1 Tolerances in concrete construction We need greater clarity and realism in specifications and also agreement on how tolerances are to be measured and what to do in specific instances of noncompliance By the Editorial Staff of Concrete Construction When a contractor finds that something won t fit, or when the architect or owner thinks that the walls aren t vertical or straight or that the floors aren t flat or level enough, someone is unhappy with the degree of tolerance achieved. Maybe the construction operations weren t precise enough. Maybe the specifications weren t tight enough or clear enough. Maybe the structure as designed couldn t actually be built to the requirements specified. In any case, some accommodation must be made by repair, adjustment or just plain acceptance of a bad situation. And, someone most likely will be disappointed. Part of our present situation in construction is that we are not entirely sure what degree of precision is needed in each individual circumstance, or what degree of precision can be achieved at reasonable cost. There is a need for all members of the construction industry to compare notes on what we want, what we really need, what practical considerations affect any particular degree of EDITOR'S NOTE: The following article is reproduced from Concrete Construction Magazine. It originally appeared in the October, I979 edition of the magazine (beginning on page 659), and was compiled by the professional staff of Concrete Construction Publications, Inc. Construction Dimensions wishes to express its appreciation to Concrete Construction for its permission to reprint the article, which we felt to be of vital interest to our own readership. precision in building, and the relation of all this to cost. The need to specify tolerances From among the possible definitions of tolerance the one we have chosen to use in this article is given in Cement and Concrete Terminology, by American Concrete Institute (ACI) Committee 116: the permitted variation from a given dimension or quantity. This variation can usually be in either of two directions and so can be regarded as positive or negative. Thus a tolerance in level of a ceiling amounting to ¼ inch in 10 feet (1)* of length could represent concrete that is up to ¼ inch (2) above the target level or as much as ¼ inch below. The immediate reason for specifying tolerances is to establish the ease of construction without the necessity of later modifying parts to fit together. A more long-range reason is to ensure that the structure will perform as needed, particularly with respect to safety. The parts of the structure should have adequate strength and be of such shape and dimensions that there is no danger of structural failure through movement of the parts. Joints should be sufficiently close to the design to perform properly and, where necessary, be capable of being sealed against intrusion of water, wind, dirt and debris. Tolerances on the location of reinforcing steel should be adequate to ensure the placeability of concrete all around the reinforcing cage. The tolerance required for appearance depends to a large extent upon the distance from which the structure will be viewed. The tolerance for an architectural concrete wall may be small compared with the surface of a dam to be viewed from a considerable distance. Within a hydraulic structure tolerances must be specified to ensure that friction losses are not high enough to significantly reduce hydraulic capacity or efficiency. Tolerances in hydraulic conduit must also ensure sufficiently smooth surfaces to prevent serious damage from erosion. Considerations that should determine tolerances It is common for a specifier to pick tolerances out of specifications previously used in the design office or from ACI or other published standards. This practice can lead to excessive costs by specifying closer tolerances than needed. Some specifiers and designers have profitably found ways to confer with constructors during the design process so that constructors can point out any unforeseen construction difficulties imposed by the tolerances. Constructors can ask questions about the reasons for the degree of precision specified and both parties can confer about the possibility of alternative, more economic designs and methods of construction. The tolerances achievable with precast concrete and cast-in-place concrete are likely to be quite different. Similarly the tolerances achievable with fixed forms, sliding forms and other types of forming systems can differ. If the specifier arbitrarily establishes a tolerance, he may be unknowingly prescribing the construction method to be used and possibly thereby increasing the cost. Sometimes it is difficult to predict the tolerance achievable. For exam- 27
2 ple, the foreshortening of jobsite precast concrete beams during prestressing may not conform to the designer s predictions. Also, the amount of camber in prestressed concrete beams is difficult to predict. In some cases it might be possible to design a prestressed concrete structure to accommodate relatively large tolerances in foreshortening or camber. A more usual way of handling the problem is to make a minor adjustment in the form after job experience with casting of beams has begun to show what dimensions are actually being achieved. Realistic, practical tolerances Phillip Birkeland, a consulting engineer, and Leonard Westhoff, a construction superintendent, report that they had asked around to find out how the tolerance tables in ACI 301 (Specifications for Structural Concrete for Buildings), ACI 347 (Recommended Practice for Concrete Formwork) and other standards had been arrived at. They came to the conclusion that the data had been compiled in the equivalent of smoke-filled rooms with no direct relationship to reality. In the absence of hard data, these committees have had to rely on their judgment (Reference 1). These tolerance tables appear to be the best the industry has but there seems to be a considerable lack of understanding of how closely they match either the tolerances being obtained in the field or the tolerances it is possible to get. For that reason Birkeland and Westhoff made extensive measurements on a building in which they were involved. Since the building seemed to be satisfactory to the owners and similar in quality to other acceptable buildings the investigators felt that the deviations measured represented acceptable tolerances. They found that the slopes and surface curvatures of the floors were generally greater than the ACI standards in effect at the time. ACI 347 permitted a tolerance of 1/16 inch per foot (3) in the slope of a floor but the investigators concluded that a more realistic tolerance might be TOLERANCES SUGGESTED BY ACI FOR REINFORCED CONCRETE BUILDINGS* Variations from the plumb. In the lines and surfaces of columns, piers, walls and in arrises In any 10 feet of length /4 inch (1) Maximum for entire length inch (7) For exposed corner columns, control-joint grooves and other conspicuous lines In any 20 feet of length /4 inch (8) Maximum for entire length /2 inch (9) Variation from the level or from the grades indicated on the drawings. In slab soffits, ceilings, beam soffits and in arrises In any 10 feet of length /4 inch (1) In any bay or in any 20 feet of length /8 inch (10) Maximum for entire length /4 inch (11) In exposed lintels, sills, parapets, horizontal grooves and other conspicuous lines In any bay or in any 20 feet of length /4 inch (12) Maximum for entire length /2 inch (9) Variations of distance between walls, columns, partitions and beams. 1/4 inch per 10 feet (1) of distance but not more than 1/2 inch (9) in any one bay and not more than 1 inch (7) total variation Variation of linear building lines from established position in plan inch (13) Variation in the sizes and locations of sleeves, floor openings and wall openings. Minus /4 inch (14) Plus /2 inch (15) Variation in cross-sectional dimensions of columns and beams and in the thickness of slabs and walls. Minus /4 inch (14) Plus /2 inch (15) Footings. Variation in dimensions in plan Minus /2 inch (16) Plus inches (17) when formed or plus 3 inches (18) when placed against unformed excavation Misplacement or eccentricity 2 percent of the footing width in the direction of misplacement but not more than inches (19) Reductions in thickness Minus percent of specified thickness Variations in steps. In a flight of stairs Rise /8 inch (20) Tread /4 inch (2) In consecutive steps Rise /16 inch (21) Tread /8 inch (20) * From Section of ACI , Recommended Practice for Concrete Formwork. The Standard also suggests other tolerances not published here for precast and precast-prestressed members, mass concrete structures, tunnel linings and cast-in-place conduits, slipformed structures, canal linings, siphons, culverts, bridges and similar structures. Variations from plumb and linear building lines on upper stories of high-rise structures (above 100 feet (22) high) are special cases which may require special tolerances. Variations in slab soffits are to be measured before removal of supporting shores; the contractor is not responsible for variations due to deflection except when the latter are corroboratory evidence of inferior concrete quality or curing, in which case only the net variation due to deflection can be considered. Applies to concrete only, not to reinforcing bars or dowels. 28
3 3/16 inch per foot (4). ACI 301 allowed a floor surface curvature of 1/8-inch offset from a 10-foot (5). The investigators concluded that curvatures up to ½-inch offset from a 10-foot (6) might be acceptable. Other measurements on the building indicated that the ACI 347 tolerance on intended floor slab elevation was about the same as they were measuring in the building. Tolerances on distances between columns required by ACI 301 and 347 agreed fairly well with what they measured. Although designers often specify unrealistic tolerances without questioning the lack of realism in the data they have access to, they also often accept the finished structure with all its deviations from the specified tolerances. It is likely that neither designers nor constructors know what tolerances are realistically obtainable; both think that the public is getting structures that are more accurately built than they really are. In Europe, realistic tolerances have been established by statistical analysis of deviations. But in Europe considerable precasting is done, which makes it relatively easy to make dimensional measurements of elements and study them statistically. Another important factor is the involvement of the design engineer in the selection of construction methods, a practice associated with industrialization of the European building industry. In the normal course of construction the deviations of any set of measurements from the intended value will fit the statistical normal distribution curve. By calculating the standard deviation from a large body of measurements it can be determined how many measurements are statistically expected to fall within given limits. If tolerances were established in statistical terms, thus acknowledging that a small number of measurements will fall outside an acceptable range, our tolerances might be more realistic. * Numbers in parentheses refer to metric equivalents listed with this article. It appears that no matter what system is used for specifying tolerances there will always be some parts of a structure that are unacceptable. The number of these instances can be decreased but frequently at considerable cost. It is simpler to plan to accommodate these by repair. Guidance for those who specify tolerances It should be possible for those directly concerned with construction to clearly interpret the tolerance requirements in the construction specifications. Tolerances should be sufficiently clear and specific not to give trouble to: the contractor who prepares the bid the job superintendent who determines materials requirements and types of craftsmen needed the shift foreman who is responsible for setting lines and grades for formwork and embedments the inspector who checks formwork for accuracy and strength before concrete is placed Several general guidelines can be stated for specifying tolerances. Be certain that the design does not demand tolerances that are unrealistic or unattainable. Provide places where the inevitable variations can be absorbed. Choose construction concepts that will ensure that critical dimensions are controlled directly and check these out with builders to be sure they are free of bugs. Dimension the drawing in such a way that the inspector can measure critical dimensions directly. Emphasize or highlight critical dimensions in drawing so that they are forcefully called to the attention of the constructor. The use of double dimensioning on drawings inevitably leads to trouble and should be avoided. This is the practice of showing both the individual dimensions and the total dimension. It leads to uncertainty about which dimension can best be allowed to float to meet all of the tolerance requirements. This subject is well explained in Reference 1. PROPOSED TOLERANCES FOR PLANENESS OF FLOORS AND OTHER FLATWORK ACI Committee 302 is preparing a new Guide for Concrete Floor and Slab Construction. This has not yet been either published or adopted, SO the proposed tolerances given here have no current authority and are still subject to change. The new tolerances being suggested by the committee are for the maximum depressions between high spots in a floor or slab for four classes of finish: Class A finish 1/8 inch below a 10-foot (23) * Class A-2 finish 3/16 inch below a 10-foot (24) Class B finish 1/4 inch below a 10-foot (25) Class C finish 1/4 inch below a 2-foot (26) * The Committee states that the tolerance for a Class A finish is extremely difficult and expensive to achieve on large areas. [It] should be specified only for critical areas where such [a tolerance is] vital for the operations that will take place in the area. Ambiguity is also caused by the practice of center-to-center dimensioning. The exact location of the center line of a column may be a matter of opinion. The best practice is to give dimensions to the face of the concrete. Unfortunately it is all too easy for a designer to assume that a building can be built to zero tolerance and for him to design accordingly. The construction of such a building may easily lead to trouble, cost everyone more money than necessary and may wind up in a lawsuit. The fact that such a design may have been constructed successfully in the past can provide a false sense of security. Constructing within the tolerances Everything possible should be done to avoid ambiguity. Much time is wasted on the job over differences about how to interpret tolerance requirements. 29
4 The constructor could wish that the specifications would supply all the required tolerances. In practice, however, he must make his own decision concerning most of them. This involves study, to determine which tolerances are important; it calls for both experience and intuition. The constructor ultimately prices his job with his own particular concept of the tolerance requirements in mind. 30 If he has underestimated the precision needed in any part of the job it is likely to cause trouble during construction or later and cost him money. A constructor would do well to think out ahead of time the methods to be used in controlling tolerances. For example, in a situation where the clear distance between columns is particularly important, he might decide to form the opening between columns instead of the columns themselves. This would lead to deviations in the column width rather than in the space between columns and the tolerance would be taken up in the amount of concrete cover over the column ties. Tolerances cannot be achieved unless they are controlled. The work begins at the time of surveying and setting out the site and includes all subsequent construction. One recent advancement in the control of dimensions, elevations, plumbness, planeness and alignment has been the introduction of lasers. Their use in construction measurement is discussed in the 7-page article Laser Construction Tools, Concrete Construction, September 1978, page 516. Other methods of controlling tolerances are illustrated in the figures. Figure 1 shows three simple methods of checking deviations of angles. A template like that shown in Figure 2 can be used to measure warping. Warping of a vertical surface can be measured with a stadia rod equipped with leveling bubbles and dial gages as shown in Figure 3. The rod is set in Position 1 near one vertical edge with the leveling bubble in a fixed position and the dial gages are adjusted to give a reading of the distance between the rod and the surface. The rod is then moved to Position 2 and held with the leveling bubble in an identical position. The distance that one dial gage has to be moved in or out indicates the amount of warping. Bowing in a simple curve can be measured by stretching wires tightly over spacer blocks and measuring down to the surface. Another method is to measure from the curve to a. Accepting out-of-tolerance work Work rarely is rejected or tom out simply because it is out of tolerance. This may be evidence that specified tolerances are likely to be more stringent than actually needed. The type of out-of-tolerance work that might require replacement are slabs on grade that are intended to
5 drain but don t, or concrete that is structure. This is simply a way of viation as descriptions of the intended to accommodate installa- recognizing the fact that there is characteristic deviations allowable. tion of machinery but does not pro- some economical limit to the degree Based on European experience tolervide sufficient room. of precision obtainable in concrete ances amounting to plus or minus 1.5 In precast work it is generally work. to 2.5 times the standard deviation more economical to cast building Such a practice leads to an idea might be realistic. In the meantime elements with a degree of precision that is now being considered in the everyone must do what they can to that anticipates some out-of-toler- construction industry: describe tol- make tolerances realistic and to plan ance elements. Then these elements erances in statistical terms, giving for efficient methods of meeting are modified later for use in the both the mean and the standard de- tolerances during construction. References This article is based almost entirely on information from the following sources: (1) Birkeland, Philip W., and Westhoff, Leonard J., Dimensional Tolerances in a Tall Concrete Building, Journal of the American Concrete Institute, August 1971, pages (2) Stevens, Alan, How Accurate is Building? BRE News, Building Research Establishment, Garston, Watford, United Kingdom, Number 36, Summer 1976, pages (3) Holbeck, Kai, and Andersen, Povl R., European Concepts of Construction Tolerances, Journal of the American Concrete Institute, March 1977, pages (4) Stephan, Dean E., Jr., and Murk, Alan, Establishing Tolerances in Concrete Construction, Journal of the American Concrete Institute, May 1977, pages (5) Graham, J.R., and Lindholm, E.A., Concrete Tolerances Importance and Achievement in the Bureau of Reclamation Construction, Journal of the American Concrete Institute, February 1978, pages (6) Recommended Practice for Concrete Formwork (ACI ), American Concrete Institute, Detroit, Michigan Metric Equivalents (1) 6 millimeters in 3 meters (14) minus 6 millimeters (2) 6 millimeters (15) plus 12 millimeters (3) 0.5 percent (16) minus 12 millimeters (4) 1.5 percent (17) plus 50 millimeters (5) 3-millimeter from 3-meter (18) plus 75 millimeters (6) 12-millimeter from 3-meter (19) 50 millimeters (7) 25 millimeters maximum (20) 3 millimeters (8) 6 millimeters in any 6 meters (21) 1.5 millimeters (9) 13 millimeters maximum (22) 30 meters (10) 9 millimeters in any bay or in (23) 3 millimeters below a 3-meter any 6 meters (24) 5 millimeters below a 3-meter (11) 19 millimeters maximum (25) 6 millimeters below a 3-meter (12) 6 millimeters in any bay or (26) 6 millimeters below in any 6 meters a 0.6 meter (13) 25 millimeters 31
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
Standard Specifications for Tolerances for Concrete Construction and Materials (ACI 117-90)
Standard Specifications for Tolerances for Concrete Construction and Materials (ACI 117-90) Reported by ACI Committee 117 W. Robert Little Chairman Russell S. Fling Chairman, Editorial Subcommittee S.
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
Code of Standard Practice for Timber Frame Structures
TFEC 2-2013 Code of Standard Practice for Timber Frame Structures August 2013 Preface This Code is intended to represent a reasonable consensus of what constitutes ordinary and acceptable practice within
FORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...
Starting Guide TABLE OF CONTENTS INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE... 7 ADVANCE CONCRETE USER INTERFACE... 7 Other important
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
Lighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: [email protected] Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma
The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma Bart B. Barrett, B.S., P.E.1 Kerry S. Lee, M.B.A., P.E., M. ASCE2 Erik L. Nelson, Ph.D., P.E., M. ASCE3
Excerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.
TECHNICAL BULLETIN Suggested Specification for White Concrete Floors Specifier Notes: 1. The Architect or Engineer should review the contents and adopt the suggested language as appropriate, ensuring it
Elevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
LAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
Metropolitan Builders Association Masonry & Concrete Standard
Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.
Example Specification for Concrete using Current Building Code Requirements
Example Specification for Concrete using Current Building Code Requirements DISCLAIMER: This specification is an example that accompanies a seminar titled The P2P Initiative: Performance-based Specs for
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
Dimensioning and Estimating Brick Masonry
TECHNICAL NOTES on Brick Construction 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 10 February 2009 Dimensioning and Estimating Brick Masonry Abstract: This Technical
L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.
L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -
SECTION 03400 PRECAST CONCRETE STRUCTURES
SECTION 03400 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for precast concrete structures, including fabrication and erection. 1.02 REFERENCE STANDARDS A. American Society for
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
COMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
9.3 Two-way Slabs (Part I)
9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are
The minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
Tension Development and Lap Splice Lengths of Reinforcing Bars under ACI 318-02
ENGINEERING DATA REPORT NUMBER 51 Tension Development and Lap Splice Lengths of Reinforcing Bars under ACI 318-02 A SERVICE OF THE CONCRETE REINFORCING STEEL INSTITUTE Introduction Section 1.2.1 in the
September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900
September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation
necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the
Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
Raising the Roof Creating Roofs in Revit David Cohn
David Cohn AB322-1 Roofs are one of the most complex architectural elements to model, but with Revit you can create just about any type of roof. This class will explore the best methods for creating various
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
symptoms of a faulty foundation
symptoms of a faulty foundation How does drought impact your home's foundation? For many Texas families, their home becomes the single largest investment and also the family fortune. The home's foundation
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
INSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
Requirements for Building Application Submission
THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: [email protected] To: Architects, Designers
SHAFT VERSUS FOOT ALIGNMENT TOLERANCES A Critique of the Various Approaches by Alan Luedeking, Ludeca, Inc.
SHAFT VERSUS FOOT ALIGNMENT TOLERANCES A Critique of the Various Approaches by Alan Luedeking, Ludeca, Inc. The only correct way to express shaft alignment tolerances is in terms of alignment conditions
Practical Alignment Tools and Techniques
Practical Alignment Tools and Techniques Bruce Lehmann Sr. Engineer, Thin Kerf Technologies Inc Accurate sawing requires attention to proper alignment and maintenance. Alignment is critical to modem sawmills
CHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
House Design Tutorial
Chapter 2: House Design Tutorial This House Design Tutorial shows you how to get started on a design project. The tutorials that follow continue with the same plan. When we are finished, we will have created
The Strength of Concrete
Chapter The Strength of Concrete.1 The Importance of Strength.2 Strength Level Required KINDS OF STRENGTH. Compressive Strength.4 Flexural Strength.5 Tensile Strength.6 Shear, Torsion and Combined Stresses.7
Proposed Minimum Subterranean Termite Treatment Standards
Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.
City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures
City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards
Lesson Plan Course Title: Construction Technology
Lesson Plan Course Title: Construction Technology Session Title: Wall Framing, Doors Performance Objective: Upon completion of this assignment, the student will be able to properly identify, gather sizing
Industry Track Inspection
Industry Track Inspection Track Supervisor Phone Number 1 TABLE OF CONTENTS INTRODUCTION 3 GAUGE 4 ALINEMENT 6 TRACK SURFACE 8 BALLAST 11 CROSSTIES 13 DEFECTIVE RAILS 16 RAIL JOINTS 17 TURNOUTS 18 OTHER
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
Prestressed Concrete I-Beam and TxGirder Haunch Design Guide
Prestressed Concrete I-Beam and TxGirder Haunch Design Guide Components of the Haunch Camber: Camber is the upward deflection in the beam after release of the prestressing strands due to the eccentricity
Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.
P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the
RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS
RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION
QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION 50.4(1) An owner of a place of employment, an employer and a contractor shall each ensure that each component of a fall-protection system is inspected
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
DE Frame with C Series Sidelight
TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder
INSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
The unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.
117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab
STATE OF NEW YORK DEPARTMENT OF HEALTH FATALITY ASSESSMENT AND CONTROL EVALUATION Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab Case Report: 07NY015 SUMMARY In February
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.
Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION
ASSESSMENT OF VISUALIZATION SOFTWARE FOR SUPPORT OF CONSTRUCTION SITE INSPECTION TASKS USING DATA COLLECTED FROM REALITY CAPTURE TECHNOLOGIES
ASSESSMENT OF VISUALIZATION SOFTWARE FOR SUPPORT OF CONSTRUCTION SITE INSPECTION TASKS USING DATA COLLECTED FROM REALITY CAPTURE TECHNOLOGIES ABSTRACT Chris Gordon 1, Burcu Akinci 2, Frank Boukamp 3, and
Basic Requirements for Residential Plan Review _
Basic Requirements for Residential Plan Review _ Below you will find the basic requirements for your plan submittal. General: Drawn to scale Plan Size minimum: 9 x 12 Designer, Engineer, or Architect name,
Electrical Wiring Technical Bulletin
Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will
REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:
HANDOUT REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition RETAINING WALLS Fifth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering
Formwork for Concrete
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
CITY OF SELMA, TEXAS Inspection Checklist: Commercial
Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides
APPENDIX K PIPE INSPECTION
APPENDIX K PIPE INSPECTION **Virginia Test Method 123** Post Installation Inspection of Buried Storm Drain Pipe and Pipe Culverts June 25, 2010 SCOPE For all roadway projects that are constructed by private
One-third of all fatalities in the U.S. construction
Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance
Fixed Access Ladders. Table of Contents. 1. Legislative Requirements
Fixed Access Ladders Engineering Data Sheet 2-04 Revised: January 1997 Table of Contents 1. Legislative Requirements 2. General 3. Rungs 4. Side Rails 5. Safety Cages 6. Attachment & Anchoring 7. Platforms
201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
PART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
PROJECT COST ESTIMATES & FEASIBILITIES
PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed
Superform Products Ltd.
TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000
DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS
8601 North Black Canyon Highway Suite 103 Phoenix, AZ 8501 For Professionals Engaged in Post-Tensioning Design Issue 14 December 004 DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS by James D. Rogers 1 1.0
SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS
1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL)
MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL) NOTE: THIS MANUAL IS INTENDED TO INSTRUCT AND TO ASSIST ALREADY QUALIFIED