Jon E. Zufelt, PhD, PE ERDC-CRREL Anchorage, Alaska
|
|
|
- Shannon Nelson
- 10 years ago
- Views:
Transcription
1 Jon E. Zufelt, PhD, PE ERDC-CRREL Anchorage, Alaska
2 Outline Why am I here? What exactly am I going to talk about? Energy Independence and Security Act Permeable Pavements in Cold Regions White Paper for USARAK TCCRE Monograph I would also like to acknowledge all the cited study authors, co-authors Rosa Affleck, Kelsey Gagnon
3 What am I talking about? Cold Regions areas that experience at least one month per year with air temperatures below freezing Pavements that allow or increase the passage of storm water through their surfaces to the underlying base and sub-base material Pervious Concrete Porous Asphalt Permeable Interlocking Pavers
4 Energy Independence and Security Act Passed in 2007, the EISA: established new storm water design requirements All Federal development and redevelopment projects Federal facility projects over 5,000 square feet must maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume and duration of flow. Federal agencies can comply using a variety of storm water management practices "green infrastructure" or "low impact development" practices includes reducing impervious surfaces, using vegetative practices, porous pavements, cisterns and green roofs
5 Permeable Pavements White Paper Began at the request of JBER Natural Resources Office Continued development of JBER Almost all projects over 5000 ft 2 Some typical treatments for reduction of storm water now not available Underground Injection Control wells no longer allowed (ADEC) Questions of water quality from storm runoff (roofs, roads, parking areas)
6 Example of Redevelopment
7 UIC s
8 Permeable Pavements White Paper Literature review of past applications/studies in cold regions General description of permeable pavement types and their design Description of six studies utilizing different types of permeable pavements at six different locations and climates Comparison of climates to Alaska
9 Literature Review Identified 135 studies specifically mentioning pervious concrete, porous asphalt, or interlocking concrete pavers Of these, 31 were definitely looking at the impacts of cold Of these, 6 were chosen to provide a wide range of climate and to document the three types of pavements
10 General design characteristics Allow storm water to percolate through the voids in the surface layer, reducing runoff Permeable, pervious, porous Generally installed on gently sloping or flat ground, light traffic, limited heavy vehicle use Critical element is the porous layers of stone beneath the permeable surface to promote infiltration Typically used for sidewalks, parking areas, or low traffic density areas
11 Pervious Concrete Pavement Pervious concrete surface layer with 15-25% voids to promote flow through the layer Clean, coarse aggregate layer (20-40% voids) to act as temporary storage for runoff Geotextile liner to prevent migration of fines Native soil sub base (Specifier s Guide to Pervious Concrete Pavements in the Greater Kansas City Area)
12 Porous Asphalt Pavement Asphalt layer has minimal fines in mixture, laid in a single course Thickness of storage layer (clean aggregate) depends on the storage volume required (design storm)
13 Permeable Interlocking Pavers (Permeable Interlocking Concrete Pavers) Typical PICP configuration (after Smith, 2010)
14 Ground Temperature in Porous Pavement During Freezing and Thawing, Lulea Sweden First winter was warmer than average with much more snow Second winter was colder than average with much less snow Groundwater temperatures ranged from 3 C in April to 8 C in October
15 Ground Temperature in Porous Pavement During Freezing and Thawing, Lulea Sweden Two test sections: 45mm thick porous asphalt layer with d 10 = 1mm, 45mm thick conventional asphalt with d 10 =.125mm Both over 1.0m aggregate base wrapped in geotextile Temperature and groundwater levels recorded
16 Ground Temperature in Porous Pavement During Freezing and Thawing, Lulea Sweden Water table levels higher under porous pavement (especially in thaw). Ground temperatures beneath the porous pavement were higher (less frost heave)
17 Deflection Basin Measurements And Seasonal Structural Behavior Of Interlocking Concrete Block Pavements In A Urban Northern Context, Québec City, Québec Temp F Mar May Jul Sep Nov Investigated interlocking concrete paver performance with variations in traffic volume, season, sub base thickness
18 Deflection Basin Measurements And Seasonal Structural Behavior Of Interlocking Concrete Block Pavements In A Urban Northern Context, Québec City, Québec Table 1. Thickness layers of pavement structures. (after after Pierre et al. 2009) MAIN STREET PRINCIPAL AVENUE INDUSTRIAL BOULEVARD Layer Thickness (mm) Layer Thickness (mm) Layer Thickness (mm) Concrete block 100 Concrete block 100 Concrete block 100 Bedding sand 20 Bedding sand 15 Stabilized Granular base (0 20 mm) Granular base (0 112 mm) 400 Granular base (0 20 mm) 300 Granular base (0 56 mm) Granular base (0 112 mm) bedding sand 225 Bitumen stabilized granular base 275 Granular base (0 20 mm) 300 Granular base (0 112 mm) Main street average traffic loads, Principal avenue high traffic volume, Industrial heavy loads and high traffic volume
19 Deflection Basin Measurements And Seasonal Structural Behavior Of Interlocking Concrete Block Pavements In A Urban Northern Context, Québec City, Québec Traffic loads simulated by a falling weight deflectometer at loading values of 40, 50, and 60 kn during fall, winter, and spring
20 Deflection Basin Measurements And Seasonal Structural Behavior Of Interlocking Concrete Block Pavements In A Urban Northern Context, Québec City, Québec Results analyzed Surface Curvature Index (SCI) and Base Curvature Index (BCI) SCI was lower in the bitumen stabilized granular base (thickness of the surface base course is important) No significant difference between types for the BCI Lowest deflections in winter when pavement frozen Highest deflections in spring during thaw Structural performance is a function of the thickness and type of the base layer
21 Performance Evaluation of Permeable Pavement and a Bioretention Swale Seneca College, King City, Ontario Investigated the water quality associated with parking lot runoff: conventional asphalt surface, conventional surface leading to bioswale, interlocking concrete pavers Temp F Mar May Jul Sep Nov
22 Performance Evaluation of Permeable Pavement and a Bioretention Swale Seneca College, King City, Ontario Seasonal high water table is more than 3 m beneath the surface Runoff collected at the pavement surface and as infiltrate 1.5 m beneath the bioswale and PCIP
23 Performance Evaluation of Permeable Pavement and a Bioretention Swale Seneca College, King City, Ontario Results indicated: Even during sub-zero air temperatures the PICP (and base course layer) functioned effectively Water quality testing showed significantly lower concentrations of pollutants in the PICP runoff and infiltrate as compared to the asphalt runoff Salt from winter maintenance could increase the mobility of metals in the groundwater Winter surface temperatures of the asphalt and PICP were very similar, but the PICP reduced local ponding and ice build-up (frozen puddles) because of its ability to infiltrate surface water
24 Examinations of Pervious Concrete and Porous Asphalt Pavements Performance for Stormwater Management in Northern Climates, Durham, New Hampshire Study to compare winter performance of porous asphalt (PA) and pervious concrete (PC) Response to frost penetration Hydraulic performance measured by infiltration capacity Winter performance based on snow and ice cover Surface friction (slip and fall) Porous asphalt lot hydraulically isolated 5,000 ft 2 Dense mix asphalt lot hydraulically isolated Pervious concrete lot 20,000 ft 2 Standard asphalt lot (control)
25 Examinations of Pervious Concrete and Porous Asphalt Pavements Performance for Stormwater Management in Northern Climates, Durham, New Hampshire Temp F Mar May Jul Sep Nov Average winter snowfall is 63 inches
26 Examinations of Pervious Concrete and Porous Asphalt Pavements Performance for Stormwater Management in Northern Climates, Durham, New Hampshire PA surface had 18-20% voids placed in single 4 lift PC surface had 15-25% voids placed in single 6 lift Both placed over choker stone course 12 or more filter course of bank run gravel (to improve water quality) Sub base filter layer of 14 for PC, 24 for PA Additional sub base crushed stone reservoir of 4 for PC and 21 for PA for water storage Temperature and groundwater level recorded Monthly surface infiltration capacity tests Visual observations, friction measurements, records of met data
27 Examinations of Pervious Concrete and Porous Asphalt Pavements Performance for Stormwater Management in Northern Climates, Durham, New Hampshire Results: PA provided greater overall benefits but PC had strengths PA performed well throughout freeze-thaw structurally, visually, and hydraulically PA allowed salt load reduction of over 70% (water drainage and less buildup of ice) PC infiltration rates were higher than PA PC also had salt load reduction PC surface is lighter colored less solar incidence Normal snow removal operations led to less overall salt load and snow and ice buildup
28 Examinations of Pervious Concrete and Porous Asphalt Pavements Performance for Stormwater Management in Northern Climates, Durham, New Hampshire Changing pavement conditions with time. PA vs. DMA. PA at 11:20am top left vs PA at 1pm top right. DMA at 11:20am bottom left vs DMA at 1pm bottom right. (after Houle et al 2009) Pervious concrete surface conditions with varying levels of shading (left: sun, center: partial sun, right: shade). (after Houle et al 2009)
29 TCCRE Monograph American Society of Civil Engineers Technical Council on Cold Regions Engineering (TCCRE) produces a series of monographs Permeable Pavements in Cold Regions arose due to a lack of guidance on design techniques Goal is to provide some history, design recommendations, construction, and operations/maintenance options for the three major types of permeable pavements
30 Chapter 1. Introduction A. Types of permeable pavements covered in the document i. Pervious Concrete ii. Porous Asphalt iii. Permeable Interlocking Pavers B. Current applications i. Stormwater Management ii. Splash and Spray Reduction C. Potential/Future applications i. Safety for Slip and Fall ii. Urban Heat Island Mitigation/Permafrost Preservation iii. Noise Reduction D. Summary of current reference documents i. Pervious Concrete (ASCE, ACI, NRMCA, ) ii. Porous Asphalt (ASCE, AI,.) iii. Permeable Interlocking Pavers (ASCE, ILPP, ) E. Summary of current reference specifications i. (ACI, AI, UFGS 2009/2010, State DOTs) Chapter 2. Permeable Pavement History in Cold Regions A. Broad Applications and Purposes B. Vehicular Pavement C. Parking Areas D. Non-Vehicular Pavement E. Case Studies F. Summary of Lessons Learned
31 Chapter 3. Design Considerations Consistent for All Pavement Types A. Hydrologic i. Site Investigation B. Hydraulic i. Section Design ii. Infiltration Considerations (especially for clogging from winter maintenance) iii. Stormwater Treatment C. Heat Transfer i. (specifically looking at freeze behavior at soil interface and potential improved performance for permafrost) D. Freezing and Thawing Base Behavior Chapter 4. Pervious Concrete Design for Cold Climates A. Structural Design B. Mixture Proportioning i. Material Selection ii. Proportioning Guidelines iii. Sample Mixture Proportions C. Construction D. Curing
32 Chapter 5. Porous Asphalt Design for Cold Climates A. Structural Design B. Mixture Proportioning i. Material Selection ii. Proportioning Guidelines iii. Sample Mixture Proportions C. Construction Chapter 6. Permeable Interlocking Paver Design for Cold Climates A. Structural Design B. Mixture Selection C. Construction Chapter 7. Operation and Maintenance A. Routine and Expected Maintenance i. Ice and Snow Removal ii. Permeability Maintenance B. Unanticipated Maintenance Concerns i. Clogging Remediation ii. Pavement Distresses
33 Contributing Authors John Kevern - University of Missouri-Kansas City Liv Haselbach - Washington State University Spencer Guthrie - Brigham Young University Mary Vancura - University of Minnesota Rob Roseen - University of New Hampshire Bob Lisi - LHB Corporation Matt Lebens - Minnesota Department of Transportation Dave Smith - Interlocking Concrete Pavement Institute Hannele Zubeck University of Alaska Anchorage Ben Worel MnROAD Jon Zufelt - CRREL
34 Timeline Outline for chapters September 2011 Rough draft for chapters January 2012 Second draft complete April 2012 Final July 2012 Presentation of Monograph August 2012 at the ASCE/CSCE Cold Regions Engineering Conference in Quebec City Publication of Monograph October 2012
35 Questions??
Permeable Interlocking Concrete Pavements. The Stormwater Problem
Permeable Interlocking Concrete Pavements The Stormwater Problem 1 Stormwater Management Objectives Water Quantity Accommodate water volumes & peak flows Water Quality Control pollutant levels A Low Impact
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng.
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng. Source: CH2M Hill The Presenter Robert Bowers, P.Eng., LEED GA [email protected] Director
Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities
Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities Presented by: Interlocking Concrete Pavement Institute The Low Impact Development Center,
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement David R. Smith, Technical Director Interlocking Concrete Pavement InsCtute, Herndon, Virginia USA William F. Hunt,
Sustainable Site Pavement Systems
Sustainable Site Pavement Systems Permeable Interlocking Concrete Pavement Training for Design Professionals ICPI Presentation #003 Presented by: Brent Davis - Design Consultant Belgard Engineered Solutions
Guidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Program 000003 Revised 1-29-08 Permeable Interlocking Concrete Pavements This program is registered with the AIA/CES and ASLA CPE for continuing education professional
AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers
F.P.O. Need SF-Rima THE TREMRON GROUP Permeable Paver Guide AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers MIAMI 11321 NW 112th Court Medley, FL 33178 800.567.1480 or 305.825.9000 Fax 305.823.6614
Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012
Updates on Pervious Pavement Design and Construction Jason T. Peterein, P.E. June 19, 2012 Program Outline Pervious Pavement Basics Pervious Pavement Construction Maintenance MSD Regulations Update Permeable
Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009
Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009 Presented by Willie Gonwa, P.E., Ph.D. West Allis, Wisconsin Porous
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012
Caltrans non-standard Special Provisions Pervious Concrete David Akers Feb 28, 2012 Section Paragraph Content 19 RSS 19-5.03B Changes title of the section 19-5.03B USAGE NOTES FOR PERVIOUS CONCRETE AND
Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)
Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone
Dave Laurie, CTR. Sales Manager, Commercial Sales DESIGNED TO CONNECT
Dave Laurie, CTR Sales Manager, Commercial Sales DESIGNED TO CONNECT Permeable Pavements For Sustainable Development Agenda Unit paver technology Permeable Interlocking Concrete Paver - research, technical
Permeable Interlocking Concrete Pavement
Permeable Interlocking Concrete Pavement A Comparison Guide to Porous Asphalt and Pervious Concrete Permeable pavement is becoming a major tool for on-site stormwater management. Background The past century
Permeable Pavement Operation & Maintanence Guide
Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems
Advancements in Permeable Pavements
Advancements in Permeable Pavements Engineers Workshop Saint Vincent College March 14 & 15 2013 Permeable Pavements There are several different words that are used to describe a pavement that water drains
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)
Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious
SUSTAINABILITY INITIATIVE: 01-02 PERMEABLE PAVEMENT: ADAPTING TO STORMWATER MANAGEMENT CHALLENGES
PERMEABLE PAVEMENT: ADAPTING TO STORMWATER MANAGEMENT CHALLENGES SUSTAINABILITY INITIATIVE: 01-02 : ADAPTING TO STORMWATER MANAGEMENT CHALLENGES Impermeable surfaces, such as streets, parking lots, and
Industry Guidelines for Permeable Interlocking Concrete Pavement in the United States and Canada. David R. Smith, Technical Director
Industry Guidelines for Permeable Interlocking Concrete Pavement in the United States and Canada David R. Smith, Technical Director PICP Drivers It costs less NPDES MS4 permit compliance EPA permit for
Waukesha County. Municipal Separate Storm Sewer System (MS4) Permit. 2008 Annual Report to the Land Use Parks & Environment Committee
Waukesha County Municipal Separate Storm Sewer System (MS4) Permit 2008 Annual Report to the Land Use Parks & Environment Committee What is an MS4 permit? 1972 Clean Water Act (Water pollution control):
PICP Construction. Why PICPs The Big Picture. Key things to know about PICPs
PICP Construction Permeable Interlocking Concrete Pavement Presenter: Frank Gandora, President Creative Hardscape Why PICPs The Big Picture Germany was first to develop PICPs 2005 Clean Water Act Federal
Industry Guidelines for Permeable Interlocking Concrete Pavement in the United States and Canada
Summary 10 th International Conference on Concrete Block Paving Industry Guidelines for Permeable Interlocking Concrete Pavement in the United States and Canada David R. Smith, Technical Director Interlocking
Pervious Concrete Pavement Maintenance and Operations Guide
Pervious Concrete Pavement Maintenance and Operations Guide NRMCA Pervious Concrete Pavement Maintenance and Operations Guide Pervious concrete pavement is a Portland cement-based, rigid permeable pavement
DRAFT. 2.11 Pervious Pavement. Description
2.11 Pervious Pavement Figure 1 Porous Concrete at Indian Run Park in Dublin, Ohio. Description Pervious pavement systems consist of a permeable pavement surface layer and one or more underlying aggregate
SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)
SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.
Porous Pavement Alternatives Cost Analysis
Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
Permeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
Low Impact Development Permeable Paving
Low Impact Development Permeable Paving An education initiative funded by the Department of Ecology June 11, 2013 How to Participate in a Webinar chat send to host Polling box will appear at first poll
Pervious Pavement. An Infiltration BMP A LID Technique. Dan Huffman Vice President, National Resources National Ready Mixed Concrete Association
Pervious Pavement An Infiltration BMP A LID Technique Dan Huffman Vice President, National Resources National Ready Mixed Concrete Association Portland, Oregon 503-292-7729 [email protected] www.nrmca.org
Permeable Pavement Treatment Capacity
Permeable Pavement Treatment Capacity April 20 2011 This investigation will analyze the pollutant removal capacity of various types of permeable paving techniques. Daniel Sullivan Joseph Fleury Contents
Green Alley. Handbook. The Chicago. Richard M. Daley, Mayor City of Chicago. An Action Guide to Create a Greener, Environmentally Sustainable Chicago
The Chicago Green Alley Handbook An Action Guide to Create a Greener, Environmentally Sustainable Chicago Printed on recycled paper, 30% post-consumer waste Richard M. Daley, Mayor City of Chicago Cheri
Best Management Practice Fact Sheet 7: Permeable Pavement
Publication 426-126 Best Management Practice Fact Sheet 7: Permeable Pavement David J. Sample, Assistant Professor and Extension Specialist, Biological Systems Engineering, Virginia Tech Lia Doumar, Undergraduate
CASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
Permeable Interlocking Concrete Pavement A Low Impact Development Tool. Training for Design Professionals
Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Design Professionals Presented by: Interlocking Concrete Pavement Institute (ICPI) The Low Impact Development Center,
Costs for Green Infrastructure and Stormwater Controls
Costs for Green Infrastructure and Stormwater Controls August 5, 2015 Bob Newport U.S. EPA Region 5 (Chicago Office) Topics to be Covered EPA data collection and cost analysis focused on postconstruction
City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions
City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager [email protected] Stormwater
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
Division 2 Section 32 14 13.19 Section 02795
Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit
Costs for Green Infrastructure and Stormwater Retention Practices
Costs for Green Infrastructure and Stormwater Retention Practices Bob Newport U.S. EPA December 9, 2014 Topics to be Covered EPA data collection and cost analysis focused on postconstruction stormwater
NC STATE UNIVERSITY PERMEABLE PAVEMENT RESEARCH AND CHANGES TO THE STATE OF NC RUNOFF CREDIT SYSTEM
NC STATE UNIVERSITY PERMEABLE PAVEMENT RESEARCH AND CHANGES TO THE STATE OF NC RUNOFF CREDIT SYSTEM William F. Hunt, III and Eban Z. Bean William F. Hunt, Biological and Agricultural Engineering, NC State
LID-01 Permeable Paving Systems
Greenville County Technical Specification for LID-01 Permeable Paving Systems 1.0 Permeable Paving Systems 1.1 Description Permeable Paving Systems are a best management practice that captures stormwater
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
Porous Asphalt Pavement Designs: Proactive Design for Cold Climate Use
Porous Asphalt Pavement Designs: Proactive Design for Cold Climate Use by Lori Kathryn Schaus A thesis presented to the University of Waterloo in fulfillment of the thesis requirement for the degree of
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT Note: This guide specification is intended for use in the U.S. It describes construction of permeable interlocking concrete pavers on a permeable,
C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures
C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Presentation Overview
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
Permeable Paving System with StormAbsorb Technology
Permeable Paving System with StormAbsorb Technology The water management solution. ideal for LEED projects 2 a better way to solve water management issues Increasingly, water management is an important
ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT
40 Sidewalk Materials Materials and Sidewalk Zones Permeable Pavement Accessibility The key components of sidewalk construction are material selection and installation. These two aspects should come together
PP-1. Introduction. 4.2.4. Permeable Pavement (PP) 4.2.4. Permeable Pavement (PP)
PP-1. Introduction Permeable Pavements are alternative paving surfaces that capture and temporarily store the Target Treatment Volume (Tv) by filtering runoff through voids in the pavement surface into
Underground Injection Control Storm Water Information
Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management
>S`[SOPZS 7\bS`Z]QYW\U 1]\Q`SbS >OdS[S\b
BSQV\WQOZ 5cWRS >S`[SOPZS 7\bS`Z]QYW\U 1]\Q`SbS >OdS[S\b / 0S 0Sab ab ;O ;O\O \OUS \O US[S\b US \b >` >`OQ OQbW OQ bwqs bw QS b] 1] 1]\b \b`] \b `]ZZ Ab `] Ab]` ]`[e [eob [e ObS` Ob S` @c @c\] \]TT \]
VA DEQ STORMWATER DESIGN SPECIFICATION NO. 7 PERMEABLE PAVEMENT. VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION
VIRGINIA DEQ STORMWATER DESIGN SPECIFICATION No. 7 VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION Permeable pavements are alternative paving surfaces that allow stormwater runoff to filter through
4.1. Permeable Pavement Systems
4.1. Permeable Pavement Systems Permeable Pavement provides the structural support of conventional pavement, but allows stormwater to drain directly through the surface into the underlying stone base and
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT A. The requirements for construction of permeable interlocking concrete pavement: 1. Install the interlocking
DEVELOPMENT OF AN ASCE STANDARD FOR PERMEABLE INTERLOCKING CONCRETE PAVEMENT
DEVELOPMENT OF AN ASCE STANDARD FOR PERMEABLE INTERLOCKING CONCRETE PAVEMENT David K. Hein, P. Eng. Vice-President, Applied Research Associates Inc., 5401 Eglinton Avenue West, Suite 204, Toronto, ON,
AUSTRALIAN PAVING CENTRE
AUSTRALIAN PAVING CENTRE The Concept 02 The concept of Ecopave permeable paving is already well established in many countries where development threatens already over-stretched drainage and river systems.
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org [email protected] Chagrin River Watershed Partners Formed
A Solution to Clogging of Porous Pavements
A Solution to Clogging of Porous Pavements Nilesh Shirke & Scott Shuler Colorado State University Fort Collins, Colorado Porous pavements are designed to allow moisture to flow through the surface into
Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction
Pervious Pavement Options and Design Guidelines (with LID example projects) SYSTEMS THINKING Need to think differently about the problem Whole System Design Site & Project Relationships Integrated Design
The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).
Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State
Stormwater Credit Open House Q&A
Stormwater Credit Open House Q&A Stormwater Charge Project GENERAL INFORMATION AND APPLICATION PROCESS FOR STORMWATER CREDITS Question: What is the response time for an application - 30 business days or
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
Appendix A: BMP Fact Sheets
San Francisco Stormwater Design Guidelines Appendix A: BMP Fact Sheets Introduction 2 Dry Well 6 Infiltration Basin 12 Infiltration Trench 18 Permeable Pavement 24 Detention Pond 32 Detention Vault 38
When Water Comes to Town What Happens
W When Water Comes to Town What Happens hen it rains, stormwater either seeps into the ground or flows away depending on the kind of surface upon which it lands. Water infiltrates pervious ground surfaces
Permeable Pavement (1008)
Permeable Pavement (1008) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A pavement system designed to achieve water quality and quantity benefits by allowing movement
Design and Construction of a Pavement for Tracked Military Vehicles
Design and Construction of a Pavement for Tracked Military Vehicles David K. Hein, P.Eng. Applied Research Associates, Inc. 5401 Eglinton Avenue West, Suite 105 Toronto, Ontario, Canada, M9C 5K6, Tel:
Construction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
SUDAS Revision Submittal Form
SUDAS Revision Submittal Form Status Date: As of 3/13/15 Topic: Permeable interlocking pavers Manual: Design & Specs Manual Location: Design Section 5L-1; Spec Section 7080 Requested Revision: Reason for
Planning, Health and Environment Division
18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
PICP WINTER WORKSHOPS
PICP WINTER WORKSHOPS Designing, Constructing, Inspecting and Maintaining Excellence Join us for a free PICP workshop where Bob Bridges, Director of Sales for Eagle Bay SWM PAVE, will share his experiences
Building Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems
www.stma.org Drainage A Crucial Component for Athletic Field Performance Part Three: Sub-Surface Installed Drainage Systems Water is applied to maintained turfgrass areas by irrigation or precipitation.
4.7 Permeable Pavement
4.7 Permeable Pavement 4.7.1 Overview Description Permeable pavements, an alternative to traditional impervious pavement, allow stormwater to drain through them and into a stone reservoir where it is infiltrated
PE01 Permeable Interlocking Concrete Pavements - Design and Construction Guide
0 PE01 Permeable Interlocking Concrete Pavements - Design and Construction Guide EDITION Nov 2010 ISBN 0 909407 58 4 LIMITED-LICENCE AGREEMENT By DOWNLOADING THIS PUBLICATION SUITE you ACCEPT ALL THE TErms
Individual Residential Property Credit
NORTHEAST OHIO REGIONAL SEWER DISTRICT Stormwater Management Program Individual Residential Property Credit Revised 12/11/12 why stormwater management? flooding POLLUTION EROSION The inability to effectively
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
Permeable Pavements in Cold Climates: State of the Art and Cold Climate Case Studies
Permeable Pavements in Cold Climates: State of the Art and Cold Climate Case Studies John S. Gulliver, Principal Investigator Department of Civil, Environmental, and Geo- Engineering University of Minnesota
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure
SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS
SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS Pervious interlocking pavers.doc Note: This guide specification for U.S. applications describes construction of permeable interlocking ceramic pavers