LIST OF DAMS AND HYDROELECTRIC POWER PLANTS WHICH SU-YAPI HAS PARTICIPATED SINCE 1975
|
|
|
- Annabel Hoover
- 10 years ago
- Views:
Transcription
1 LIST OF DAMS AND HYDROELECTRIC S 1 GÜZELHİSAR DAM 2 DOĞANCI DAM (Selahattin Saygı) 3 KÜLTEPE DAM 4 İVRİZ DAM 5 SEVİŞLER DAM 6 KALECİK DAM 7 KIZILDERE DAM & KÖKLÜCE HEPP İzmir Bursa Kırşehir Konya Manisa Osmaniye Tokat EARTH Entire Dam Except the Body, Contractor Entire Dam Except the Body, Contractor EARTH FILL Entire Dam Except the Body, Contractor EARTH FILL Entire Dam Except the Body, Contractor EARTH FILL Entire Dam Except the Body, Contractor Entire Dam Except the Body, Contractor EARTH Diversion-Bottom Outlet, Spillway, Energy Water Intake Structure, Energy Tunnel Excavation, Shoring and Partial Coating, Surge Tank, Contractor 8 KAYABOĞAZI DAM ALTINKAYA DAM 9 DERBENT DAM KOVALI DAM 12 OYMAPINAR DAM 13 KOÇKÖPRÜ DAM & HEPP 14 ALTINKAYA DAM & HEPP Kütahya Samsun Samsun Kayseri Antalya Van Samsun EARTH Entire Dam Except the Body, Contractor Cofferdams, Diversion Structures EPDC, SU-İŞ, (including Gate) TMB Spillway, Diversion and Energy EPDC, SU-İŞ, Water Intake Structure TMB EARTH FILL Entire Dam Except the Body, Contractor CONCRETE ARCH (2) (1) (1) (2) Dam Crest, Tail Water Outlet Structure Switchyard (Const.) (1) Entire Dam Except the Body (2) Energy Structures, Contractor, Contractor Diversion Structures, Contractor - Su-Yapı has been working on Dams and HEPP since This list includes the services that have been performed after year The explanation on the items with () for detail design services is given on page 16/ Page: 1/16
2 LIST OF DAMS AND HYDROELECTRIC S 15 KAYRAKTEPE 16 AĞCAŞAR DAM 17 MANAVGAT 18 BÜYÜKÇEKMECE DAM 19 ÇATÖREN DAM 20 SEKKÖY DAM LAMAS III & IV 21 HYDROELECTRICITY STAGES 22 BOYABAT 23 KAPULUKAYA 24 KILIÇKAYA 25 MENZELET 26 ALTINKAYA 27 ADIGÜZEL 28 KARACAÖREN 29 YAHYASARAY DAM Mersin Kayseri Antalya İstanbul Eskişehir Muğla Mersin Sinop Kırıkkale Tokat K.Maraş Samsun Denizli Burdur Yozgat Cofferdams, Diversion-Bottom Outlet Structures, Body, Spillway, Energy Water Intake Structure, Switchyard EPDC, SU-İŞ, TMB EARTH FILL Entire Dam Except the Body, Contractor EARTH FILL Entire Dam Except the Body and Hydromechanica EİEİ KEPEZ Elec. Inc., Contractor EARTH FILL Spillway, Contractor EARTH FILL Entire Dam Except the Body, Contractor EARTH FILL Entire Dam TEK, Contractor - The explanation on the items with () for detail design services is given on page 16/ IIIA 9.35 IIIB 9.35 IV Entire Dam TGT CONCRETE Power Plant Building, Control EPDC, SU-İŞ, GRAVITY Building and Roads TMB Diversion-Bottom Outlet, Spillway EARTH FILL Energy Structure, Contractor Entire Dam Except the Body, Contractor Entire Dam (A revis.project has been submitted for the body) Consultancy, Supervision Services EPDC, SUİŞ, TMB, Contractor Energy Structures and HEPP, Müteahhit EARTH FILL Energy Structures and HEPP, Contractor EARTH FILL Entire Dam Except the Body, Contractor Page: 2/16
3 LIST OF DAMS AND HYDROELECTRIC S 30 ÇAVDARHİSAR DAM Kütahya EARTH FILL Entire Dam Except the Body, Contractor 31 POLAT DAM Malatya Entire Dam Except the Body, Contractor 32 EĞREKKAYA DAM Ankara EARTH FILL Entire Dam Except the Body, Contractor 33 ÜRKMEZ DAM İzmir EARTH FILL Entire Dam Except the Body, Contractor 34 ÇAT DAM EARTH Adıyaman Entire Dam Except the Body, Contractor 35 AHMETLER DAM EARTH Muğla Entire Dam TEK, Contractor 36 HANAY KÜL DAM Muğla Entire Dam TEK, Contractor 37 SARIMEHMET DAM Van EARTH FILL Entire Dam Except the Body, Contractor 38 KÜRE-ÇATAK DAM Entire Dam, Contractor 39 GAYT DAM Bingöl EARTH FILL Spillway, Contractor 40 ÇAMGAZİ DAM Adıyaman EARTH FILL Entire Dam Except the Body, Contractor 41 KARACAÖREN II HEPP CONCRETE Entire Dam Except the Body, KEPEZ Elec. Inc., Burdur GRAVITY Switchyard and Mechanica Contractor 42 ÇAMALAN DAM Entire Dam EARTH FILL Ankara Feasibility Report for BOT, Contractor 43 KOVADA III HEPP Isparta Feasibility & Final Design for BOT GÖKDERE Inc. 44 ARMAĞAN DAM EARTH Kırklareli Entire Dam Except the Body, Contractor 45 BOYABAT DAM & EARTH HEPP Sinop Diversion Tunnels, Contractor - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model Page: 3/16
4 LIST OF DAMS AND HYDROELECTRIC S 46 SAZLIDERE DAM 47 YEDİGÖZE 48 BOYABAT 49 GEZENDE 50 KİRAZDERE DAM 51 YENİHAYAT DAM 52 ERFELEK DAM 53 KUZGUN 54 DİCLE 55 BATMAN İstanbul TURKİYE Sinop Karaman Kocaeli Çorum Sinop Erzurum Diyarbakır Diyarbakır Entire Dam Except the Body, Contractor Feasibility Report for BOT ATA Cons. Inc. CONCRETE GRAVITY Feasibility Report for BOT ATA Cons. Inc. CONCRETE ARCH Entire Dam Except the Body, Contractor Entire Dam Except the Body, Contractor İzmit Water Inc. EARTH FILL Entire Dam Except the Body, Contractor EARTH FILL Entire Dam Except the Body, Contractor Entire Dam Except the Body, Contractor Switchyard and HEPP, Contractor EARTH Entire Dam Except the Body, Contractor 56 KÜRTÜN Gümüşhane Covered by R.Concrete) Entire Dam, Contractor (Final design has been revised, underground power plant and tunnel spillway and front face cover have been designed) 57 PALANDÖKEN DAM EARTH FILL Entire Dam Except the Body, Contractor Erzurum EARTH 58 ADATEPE DAM Entire Dam Except the Body K.Maraş LİMAK Const. Inc. 59 ALAKIR I HEPP Feasibility Report for BOT KEPEZ Elec. Inc. Antalya - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model Page: 4/16
5 LIST OF DAMS AND HYDROELECTRIC S 60 TAŞOLUK DAM 61 ALARAHAN DAM & HEPP 62 GÖKTAŞ 63 KÖPRÜ 64 ERENLER HEPP 65 ÇİNE 66 AKKÖPRÜ 67 OBRUK 68 GÜLBAHAR DAM 69 DEMİRÖZÜ DAM 70 BERKE 71 OYRAK DAM 72 OBRUCAK DAM 73 KAVŞAKKAYA DAM Çanakkale Antalya Artvin Aydın Muğla Çorum Entire Dam Except the Body, VİNSAN Inc Feasibility Report for BOT KEPEZ Elec. Inc. ARCH GRAVITY Feasibility Report for BOT Feasibility Report for BOT ROLLER COMPACTED CONCRETE (RCC) Regülatör 10 ÇUKUROVA ELECTRIC Inc. ÇUKUROVA ELECTRIC Inc Feasibility Report for BOT ECETUR Inc Entire Dam, ÖZKAR Inc Entire Dam Except the Body EARTH FILL WITH CLAY CORE Entire Dam Except the Body NTF Const. Inc. LİMAK Const. Inc. SAND GRAVEL Entire Dam Except the Body Bingöl FILL ÖZCAN Inc. SAND GRAVEL Entire Dam Except the Body Bayburt FILL ECETUR Inc. Construction Supervision and ELTEM-TEK ÇUKUROVA CONCRETE ARCH Osmaniye Technical Consulting YAPI TEKNİK ELECTRIC Inc. ZONED Entire Dam ZONED Entire Dam Ankara WITH CLAY CORE Entire Dam 74 BAĞIŞTAŞ II HEPP CONCRETE Feasibility Report for BOT EMT Inc. Erzincan CONCRETE 75 BOLASAN HEPP Feasibility Report for BOT ELTEM-TEK DEDEMAN UNIT Antalya GRAVITY WEIR - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model Page: 5/16
6 LIST OF DAMS AND HYDROELECTRIC S 76 OTLUCA HEPP 77 ALAKÖPRÜ 78 KARAKUZ 79 ALKUMRU 80 PEMBELİK 81 ILICA HEPP 82 TOR 83 GÜNDOĞMUŞ 84 ALARAHAN I Mersin Mersin Siirt Tunceli Antalya Antalya Regülatör Feasibility Report for BOT Feasibility Report for BOT Feasibility Report for BOT Feasibility Report for BOT Feasibility Report for BOT Regulator Feasibility Report for BOT Feasibility Report for BOT ARCH GRAVITY Feasibility Report for BOT Feasibility Report for BOT EMT Inc. EMT Inc. EMT Inc. GÜNSAYIL Inc. AKSA Inc. POLAT YOLYAPI Inc. POLAT YOLYAPI Inc. EY Inc. EY Inc. 85 ALARAHAN II Antalya ROLLER COMPACTED CONCRETE (RCC) Feasibility Report for BOT EY Inc. 86 KÖPRÜBAŞI DAM 87 ÇAY 88 ANDIRAZ DAM 89 AKTAŞ 90 ARAÇ DAM ZONED EARTH FILL ZONED EARTH FILL ZONED EARTH FILL - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model Planning Report and Revision of Master Plan Planning Report and Revision of Master Plan Planning Report and Revision of Master Plan Report of Revision Master Plan Report of Revision Master Plan Page: 6/16
7 LIST OF DAMS AND HYDROELECTRIC S 91 GİRME DAM 92 GÖKPINAR DAM 93 ÇAL HEPP 94 BAYIR DAM 95 PAMUK HEPP 96 SULAKYURT DAM 97 TORUL DAM 98 İKİZDERE DAM 99 URUŞ DAM 100 ELMALI DAM, TAŞOBA DAM & BÜYÜKDÜZ HEPP 101 EŞEN II HEPP 102 DAMLACIK HEPP 103 MARMARİS DAM ZONED Entire Dam Muğla EARTH FILL Eskişehir WITH CLAY CORE Entire Dam Entire Dam Denizli LİMAK Entire Dam Except the Body Muğla ÖZKAR Inc. Regulator Entire Dam Mersin 12,5 LİMAK / BEST / ENDA ROLLER COMPACTED Entire Dam Kırıkkale CONCRETE (RCC) Entire Dam Gümüşhane BAYTUR / ÖZDEMİR Aydın Ankara Gümüşhane Muğla Kırşehir Muğla EARTH ROLLER COMPACTED CONCRETE (RCC) CONCRETE ARCH GRAVITY ROCK FILL Entire Dam Except the Body, LİMSAN/LİMAK Entire Dam Regulator 35 Regulator Final Design Preliminary Report Entire Dam Feasibility Report for BOT Planning Report, Final and Detail Design AGE / CEYLAN GÖLTAŞ Energy Inc. EMT AKFEN MARİÇ-BELBİR 104 TAHTAKÖPRÜ DAM AZERBAYCAN Khachmaz ZONED EARTH FILL Prefeasibility MITSUBISHI CO. (Japan) - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model Page: 7/16
8 LIST OF DAMS AND HYDROELECTRIC S 105 DÜZCE-AKSU HEPP Regulator Feasibility Report for BOT Düzce 5 TUBİN Inc. 106 GELİNGÜLLÜ HEPP Feasibility Report EARTH FILL Yozgat Auto Producer Mode SUTA Ltd. Co. 107 NİKSAR HEPP Regulator Feasibility Report for BOT Tokat TEPE Inf. Inc. 108 AKINCI HEPP Regulator Feasibility Report for BOT Tokat TEPE Inf. Inc. 109 KOZCAĞIZ DAM Master Plan and EARTH FILL Bartın Planning Report 110 BAHÇELİK HEPP Kayseri Entire Dam MOLU Inc. Co. 111 MACARRETANE MOZAMBİK Rehabilitation of Hydromechanica REGULATOR DAM Macarretane System TECNICA ARA-Sul (Mozambique) ALPASLAN II Diversion-Bottom Outlet and 112 ZONED Muş Energy Water Intake Structure MWH (HARZA) 113 SEYRANTEPE Granular fill type DARENHES Entire Dam Elazığ with central core 114 BAYRAMHACILI SENERJİ Entire Dam Nevşehir Energy Gen. Inc. 115 AKOCAK HEPP Trabzon Entire Dam NUR Energy Inc. 116 HAMZALI HEPP CANAL GÜNGÖR Entire Dam Ankara 117 OTLUCA HEPP GÜNGÖR Entire Dam Mersin 118 ZİNCİRLİ HEPP GÜNGÖR Entire Dam Antalya 119 ÇAMLICA III HEPP GÜNGÖR Entire Dam 120 SARAÇ GÜNGÖR EARTH FILL Entire Dam Sivas - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model Page: 8/16
9 LIST OF DAMS AND HYDROELECTRIC S 121 ERBAA HEPP 122 CEVİZLİK 123 AKINCI HEPP 124 BÜYÜKKARAÇAY 125 NARLI Tokat Rize Tokat Hatay Muğla Roller Compacted Concrete (RCC) Entire Dam Entire Dam Entire Dam ETİ FERNAS Construction Ltd. Co. ETİ Entire Dam Entire Dam ETİ 126 WADI DAYQAH DAM OMAN Muscat RCC & Rock Fill Compacted Concrete Entire Dam Entire Dam BVI ve NESPAK MRMEWR Ministry of Regional Municipalities, Environment and Water Resources 127 ÇAMBAŞI 128 TATAR 129 AKTAŞ DAM 130 AYVADERE 131 GÜNEYCE 132 ÇANKAYA KARAKURT DAM & 133 HEPP 134 GÖKDERE 135 PİRİNÇLİ Trabzon Elazığ İzmir Trabzon Trabzon Trabzon Kars Karaman Çorum Granular fill type with central core Semi Pervious Fill with Clay Core Entire Dam Entire Dam FERNAS Energy Gen. Inc. DAREN HES Entire Dam Regulator 12 Regulator 7 Regulator 15 - The explanation on the items with () for detail design services is given on page 16/ Entire Dam Entire Dam Entire Dam Entire Dam Entire Dam Entire Dam ATLAS Mining Maritime Trade Inc. ATLAS Mining Maritime Trade Inc. ZORLU Energy Electricity Gen. Inc. BİLSEV Energy Gen. Inc. SEMA Electricity DERYA Electricity Page: 9/16
10 LIST OF DAMS AND HYDROELECTRIC S AKSU-ANAKOL 136 (ÇORUH) 137 ADASU 138 ASLANCIK Erzurum Adapazarı Giresun Send. Gravel & Rock Fill With Blanket Granular fill type with central core Entire Dam LİMAK Inc. Co. Regulator Entire Dam Entire Dam ADASU Energy Inc. 139 SAYAN Regulator SEMA Electricity Entire Dam 12,5 140 ULADI DAM İzmir Entire Dam 141 YEDİGÖZE YEDİGÖZE Entire Dam 142 NİKSAR HEPP SELEN Entire Dam Tokat DEREKÖY DAM & Entire Dam DEMİRKAPI HEPP Rize 144 ÇETİN EnBW Kraftwerke A.G Entire Dam Siirt (Germany) 145 DERELİ BEREKET Energy Entire Dam Giresun 146 ÇIRAKDAMI BEREKET Energy Entire Dam Giresun 147 ÇAMLICA Entire Dam Artvin 148 TUNCA Edirne Entire Dam KADINCIK III & 40 DERYA Electricity Entire Dam KADINCIK IV HEPP Mersin KEMERÇAYIR Entire Dam Trabzon - The explanation on the items with () for detail design services is given on page 16/ Page: 10/16
11 LIST OF DAMS AND HYDROELECTRIC S 151 ÜÇHANLAR 152 ÜÇHARMANLAR 153 BADEMLİ DAM 154 BURGAZ DAM 155 YALNIZCA 156 ORTAÇAĞ HEPP 157 SARNIÇ HEPP 158 ERİK HEPP 159 YUMRUTEPE HEPP 160 İKİSU HEPP 161 KALECİK HEPP 162 KEPEZKAYA HEPP 163 KARACASU DAM 164 UZUNÇAYIR 165 ALKUMRU 166 DEREKÖY Trabzon Trabzon İzmir İzmir Karabük Trabzon Artvin Artvin Giresun Giresun Artvin Karaman Aydın Tunceli Siirt Rize GRANULAR FILL WITH CENTRAL CLAY CORE EARTH FILL EARTH FILL WITH CLAY CORE SANDGRAVEL FILL WITH CLAY CORE Entire Dam Entire Dam Entire Dam Entire Dam (talveg) 55 (talveg) 58 - The explanation on the items with () for detail design services is given on page 16/ Entire Dam Entire Dam Entire Dam Entire Dam Entire Dam Entire Dam Entire Dam Entire Dam Final and detail design for the body of dam Detail design of power plant Entire Dam Entire Dam Ekber Topal Energy Gen. Ltd. Co. LİMAK Construction Trade Co. Inc. LİMAK Hydroelectric Power Investments Inc. LİMAK Hydroelectric Power Investments Inc. BESS Electric. Gen. Ind. & Trade Inc Page: 11/16
12 LIST OF DAMS AND HYDROELECTRIC S 167 KELKİT-AKINCI HEPP 168 BEYYURDU DAM 169 ASLANDAĞI DAM 170 AYVALI 171 PEÇENEK DAM 172 ÇİLEKLİTEPE HEPP 173 ARKUN 174 KIZILEV HEPP 175 ÖZLÜCE HEPP 176 SERPİN HEPP 177 KİRAZLIK HEPP 178 SAYAN HEPP 179 PERVARİ WEIR 180 BOYABAT 181 AYDINCIK DAM 182 ADATEPE DAM Tokat Hakkari Hakkari Erzurum Ankara Giresun Artvin Giresun Erzurum Giresun Siirt Osmaniye Siirt Sinop Manisa K.Maraş Entire Dam ETİ Entire Dam Entire Dam Entire Dam ÖZDOĞAN Energy Inc. EARTH FILL Revision of Planning Report AKAR-SU CONCRETE GRAVITY Entire Dam CENAY Electric. Gen. Ind. & Trade Inc Entire Dam YAPI TEKNİK DOKA Electric Gen. Inc Entire Dam AKSU Electric Gen. Inc Entire Dam AKSU Electric Gen. Inc Entire Dam AKSU Electric Gen. Inc Entire Dam BAREN Energy Gen. Inc Entire Dam KAREL Electric Gen.Inc Entire Dam Entire Dam YAPI TEKNİK ONK Electric Gen. Trade Inc. Co. BOYABAT Electric Gen. Inc. EARTH FILL Entire Dam WITH CLAY CORE - The explanation on the items with () for detail design services is given on page 16/ Revision of Planning Report HİDRODİZAYN Page: 12/16
13 LIST OF DAMS AND HYDROELECTRIC S 183 KARAKUZ DAM 184 ÇELENGÖZ DAM 185 CİZRE 186 BOZKIR 187 TEFEN HEPP 188 MENGE 189 KÖPRÜ SAYAN WEIR KESKİN DAM BAĞIŞTAŞ II DAM KIZKAYASI DAM BAĞIŞTAŞ I DAM 195 NAMAZGAH DAM 196 BAYRAM DAM 197 KEMAH 198 HİMMETLİ HEPP K.Maraş Manisa Şırnak Konya Karabük Osmaniye Siirt Erzincan Bursa Erzincan Kocaeli Artvin Erzincan WITH CLAY CORE Revision of Planning Report HİDRODİZAYN ZONED EARTH FILL Entire Dam GRANULAR FILL TYPE AYDINLI Energy WITH CENTRAL CORE Entire Dam Gen.& Trade Inc Entire Dam Entire Dam AKSU Electric Gen. Inc. CONCRETE GRAVITY Entire Dam Entire Dam Entire Dam Entire Dam Entire Dam YAPI TEKNİK WITH CLAY CORE Entire Dam WITH CLAY CORE Entire Dam ENERJİ SA Energy Gen. Inc. ENERJİ SA Energy Gen. Inc. KAREL Electric Gen. Inc. NTF Const. & Trade Co. Ltd. AKDENİZLİ Electric Gen. Inc. ÇALIK Energy Gen. & Mining Inc. OREN Energy Electric Gen. Inc Entire Dam İSU CONCRETE GRAVITY - The explanation on the items with () for detail design services is given on page 16/ Entire Dam Entire Dam Design Supervision LNS Energy Gen. Ind. & Trade Inc. AK Energy Electric Gen. Inc. MEM Energy Electric Gen. Inc.Co Page: 13/16
14 LIST OF DAMS AND HYDROELECTRIC S GÖKKAYA DAM ÇAYÖNÜ - DERYA WEIR KAYABEYİ DAM 202 GÖKTAŞ I 203 GÖKTAŞ II 204 ÇAKMAK DAM 205 ŞENYAYLA I ŞENYAYLA II KARGI 208 GÖKBEL I GÖKBEL II DARAN I DARAN II 211 NOBULEVI DAM 212 TSKHIMRA DAM 213 Diyarbakır Ardahan Edirne Diyarbakır Diyarbakır Ankara Ankara Ankara Karaman Karaman GEORGIA GEORGIA Design Supervision CONCRETE GRAVITY Entire Dam Entire Dam MEM Energy Electric Gen. Inc.Co. ERENTUR Ind. & Trade Inc. PELİN Energy Gen & Trade Co. Ltd. TSKB Garanti Yapı Kredi İş Bank / BEREKET Energy Inc. TSKB Garanti Yapı Kredi İş Bank / BEREKET Energy Inc. EARTH FILL WITH CLAY CORE Revision of Planning Report Entire Dam Entire Dam WITH CLAY CORE Entire Dam - The explanation on the items with () for detail design services is given on page 16/ Entire Dam Entire Dam Entire Dam Entire Dam ME-ED Energy Electric Gen. Co.Ltd. ME-ED Energy Electric Gen. Co.Ltd. KARGI Energy Electric Gen. Inc. GÖKBEL Energy Electric Gen. Inc. GÖKBEL Energy Electric Gen. Inc. Yapı Kredi Bank Kurtsuyu Elec.Gen.Inc. Yapı Kredi Bank Kurtsuyu Elec.Gen.Inc. KLG LLC (Kolin / Limak JV) KLG LLC (Kolin / Limak JV) Page: 14/16
15 LIST OF DAMS AND HYDROELECTRIC S ERJIA I - II LECHEKKA DAM AND HEPP PEMBELİK DAM ARTVİN DAM 218 BALLIKAYA DAM TORTUM II BİTLİS ARINCIK WEIR 221 & AK HEPP 222 KUŞAKLI 223 BURGAZ 224 İKİSU 225 KÖROĞLU HEPP 226 OYLAT HEPP 227 AKBAŞ 228 AKKENT-ÇALKUYUCAK GEORGIA GEORGIA Tunceli Artvin Adapazarı Erzurum Bitlis Muş İzmir Giresun Osmaniye Bursa Denizli Denizli CONCRETE GRAVITY CONCRETE ARCH GRAVITY Entire Dam Entire Dam Entire Dam KLG LLC (Kolin / Limak JV) KLG LLC (Kolin / Limak JV) DARENHES Elect. Gen. Inc. GarantiYapı Krediİş BankVakıf Bank / Doğuş Energy WITH CLAY CORE Entire Dam Due Diligence Services 2011 Due Diligence Services 2011 Due Diligence Services Entire Dam SANDGRAVEL FILL WITH CLAY CORE Entire Dam - The explanation on the items with () for detail design services is given on page 16/ Entire Dam Entire Dam Entire Dam Yapı Kredi BankAkbank Nur-Tek Elect. Gen. Inc. Yapı Kredi BankAkbank Nuve Elect. Gen. Inc. Yapı Kredi BankAkbank Özbey Energy ENERJİSA Energy Gen. Inc. LİMAK Const. Trade & Ind. Inc. ETKEN Elect. Energy Gen. Ltd. Co. ETKEN Elect. Energy Gen. Ltd. Co. Yapı Kredi Bank Merter Tekstil Branch Yapı Kredi Bank Merter Tekstil Branch Page: 15/16
16 LIST OF DAMS AND HYDROELECTRIC S 229 KOÇALİ DAM 230 ÇARDAK DAM 231 BEŞPARMAK DAM KAYRAKTEPE DAM & HEPP ALPASLAN II DAM & HEPP 234 YUSUFELİ 235 CİZRE HEPP 236 BALLIKAYA DAM 237 CİZRE HEPP 238 ARADAH DAM SAMİ SOYDAM 239 SANDALCIK 240 GÖKSU 241 KÖPRÜBAŞI Adıyaman Antalya Aydın Mersin Muş Artvin Şırnak Adapazarı Şırnak SAUDI ARABIA Denizli Bolu Trabzon Entire Dam Entire Dam Entire Dam Entire Dam WITH CLAY CORE Entire Dam DOUBLE CURVATURE CONCRETE ARCH Entire Dam Entire Dam WITH CLAY CORE Entire Dam CONCRETE GRAVITY Entire Dam Bottom Outlet Valve Chamber WITH CLAY CORE Entire Dam Alpaslan II Energy Gen. & Min. Ind. Trade Inc. LCK Yusufeli Ordinary Partnership NUROL / CENGİZ Partnership YÖNTAŞ İnş. San. ve Tic. A.Ş. ÇATAK Enerji Elk. Üretim A.Ş. KİT Müh. ve Mak. Ltd. Şti. Garanti Bank/Akbank ZORLU Hid. En. Ür. A.Ş. Ziraat Bank Tek-En En.Ür.A.Ş. Yapı Kredi Bank Küçük Enerji Ür. A.Ş. 1 - SU-YAPI HAS BEEN WORKING ON DAMS AND HEPP SINCE THE ABOVE LIST INCLUDES THE SERVICES THAT HAVE BEEN PERFORMED AFTER PRE-TENDER DRAWINGS FOR THE FACILITIES, CIVIL WORKS OF WHICH ARE BIDDED BY AND FOR WHICH THE IS PROVIDED TO THE CIVIL WORKS CONTRACTOR BY SU-YAPI, ARE BASED ONLY ON HYDRAULIC DIMENSIONS, OTHER THAN THE DRAWINGS FOR EMBANKMENT; THEREFORE, FOR SUCH FACILITIES IS PERFORMED BY THE REQUIRED, STABILITY ANALYSIS AND STRUCTURAL DESIGN WHICH ARE CARRIED OUT WITHIN THE SCOPE OF STUDIES. FURTHERMORE, IF A NEED FOR DESIGN REVISION ARISES, TO COPE WITH THE SOIL, MATERIAL RESTRAINTS, PROGRAM AND OPERATING CONDITIONS CONFRONTED IN STAGE SUCH REVISIONS ARE CARRIED OUT BY SU-YAPI AS WELL. THE DRAWINGS DURING PHASE ARE DEVELOPED IN PARALLEL TO THE CIVIL WORKS AND ACCORDING TO OUR CONTINOUS IN-SITU STUDIES AND SITE CONDITIONS. 3 - BOT : BUILD-OPERATE-TRANSFER MODEL, : GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS Page: 16/16
TEB 31 December 2014
TEB 3 December 04 Summary Balance Sheet Source: TEB BRSA Consolidated Financials Summary Income Statement 3 Source: TEB BRSA Consolidated Financials Strong balance sheet growth with continuing commitment
Summary Balance Sheet. Source: TEB BRSA Consolidated Financials
TEB 30 June 03 Summary Balance Sheet Source: TEB BRSA Consolidated Financials Summary Income Statement 3 Source: TEB BRSA Consolidated Financials Strong balance sheet growth, commitment to core banking
Privatisation Agenda for Energy Assets
www.pwc.com.tr October 2012 Privatisation Agenda for Energy Assets Contents Introduction 3 Power distribution companies 4 Hamitabat and small hydro assets 6 Başkent Gaz 7 2 PwC Introduction Lower deal
TURKEY WHAT S HOT WHAT S NOT
TURKEY WHAT S NOT TURKEY WHAT S NOT There is TURKEY TURKEY WHAT S NOT There is TURKEY and TURKEY WHAT S NOT There is TURKEY and There is İSTANBUL TURKEY Secondary and tertiary cities Limited/focused service,
Analysis of variable-base heating and cooling degree-days for Turkey
Applied Energy 69 (2001) 269 283 www.elsevier.com/locate/apenergy Analysis of variable-base heating and cooling degree-days for Turkey Orhan Bu yu kalaca *, Hu samettin Bulut, Tuncay Yılmaz Department
Fibabanka Overview September 2013
Fibabanka Overview September 2013 12 Countries 74 Companies >12,000 employees Fiba Group Sectors & Companies Fiba Holding Fina Holding Banking Other Financial Services Retail Real Estate & Asset Management
Monitoring data and existing information Country Presentation from Turkey
Workshop on DEVELOPING REGIONAL COOPERATION FOR SHARED KARST AQUIFER MANAGEMENT IN SEE 27-28 June 2008 Thessaloniki, Greece Monitoring data and existing information Country Presentation from Turkey Plan
YAPI KREDİ: A New Bank is Born. İstanbul, 2 October 2006
YAPI KREDİ: A New Bank is Born İstanbul, 2 October 2006 AGENDA THE NEW BANK SHAREHOLDING AND ORGANIZATIONAL STRUCTURE VISION AND KEY TARGETS 2 YAPI KREDİ MERGER IS THE BIGGEST M&A PROJECT IN THE HISTORY
As of 31.12.2013. www.sekerbank.com.tr
As of 3.2.203 www.sekerbank.com.tr Contents Pages Background & Ownership 3-4 Ratings and Financial Performance 6-0 Risk Management 4-6 Business Strategies & Current Strengths 8-20 National Presence and
CATTLE SECTOR IN TURKEY
CATTLE SECTOR IN TURKEY Çagla Yüksel Kaya Veterınarıan CATTLE BREEDERS ASSOCIATION OF TURKEY CATTLE SECTOR its value shared in 2004 In EU-25 nearly 23% of the total value of agricultural production and
THE INNOVATION INDEX OF CITIES OF TURKEY: AN EMPIRICAL ANALYSIS FOR DETERMINING FACTORS OF INNOVATION
Ekonometri ve İstatistik Sayı:22 2015 36-46 İSTANBUL ÜNİVERSİTESİ İKTİSAT FAKÜLTESİ EKONOMETRİ VE İSTATİSTİK DERGİSİ THE INNOVATION INDEX OF CITIES OF TURKEY: AN EMPIRICAL ANALYSIS FOR DETERMINING FACTORS
NATURAL GAS MARKET TARIFFS REGULATION
NATURAL GAS MARKET TARIFFS REGULATION 1 Presentation Outline NATURAL GAS MARKET TARIFFS Tariff Definition Process and Main Principles Type of Tariffs Connection Tariffs Tariffs Regarding Transmission and
www.pwc.com.tr Privatisation Update
www.pwc.com.tr Privatisation Update 12 October 2015 Electricity generation...3 Electricity and gas distribution...10 Looking ahead...11 2 Privatization Update Electricity generation In March 2010, Turkey
INVESTOR PRESENTATION. BRSA Unconsolidated Financial Statements Highlights 30.06.2015 www.sekerbank.com.tr
INVESTOR PRESENTATION BRSA Unconsolidated Financial Statements Highlights 30.06.205 www.sekerbank.com.tr CONTENTS About Şekerbank 3-7 Background / Milestones Strategy & Mission Ownership Ratings Geographical
INVESTOR PRESENTATION. BRSA Unconsolidated Financial Statements Highlights 31.03.2015 www.sekerbank.com.tr
INVESTOR PRESENTATION BRSA Unconsolidated Financial Statements Highlights 3.03.205 www.sekerbank.com.tr CONTENTS About Şekerbank 3-7 Background / Milestones Strategy & Mission Ownership Ratings Geographical
TEASER. Privatization of Turkey s Electricity Distribution Industry
TEASER Privatization of Turkey s Electricity Distribution Industry Legal Disclaimer Regarding the Teaser Any estimates and projections contained in the present Teaser (the Teaser ) involve significant
Zeitschrift für die Welt der Türken Journal of World of Turks THE IMPACT OF ECONOMIC DEVELOPMENT ON REGIONAL MIGRATION IN TURKEY
THE IMPACT OF ECONOMIC DEVELOPMENT ON REGIONAL MIGRATION IN TURKEY Mustafa METE Hakkı ÖZBAŞ Abstract: Since its inception, Turkey has experienced several migration movements. It is a transit country that
NEWSPAPER ADVERTISING RATES
NEWSPAPER ADVERTISING RATES Effective from April 2014 CONTENTS SABAH Page TAKVİM Page Turkey Edition 2 Turkey and Istanbul Adv. Edition 10 Istanbul Edition 3 Günaydın Advertising Edition 4 FOTOMAÇ Sabah
Modeling Solar Energy Potential In Turkey
Modeling Solar Energy Potential In Turkey Serhat SENSOY, Yusuf ULUPINAR, Mesut DEMIRCAN, Ilker ALAN, Zuhal AKYUREK, Pinar A. BOSTAN Turkish State Meteorological Service, Ankara, Turkey Abstract Since the
INVESTOR PRESENTATION. BRSA Unconsolidated Financial Statements Highlights 31.12.2015 www.sekerbank.com.tr
INVESTOR PRESENTATION BRSA Unconsolidated Financial Statements Highlights 3.2.205 www.sekerbank.com.tr CONTENTS About Şekerbank 3-7 Background / Milestones Strategy & Mission Ownership Ratings Geographical
VISITOR SURVEY EXECUTIVE SUMMARY
VISITOR SURVEY EXECUTIVE SUMMARY March 11 14, 2015 TÜYAP Fair Convention and Congress Center Istanbul / TURKEY CONTENTS PAGE 1. SUBJECT 3 1.1. KEY INFORMATION 3 1.2. PURPOSE 4 1.3. METHOD AND SAMPLING
General Directorate of Turkish Electromechanics Industry
General Directorate of Turkish Electromechanics Industry June 2015 General Directorate of Turkish Electromechanics Industry www.temsan.gov.tr General Directorate Ankara Factories Diyarbakir Factories www.temsan.gov.tr
RATIO ESTIMATORS IN POST-STRATIFICATION
Nüfusbilim Dergisi\Turkish Journal of Population Studies, 2012, 34, 3-15 3 RATIO ESTIMATORS IN POST-STRATIFICATION In this study, some ratio-type estimators are taken into consideration in literature and
REPUBLIC OF TURKEY MINISTRY OF ECONOMY NEW INVESTMENT INCENTIVES PROGRAM
REPUBLIC OF TURKEY MINISTRY OF ECONOMY NEW INVESTMENT INCENTIVES PROGRAM April, 2012 1 The New Investment Incentives Program General Investment Incentive Scheme Regional Investment Incentive Scheme Large
Individual Pension System Progress Report
Individual Pension System Progress Report 29 Individual Pension System Progress Report 29 [email protected] Electronic version of this document and reference data of selected statistics are available
RESULT SUMMARY OF THE VISITOR SURVEY
November, 14 17, 2013 RESULT SUMMARY OF THE VISITOR SURVEY TÜYAP Fair, Convention and Congress Center Büyükçekmece İstanbul, Turkey 6 TABLE OF CONTENTS PAGE 1. SUBJECT OF THE SURVEY 3 1.1. INFORMATION
A. Sinan Türkyılmaz, Attila Hancıoğlu and İsmet Koç
SURVEY DESIGN APPENDIX B A. Sinan Türkyılmaz, Attila Hancıoğlu and İsmet Koç The major features of sample design and implementation for the Turkish Demographic and Health Survey, 2003 (TDHS-2003) are described
FMD SITUATION IN TURKEY. -Country Report- FMD SITUATION IN TURKEY. - Country Report- Dr Nihat Pakdil Deputy Secretary of M.A.R.A.
Appendix 11 FMD SITUATION IN TURKEY -Country Report- FMD SITUATION IN TURKEY - Country Report- Dr Nihat Pakdil Deputy Secretary of M.A.R.A. of Turkey A.Naci BULUT Head of Diagnosis Department Sap Institute,
DIMENSION OF WATER LOSS THROUGH DISTRIBUTION SYSTEM AND REDUCTION METHODS IN TURKEY
DIMENSION OF WATER LOSS THROUGH DISTRIBUTION SYSTEM AND REDUCTION METHODS IN TURKEY İzzet ÖZTÜRK Vedat UYAK Mehmet ÇAKMAKCI Lütfi AKÇA İstanbul Technical University, Faculty of Civil Engineering, Department
Applied Energy 84 (2007) 477 491. Simple model for the generation of daily global solar-radiation data in Turkey
Applied Energy 84 (2007) 477 491 APPLIED ENERGY www.elsevier.com/locate/apenergy Simple model for the generation of daily global solar-radiation data in Turkey Hüsamettin Bulut a, *, Orhan Büyükalaca b
www.pk ww. fhot els e. ls c. om
Turkey - overview Zonguldak Tekirdağ Istanbul Kocaeli Sakarya Bursa Ankara Balıkesir Eskişehir Çorum Samsun Tokat Sivas Ordu Trabzon Erzurum Ağrı Manisa Kütahya İzmir Afyonkarahisar Aydın Denizli Muğla
Poverty and Social Stratification at the Regional Levels in Turkey
Poverty and Social Stratification at the Regional Levels in Turkey Ercan Dansuk * Mehmet Ozmen ** Güzin Erdogan *** Abstract This study presents a starting point in examining the issue of poverty in Turkey
FACTS & FIGURES: TEDU 2014-15 (as of May 31st, 2015)
FACTS & FIGURES: TEDU 2014-15 (as of May 31st, 2015) TEDU STUDENTS a. Newly enrolled students in 2014: Placed (w. full ) : 37 Placed (w. 75% ) : 34 Placed (w. 50% ) : 203 Placed (w. 25% ) : 96 Placed (total)
Relationship between GDP per Capita and Gender Parity in Primary Education: Evidence from Provinces of Turkey 1. Sedat Gümüş a2
Çankırı Karatekin Üniversitesi Sosyal Bilimler Enstitüsü Dergisi 1(2010) 141 158 Relationship between GDP per Capita and Gender Parity in Primary Education: Evidence from Provinces of Turkey 1 a Michigan
REFERENCES LİST VAN 500 BEDS STATE HOSPITAL
REFERENCES LİST BURSA CEKIRGE 700 BEDS STATE SANLIURFA EYYUBIYE 533 BEDS STATE ISPARTA SULEYMAN DEMIREL UNIVERSITY 500 BEDS TRAINING AND RESEARCH VAN 500 BEDS STATE MUGLA 475 BEDS STATE ORDU UNYE 400 BEDS
SHEEP AND GOAT MEAT Non-exhaustive list of issues and questions to facilitate preparations for bilateral meetings TURKEY
1. General situation of the sector SHEEP AND GOAT MEAT Non-exhaustive list of issues and questions to facilitate preparations for bilateral meetings TURKEY 2002 2003 2004 1 2005 (f) Production: Total size
İŞİMİ INTRODUCTION. at the crossroads between East and West, overlapping Europe and Asia geographically.
TURKISH STATE RAILWAYS ANKARA HST Station 14 October 2008 1 DEMİRYOLLARININ TARİHSEL GELİŞİ İŞİMİ INTRODUCTION www.ubak.gov.tr TURKEY is: at the crossroads between East and West, overlapping Europe and
Slide 1 UNECE-Committee on Sustainable Energy 20th Session of the Working Party on Gas 19-20 January 2010 BOTAŞ Projects at the Center of the Energy Arena Strategy and Busines Development Department 03.02
TRADE EXHIBITION ISSUE REPORT
TRADE EXHIBITION ISSUE REPORT 23 rd Anfaş Hotel Equipment Trade Exhibition 2012 which is the leading event in hospitality industry held on 18-21 January, successfully gathered all sector professionals.
RENEWABLE INTEGRATION IN TURKISH POWER SYSTEM
RENEWABLE INTEGRATION IN TURKISH POWER SYSTEM Nurhan OZAN Transmission Planning & Coordination Manager Research, Planning, Coordination Department TURKISH ELECTRICITY TRANSMISSION CORPORATION () www.teias.gov.tr
TURKISH ECONOMIC ASSOCIATION. DISCUSSION PAPER 2011/4 http ://www.tek. org.tr PRIVATIZATION AND REGIONAL DISTRIBUTION OF MANUFACTURING IN TURKEY
TURKISH ECONOMIC ASSOCIATION DISCUSSION PAPER 2011/4 http ://www.tek. org.tr PRIVATIZATION AND REGIONAL DISTRIBUTION OF MANUFACTURING IN TURKEY Fatma Doğruel and A.Suut Doğruel April, 2011 Privatization
Chart Alert !! URGENT!!
Chart Alert!! URGENT!! Date: 18 December 2009 Subject: Turkey (LT) New Minimum Visibility Values for Airports within Turkey With AIRAC AIP SUP 07/09, Turkey has implemented minimum visibility values for
The Impacts of Internal Migration on Urban and Work Life in Istanbul
The Impacts of Internal Migration on Urban and Work Life in Istanbul Mustafa Öztürk Abstract: The main destinations of internal migration movements that originated in Turkey in the 1950s as a result of
TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT
TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT 0 75 75 150 km Kocaeli (İzmit) BOSBORUS 0 İzmir Konya ANKARA 150 mi İçel (Mersin) REPUPLIC OF CYPRUS Iskenderun Adana SYRIA
Session FT5.22: Integrated Risk Management in Mediterranean Towns: Experience Sharing. Expert Panel
Session FT5.22: Integrated Risk Management in Mediterranean Towns: Experience Sharing Expert Panel Prof. Dr. Veysel EROGLU Director General of State Hydraulic Works Flood is a natural event. However, human
Intangible Cultural Heritage Safeguarding Efforts
Field Survey Report Intangible Cultural Heritage Safeguarding Efforts in the Asia-Pacific 2013 International Information and Networking Centre for Intangible Cultural Heritage in the Asia-Pacific Region
TABAR ENGINEERING CONSTRUCTION AND TRADING LIMITED. : Hüseyin TABAK
Name Profession Years With Firm Professional Experience : Hüseyin TABAK : Civil Engineer (M.Sc.) : 45 years : 50 years KEY QUALIFICATIONS : Founder and General Manager of Tabar Engineering Construction
Renewable Energy Solutions
Renewable Energy Solutions About Us Mission, Vision and Management Approach Business Segments Energy Solar Power Plants (SPP) Hydroelectric Power Plant (HPP) Wind Power Plant (WPP) EPC (Engineering, Procurement
Universal health coverage in Turkey: enhancement of equity
Universal health coverage in Turkey: enhancement of equity Rifat Atun, Sabahattin Aydın, Sarbani Chakraborty, Safir Sümer, Meltem Aran, Ipek Gürol, Serpil Nazlıoğlu, Şenay Özgülcü, Ülger Aydoğan, Banu
The point where technique meets with experience. REPAIR WELDING SERVICE. Services for Cement Manufacturer, Iron & Steel Works, Mining Industry.
The point where technique meets with experience. REPAIR WELDING SERVICE Services for Cement Manufacturer, Iron & Steel Works, Mining Industry. About Us Our company as ReWeld is providing services about
HYDROPOWER. Purpose Builts
HYDROPOWER Purpose Builts Prosem Engineering has defined three main pillars for its service concept: cooperation, excellent service provision and innovative approach. Strategic Partnership Cooperation
HYDROPOWER. Purpose Builts
HYDROPOWER Purpose Builts Who We Are Kamil Karaağaç CEO, Founder kkaraagac @ prosem.biz Finished his bachelor degree at 1993 in Middle East Technical University Civil Engineering Department. His career
Zeynep ÖZLER Melih ÖZSÖZ Economic Development Foundation - TURKEY. Visa Situation in Turkey
Zeynep ÖZLER Melih ÖZSÖZ Economic Development Foundation - TURKEY Visa Situation in Turkey Strengthening the triangle CSOs National Governments- European Commission-Reinforcing the Europe-wide civil society
MAKRO ENVIRONMENTAL PROTECTION AND INDUSTRIAL PLANTS
MAKRO ENVIRONMENTAL PROTECTION AND INDUSTRIAL PLANTS PRODUCTION AND TRADE CO. LTD. is a company working in subjects of designing, engineering, producing, installation, automation and operation of all types
SOLID WASTE MANAGEMENT IN TURKEY Current Status and Developments
SOLID WASTE MANAGEMENT IN TURKEY Current Status and Developments Res. Asst. Başak TARHAN, M.Sc. Prof. Dr. Kahraman ÜNLÜ Middle East Technical University Department of Environmental Engineering INTRODUCTION
Mother Child Education Foundation
2007 Annual Report Contents 1 Mother Child Education Foundation 2 President s Message 6 Board of Trustees and Board of Directors 7 Our Consultants 10 ACEV Programs and Activities 11 ACEV's Approach 12
Rumeli Cement Group Plants Preliminary Information. September 2004
Rumeli Cement Group Plants Preliminary Information September 2004 The present document has been prepared by Rumeli Group, Ernst & Young and Garanti Securities in good faith for information purposes only,
2016 DHMİ AIRPORT CHARGES
REPUBLIC OF TURKEY GENERAL DIRECTORATE OF STATE AIRPORTS AUTHORITY (DHMI) 2016 DHMİ AIRPORT CHARGES Charges Page 1 International Landing and Parking Charges 1 2 Passenger Service Charges 5 3 Charges for
DENİZBANK FINANCIAL SERVICES GROUP ANNUAL REPORT 2013
DENİZBANK FINANCIAL SERVICES GROUP ANNUAL REPORT 2013 DenizBank is a member of Sberbank Group. SECTION I INTRODUCTION 1 DenizBank Financial Services Group (DFSG) 2 DenizBank s Mission and Vision 2 Dividend
ELDER ELECTRICITY DISTRIBUTION SYSTEM OPERATORS OF TURKEY
ELDER ELECTRICITY DISTRIBUTION SYSTEM OPERATORS OF TURKEY PREAMBLE ELDER is one of the oldest NGO s in the electricity sector with its almost 15-year history. Since its establishment, it has aimed to
Mediterranean region. Contents 18.02.2014 WATER FOOTPRINT OF TOURISM AND AGRICULTURAL PRODUCTION IN TURKEY
WATER FOOTPRINT OF TOURISM AND AGRICULTURAL PRODUCTION IN TURKEY Prof.Dr.Bülent Topkaya Akdeniz University Department of Environmental Engineering Mediterranean Region Water in Turkey Tourism activities
DIN EN ISO 9001:2008 DIN EN ISO 14001:2004 OHSAS 18001:2007
DIN EN ISO 9001:2008 REFERENCE LIST Reference List for Titan IS7, IS14, IS16, IS18, IS20, IS21 and IS26 Concrete Spraying Machines sales by January 2016. 1 LIMAK INSAAT Black Sea Highway IS16 2003 2 LIMAK
Educational Inequality in Turkey: An Evaluation by Gini Index* Türkiye de Eğitim Eşitsizliği: Gini İndeksine Göre Değerlendirme
Eğitim ve Bilim 2011, Cilt 36, Sayı 160 Education and Science 2011, Vol. 36, No 160 Educational Inequality in Turkey: An Evaluation by Gini Index* Türkiye de Eğitim Eşitsizliği: Gini İndeksine Göre Değerlendirme
PİRAMİT ENGINEERING& CONSULTING LTD. COM.
PİRAMİT ENGINEERING& CONSULTING LTD. COM. Since its foundation in 1987, Piramit Engineering Consultancy Co. Ltd. has been providing engineering and consultancy services in various fields: Infrastructure
NEWSLETTER. www.grouplaw.com.tr. GROUP LAW Law Firm Hukuk Bürosu GROUP LAW FIRM UPDATES
V O L U M E 3 I S S U E 3 1-3 0 2 0 1 3 GROUP LAW GROUP LAW FIRM UPDATES CONTENTS PAGES GROUP LAW FIRM UP- DATES PPP FEATURES & PRI- VATIZATION HIGHLISHT ENERGY SECTOR UP- DATES 1 2 6 Nomination of Group
Mühendislik Danışmanlık Sanayi ve Ticaret Ltd. Şti.
Mühendislik Danışmanlık Sanayi ve Ticaret Ltd. Şti. COMPANY INTRODUCTION INFORMATIONS Tel: +90 212 728 8132 / +90 535 334 4912 / Fax: +90 212 728 8134 Web : www.obef.com.tr /E-mail: [email protected], Adres
A Perspective of Turkey Nuclear Power Plant Projects
Electricity Generation Co. Inc. Department of Nuclear Power Plants A Perspective of Turkey Nuclear Power Plant Projects Mehmet BULUT, Ph.D. [email protected] Workshop on Energy Assesments and Pre-Feasibility/Feasibility
ISSN: 1306-3111/1308-7304 Received: October 2013 NWSA ID: 204.9.2.3A0066 Accepted: April 2014 E-Journal of New World Sciences Academy
NWSA-Physical Sciences Status : Original Study ISSN: 1306-3111/1308-7304 Received: October 2013 NWSA ID: 204.9.2.3A0066 Accepted: April 2014 E-Journal of New World Sciences Academy Ömer Bilen Yıldız Technical
ADDITIONAL QUESTIONS FOR TURKEY
ADDITIONAL QUESTIONS FOR TURKEY GENERAL PRINCIPLES Free Movement of Goods in the Non-Harmonised Area How does Turkey intend to ensure the free circulation of products with all Member States? Turkey is
RANKING OF TURKISH UNIVERSITIES BY ACADEMIC PERFORMANCE (JANUARY 2010)
RANKING OF TURKISH UNIVERSITIES BY ACADEMIC PERFORMANCE (JANUARY 2010) Turkish Universities (114 of them) are ranked according to their academic performances based on national and international sources.
INFORMATION CONCERNING CERTIFICATION OF ORIGIN. Addendum. Notification by Turkey
GENERAL AGREEMENT ON TARIFFS AND TRADE RESTRICTED CPC/10/Add.29 15 October 1987 Special Distribution Preferential Arrangements Among Developing Countries Negotiated in GATT INFORMATION CONCERNING CERTIFICATION
MONTHLY REPORT MAY 2011
MONTHLY REPORT MAY 2011 Issue date: 21.06.2011 Abbreviations: LTM: Last twelve months YTD: Year-to-date MoM: Month-on-month AKFEN HOLDING As of 31 May 2011, the price of Akfen Holding s bond realized at