioritize pipeline segments Evaluate benefits of mitigation Determine most effective mitigation, monitoring and inspection activities Allocate resources effectively Improve production reliability Continual assessment process 9
10 Pipeline Risk Assessment Structure Total Risk Failure Probability Consequence Internal Corrosion External Corrosion Leak/Spill Volume Original Conditions Mitigated Original Conditions Mitigated Health & Safety CO 2, T, O 2, H 2 S, Cl, bacteria, Sulphur, age, failure history Pigging, batching, inhibitor injection, coupon, internal coating, ILI. Coating type, coating condition, ILI, failure history, age, soil type, interference Effective CP, CP survey, rectifier check, coating effectiveness, coating survey, coating quality control, ILI, dig verification Financial Cleanup Repair Social 10
11 Pipeline Risk Management Risk Mitigation Strategy Data collection on all operated pipelines Calculation of risk Identify high risk pipelines Develop a mitigation plan Implement Monitor and inspect 11
12 Summary and Conclusions Pipeline failures have a huge impact to a company's bottom-line due to financial impact (environmental clean-up and lost production) and corporate reputation Implementation of an effective Pipeline Integrity Management Plan can significantly reduce pipeline failures High risk pipelines are identified through a risk assessment process and then further action is determined through the Pipeline Integrity Management Plan 12
The Engineering Science of Oil Pipelines
The Engineering Science of Oil Pipelines From the Keystone XL pipeline project to spills and leaks in existing lines, pipelines are in the news. The SMCC has prepared this backgrounder on crude oil and
Risk Based Asset Management
Document number Risk Based Asset Management turning policy into operational excellence Dave Oesterholt DNV GL Oil & Gas - Groningen Office, NL Monday, 2 December 2013 Location Groningen, NL: Gas Consulting
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected]. Task Number Item Date(s) Recorded By
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected] PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is
Report 2013-B: Pipeline Performance in Alberta, 1990 2012
Report 2013-B: Pipeline Performance in Alberta, 1990 2012 August 2013 Report 2013-B Report 2013-B: Pipeline Performance in Alberta, 1990 2012 August 2013 Published by Alberta Energy Regulator Suite 1000,
California Public Utilities Commission Risk Assessment Unit Hazard Database Project Report on Status and Initial Recommendations
California Public Utilities Commission Risk Assessment Unit Hazard Database Project Report on Status and Initial Recommendations March 14, 2012 I. Introduction The California Public Utilities Commission
MAR 23 2012. Sincerely,
MAR 23 2012 Mr. Terry Gottberg President Merit Energy Company, LLC 1327 Noel Road, Suite 500 Dallas, TX 75240 Re: CPF No. 5-2011-6001 Dear Mr. Gottberg: Enclosed please find the Final Order issued in the
A RISK MANAGEMENT TOOL FOR ESTABLISHING BUDGET PRIORITIES. John F. Kiefner, Ph.D President Kiefner and Associates, Inc. Worthington, Ohio 43085
A RISK MANAGEMENT TOOL FOR ESTABLISHING BUDGET PRIORITIES John F. Kiefner, Ph.D President Kiefner and Associates, Inc. Worthington, Ohio 43085 Presented at the Risk Assessment/Management of Regulated Pipelines.
Managing the integrity of pipeline assets
ROSEN Integrity Solutions Managing the integrity of pipeline assets Pipeline Integrity Services ROSEN: Leading the way in integrity management The safe and efficient operation of major transmission pipe
NSW Licensed Pipeline Performance Reporting Guidelines
NSW Licensed Pipeline Performance Reporting Guidelines NSW Trade & Investment Resources and Energy Division GPO Box 3889 Sydney NSW 2001 Rev Jan 2012 NSW T & I Division of Resources and Energy Contents
Guidance 1 for Strengthening Pipeline Safety Through Rigorous Program Evaluation and Meaningful Metrics
Guidance 1 for Strengthening Pipeline Safety Through Rigorous Program Evaluation and Meaningful Metrics 1 This document is to provide guidance describing methods to evaluate and measure IM program effectiveness.
PIPELINE FUNDAMENTALS. texaspipelines.com
PIPELINE FUNDAMENTALS texaspipelines.com Texas Oil & Gas: Generating $2.6 Billion for State Revenues texaspipelines.com Texas Oil & Gas Texas produces 20% of US Domestic Oil Production 1.1 Million Barrels
In-line inspection (intelligent pigging) of offshore pipeline. Birger Etterdal 2011-11-14
In-line inspection (intelligent pigging) of offshore pipeline Birger Etterdal Content Type of defects Different inspection tools Objective of any inspection Focus on corrosion mapping for submarine pipelines
Eagle Ford Oilfield Services, LLC 150 Port Royal, Aransas Pass, Texas 78336
Eagle Ford Oilfield Services, LLC 150 Port Royal, Aransas Pass, Texas 78336 www.efofs.com (361) 212-0883 (361) 526-2332 MEMBER # 400-193088 Mission Statement Eagle Ford Oilfield Services, LLC. is a company
Fuel Storage Who to ask: tank farm owners/operators
Fuel Storage Fuel Storage Who to ask: tank farm owners/operators 89. How many tank farms are there in the village and who owns them? Fuel tank farm The questions in the following section should be answered
Jeffrey D. Wiese Associate Administrator for Pipeline Safety
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NOV 1 Z 2015 1200 New Jersey Ave, 5.E. Washington, D.C. 20590 VIA CERTIFIED MAIL AND FAX TO: 713-646-4378 Mr. Troy
ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION
ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION After concession is expired or at the end of its economic life, pipeline network and all associated structures are due for decommissioning
INLINE INSPECTION OF PIPELINES CRITICAL FACTORS IN STRUCTURAL DESIGN, TESTING AND MANUFACTURING
COURSE INLINE INSPECTION OF PIPELINES CRITICAL FACTORS IN STRUCTURAL DESIGN, TESTING AND MANUFACTURING Denver Marriott Tech Center is authorized by IACET to offer 0.8 CEUs for the course. 1 OVERVIEW This
The Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
reduction ore = metal oxides metal oxidation
Cathodic Protection and Interferences René Gregoor Madrid, June 18 th and 19 th 2009 1 Cathodic protection and interferences Corrosion Cathodic protection Protection criterion ON potential measurements
April 15, 2011 VIA ELECTRONIC TRANSMISSION
Enbridge Pipelines (Lakehead) L.L.C. Shaun G. Kavajecz, Manager 119 N 25 th Street E Pipeline Compliance Superior, WI 54880 Tel 715 394 1445 www.enbridgepartners.com Fax 713 821 9428 [email protected]
NW Natural & Pipeline Safety
NW Natural & Pipeline Safety We Grew Up Here NW Natural is an Oregon-based utility company founded in 1859. The company purchases natural gas for its core market in western Oregon and southwestern Washington,
FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY
Operational Safety INTRODUCTION The Millennium Pipeline Company (Millennium) is proud of the key role it plays in New York s energy infrastructure. The Millennium Pipeline is a vital link in a system that
SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM
Page 1 of 9 SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Program Overview: The Distribution Integrity Management Program ( DIMP ) activities are focused on obtaining and evaluating information
Pipeline Compliance System Version 7.6. Cathodic Protection Data Manager User and Administrator Guide
Pipeline Compliance System Version 7.6 Cathodic Protection Data Manager User and Administrator Guide Information in this document is subject to change without notice. 1999-2014 American Innovations, Ltd.
INLINE INSPECTION OF PIPELINES CRITICAL FACTORS IN STRUCTURAL DESIGN, TESTING AND MANUFACTURING
COURSE INLINE INSPECTION OF PIPELINES CRITICAL FACTORS IN STRUCTURAL DESIGN, TESTING AND MANUFACTURING Denver Marriott Tech Center EUCI is authorized by IACET to offer 0.8 CEUs for the course. 1 OVERVIEW
SOCALGAS APROACH TO PIPELINE INTEGRITY
SUMMER 2011 SOCALGAS APROACH TO PIPELINE INTEGRITY Southern California Gas Company (SoCalGas ) is committed to providing clean, safe and reliable natural gas to its customers and takes important steps
ASMECourseCatalog. www.energyu.org www.midwestenergy.org
ASMECourseCatalog www.energyu.org www.midwestenergy.org ASME Abnormal Operating Conditions... 6 ASME GAS01 Hazards of Natural Gas and Prevention of Accidental Ignition... 6 ASME 0001 Measure Structure-to-Electrolyte
Force Main Condition Assessment: New Technologies & Case Studies
Force Main Condition Assessment: New Technologies & Case Studies Andy Dettmer, Ph.D., P.E. CMOM Workshop August 19, 2014 2 1 Three takeaways 1. Most of your force mains are good 2. We can pinpoint the
Integrity Management Products and Services Rehabilitation and Maintenance Services and Project Services
SM Integrity Management Products and Services Rehabilitation and Maintenance Services and Project Services Safety Our workforce is our most important asset. Through our commitment to safety excellence,
Rebuilding the World s Pipeline Infrastructure
Rebuilding the World s Pipeline Infrastructure William J. Hoff Group Director, Engineering Services Gulf Interstate Engineering Company Edward J. Wiegele President, Professional Services Willbros Engineers
NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES 2013 DATA REPORT
NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES 2013 DATA REPORT October 2014 Amended July 2015 Permission to Reproduce Materials may be reproduced for personal, educational and/or non-profit activities,
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
PODS!"#$% &"'&( )*+,-+(*+ PODS, + *+./0 -(12$3 4&-050% -56 *(1"&7(&8&-&8 (APDM, PPDM) 9:+.&8 ;4$*($% [email protected]
PODS!"#$% &"'&( )*+,-+(*+ PODS, + *+./0 -(12$3 4&-050% -56 *(1"&7(&8&-&8 (APDM, PPDM) 9:+.&8 ;4$*($% [email protected] !"#$%&'( "$)*+,(&-. - $/$0&+1(&-. PODS APDM PPDM GTI GRI Pipeline Open Data Standard
THE STATE OF THE NATIONAL PIPELINE INFRASTRUCTURE
US DEPARTMENT OF TRANSPORTATION Introduction THE STATE OF THE NATIONAL PIPELINE INFRASTRUCTURE Over the past 70 plus years, a nationwide system of pipelines has been constructed to transport almost 100
Meeting the Challenge of Pipeline Emergency Repair
Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider
Cathodic Protection. Remote Monitoring of Cathodic Protection on a Gas Distribution Network
Cathodic Protection Remote Monitoring of Cathodic Protection on a Gas Distribution Network Author: Martin Alderson Northern Gas Networks Issued for UKOPA members CP measurements are very labour intensive
Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines
The INGAA Foundation, Inc. 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines for the safety of all personnel and the general public during pressure (e.g., hydrostatic, pneumatic)
Portable Natural Gas Supply Solutions
Portable Natural Gas Supply Solutions Presented by Dimitri Karastamatis, P.E. September 22, 2015 Overview CenterPoint Energy Mobile Energy Solutions Pipeline Integrity Portable Gas Supply (CNG & LNG) Other
Introduction to OmniMetrix
Introduction to OmniMetrix Who We Are OmniMetrix is the leader and pioneer in wireless remote monitoring, control and diagnostics for pipelines and critical equipment. With over 16 years of experience
SILICON VALLEY CLEAN WATER. May 2015
SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial
Underground Storage Tanks
Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation
Diane Roy Director, Regulatory Services
Diane Roy Director, Regulatory Services Gas Regulatory Affairs Correspondence Email: [email protected] Electric Regulatory Affairs Correspondence Email: [email protected]
Enbridge Class Location Change Management Plan. 1.1 Additional Information for Identified Changed Class Locations
Information Request No. 1-1.1 Additional Information for Identified Changed Class Locations Reference: i. (A70936) Preamble: ii. Canadian Standards Association (CSA) Z662-15, Oil and Gas Pipeline Systems
Industrial Strength Leak Detection
Industrial Strength Leak Detection Don t let an undetected leak or spill ruin the environment or your reputation... TraceTek Technology: Find leaks before major damage is done... TraceTek Technology: Sensors
Good Housekeeping Practices for DPW/Fleet Maintenance Facilities
Good Housekeeping Practices for DPW/Fleet Maintenance Facilities Kevin P. Walker C&S Engineers, Inc. Best Management Practices Best Management Practices (BMPs) are measures and/or controls used to prevent
Challenges Managing ILI Data in an Enterprise Environment using PODS 6.0 Relational. Bruce Dupuis John Spurlock Alejandro Reyes
Challenges Managing ILI Data in an Enterprise Environment using PODS 6.0 Relational Bruce Dupuis John Spurlock Alejandro Reyes Triggers Partnership between TransCanada and ROSEN to implement a PIMS ILI
An introduction to pipeline pigging CONTENTS
An introduction to pipeline pigging iii CONTENTS Foreword... vii What is a pig?... viii The history of pipeline pigging... ix Acknowledgements... xi Important notice... xi PPSA - Presidents and Officers...
Additional Services Agreement. Part 3: Schedule of our requirements
Additional Services Agreement Part 3: Schedule of our requirements Schedule of our requirements Part A Water Services 1 All water services All connections to our water mains, including those used for construction
Tennessee Gas Association
Environmental, Health, and Safety These courses promote sound work practices and are designed to satisfy many of the environmental, health, and safety regulations for initial and refresher employee training.
Tecnosystem Group Srl - Pietro Fiorentini Spa
Tecnosystem Group Srl - Pietro Fiorentini Spa C. Calvi Tecnosystem Group Srl - M.H.G. Juinen Merrem & La Porte CATHODIC PROTECTION REMOTE MONITORING A.C. Influence Analysis of field tests with a new Data
Underground Storage Tank Cathodic Protection Checklist
Underground Storage Tank Cathodic Protection Checklist The attached Underground Storage Tank (UST) checklist is required for the activity above. This checklist certifies the Cathodic Protection activities
Owner-User Pressure Equipment Integrity Management Requirements
the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines
December 2003 EPB 241B. Some sections are completed, some are partially complete and some are left blank.
Note: As of October 1, 2012 The Water Security Agency and Saskatchewan Ministry of Environment share responsibility and authority for the administration of The Environmental Management and Protection Act,
Contingency Plan. Facility Name
Contingency Plan Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility to respond to an emergency situation. This includes
University of Calgary`s Research Areas on Pipeline Safety Technology
University of Calgary`s Research Areas on Pipeline Safety Technology Seonghwan (Sam) Kim, Ph.D., P.Eng. Assistant Professor and Canada Research Chair in Nano Sensing Systems Department of Mechanical and
Leakage Management & Control
Leakage Management & Control (An overview) Saroj Sharma April 2008 Delft, The Netherlands Contents Introduction Causes of leaks and benefits of leakage control Leakage management strategy Economic level
SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN
SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN XXXX FARM (CITY OR COUNTY), MICHIGAN CONTACT (NAME), OWNER CERTIFICATION: I hereby certify that I have examined the facility, and being familiar with the
PIPELINE INTEGRITY SOFTWARE By Valery V. Kotov, Weatherford P&SS, Lukhovitsy, Russia
PIPELINE INTEGRITY SOFTWARE By Valery V. Kotov, Weatherford P&SS, Lukhovitsy, Russia ABSTRACT It is now commonly accepted that In-Line Inspection is one of the most reliable methods of ensuring pipeline
Province of Alberta PIPELINE ACT PIPELINE RULES. Alberta Regulation 91/2005. With amendments up to and including Alberta Regulation 4/2015
Province of Alberta PIPELINE ACT PIPELINE RULES Alberta Regulation 91/2005 With amendments up to and including Alberta Regulation 4/2015 Office Consolidation Published by Alberta Queen s Printer Alberta
Northern Region. Underground Storage Tank
California CUPA Northern Region Presents Underground Storage Tank Designated Operators Workshop Workshop Agenda Definitions Tank Construction Corrosion Protection Spill Prevention Overfill Prevention Piping
A cure for water damage in real estate
A cure for water damage in real estate Presented for BC Non-Profit Housing Association by Jeff Shearman, Zurich Services Corporation 2010 Zurich Canada Focused on our customer Reduce overall risk by reducing:
SDG&E DIRECT TESTIMONY OF MARIA T. MARTINEZ (PIPELINE INTEGRITY FOR TRANSMISSION AND DISTRIBUTION) November 2014
Company: San Diego Gas & Electric Company (U0M) Proceeding: 01 General Rate Case Application: A.1--XXX Exhibit: SDG&E-0 SDG&E DIRECT TESTIMONY OF MARIA T. MARTINEZ (PIPELINE INTEGRITY FOR TRANSMISSION
GIS Based Risk Analysis Simplifying the Risk Assessment Process
GIS Based Risk Analysis Simplifying the Risk Assessment Process David Adler Principal Engineer System Integrity NiSource Gas Transmission and Storage John Beets Principal GIS Technologist Willbros Engineering
Cost Evaluation of Black Steel Pipe and Galvanized Pipe When Using a Nitrogen Generator
Cost Evaluation of Black Steel Pipe and Galvanized Pipe When Using a Nitrogen Generator Andy L. Kaempfer Business Development Manager Potter Electric Signal Company, LLC 1609 Park 370 Place St. Louis,
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick
Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public
Appendix J3 - Outline Fuel Spill Contingency Response Plan Control room receives call on fuel spill from staff or public Initial Actions to be taken after Fuel Spill reported Identification of the source
THERMOPLASTIC LINERS FOR REHABILITATION OF OIL FLOWLINE AND WATER INJECTION LINES, INTEGRITY AND SERVICE LIFE
THERMOPLASTIC LINERS FOR REHABILITATION OF OIL FLOWLINE AND WATER INJECTION LINES, INTEGRITY AND SERVICE LIFE Vincenzo Savino [1] Mauyed S. Mehdi [1] Abdullah K. Al-Dossary [2] [1] Saudi Aramco, Consulting
Telemetry system for cathodic protection equipment of underground metal pipelines
RECOMMENDATION PCRA 009 June 2010 Rev. 0 Committee for Cathodic Protection and Associated Coatings Telemetry system for cathodic protection equipment of underground metal pipelines DISCLAIMER: The present
ALL UST SYSTEMS. MOTOR FUEL, USED OIL, BULK HEATING OIL STORAGE (Federal/State Regulated Systems)
FACTS ABOUT: UST SYSTEMS COMPLIANCE OUTLINE Maryland Department of the Environment In Maryland, certain UST systems must meet various compliance requirements. The following is a summary of the current
Rohrback Cosasco Systems
Rohrback Cosasco Systems Leading the World in Corrosion Monitoring Systems R ohrback Cosasco Systems (RCS) is the world leader in corrosion monitoring technology. Since 1950, RCS has provided leading-edge
Corrosion Control & Cathodic Protection for Water & Wastewater Systems
Corrosion Control & Cathodic Protection for Water & Wastewater Systems Presented By: James T Lary Corrpro Companies, Inc 1090 Enterprise Dr. Medina, OH 44256 Tel. 330-723 723-5082 (x1215) email: [email protected]
S Y S T E M M O D E R N I Z A T I O N
S Y S T E M M O D E R N I Z A T I O N T H E L I N E M B E X T E N S I O N P R O J E C T B A L T I M O R E A N D H A R F O R D C O U N T I E S, M A R Y L A N D Project Overview Columbia Gas Transmission
Analysis of Oil Pipeline Failures in the Oil and Gas Industries in the Niger Delta Area of Nigeria
Analysis of Oil Pipeline Failures in the Oil and Gas Industries in the Niger Delta Area of Nigeria C.H. Achebe, Member, IAENG, U.C. Nneke, and O.E. Anisiji Abstract - This research work on the analysis
Program Design and Engineering Key to Infrastructure Replacement and Cost Containment
Program Design and Engineering Key to Infrastructure Replacement and Cost Containment By: Tom Ziegenfuss, COO Les Goodman VP/Distribution Dave Klimas, VP/Distribution Glen Armstrong, Senior Codes Specialist
Pipeline Safety Excellence ANNUAL LIQUID PIPELINE SAFETY PERFORMANCE REPORT & STRATEGIC PLAN 2013
TM Pipeline Safety Excellence ANNUAL LIQUID PIPELINE SAFETY PERFORMANCE REPORT & STRATEGIC PLAN 2013 ASSOCIATION OF OIL PIPE LINES (AOPL) represents liquid pipeline owners and operators transporting crude
Operating Plant and Systems Professionals DR. JOHN S. SMART, III SENIOR CORROSION, PIPELINE AND METALLURGY CONSULTANT
Operating Plant and Systems Professionals Inc. Your Increased Profitability is Our Bottom Line DR. JOHN S. SMART, III SENIOR CORROSION, PIPELINE AND METALLURGY CONSULTANT SUMMARY John S. "Jack" Smart is
Distribution Planning. Justin Cook Gord Dillon
Distribution Planning Justin Cook Gord Dillon Agenda 1) Organization Structure 2) District Areas 3) Piping Network 4) What Is Distribution Planning? 5) How Does Distribution Planning Affect You? Contract
CHAPTER VIII. completeness of the operations and maintenance procedures; omission or deficiency of an applicable portion of the plan;
CHAPTER VIII PLANS AND REPORTS REQUIRED BY THE FEDERAL GOVERNMENT PLANS REQUIRED BY THE FEDERAL GOVERNMENT All operators of natural gas systems are required to maintain plans for operations and maintenance
CATHODIC PROTECTION SYSTEM DESIGN
CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of
The State of Natural Gas Pipelines in Fort Worth
TheStateofNaturalGas PipelinesinFortWorth ProducedBy AccufactsInc. ClearKnowledgeintheOverInformationAge RichardB.Kuprewicz President,AccufactsInc. (425)836 4041 [email protected] 1155N.StateSt.Suite609
INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM
INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM 1. IS 15663(Part 1):2006 This code covers requirements and recommendations for the design, materials, construction and testing of pipelines made of steel
Petroleum Storage Tank Compliance 101
Petroleum Storage Tank Compliance 101 Palm Beach County Board of County Commissioners Department of Environmental Resources Management Petroleum Storage Tank Compliance Section www.pbcgov.com/erm 561-233-2400
Arkansas Natural Gas Severance Marketing Costs
Arkansas Natural Gas Severance Marketing Costs The following lists present various costs by category as "Allowable" or "Disallowed" as marketing costs. While listing many items, this list may not be all
At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from