1 DEPARTMENT OF TECHNOLOGY AND BUILT ENVIRONMENT Comparison of fuzzy and crisp analytic hierarchy process (AHP) methods for spatial multicriteria decision analysis in GIS Maryam Kordi September 28 Master s Thesis in Geomatics Supervisor: Dr. Anders Brandt Examiners: Prof. Anders Östman - Dr. Bo Malmström
2 Abstract There are a number of decision making problems in which Geographical Information System (GIS) has employed to organize and facilitate the procedure of analyzing the problem. These GIS-based decision problems which typically include a number of different criteria and alternatives are generally analyzed by Multicriteria Decision Analysis (MCDA).Different locations within a geographical area represent the alternatives by which the overall goal of the project is achieved. The quality of achieving the goal is evaluated by a set of criteria which should be considered in the work. Analytic Hierarchy Process (AHP) which is a powerful method of MCDA generally can organize spatial problems and decides which alternatives are most suitable for the defined problems. However due to some intrinsic uncertainty in the method, a number of authors suggest fuzzifying the method while others are against fuzzification of the AHP. The debate over fuzzifying AHP is going on and attempt for finding that was mostly in theory, and little, if any; practical comparison between the AHP and fuzzified AHP has done. This work presents a practical comparison of AHP and fuzzy AHP in a GIS-based problem, case study, for locating a dam in Costa Rica, considering different criteria. In order to perform the AHP and fuzzy AHP in the GIS-based problem and calculating weights of the criteria by the methods, some computer codes have written and developed in MATLAB. The comparisons between the AHP and fuzzy AHP methods are done on result weights and on the result final maps. The comparison between the weights is repeated on different levels of uncertainty in fuzzy AHP then all the results are compared with the result of AHP method. Also this study for checking the effect of fuzzification on results is suggested Chi-Square test as a suitable tool. Comparisons between the resulting weights of the AHP and fuzzy AHP methods show some differences between the methods. Furthermore, the Chi-Square test shows that the higher level of uncertainty in the fuzzy AHP, the greater the difference in results between the AHP and fuzzy AHP methods. Keywords: Geographical Information System (GIS), Multicriteria Decision Analysis (MCDA), Analytic Hierarchy Process (AHP).
3 Preface This thesis is dealing with geographical information system and multicriteria decision analysis. These two areas of research are very interesting to me as my academic background was in Applied Mathematics and Geomatics. Having a contact with Thomas L. Saaty and Jacek Malczewski, they sent me some related articles that encouraged me to focus on fuzzifying the AHP concept. According to some natural uncertainty in the AHP, some researchers have used the fuzzy concept to fuzzify the method while other researchers are against it. So far most attempts for fuzzifying the AHP and comparing the fuzzy result with result of AHP have been made in theory and almost no practical examples have been performed. Lack of practical approach in this field, led me to define a practical example of a GIS-based decision making problem. This example was based on a project course where the task was to find the optimum location for a dam in Costa Rica, which I did during my Master studies. I would like to dedicate this work to my parents in Iran for always supporting and believing in me. Also special thanks go to my sister Masoumeh and my brother in law Hesam who encouraged me to pursue my graduate studies in Sweden. I am also grateful for their help and support when I was in Uppsala, without their help I could not have started my studies comfortably. I would like to thank my supervisor Anders Brandt for his encouragement from the beginning and enthusiastic support throughout the thesis. I can never thank him enough for his academic support and help, not only in my Master s thesis but in all the steps of my studies in University of Gävle. Thanks are due to Stig-Göran Mårtensson, Anders Östman, Pia Ollert-Hallqvist, Peter Fawcett, Lise-Lotte Dahlberg and Bo Malmström because they were great teachers for me during my master study. For their help in finding the interesting subject for my Master s thesis and sending me some invaluable articles, Thomas L. Saaty and Jacek Malczewski must be thanked. I would like to thank Mehdi Ardavan for his help during my thesis work, also for editing and revising my thesis report and MATLAB codes. I also would like to thank all Personnel in the division of Geomatics in University of Gävle especially Staffan Nygren who helped me with some computer problems and also thanks are due to my friends in the devision Anna Hansson, Ulrika Lindgren and Linda Alm for being the best friends possible. Also thanks are due to Maryam Mohammadi for her help in preparing some of the figures and Willem Tims for revising some part of my report, also due to Tayyab Hussain and Ioannis Tolikas for helping me with some GIS-software problems at the beginning of the work. 2
4 Table of contents Abstract... Preface... 2 Table of contents Introduction Multicriteria Decision Analysis (MCDA) Analytic Hierarchy Process (AHP) Calculating weights Mean of normalized values - Lambda max method Geometric mean method Consistency ratio in the AHP Uncertainty in the AHP Fuzzy weights Consistency ratio in fuzzifying the pairwise ratios Employing geometric mean for fuzzy weights Material and method Study area Hydrological modeling Stream network Hydraulic head Undulation Criteria in GIS-MCDA Factors of Forest and Agriculture Factors of Road and City Factors of Hydraulic head, Water discharge and Undulation Constraints in GIS-MCDA
5 3.. Constraint of River Constraints of Reservoir and National Park Multicriteria Decision Making in GIS Consistency ratio Defuzzification Results AHP Lambda Max (λ max ) AHP geometric mean AHP fuzzy triangular AHP fuzzy narrow trapezoidal AHP fuzzy medium trapezoidal AHP fuzzy wide trapezoidal Percentage difference between weights Chi-Square ( χ ) test for Independence Comparison between maps Discussions and Conclusion References Appendix A Appendix B... 4 Appendix C
6 . Introduction GIS-based multicriteria decision analysis (GIS-MCDA) is a process of decision making at which geographical data and value judgments are brought together to obtain more information for the decision makers (Malczewski 26). Although Analytic Hierarchy Process (AHP) method is a powerful tool in MCDA for spatial problems, some of the researchers believe that the Saaty s AHP method has some weaknesses. For example as Yang and Chen (24) have mentioned, the uncertainty associated with the mapping of decision makers judgment to number, is not taken into account by the AHP and also the preference and personal judgment of decision maker have huge effect on the AHP result. In order to overcome these problems, some researchers and authors made the Saaty s AHP modified and fuzzified to formulate and control the uncertainty. E.g. Buckley (985) has considered trapezoidal membership function for comparison ratios in AHP and Chang (996) has developed a new approach for triangular case. In fact they believe having a defined uncertainty in the form of fuzzy numbers in comparison ratios and then obtaining the weights in fuzzy forms, help the decision-makers to get a better understanding of the final importance of the factors and the uncertainty lying within them. However, Saaty, the developer of the AHP, is against fuzzification of his method. He believes the AHP by pairwise comparison matrix is already fuzzy because some uncertainty lies in the nature of the method, i.e. he believes that ratios in the method are not absolute or crisp numbers, in fact they are fuzzy numbers, so making the AHP fuzzier not only does not guarantee better results but could make it worse (Saaty & Tran 27, 28; Saaty 28). So far the attempts and works for comparing the AHP and fuzzy AHP were mostly done in theory and almost not enough practical examples of a GIS-based decision making problem has been done. The main goal of this thesis is to practically compare the results of AHP and fuzzy AHP methods by applying them in a GIS based problem. In order to practically analyze the probable difference in result of performing AHP and fuzzy AHP methods, in a sophisticated example which is based on GIS, the optimum site for a dam is located and analyzed. The dam is to be investigated over two main upstream tributaries of Reventazon River in Costa Rica, considering different criteria. The comparison between the result of AHP and fuzzy AHP in the work is done in two approaches. The first comparison approach is done on weights obtained from the AHP and fuzzy AHP methods. Analysis is carried out first in normal and non-fuzzy numbers and then fuzzified AHP is applied on fuzzy comparison ratios which yield weights in fuzzy format. In the fuzzy AHP, pairwise comparison matrix is considered with different degrees of uncertainty for ratios which has not been considered in previous works in this field. For calculating weights of AHP and fuzzy AHP and performing the methods, some computer programs have been created and developed by the author in MATLAB. The second comparison approach is done in order to analyze the probable difference in the resulted maps from GIS software after performing the AHP and fuzzy AHP methods. Also, this thesis for checking the effect of fuzzification on result maps, suggest and perform the Chi-Square test as a suitable tool. The Chi- Square test, statistically checks the effect of fuzzification on GIS resulted maps in terms of the degree of uncertainty in fuzzy weights. Such a comparison between the AHP and fuzzy AHP, which is based on GIS maps, has not been done in this format before. 5
7 2. Multicriteria Decision Analysis (MCDA) Multicriteria decision analysis (MCDA) for structuring decision problem and evaluating alternatives provides a rich collection of methods (Malczewski 26). In most management and decision-making problems the management team has already a well-defined goal that must be achieved. In order to reach that aim always it is necessary to choose from a number of options. These options, in the field of the MCDA, are referred to as alternatives. The decision makers or the decision-makers consider the existing alternatives which have different attributes and characteristics and the final job is to choose the best among them. Choosing among the alternatives is done by considering the impact of these alternatives on the quality of the final result alongside with shortcomings of every alternative. Therefore effects of alternatives on different issues such as environmental issues, financial matters or cost and benefit considerations, social considerations, technical problems, etc give rise to consideration of several criteria which play important roles in finalizing the project. However, the criteria demonstrate the characteristics and important issues which the final goal is evaluated according to them. If a decision maker wants to rank the importance of the alternatives, this only is according to the criteria. But it should be noticed that according to every different criteria the ranking between the alternatives would be different. For applying MCDA, a tool is needed which takes the ranking and comparison data to processes them and calculates the weights of different alternatives or criteria. The AHP can be served as a powerful tool in calculating weights and pursuing MCDA procedure. 2.. Analytic Hierarchy Process (AHP) The AHP which is a powerful tool in applying MCDA was introduced and developed by Saaty in 98. In the AHP method, obtaining the weights or priority vector of the alternatives or the criteria is required. For this purpose Saaty (98) has used and developed the Pairwise Comparison Method (PCM), which is explained in detail in next part of the work. In the AHP the decision making process starts with dividing the problem into a hierarchy of issues which should be considered in the work. These hierarchical orders help to simplify the illustration of the problem and bring it to a condition which is more easily understood. In each hierarchical level the weights of the elements are calculated. The decision on the final goal is made considering the weights of criteria and alternatives. In Figure, where the structure of AHP elements is illustrated, it is shown that the goal is decided through a number of different criteria. These criteria determine the quality of achieving the goal using any of Alternatives ( Ai, i=... k). The Ai are different options, choices or alternatives that could be used to reach the final aim of the project. Comparing these alternatives and defining their importance over each other are done using the pairwise comparison method. Giving importance ratios for each pair of alternatives, a matrix of pairwise comparison ratios is obtained. 6
8 GOAL Criterion Criterion 2 Criterion 3 Criterion k A A2 A3 A A2 A3 A A2 A3 A2 A3 A A K A K A K A K Figure. Structure of the AHP. The criteria might also have different importance compared to each other. Therefore a pairwise comparison matrix is considered for the criteria. Elements of this matrix are pairwise or mutual importance ratios between the criteria which are decided on the basis that how well every criterion serves and how important it is in reaching the final goal. For creating the pairwise comparison matrix in the PCM, Saaty (98) has employed a system of numbers to indicate how much one criterion is more important than the other. These numerical scale values and their corresponding intensities are stated in Table. Table. Scales in pairwise comparisons (Adapted from Saaty 98). Intensity of importance Verbal judgment of preference Equally Importance 3 Moderate importance 5 Strong importance 7 Extreme importance 9 Extremely more important 2, 4, 6, 8 Intermediate values between adjacent scale values In order to compare homogeneous elements whose comparison falls within one unit, decimals are used (Saaty 26). If the elements of the pairwise comparison matrix are shown with, which indicates the importance of i th criterion over j th, then c could be calculated as / c (Boroushaki & Malczewski ji 28). The AHP method employs different techniques to determine the final weights; two of them are explained and used in his thesis. The first is Lambda Max ( λ max ) technique and the other is geometric mean. Later, in Result chapter, it is shown that different techniques in the AHP do not yield the same result. ij c ij 7
9 2.2. Calculating weights Saaty (98) has used the lambda max technique to obtain the weights of the criteria in the pairwise comparison method. Every matrix has a set of eigenvalues and for every eigenvalue there is a corresponding eigenvector. In Saaty s lambda max technique, a vector of weights is defined as the normalized eigenvector corresponding to the largest eigenvalue λ max. If the weights are shown as a vector w consisted of w i (i= n), then the following formula shows how they are calculated. C w = λ w () at which C is the pairwise comparison matrix of the criteria; w is the vector of weights and λ is the eigenvalue that in this method should be the maximum of them, i.e. λ max. In this method special mathematical conditions are required to guarantee that a unique answer is yielded. Also difficulties in calculating and finding the eigen values and vectors have led to use of an approximation to the lambda max method. As Malczewski (999) used in his book an approximation of the eigenvector associated with the maximum eigenvalue is calculated through a simple procedure which is sometimes referred to as mean of normalized values Mean of normalized values Lambda max method In mean of normalized values method which gives an approximation of lambda max method, the sum of elements in each column in pairwise comparison matrix is calculated. Then each column elements is divided by the calculated sum at the previous step. Then the arithmetic average of each row of the normalized matrix gives the weight of the corresponding criterion or alternative. The accuracy of this approximation is increased when the pairwise comparison matrix has a low consistency ratio Geometric mean method Another method of calculating the weights of criteria in the PCM is geometric mean method. In this method as Buckley (985) explained, the weights in a pairwise comparison matrix of alternatives, A, are calculated by following formula. n / n r i = ( a ij ) j= (2) and then w i = j r i r j (3) at which a ij alternatives. (i,j=..n) are the comparison ratios in the pairwise comparison matrix and n is number of 8
10 2.5. Consistency ratio in the AHP A matrix A is called consistent if and only if a.a = a at which is the ij th element of the matrix ik (Buckley 985). However in practice it is unrealistic to expect the decision-makers provide pairwise comparison matrices which are exactly consistent especially in the cases with a large number of alternatives. Expressing the real feelings of the decision makers generally lead to matrices that are not quite consistent. However some matrices might violate consistency very slightly by only two or three elements while others may have values that cannot even be called close to consistency. A measure of how far a matrix is from consistency is performed by Consistency Ratio (C.R.). Han and Tsay (998) explained that having the value of λmax is required in calculating the consistency ratio. This is obtained by calculating matrix product of the pairwise comparison matrix and the weight vectors and then adding all elements of the resulting vector. After that a Consistency Index ( C.I. ) is introduced as: λmax n C.I. = (4) n at which n is the number of criteria and λmax is the biggest eigenvalue (Han & Tsay 998; Malczewski 999). Random Index (R.I.) is the consistency index of a pairwise comparison matrix which is generated randomly. Random index depends on the number of elements which are compared and as it is shown in Table 2; in each case for every n, the final R.I. is the average of a large numbers of R.I. calculated for a randomly generated matrix. The final consistency ratio is calculated by comparing the C.I. with the Random Index (Malczewski 999). kj ij a ij C.I. C.R. = R.I. (5) The consistency ratio is designed such a way that shows a reasonable level of consistency in the pairwise comparisons if C.R. <. and C.R.. indicate inconsistent judgments. Table 2. Random Inconsistency Index (RI) for n =, 2,, 2 (Adapted from Saaty 98). n R.I Uncertainty in the AHP As it has already been stated in the introduction, Saaty (28) believes that some uncertainty is lying in the nature of AHP method. Also Buckley (985) has raised questions about certainty of the comparison ratios used in the AHP. He had considered a situation in which the decision-maker can express feelings of uncertainty while he/she is ranking or comparing different alternatives or criteria. The method he has used to take uncertainties into account is using fuzzy numbers instead of crisp numbers in order to compare the importance between the alternatives or criteria. 9
11 2.7. Fuzzy weights As Buckley (985) has considered, trapezoidal membership functions is adopted for fuzzy numbers in this work to fuzzify the comparison ratios. In specific cases, by selecting accordingly the parameters of membership function, trapezoidal shape is converted to triangular. Suppose that the a fuzzy number is described as (α,β,γ,δ) where <α β γ δ and at which α, β, γ and δ are the four parts of the fuzzy number, the membership function for any given fuzzy number is shown by μ(x) and these two numbers form an ordered pair (x, μ(x)). The description of fuzzy number means that the membership function is to the left of α. Then a line connects the two points (α, ) and (β, ). After that it is constant at value between β and γ. Then a line connect the two points (γ, ) and (δ, ) and finally membership function equals zero in the right of δ. Figure 2 illustrates a fuzzy membership function of a fuzzy number. A corresponding fuzzy ratio of a ij is shown with a bar sign above it i.e. aij = ( αij, βij, γij, δij). So from now on, the bar sign above a variable, means that it is fuzzy. Figure 2. Fuzzy memberships function of a fuzzy number Consistency ratio in fuzzifying the pairwise ratios Buckley (985) has proved the following theorem: Consider A = [ a ij ] where aij = ( αij, βij, γij, δij) and let β ij aij γij for all i,j ; If A = [ a ij ] is consistent then A is also consistent. In fuzzifying the pairwise ratios ( a ij ), if the conditions mentioned in the theorem are satisfied and also if consistency ratio of the main matrix A is low, then the fuzzified matrix A can also be considered as a matrix which has low consistency ratio. The mentioned considerations and conditions are satisfied during the fuzzifying of the ratios in all steps of this work so all fuzzified matrices in the study are consistent Employing geometric mean for fuzzy weights As Buckley (985) stated, calculating the eigenvector is sometimes problematic in lambda max method and a decision cannot be made on selecting one criterion over another. He suggests geometric mean technique as a method that can easily be applied in the process of fuzzifying the AHP. However, the
12 weights obtained from AHP lambda max and AHP geometric mean are very much close to each other if the consistency ratio is kept small which is satisfied in this thesis. In Buckley s (985) method for fuzzifying the AHP, in order to calculate membership functions and get the exact graph for fuzzy weights the following values should be calculated: f i n = = ( y) ( β α ) j ij ij y + α ij / n ) (6) g i n = = ( y) ( γ δ ) y + δ ) j ij ij ij / n for y (7) αi = n j= αij / n and α = n i= α i (8) βi = n j= βij / n and β = n i= β i (9) γ i = n j= γij / n and γ = n i= γ i () δi = n j= δij / n and δ = n i= δ i () n ( y) = f i ( y) f and i= g n ( y) = g i ( y) i= (2) The final fuzzy weights are defined as αi βi γi δi w i =,,, (3) δ γ β α α where the graph of the membership function is zero to the left of i α, on the interval i βi δ, is defined δ γ fi( y) βi γi by x = and is a horizontal line at the value of on the interval g( y), and then on the interval γ β γi δi gi( y), it is defined by x =. β α f ( y) Here x-axis is horizontal and y-axis is vertical. Therefore attention should be paid when using the gi ( y) fi( y) formulas x = and x = which calculates the x component regarding its corresponding y value. f y g y ( ) ( ) For y = the graph starts at ( δ α i, ) and increases to ( γ β i, ) when y is increasing from to.
13 3. Material and method The coordinate system used in this project is Cuadricula Lambert, Costa Rica Norte using the following parameters. Projection: Lambert Conformal Conic, Datum: NAD83, Planar units: Meters, First standard parallel: (= 9º 56' '' N), Second standard parallel: (= º ' '' N), Central meridian: (= 84º 2' '' W), Origin latitude: (= º 28' '' N), False easting (m): 5, False northing (m): Study area A Shuttle Radar Topography Mission (SRTM) 9 m Digital Elevation Model (DEM) of the study area in Costa Rica, which was downloaded from the website of Consortium for Spatial Information at: was used as original data for making hydrological features of the work. The SRTM digital elevation data, generated by NASA is available free of charge by USGS. Costa Rica has a land area of approximately 5, Km 2 in the Central America with a mountainous topography (Ballestero 23). The study area which covers a small portion of Costa Rica, approximately 384 Km 2, is covered by the DEM and it is located in the middle of the country slightly south of Cartago City. In Figure 3 the study area is illustrated by a red polygon on the map of Costa Rica. Figure 3. Map of Costa Rica and the study area shown with red polygon. 2
14 The study area contains some small towns and villages such as Orosi and San Rafael, but also it covers two upstream main tributaries of Reventazon River. Orosi River and Macho River, as shown in Figure 4 with red color, are located in the upper Reventazon River basin and they are the base locations for investigation in the study. Figure 4. The Reventazon River basin/with the main sub-basin boundaries in gray (Adapted from Brandt, 999). The hydroelectric potential in Costa Rica is great (Ballestero 23) and small-scale hydropower scheme is important for remote small cities, villages or small industries to obtain energy (Gismalla & Bruen 996). So the case study investigated the possible sites for building dam on the Orosi River and Macho River which are surrounded by the study area. The purpose of establishing the dam is to provide small-scale hydroelectricity for small towns and villages located in the area. As spatial decision problems typically concern a large set of feasible alternatives and multiple evaluation criteria, they give rise to the GIS-based MCDA (Malczewski 26). Also the GIS and MCDA can benefit from each other as two areas of research (Malczewski 999, 26) therefore, in this work GIS and MCDA were used to locate the dam by employing GIS while using and comparing the results of applied fuzzy and non-fuzzy MCDA methods. Beside the DEM, land information data was also used in the work (Saborio, no year). The land information data is included in the landuse file in IDRISI file format. The rainfall data for different rain stations along the rivers and runoff data with runoff coefficients in percent were the other land information data, obtained from Vahrson (992). Topographic maps :5, and satellite images of the study area were available as reference material during the work. The satellite images were obtained from Free Global Orthorectified Landsat Data via FTP at: The software used in the project are ArcGis 9.2; Arc View 3.3, IDRISI for converting files, ERDAS Imagine 8.7 and finally MATLAB was employed to create some codes for the work. 3
15 3.2. Hydrological modeling Prior to each study several steps are undertaken for different phases of the work. In the study for locating the dam or reservoir some hydrological modeling and GIS analysis was required to obtain the pivotal elements involved in the work. This section of the study describes the steps of deriving hydrologic characteristics and providing GIS layer for them in ArcMap 9.2. The produced layers were used in making criteria maps or were involved in the other parts of the work. In order to describe morphology and model the basin of the study area the DEM file was converted to a raster format file in ArcMap 9.2. The produced DEM was applied by the project coordinate system as same as the other layers and maps during the rest of the work. In the next step by using Hydrology Modeling toolbar of the software, stream network and its pre-elements are computed from the DEM Stream network The sinks in DEM could have some effect on computing flow direction so the first step in creating stream network would be using Fill Sink function in the Arc Map 9.2. to clear the problem. The direction of the water flow in all pixels of the study area was shown by the computed flow direction which was derived from the same function in the software. Flow Accumulation is an indirect measurement of amount of accumulated flow at each cell. The raster result of Flow Accumulation function was used in process of creating a raster stream network by applying a threshold value to choose cells with a high accumulated flow (ESRI, Arc GIS Desktop Help ). After applying different threshold values and comparing results with reference data, the threshold value of 5 was chosen for the work. The raster result of stream network could be a simulation map for reflecting the river streams in the area. Producing water discharge map which is another hydrological element related to the work was the next step. The creation of water discharge layer requires creation of two sub element grids: flow direction and runoff. As the runoff is related to rainfall, evaporation and transpiration which are the climate factors (Gismalla & Bruen 996); making precipitation and evaporation grids are the prerequisites for making runoff grid. Surfer 8 was used to obtain the spatial distribution of the rainfall by interpolating the rain station data which was in Excel file format. The rain station data was not dense and the Kriging method has a better result on scattered data so the Kriging interpolation method was applied. The output grid was referred to as precipitation. To create an evaporation grid the land use data in IDRISI file format was imported in Erdas Imagine file format in order to make it possible to add the runoff coefficient, mentioned in the runoff data file, to its attribute table. The evaporation grid was obtained by reclassifying the new land use file through the runoff coefficients in ArcMap 9.2. Finally the runoff grid was calculated by multiplying the generated evaporation and precipitation grids. For calculation of water discharge a script, which is mentioned in the Appendix A, was compiled and ran in Arcview 3.3. The unit of the result is in mm/year the same as unit of water runoff. In order to have the unit in m 3 /s, formula 4 was applied on the result. m 3 /s = ( Weighted runoff grid [mm] *. * cell area [m 2 ] ) / (6*6*24*365 [s]). (4) The relation between steps of creating water discharge is illustrated in Figure 5. 4
16 Rain fall data Land use data Precipitation Evaporation Multiply Runoff Flow direction Water discharge Run the Script Figure 5. Steps of creating water discharge grid Hydraulic head The other hydrological factor that is important in building a dam is hydraulic head or the difference in elevation on river courses. The hydraulic head is necessary in determining how much energy can be produced in a certain place by a dam. To calculate hydraulic head, the DEM and water flow grid was used with weighted flow greater than 3m 3 /s to secure minimum water discharge that is needed for making small-scale hydropower. The water discharge is important to specify the hydrologic balance in a certain area. The resulted water course grid was multiplied by the DEM grid to produce a minimum value grid. The generated grid was analyzed using the Neighborhood Statistics function in ArcView 3.3 to assign to each cell the least value among its neighboring cells within a random radius of m. The output map was multiplied with the water course grid. The final hydraulic head grid was produced by subtracting the generated map of the DEM grid Undulation Undulation, or steepness of the terrain, is the other considerable factor in the work. A high undulation represents the possibilities for building a shorter dam wall that is supported by higher terrain at its sides. So the Neighborhood Statistics function in ArcView 3.3 again was used on DEM grid. The function, by assigning the largest value to each cell among its neighboring cells, located the places with the highest undulation. The final undulation grid was computed by subtracting the highest undulation grid from the DEM grid Criteria in GIS-MCDA Multicriteria decision analysis is based on a number of pivotal evaluation criteria, defined according to conditions of the case study that should be considered. The process of selecting evaluation criteria for the work is described in the next part. Locating the optimum location for the dam or reservoir involves several evaluation criteria. For selecting the evaluation criteria the general rule is that they should be recognized with respect to the problem situation (Malczewski 999). No universal techniques are available for considering a set of criteria although the desirable properties of objectives can yield guidelines for selecting a set of evaluation criteria (Malczewski 999). For a particular decision making problem, the set of evaluation criteria may be developed through an examination of the relevant literature, analytical study and opinions (Malczewski 999). As Baban and Wan-Yusof (23) have mentioned, the evaluation criteria influencing dam and reservoir selection include; (I) Economy, (II) Hydrology and hydraulics, (III) Topography, (IV) Geology, (V) Points of abstraction and supply or technical issues and (VI) Environmental considerations. In this study most of the mentioned evaluation criteria were considered although the chief goal of the project was not to build the dam after locating the optimum position; if else one could have considered a few more factors which might be of some importance in building the dam. 5
17 To combine MCDA and GIS each of the criteria should be represented as a map in the GIS database (Malczewski 999; Baban & Wan-Yusof 23). It should be noticed that two types of criteria maps, factor maps and constraint maps, are not the same. A factor map represents the quality of achieving an objective through a spatial distribution (Malczewski 999). However a constraint map represents restrictions or limitations on decision making problem that these restrictions do not allow certain actions to be taken (Malczewski 999). For the study due to mentioned considerations for building dam, seven factor maps and three constraint maps were defined. Prior to describing the reason of considering each of criteria and explaining the process of making maps for them, all factor maps considered in the work, are itemized and described in Table 3. Table 3. Factor types considered in the work. Factor type Undulation Road City Water discharge Hydraulic head Agriculture Forest Description The more undulated, the better The closer to the road, the better The closer to the cities, the better The larger mean of water discharge, the better The higher the value of hydraulic head (the steeper), the better The farther from agricultural land, the better The farther from forest, the better There are some common steps for making all factor maps which are described before the individually explanation of each factor map. The IDRISI landuse file was imported in Erdas Imagine and recoded considering which factor map was produced. In should be mentioned that the topographic map was used for digitizing the roads which were used for making factor map. For each factor map value one was assigned to the class corresponded to the feature and the value zero to the other classes. Threshold for the factor are areas too small to support the factor map. For considering threshold is needed to group the separate pixels into continuous areas by Clump operator in the software. By setting connected neighbors to eight pixels, the whole neighborhood around each pixel was identified. Then by performing Sieve operator and setting minimum size of pixels for each factor map, the threshold area was eliminated. The Recode operator was used to assign value to all areas larger than the minimum cell size and value to the other. After the Recode process, the output map was analyzed using the GIS Analysis s Search function to calculate the distances for any place to the proper place for the criterion. The resulting map was stretched linearly for each factor using General Contrast operator and enhanced radiometrically to have values ranging from to 255 grey levels. It should be mentioned that in making all the factor maps, objects lying outside of the study area were not considered in the work. In Appendix B, Figure 2 shows the different kinds of landuse in the study area Factors of Forest and Agriculture Due to environmental considerations that include flooding agricultural land, drowning wildlife (Baban & Wan-Yusof 23) and laws protecting the nature, the dam cannot built close to large virgin forest and agricultural lands. In the generated factor maps; the higher values represent areas farther from the feature. So for agriculture and forest, the produced factor maps satisfy the conditions of the study, i.e. the farther, the better. 6
18 3.8. Factors of Road and City One of the important items, particular to building dam for small-scale hydroelectricity, is distribution of hydropower to users (Gismalla & Bruen 996). Locating a reservoir site close to demand points is more usable (Baban & Wan-Yusof 23). Also building a special power line over a noticeable distance to distribute small-scale hydroelectricity is not economical (Gismalla & Bruen 996) and constructing roads from urban areas to dam is expensive. Thus the power should be used close to the area that it is produced (Gismalla & Bruen 996). So the City factor and Road factor were developed in the work to be used in the MCDA. The city and road factor maps were based on the assumption that the dam should be built close to cities and close to roads. That was opposite to the obtained factor maps. To change the values, so that the higher values represent areas closer to the feature, a blank map covering the same areas with a single class was produced. All pixels in the blank map had the value of 255. By using the Operator function in the software, the radiometrically enhanced maps of the factors were subtracted from the blank map. The produced maps in the last process were the final factor maps for city and road which comply with the condition of the study Factors of Hydraulic head, Water discharge and Undulation The available power at a certain location is directly related to the water discharge and hydraulic head with following formula (Gismalla & Bruen 996). P = ηρghq (5) where P = power in (Watts), η = overall efficiency of the installation, ρ = density of water in (Kgm -3 ), g = acceleration due to gravity, h = hydraulic head difference in (m) and q = water discharge in (m 3 s - ). Therefore, the areas with large runoff potentials and/or with large ground slopes are suitable (Gismalla & Bruen 996). In order to deliver water by gravity, high water discharge, high undulation and high hydraulic head are needed to result in gravitational pressure (Baban & Wan-Yusof 23). Also due to the economical reasons, the dam would be built in the area with high elevation and irregular topography e.g. mountains at the sides of the river in order to dam s wall does not have to be too long. The next step is developing the factor maps for the three mentioned items. The already produced water discharge, hydraulic head and undulation grids were imported to Erdas Imagine 9. and were stretched linearly by using the Radiometric Enhancement function in the software. This would make the factor maps have values ranging from to 255, of which 255 represents the best value. All the factor maps which are created for the study can be found in Appendix B. 3.. Constraints in GIS-MCDA Constraint maps take the form of boolean (or logical) maps which contain only the values of either One or Zero. The values, corresponding to the condition of the study, represent the suitability or unsuitability of a certain place for the work. Table 4 shows the description for each three different considered constraint maps in the work. 7
19 Table 4. Constraint types considered in the work. Constraint Map River Reservoir National Park Description The dam must be built on a river River = others = The dam cannot be built over the existing reservoir. Reservoir = others = Tapanti National Park is a protected area and the dam cannot be built in it. Tapanti National Park = others = 3.. Constraint of River For making a dam the basic consideration is that the dam should be built on a river not on dry land. So this criterion was used as a constraint map with value one for suitable places for building the dam, i.e. river, and zero for the rest area. For making the constraint map for river the following steps was performed. From the hydraulic head map, a river map was generated and exported to Erdas Imagine. By using the recode function of the software, value of one was assigned to the river and zero to the other area of the map which are inappropriate for the river criterion Constraints of Reservoir and National Park During the past years Costa Rica has been creating a widespread protected areas system which protects almost 25% of the national territory from the activities that could damage resources (Sánchez-Azofeifa et al. 23). Tapanti national park located in Orosi Valley is one of these protected portions which covers the area of 5, Hectares and the Orosi River runs through the middle of it ( 28). The Tapanti national park is located in the study area and due to the laws protecting the nature should be eliminated of the study area. Also topographic maps of the study area show that there is a small reservoir which is near the Macho River at the north of the study area that should be excluded from this work because another dam could not be built over the existing reservoir. Generating map for mentioned constraints was done in ArcMap 9.2 by digitizing and making polygon around the already existing reservoir and around the Tapanti national park. By reclassifying the produced maps, the value zero was assigned to the constraint feature area i.e. classes that represent existing reservoir and Tapanti national park and value of one was assigned to the other areas. The satellite Images and topographic map of the area were used to collate the areas. The coordinate system of Costa Rica was applied on all produced factor maps and the constraint map to prevent encountering errors in the data processing for performing MCDA. The Constraint maps created in the work are shown in the Appendix B. 8
20 3.3. Multicriteria Decision Making in GIS How to combine the several criteria maps to form a single index of evaluation is the primary issue in the multicriteria decision making problem (Eastman 23). As the solution lies in the intersection, logical AND, of the conditions (Eastman 23); the constraint maps simply are multiplied together. i.e. C = c j where c j = constraint map j (6) In the case of continuous factor maps, a weighted linear combination (Eastman 23) is used. In this method, the factor maps are multiplied by a certain weight which is assigned to each of them and then the summation of the resulted maps, product an overall suitability map (Eastman 23). i.e. S = w i x i where S = suitability, w i = weight of factor i and x i = factor map i. (7) The Result map is derived by multiplying the overall factor map and overall constraint map. i.e. R = S C where R = Resul map (8) The model of MCDA in GIS used in this work is illustrated in Figure 6. Constraint map Factor map Factor map 2 Factor map 3 Factor map 4 Factor map 5 Factor map 6 Factor map 7 Constraint map 2 Constraint map 3 Multiply by Corresponding Weights Multiply Weighted map Weighted map 2 Weighted map 3 Weighted map 4 Weighted map 5 Weighted map 6 Weighted map 7 Overall Constraint map Summation of the weighted maps Multiply Overall Factor Map Result Map Figure 6. Model of MCDA in GIS. As explained earlier, a pairwise comparison matrix for criteria is a fundamental issue in AHP and fuzzy AHP. In the pairwise comparison matrix comparison ratios are derived from a judgment range. The judgment range goes from equality to extreme importance of one factor over another. They correspond to the numerical judgments (, 3, 5, 7, 9) and compromises between the values (Saaty, 99). The comparison ratios should be set regarding the goal of the project and characteristics it might involve. Selecting any final use for the dam in this work was completely arbitrary. Here the dam is chosen to be used for hydroelectric power production which simplifies the procedure of determining comparison ratios for pairwise comparison matrix. These characteristics may include the distance from the cities, distance from the forests, distance from the agricultural lands, distance from the roads, the amount of water discharge, the value of hydraulic head and the amount of the undulation. In fact the mentioned characteristics are the factors which are the essential parts of the AHP respective of the study purpose. 9
21 Importance of the factors and their priorities on each other, as the values of comparison ratios, will be determined considering their impact on the quality of the dam as a hydroelectricity power station, and the personal experience and knowledge of the decision makers. Mostly economic conditions are emphasized in the site selection for a reservoir or a dam, thus it seems undulation is the most important factor between all because of its economical impact on the work and its direct influence on the generation of energy. Once more due to economical reasons distance from roads and distance from cities have the second and third priorities. The distance from roads has precedence over the distance from cities because the cost of building roads is much more than constructing power line to distribute electricity for cities. Factors which are directly related to the construction of the dam and energy generation also are significant. The water discharge factor because of its relation to runoff and power generation has the fourth priority. Also hydraulic head by considering its exact effect on the power available at a given location takes the fifth priority. The environmental factors are relatively new considerations for decision makers in locating the optimum place for dam or reservoir. So due to the environmental consideration and the laws protecting the nature, agriculture factor and forest factor take sixth and seventh priorities respectively. The reason for priority of agriculture over forest is the consideration of croplands. By considering the mentioned priorities for factors and contemplating different consideration issues also through personal experience, knowledge and understanding of the decision making problem, the suggested pairwise comparison matrix is presented in Table 5. It should be noticed that if a ij is the element of matrix stated in row i and column j then the formula of a ji = /a ij calculates the corresponding element of a ji in the symmetric pairwise comparison matrix Forest Table 5. Pairwise comparison matrix for crisp ratios. Agriculture Hydraulic head Water discharge City Road Undulation Forest /3 /4 /4 /5 /6 /7 Agriculture 3 /3 /3 /4 /4 /5 Hydraulic head 4 3 /2 /3 /4 /4 Water discharge /3 /2 /3 City /2 /2 Road /2 Undulation Afterwards the comparison ratios in table should be fuzzified in order to start the fuzzy AHP and to calculate its fuzzy weights. Fuzzification means instead of the exact or crisp number a ij, a fuzzy number in the form of aij = ( αij, βij, γij, δij) be used which indicates a trapezoidal membership function. However if β ij = γ ij, it results in a triangular membership function. Triangular membership function gives a sense of simplicity to the decision-maker because a ij could easily be considered as the upper vertex. In this work the condition = β = γ is one of the cases considered in fuzzifying the AHP. aij ij ij 2
22 According to the last equality the highest density of the possibility of the fuzzy number is collected at this pointβ = γ. By separating these two variables it is possible to spread the distribution of the fuzzy ij ij number in order to add to uncertainty. As soon as γ uncertainty. Larger γ ij ij ij β becomes greater than zero it gives more ij β, results in higher uncertainty. Therefore it gives opportunity to analyze the difference between AHP and fuzzy AHP with three more options; one is low γ β with value of while the second is a higher γij βij with value equal to.5 and the last is the highest γij βij equal to 2. So far four groups of fuzzy pairwise comparison ratios are presented; triangular fuzzy ratios, narrow trapezoidal ratios, medium trapezoidal ratios and wide trapezoidal ratios. The matrices of these groups of ratios are presented in Tables 6, 7, 8 and 9 respectively. It should be noticed that these pairwise comparison matrices are fuzzy positive reciprocal matrices. A fuzzy positive reciprocal matrix is an n n matrix with elements aij = [ αij, βij, γij, δij ] where a = (a = [ δ, γ, β α ] and a ii = [,,, ] for all i= n (Buckley 984). ji ij) ij ij ij, ij ij ij Forest Forest [,,,] Table 6. Pairwise comparison matrix for triangular fuzzy ratios. Agriculture Hydraulic head Water discharge City Road Undulation Agriculture [2,3,3,4] [,,,] Hydraulic head [3,4,4,5] [2,3,3,4] [,,,] Water discharge [3,4,4,5] [2,3,3,4] [,2,2,3] [,,,] City [4,5,5,6] [3,4,4,5] [2,3,3,4] [2,3,3,4] [,,,] Road [5,6,6,7] [3,4,4,5] [3,4,4,5] [,2,2,3] [,2,2,3] [,,,] Undulation [6,7,7,8] [4,5,5,6] [3,4,4,5] [2,3,3,4] [,2,2,3] [,2,2,3] [,,,] Table 7. Pairwise comparison matrix for narrow trapezoidal fuzzy ratios. Forest Agriculture Hydraulic head Water discharge City Road Undulation Forest [,,,] Agriculture [2,2.5,3.5,4] [,,,] Hydraulic head [3,3.5,4.5,5] [2,2.5,3.5,4] [,,,] Water discharge [3,3.5,4.5,5] [2,2.5,3.5,4] [,.5,2.5,3] [,,,] City [4,4.5,5.5,6] [3,3.5,4.5,5] [2,2.5,3.5,4] [2,2.5,3.5,4] [,,,] Road [5,5.5,6.5,7] [3,3.5,4.5,5] [3,3.5,4.5,5] [,.5,2.5,3] [,.5,2.5,3] [,,,] Undulation [6,6.5,7.5,8] [4,4.5,5.5,6] [3,3.5,4.5,5] [2,2.5,3.5,4] [,.5,2.5,3] [,.5,2.5,3] [,,,] 2
23 Table 8. Pairwise comparison matrix for medium trapezoidal fuzzy ratios. Forest Agriculture Hydraulic head Water discharge City Road Undulation Forest [,,,] Agriculture [.5,2.25,3.75, 4.5] [,,,] Hydraulic head [2.5,3.25,4.75, 5.5] [.5,2.25,3.75, 4.5] [,,,] Water discharge [2.5,3.25,4.75, 5.5] [.5,2.25,3.75, 4.5] [.5,.25, 2.75,3.5] [,,,] City [3.5,4.25,5.75, 6.5] [2.5,3.25,4.75, 5.5] [.5,2.25, 3.75,4.5] [.5,2.25, 3.75,4.5] [,,,] Road [4.5,5.25,6.75, 7.5] [2.5,3.25,4.75, 5.5] [2.5,3.25, 4.75,5.5] [.5,.25, 2.75,3.5] [.5,.25, 2.75,3.5] [,,,] Undulation [5.5,6.25,7.75, 8.5] [3.5,4.25,5.75, 6.5] [2.5,3.25, 4.75,5.5] [.5,2.25, 3.75,4.5] [.5,.25,2.75,3.5] [.5,.25, 2.75,3.5] [,,,] Forest Forest [,,,] Table 9. Pairwise comparison matrix for wide trapezoidal fuzzy ratios. Agriculture Hydraulic head Agriculture [.5,2,4,4.5] [,,,] Hydraulic head [2.5,3,5,5.5] [.5,2,4,4.5] [,,,] Water discharge [2.5,3,5,5.5] [.5,2,4,4.5] [.5.,,3,3.5] [,,,] City [3.5,4,6,6.5] [2.5,3,5,5.5] [.5,2,4,4.5] [.5,2,4,4.5] [,,,] Water discharge City Road Undulation Road [4.5,5,7,7.5] [2.5,3,5,5.5] [2.5,3,5,5.5] [.5.,,3,3.5] [.5.,,3,3.5] [,,,] Undulation [5.5,6,8,8.5] [3.5,4,6,6.5] [2.5,3,5,5.5] [.5,2,4,4.5] [.5.,,3,3.5] [.5.,,3,3.5] [,,,] Once pairwise comparison matrices of AHP and all fuzzy AHPs are produced, the corresponding weights can be calculated as it is explained in Chapter 2. However before calculating the weights it is necessary to check the consistency ratio parameter in the fuzzified matrices Consistency ratio The procedure for calculating consistency ratio of a pairwise comparison matrix was explained in chapter 2. However, as Saaty (98) has shown, having a comparison matrix of very low C.R. does not necessarily indicate realistic feeling of the decision-makers. Actual feelings of a decision-maker might result in a matrix that does not have a very low C.R. Here the C.R. has been kept as low as possible while the judgment on the ratios is not bound on the consistency matter. This value as resulted from running the MATAB codes of AHP is equal to.55 for non-fuzzy pairwise comparison matrix presented in Table 5. In Chapter 2, a theorem for consistency of a fuzzy matrix i.e. β ij aij γij through the consistency of the normal matrix is stated. Since this condition of the theorem is satisfied completely and also C.R. is kept fairly low it is expected that the fuzzy pairwise comparison matrix should also be consistent to the same 22
24 degree as the normal pairwise comparison matrix is. So here for the fuzzy pairwise comparison matrix the same consistency ratio is used. This C.R. was calculated before fuzzifying the pairwise comparison matrix. Once consistency ratio is checked, the next step is to calculate the corresponding weights. MATLAB codes which were mentioned before are run in order to determine the weights of AHP and fuzzy AHP. The calculated weights are presented in the chapter 4. In order to use the obtained fuzzy weights in GIS software or even to compare them with the non-fuzzy AHP method, it is necessary to convert the fuzzy weights to crisp numbers. This procedure is referred to as deffuzification Defuzzification It has already been stated that the weights of a normal AHP with crisp numbers may contain some uncertainty. Therefore comparing an exact number with membership graph of its fuzzy number might not be a good idea especially the comparison is more difficult when the exact number lies somewhere near the middle of the graph. Therefore, in the software developed for this work a defuzzification method is used to approximate a fuzzy number. Specifically speaking the defuzzified number is in fact a Mathematical Expectation from the membership function which is considered as a probability function. The defuzzified number is calculated from the following formula (Zimmermann 934): x = + μ X x= + μ X x= in which x < α and ( x) ( x) μ X ( x).xdx x > δ dx is the membership function of the fuzzy number. Since this function is equal to zero for in this study, the limits of the integrals can be changed to: (9) x = δ μ x=α δ μ x=α X ( x) X ( x).x dx dx (2) The weights obtained from defuzzification procedure, were employed in GIS software in order to make maps to show the best location of the dam. Although all GIS software have the basic tools for evaluating such a model for multicriteria decision problem (Eastman 23), in this study processing the model was done in the ArcMap 9.2 by using functions in the Raster Calculator of the software. It should be noticed that the projection of Costa Rica was assigned to all produced layers and maps during the work. The represented locations by AHP and also fuzzy AHPs methods are compared in chapter 4. 23
25 4. Results In previous chapters, AHP and the pairwise comparison method have been described in detail. Also the necessary factors and constraints for the case study have been determined. The importance of these factors over each other has been analyzed and the comparison ratios have been assigned to form the pairwise comparison matrix. GIS software was employed to obtain final maps of the optimum location of the dam in the study area by using weights calculated from the pairwise comparison matrix. Final maps exhibit some difference in specifying the optimum location of the dam. This difference is due to the difference in the weights imported in the model of MCDA in GIS. The weights imported to GIS software are obtained from different methods of AHP. First the weights are calculated by lambda max method in the AHP. Then geometric mean method in AHP is used to obtain the corresponding weights. These two vectors of weights are computed through normal and non-fuzzy methods. Afterwards, as it is stated in previous chapter, the geometric mean method is fuzzified and applied to get the weights in which some certain degrees of uncertainty are considered. Four different levels of uncertainty give rise to four types of membership functions of comparison ratios which are triangular, narrow trapezoidal, medium trapezoidal and wide trapezoidal. All weights were calculated by MATLAB m-files which are specifically written by the author for this purpose. In order to be able to compare the resulted maps of different methods, they were divided in five priority classes to show the five priority locations of the dam. In the following section, the results of the applied methods are discussed first in terms of obtained weights and then in terms of resulted maps. 4.. AHP Lambda Max (λ max ) The AHP Lambda max (λ max ) method results in the weights for each factor which are shown in Table. Table. Weights obtained of AHP lambda max Rank Factors AHP lambda max Undulation Road City Water discharge.32 5 Hydraulic head Agriculture Forest.298 Applying these weights in the model of MCDA in GIS, the final map shows the optimum location of the dam in the case study area. This map is shown in Figure 7 and later it is compared with other maps to discuss about the differences between the different applied methods. 24
26 Figure 7. Map resulted from AHP lambda max 4.2. AHP geometric mean The weights obtained from applying the AHP geometric mean method which is not yet fuzzified, are shown in Table. Table. Weights obtained of AHP geometric mean. Rank Factors AHP geometric mean Undulation Road City Water discharge.28 5 Hydraulic head.84 6 Agriculture Forest.29 The final map showing the optimum location for the dam after applying the weights to model of MCDA in GIS is shown in Figure 8. 25
27 Figure 8. Map resulted from AHP geometric mean method AHP fuzzy triangular The triangular membership functions in fuzzy AHP, that is a special case of trapezoidal membership function at which β = γ, results in fuzzy weights for factors. These weights and the membership ij ij functions of them are represented in Appendix C. Running the MATLAB code, the fuzzy weights are defuzzified and normalized. The resulting weights are shown in Table 2. Table 2. Defuzzified weights obtained of AHP fuzzy triangular. Rank Factors AHP fuzzy triangular Undulation Road City.99 4 Water discharge.59 5 Hydraulic head Agriculture Forest.288 The obtained weights are used in GIS software, ArcMap 9.2, to get the final map. This map which shows the best location of the dam in the case study area is presented in Figure 9. 26
28 Figure 9. Map resulted from AHP fuzzy triangular AHP fuzzy narrow trapezoidal The narrow trapezoidal fuzzy membership functions in AHP fuzzy, at which β γ, results fuzzy ij ij = weights for factors. These fuzzy weights with their membership functions are shown in Appendix C. The defuzzified and normalized weights are shown in Table 3. Table 3. Defuzzified weights obtained of AHP fuzzy narrow trapezoidal Rank Factors AHP fuzzy narrow trapezoidal Undulation Road City.96 4 Water discharge.79 5 Hydraulic head Agriculture Forest.285 The final map showing the optimum location for the dam after applying the defuzzified weights to model of MCDA in GIS is shown in Figure. 27
29 Figure. Map resulted from AHP fuzzy narrow trapezoidal 4.5. AHP fuzzy medium trapezoidal The medium trapezoidal fuzzy membership functions in AHP fuzzy, at which β γ. 5, results fuzzy ij ij = weights for factors. These fuzzy weights with their membership function are represented in the Appendix C and the defuzzied weights are shown in Table 4. Table 4. Defuzzified weights obtained of AHP fuzzy medium trapezoidal Rank Factors AHP fuzzy medium trapezoidal Undulation Road City Water discharge.2 5 Hydraulic head.85 6 Agriculture Forest.279 The obtained weights are used in GIS software, ArcMap 9.2, to get the final map. The final map showing the optimum location for the dam is shown in Figure. 28
30 Figure. Map resulted from AHP fuzzy medium trapezoidal 4.6. AHP fuzzy wide trapezoidal The wide trapezoidal fuzzy membership functions in AHP fuzzy, at which β γ 2, result in fuzzy ij ij = weights for factors. These fuzzy weights with their membership functions are shown in Appendix C and the defuzzied weights are shown in Table 5. Table 5. Defuzzified weights obtained of AHP fuzzy wide trapezoidal Rank Factors AHP fuzzy wide trapezoidal Undulation Road City Water discharge Hydraulic head Agriculture Forest.277 The resulted and defuzzified weights are imported in GIS software, ArcMap 9.2, and the map obtained from the model of MCDA in GIS shows the optimum location of the dam in the study area. This map is presented in Figure 2. 29
31 Figure 2. Map resulted from AHP fuzzy wide trapezoidal 4.7. Percentage difference between weights The results show that there are some differences between the obtaining weights of different fuzzy pairwise comparison matrices. If the differences between the weights obtained from non-fuzzy geometric mean method and the weights obtained from each fuzzified method are calculated, a graph of difference from the non-fuzzy method could be presented over various ranges of uncertainties. This range includes triangular, narrow, medium and wide membership functions (Figure 3). The difference is calculated by first subtracting the weight vector of the non-fuzzy geometric mean method from each fuzzified methods and then the result is divided by the geometric mean weight. Then summation of absolute values of all elements in the normalized weight difference vector gives the final deviation value which is used to obtain the graph. The formula 2 explains the procedure. w Percentage difference = i w i (2) w i i in which w i is the defuzzified weight number i which has been calculated through fuzzy AHP geometric mean and is the weight number i calculated from AHP geometric mean (non-fuzzy). w i 3
32 Figure 3. Percentage difference between the weights obtained from various levels of uncertainty in the fuzzy AHP and Non-fuzzy AHP geometric mean Chi-Square ( χ ) test for Independence 2 The differences between the weights obtained from different methods led to use Chi-Square ( χ ) test to examine if there is any statistical relationship between the degree of uncertainty in fuzzification and the resulting map. All the obtained maps of different methods have five classes to show the priority of the locations. Each of the classes contains a number of pixels e.g. the resulted map of AHP geometric mean, contains 6 pixels in the class of priority one while the resulted map of fuzzy AHP by degree of uncertainty as triangular, contains 9 pixels in the class of priority one. This difference raises the question: Is there any relationship between the degree of uncertainty and the number of pixels in each priority class of the maps. In fact the Chi-Square test was used to examine the question. In Chi-Square test, the comparison between the maps is performed through comparing the number of pixels of river in each priority class at AHP and fuzzy AHP. Therefore for every uncertainty level there is a set of integer numbers which indicate the number of pixels of the river at every priority class. This set of numbers is compared, by Chi-Square test, with the corresponding set of AHP geometric mean. The final judgment is performed by comparing the results of Chi-Square tests for all levels of uncertainty. This comparison is presented later after obtaining the results of all Chi-Square tests. The Chi-Square test for examining the independence of two variables starts with a Null Hypothesis and an Alternative Hypothesis. The Null Hypothesis defined as there is no relationship between the variables. The Alternative Hypothesis indicates existence of some relationship between the variables (Dowdy et.al 24). Here in this case the Null and Alternative Hypothesizes are defined as: Null Hypothesis: H : The level of uncertainty has no effect on difference between the under testing map and the AHP geometric mean map. Alternative Hypothesis: H : The level of uncertainly can have some effects on difference between the under testing map and the AHP geometric mean map. 3
33 The Chi-Square statistic value is calculated by the following formula (Dowdy et.al 24). χ 2 ( O E ) = i E i in which O = i i [ ] O i 2 is the observed value. Here in this case O is equal to the vector which indicates the number of pixels in each class of the examining map and E = [ ] E i (22) is the expected value. Here E is equal to the vector which indicates the number of pixels in each priority class of the map related to AHP geometric mean method. If the Null Hypothesis is correct, then O = E for each class and χ 2 =. So there is no relationship between the degree of uncertainty and difference between the maps. If the Alternative Hypothesis is correct 2 2 then O E and the overall χ value of the test is large. If the obtained χ value is small then the Null Hypothesis cannot be rejected. 2 For finding whether the obtained χ value is small or large, some items are considered. One of the items is Degree of Freedom (DF) which, in this case, is number of priority classes in each map i.e. 5, mines one; multiplied by number of examining maps i.e. 2, mines one; which finally is (5-) (2-) =4. Significance 2 level is another item of χ distribution which should be selected in the work. Traditionally researchers use level of.5 which is sometimes referred to as %5 significance level. In this work the same level has chosen as it provides a good reference point for final judgment. 2 2 From the table of χ distribution, the critical χ value can be determined when the significance level and the degree of freedom are known. In this case, with 4 degrees of freedom and.5 levels of significance, for the critical χ value the number of is extracted from the χ distribution table. If the χ value 2 obtained from the test is bigger than the critical χ value then the Null Hypothesis is rejected and if 2 2 the χ value reported of the test is smaller than the critical χ value, the Null Hypothesis of no relationship between the variables cannot be rejected (Dowdy et.al 24). The number of pixels in each priority class of the maps was required for performing the Chi-Square test and they are shown in Table 6. Table 6. Number of pixels in each priority class of the maps with different levels of uncertainty. Number of pixels priority priority 2 priority 3 priority 4 priority 5 Total AHP geometric mean AHP fuzzy triangular AHP fuzzy narrow trapezoidal AHP fuzzy medium trapezoidal AHP fuzzy wide trapezoidal For performing the test, a MATLAB code was written. After applying that for different level of uncertainty in fuzzy AHP, obtained Chi-Square values are mentioned in Table 7. 32
34 Table 7. The Chi-Square test values for different level of uncertainty in fuzzy AHP and AHP geometric mean. Method AHP fuzzy triangular AHP fuzzy narrow trapezoidal AHP fuzzy medium trapezoidal AHP fuzzy wide trapezoidal Chi-Square test value As it is shown in the Table 7, three of calculated χ values were smaller than which is the critical χ value in the study i.e. AHP fuzzy triangular, AHP fuzzy narrow trapezoidal and AHP fuzzy medium trapezoidal.so for them, the observed values were similar to the expected values and the Null 2 Hypothesis cannot be rejected. But in AHP fuzzy wide trapezoidal, the χ value is bigger than the critical χ 2 2 value and it means that the Null Hypothesis must be rejected and the Alternative Hypothesis 2 should be accepted. So χ test in this case shows that there is some relationship between degree of uncertainty and difference between the maps Comparison between maps In order to analyze the optimum locations for the dam represented by maps with different degrees of uncertainty in AHP fuzzy, the result maps were compared with the maps obtained by AHP geometric mean which was the basic method of AHP for defuzzification. The comparison shows some differences in representing optimum locations for the dam in different maps. Moreover the comparisons between the AHP lambda max and AHP geometric mean maps also show some differences e.g., as is shown in Figure 4, in the AHP geometric mean map there are three pixels in the North part, shown with arrow, that show the best location for the dam while in AHP lambda max map these three pixels are not in the first priority class. Figure 4. The comparison between the result maps of AHP geometric mean and AHP lambda max. As it is stated in Table 6, the numbers of pixels in each priority class of the different maps are not the same so there could be some differences between the presented optimum locations of the dam in different maps. All the obtained maps of different methods are shown in previous part and it is easily possible to compare the presented locations in different priorities of the dam in more detail. Focusing on a small section of the river, it is much easier to compare the resulted priority classes of all fuzzy AHP groups with AHP geometric mean. This small section is presented by a circle around it in 33
35 Figures 5 to 9. In Figure 5, the resulted map of AHP geometric mean shows that in the selected area all of the pixels belong to second class of priority except two of them which are in first priority class. This situation changes until in wide trapezoidal fuzzy AHP all of the pixels are in the first priority class. This explicitly shows the difference between GIS maps of optimum location when different levels of uncertainty are considered in comparison ratios. Figure 5. The result map of AHP geometric mean. Figure 6. The result map of AHP fuzzy triangular. 34
36 Figure 7. The result map of AHP fuzzy narrow trapezoidal. Figure 8. The result map of AHP fuzzy medium trapezoidal. Figure 9. The result map of AHP fuzzy wide trapezoidal. 35
37 5. Discussions and Conclusion Having the resulting weights and final maps, the next step is to compare the results in a more conceptual manner. Earlier it was mentioned that Saaty (28) is against fuzzifying the AHP. He concludes that fuzzification of the process does not give much different results. He also believes AHP is already a fuzzy process because most ratios for ranking are not absolute or crisp numbers. In fact, they are already fuzzy numbers and there is no theoretical proof that fuzzifying the comparison data leads to better results therefore it cannot be proved that fuzzifying AHP is a confident idea. The above mentioned statement that AHP is already a fuzzy process is acceptable. The resulting weights and resulting maps of geometric mean and lambda max methods of the AHP are not the same. Comparing the weights obtained from lambda max and geometric mean methods, it can be seen that there is some difference between the two methods. There is no proof that which one is more acceptable or even closer to a reference vector of weights. In fact such a reference vector does not exist and the weights obtained from different methods are both equally acceptable. However it should be noticed that these differences between these two methods, and also between a numbers of other methods, are enough to conclude that there is some intrinsic uncertainty in the AHP which is in good agreement with Saaty s considering AHP as an already fuzzy process. Another issue which makes developing a pairwise comparison matrix in the AHP difficult is the fact that the comparison ratios are not exact numbers. It is known that AHP is developed to help decision-makers to evaluate the importance of some criteria or some alternatives. Mixing concepts of importance and exact numbers is difficult. The numbers,3,5,7 and 9 used in pairwise comparison matrix only indicate the importance of the corresponding factors. The way that the ratios in pairwise comparison matrix are defined is different from the meaning of numbers in algebra. For example if an arbitrary point A on the river is compared to point B, according to the economic criterion, by the number 3; it does not mean that economic benefits of point A is 3 times that of point B.What can be extracted from this number 3 is that point A has moderately higher economic benefits. Therefore any interpretation of the comparison ratios or even weights should be done considering this fact. However till now little work, if any, has been done about the level of uncertainty. In most of the previous works AHP and fuzzy AHP have been compared when the uncertainty in comparison ratios was constant. But adding some more uncertainty to the comparison ratios makes the results much more different i.e. the higher level of uncertainty added to comparison ratios, results in more differences between AHP and fuzzy AHP. However in this work, by Chi-Square test, it has been shown that this difference grows slowly by increasing the level of uncertainty. In the first three levels of uncertainty, the effect of increasing the level of uncertainty on difference between the maps is insignificant although by increasing the level of uncertainty the Chi-Square test values are also growing. But the Chi-Square test values are 2 still smaller than the critical χ value which indicate the result maps are almost similar to map resulted of AHP geometric mean. However in the AHP fuzzy wide trapezoidal, the Chi-Square test value is larger 2 than the critical χ value so the influence of increasing the level of uncertainty is considerable and the result map of the method and the map resulted by AHP geometric mean are not the same. The Chi-Square test was repeated for every different uncertainty levels of fuzzy AHP in the work. It should be mentioned that the result of each individual test is slightly dependent on the number of priority classes and how they are defined and also on the significance level chosen. However the overall conclusion remains intact and comparing the results it is concluded that the difference between the result maps of AHP geometric mean and the fuzzy AHP grows by increasing the uncertainty level. 36
38 References Baban S. J. and Wan-Yusof K. 23, Modelling Optimum Sites for Locating Reservoirs in Tropical Environments, Water Resources Management, Vol. 7, pp. 7. Ballestero, M., 23, Tárcoles River Basin Costa Rica. Background paper prepared for the World Bank research project Integrated River Basin Management and the Principle of Managing Water Resources at the Lowest Appropriate Level When and Why Does It (Not) Work in Practice?, vi+4 p. Available at: d_final.pdf Boroushaki S. and Malczewski J. 28, Implementing an extension of the analytical hierarchy process using ordered weighted averaging operators with fuzzy quantifiers in ArcGIS, Computers and Geosciences, Vol. 34, pp Brandt, S.A., 999, Reservoir desiltation by means of hydraulic flushing: Sedimentological and Geomorphological Effects in Reservoirs and Downstream Reaches As Illustrated by the Cachí Reservoir and the Reventazón River, Costa Rica.Geographica Hafniensia, Vol. A8, pp. 23. Buckley J.J. 985, Fuzzy Hierarchical Analysis, Fuzzy sets and systems, Vol. 7, No. 3, pp Chang D. Y. 996, Application of the extent analysis method on fuzzy AHP, European Journal of Operational Research, Vol. 95, pp Costa Rica, Tapanti National Park. 28. Available at: [accessed August 28]. Dowdy Sh., Wearden S. and Chilko D., 24, Statistics for Research. 3 rd ed. New Jersey: John Wiley & Sons, Inc. Eastman J. R. 23, IDRISI Kilimanjaro Guide to GIS and Image Processing, Idrisi Source Code. ESRI 28, Arc GIS Desktop Help 9.2. [Online]. Avalable at: [accessed August 28]. Gismalla Y.A. and Bruen M. 996, Use of a GIS in reconnaissance studies for small-scale hydropower development in a developing country: a case study from Tanzania, Application of Geographic Information System in Hydrology and Water Resources Management, Vol Han W.J. and Tsay W.D. 998, Formulation of Quality Strategy Using Analytic Hierarchy Process, Twenty Seven Annual Meeting of the Western Decision Science Institute, University of Northern Colorado, USA, pp Malczewski J. 999, GIS and Multicriteria Desision Analysis, New York: John Willey and Sons, Inc. Malczewski J. 26, GIS-based multicriteria decision analysis: a survey of the literature, International Journal of Geographical Information Science, Vol. 2, No. 7, pp Saaty L.T. (98), The Analytic Hierarchy Process, New York, McGraw-Hill International. 37
39 Saaty L.T. 99, How to make a decision: The Analytic Hierarchy Process, European Journal of Operational Research, Vol. 48, pp Saaty L.T. 26, Rank from comparisons and from ratings in the analytic hierarchy/network processes, European Journal of Operational Research, Vol. 68, pp Saaty T.L. and Tran L.T. 27, On the invalidity of fuzzifying numerical judgments in the Analytic Hierarchy Process, Mathematical and Computer Modelling, Vol. 46, pp Saaty T.L. and Tran L.T. 28, Fuzzy Judgments and Fuzzy Sets, Unpublished report. Saaty T.L. 28, There is no Mathematical Validity for Using Fuzzy Number Crunching in the Analytic Hierarchy Process, Unpublished report. Saborio, J., no year, Mapeo digital del potencial de erosion, cuenca Río Reventazón, Costa Rica, Unpuplished report, Instituto Costarricence de Electricidad. Sánchez-Azofeifa G.A., Daily G.C., Pfaff A.S.P. and Busch Ch. 23, Integrity and isolation of Costa Ricas national parks and biological reseves:examining the dynamics of land-cover change, Biological Conservation, Vol. 9, pp Vahrson, W.-G., 992: Tropische Starkregen und ihre Verteilung - das Beispiel des Einzugsgebietes des Río Reventazón, Costa Rica (Spatial distribution of heavy rainfalls in the tropics - the example of the Río Reventazón catchment, Costa Rica). Die Erde, Vol. 23, No., pp. -5. Yang Ch.Ch. and Chen B.Sh. 24, Key Quality Performance Evaluation Using Fuzzy AHP, Journal of the Chinese Institute of Industrial Engineers, Vol. 2, No. 6, pp Zimmermann H.J., 934. Fuzzy Set Theory and Its Applications. 3 rd Kluwer Academic Publishers. ed. Boston/Dordrecht/London: 38
40 Appendix A The Script for Making the Water discharge: theview = av.getactivedoc thegtheme = theview.getactivethemes.get() agrid = thegtheme.getgrid thegrid = theview.findtheme("flow direction").getgrid theprj = theview.getprojection runoff = agrid *.asgrid flowaccgrid = thegrid.flowaccumulation(runoff) thegtheme = Gtheme.Make(flowaccgrid) if(flowaccgrid.haserror)then return(nil) end theview.addtheme(thegtheme) 39
41 Appendix B: The landuse of study area, factor and constraint maps of the project. Figure 2. Different landuse of study area. Figure 2. Factor map of Undulation. 4
42 Figure 22. Factor map of Road. Figure 23. Factor map of City. 4
43 Figure 24. Factor map of Road Water flow. Figure 25. Factor map of Hydraulic head. 42
44 Figure 26. Factor map of Agriculture. Figure 27. Factor map of Forest. 43
45 Figure 28. Constraint map of National park. Figure 29. Constraint map of Reservoir. Figure 3. Constraint map of River. 44
46 Appendix C: Fuzzy weights for fuzzy membership functions. Fuzzy weights for fuzzy triangular membership functions..5 Weight for atriangular membership function Figure 3. Weight of the fuzzy AHP trangular: (.83,.29,.29,.5).5 Weight2 for atriangular membership function Figure 32. Weight 2 of the fuzzy AHP trangular: (.294,.495,.495,.897) 45
47 .5 Weight3 for atriangular membership function Figure 33. Weight 3 of the fuzzy AHP trangular: (.463,.84,.84,.52).5 Weight4 for atriangular membership function Figure 34. Weight 4 of the fuzzy AHP trangular: (.62,.28,.28,.224).5 Weight5 for atriangular membership function Figure 35. Weight 5 of the fuzzy AHP trangular: (.29,.864,.864,.366) 46
48 .5 Weight6 for atriangular membership function Figure 36. Weight 6 of the fuzzy AHP trangular: (.92,.2293,.2293,.4285).5 Weight7 for atriangular membership function Figure 37. Weight 7 of the fuzzy AHP trangular: (.647,.326,.326,.5465) Fuzzy weights for fuzzy narrow trapezoidal membership fanctions..5 Weight for anarrow Trapezoidal membership function Figure 38. Weight of the AHP fuzzy narrow trapezoidal: (.62,.23,.373,.593) 47
49 .5 Weight2 for anarrow Trapezoidal membership function Figure 39. Weight 2 of the AHP fuzzy narrow trapezoidal: (.256,.38,.653,.79).5 Weight3 for anarrow Trapezoidal membership function Figure 4. Weight 3 of the AHP fuzzy narrow trapezoidal: (.399,.6,.8,.864).5 Weight4 for anarrow Trapezoidal membership function Figure 4. Weight 4 of the AHP fuzzy narrow trapezoidal: (.5,.83,.545,.279) 48
50 .5 Weight5 for anarrow Trapezoidal membership function Figure 42. Weight 5 of the AHP fuzzy narrow trapezoidal: (.872,.39,.2535,.4487).5 Weight6 for anarrow Trapezoidal membership function Figure 43. Weight 6 of the AHP fuzzy narrow trapezoidal: (.968,.687,.398,.564).5 Weight7 for anarrow Trapezoidal membership function Figure 44. Weight 7 of the AHP fuzzy narrow trapezoidal: (.333,.2327,.424,.6364) 49
51 Fuzzy weights for fuzzy medium trapezoidal membership fanctions..5 Weight for amedium Trapezoidal membership function Figure 45. Weight of the AHP fuzzy medium trapezoidal: (.42,.25,.429,.722).5 Weight2 for amedium Trapezoidal membership function Figure 46. Weight 2 of the AHP fuzzy medium trapezoidal: (.29,.335,.76,.337).5 Weight3 for amedium Trapezoidal membership function Figure 47. Weight 3 of the AHP fuzzy medium trapezoidal: (.339,.533,.27,.2386) 5
52 .5 Weight4 for amedium Trapezoidal membership function Figure 48. Weight 4 of the AHP fuzzy medium trapezoidal: (.43,.7,.83,.3499).5 Weight5 for amedium Trapezoidal membership function Figure 49. Weight 5 of the AHP fuzzy medium trapezoidal: (.724,.2,.3,.5874).5 Weight6 for amedium Trapezoidal membership function Figure 5. Weight 6 of the AHP fuzzy medium trapezoidal: (.747,.429,.3624,.6448) 5
53 .5 Weight7 for amedium Trapezoidal membership function Figure 5. Weight 7 of the AHP fuzzy medium trapezoidal: (.22,.976,.4737,.7548) Fuzzy weights for fuzzy wide trapezoidal membership fanctions..5 Weight for awide Trapezoidal membership function Figure 52. Weight of the AHP fuzzy wide trapezoidal :(.42,.52,.65,.722).5 Weight2 for awide Trapezoidal membership function Figure 53. Weight 2 of the AHP fuzzy wide trapezoidal: (.29,.238,.95,.337) 52
54 .5 Weight3 for awide Trapezoidal membership function Figure 54. Weight 3 of the AHP fuzzy wide trapezoidal: (.339,.369,.294,.2386).5 Weight4 for awide Trapezoidal membership function Figure 55. Weight 4 of the AHP fuzzy wide trapezoidal: (.43,.452,.362,.3499).5 Weight5 for awide Trapezoidal membership function Figure 56. Weight 5 of the AHP fuzzy wide trapezoidal: (.724,.797,.587,.5874) 53
55 .5 Weight6 for awide Trapezoidal membership function Figure 57. Weight 6 of the AHP fuzzy wide trapezoidal: (.747,.858,.5735,.6448).5 Weight7 for awide Trapezoidal membership function Figure 58. Weight 7 of the AHP fuzzy wide trapezoidal: (.22,.78,.698,.7548) 54
Title: Effects of increasing fuzziness on analytic hierarchy process for spatial multicriteria decision analysis
Authors Accepted Manuscript This is a post-print version of the following paper: Title: Effects of increasing fuzziness on analytic hierarchy process for spatial multicriteria decision analysis Authors:
ANALYTIC HIERARCHY PROCESS (AHP) TUTORIAL
Kardi Teknomo ANALYTIC HIERARCHY PROCESS (AHP) TUTORIAL Revoledu.com Table of Contents Analytic Hierarchy Process (AHP) Tutorial... 1 Multi Criteria Decision Making... 1 Cross Tabulation... 2 Evaluation
MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process
MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process Business Intelligence and Decision Making Professor Jason Chen The analytical hierarchy process (AHP) is a systematic procedure
A Method Using ArcMap to Create a Hydrologically conditioned Digital Elevation Model
A Method Using ArcMap to Create a Hydrologically conditioned Digital Elevation Model High resolution topography derived from LiDAR data is becoming more readily available. This new data source of topography
An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy Logic: Case Studies of Life and Annuity Insurances
Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 126 An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy
ANALYSIS 3 - RASTER What kinds of analysis can we do with GIS?
ANALYSIS 3 - RASTER What kinds of analysis can we do with GIS? 1. Measurements 2. Layer statistics 3. Queries 4. Buffering (vector); Proximity (raster) 5. Filtering (raster) 6. Map overlay (layer on layer
THE ANALYTIC HIERARCHY PROCESS (AHP)
THE ANALYTIC HIERARCHY PROCESS (AHP) INTRODUCTION The Analytic Hierarchy Process (AHP) is due to Saaty (1980) and is often referred to, eponymously, as the Saaty method. It is popular and widely used,
Combining Fuzzy Analytic Hierarchy Process
International Journal of Engineering & Technology IJET-IJENS Vol: 11 No: 05 37 Combining Fuzzy Analytic Hierarchy Process and GIS to Select the Best Location for a Wastewater Lift Station in El-Mahalla
Introduction to GIS (Basics, Data, Analysis) & Case Studies. 13 th May 2004. Content. What is GIS?
Introduction to GIS (Basics, Data, Analysis) & Case Studies 13 th May 2004 Content Introduction to GIS Data concepts Data input Analysis Applications selected examples What is GIS? Geographic Information
How to do AHP analysis in Excel
How to do AHP analysis in Excel Khwanruthai BUNRUAMKAEW (D) Division of Spatial Information Science Graduate School of Life and Environmental Sciences University of Tsukuba ( March 1 st, 01) The Analytical
The Analytic Hierarchy Process. Danny Hahn
The Analytic Hierarchy Process Danny Hahn The Analytic Hierarchy Process (AHP) A Decision Support Tool developed in the 1970s by Thomas L. Saaty, an American mathematician, currently University Chair,
Research on supply chain risk evaluation based on the core enterprise-take the pharmaceutical industry for example
Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2014, 6(6):593-598 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Research on supply chain risk evaluation based on
Design of Analytic Hierarchy Process Algorithm and Its Application for Vertical Handover in Cellular Communication
Design of Analytic Hierarchy Process Algorithm and Its Application for Vertical Handover in Cellular Communication Under the Guidance of Asso. Prof. Mr. Saurav Dhar Deptt. of Electronics and Communication
GEOENGINE MSc in Geomatics Engineering (Master Thesis) Anamelechi, Falasy Ebere
Master s Thesis: ANAMELECHI, FALASY EBERE Analysis of a Raster DEM Creation for a Farm Management Information System based on GNSS and Total Station Coordinates Duration of the Thesis: 6 Months Completion
Decision Making on Project Selection in High Education Sector Using the Analytic Hierarchy Process
Decision Making on Project Selection in High Education Sector Using the Analytic Hierarchy Process Nina Begičević University of Zagreb, Faculty of Organization and Informatics, Pavlinska 2, Varaždin [email protected]
A Fuzzy AHP based Multi-criteria Decision-making Model to Select a Cloud Service
Vol.8, No.3 (2014), pp.175-180 http://dx.doi.org/10.14257/ijsh.2014.8.3.16 A Fuzzy AHP based Multi-criteria Decision-making Model to Select a Cloud Service Hong-Kyu Kwon 1 and Kwang-Kyu Seo 2* 1 Department
OBJECT ORIENTED SOFTWARE SYSTEM BASED ON AHP
OBJECT ORIENTED SOFTWARE SYSTEM BASED ON AHP Soumi Ghosh Department of Computer Science & Engineering Amity School of Engineering and Technology Amity University, Sec-125, NOIDA, (U.P.), INDIA [email protected]
INTEGRATED ANALYTICAL HIERARCHY PROCESS MODELING OF WATERSHEDS FOR ENVIRONMENTALLY SUSTAINABLE DEVELOPMENT
INTEGRATED ANALYTICAL HIERARCHY PROCESS MODELING OF WATERSHEDS FOR ENVIRONMENTALLY SUSTAINABLE DEVELOPMENT Rao Kumar Raghavendra 1 1 Professor & Head, Department of Civil Engineering, New Horizon College
Selection of Database Management System with Fuzzy-AHP for Electronic Medical Record
I.J. Information Engineering and Electronic Business, 205, 5, -6 Published Online September 205 in MECS (http://www.mecs-press.org/) DOI: 0.585/ijieeb.205.05.0 Selection of Database Management System with
Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan
Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan H. S. M. Hilmi 1, M.Y. Mohamed 2, E. S. Ganawa 3 1 Faculty of agriculture, Alzaiem
Modeling Flood Risk for an Urban CBD Using AHP and GIS
Modeling Flood Risk for an Urban CBD Using AHP and GIS Generino P. Siddayao, Sony E. Valdez, and Proceso L. Fernandez Abstract The Central Business District (CBD) of a city is the activity center of the
A GIS-Based Sensitivity Analysis of Multi-Criteria Weights
18 th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 2009 http://mssanz.org.au/modsim09 A GIS-Based Sensitivity Analysis of Multi-Criteria Weights Chen, Y. 1, 2, J. Yu 1, 3, K. Shahbaz 4 and
Create a folder on your network drive called DEM. This is where data for the first part of this lesson will be stored.
In this lesson you will create a Digital Elevation Model (DEM). A DEM is a gridded array of elevations. In its raw form it is an ASCII, or text, file. First, you will interpolate elevations on a topographic
An Introduction to Point Pattern Analysis using CrimeStat
Introduction An Introduction to Point Pattern Analysis using CrimeStat Luc Anselin Spatial Analysis Laboratory Department of Agricultural and Consumer Economics University of Illinois, Urbana-Champaign
Landslide hazard zonation using MR and AHP methods and GIS techniques in Langan watershed, Ardabil, Iran
Landslide hazard zonation using MR and AHP methods and GIS techniques in Langan watershed, Ardabil, Iran A. Esmali Ouri 1* S. Amirian 2 1 Assistant Professor, Faculty of Agriculture, University of Mohaghegh
Project Management Software Selection Using Analytic Hierarchy Process Method
International Journal of Applied Science and Technology Vol. 4, No. ; November 04 Project Management Software Selection Using Analytic Hierarchy Process Method Birgul Kutlu Professor Bogazici University
DATA ANALYSIS II. Matrix Algorithms
DATA ANALYSIS II Matrix Algorithms Similarity Matrix Given a dataset D = {x i }, i=1,..,n consisting of n points in R d, let A denote the n n symmetric similarity matrix between the points, given as where
USING THE ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT AND PRIORITIZE PROJECTS IN A PORTFOLIO
USING THE ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT AND PRIORIZE PROJECTS IN A PORTFOLIO Ricardo Viana Vargas, MSc, IPMA-B, PMP Professor Fundação Getúlio Vargas (FGV) Brasil Professor Fundação Instituto
MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING
1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications
A HYDROLOGIC NETWORK SUPPORTING SPATIALLY REFERENCED REGRESSION MODELING IN THE CHESAPEAKE BAY WATERSHED
A HYDROLOGIC NETWORK SUPPORTING SPATIALLY REFERENCED REGRESSION MODELING IN THE CHESAPEAKE BAY WATERSHED JOHN W. BRAKEBILL 1* AND STEPHEN D. PRESTON 2 1 U.S. Geological Survey, Baltimore, MD, USA; 2 U.S.
Development of Virtual Lab System through Application of Fuzzy Analytic Hierarchy Process
Development of Virtual Lab System through Application of Fuzzy Analytic Hierarchy Process Chun Yong Chong, Sai Peck Lee, Teck Chaw Ling Faculty of Computer Science and Information Technology, University
Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2
The Utilization of Geographic Information Systems and Multi-Criteria Decision Making with Local Community Participation for Selection of Site for Micro Hydropower Project: A Case Study of Chi River Basin,
Decision-making with the AHP: Why is the principal eigenvector necessary
European Journal of Operational Research 145 (2003) 85 91 Decision Aiding Decision-making with the AHP: Why is the principal eigenvector necessary Thomas L. Saaty * University of Pittsburgh, Pittsburgh,
A GIS helps you answer questions and solve problems by looking at your data in a way that is quickly understood and easily shared.
A Geographic Information System (GIS) integrates hardware, software, and data for capturing, managing, analyzing, and displaying all forms of geographically referenced information. GIS allows us to view,
What is GIS? Geographic Information Systems. Introduction to ArcGIS. GIS Maps Contain Layers. What Can You Do With GIS? Layers Can Contain Features
What is GIS? Geographic Information Systems Introduction to ArcGIS A database system in which the organizing principle is explicitly SPATIAL For CPSC 178 Visualization: Data, Pixels, and Ideas. What Can
Remote Sensing, GPS and GIS Technique to Produce a Bathymetric Map
Remote Sensing, GPS and GIS Technique to Produce a Bathymetric Map Mark Schnur EES 5053 Remote Sensing Fall 2007 University of Texas at San Antonio, Department of Earth and Environmental Science, San Antonio,
Analytical Hierarchy Process for Higher Effectiveness of Buyer Decision Process
P a g e 2 Vol. 10 Issue 2 (Ver 1.0), April 2010 Global Journal of Management and Business Research Analytical Hierarchy Process for Higher Effectiveness of Buyer Decision Process Razia Sultana Sumi 1 Golam
Journal of Chemical and Pharmaceutical Research, 2014, 6(3):34-39. Research Article. Analysis of results of CET 4 & CET 6 Based on AHP
Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2014, 6(3):34-39 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Analysis of results of CET 4 & CET 6 Based on AHP
Spatial Analyst Tutorial
Copyright 1995-2010 Esri All rights reserved. Table of Contents About the ArcGIS Spatial Analyst Tutorial......................... 3 Exercise 1: Preparing for analysis............................ 5 Exercise
A new Environmental Performance Index using analytic hierarchy process: A case of ASEAN countries
Article A new Environmental Performance Index using analytic hierarchy process: A case of ASEAN countries Wan Khadijah Wan Ismail, Lazim Abdullah Department of Mathematics, Faculty of Science and Technology,
Klaus D. Goepel No 10 Changi Business Park Central 2 Hansapoint@CBP #06-01/08 Singapore 486030 E-mail: [email protected] ABSTRACT
IMPLEMENTING THE ANALYTIC HIERARCHY PROCESS AS A STANDARD METHOD FOR MULTI-CRITERIA DECISION MAKING IN CORPORATE ENTERPRISES A NEW AHP EXCEL TEMPLATE WITH MULTIPLE INPUTS Klaus D. Goepel No 0 Changi Business
SESSION 8: GEOGRAPHIC INFORMATION SYSTEMS AND MAP PROJECTIONS
SESSION 8: GEOGRAPHIC INFORMATION SYSTEMS AND MAP PROJECTIONS KEY CONCEPTS: In this session we will look at: Geographic information systems and Map projections. Content that needs to be covered for examination
Performance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process
Performance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process Y. H. Liang Department of Information Management, I-SHOU
Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts
LARS 2007 Catchment and Lake Research Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts Seleshi Bekele Awulachew International Water Management Institute Introduction
5. GIS, Cartography and Visualization of Glacier Terrain
5. GIS, Cartography and Visualization of Glacier Terrain 5.1. Garhwal Himalayan Glaciers 5.1.1. Introduction GIS is the computer system for capturing, storing, analyzing and visualization of spatial and
Project Management Software Selection Using Analytic Hierarchy Process Method
Project Management Software Selection Using Analytic Hierarchy Process Method ISSN - 35-055 Sweety Sen (B.tech: Information Technology) Dronacharya College of Engineering Gurgaon, India Phone no. : 00343
Subcontractor Selection Using Analytic Hierarchy Process
Volume 3 Number 3 2012 pp. 121-143 ISSN: 1309-2448 www.berjournal.com Subcontractor Selection Using Analytic Hierarchy Process Vesile Sinem Arıkan Kargı a Ahmet Öztürk b Abstract: Turkish textile firms
1604 JOURNAL OF SOFTWARE, VOL. 9, NO. 6, JUNE 2014
1604 JOURNAL OF SOFTWARE, VOL. 9, NO. 6, JUNE 2014 Combining various trust factors for e-commerce platforms using Analytic Hierarchy Process Bo Li a, Yu Zhang b,, Haoxue Wang c, Haixia Xia d, Yanfei Liu
Estimation of Unknown Comparisons in Incomplete AHP and It s Compensation
Estimation of Unknown Comparisons in Incomplete AHP and It s Compensation ISSN 0386-1678 Report of the Research Institute of Industrial Technology, Nihon University Number 77, 2005 Estimation of Unknown
Understanding Raster Data
Introduction The following document is intended to provide a basic understanding of raster data. Raster data layers (commonly referred to as grids) are the essential data layers used in all tools developed
Quantifying energy security: An Analytic Hierarchy Process approach
ERG/200906 Quantifying energy security: An Analytic Hierarchy Process approach Larry Hughes, PhD Energy Research Group Department of Electrical and Computer Engineering Dalhousie University Halifax, Nova
Managing sewer flood risk
Managing sewer flood risk J. Ryu 1 *, D. Butler 2 1 Environmental and Water Resource Engineering, Department of Civil and Environmental Engineering, Imperial College, London, SW7 2AZ, UK 2 Centre for Water
Objectives. Raster Data Discrete Classes. Spatial Information in Natural Resources FANR 3800. Review the raster data model
Spatial Information in Natural Resources FANR 3800 Raster Analysis Objectives Review the raster data model Understand how raster analysis fundamentally differs from vector analysis Become familiar with
What is GIS. What is GIS? University of Tsukuba. What do you image of GIS? Copyright(C) ESRI Japan Corporation. All rights reserved.
What is GIS University of Tsukuba Graduate School of Life and Environmental Science April 21 st, 2011 What is GIS? What do you image of GIS? Gas Insulated Switch Groupe Interventional Speciale Geographic
USING THE ANALYTIC HIERARCHY PROCESS FOR DECISION MAKING IN ENGINEERING APPLICATIONS: SOME CHALLENGES
Published in: Inter l Journal of Industrial Engineering: Applications and Practice, Vol. 2, No. 1, pp. 35-44, 1995. 1 USING THE ANALYTIC HIERARCHY PROCESS FOR DECISION MAKING IN ENGINEERING APPLICATIONS:
Slope Density. Appendix F F-1 STATEMENT OF PURPOSE DISCUSSION OF SLOPE
Appendix F Slope Density F-1 STATEMENT OF PURPOSE This document has been prepared with the intent of acquainting the general reader with the slope-density approach to determining the intensity of residential
3D Model of the City Using LiDAR and Visualization of Flood in Three-Dimension
3D Model of the City Using LiDAR and Visualization of Flood in Three-Dimension R.Queen Suraajini, Department of Civil Engineering, College of Engineering Guindy, Anna University, India, [email protected]
Interactive comment on A simple 2-D inundation model for incorporating flood damage in urban drainage planning by A. Pathirana et al.
Hydrol. Earth Syst. Sci. Discuss., 5, C2756 C2764, 2010 www.hydrol-earth-syst-sci-discuss.net/5/c2756/2010/ Author(s) 2010. This work is distributed under the Creative Commons Attribute 3.0 License. Hydrology
Supplier Performance Evaluation and Selection in the Herbal Industry
Supplier Performance Evaluation and Selection in the Herbal Industry Rashmi Kulshrestha Research Scholar Ranbaxy Research Laboratories Ltd. Gurgaon (Haryana), India E-mail : [email protected]
How To Check For Differences In The One Way Anova
MINITAB ASSISTANT WHITE PAPER This paper explains the research conducted by Minitab statisticians to develop the methods and data checks used in the Assistant in Minitab 17 Statistical Software. One-Way
Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM
Guidance for Flood Risk Analysis and Mapping Changes Since Last FIRM May 2014 This guidance document supports effective and efficient implementation of flood risk analysis and mapping standards codified
AP Physics 1 and 2 Lab Investigations
AP Physics 1 and 2 Lab Investigations Student Guide to Data Analysis New York, NY. College Board, Advanced Placement, Advanced Placement Program, AP, AP Central, and the acorn logo are registered trademarks
Algebra 2 Chapter 1 Vocabulary. identity - A statement that equates two equivalent expressions.
Chapter 1 Vocabulary identity - A statement that equates two equivalent expressions. verbal model- A word equation that represents a real-life problem. algebraic expression - An expression with variables.
Decision Making and Evaluation System for Employee Recruitment Using Fuzzy Analytic Hierarchy Process
International Refereed Journal of Engineering and Science (IRJES) ISSN (Online) 2319-183X, (Print) 2319-1821 Volume 2, Issue 7 (July 2013), PP.24-31 Decision Making and Evaluation System for Employee Recruitment
EXPLORING SPATIAL PATTERNS IN YOUR DATA
EXPLORING SPATIAL PATTERNS IN YOUR DATA OBJECTIVES Learn how to examine your data using the Geostatistical Analysis tools in ArcMap. Learn how to use descriptive statistics in ArcMap and Geoda to analyze
Spatial data analysis: retrieval, (re)classification and measurement operations
CHAPTER 7 Spatial data analysis: retrieval, (re)classification and measurement operations In chapter 5 you used a number of table window operations, such as calculations, aggregations, and table joining,
Method for route selection of transcontinental natural gas pipelines
Method for route selection of transcontinental natural gas pipelines Fotios G. Thomaidis 1 National and Kapodistrian University of Athens Department of Informatics and Telecommunications [email protected]
06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH
06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH Richard Kellagher 1, Mike Panzeri 1, Julien L Homme 1, Yannick Cesses 1, Ben Gouldby 1 John Martin 2, Oliver Nicholson 2, Mark
SPATIAL DATA ANALYSIS
SPATIAL DATA ANALYSIS P.L.N. Raju Geoinformatics Division Indian Institute of Remote Sensing, Dehra Dun Abstract : Spatial analysis is the vital part of GIS. Spatial analysis in GIS involves three types
Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time
Tamsui Oxford Journal of Management Sciences, Vol. 0, No. (-6) Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time Chih-Hsun Hsieh (Received September 9, 00; Revised October,
December 4, 2013 MATH 171 BASIC LINEAR ALGEBRA B. KITCHENS
December 4, 2013 MATH 171 BASIC LINEAR ALGEBRA B KITCHENS The equation 1 Lines in two-dimensional space (1) 2x y = 3 describes a line in two-dimensional space The coefficients of x and y in the equation
Tutorial 8 Raster Data Analysis
Objectives Tutorial 8 Raster Data Analysis This tutorial is designed to introduce you to a basic set of raster-based analyses including: 1. Displaying Digital Elevation Model (DEM) 2. Slope calculations
HYDROLOGY OF THE TRANSBOUNDARY DRIN RIVER BASIN
University of Texas at Austin GIS in Water Resources Instructor: Dr. David Maidment HYDROLOGY OF THE TRANSBOUNDARY DRIN RIVER BASIN Wikipedia Elisabeta Poci December, 2011 1 Table of Contents: 1. Introduction
Development of an Impervious-Surface Database for the Little Blackwater River Watershed, Dorchester County, Maryland
Development of an Impervious-Surface Database for the Little Blackwater River Watershed, Dorchester County, Maryland By Lesley E. Milheim, John W. Jones, and Roger A. Barlow Open-File Report 2007 1308
A FUZZY LOGIC APPROACH FOR SALES FORECASTING
A FUZZY LOGIC APPROACH FOR SALES FORECASTING ABSTRACT Sales forecasting proved to be very important in marketing where managers need to learn from historical data. Many methods have become available for
Vendor Evaluation and Rating Using Analytical Hierarchy Process
Vendor Evaluation and Rating Using Analytical Hierarchy Process Kurian John, Vinod Yeldho Baby, Georgekutty S.Mangalathu Abstract -Vendor evaluation is a system for recording and ranking the performance
Colorado Natural Heritage Program
CNHP s mission is to preserve the natural diversity of life by contributing the essential scientific foundation that leads to lasting conservation of Colorado's biological wealth. Colorado Natural Heritage
REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS. Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 INTRODUCTION
REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 ABSTRACT: Regional sediment management (RSM) requires the capability
A Controlled Experiment on Analytical Hierarchy Process and Cumulative Voting -
Master Thesis Software Engineering Thesis no: MSE-2007-17 June 2007 A Controlled Experiment on Analytical Hierarchy Process and Cumulative Voting - Investigating Time, Scalability, Accuracy, Ease of use
Using Analytic Hierarchy Process (AHP) Method to Prioritise Human Resources in Substitution Problem
Using Analytic Hierarchy Process (AHP) Method to Raymond Ho-Leung TSOI Software Quality Institute Griffith University *Email:[email protected] Abstract In general, software project development is often
Evaluation of Forest Road Network Planning According to Environmental Criteria
American-Eurasian J. Agric. & Environ. Sci., 9 (1): 91-97, 2010 ISSN 1818-6769 IDOSI Publications, 2010 Evaluation of Forest Road Network Planning According to Environmental Criteria Amir Hosian Firozan,
APPLICATION OF GOOGLE EARTH FOR THE DEVELOPMENT OF BASE MAP IN THE CASE OF GISH ABBAY SEKELA, AMHARA STATE, ETHIOPIA
APPLICATION OF GOOGLE EARTH FOR THE DEVELOPMENT OF BASE MAP IN THE CASE OF GISH ABBAY SEKELA, AMHARA STATE, ETHIOPIA Abineh Tilahun Department of Geography and environmental studies, Adigrat University,
COMBINING THE METHODS OF FORECASTING AND DECISION-MAKING TO OPTIMISE THE FINANCIAL PERFORMANCE OF SMALL ENTERPRISES
COMBINING THE METHODS OF FORECASTING AND DECISION-MAKING TO OPTIMISE THE FINANCIAL PERFORMANCE OF SMALL ENTERPRISES JULIA IGOREVNA LARIONOVA 1 ANNA NIKOLAEVNA TIKHOMIROVA 2 1, 2 The National Nuclear Research
A fuzzy analytic hierarchy process tool to evaluate computer-aided manufacturing software alternatives
TJFS: Turkish Journal of Fuzzy Systems (eissn: 09 90) An Official Journal of Turkish Fuzzy Systems Association Vol. No.2 pp. 4-27 204. A fuzzy analytic hierarchy process tool to evaluate computer-aided
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING
SUPPLY CHAIN MANAGEMENT AND A STUDY ON SUPPLIER SELECTION in TURKEY
SUPPLY CHAIN MANAGEMENT AND A STUDY ON SUPPLIER SELECTION in TURKEY Pelin Alcan, Hüseyin Başlıgil, Melih Coşkun Yildiz Technical University, Besiktas, İstanbul, Turkey Abstract This study mainly focuses
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling
Selection of Drainage Network Using Raster GIS A Case Study
International Journal of Engineering Science Invention ISSN (Online): 2319 6734, ISSN (Print): 2319 6726 Volume 2 Issue 8 ǁ August. 2013 ǁ PP.35-40 Selection of Drainage Network Using Raster GIS A Case
How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam
FLOOD HAZARD AND RISK ASSESSMENT OF HOANG LONG RIVER BASIN, VIETNAM VU Thanh Tu 1, Tawatchai TINGSANCHALI 2 1 Water Resources University, Assistant Professor, 175 Tay Son Street, Dong Da District, Hanoi,
Application of ARCGIS and Analytical Hierarchy Process in the Risk Assessment of Geological Disaster in Complex Mountains
Application of ARCGIS and Analytical Hierarchy Process in the Risk Assessment of Geological Disaster in Complex Mountains Li Li Lecturer Key Laboratory of Water Environment Evolution and Pollution Control
Auxiliary Variables in Mixture Modeling: 3-Step Approaches Using Mplus
Auxiliary Variables in Mixture Modeling: 3-Step Approaches Using Mplus Tihomir Asparouhov and Bengt Muthén Mplus Web Notes: No. 15 Version 8, August 5, 2014 1 Abstract This paper discusses alternatives
Information Contents of High Resolution Satellite Images
Information Contents of High Resolution Satellite Images H. Topan, G. Büyüksalih Zonguldak Karelmas University K. Jacobsen University of Hannover, Germany Keywords: satellite images, mapping, resolution,
Talk:Analytic Hierarchy Process/Example Leader
Talk:Analytic Hierarchy Process/Example Leader 1 Talk:Analytic Hierarchy Process/Example Leader This is an example showing the use of the AHP in a practical decision situation. Click HERE to return to
Metadata for Big River Watershed Geologic and Geomorphic Data
Metadata for Big River Watershed Geologic and Geomorphic Data Metadata are descriptions and information regarding compiled data. This appendix contains the metadata that describes the compiled data used
Adopting an Analytic Hierarchy Process to Select Internet Advertising Networks
Adopting an Analytic Hierarchy Process to Select Internet Advertising Networks Chin-Tasi Lin 1), Pi-Fang Hsu 2) 1) Yuanpei Institute of Science and Technology, Department of Information Management, Taiwan
Applying the Analytic Hierarchy Process to Health Decision Making: Deriving Priority Weights
Applying the to Health Decision Making: Deriving Priority Weights Tomás Aragón, MD, DrPH Principal Investigator, Cal PREPARE,. CIDER UC Berkeley School of Public Health Health Officer, City & County of
15.062 Data Mining: Algorithms and Applications Matrix Math Review
.6 Data Mining: Algorithms and Applications Matrix Math Review The purpose of this document is to give a brief review of selected linear algebra concepts that will be useful for the course and to develop