MDOT Construction Field Services Update MDOT LAP/Consultant Construction Kickoff Meetings
|
|
|
- Stuart Cobb
- 10 years ago
- Views:
Transcription
1 MDOT Construction Field Services Update 2013 MDOT LAP/Consultant Construction Kickoff Meetings
2 Topic Overview Contract Administration Issues & Trends e-construction Documentation Buy America
3 Construction Issues Topic Overview (continued) Geotechnical/Density Paving Concrete and Hot Mix Asphalt (HMA) Notifications and Where to Find Documents Breaking News
4 Contract Modifications BOH-IM Processing Contract Modifications Timeliness Consulting with TSC Construction Engineers Timelines e-sign
5 Contract Modifications STC/SAB Process > 200 days Current Requirements BOHIM Maximum approval 64 days for Tier III Additional Oversight Signatures Mandatory Local Agency signature Tier III Average Time 39 days handwritten signatures 6 days electronic signatures
6 e-sign Contract Modifications Tier I e-signed contract modifications can be approved within minutes Eliminates mail time e-sign has minimal cost Can t refuse e-sign (via e-sign Act 6/2000) Contractors being paid 4-5 times faster
7 Timely Progress Payments BOH-IM Timely Progress Payments Pay in whole for work completed and accepted No Retainage Affects Prompt Payment which is part of the Contract documents
8 Timely Finaling of Projects Currently collecting statewide best practices Goal is to issue final estimate within 120 days of project acceptance Issues with documentation leading cause of overdue finals
9 Project Inspection and Onsite inspection Oversight Certified for inspections Final inspections
10 e-construction 5 Major Components 3D Plans/Model at Bidding (GPS equipment) e-signature Mandatory Paperless Projects (Electronic Records) Contractor submits to ProjectWise (no software) New MDOT e-filing system Saves Time and Cost For MDOT, Contractors, Subs, Suppliers, Local Agencies & Consultants.
11 e-construction 4 Pilot projects (> $120 million) Direct Cost Savings Immense Time Savings Transparent Accountable Reduced Construction Cost Goal is 2014 Statewide Implementation
12 Documentation Extension of Time Requests Progress Clauses Maintenance of Traffic
13 Office Technician Certification BOH-IM Office Technician Certification Requirements For State or Federal Aid Projects must: Current, non-expired MDOT Office Technician Certification on file Expire 4 years from date of certification Includes all similarly titled certifications Part of being Pre-Qualified for Road CE already
14 Local Agency Force Account BOH-IM Construction Oversight of Local Agency Force Account Essentially the original 1120 stays in the Project Files, maintained by the Local Agency. Local Agency must maintain original 1120 for auditing purposes. Copies of 1120 distributed per the BOH-IM
15 Buy America Required Documentation Step Certification for Pay Items and Materials that require Step Certification. Step Certification documentation is from company that affects steel/iron. Attention is directed to note list on step cert list. Pay Item List is available at: MDOT Website for Maps and Publications select Manuals and Guides
16 Buy America Minimal use of foreign steel allowed, greater of the following two values: 0.10 percent of total project cost $2,500 Payment is not to be processed until all Buy America certifications are received by the Engineer, includes stockpile payments Items not on step cert list do not require Buy America documentation
17 Buy America Qualified Products List, Approved Manufacturers and Tested Stock Construction Field Services maintaining Buy America Certification Field documentation is product label, shipping record, etc. Compliance Document available at: MDOT Website under Maps and Publications select Manuals and Guides
18 Buy America Clarification letter from FHWA on 12/21/12 BOH-IM Miscellaneous steel components or sub components are not subject to Buy America. For audit purposes always a good idea to print the Step Cert list current for that letting
19 Geotechnical Subsurface investigation Appropriate Design (site conditions) Depth of Investigation Density Reports Submitted daily to project office for QA review Submitted weekly to Lansing Density Unit and Region Area Density Supervisor
20 Geotechnical Drilled Shaft Construction New specification 718 in the 2012 SSFC Tremie Pour Checklist MDOT Form 1990 LRFD Plan Notes Pile Forms (1157L, 1161L) Provide final copies not raw data
21 Paving - Concrete Quality Assurance/Quality Control New Special Provision 12SP604(A) for Local Agency Projects only. Quality Assurance pay item no longer applies Conc Quality Initiative pay item no longer applies All QA calculations made by Agency Costs for QC program and initial curing facilities are included in unit prices for the work no additional payment
22 Paving - Concrete Concrete Pavement Repairs Maturity Method of Acceptance Beam Breaks with specified minimum flexural strength required. 28 Day Cylinders for acceptance of pavement repair not required. Better definitions Repair versus what is a Replacement.
23 Paving - Concrete Simplified the concrete patching mixture selection as follows, Less than 72 hours opening to traffic: Grade P-NC at 300 psi flexural strength 72 hours or greater opening to traffic: Grades P1 or P1M at 550 psi opening to traffic strength Note: MDOT Grade HE concrete no longer exists
24 Documentation Density Paving - HMA Proper documentation must be recorded. Temperature Needs to be recorded on load tickets. Calculations of Yield Many times a number is given but not the calculations that support it. JMF Written up for the project prior to the start of paving.
25 Paving - HMA Pre-Production meetings QC/QA testing requirements Communication Plan JMF Testing responsibilities
26 FHWA CAP Program FHWA Compliance Assessment Program (CAP) Random projects selected out of FHWA headquarters. Assigned to random FHWA Staff Picking State and Local projects
27 FHWA Construction Review Plan Samples of both MDOT and Local Agency Projects Currently updating their Construction Inspection Report form Will cover there standard areas of emphasis and include Special Emphasis Areas
28 FHWA Construction Review Plan Special Emphasis Areas Review of Pavement Marking Scaring Review of SESC issues Review of Contractor Force Accounts Inquiry of witnessing HMA Binder sampling on Construction Contracts
29 Job Site Posters Make sure their posted and legible No specific size requirements but you have to be able to read them. Dates must not be cut off as that is how you verify the correct poster Refer to MDOT form 1967 for the Jobsite Poster Checklist.
30 Document Locations, Notifications, and e-sign Demonstration
31
32
33
34
35 Update Notifications
36
37
38
39
40
41 Questions Scott Greene
NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form
(NETTCP) Course Registration Form Interim Certification (Cost $300 members / $425 non-members) HMA Plant Technician* HMA Paving Inspector* Soils & Aggregate Inspector* Soils & Aggregate Lab Technician*
Inspections: Central Laboratory of the Regions
Page 1 Inspections: Central Laboratory of the Regions Protocol for Open Laboratory Review of a CDOT Materials Testing Laboratory Protocol for the Inspection of Region Materials Laboratories by the Central
CHAPTER 4 CONCRETE TRAINING AND QUALIFICATIONPROGRAM
Concrete Training Qualification Program Topic No. 700-000-001 Effective: July 1, 2002 Construction Training and Qualification Manual Revision: March 22, 2011 Concrete Training and Qualification Program
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.
Quality Assurance Procedures for Construction and Materials Sampling and Testing 14
Page 1 Quality Assurance Procedures for Construction and Materials Sampling and Testing 14 1. PURPOSE 1.1 To prescribe policies, procedures, and guidelines to assure the quality of materials on all Colorado
CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
Quality Assurance Program for Design-Bid-Build Projects. January 2016. 2016 by Texas Department of Transportation 512/506-5802 All Rights Reserved
Quality Assurance Program for Design-Bid-Build Projects January 2016 2016 by Texas Department of Transportation 512/506-5802 All Rights Reserved TABLE OF CONTENTS SECTION 1 - INTRODUCTION... 4 1.1 Overview...
QUALITY ASSURANCE PROGRAM
QUALITY ASSURANCE PROGRAM (Revised December, 2009) TABLE OF CONTENTS I. Overview..1 II. III. IV. Roles and Responsibilities...5 Laboratory Certification Program 7 Technician Certification Program...10
LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST
LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST The following checklist has been developed to ensure that all required aspects of a project approved for Federal funding have been addressed and a responsible
Work Type Definition and Submittal Requirements
Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials
5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN
5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN NOTE: This document is generally written in the imperative mood. The subject, "the Contractor" is implied. Also implied in this language are "shall",
Construction Management Program
Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
Soils and Aggregates Division
Dan Sajedi, Division Chief 443-572-5162 George Hall, Assistant Division Chief Field Operations 443-572-5271 Eric Frempong, Assistant Division Chief Laboratory 443-572-5055 Aggregate Materials, Controlled
Project Procedures Guide. Sampling Frequencies for Materials Testing and Inspection
Project Procedures Guide Sampling Frequencies for Materials Testing and Inspection PREFACE This Project Procedures Guide is intended for use as a resource in determining reasonable sampling frequencies
CONSTRUCTION INSPECTOR CERTIFICATION PROGRAM
CONSTRUCTION INSPECTOR CERTIFICATION PROGRAM COLORADO DEPARTMENT OF TRANSPORTATION COURSE CATALOG 2011 October 27, 2010 Table of Contents CHIEF ENGINEERS POLICY MEMO #25... 2 CERTIFICATION: BASIC HIGHWAY
High-Speed Nondestructive Testing and Intelligent Construction Systems
High-Speed Nondestructive Testing and Intelligent Construction Systems 1st International Conference on Transportation Construction Management February 9-11, 9 2008 Orlando, Florida Ted Ferragut, P.E. NDT
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA October 21, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04
1. Is it required that each company that bids on this RFP be pre-registered or pre-qualified prior to bidding?
To: From: All Prospective Bidders Purchasing Department Date: September 9, 2015 Subject: Inquiries and Responses RFP#: Fixed A/V Maintenance/Repairs/Equipment Services 102-2015 Inquiries and Responses:
Section 100 Contractor Quality Control Program
7/21/2014 AC 150/5370-10G Section 100 Contractor Quality Control Program 100-01 General. When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and
CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015
CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015 The Code of Federal Regulations (CFR) Title 23, part 112, and 23 CFR
CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING. 7.05 Subdivision Improvement Performance Bond Requirements
CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING 7.00 Construction 7.01 Inspection and Testing of Improvements 7.02 Approval of Improvements 7.03 City Engineer s Acceptance of All Improvements
Table of Contents. Introduction and Purpose... 3. Technician Certification Programs... 4
November 2015 Table of Contents Introduction and Purpose... 3 Technician Certification Programs... 4 Program Administration... 4 Required Experience... 5 Training Programs... 6 Waivers for Experience...
MATERIALS CERTIFICATION SCHOOLS
MATERIALS CERTIFICATION SCHOOLS Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools must be done online through the VDOT University
MATERIALS CERTIFICATION SCHOOLS
MATERIALS CERTIFICATION SCHOOLS 2011, Virginia Department of Transportation Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools may
MATERIALS CERTIFICATION SCHOOLS 2016
MATERIALS CERTIFICATION SCHOOLS 2016 2014, Virginia Department of Transportation Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools
Field Density Determination of Asphalt Concrete by the Coring Method
Field Density Determination of Asphalt Concrete by the Coring Method 1. Scope: This procedure is for determining the density of in place asphalt concrete pavement. 2. Apparatus: 2.1 Scale or balance having
Quality Assurance Program. June 2005 2005 by Texas Department of Transportation (512) 416-2055 all rights reserved
Quality Assurance Program June 2005 2005 by Texas Department of Transportation (512) 416-2055 all rights reserved Quality Assurance Program June 2005 Manual Notices Manual Notice 2005-1To: Users of the
QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park
QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
Asphaltic Wedge Paving
OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local
LOCAL PUBLIC AGENCY (LPA) QUALITY ASSURANCE PROGRAM
Certified LPA Field Tested Materials LOCAL PUBLIC AGENCY (LPA) QUALITY ASSURANCE PROGRAM (Revised February 2015) TABLE OF CONTENTS I. Overview..1 II. III. IV. Roles and Responsibilities...5 Laboratory
HIGH TENSION CABLE BARRIER
Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section
Quality Assurance/Quality Control Plan. Division of Transportation Solutions
Quality Assurance/Quality Control Plan Division of Transportation Solutions January 2009 Table of Contents MISSION STATEMENT 3 GENERAL POLICY 3 QA/QC RESPONSIBILITIES 4 PROJECT DESIGNER 4 DELDOT S PROJECT
OCCUPATIONAL GROUP: Facilities Support. CLASS FAMILY: Facility Management CLASS FAMILY DESCRIPTION:
OCCUPATIONAL GROUP: Facilities Support CLASS FAMILY: Facility Management CLASS FAMILY DESCRIPTION: This family of positions includes those whose purpose is to oversee the operations of or the construction
NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document
NRMCA Quality Certification Ready Mixed Concrete Quality Management System Certification Criteria Document Version 1 February 2014 NRMCA Quality Certification Ready Mixed Concrete Quality Management System
ODOT Inspection Certification Program
ODOT Inspection Certification Program Overview The Inspection Certification Program is one component of ODOT s Inspection Quality Assurance (QA) Program. The Inspection Certification Program provides training
Example Specification for Concrete using Current Building Code Requirements
Example Specification for Concrete using Current Building Code Requirements DISCLAIMER: This specification is an example that accompanies a seminar titled The P2P Initiative: Performance-based Specs for
INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM
1/1/13 INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM The purpose of the Qualified Laboratory and Technician Program is to establish policies, procedures, and guidelines
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
Acceptance Codes APPENDIX - A. Acceptance Criteria
1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.
e-construction Lead State Profiles
e-construction Lead State Profiles This document is intended to provide a brief high-level snapshot of e-construction practices for the eight Lead States. It will be updated as new information becomes
Construction Contract Administration and Technology Updates
Construction Contract Administration and Technology Updates MDOT - ACEC Partnering Workshop Thursday, February 5, 2015 Lansing Center Lansing, Michigan What is on the horizon? LAP Contract Design Pilot
Appendix. Change Management Plan. Communication Plan. QA/QC Plan. Transition and Closure Plan C-1
Appendix C Change Management Plan Communication Plan QA/QC Plan Transition and Closure Plan C-1 CHANGE MANAGEMENT PLAN Whether the effects of changes are positive or negative, managing change is an important
QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS
QUALITY ASSURANCE and QUALITY CONTROL PROCESS GUIDE for PROJECT MANAGERS MDOT Trunkline Projects January 2005 TABLE OF CONTENTS Discussion.. 2 Scope Verification Meeting..... 3 Overview 3 Procedure...
ADMINISTRATIVE MANUAL FOR CONSTRUCTION TECHNICIAN TRAINING AND CERTIFICATION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
ADMINISTRATIVE MANUAL FOR CONSTRUCTION TECHNICIAN TRAINING AND CERTIFICATION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT Louisiana Transportation Research Center Louisiana Department of Transportation
Pennsylvania Asphalt Improvement Network (PASIN) Hot Mix Asphalt Industry Baseline Assessment Report. December 2006
Pennsylvania Asphalt Improvement Network (PASIN) Hot Mix Asphalt Industry Baseline Assessment Report December 2006 Table of Contents INTRODUCTION... 4 SECTION 1: EXECUTIVE SUMMARY... 4 1. Methodology...4
PROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES
CHAPTER 5 - Construction Project Management Contents Introduction... 2 Construction Contract Management... 2 CEI Contracts... 3 Community Awareness Plan... 7 Alternative Contracting Methods... 8 Warranty
Quality Assurance QUALITY ASSURANCE PLAN
Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES
1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction
State of North Carolina Prequalification for First Tier Subcontractors under CM at Risk
NC General Statute 143.128.1.c states, The construction manager at risk shall contract directly with the public entity for all construction; shall publicly advertise as prescribed in G.S. 143 129; and
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt
CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Special Inspector Qualification Michael Roach, P.E., Building Official
Reference: IBC Chapter 17, Section 1704 General: Special inspections required by IBC Chapter 17 shall be conducted by qualified persons working for an approved agency. The Building Official shall maintain
Office of Construction and Innovative Contracting Technical Certification Unit. Technical Certification Handbook 2016
Office of Construction and Innovative Contracting Technical Certification Unit Technical Certification Handbook 2016 Updated September 2015 For Your Information REGISTRATION Registration opens October
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
Hot Mix Asphalt Test Result Verification and Dispute Resolution
Colorado Procedure 17-15 Standard Practice for Hot Mix Asphalt Test Result Verification and Dispute Resolution 1. SCOPE 1.1 The purpose of this Hot Mix Asphalt (HMA) Test Result Verification and Dispute
General Contractor Pre-qualification Requirements
General Contractor Pre-qualification Requirements Trevor Arnett / Clark Atlanta University Atlanta, Georgia Project Description Trevor Arnett is an existing historic building constructed in 1931 as a library
CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES
CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES 15.1 OVERVIEW To effectively assure Equal Employment Opportunity (EEO), the Federal Highway Administration (FHWA) requires
Getting Connected with the Colorado Department of Transportation (CDOT)
Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
VDOT GOVERNANCE DOCUMENT
VDOT GOVERNANCE DOCUMENT Minimum Requirements for Quality Assurance and Quality Control on Design Build and Public-Private Transportation Act Projects Location and Design Division Alternate Project Delivery
MDOT Prevailing Wage Compliance
MDOT Prevailing Wage Compliance Introduction - MDOT Oversight / Labor Standards Statutes Chris Roe MDOT Prevailing Wage Compliance (517) 202-3716 [email protected] Contract Documents Wage Decisions Wage
Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way.
Contractor Quality Control Oh No, We Got an Airport Job! John Savastio Quality Control Manager Highway Materials, Inc. We ve Come A Long Way. Investment in Staff, Labs and Equipment Acceptance based on
Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.
2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.org History Performance Graded Binders MDOT Local Agency Guide NAPA Guide Outline Other Considerations For each there are: Right
7. Do you perform any out of state work?... If yes, in what states and provide details of work performed
Applicant s Name* (*If more than one entity, attach separate sheet with description of each entity s operations, relationship to each other and ownership.) Contractors Application Agent Applicant Mailing
JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
Section 5.6 QUALITY CONTROL PROGRAM
5.6.1 PURPOSE Section 5.6 QUALITY CONTROL PROGRAM This document describes activities for personnel who are involved with the Florida Department of Transportation s (Department) Quality Control (QC) Program,
Asset Maintenance Bridge Emergency Response
FDOT Districts 1 & 7 Structures and Facilities Office Asset Maintenance Bridge Emergency Response Bridge No. 100300 Gandy Boulevard (US 92) over Tampa Bay, FL Jose Pepe Garcia, P.E., Florida DOT David
RFP No. 15-037R PERSONAL COMPUTER, LAPTOP, TABLET, PHONES, AND PRINTER TECHNICAL SUPPORT. ADDENDUM NO. 2 October 21, 2015
County Executive Steven R. Schuh RFP No. 15-037R PERSONAL COMPUTER, LAPTOP, TABLET, PHONES, AND PRINTER TECHNICAL SUPPORT ADDENDUM NO. 2 October 21, 2015 TO ALL BIDDERS: PLEASE NOTE THE FOLLOWING CHANGES:
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
MoDOT Quality Oversight Plan
MoDOT Quality Oversight Plan Contract ID: I-70-1(200) Job: J4I1916 Federal: ACIM 70-1(200) Table of Contents Sampling 1 Audits 1 Materials Certification to FHWA 2 Appendix A (Schedule of ) 9 Appendix B
INTRODUCTION: PURPOSE:
UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found
Quality Management Plan
September 8, 2015 NYNJ LINK DEVELOPER LLC Revision 0 Developer s Maintenance and Control Facility Elizabeth, NJ Parsons Project No.: 648109 & 449252 This page intentionally left blank. This page intentionally
Electronic Signature How To Guide
Electronic Signature How To Guide Internet-based Provider Enrollment, Chain, and Ownership System (PECOS) now allows providers and suppliers to electronically sign Medicare enrollment applications. Utilizing
The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).
Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State
PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
SUBCONTRACTOR Pre-Qualification Form
Please complete the form below and email (form and all attachments) to [email protected] or fax to 602-266-7070. If all information is not provided and all attachments are not submitted this will