1 CARLSON CREEK HYDROELECTRIC PROJECT PRELIMINARY FEASIBILITY EVALUATION AEA GRANT # ALASKA POWER & TELEPHONE COMPANY DECEMBER, 2011

2 CARLSON CREEK HYDROELECTRIC PROJECT PRELIMINARY FEASIBILITY EVALUATION Table of Contents SECTION 1 INTRODUCTION A. AEA GRANT HISTORY... 1 B. COMMUNITY PROFILES... 1 C. ENERGY PROFILE... 2 D. PROJECT LOCATION AND BASIN DESCRIPTION... 3 E. SITE VISIT... 3 SECTION 2 HYDROLOGY A. STREAM GAGES... 5 B. FLOW DURATION CURVE... 5 SECTION 3 ALTERNATIVE ARRANGEMENTS A. ALTERNATIVE B. ALTERNATIVE C. ALTERNATIVE D. ALTERNATIVE SECTION 4 CONSTRUCTION COSTS AND COST OF POWER A. CONSTRUCTION COST ESTIMATES... 8 B. GENERATION ESTIMATES... 8 C. COST OF POWER... 9 D. SUPPLEMENTAL DIESEL GENERATION... 9 E. RATE IMPACTS... 9 SECTION 5 CONCLUSIONS AND RECOMMENDATIONS A. CONCLUSIONS B. RECOMMENDATIONS... 12

3 SECTION 1 INTRODUCTION A. AEA GRANT HISTORY In 2009, Alaska Power & Telephone Company (AP&T) was awarded a grant of $40,000 by the Alaska Energy Authority (AEA) during Round II of the Renewable Energy Grant Program, based on an application submitted by AP&T in October, The terms of the grant required a 20% matching contribution by AP&T. The approved scope of work for the grant comprised the following Phase I reconnaissance tasks: Installation of two stream gages Site inspection by AP&T engineers Re-evaluation of project capacity and construction cost based on information from the site visit and stream gages. Reconnaissance report to document Phase I activities Request jurisdictional determination from the Federal Energy Regulatory Commission (FERC) AP&T conducted a one-day site visit on September 24, A memorandum summarizing the site visit was prepared, and is summarized in Section 1.C below. The full text of the memorandum is included in Appendix A of this report. Unfavorable conditions were identified during the site visit. In addition, the Governor s veto of Round III funding for the project in 2010 indicated a possible unwillingness to fund a major portion of the project costs, which AP&T knew would be necessary for the project to be of benefit to its ratepayers. Therefore, AP&T elected to not do any significant work on the project in In the spring of 2011, AP&T began preparing the jurisdictional determination request to FERC as required by the scope of services. Based on AP&T s experience, we expected that FERC would rule that they had jurisdiction over the project only if there was a reasonably likelihood that it would affect anadromous fish. Thus, AP&T conducted a preliminary re-evaluation of alternative concepts for the site, and concluded that no alternative would be economically feasible, even with 80% grant funding of the development cost. Because of that conclusion, a jurisdictional determination request was not filed. This current report was developed to document the studies of the alternative considered for the site. It also includes additions in response to AEA comments by on October 25, B. COMMUNITY PROFILES The Carlson Creek Project was conceived as a renewable energy resource to serve the communities of Slana, Mentasta, and Chistochina. According to the DCA Community Information Summaries, these three small communities have the following socioeconomic characteristics: Carlson Creek Hydroelectric Project 1 December, 2011 Preliminary Feasibility Evaluation

4 Slana Mentasta Chistochina Population Number of housing units Number of occupied housing units Economic basis Recreation, tourism, subsistence Subsistence Subsistence Unemployment rate 25.6% 34.4% 14.3% % below poverty level 48.4% 38.2% 5.3% C. ENERGY PROFILE All three communities are supplied with electric service by AP&T through its Alaska Power Company subsidiary. Until 2009, each community was served by its own diesel powerplant. In late 2009, AP&T completed a transmission line linking the three communities. Since then, generation has been primarily from the Slana powerplant (730 kw in 3 units), which AP&T upgraded in The Mentasta and Chistochina powerplants (395 kw and 220 kw respectively) are relegated to standby service. Generation for the last six years by the three communities is summarized in the following table. All generation is from diesel generators. Generation for 2011 is for January-November. Year Total Generation, kwh Generation Sold, kwh Losses and AP&T use, kwh Average Efficiency, kwh/gal (2) Peak Load, kw ,038, , , /10.41 NA ,094, , , /10.30 NA ,129, , , /10.81 NA ,226,086 1,075, , / ,319,078 1,161, , / (1) 1,285,628 1,119, , / (1) January-November (2) Values are per kwh generation / per kwh sold The generation is typically seasonal, with higher generation in the cold months and lower generation in the warmer months, as illustrated by the graph below. Loads have been growing at a fairly steady rate, averaging about 6% per year for Loads for 2011 appear to be following that same trend. The current retail electricity rate for the Slana-Mentasta-Chistochina system is $0.6887/kWh, which includes the base rate of $0.3391/kWh and a Cost of Power Adjustment rate of $0.3496/kWh. For residential customers, the Power Cost Equilization program reduces the rate for the first 500 kwh/month by $0.5064/kWh. Rates for the Slana- Carlson Creek Hydroelectric Project 2 December, 2011 Preliminary Feasibility Evaluation

5 Generation (1) Mentasta-Chistochina system vary significantly according to the cost of diesel fuel; there has generally been an increasing trend to the rates because of the influence of the fuel costs. 150% 100% 50% 0% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec (1) Average daily generation as a percent of the average annual daily generation D. PROJECT LOCATION AND BASIN DESCRIPTION The Carlson Creek site is located approximately 6 miles northeast of Slana, at longitude W, latitude N. The creek drains about 9 sq. mi. of land, most of which is part of the Alaska Range. The creek flows into the Slana River, which eventually flows in the Copper River and the Gulf of Alaska. There are two distinct sub-basins. The major portion of the creek drains a 4.5 sq. mi. area, oriented primarily northwest to southeast, with elevations from 2,200 feet to 6,000 feet. There are no significant glaciers, lakes, or ponds in this sub-basin, but there is one rather large and recent landslide that has filled much of the upper valley with debris. There are no roads in the sub-basin, and trails are very limited. The second sub-basin has a more east-west orientation, and includes Carlson Lake, with a surface area of about 103 acres (about 4% of the total sub-basin area of 4.3 sq. mi.). The average elevation of this sub-basin is somewhat lower. There is an ATV trail to the lake, with some primitive recreational development in a park-like area near the lake outlet. Most of the higher elevation area of the drainage basin is owned by the native regional corporation (Ahtna, Inc.), as is much of the area near the confluence of Carlson Creek and the Slana River. There is a private landholding in this lower Ahtna area that spans both Carlson Creek and the Tok Cutoff Highway. The remainder of the drainage area is owned by the State of Alaska (Department of Natural Resources). Vegetation in the Carlson Creek basin is varied, with moderately dense coniferous forest in the lower elevations to treeless tundra at the higher elevations. Climate is typical for interior Alaska, with limited precipitation (about 13 inches average at lower elevations), relatively warm summers and long, cold winters. E. SITE VISIT A site visit was conducted on September 24, 2009 by Larry Coupe (AP&T Senior Civil Engineer) and Dan Burfoot (AP&T Mechanic). ATVs were ridden to the eastern end of Carlson Lake; the middle portion of Carlson Creek was inspected by hiking on game trails. A memorandum discussing the site visit is included in Appendix A of this report. Key information gained from the site visit is as follows: Carlson Creek Hydroelectric Project 3 December, 2011 Preliminary Feasibility Evaluation

6 There is some limited recreational use of Carlson Lake. Significantly more water was flowing in Carlson Creek than was flowing out of Carlson Lake, even though the drainage areas are about the same. A small creek was observed flowing off the hillside from the northeast towards Carlson Lake, but completely disappeared into the ground prior to reaching the lake. No bedrock outcrops were observed anywhere along Carlson Creek; the ground in the valley probably includes a significant depth of alluvium. Based on these observations and the site topography, AP&T has concluded that Carlson Lake is impounded by a moraine deposit, and that a significant portion of the inflow to the lake leaves the lake by percolation through the moraine rather than by surface flow down the outlet channel. Carlson Creek Hydroelectric Project 4 December, 2011 Preliminary Feasibility Evaluation

7 SECTION 2 HYDROLOGY A. STREAM GAGES When the scope of work for the AEA grant application was being developed, AP&T anticipated that the project would include a diversion from Carlson Creek to Carlson Lake and a siphon intake at Carlson Lake into a penstock leading to a powerhouse near the Tok Cutoff Highway; Carlson Lake would be used to store excess summer flows for use in the winter. Therefore, in the scope of work for the AEA grant, AP&T proposed to install two stream gages to begin measurement of the flows in Carlson Creek and the Carlson Lake outlet. As a result of the site visit, AP&T became concerned that the project as described above would not be feasible due to the high cost of grouting the moraine impounding Carlson Lake. The storage potential of Carlson Lake was what made the site attractive, since it might allow the site to provide a renewable energy source that meets the year-around needs of the Slana-Mentasta- Chistochina system. AP&T therefore elected to forego the gage installation while it decided whether to look any further at Carlson Creek as a generation resource. As a result of that additional evaluation, AP&T concluded that no alternative would be economically feasible, even with 80% grant funding of the development cost. Because of that conclusion, stream gages were not installed. B. FLOW DURATION CURVE Because there are no gage records for Carlson Creek, AP&T has evaluated the generation potential using a regional flow duration curve that was developed by AP&T during its studies of the Yerrick Creek site. This regional flow duration curve is based on flow duration curves for various USGS gages in the area, for various size drainage basins and record lengths. The flow duration curve judged to be most appropriate for Carlson Creek is shown in the table below: Preliminary Flow Duration Curve % Time Exceeded Flow, cfs/mi This regional flow duration curve results in an estimated average annual flow of 0.77 cfs/mi 2 Carlson Creek Hydroelectric Project 5 December, 2011 Preliminary Feasibility Evaluation

8 SECTION 3 ALTERNATIVE ARRANGEMENTS As noted in Section 1, AP&T conducted a preliminary evaluation of alternative arrangements for the project to determine if any looked attractive enough to warrant further study. A key factor in this evaluation was the desire to find an arrangement that would not trigger FERC jurisdiction by potentially causing an impact to the anadromous fish in the Slana River. Another key factor was the desire to avoid impacts to the private landholding surrounding Carlson Creek near the Tok Cutoff Highway. AP&T looked at four different alternatives, as shown on the attached four figures and described below. For the first alternative, there are two options presented for location of the powerhouse, depending on whether to completely avoid a private landholding or not. Similarly, there are three optional powerhouse locations for the second alternative, but only one option for each of the third and fourth alternatives. A. ALTERNATIVE 1 Alternative 1 is the project arrangement that was contemplated in the grant application (see Figure 1). It includes the following features (Option A): A diversion structure on North Fork Carlson Creek A 18 x 6,900 long pipeline to from the diversion structure to Carlson Lake A siphon intake at Carlson Lake A 24 x8700 long pipeline/penstock from Carlson Lake to the powerhouse A powerhouse adjacent to Carlson Creek and just above the private landholding. A 2300 long transmission line to interconnect to our Slana-Mentasta-Chistochina intertie. Access roads along the penstock and pipeline. With Option B, the powerhouse would be located downstream at the Tok Cutoff highway, which would increase the pipeline/penstock length by 1700 feet, eliminate the transmission line, and increase the head by about 70 feet. Note that this puts the powerhouse and part of the penstock on private land; it was considered only to show the benefit of the additional head. FERC would probably rule that they would not have jurisdiction with this alternative. However, AP&T has some technical reservations, as follows: The lake may not be usable for storage without expensive grouting, as explained previously in Section 2. If the project releases directly into the Carlson Creek channel, wintertime operation could be problematic because of ice build-up in the channel, which could back water up into the powerhouse and/or create a hazardous situation for the downstream property owner and highway bridge. A lot would depend on how stable the flows are. Load-following operation in the winter might not be possible. Carlson Creek Hydroelectric Project 6 December, 2011 Preliminary Feasibility Evaluation

9 B. ALTERNATIVE 2 Alternative 2 would be a simple run-of-river development of North Fork Carlson Creek (see Figure 2). As with Alternative 1, there are A and B options depending on the powerhouse location with respect to the private landholding. The diversion site is moved further up the North Fork than with Alternative 1 to gain about 50 feet of additional head. There is a large landslide in the valley upstream of the diversion that appears to be relatively recent. That could be beneficial in that it might moderate stream flows somewhat, which would enhance run-of-river operation. However, the slide is likely to contribute substantial bedload during floods, which could be problematic for the diversion structure. The third option (Option 2C) is to locate the powerhouse at the edge of a pond system near the Slana River to gain about 170 of additional head (compared to 2A). It would require 1400 of additional penstock, but 500 less road. The transmission line would only be a couple of hundred feet long. This option could be worthwhile because it could be developed entirely on state land, and would facilitate winter operation by allowing discharge below a stable ice cover. However, there is a possibility that FERC would rule that they have jurisdiction because the pond system drains directly into the Slana River, which is a cataloged salmon stream. C. ALTERNATIVE 3 Alternative 3 is similar to 2C, but includes a diversion out of Carlson Lake to possibly enhance winter operation (see Figure 3). Both the Carlson Lake and North Fork Carlson Creek diversions would be routed to a forebay at an existing pond, which would probably need to be deepened substantially. From the forebay, the penstock would be routed to the pond system near the Slana River as with Option 2C. However, because of the lower elevation, the penstock could not be located to avoid Ahtna land. Note that this option does not overcome the leaky lake and FERC jurisdiction issues discussed above. D. ALTERNATIVE 4 The final alternative is meant to address the leaky lake issue by developing a reservoir in a basin to the north of the Carlson Creek drainage (see Figure 4). Google Earth images and the USGS topography suggest there might be a reasonable dam site at about the 2500 feet elevation, and there are a couple of lakes to the north that perhaps could be incorporated into the reservoir. The USGS topography is not detailed enough to allow development of a storage curve; the minimum required dam height is estimated to be 80 feet. Inflow to the reservoir would be from Carlson Lake (on a run-of-river basis), North Fork Carlson Creek, and an unnamed creek to the north of the reservoir. The main powerhouse would be located on the same pond system along the Slana River as with Alternatives 2C and 3. Depending on where the North Fork is diverted, there could be enough head to justify a second powerhouse on that diversion. Carlson Creek Hydroelectric Project 7 December, 2011 Preliminary Feasibility Evaluation

10 SECTION 4 CONSTRUCTION COSTS AND COST OF POWER AP&T has made a preliminary cost estimate for each of these alternatives and options in order to allow a reasonable comparison. AP&T has also estimated generation amounts based on the regional flow duration curve described previously, and has calculated a preliminary cost of power for each. Obviously, these are very preliminary values, but are considered to be in the ballpark. A. CONSTRUCTION COST ESTIMATES An estimated construction was developed for each alternative and option based on unit prices for the major components, as follows: Access roads: o Easy construction - $50/ft o Moderate construction - $100/ft o Difficult construction - $200/ft Diversion Structures - $500,000 Embankment dams - $25/cy Pipeline/penstock: o 12 diameter HDPE - $160/ft o 18 diameter HDPE - $200/ft o 24 diameter HDPE - $350/ft Power plants o Structure - $200,000 o Generating equipment - $1000/kW o Miscellaneous equipment - $500/kW Transmission lines - $200,000/mi Contingencies 35% Indirect costs 12% Construction quantities for the alternatives and options were derived by measured lengths from digitized USGS topographic mapping. The construction cost estimates are summarized in the following Table 2. B. GENERATION ESTIMATES The installed capacity for each of the alternatives and options was calculated based on the following assumptions: Flows are proportional to the drainage area, and are defined by the regional flow duration curve described previously; drainage areas were measured from digitized USGS topographic mapping. Hydraulic capacity set at the 10% exceedence level (1.75 cfs/mi 2 ). Carlson Creek Hydroelectric Project 8 December, 2011 Preliminary Feasibility Evaluation

11 Pipeline/penstock head losses calculated by Manning s equation with n= Generating equipment combined efficiency of 80%. The average annual energy for each of the alternatives and options was calculated based on the following assumptions: 90% of the available streamflow is diverted from creeks for generation (10% spill). 50% of the Carlson Lake inflow is diverted for generation (to account for leakage). Pipeline/penstock head losses calculated by Manning s equation with n= Generating equipment combined efficiency of 80%. 20% of the potential generation for run-of-river alternatives is unusable due to mismatch of loads and generation. The calculated installed capacity and average annual generation values are shown in Tables 2. C. COST OF POWER The first year cost of power was calculated for each of the alternatives and options for three levels of grant funding: 0%, $4,000,000, and 80%. Other assumptions for the calculation were as follows: 8.0% interest rate for debt service. 30 year term for debt service. $75,000 incremental O&M cost for run-of-river alternatives $100,000 incremental O&M for storage alternatives The calculated production costs for the alternatives are shown in Table 2. For comparison, the current production cost of diesel generation for the Slana-Mentasta-Chistochina system is about $0.32/kWh (assuming a fuel cost of $4.00/gallon and an efficiency of 12.5 kwh/gallon. D. SUPPLEMENTAL DIESEL GENERATION By comparing the current annual energy requirements shown in Section 1 to the estimated generation by the alternatives, it can be concluded that only Alternative 4 has the potential to generate more than the current energy requirements. All other alternatives would require substantial amounts of supplemental diesel generation, varying from about 100,000 kwh per year to 600,000 kwh per year. As noted in Section 1, loads have been increasing at a rate of about 6% per year; if that trend continues then the amount of supplemental diesel generation would also increase, and even Alternative 4 would require supplemental diesel generation by the time it was built. E. RATE IMPACTS Rate impacts associated with the various alternatives and grant funding levels are also shown in Table 2. As can be seen, only Alternatives 1B, 2A, 2B, 2C, and 3 with 80% grant funding show any beneficial rate impacts. Even with those alternatives, the benefits are quite small compared to the overall retail electricity rate of almost $0.69/kWh. Note that this is based on comparison to current conditions. If diesel fuel costs continue to rise as expected, then the benefits of a Carlson Creek development would also increase. However, it is AP&T s opinion that a more detailed evaluation of the Carlson Creek site to consider the long-term economics would indicate a marginally-economical project at best. It is also AP&T s opinion that there are other Carlson Creek Hydroelectric Project 9 December, 2011 Preliminary Feasibility Evaluation

12 renewable energy options available for the Slana-Mentasta-Chistochina system that are more promising. In particular, AP&T believes that a transmission line interconnecting the Slana- Mentasta-Chistochina system to the Tok system in combination with renewable energy development in the Tok area would be superior to a Carlson Creek development. Carlson Creek Hydroelectric Project 10 December, 2011 Preliminary Feasibility Evaluation

13 Project Feature Table 2 Construction Cost Summary Alternative 1 Alternative 2 Alternative Option A Option B Option A Option B Option C 3 Alternative 4 Access roads $1,555,000 $1,555,000 $1,275,000 $1,300,000 $1,400,000 $2,110,000 $1,875,000 Diversion structures $1,000,000 $1,000,000 $500,000 $500,000 $500,000 $1,500,000 $1,500,000 Storage dam $0 $0 $0 $0 $0 $0 $6,000,000 Pipelines/penstocks $4,425,000 $4,915,000 $2,160,000 $2,360,000 $2,440,000 $5,475,000 $5,165,000 Power plant $494,000 $562,000 $560,000 $609,000 $686,000 $635,000 $979,000 Transmission line $87,000 $0 $87,000 $0 $8,000 $8,000 $265,000 Subtotal $7,561,000 $8,032,000 $4,582,000 $4,769,000 $5,034,000 $9,728,000 $15,784,000 Contingencies $2,646,000 $2,811,000 $1,604,000 $1,669,000 $1,762,000 $3,405,000 $5,524,000 Indirect costs $907,000 $964,000 $550,000 $572,000 $604,000 $1,167,000 $1,894,000 Total construction cost $11,114,000 $11,807,000 $6,736,000 $7,010,000 $7,400,000 $14,300,000 $23,202,000 Installed capacity (kw) Usable generation (MWh) 860 1, ,000 1,260 1,590 Capacity cost ($/kw) 0% grant funding $4,000,000 grant funding 80% grant funding Energy cost ($/kwh) 0% grant funding $4,000,000 grant funding 80% grant funding Rate impact ($/kwh) 0% grant funding $4,000,000 grant funding 80% grant funding 55,600 35,600 11, ,200 32,500 9, ,100 11,400 5, ,700 11,000 5, ,900 10,500 4, ,300 35,500 9, ,500 49,300 11, Carlson Creek Hydroelectric Project 8 December, 2011 Preliminary Feasibility Evaluation

14 SECTION 4 CONCLUSIONS AND RECOMMENDATIONS A. CONCLUSIONS AP&T concludes the following as a result of this reconnaissance-level study of the Carlson Creek site: 1. There are significant challenges with development of Carlson Lake as a storage site for a hydroelectric development. In particular, there is evidence that Carlson Lake is impounded by a moraine which is relatively porous. In addition, there is some limited recreational use of the lake outlet area that could be problematic. 2. A run-of-river development of Carlson Creek appears to be the option that would have the most economical cost of power. However, it would be very seasonal and would require supplemental diesel generation during all of the year except during the early summer. 3. There appears to be potential for developing a reservoir in an area north of Carlson Creek (Alternative 4). However, AP&T has not visited that site and therefore the costs and benefits calculated for it are more speculative than for the other alternatives. It does provide the greatest amount of power. 4. It is unknown whether any of the alternatives could generate during the winter months, either because of a lack of inflow (run-of-river options) or ice buildup below the powerhouse (all options). Discharge into a pond system adjacent to the Slana River might mitigate this latter concern, but that could also trigger FERC jurisdiction. 5. The cost of power from all of the alternatives considered in this study would be significantly higher than the cost of diesel generation unless almost all of the construction cost is funded by grants. It is unclear whether the State would be willing to provide grant funding to the level that would make a Carlson Creek development economical. B. RECOMMENDATIONS As a result of this study, it is AP&T s opinion that the Carlson Creek site does not exhibit a sufficient degree of feasibility to warrant any further study. AP&T believes that there are other options for supplying renewable energy to the Slana-Mentasta-Chistochina system that are more promising. Carlson Creek Hydroelectric Project 12 December, 2011 Preliminary Feasibility Evaluation

15 CARLSON CREEK PROJECT

16 CARLSON CREEK PROJECT

17 CARLSON CREEK PROJECT

18 CARLSON CREEK PROJECT

19 APPENDIX A Site Visit Memorandum

20 Alaska Power & Telephone Company ENGINEERING DEPARTMENT 193 Otto Street, P.O. Box 3222 Port Townsend, WA FAX (360) Telephone: (360) Ext Ext address: MEMO TO: FROM: Bob Grimm Eric Hannan Vern Neitzer Larry Coupe DATE: September 30, 2009 No. of PAGES: 5 RE: Carlson Creek MESSAGE: On September 24, 2009, I visited the Carlson Creek site near Slana with Dan Burfoot from the Tok Office. We first rode ATVs from a trailhead just south of the Carlson Creek bridge over the Tok Cutoff highway to the outlet of Carlson Lake. The trail is in good condition, and the lake is easily accessible. Following the inspection of the lake outlet area, we rode back towards the trailhead and headed upstream on Carlson Creek. We were only able to follow an old trail for a few hundred feet before having to dismount and follow foot and game trails upstream. We first went to an area about 75 feet in elevation above the lake level, which would be a possible site for a diversion over to Carlson Lake. We then went several hundred feet further upstream to see if we could reach the toe of a large landslide that is apparent in Google Earth images. We were able to view the slide toe from a distance, but judged it too distant to be worth the continued hike. We then proceeded downstream to the ATVs, rode to the trailhead, loaded up, viewed the creek from the highway crossing, and returned to Tok. The total trip was from about 8:30 AM to 2:30 PM. 1

21 Prior to the site inspection, I had looked at USGS topographic maps and Google Earth images, and had measured drainages areas and potential head. Based on that information, I had conceived of a project arrangement that included a diversion from Carlson Creek to Carlson Lake and a penstock from Carlson Lake to a powerhouse near the Tok Cutoff highway. Carlson Lake would be used for storing excess flow in the summer for use in the winter. The following are my first impressions of the potential for hydro development at the site, particularly with regard to this perceived concept. CARLSON LAKE Carlson Lake has a drainage area of about 4.3 square miles and a surface area of about 103 acres. Depth is unknown, but judging from the steepness of the shorelines it may be relatively deep. The large surface area would allow for a significant amount of storage with a modest drawdown. The lake outlet area is relatively level, with a park-like setting. It is obviously used occasionally for recreation. Dan indicated there used to be a cabin on the lake that was a permanent residence, accessible by a trail around the shoreline. Dan is not sure if the resident is still alive and/or if the cabin is still being used. The lake level is currently controlled by a beaver dam about 5 feet high at the northeast end of the lake. Only a small amount of flow was observed in the outlet stream below the beaver dam (<1 cfs). There is a small creek running towards the lake from the northwest. As it approaches the lake, it percolates into the ground. During our inspection, the flow never reached the lake, but during high flow periods it would. The fact that this stream disappears into the ground indicates a pretty high porosity for the material damming the outlet end of the lake. My supposition is that the material is unconsolidated glacial drift, possibly a lateral or terminal moraine. This is rather problematic for using the lake in a hydro development, as it is likely that a considerable portion of the lake inflow leaves the lake as subsurface flow. We would need to install some sort of a cutoff (such as a grout curtain) if we want to use the natural or diverted lake inflow for generation. Bedrock is probably quite deep, so a grout curtain could be quite expensive. If we want to consider use of the lake further, we should plan on some seismic refraction studies of the lake outlet, and possibly a test boring and pumping tests. CARLSON CREEK Carlson Creek appears to be a typical high-gradient stream, with a drainage area of about 4.5 square miles at the diversion site. The streambed is primarily gravel and cobbles. The floodplain is perhaps 100 feet wide near the lower end, but tends to narrow and become somewhat steeper as you move upstream. Much of the floodplain is overgrown with brush and small trees, leaving only a primary channel about feet wide. During our visit (a recession flow period) the stream was about 8 feet wide and less than a foot deep, with an estimated flow of perhaps 4-5 cfs. No bedrock was apparent anywhere in the stream channel or on the banks. The stream appears to be cutting though glacial till and/or debris flows. Any intake structure will need to consider both the seepage potential of the substrate and the likelihood of substantial bedload during high flows. A smaller version of whatever we use at Yerrick Creek might be appropriate. 2

22 When I first looked at this site on Google Earth a couple of years ago, the image quality was poor. When I looked at it this year, newer photography was available with much higher resolution, and a large landslide is clearly visible in the basin above the likely diversion site. It is so large that I would have noticed it in the earlier photography, which leads me to believe the slide is quite recent (maybe triggered by the 7.9M 2004 earthquake on the nearby Denali fault?). The slide debris will probably continue to move downstream during high flows. The north side of the creek would provide the best access to the diversion area, and would be the preferred route for the penstock if the flow is not diverted over to the lake. If the flow is diverted to the lake, there appears to be a reasonable sidehill route; the sidehill slopes to not appear to be too steep, although we did not make a thorough inspection of the area. POWERHOUSE SITE The gradient of Carlson Creek appears to be significantly less near the highway than at the diversion area. Carlson Creek eventually flows into the Slana River about 3,000 feet below the highway. There is a native allotment encompassing the highway and Carlson Creek; depending on the cooperativeness of the allotment owners, it may be necessary to locate the powerhouse above the allotment, which would provide a gross head of about 300 feet. However, that location would only work with a project that does not operate in the winter, since a winter discharge could create an ice dam above the allotment that would not be acceptable. If we want to operate in the winter, we should probably plan on running the penstock all the way to the Slana River and discharge there to prevent ice formation; that would provide a gross head of about 450 feet. FLOW MEASUREMENT If we choose to install a stream gage on Carlson Creek, my recommendation would be as follows: Locate the gage in the lower portion of the creek where it is more accessible; there appeared to be a reasonable site where the ATV trail first crosses the creek. This is well below the diversion site, but the channel is probably more stable further down. When flow measurements are made to develop the stage-discharge curve for the gage, on the same day measure flow at the diversion site and at one or two more locations between the diversion and the gage. This would allow us to determine how the flow varies along the creek during high, medium, and low flows so the flows at the diversion site could be derived to the gage flows. Measurement of flow in the outlet stream of the lake near Carlson Creek might also be valuable if that channel can be found. 3

23 Carlson Lake looking south from near outlet (outlet to left of photo) Carlson Creek near diversion; flow estimated at 4-5 cfs 4

24 Carlson Creek above diversion; landslide debris visible in the distance 5

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

CLIFTY CREEK PLANT MADISON, INDIANA

CLIFTY CREEK PLANT MADISON, INDIANA 2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects

More information

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations

More information

Town of Warwick, Village of Florida, Village of Greenwood Lake and Village of Warwick MULTI JURISIDICTIONAL, MULTI HAZARD MITIGATION PLAN DRAFT

Town of Warwick, Village of Florida, Village of Greenwood Lake and Village of Warwick MULTI JURISIDICTIONAL, MULTI HAZARD MITIGATION PLAN DRAFT Town of Warwick, Village of Florida, Village of Greenwood Lake and Village of Warwick MULTI JURISIDICTIONAL, MULTI HAZARD MITIGATION PLAN DRAFT Appendix B Historical Hazard Documentation Rev #0 May 2013

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco.

Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco. Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco.net Project Sponsors include: The City of Corvallis Oregon

More information

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,

More information

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO) Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential

More information

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. 29601 1 Historical background of Stone Lake A series of three

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Basic Hydrology. Time of Concentration Methodology

Basic Hydrology. Time of Concentration Methodology Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from

More information

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION

More information

ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage

ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage DOEIID-10360 Distribution Category: UC-22S ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage M. J. Sale G. F. Cada

More information

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department

More information

U.S. Army Corps of Engineers Tulsa District

U.S. Army Corps of Engineers Tulsa District U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts

More information

Sample Micro Hydro Initial Report

Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

https://orm.usace.army.mil/orm2/f?p=106:34:4198546103662037::no::

https://orm.usace.army.mil/orm2/f?p=106:34:4198546103662037::no:: Page 1 of 6 APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers JD Status: DRAFT SECTION I: BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION

More information

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant By Ginger Gillin, John Pizzimenti, and Doug Foss, GEI Consultants, Inc., USA, and Jon Jourdonnais, PPL Montana, USA. Abstract The

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

Colorado Water Bar December 13, 2012

Colorado Water Bar December 13, 2012 Colorado Water Bar December 13, 2012 Typical DWR Comments for Water Court Applications Augmentation Plans Applicant must prove that the proposed augmentation plan will be sufficient to prevent injury to

More information

14. ENGINEERING AND CONSTRUCTION SCHEDULES. 14.1. Preparation of Schedules ALASKA ENERGY AUTHORITY AEA11-022 ENGINEERING FEASIBILITY REPORT

14. ENGINEERING AND CONSTRUCTION SCHEDULES. 14.1. Preparation of Schedules ALASKA ENERGY AUTHORITY AEA11-022 ENGINEERING FEASIBILITY REPORT 14. ENGINEERING AND CONSTRUCTION SCHEDULES The project procurement strategy and contract strategy based on the project risk profile have not yet been formulated. For the purposes of completing the construction

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached

More information

DRAFT SOUTH FORK SKYKOMISH RIVER

DRAFT SOUTH FORK SKYKOMISH RIVER DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

PROJECT STATUS REPORT. Development of microhabitat suitability criteria for fry and juvenile salmonids of the Trinity River

PROJECT STATUS REPORT. Development of microhabitat suitability criteria for fry and juvenile salmonids of the Trinity River PROJECT STATUS REPORT Development of microhabitat suitability criteria for fry and juvenile salmonids of the Trinity River Prepared for: Trinity River Restoration Program P.O. Box 13 1313 South Main St.

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Sea Water Heat Pump Project

Sea Water Heat Pump Project Sea Water Heat Pump Project Alaska SeaLife Center, Seward, AK Presenter: Andy Baker, PE, YourCleanEnergy LLC Also Present is ASLC Operations Manager: Darryl Schaefermeyer ACEP Rural Energy Conference Forum

More information

FLOOD PROTECTION BENEFITS

FLOOD PROTECTION BENEFITS IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

USING PROBABILISTIC FORECASTS TO IMPROVE PLANNING AND OPERATIONS FOR WATER RESOURCES SYSTEMS

USING PROBABILISTIC FORECASTS TO IMPROVE PLANNING AND OPERATIONS FOR WATER RESOURCES SYSTEMS USING PROBABILISTIC FORECASTS TO IMPROVE PLANNING AND OPERATIONS FOR WATER RESOURCES SYSTEMS W. JOSH WEISS, PH.D., P.E. jweiss@hazenandsawyer.com 2013 Susquehanna Water Science Forum October 7, 2013 OUTLINE

More information

Alaska Energy Authority: Renewable Energy Fund and Susitna-Watana Hydro

Alaska Energy Authority: Renewable Energy Fund and Susitna-Watana Hydro Photo by: Cassandra Cerny, GVEA Alaska Energy Authority: Renewable Energy Fund and Susitna-Watana Hydro Sara Fisher-Goad, executive director Northwest Power Producers Association Oct. 29, 2015 2 Alaska

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

How To Check For Scour At A Bridge

How To Check For Scour At A Bridge Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

< SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE >

< SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE > CASE PROFILE COLLECTION No 5 < SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE > Stephen Foster September 2002 TASK MANAGERS: Gabriel Azevedo

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

How To Assess An Area For Erosion

How To Assess An Area For Erosion SKY BASIN (UPPER CA 1 WATERSHED) EROSION ASSESSMENT Prepared by Kevin Drake, CPESC Integrated Environmental Restoration Services, Inc. August 2014 COMMON GROUND UNCOMMON SOLUTIONS P.O. BOX 7559 2780 LAKE

More information

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G1400656.

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G1400656. Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report Department of Ecology Grant No. G1400656 Submitted by: Walla Walla Watershed Management Partnership Walla Walla, WA Walla Walla

More information

Architectural Processing and Inspections for Home Mortgage Insurance

Architectural Processing and Inspections for Home Mortgage Insurance Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect

More information

GRANT APPLICATION JACK RIVER HYDROELECTRIC PROJECT FEASIBILITY STUDY

GRANT APPLICATION JACK RIVER HYDROELECTRIC PROJECT FEASIBILITY STUDY GRANT APPLICATION FOR JACK RIVER HYDROELECTRIC PROJECT FEASIBILITY STUDY SEPTEMBER 2012 SUBMITTED TO ALASKA ENERGY AUTHORITY RENEWABLE ENERGY GRANT PROGRAM ROUND VI RFA #AEA-13-006 SUBMITTED BY NATIVE

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey IV. PROPOSED PLAN FOR AMD ABATEMENT GOALS AND OBJECTIVES Although the major natural resource in the Wyoming Valley is anthracite coal*, its importance to the present and future economy of the area is limited

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

Water Resources Collections and Archives University of California

Water Resources Collections and Archives University of California Water Resources Collections and Archives University of California Title: Effects of climate change on the hydrology of upper Alameda Creek Author: Klausmeyer, Kirk, University of California, Berkeley Publication

More information

Black Canyon Hydroelectric Project FERC Project No. P-14110 Proposed Fish Passage Study Plan September 2012

Black Canyon Hydroelectric Project FERC Project No. P-14110 Proposed Fish Passage Study Plan September 2012 Black Canyon Hydroelectric Project FERC Project No. P-14110 Proposed Fish Passage Study Plan September 2012 Prepared for Black Canyon Hydro, LLC 3633 Alderwood Avenue Bellingham, WA 98225 Table of Contents

More information

Information Request 14

Information Request 14 Information Request 14 Information Request 14 14-1 Responses to Information Request 14 Response to Information Request 14a Response to Information Request 14b Response to Information Request 14c Response

More information

Water Year 2001 in Northern California: Have the Good Years Ended?

Water Year 2001 in Northern California: Have the Good Years Ended? Water Year 21 in Northern California: Have the Good Years Ended? Maurice Roos Abstract For the second water season in a row, precipitation and snowpack accumulation from October through December were far

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

Multi-Jurisdictional Hazard Mitigation Plan

Multi-Jurisdictional Hazard Mitigation Plan Flooding General Flooding is the leading cause of death among all types of natural disasters throughout the United States, with its ability to roll boulders the size of cars, tear out trees, and destroy

More information

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Presentation Overview

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

NPLOTH7 GIS Database Development Mission (2619), Bryson (2601), Franklin (2603), Dillsboro (2602) Final Report

NPLOTH7 GIS Database Development Mission (2619), Bryson (2601), Franklin (2603), Dillsboro (2602) Final Report NPLOTH7 GIS Database Development Mission (2619), Bryson (2601), Franklin (2603), Dillsboro (2602) Final Report Introduction Duke Power Nantahala Area (Duke) is in the process of relicensing the Mission,

More information

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,

More information

Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008

Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 In partnership with Montana Department of Fish, Wildlife, and Parks (FWP), American Wildlands, and Wildlife Forever, the Madison

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Section 2. Mono Basin Operations

Section 2. Mono Basin Operations Section 2 Mono Basin Chapter 2 Mono Basin Compliance with State Water Resources Control Board Decision 1631 and Order Nos. 98-05 and 98-07 May 2008 Los Angeles Department of Water and Power Table of Contents

More information

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING

More information

Climate Change. Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist

Climate Change. Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist Climate Change A n o t h e r F a c t o r i n M a n a g i n g S o u t h e r n C a l i f o r n i a s W a t e r R e s o u r c e s Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist USEPA-Region

More information

Waterway Technote Planning

Waterway Technote Planning Waterway Technote Planning Contents Benefits to planning your waterway management 1 Prioritising waterway management where to start? 1 What are your priorities? 1 Start with the best areas or those at

More information

Challenges. Estimated Damages from 100-Year Flood

Challenges. Estimated Damages from 100-Year Flood Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of

More information

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA René Leclerc Geomorphologist Robert C. MacArthur, Ph.D., P.E. Principal Headwaters

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Recreational Enhancements on the Lehigh River Public Information Workshop February 2013

Recreational Enhancements on the Lehigh River Public Information Workshop February 2013 Recreational Enhancements on the Lehigh River Public Information Workshop February 2013 Cooperating Agencies US Army Corps of Engineers Philadelphia District Pennsylvania Fish & Boat Commission Pennsylvania

More information

BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION)

BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION) BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION) CD NO. 1 OF 19 CDS Initial Statement Exhibit A: Description

More information

Swannanoa River Flood Risk Management Study

Swannanoa River Flood Risk Management Study Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

Yukon Development Corporation. Next Generation Hydro Summary of the Hydroelectric Power Planning Directive Work Plan

Yukon Development Corporation. Next Generation Hydro Summary of the Hydroelectric Power Planning Directive Work Plan SUMMARY Yukon Development Corporation Next Generation Hydro Summary of the Hydroelectric Power Planning Directive Work Plan It is time for bold leadership to take charge of our energy future so the next

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

ARIZONA DEPARTMENT OF WATER RESOURCES

ARIZONA DEPARTMENT OF WATER RESOURCES ARIZONA DEPARTMENT OF WATER RESOURCES WATER MANAGEMENT REQUIREMENTS FOR SOLAR POWER PLANTS IN ARIZONA ADWR CONTACT: Jeff Tannler, Statewide Active Management Area Director Arizona Department of Water Resources

More information

TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO

TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO Steven Jones, M.S., P.E. September 4, 2013 Outline Micro Hydro Power Basics Hydro Power Equipment

More information

Preliminary Assessment

Preliminary Assessment Preliminary Assessment Bonebrake Theological Seminary Site Dayton Unit III Dayton, Ohio Prepared by: U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207-3199 September 5,

More information

Clean Development Mechanism Project Opportunities in Indonesia

Clean Development Mechanism Project Opportunities in Indonesia Clean Development Mechanism Project Opportunities in Indonesia Pre-feasibility Report on a Micro Hydro Power CDM Project Center for Research on Material and Energy Institut Teknologi Bandung October 2002

More information

October 11, 2005. Sharon Stohrer State Water Resources Control board P.O. Box 2000 Sacramento, CA 95812-2000

October 11, 2005. Sharon Stohrer State Water Resources Control board P.O. Box 2000 Sacramento, CA 95812-2000 October 11, 2005 Sharon Stohrer State Water Resources Control board P.O. Box 2000 Sacramento, CA 95812-2000 Re: Maidu Cultural and Development Group CEQA Scoping Comments for the Environmental Impact Report

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information