Surface Infiltration Rate of Permeable Pavements
|
|
|
- Gillian Lee
- 10 years ago
- Views:
Transcription
1 22 Surface Infiltration Rate of Permeable Pavements E. Z. Bean, W. F. Hunt, and D. A. Bidelspach Asphalt surfaces have greatly increased the amount of pollutant-carrying runoff entering surface waters. To counteract this, permeable pavement can be installed to allow water to infiltrate, thus reducing runoff and acting as a filter. This study tested the surface infiltration rate of 27 permeable pavement sites in North Carolina, Maryland and Delaware. One of these sites in North Carolina was monitored to compare pollutant loads of asphalt runoff to those in infiltrate. Concrete grid pavers (CGP) and permeable interlocking concrete pavers (PICP) were tested with pavement ages ranging from six months to 20 years. Two infiltration tests were run on 14 CGP lots filled with sand. The initial test was on the existing condition of the surface and second test was run after the removal of the top layer of residue ( cm) to simulate maintenance. Maintenance improved the infiltration rate on 13 of 14 sites. Analysis of the data showed that maintenance improves surface permeability at a confidence level of 99.8%. The median average infiltration rate increased from 5.0 cm/h, for existing conditions, to 8.0 cm/h after maintenance. Eleven PICP sites were also tested. Sites built in close proximity to loose fine particles had infiltration rates significantly less than sites free of loose fines. Averages of each condition are 60 cm/h and 2000 cm/h respectively. Even the minimum existing infiltration rates were comparable to those of a grassed sandy loam soil. Water quality data included in this study shows the results of six storms from June to October, With only a few storms to compare, Bean, E., W.F. Hunt III and D. Bidelspach "Surface Infiltration Rate of Permeable Pavements." Journal of Water Management Modeling R doi: /JWMM.R CHI ISSN: (Formerly in Effective Modeling of Urban Water Systems. ISBN: ) 451
2 452 Surface infiltration rate of permeable pavements only Zinc has been identified as having a statistically significant difference between infiltrate and runoff Introduction Permeable pavement is an alternative to traditional asphalt and concrete surfaces. Permeable pavement allows stormwater to infiltrate into either a storage basin below or exfiltrate to the soil and ultimately recharge the water table, while also potentially removing pollutants (EPA, 1999). Urbanization has a detrimental effect on our surface waters systems. Increased runoff rates from paved surfaces have increased peak flow through stream channels causing erosion and stream bank instability along with overland erosion (Leopold et al., 1964). Runoff from parking lots also carries pollutants, such as sediments, nutrients, and heavy metals, into surface waters. In an effort to reduce these effects of urbanization, many municipalities in North Carolina established regulations that limit the amount of impervious surface a property can have (Bennett, 2003). Permeable pavement is a potential solution; in lieu of 100% impermeable lots, perhaps a fraction of runoff can be reduced and pollutants be removed. As a result, the use of permeable pavement is poised to grow. North Carolina has implemented a stormwater credit system for developed sites to manage onsite runoff. Several best management practices (BMPs) were given credits for pollutant reduction, sediment reduction, and peak flow detention. Permeable pavement has not been included in BMPs receiving credit because they may clog. However, North Carolina has not altogether prevented the use of permeable pavement. Permeable pavement is allowed to be used as a BMP under the innovative BMP classification. Innovative BMPs however must be monitored on an individual basis to assess their performance (Bennett, 2003). Few landowners have been willing to assume the cost of this required monitoring, thus limiting the number of permeable pavement installations. Recent studies have found positive results using permeable pavement with respect to both runoff reduction and water quality improvement. The use of permeable pavement, instead of traditional asphalt has been shown to decrease surface runoff and lower peak discharge significantly (Pratt 1995; Booth, 1996; Hunt et al., 2001). Permeable pavement has also been shown to act as a filter of such pollutants as lead and automotive oil (Brattebo and Booth, 2003; Pratt, 1995).
3 Surface infiltration rate of permeable pavements 453 Figures 22.1 and 22.2, below, show examples of permeable interlocking concrete pavers (PICP) and concrete grid pavers (CGP). PICP are concrete block pavers that create voids on the corners of the pavers. Photo-analysis was used to determine that open, or void, space is at least nine percent (9%) of the surface area. Most research that has been conducted has examined these block pavers as test surfaces (Balades et al., 1995; Pratt 1995; Gerritts and James, 2002). CGP paving systems are comprised of concrete blocks with voids inside and between the blocks. Photo-analysis was used to determine that open, or void, space is approximately (30%) of the surface. In this study, the sites examined had voids either filled with sand or No. 78 stone (ASTM D 448). Sites were selected only if they were constructed with subsurface storage. Details concerning subsurface storage media would have been difficult to ascertain due to many sites being constructed more than 10 years prior to this study. Rainfall had not occurred at each site for at least the previous 24 hours, this ensured that the pavements would be dry for testing. Figure 22.1 PICP Figure 22.2 CGP
4 454 Surface infiltration rate of permeable pavements Pratt (1995) has found that clogging can be a result of fine particles accumulating in void spaces of permeable pavements. Smaller particles trap larger particles, therefore the rate of clogging increases as more fines are trapped (Balades et al., 1995). However, clogging can be limited by regular maintenance, either by vacuum sweeper or high pressure washing (Balades et al., 1995). Removing the top mm ( in.) of void space material for low to medium traffic areas substantially regenerates infiltration capacity. Permeable pavements in higher traffic areas improve somewhat when mm (0.8-1 in.) of material is removed (Gerritts and James, 2002). Gerritts and James compared infiltration rates before and after removal of void space material, using a removal depth of between mm ( in.). The goals of this study were as follows: (i) determine surface infiltration rates of each pavement system; (ii) compare and evaluate these rates for the pavement systems; (iii) analyze the impact maintenance has on revitalizing surface infiltration rates; (iv) monitor pollutant levels of infiltrate compared to asphalt runoff; (v) offer basic siting guidelines based upon these results. It is important to note that the focus of this study was to determine site surface infiltration rates, which is not an equivalent to the hydraulic conductivity or total infiltration rate of the sites Procedure Infiltration Measurements Sixteen CGP and 11 PICP sites were tested in this study to determine infiltration rates. Double- or single-ring infiltrometers were used at each site to measure surface infiltration rates. Two sets of tests were run at 14 of the 16 CGP sites, one set to measure existing conditions, and one set to measure maintained conditions. Each set of tests included three infiltration tests to help counteract variability in the surface conditions and infiltration rates. Locations for these tests were representative of the entire surface. This study used ASTM D 3385, is the Standard Test Method for Infiltration Rate in Field Soils Using Double-Ring Infiltrometer, as a basis to measure infiltration rates. This test measures infiltration rates for soils with a hydraulic conductivity between mm/s to mm/s. The test used during this study modified some of the methods and materials in ASTM D
5 Surface infiltration rate of permeable pavements to operate more efficiently in this study s environments and resources. The double ring infiltrometers used in this study consisted of two 16 gauge galvanized steel rings. The inner rings had a diameter between 28 cm and 30.5 cm. The outer rings had diameters between 76 cm and 91 cm, or approximately three times the diameter of the inner rings. At each site, locations for testing were chosen based upon visual assessment. Areas that represented the overall condition of the site were selected. Once locations were selected for testing, the infiltrometer rings were sealed to the surface using plumber s putty. The inner ring was then filled with water to a depth of approximately 50 mm above the testing surface to determine if there was any leakage to the outer ring. Once all leaks if any - were plugged, both the inner and outer rings were filled to a depth between 125 mm and 175 mm. The initial level of water in the inner ring, outer ring, and current time (effectively time 0) were then recorded. Water was then allowed to infiltrate freely. During infiltration, inner and outer ring water levels were measured from a fixed point on the top of the ring down to the water level and then recorded with the time approximately every five minutes. Water was only added to the outer ring when it had dropped more than 10 mm below the inner ring water level to equalize hydraulic heads. A test was considered complete when either the inner ring ran dry or enough time had elapsed to determine the infiltration rate. The time needed to determine the infiltration rate was a minimum of 45 minutes. As stated before, the third goal of this study was to compare existing condition infiltration rates to maintained condition infiltration rates for CGP pavements. At each site three existing tests were conducted and then three maintenance tests were conducted in different locations. An existing test was an infiltration test where the surface remained unaltered prior to the infiltration test. A maintenance" test was an infiltration test where the void material was removed to a depth between 1.3 cm and 1.9 cm to simulate maintenance by a vacuum truck or street sweeper. For CGP sites, if the measured existing infiltration rates of a site were lower than 25 cm/h, a set of maintenance tests was run. Many PICP sites had infiltration rates too high to maintain a hydraulic head using the double-ring infiltrometer test. A modified test, known as a surface inundation test (Figure 22.4) was run at these sites. For the surface inundation test an inner ring of the double ring infiltrometer was sealed to the test surface and a scale was taped inside the ring. Using a five gallon bucket, water was quickly poured into the inner ring. Time was recorded from when the water started pouring in. The time was then recorded when the bucket emptied (along with the peak level of water inside the ring), and then every
6 456 Surface infiltration rate of permeable pavements seconds until the ring emptied. If the ring emptied in less than 30 seconds, then the time that the ring emptied was recorded. This test is neither as accurate nor as precise as the double-ring-infiltrometer test. However, this was a means of obtaining a rough estimate of the surface infiltration rate. After the data were collected, the water levels were plotted as functions of time for each test. A linear regression model was determined to be the most representative of the data, with R2 values for almost all sites being over 0.99, only four tests being lower than 0.90, and none lower than Hydraulic conductivities are typically functions of the corresponding hydraulic head. However, due to the extreme surface infiltration rates, hydraulic head did not seem to affect the infiltration rates, which was evident by the high R 2 values using linear regression. The slope of the least squares line for each test was determined to be the surface infiltration rate of the permeable surface. For some tests, the first, second, and/or third data points were removed if they skewed the surface infiltration rate. Figure 22.3 Double-ring-infiltrometer tests.
7 Surface infiltration rate of permeable pavements 457 Figure 22.4 Surface inundation test. Since the surface infiltration rates were determined by a linear model, a large initial drop in the water surface would skew the slope of the regression line away from the rest of the data, and therefore returning a higher or lower surface infiltration rate than reflected by the rest of the data. Forty out of 130 total tests had between one and three points removed. The infiltration rate stated for each site was determined for each set of infiltration tests by averaging the three test results Water Quality The Mickey s Pastry Shop site is a parking lot that uses asphalt for the drive paths and PICP as parking stalls. Installed in 2001, water quality monitoring has taken place since June of Nutrient, metal, and sediment loadings of asphalt runoff were compared to loadings of stormwater that has passed through the storage layer of PICP area. This study assumes that the water quality of water infiltrating into the PICP cell and water quality of runoff from the asphalt are the same. Therefore this study analyzes whether the PICP cell removed individual pollutants. To date, six storms have been analyzed. During construction, a drainage pipe was installed to collect water samples beneath the pavement layers. The outlet of the 3 inch (76mm) PVC drain pipe was controlled by a manual valve. Before and after each monitored storm, the
8 458 Surface infiltration rate of permeable pavements pipe valve was opened to drain the storage basin. Collection was done the day following a rain event. Collection was taken after opening the valve and allowing enough water to drain so that water was coming from the subsurface storage basin. Flushing typically lasted between 10 and 15 s and ensured that the sample collected was from the storage basin and not only from the drain pipe. Runoff was collected using an ISCO 67 sampler. A trough was installed at the edge of an asphalt drive. The sampler pulled samples from this trough ever 20 minutes into a single collection jar. These samples were also collected the day after a rainfall event. The jar was emptied after each rain event to ensure that only one rain storm is being analyzed. Both samples were analyzed by Tri-Test of Raleigh, NC. Samples were analyzed for concentrations of: total phosphorus (TP), total suspended solids (TSS), total Kjeldahl nitrogen (TKN), nitrate-nitrite (NO X -N), total nitrogen (TN), copper (Cu), and Zinc (Zn) Results Concrete Grid Pavers Infiltration rates were measured from 16 sites with CGP. Figure 22.5 is a graphic showing the infiltration rates of the lots tested throughout North Carolina. Of these, 14 sites were maintained, and had their maintenance infiltration rate measured. (The existing or unmaintained and maintained were defined earlier in the Procedure section.) Of the two sites that did not have maintenance performed, the measured infiltration rate at one site was greater than 250 mm/h, Kinston TS, and the other had an existing infiltration of 100 mm/h, Wynn Plaza. The site with the lowest surface infiltration rate, Town of Cary Public Works (10 mm/h), could be the result of a combination of factors (i.e. no maintenance and frequent heavy traffic). This site also was constructed in a clay soil area and clays can be more easily transported and deposited in voids, causing clogging. However, since the surrounding area is relatively undisturbed, clay particles being deposited on the surface is most likely not a significant factor. Of the sites that had maintenance testing, 13 had noticeably higher infiltration rates than the unmaintained pavers. The only site that did not increase its infiltration rate was Blackman Beach Access. This anomaly was potentially due to a high infiltration rate of 222 mm/h for one of the existing
9 Surface infiltration rate of permeable pavements 459 tests, while all other tests, existing and maintained, had infiltration rates less than 100 mm/h. The mean and median average existing surface infiltration rates, where both rates were recorded, were 71 mm/h and 50 mm/h respectively; the mean and median average maintained surface infiltration rate was 118 mm/h and 80 mm/h, respectively. Comparing means, shows that maintaining the lots increased the permeability by 66%. Infiltration Rate (cm/hr) Kinston CGP Municipal Bldg. Concrete Grid Pavers (CGP) Gull Conch Bainbridge Site Existing Blackman Carrabba's Figure 22.5 Infiltration rates measured from CGP sites. Maintained Ind. Beach Permeable Interlocking Concrete Pavers Eleven PICP sites were tested; seven in Maryland, three in North Carolina and one in Delaware. Six of these sites were tested using only the surface inundation test, due to their high infiltration rates (>150 cm/h) Havre de Grace maintained a hydraulic head just enough to fill the double-ringinfiltrometers for testing, but had an average infiltration rate average of 100 cm/h. One of the three tests ran at the Penny Rd. site was a surface inundation test, however the other two were a double-ring-infiltrometer tests. The three remaining PICP sites had surface infiltration rates low enough to maintain a hydraulic head so that standard double-ring infiltrometer tests were able to be performed. The four sites which used double-ring-infiltrometer tests were located in close proximity to areas containing exposed fine soil particles, e.g. gravel drive, a river bed, a beach and a construction site. Figure 22.6
10 460 Surface infiltration rate of permeable pavements shows measured infiltration rates for permeable pavement applications using PICP or similar products. The last four infiltration rates are the four PICP sites affected by fine soil particles. It has been shown statistically, using a paired t-test (p < ), that surface infiltration rates of sites located near fines are substantially lower than those rates from areas free from fines. Infiltration Rate (cm/hr) Permeable Interlocking Concrete Pavers (PICP) Mickey's Pastries Baywoods Harve de' Grace Wal-Mart Captiva Bay Condos CVS Pharmacy Dough Rollers Cary Home Site River Bend Existing Maintained Boat Ramp Somerset Dr. Figure 22.6 Infiltration rates for PICP applications Water Quality For water quality data from Mickey s Pastry Shop, a PICP site tested above, differences in concentrations were determined to be significant if SAS TM returned p-values for the paired t-test of less than Zinc was the only pollutant to have significantly lower concentrations for infiltrated runoff with a p-value of ( Figure 22.7) The other six pollutants monitored were: Cu, NO X -N, TKN, TN, TP and TSS. None of these constituents were significantly different (p 0.05), however some showed a removal trend. Phosphorus (p = 0.13) showed a strong tendency to have lower concentrations in infiltrate compared to runoff ( Figure 22.8) For four of the six storms, infiltrate concentrations of TP were less than half that of the runoff concentrations, and for four of the storms, the
11 Surface infiltration rate of permeable pavements 461 infiltrate TP concentration was less than the minimum detectable value (0.05 mg/l) Zinc by ICP/MS-Water Infiltrate Runoff mg/l Jun 11 Jul 24 Aug 15 Sept 19 Sept 23 Oct 9 Feb 4 Feb 13 Storm Figure 22.7 Zinc concentrations in runoff and infiltrate from six storms. Copper data (p = 0.18) shows that for storms 1, 2, and 6, concentrations in runoff and infiltrate were relatively equal. However for storms 3, 4, and 5, infiltrate has lower concentrations of copper than the runoff. It should be noted that for storms two through six, the infiltrate concentrations of copper were less than the minimal detectable value (0.01 mg/l). There were essentially no trends for TSS, TN and TKN, while there may have been an increasing trend for NO X -N when comparing runoff from asphalt to the infiltrate. With more storms and data to compare, it will become more certain how well these pollutants, along with Zinc, are removed Analysis and Key Conclusions There are several observations that can be drawn from this study. The first is that parking lot maintenance is a key to sustaining higher infiltration rates on pavements comprised of CGP, filled with sand. Thirteen of 14 sites had increased infiltration rates after removal of the top layer (1.3 cm typical depth) of accumulated void space material.
12 462 Surface infiltration rate of permeable pavements Total Phosphorus Infiltrate Runoff mg/l Jun 11 Jul 24 Aug 15 Sept 19 Sept 23 Oct 9 Feb 4 Feb 13 Storm Figure 22.8 Phosphorus concentrations in runoff and infiltrate from six storms. Without maintenance the median average infiltration rate was 50 mm/h, while with maintenance the median infiltration rate was 8.0 cm/h. A SAS TM (2003) analysis showed that there was a statistically significant difference between existing and maintained infiltration rates to a 99.8% confidence. It can be stated with high confidence that maintenance significantly improved infiltration rates for the CGP sites with sand in this study. Infiltration rates of PICP filled with gravel are not limited by their surface infiltration capacity provided they are sited in areas free of soil disturbances. The average PICP infiltration rate was 2000 cm/h, while the PICP sites near disturbed soils with fines was 610 mm/h, a decrease of almost 97%. A SAS TM (2003) test was run to determine if there was a significant difference between the infiltration rates of PICP near fines and free of fines. The analysis showed a significant difference in surface infiltration rates at a confidence level of 99.5%. PICP sites free of fines have significantly higher infiltration rates than PICP sites with sandy fines present in this study. Lastly, each site tested, with the exception of three (Somerset Drive, Hargrove, and Town of Cary Public Works) had infiltration rates greater than 25 mm/h. These rates are equal to or greater than infiltration rates expected for grassed sandy loam. Surface clogging in predominantly coarse grain soil
13 Surface infiltration rate of permeable pavements 463 environments, therefore, does not cause permeable pavements to have surface infiltration rates reduced below some naturally grassed areas. As a result of this study, suggested siting and maintenance guidelines are as follows: For CGP sites filled with sand: Maintenance, using a vacuum sweeper, should be performed on at least a yearly basis. Removing the top 13 mm of material accumulated within void spaces has been significantly shown to improve infiltration rates. Sand should then be backfilled into the void spaces to prevent sealing at a lower depth. For PICP sites: PICP lots installed for infiltration purposes should not be sited adjacent to areas with free fine particles. Fine particles have been shown to severely decrease infiltration rates. After six storms, water quality analysis from Mickey s Pastry Shop in Goldsboro, NC, shows that the site had significantly lower concentrations of Zinc in infiltrate as compared to the asphalt runoff. With more storms, this may also be shown with pollutants such as Cu, TSS, TP and TKN. With only six events measured, these pollutants show trends of lower concentrations for infiltrate than runoff. To conclude, there are several states, including North Carolina, which do not credit permeable pavement with reducing runoff. In regions with coarse grain soil (sandy soils) data from this study suggest that permeable pavement could be counted as truly permeable. Of 27 pavements tested only three sites had infiltration rates less than 1 in/h, including the one site tested in a fine grain soil (clay soil) environment. Evidence suggests that, provided the following conditions are met, permeable pavements do reduce runoff to a significant extent: (i) it is sited in a sandy or loamy sand soil, (ii) it is located in soils without seasonally high water tables, (iii) it is well-maintained, (iv) it is constructed with proper materials and techniques, (v) it is essentially flat and away from disturbed clay soils, and (vi) it does not have overburdening structural loads. Acknowledgments Several agencies and people have aided this research in many different ways. Thanks go to the Interlocking Concrete Pavement Institute, the North Carolina
14 464 Surface infiltration rate of permeable pavements Department of Environmental Health and Natural Resources, which administers the EPA 319(h) grants, helped fund this study. The contributions of Brandon Eckrote, Lucas Sharkey, and L. T. Woodlief were critical in gathering infiltration data. Jonathan Smith provided assistance and guidance throughout this study. The authors would like to thank Amy Moran and Mike Regans for their help in setting up data collection and analysis. Thanks goes to all of the property owners, town officials, and extension agents who assisted in site selection and background information for each site. Their assistance was vital to this study. References ASTM D Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer. American Society for Testing and Materials. 10 Jun Conshohocken, PA ASTM D Standard Classification for Sizes of Aggregate for Road and Bridge Construction. American Society for Testing and Materials. 10 Feb Conshohocken, PA Balades, J. D., Legret, M., and Madiec, H. (1995) Permeable Pavements: Pollution Management Tools. Water Science and Technology. 32(1): Bennett, B. (2003) Personal communication. 3 November. Booth, D. B., Leavitt, J., and Peterson, K. (1996) The University of Washington Permeable Pavement Demonstration Project. Brattebo, B. O., and Booth, D. B. (2003) Long-Term Stormwater Quantity and Quality Performance of Permeable Pavement Systems. 1 July 2003 University of Washington, Department of Civil and Environmental Engineering, Seattle, W.A. EPA. (1999) Storm Water Technology Fact Sheet: Porous Pavement. EPA: 832-F Washington, D. C.: Environmental Protection Agency. Gerritts, C, and James, W. (2002) Restoration of Infiltration Capacity of Permeable Pavers. In: Proceedings of 9th International Conference on Urban Drainage. ASCE. Portland, O.R. Hunt, W. F., Stephens, S., and Mayes, D. (2002) Permeable Pavement Effectiveness in Eastern North Carolina. In: Proceedings of 9th International Conference on Urban Drainage. ASCE. Portland, O.R. Leopold, L. B., Wolman, M. G., and Miller, J. P. (1964) Fluvial Processes in Geomorphology. San Francisco, C. A.: W.H. Freeman and Company. Pratt, C. J., Mantle, J. D. G., and Schofield, P. A. (1995) UK Research into the Performance of Permeable Pavement, Reservoir Structures in Controlling Stormwater Discharge Quanitity and Quality. Water Science and Technology. 32(1): SAS. (2003) SAS User's Guide: Statistics. Ver Cary, N.C.: SAS Institute, Inc.
NC STATE UNIVERSITY PERMEABLE PAVEMENT RESEARCH AND CHANGES TO THE STATE OF NC RUNOFF CREDIT SYSTEM
NC STATE UNIVERSITY PERMEABLE PAVEMENT RESEARCH AND CHANGES TO THE STATE OF NC RUNOFF CREDIT SYSTEM William F. Hunt, III and Eban Z. Bean William F. Hunt, Biological and Agricultural Engineering, NC State
Pervious Pavers: Where is the Perviousness?
Pervious Pavers: Where is the Perviousness? Elizabeth (Betsy) Pappas Research Hydraulic Engineer Chi-hua Huang Soil Scientist United States Department of Agriculture Agricultural Research Service National
Permeable Pavement Treatment Capacity
Permeable Pavement Treatment Capacity April 20 2011 This investigation will analyze the pollutant removal capacity of various types of permeable paving techniques. Daniel Sullivan Joseph Fleury Contents
Kelly A.Collins 1, William F. Hunt* 2, and Jon M. Hathaway 3 A permeable pavement parking lot in eastern North Carolina consisting of four types of permeable pavement and standard asphalt was monitored
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Program 000003 Revised 1-29-08 Permeable Interlocking Concrete Pavements This program is registered with the AIA/CES and ASLA CPE for continuing education professional
A Solution to Clogging of Porous Pavements
A Solution to Clogging of Porous Pavements Nilesh Shirke & Scott Shuler Colorado State University Fort Collins, Colorado Porous pavements are designed to allow moisture to flow through the surface into
Permeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
Field Performance of Two Stormwater Bioretention Filtration Design Configurations
Field Performance of Two Stormwater Bioretention Filtration Design Configurations Andrew Anderson, E.I.T. North Carolina State University Department of Biological & Agricultural Engineering 2013 Annual
Permeable Pavement Operation & Maintanence Guide
Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for
AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers
F.P.O. Need SF-Rima THE TREMRON GROUP Permeable Paver Guide AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers MIAMI 11321 NW 112th Court Medley, FL 33178 800.567.1480 or 305.825.9000 Fax 305.823.6614
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities
Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities Presented by: Interlocking Concrete Pavement Institute The Low Impact Development Center,
National Pollutant Removal Performance Database
National Pollutant Removal Performance Database Version 3 September, 2007 8390 Main Street, 2 nd Floor Ellicott City, MD 21043 410.461.8323 FAX 410.461.8324 www.cwp.org www.stormwatercenter.net The National
Guidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
Sustainable Site Pavement Systems
Sustainable Site Pavement Systems Permeable Interlocking Concrete Pavement Training for Design Professionals ICPI Presentation #003 Presented by: Brent Davis - Design Consultant Belgard Engineered Solutions
Best Management Practice Fact Sheet 7: Permeable Pavement
Publication 426-126 Best Management Practice Fact Sheet 7: Permeable Pavement David J. Sample, Assistant Professor and Extension Specialist, Biological Systems Engineering, Virginia Tech Lia Doumar, Undergraduate
Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012
Updates on Pervious Pavement Design and Construction Jason T. Peterein, P.E. June 19, 2012 Program Outline Pervious Pavement Basics Pervious Pavement Construction Maintenance MSD Regulations Update Permeable
CASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012
Caltrans non-standard Special Provisions Pervious Concrete David Akers Feb 28, 2012 Section Paragraph Content 19 RSS 19-5.03B Changes title of the section 19-5.03B USAGE NOTES FOR PERVIOUS CONCRETE AND
PICP Construction. Why PICPs The Big Picture. Key things to know about PICPs
PICP Construction Permeable Interlocking Concrete Pavement Presenter: Frank Gandora, President Creative Hardscape Why PICPs The Big Picture Germany was first to develop PICPs 2005 Clean Water Act Federal
Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)
Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
Permeable Paving System with StormAbsorb Technology
Permeable Paving System with StormAbsorb Technology The water management solution. ideal for LEED projects 2 a better way to solve water management issues Increasingly, water management is an important
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement David R. Smith, Technical Director Interlocking Concrete Pavement InsCtute, Herndon, Virginia USA William F. Hunt,
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Permeable Interlocking Concrete Pavements. The Stormwater Problem
Permeable Interlocking Concrete Pavements The Stormwater Problem 1 Stormwater Management Objectives Water Quantity Accommodate water volumes & peak flows Water Quality Control pollutant levels A Low Impact
The International Stormwater BMP Database Part 1: Summary of Database
Land Development Brief: February 2013 The Pennsylvania Housing Research Center The International Stormwater BMP Database Part 1: Summary of Database Katherine L. Blansett, Ph.D., P.E. INTRODUCTION This
Scheduling Maintenance for Infiltration Basins and Trenches
Visual Inspection for Infiltration Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections
Underground Injection Control Storm Water Information
Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
Low Impact Development
Low Impact Development for Linear Transportation Projects Disclaimer This project was developed through an Assistance Agreement under the U.S. EPA Office of Water 104 b(3) Program. It is intended for use
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng.
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng. Source: CH2M Hill The Presenter Robert Bowers, P.Eng., LEED GA [email protected] Director
Porous Pavement Alternatives Cost Analysis
Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.
A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
Industry Guidelines for Permeable Interlocking Concrete Pavement in the United States and Canada. David R. Smith, Technical Director
Industry Guidelines for Permeable Interlocking Concrete Pavement in the United States and Canada David R. Smith, Technical Director PICP Drivers It costs less NPDES MS4 permit compliance EPA permit for
SE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
Advancements in Permeable Pavements
Advancements in Permeable Pavements Engineers Workshop Saint Vincent College March 14 & 15 2013 Permeable Pavements There are several different words that are used to describe a pavement that water drains
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses
Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause
Property Care White Papers. Site Drainage: Monitor and Maintain
Monitor and Maintain Site Drainage Good site drainage is an important part of keeping water issues from affecting the building. The upkeep of existing systems should be an important part of any maintenance
LID-01 Permeable Paving Systems
Greenville County Technical Specification for LID-01 Permeable Paving Systems 1.0 Permeable Paving Systems 1.1 Description Permeable Paving Systems are a best management practice that captures stormwater
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based
SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)
SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.
Concrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
Planning, Health and Environment Division
18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
PP-1. Introduction. 4.2.4. Permeable Pavement (PP) 4.2.4. Permeable Pavement (PP)
PP-1. Introduction Permeable Pavements are alternative paving surfaces that capture and temporarily store the Target Treatment Volume (Tv) by filtering runoff through voids in the pavement surface into
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network
Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs Tom Schueler Chesapeake Stormwater Network Recent Expert Panels 1. Stormwater Retrofit Practices 2. New State Performance Standards
Permeable Interlocking Concrete Pavement A Low Impact Development Tool. Training for Design Professionals
Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Design Professionals Presented by: Interlocking Concrete Pavement Institute (ICPI) The Low Impact Development Center,
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
Chapter 2 Treatment Facility Menus
Chapter 2 Treatment Facility Menus This chapter identifies the treatment facility menus. The menus in this chapter are as follows: Oil Control Menu, Section 2.1 Phosphorus Treatment Menu, Section 2.2 Enhanced
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts Submitted to: Town of Sudbury December 2011 Table of Contents 1.0 Introduction... 1 1.1 Responsibility...
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
Follow the Drop. Activity Overview Students observe and collect information about water runoff on their school property. Objective Students will:
Follow the Drop Activity Overview Students observe and collect information about water runoff on their school property. Objective Students will: Practice observation and investigative skills Survey and
Analysis of Double-Ring Infiltration Techniques and Development of a Simple Automatic Water Delivery System
2005 Plant Management Network. Accepted for publication 25 April 2005. Published. Analysis of Double-Ring Infiltration Techniques and Development of a Simple Automatic Water Delivery System Justin H. Gregory,
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
LANDSCAPING AQUA SPORT. Rainwater treatment using filter substrate channel. DIBt approval applied for
CIVILS LANDSCAPING AQUA SPORT Drainfix Clean Rainwater treatment using filter substrate channel DIBt approval applied for CIVILS LANDSCAPING AQUA SPORT Drainfix Clean Application areas For the treatment
Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)
Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious
Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario.
Stormwater Management Design Brief Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario Prepared For: 1319 Kanata Tires & Rims June 30, 2015 Report No: FS-15-013-REP.02 Stormwater
Permeable Interlocking Concrete Pavement
Permeable Interlocking Concrete Pavement A Comparison Guide to Porous Asphalt and Pervious Concrete Permeable pavement is becoming a major tool for on-site stormwater management. Background The past century
AUSTRALIAN PAVING CENTRE
AUSTRALIAN PAVING CENTRE The Concept 02 The concept of Ecopave permeable paving is already well established in many countries where development threatens already over-stretched drainage and river systems.
SUDAS Revision Submittal Form
SUDAS Revision Submittal Form Status Date: As of 3/13/15 Topic: Permeable interlocking pavers Manual: Design & Specs Manual Location: Design Section 5L-1; Spec Section 7080 Requested Revision: Reason for
ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT
40 Sidewalk Materials Materials and Sidewalk Zones Permeable Pavement Accessibility The key components of sidewalk construction are material selection and installation. These two aspects should come together
Storm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
Low Impact Development Permeable Paving
Low Impact Development Permeable Paving An education initiative funded by the Department of Ecology June 11, 2013 How to Participate in a Webinar chat send to host Polling box will appear at first poll
Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction
Pervious Pavement Options and Design Guidelines (with LID example projects) SYSTEMS THINKING Need to think differently about the problem Whole System Design Site & Project Relationships Integrated Design
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009
Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009 Presented by Willie Gonwa, P.E., Ph.D. West Allis, Wisconsin Porous
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
Storm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
>S`[SOPZS 7\bS`Z]QYW\U 1]\Q`SbS >OdS[S\b
BSQV\WQOZ 5cWRS >S`[SOPZS 7\bS`Z]QYW\U 1]\Q`SbS >OdS[S\b / 0S 0Sab ab ;O ;O\O \OUS \O US[S\b US \b >` >`OQ OQbW OQ bwqs bw QS b] 1] 1]\b \b`] \b `]ZZ Ab `] Ab]` ]`[e [eob [e ObS` Ob S` @c @c\] \]TT \]
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:
Rational Method Hydrologic Calculations with Excel, Course #508 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Calculation of peak storm water runoff rate from a drainage
Operation & Maintenance Document Templates
Appendix G Operation & Maintenance Document Templates The following templates are provided to assist project applicants in preparing stormwater treatment measure maintenance plans, which municipalities
Pervious Concrete Pavement Maintenance and Operations Guide
Pervious Concrete Pavement Maintenance and Operations Guide NRMCA Pervious Concrete Pavement Maintenance and Operations Guide Pervious concrete pavement is a Portland cement-based, rigid permeable pavement