1 REQUEST FOR QUALIFICATIONS For an AS-NEEDED CONSULTING PROJECT MANAGER(S) With Hospital, Clinical Care and Building Systems Renewal Experience For the UNIVERSITY OF CALIFORNIA, SAN DIEGO On behalf of FACILITIES DESIGN & CONSTRUCTION Issue Date: Monday, September 28, 2015 Proposals Due: Tuesday, October 13, 2015 Page 1 of 7
2 I. OVERVIEW The University of California, San Diego (University), on behalf of Facilities Design & Construction (FD&C) and Facilities Management (FM), requests written responses to this Request for Qualifications (RFQ) for the selection of an As-Needed Consulting Project Manager(s) with demonstrated project management experience in acute care hospitals including licensed and nonlicensed clinical care facilities and/or the renewal of non-clinical facilities infrastructure and building systems. For Health System-related projects the Agency Having Jurisdiction (AHJ) for plan review and issuance of the building permit is the Office of Statewide Health Planning and Development (OSHPD), the AHJ for non-clinical work will be the Campus Architect. Additionally, any hospital or clinical licensing requirements are generally within the purview of the California Department of Public Health (CDPH). Under the direction of the Campus Architect, the Consulting Project Manager(s) may provide assistance in numerous capacities, although not all-inclusive, in the following areas: 1. Capital improvements project management and construction management 2. Development of quality assurance/quality control (QA/QC) tools and resources 3. Facilitation of peer review services 4. Development of improved best management practices within FD&C II. DEMONSTRATED EXPERIENCE REQUIREMENTS Respondents must be licensed business entities that are able to designate a qualified individual, or individuals, within the business entity for these services. FD&C will consider the selection of one or more responding firms. The University is willing to allow for qualified staff members, within the business entity, to provide work support for the designated qualified individual, but only upon approval by the University. Demonstrated leadership and management experience for the proposed designated Project Manager shall include the following: 1. DEMONSTRATED 10 YEARS OF LEADERSHIP EXPERIENCE AS FOLLOWS: A. For participation in healthcare-related projects: Working with OSHPD and similar regulatory agencies in a project management or construction management capacity. B. For participation in healthcare-related projects: Working within an acute care hospital facility or licensed clinical facility in a project management or construction management capacity. C. For participation in healthcare-related projects: Working and collaborating with OSHPD Inspectors of Record (IORs) during the course of construction. Page 2 of 7
3 D. Developing, managing and forecasting complex budget and financial needs of a project including Cost Proposals, Change Orders, and Budget Contingency management. E. Facilitating and managing the work of architects, engineers, and other design professionals. F. Working within multiple construction delivery models such as: Design/Bid/Build, Design/Build, and Construction Manager/General Contractor (CMGC). G. Facilitating and managing the development of pre-project feasibility evaluations, project programming, conceptual design and schematic design phases, and preliminary project budgets and schedules. H. Facilitating and managing the development, preparation and coordination of construction documents, project specifications, agency plan-review approvals, and Contract Documents for bidding and construction. I. Working and collaborating with agencies as necessary to secure building permits, final inspections, project acceptance and Certificates of Occupancy. J. Providing oversight during construction administration, construction close-out, building commissioning and building occupancy phases. 2. DEMONSTRATED GENERAL EXPERIENCE AS FOLLOWS: A. Working within a University or similar institutional environment, in a project management or construction management capacity. B. Knowledge and familiarity with the construction of building components such as structural, mechanical, electrical, plumbing, fire and life-safety, security and low voltage and telecommunication systems. C. Knowledge and familiarity with fire and life-safety systems, accessibility compliance, building safety and exiting and other applicable building code requirements. D. Knowledge and familiarity with the development and application of critical path construction scheduling. E. Knowledge and familiarity with LEED certified projects, sustainable and green building practices and clean energy standards. F. Knowledge and familiarity with current software applications and technologies including, Excel, Word, Microsoft Project, internet-based project management tools, 3d CAD programs (such as Revit), clashing software (such as Navis Works) and tablet based coordination programs (such as Vela). Page 3 of 7
4 III. GENERAL SCOPE OF SERVICES BY THE CONSULTING PROJECT MANAGER Consulting Project Manager services may include, but are not limited to, the following activities: 1. Responsible control of project budget, including managing and forecasting and reporting of project budget contingency. 2. Leadership, management and coordination of various parties involved in project planning, design and construction processes. These parties would include, among others, hospital and campus administrators, user groups and departments, hospital and campus staff, hospital and campus planners, facility systems and maintenance engineers, architects and engineers, general contractors and sub-contractors and FD&C. 3. Leadership, management and coordination of project planning, design and construction phases including project feasibility studies, existing conditions evaluation, cost and schedule analysis, contracts development, schematic design, design development, construction documents, contract documents, bidding, bid award, construction administration, construction close-out and post-construction follow-up. These services include the skill-sets that will encourage collaboration, consensus-building and problemsolving among the project stakeholders. 4. Review of construction plans and specifications for adequacy and completeness prior to bidding. 5. Review of project specifications. 6. Participation in constructability reports. 7. Review and approval of general contractor submittals and shop drawings. 8. Review, evaluation, approval and reporting, on behalf of the University, on the general contractor s Cost Proposals, Change Order Requests and Change Orders. 9. Life-safety inspections for Substantial Completion readiness. 10. Evaluation, assessment, communication and reporting of in-progress construction work in terms of compliance with the Project Schedule, Project Budget and Project Program. 11. Negotiation and settlement of construction conflicts including interpretation of the Contract Documents, assessment of Compensable Delay Claims, and evaluation of Change Order Proposals. 12. Evaluation, assessment, recommendations and reporting regarding the general contractor s baseline construction schedules, look-ahead schedules and schedule updates required by the Contract Documents. 13. Coordination and facilitation of project Close-out procedures and deliverables as required by the Contract Documents. 14. Collection, coordination and submittal of final Record Drawings as required by the Contract Documents. 15. Collection and organization of construction cost data at the conclusion of construction. Page 4 of 7
5 IV. CONTRACT REQUIREMENTS All consulting services to be provided by the selected Consulting Project Manager(s) shall be in accordance with the standard University Contracting procedures, which have been approved by the Office of General Counsel. The selected Consulting Project Manager(s) will perform work under a Professional Services Agreement (PSA) with the University, with authorizations for specific assignments thereafter. The term of the Agreement will be 1 year with an option to extend on an annual basis to a maximum of 4 additional years. V. SELECTION PROCESS Submittals will be received from interested respondents by no later than 4:00 PM on TUESDAY, OCTOBER 13, The criteria for review of the submitted qualifications and selection of the successful respondents are provided in Section I, Overview above. VI. REQUEST FOR QUALIFICATIONS SUBMITTAL REQUIREMENTS To be fully considered, the respondents shall comply with the following instructions: 1. FORMAT Submit one electronic copy in pdf format, on a cd or flash drive ( ed submittals will not be accepted). Any graphic images, spreadsheets or pages larger than 8.5 x 11 should be submitted in landscape view. This is an electronic submittal only no paper copies will be accepted. VII. REQUIRED RESPONSE ITEMS The RFQ submittal shall contain the following response items: 1. LETTER OF INTEREST A. Provide a letter that expresses the respondent s interest to serve as an as-needed Consulting Project Manager, and also describes the respondent s perceived leadership and management strengths in light of the qualifications criteria. 2. RESPONDENT S QUALIFICATIONS A. The respondent is to complete and submit a Statement of Qualifications (SOQ) form Attachment B. (An Attachment A is not a part of this RFQ) 3. RESPONSE TO SELECTION CRITERIA A. Describe how and to what extent, the respondent firm satisfies, or intends to satisfy, each of the selection criteria in Section II, Overview above. Page 5 of 7
6 4. RESUMES A. Submit a resume of each individual proposed by the respondent to provide Consulting Project Manager services. Include all relevant experience with similar projects, and indicate the role or duties performed on each project. 5. REFERENCES A. Provide a minimum of 3 references for the designated qualified individual within the company from Architects, Contractors, and Owners (9 total). Also provide references for the company. References can be listed on the Statement of Qualifications Form, Attachment B to this RFQ. 6. STANDARD BILLING RATE SHEET A. Provide an itemized rate schedule that identifies hourly rates and expenses, including any proposed cost-plus charges on sub-consultant work. Rates are good for at least one year. Inflation/Cost of Living adjustments will be considered at renewal date each year. 7. STATEMENT OF UNDERSTANDING A. While the consultant will be selected utilizing qualification-based selection, a Statement of Understanding will be requested from the successful respondent prior to final selection that agrees to provide services within specifically stated and limited fee parameters. VIII. PROCEDURES FOR SUBMISSION One copy of your proposal is due in this office no later than 4:00 p.m., TUESDAY, OCTOBER 13, Mailing Address: University of California, San Diego Jennifer Mora, Contracts Analyst Office of Facilities Design and Construction 9500 Gilman Drive MC 0916 La Jolla, CA Delivery or Overnight Mail/Physical Address: University of California, San Diego Jennifer Mora, Contracts Analyst Office of Facilities Design and Construction North Torrey Pines Road, Suite 465 La Jolla, CA Hours of business: Monday through Friday, 8:00 am to 4:30 pm. Page 6 of 7
7 Technical questions or questions regarding the scope of services for healthcare-related project management services should be directed to John Mattox, Senior Director, Healthcare Project Management, (858) Questions regarding campus-related project management services should be directed to Randy Leopold, Senior Director, Campus Project Management, (858) Questions regarding building renewal project management services should be directed to Harley Crace, Assistant FM Director of Project Management, (858) The University requests that interested firms refrain from contacting any other party regarding this project. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Candidate Firm may be required to show evidence of its equal employment opportunity policy. Page 7 of 7
This request for qualifications seeks the following type of service providers:
ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS NOTICE SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ARCHITECTURAL SERVICES The San Francisco Unified School District Facilities,
Request for Qualifications for Program Management Support Services for The Greenville-Spartanburg International Airport Terminal Improvement Program
Request for Qualifications for Program Management Support Services for The Greenville-Spartanburg International Airport Terminal Improvement Program SECTION 1 - GENERAL INFORMATION The Greenville-Spartanburg
REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT
REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT DUE: January 9, 2015 @ 5:00 PM Lopez Island School District 86 School Road Lopez Island, WA 98261 Contact: Bill Evans, Superintendent
Volume II- Project Development Processes
Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required
Attachment 5 Electrical Engineering
A. Phase 1, Preliminary Design: The CONSULTANT shall: Attachment 5 Electrical Engineering 1. Ascertain the requirements for each project through a meeting with the Capital Projects Division Manager or
REQUEST FOR QUALIFICATIONS (RFQ) DIVISION OF THE STATE ARCHITECT INSPECTOR OF RECORD SERVICES
REQUEST FOR QUALIFICATIONS (RFQ) DIVISION OF THE STATE ARCHITECT INSPECTOR OF RECORD SERVICES 1. STATEMENTS OF QUALIFICATIONS REQUESTED The San Bernardino Community College District (District) Facilities
REQUEST FOR QUALIFICATIONS Environmental and/or Industrial Hygiene Consultants September 2013 September 2016
The San Francisco Unified School District (SFUSD) is seeking the services of multiple qualified to support asbestos and lead-impacting construction projects as well as other industrial hygiene support
CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS
CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS On-Call Consultant List for Mechanical Engineering Services TABLE OF CONTENTS REQUEST FOR QUALIFICATIONS PAGE NO. SECTION I PROJECT
ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning
Understanding the Hospital Planning, Design, and Construction Process Introduction California s acute care hospitals are an essential health care resource that serve a wide range of patients during times
CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT
CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS EAST VALLEY ADULT RESOURCES TENANT IMPROVEMENT Project Funding by the United States Department of Housing and Urban Development Through
TOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT
TOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT The Milford Board of Library Trustees, as the Awarding Authority, invites the submission of qualifications by responsible
Request for Qualifications 2015-162
Kitsap County Human Services Department Request for Qualifications 2015-162 Architectural and Project Management Services - Kitsap County Work Release Facility Remodel Response Deadline: November 17, 2015
Master Service Agreements Statement of Work (SOW)
Master Service Agreements Statement of Work (SOW) Service Category: System/Business Analyst Project: Infrastructure Evaluation & Documentation I. Master Service Agreements Statement of Work Defined. The
Animal Health Center for Reid Park Zoo, Tucson, Arizona
Reid Park Zoological Society Request for Qualifications Professional Architectural and Engineering Services for Animal Health Center for Reid Park Zoo, Tucson, Arizona SUBMITTAL DUE DATE: March 21, 2014
Program/Construction Management Request for Qualifications
Solano Community College District Program/Construction Management Request for Qualifications Please note: Applicants must attend the mandatory pre-qualification conference on Friday, January 11, 2013 at
REQUEST FOR QUALIFICATIONS RFQ NO. 011-04 ARCHITECTURAL/ENGINEERING SERVICES GOLDEN WEST COLLEGE INFRASTRUCTURE MASTER PLAN & UPGRADE PROGRAM
REQUEST FOR QUALIFICATIONS RFQ NO. 011-04 ARCHITECTURAL/ENGINEERING SERVICES GOLDEN WEST COLLEGE INFRASTRUCTURE MASTER PLAN & UPGRADE PROGRAM Physical Facilities Department 1370 Adams Avenue Costa Mesa,
Request of Qualification Proposal for Construction Management Services
Request of Qualification Proposal for Construction Management Services Dated June 10, 2014 Table of Contents Overview 3 Introduction 4 Scope of Construction Managers Services 4 Submission of Qualifications
Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive
Jacobs Contract performance Tracking spreadsheet = Excellent 2 = Meets performance standards 1 = Improvement needed 0= Unsatisfactory Report for the time period: Annual report 210 Total average score 2.86
REQUEST FOR QUALIFICATIONS ARCHITECTURAL DESIGN SERVICES FOR A FIRE STATION
Architectural Design Services RFQ October 30, 2015 Shoreline Fire Station & Headquarters Modifications REQUEST FOR QUALIFICATIONS ARCHITECTURAL DESIGN SERVICES FOR A FIRE STATION A. Purpose of Request:
Request for Qualification (RFQ) For Architectural Services. McCormick, South Carolina
Request for Qualification (RFQ) For Architectural Services McCormick, South Carolina 1 REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES TABLE OF CONTENTS I. PURPOSE OF RFQ... II. SITES DESCRIPTION..
Construction Management Standards of Practice
Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388
CITY COMMISSION LARGO, FLORIDA REQUEST FOR QUALIFICATIONS (RFQ) FOR DATA CENTER DESIGN SERVICES. RFQ #: 11-Q-375 DATE: July 8, 2011
CITY COMMISSION LARGO, FLORIDA REQUEST FOR QUALIFICATIONS (RFQ) FOR DATA CENTER DESIGN SERVICES RFQ #: 11-Q-375 DATE: July 8, 2011 The City of Largo is accepting "Statements of Qualifications" (SOQ) from
Construction Management At-Risk
Oconee County Schools P.O. Box 146, 34 School Street Watkinsville, GA 30677 706-769-5130 706-769-3513 REQUEST FOR PROPOSALS ISSUE DATE: March 10, 2016 RFP REF: Construction Management At-Risk Construction
THE TOWN OF NORTH SMITHFIELD
THE TOWN OF NORTH SMITHFIELD SPECIFICATIONS FOR REQUEST FOR PROPOSALS FOR EMERGENCY PLANNING, DISASTER RECOVERY, DEBRIS MANAGEMENT, AND HAZARD MITIGATION PROGRAM SERVICES SEPTEMBER 2014 FINANCE DIRECTOR
Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho
Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho REQUEST FOR QUALIFICATIONS Independent School District No. 1, Lewiston, Idaho ( District ) is seeking responses from individuals
REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL ARCHITECTURAL/ENGINEERING AND CONSULTING SERVICES FOR Fiscal Years 2015 2018
REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL ARCHITECTURAL/ENGINEERING AND CONSULTING SERVICES FOR Fiscal Years 2015 2018 Solicitation No.: BFZ1523 1. Mission Statement and General Information 1.1.
Revised Work Scope Dated April 23 rd, 2015
Revised Work Scope Dated April 23 rd, 2015 2.4 SCOPE OF SERVICES The following combines the Scope of Services included in RFQ No. 671 dated March 12, 2015 and the Invitation to Interview letter dated March
NOTICE TO CM/GC Companies
NOTICE TO CM/GC Companies Facilities and Construction Management Jefferson County School District R-1 (Jeffco) is pre-qualifying Construction Manager/General Contractors for CM/GC services for a new K-6
Request for Qualifications (RFQ NO. 1415-3) CONSTRUCTION MANAGEMENT/OWNERS REPRESENTATIVE SERVICES APRIL 16, 2015
NORWALK-LA MIRADA UNIFIED SCHOOL DISTRICT Request for Qualifications (RFQ NO. 1415-3) CONSTRUCTION MANAGEMENT/OWNERS REPRESENTATIVE SERVICES APRIL 16, 2015 Norwalk-La Mirada Unified School District Purchasing
Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital
Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital June 21, 2007 The Grossmont Healthcare District (GHD) will accept proposals for Architectural and Engineering
Open for Business Streamlined Permitting Orange County PERMITTING STANDARDS
CUSTOMER SERVICE Instill positive proactive attitude in the staff project review team, throughout the entire process, to help the customer make his or her project a reality. Provide Opportunity for Customer
Manage Deliverables - Construction Step 6. July 12, 2012
Manage Deliverables - Construction Step 6 July 12, 2012 Project Management Concept Step 1: Needs Development Step 2: Scope Development Step 3: Procurement of Design Team Step 4: Design Step 5: Bid/Procurement
Capital Project Delivery Handbook
Capital Project Delivery Handbook Volume One Facilities Planning & Construction 1 FACILITIES PLANNING & CONSTRUCTION 3/8/09 2 FACILITIES PLANNING & CONSTRUCTION 1. WELCOME TO FACILITIES PLANNING & CONSTRUCTION...
REQUEST FOR QUALIFICATIONS RFQ NO. 001-09
REQUEST FOR QUALIFICATIONS RFQ NO. 001-09 COAST COMMUNITY COLLEGE DISTRICT Facilities & Planning Department 1370 Adams Avenue, Costa Mesa, CA 92626 Telephone (714) 438-4673 Fax (714) 438-4893 The is inviting
REQUEST FOR QUOTES (RFQ) HEALTH COVERAGE ANALYST/PROJECT MANAGER
REQUEST FOR QUOTES (RFQ) HEALTH COVERAGE ANALYST/PROJECT MANAGER Applications Due: Tuesday, June 16, 2015, 12:00 pm I. BACKGROUND The San Mateo County Health System (Health System) mission is to help residents
NORTH CAROLINA DEPARTMENT OF STATE TREASURER REQUEST FOR QUALIFICATIONS TAX COUNSEL
NORTH CAROLINA DEPARTMENT OF STATE TREASURER REQUEST FOR QUALIFICATIONS TAX COUNSEL I. Purpose & Background The North Carolina Department of State Treasurer ( Department ) requests proposals from law firms
REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES. Prepared by. City of Richmond Finance Department. February 18, 2016 RESPONSES DUE:
REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES Prepared by City of Richmond Finance Department February 18, 2016 RESPONSES DUE: 2:30 P.M., Monday, March 7, 2016 REQUEST FOR STATEMENTS OF QUALIFICATIONS
REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES
REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES (Construction Manager At-Risk) FOR PROJECTS IN THE CENTER UNIFIED SCHOOL DISTRICT April 7, 2005 The ( District ) is seeking Statements
TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #2015-12
TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #2015-12 Sealed bids are due by 10:30 am on Friday, January 30, 2015 Bid Specs are
REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office
REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield
Executive Office for Administration & Finance. Request for Qualifications For Construction Management Services
Executive Office for Administration & Finance Request for Qualifications For Construction Management Services Massachusetts State Project (Project Number) (Full Project Name and Location), Massachusetts
Perkins Eastman is an Equal Opportunity Employer and a participant in the Federal E-Verify program. EOE/M/F/D/V
BOSTON Architectural Designer I The Architectural Designer will assist the project architect in tasks necessary to complete project documentation and construction administration duties consistent with
REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES Various Projects RFQ/RFP No. 15-16-02
Banning Unified School District 161 West Williams Street, Banning, CA 92220 (951) 922-2706 phone (951) 922-0227 fax January 12, 2016 REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT
School Construction Projects
The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) For the Project: CITY OF KATY NEW KATY FIRE STATION #2 Issued: August 13, 2015 Katy Fire Station #2 August 13, 2015 Page 1 of 17 Request
CAPITAL PROJECT COSTS!!! UNIVERSITY OF CALIFORNIA SANTA CRUZ
INTRODUCTION All Capital Project Budgets have 2 basic components: Construction Fees, Project Management, and Administration This presentation looks at COST DRIVERS that impact these 2 components and COST
REQUEST FOR QUOTES (RFQ) FOR PLUMBING SERVICES. RFQ Release Date: August 3, 2015. Quote Due Date: August 21, 2015 at 5:00 p.m.
REQUEST FOR QUOTES (RFQ) FOR PLUMBING SERVICES RFQ Release Date: August 3, 2015 Quote Due Date: August 21, 2015 at 5:00 p.m. SOUTHEAST MICHIGAN COMMUNITY ALLIANCE (SEMCA) 25363 Eureka Rd. Taylor, MI 48180
REQUEST FOR QUALIFICATIONS CONSULTANT ARCHITECTURAL SERVICES FOR VARIOUS TOWN BUILDINGS FOR THE PUBLIC WORKS DEPARTMENT, TOWN OF GROTON, CT
REQUEST FOR QUALIFICATIONS CONSULTANT ARCHITECTURAL SERVICES FOR VARIOUS TOWN BUILDINGS FOR THE PUBLIC WORKS DEPARTMENT, TOWN OF GROTON, CT Statements of Qualification for the selection of on-call architectural
Exhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
Questions and Answers
Questions and Answers 1. Can pictures be inserted in the Request for Qualifications package? Do they count toward the number of pages submitted? A. Yes, you can insert photos as long as the total page
Project Implementation Guide for CT, PET/CT, X-Ray, and Nuclear Systems
GE Healthcare Project Implementation Guide for CT, PET/CT, X-Ray, and Nuclear Systems Working together to get your new technology online so you can begin providing patient care. Table of Contents Table
REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT
REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Table of Contents I. Events Calendar. 1 II. Introduction.. 2 III. Inquires.
GREENBURGH CENTRAL SCHOOL DISTRICT No. 7 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES
GREENBURGH CENTRAL SCHOOL DISTRICT No. 7 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES Greenburgh Central School District No. 7 ( The District ) invites proposals to perform construction management
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services
CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
Contract No. E22PS02 DOCUMENT CONTROL PLAN (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT
Contract No. E22PS02 (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT Prepared By: Paul Eckler Date Project Controls Lead Karen Arpino-Shaffer Deputy Program Manager Date Michael J. McBride,
REQUEST FOR QUALIFICATIONS FOR VARIOUS AS-NEEDED ENGINEERING AND PROFESSIONAL SERVICES FOR FISCAL YEARS 2017 THRU 2019
Board of Commissioners of the Port of New Orleans REQUEST FOR QUALIFICATIONS FOR VARIOUS AS-NEEDED ENGINEERING AND PROFESSIONAL SERVICES FOR FISCAL YEARS 2017 THRU 2019 April 20, 2016 Deadlines for qualifications
NOTICE TO ALL CONSULTING ENGINEERING FIRMS
NOTICE TO ALL CONSULTING ENGINEERING FIRMS Solicitation Number S-126-14 The SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION (SCDOT) is seeking proposals from all interested consulting firms experienced in
Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS
RFQ Term: 9/29/2015 12/1/2019 Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS Denver Water (DW), in an effort to improve the administration and efficiency, has initiated
Santa Barbara County Department of Alcohol, Drug and Mental Health Services Division of Alcohol and Drug Programs
Santa Barbara County Department of Alcohol, Drug and Mental Health Services Division of Alcohol and Drug Programs Request for Proposal (RFP) Drug Diversion - PC 1000 Treatment Services Through Fiscal Year
NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES 2015 2016
NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES 2015 2016 Notice is hereby given that the Board of Education of the Newburgh Enlarged City School District,
City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT
City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT Date original issued: September 28, 2015 Qualifications Statements due: The City of Vallejo will consider Proposals submitted in response
Division of Capital Asset Management Standard Designer Evaluation Forms for Public Agencies
Standard Designer Evaluation Forms for Public Agencies The Standard Designer Evaluation forms are required by Section 13 of Chapter 159 of the Acts of 2000 which amends Section 38E of MGL Chapter 7. As
RFQ REQUEST FOR QUALIFICATIONS. Architectural/Engineering Services. MENANDS SCHOOL DISTRICT 19 Wards Lane Menands, NY 12204
RFQ REQUEST FOR QUALIFICATIONS Architectural/Engineering Services MENANDS SCHOOL DISTRICT 19 Wards Lane Menands, NY 12204 Issued: January 28, 2015 Submission Deadline: February 26, 2015 @ Noon Att: Joanne
TOWN OF MILLIS REQUEST FOR PROJECT MANAGEMENT SERVICES (RFS) FOR CLYDE F. BROWN ELEMENTARY SCHOOL
TOWN OF MILLIS REQUEST FOR PROJECT MANAGEMENT SERVICES (RFS) FOR CLYDE F. BROWN ELEMENTARY SCHOOL The Town of Millis is seeking the services of a qualified Owner s Project Manager as defined in Massachusetts
Request for Qualifications #2015-008
Request for Qualifications #2015-008 Online Permit System Software Development Services SECTION I SUMMARY... 1 SECTION II BACKGROUND... 2 SECTION III SUBMISSION REQUIREMENTS... 3 SECTION IV GENERAL DESCRIPTION
GEORGETOWN PUBLIC SCHOOLS REQUEST FOR PROPOSALS. Perley Elementary School Roof Replacement Project DESIGN SERVICES
GEORGETOWN PUBLIC SCHOOLS REQUEST FOR PROPOSALS Perley Elementary School Roof Replacement Project DESIGN SERVICES The Georgetown School Committee seeks proposals for Design Services in connection with
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: School District Board + OFCC Project Name Wellington New K-8 EM/MS Response Deadline
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (CM at Risk Contract) Administration of Project: School District Board + OFCC Project Name Groveport Madison High School Response Deadline 10/17/2014 4:00pm local time Project
BUILDING OCCUPANCY RESUMPTION PROGRAM
BUILDING OCCUPANCY RESUMPTION PROGRAM Revised JANUARY 2011 CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF BUILDING INSPECTION EMERGENCY OPERATIONS PLAN For any questions regarding this program, please
Attachment A. Application for Prequalification. General Contractors, Trade Subcontractors and Related Construction Service Providers.
Attachment A Application for Prequalification of General Contractors, Trade Subcontractors and Related Construction Service Providers Pre-Qualification Form 03.14.16 Page 1 of 15 Application for Pre-Qualification:
REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR A ROOF CONSULTANT
REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR A ROOF CONSULTANT Durango School District 9 R (Owner) 201 East 12 th Street Durango, Colorado 81301 Phone (970) 247 5411, ext. 1458 PROPOSAL DUE DATE/DELIVERY
COAST COMMUNITY COLLEGE DISTRICT REQUEST FOR PROPOSALS #2013 FOR
COAST COMMUNITY COLLEGE DISTRICT REQUEST FOR PROPOSALS #2013 FOR CONSTRUCTION MANAGEMENT SERVICES FOR ORANGE COAST COLLEGE BUSINESS, MATH, COMPUTING CENTER December 14, 2012 PROPOSALS DUE: By 4 p.m. -
AGREEMENT FOR PROFESSIONAL DESIGN SERVICES
AGREEMENT FOR PROFESSIONAL DESIGN SERVICES This Professional Design Services (this "Agreement"), made as of 20 by and between the University of Cincinnati (the "University") by the Division of Administration
Construction Manager at Risk
Request for Qualifications (RFQ) Construction Manager at Risk Beaufort County Jail and Sheriff s Office Jim Chrisman, Assistant County Manager/Finance Officer Beaufort County Government Beaufort County
New WMHS Construction Management Firm
New WMHS Construction Management Firm RFQ Schedule November 5, 2013 Board Meeting Approval to Advertise and use revised RFQ Week December 9, 2013 Ad runs in local papers (Thursday Dec. 12 th ) Week December
Colorado Mesa University CMU 2489 REQUEST FOR QUALIFICATIONS SMALL BUSINESS GENERAL CONTRACTOR PREQUALIFICATION
CMU 2489 REQUEST FOR QUALIFICATIONS SMALL BUSINESS GENERAL CONTRACTOR PREQUALIFICATION BACKGROUND, OVERVIEW AND GOALS Colorado Mesa University is soliciting the submittal of qualifications from General
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (CM at Risk Contract) Administration of Project: Local Higher Education Project Name FAES- Student Success Center Response Deadline 03/04/2013 4:30 pm local time Project Location
Mid Michigan Community College
Mid Michigan Community College REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT/CONSTRUCTOR SERVICES PART 1 -- GENERAL INSTRUCTIONS A. PROJECT DESCRIPTION Mid Michigan Community College (the "Owner")
747 Market Street, Room 900 * Tacoma, WA. 98402-3793 * (253) 591-5221 * Fax (253) 591-5180 * www.cityoftacoma.org
747 Market Street, Room 900 * Tacoma, WA. 98402-3793 * (253) 591-5221 * Fax (253) 591-5180 * www.cityoftacoma.org February 13, 2015 RESPONSES DUE BY 5:00 PM FRIDAY, MARCH 13, 2015 REQUEST FOR PROPOSALS
CONTRACT FOR DESIGN SERVICES. Appendix 2 Contract Documents Design Services. PS-0748-A Page 1 5/4/2016 Appendix 2
CONTRACT FOR DESIGN SERVICES Contract Documents Design Services PS-0748-A Page 1 5/4/2016 Table of Contents Design Services Contract Contract references Attachments described below that will be provided
CULVER CITY UNIFIED SCHOOL DISTRICT 4034 Irving Place Culver City, CA 90232 (310) 842-4220 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES
CULVER CITY UNIFIED SCHOOL DISTRICT 4034 Irving Place Culver City, CA 90232 (310) 842-4220 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES is requesting qualified persons, firms, partnerships, corporations,
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Shideler Hall Renovation Response Deadline 12/20/13
CITY COLLEGE OF SAN FRANCISCO May 2008 PROJECT INSPECTION SERVICES
REQUEST FOR QUALIFICATIONS Project Number 105A, 106A City College of San Francisco DSA - Inspector of Record Services for: Balboa Reservoir Development Site Work Academic Joint Use Facility (Revised 5/12/08)