1 Yorkshire Water Water Resources Management Plan Water Resources Management Plan Yorkshire Water Services Ltd August 2014

2 Yorkshire Water Water Resources Management Plan

3 Yorkshire Water Water Resources Management Plan Contents Contents... 3 List of figures... 5 List of tables Baseline Supply Demand Balance East Surface Water Zone supply demand balance Grid Surface Water Zone supply demand balance Options appraisal Types of options available to meet the deficit Development of potential options Water trading options Environmental, social and carbon costs Optimisation model WRAPsim modelling of options Impact of climate change on options Grid Surface Water Zone least cost solution SEA and Habitats Regulation Assessment Customer views on options Willingness to pay surveys Customer Challenge Group Grid Surface Water Zone preferred solution SEA of preferred solution SEA cumulative impact assessment Mitigation and monitoring Habitats Regulations Assessment and Water Framework Directive Assessment Customer preferences to preferred solution Final planning headroom assessment Grid Surface Water Zone preferred solution sensitivity testing Sensitivity testing scenario solutions Management of risk and uncertainty Final Planning Scenario Supply Demand Balance Future leakage targets Greenhouse gas emissions... 47

4 Yorkshire Water Water Resources Management Plan Bibliography Glossary of terms Appendices... 54

5 Yorkshire Water Water Resources Management Plan List of figures Figure 7.1: Grid SWZ baseline forecast supply demand balance...8 Figure 7.2: Options appraisal process...9 Figure 7.3: Grid SWZ least cost solution...15 Figure 7.4: Integration of SEA, HRA and WFD in the WRMP Process...17 Figure 7.5: Grid SWZ preferred solution for the baseline dry year annual average scenario...27 Figure 7.6: Grid SWZ optimised solution for the selected target headroom scenario...41 Figure 7.7: Grid SWZ optimised solution for the increased target headroom profile scenario...42 Figure 7.8: Grid SWZ initial optimised solution for the maximum climate change scenario...43 Figure 7.9: Grid SWZ final optimised solution for the maximum climate change scenario...44 Figure 8.1: Grid SWZ preferred solution supply demand balance...46 Figure 8.2: Baseline and final planning scenario regional greenhouse gas emissons...48 List of tables Table 7.1: Summary of the Grid SWZ supply demand deficit across the planning period...8 Table 7.2: SEA topics and objectives...18 Table 7.3: SEA outputs of Grid SWZ least cost solution...21 Table 7.4: Summary of option changes following least cost solution...25 Table 7.5: Start date and yield of schemes to deliver the Grid SWZ preferred solution...26 Table 7.6: SEA outputs of Grid SWZ preferred solution...30 Table 7.7: Resource option implementation timetable...34

6 Yorkshire Water Water Resources Management Plan Table 7.8: Solution sensitivity testing scenarios...37 Table 8.1: Final planning supply demand surplus...45 Table 8.2: Future leakage targets...47

7 Yorkshire Water Water Resources Management Plan Baseline Supply Demand Balance 1. The previous chapters describe how we develop a baseline forecast for supply and demand for each resource zone. Supply refers to the total water available for use (line 13BL in the water resources planning table WRP1 BL Supply). Demand refers to the sum of distribution input and target headroom. Target headroom is added to distribution input to ensure supply can meet a demand greater than the forecast distribution input. This allows for uncertainties in the components that make up the supply demand balance and gives us greater confidence we can meet our chosen level of service. 2. The supply forecast is compared against demand to determine if we have sufficient supply to meet demand over 25 years. If the supply demand balance shows there is a deficit we will need to invest in schemes to either increase supply or decrease demand to ensure we can meet our chosen level of service in the future. 7.1 East Surface Water Zone supply demand balance 3. A supply demand appraisal has been undertaken for the East SWZ dry year annual average planning scenario and the critical period scenario. For both planning scenarios there is a surplus throughout the planning period. 4. In the dry year annual average scenario, supply is 4.99Ml/d or more above demand for each year of the planning period. 5. The critical period scenario also shows a surplus throughout the planning period. The surplus is no less than 2.84Ml/d throughout the 25 years. This surplus is less than the dry year annual average, as demand increases in this scenario to represent the peak period. 6. This zone has a large surplus in both scenarios, therefore no investment is required to meet the level of service in the East SWZ over the 25 year planning period. 7.2 Grid Surface Water Zone supply demand balance 7. The baseline supply demand balance for the Grid SWZ dry year annual average scenario is shown in Figure 7.1. This shows a substantial deficit which is increasing over the planning period as the forecast supply cannot meet the forecast demand. 8. The deficit is the result of a continuing decline in water available for supply, due to the impacts of climate change and sustainability reductions. Climate change is forecast to create a year on year incremental reduction in supply. A 2.0Ml/d sustainability reduction is applied in 2013/14 and a 0.7Ml/d sustainable reduction applied in 2017/18.

8 2015/ / / / / / / / / /40 Ml/d Yorkshire Water Water Resources Management Plan Demand does not change significantly over the planning period. Following an initial decline, it increases steadily to 2.5Ml/d above the base year demand by 2039/ Demand + headroom Deficit below headroom from 2018/ Demand Water available decreasing due to climate change Deficit below demand from 2027/28 Total WAFU Figure 7.1: Grid SWZ baseline forecast supply demand balance 10. The Grid SWZ supply demand deficit starts in 2018/19, when demand, including target headroom, is 2.67Ml/d greater than supply. By 2027/28 supply is below demand and no headroom is available. The deficit continues increasing to Ml/d by 2039/40. A summary of the deficit is given below in Table 7.1. Planning scenario Grid SWZ dry year annual average deficit Table 7.1: Summary of the Grid SWZ supply demand deficit across the planning period

9 Yorkshire Water Water Resources Management Plan Options appraisal 11. As a deficit has been identified in the Grid SWZ, we need to invest in schemes that will either reduce the forecast demand or provide additional supply in the future. There are numerous schemes that we could implement. To select an appropriate solution to the deficit we considered the available options and determined which were feasible. We then carried out an options appraisal as summarised in Figure 7.2. Figure 7.2: Options appraisal process 12. The options appraisal determines a solution that is sustainable against infrastructure limitations, environmental impacts and our customers preferences. Infrastructure limitations are identified through our WRAPsim model. 13. The options appraisal initially determines the lowest cost solution, including monetised environmental, social and carbon costs, as well as economic costs. We have an optimisation model to determine the least cost solution, based on net present costs.

10 Yorkshire Water Water Resources Management Plan We assess the least cost solution against our customers preferences and the environmental, social and economic factors that cannot be monetised. These nonmonetised costs are determined through a Strategic Environmental Assessment (SEA) that considers the environmental and social impacts of each of the available options. 15. To take account of non-monetised factors we may need to constrain out some of the feasible options or delay/bring forward certain schemes. We then re run the optimisation model to provide a solution that is our preferred solution. The steps involved in moving from our least cost solution to our preferred solution to meet the Grid SWZ deficit are outlined below: Step 1: Run the optimisation model with all feasible options included. Step 2: Determine the yield availability of resource options in our WRAPsim deployable output model. This is carried out after an initial run of the optimisation model as the cumulative impact of the solution can provide different yields to those provided by the individual options. Step 3: Re run the model with option yields reduced according to those determined in step 2. This provides the least cost solution to the supply demand deficit. Step 4: Review the least cost solution against the SEA to identify options that should be constrained out to minimise the impact of the solution on the environment or society. Step 5: Determine if the least cost solution meets customers preferences. It will not always be possible to find a solution that all our customers and stakeholders agree to be optimal. However, if the solution contradicts all customer preferences we will amend the feasible options to readdress the balance. Step 6: Rerun the optimisation model to determine a solution that provides best value for the environment, customers and stakeholders and secures supply over the planning period. This is our preferred solution to the supply demand deficit. It may be necessary to repeat steps 4 to 6 until we have a solution that meets all our objectives. 16. The following sections describe the options appraisal process in more detail; Types of options available to meet the deficit 17. We have numerous options available to meet a supply demand deficit. These can be grouped into four categories: Resource management - options which increase deployable output, such as new reservoirs or resource transfers. Production management - options targeted at activities between abstraction and distribution input. Distribution management - options targeted at activities between distribution input and the point of consumption.

11 Yorkshire Water Water Resources Management Plan Customer side management - options affecting customers use and supply pipe losses Development of potential options 18. We have a range of resource schemes available as options to meet a supply demand deficit. A workshop was held in April 2012 to bring together Yorkshire Water staff with knowledge of our supply system and operations. In this workshop we reviewed the WRMP 2009 list of options and identified new potential schemes. 19. During the workshop we reviewed the technical, environmental, carbon and social attributes of each option. The technical attributes considered were yield increase/demand decrease; construction/delivery costs; time to implement; and asset life of infrastructure. 20. The information collated in the workshop was used to determine which schemes were feasible options and constrain out those that were not suitable. The information was used to assess the schemes against the following criteria: Does the option address the problem? Does the option avoid breaching any unalterable constraints? Is the option promotable/does it meet regulatory and stakeholder expectations? Is the risk of the option failing acceptable? Should the option be taken through to the constrained list? 21. Appendix A gives the unconstrained list of options, i.e. all the potential options considered; and Appendix B gives a brief description of the feasible options. The next step was to determine build costs and operating costs for each feasible options. 22. Where financial cost data was already available for options, we applied inflation using the Retail Price Index (RPI). Arup consultants were commissioned to assess and cost the options for which costs were either not available or there was evidence to suggest previous costs needed revising Water trading options 23. In accordance with the Environment Agency et al. (2013) Water resources planning guideline, water companies should consider water trading options in their water resource management plans. This could be with other water companies or third parties. 24. During the pre-consultation phase we met with our neighbouring water companies - Northumbrian Water, United Utilities, Severn Trent Water and Anglian Water - to discuss potential water trading opportunities. These discussions included both importing and exporting water. 25. Our discussion with Northumbrian Water identified two potential imports with variations on how the water could be transferred. There are no options available for us to export water to Northumbria Water.

12 Yorkshire Water Water Resources Management Plan Our previous water resources management plans have included an option for Northumbrian Water to provide us with water that it is licenced to abstract from the River Tees. Our discussions with Northumbrian Water for this plan confirmed it has sufficient spare capacity to provide up to 140Ml/d from the River Tees to a treatment works near York. This export could be transferred either via a pipeline or via a combination of pipeline and rivers. 27. Additional options were identified to import 15Ml/d from Northumbrian Water to the Yorkshire Dales area in our Grid SWZ. There are two alternatives to this scheme, one would transfer raw water and the other treated water. The source of this export would also be the River Tees. These schemes could be delivered in combination with an export to the York water treatment works but the combined yield would be constrained to 140Ml/d. 28. Our meeting with United Utilities identified one option for us to export water to its regions and three options for us to import water from United Utilities. The export would be a release from one of our reservoirs to the Huddersfield Canal for United Utilities to abstract. 29. The three imports include a release from one of United Utilities reservoirs to the Rochdale Canal, connecting an existing raw water pipeline to deliver water to North Yorkshire and installing a clean water pipeline transfer, also to North Yorkshire. 30. Our meeting with Severn Trent Water identified one export and no imports. Our export would transfer 20Ml/d from South Yorkshire to Severn Trent Water via a new pipeline. Discussions with Anglian Water did not identify any imports or exports. 31. An outline of all feasible imports and exports is provided in Appendix B. We have not identified a bulk transfer as part of our preferred solution and Severn Trent Water and United Utilities have informed us they do not require us to export to their supply areas. 32. To determine potential third party transfers we obtained details of unused/partially used and recently revoked groundwater abstraction licences in the Yorkshire region from the Environment Agency. We assessed the feasibility of each licence based on the potential to use the yield in supply. This was limited by the capacity to treat the water and the water quality, i.e. a number of sites were in areas where we had previously closed sources due to poor water quality or mained out the supply. 33. From this list we identified four recently revoked licences that we could use for supply. These are included in our feasible options list (see Appendix B) Environmental, social and carbon costs 34. This section describes the methodology to calculate monetised costs for the environmental, social and carbon impacts of the feasible options. The non-monetised environmental and social costs are determined in a Strategic Environmental Assessment, as described in Section We derived carbon, environmental and social costs for all feasible options through a desktop assessment. We calculated the costs for new schemes and reappraised the costs for schemes included in the WRMP 2009 options appraisals.

13 Yorkshire Water Water Resources Management Plan The Water resources planning guideline, (Environment Agency et al., 2013) recommends using the Risk and Policy Analysts Ltd (RPA) methodology, Benefits Assessment Guidance, (Environment Agency, 2012) to estimate the environmental and social costs for the options. The guidelines also recommend referring to the Economics of Balancing Supply and Demand Methodology (UKWIR, 2003) guidelines for the inclusion of environmental and social costs. The RPA methodology is an updated version of the methodology recommended in the UKWIR guidance. We inflated all costs from this report to current prices using the retail price index (RPI). 37. We based the atmospheric carbon impact of each potential solution on the Traded Cost of Carbon, as recommended in the planning guideline. However, we derived the operational impacts from the A Framework for Accounting for Embodied Carbon in Water Industry Assets (UKWIR, 2012) and derived the embodied carbon emissions from a Yorkshire Water based methodology. This methodology will align with the forthcoming UKWIR methodology for embodied carbon. 38. We developed social costs in relation to traffic from a Yorkshire specific study Lane Rental Charging A Way Forward (Stone and Webster, 2002). 39. Appendix D gives the environmental, social and carbon costs for the Grid SWZ options Optimisation model 40. We use an optimisation model to calculate the least cost solution. Since the WRMP 2009 was published a new optimisation model has been developed by Hartley McMaster Ltd on behalf of Yorkshire Water. 41. The optimisation model takes account of all feasible supply and demand options and optimally schedules investment to meet the projected deficit at minimum net present cost (NPC). In accordance with Environment Agency guidelines, all costs are discounted over 80 year and inflated by 4.5%. Further information on the model constraints and assumptions is provided in Appendix A. 42. The model is populated with the cost data described above and all other parameters such as time to implement, yield capacity, first practical year available, interdependencies and mutual exclusions are specified for each option. 43. The economic model utilises a linear/integer programming approach, as described in the UKWIR report, The Economics of Balancing Supply and Demand (Environment Agency and UKWIR, 2002). This is an alternative technique to the average incremental social cost (AISC) approach for option selection. 44. Where there are only variable costs and no option dependencies, the AISC and integer programming methodologies will give the same solution. If there are dependencies between options, the AISC approach may not give the optimal ranking without fine tuning, which may result in an alternative solution being overlooked. 45. The integer programme technique selects a schedule of options that will, in aggregate, meet any projected deficit in each year, from the base year to the end of the 25 year planning horizon. The selected schedule of options has the least net present value (NPV).

14 Yorkshire Water Water Resources Management Plan The output from the model includes AIC (average incremental cost), AISC and NPV costs, as defined in The Economics of Balancing Supply and Demand (Environment Agency and UKWIR, 2002), based on the output of the scheme WRAPsim modelling of options 47. In order to cost the schemes for the Grid SWZ, each feasible supply side option is assigned a yield that could be available from implementing the individual scheme. However, the final yield of each scheme is influenced by the supply demand balance scenario and the other options selected. WRAPsim modelling is used to determine the option yield, taking into account the hydrological conditions and infrastructure constraints of the Grid SWZ at the given deficit. 48. We cannot carry out the WRAPsim modelling of options until after the supply demand deficit is known. For example, the River Ouse Raw Water Transfer option has a maximum capacity of 60Ml/d but the amount taken will depend on the available treatment capacity at the receiving water treatment works. We cannot take 60Ml/d if the water treatment works does not have this spare capacity. However, we cannot determine the yield the option can provide until the impacts of climate change and sustainability reductions are known, as these factors will impact on the volume of water available to treat at the treatment works. 49. WRAPsim also needs to consider the cumulative impact of the options selected. The yield of the scheme may be dependent on the other schemes selected, particularly if the yields are to be treated at the same treatment works. 50. An initial run of the optimisation model with the schemes at their maximum capacity provided the schemes to be considered in WRAPsim in correlation with each other. The yields of options in the optimisation model are then revised to include any reductions due to hydrological and infrastructure constraints Impact of climate change on options 51. The effect of climate change on individual selected options was assessed prior to inclusion in the optimisation model. After the change in groundwater climate change assessment for the WRMP described in Part 1,Section 3.7, none of our options were thought to be directly affected by climate change. 52. The options in our preferred solution have been modelled with our median climate change scenario to ensure that the options are robust to climate change. This is fully described in the report Technical submission: Climate Change Effect on Deployable Output. 7.4 Grid Surface Water Zone least cost solution 53. The optimisation model was run to determine the least cost solution for meeting the supply demand deficit in the Grid SWZ over the 25 year planning period. This output is shown in Figure 7.3.

15 Yorkshire Water Water Resources Management Plan Figure 7.3: Grid SWZ least cost solution

16 Yorkshire Water Water Resources Management Plan The least cost model run provides a solution with 13 demand reduction options and five schemes to increase supply. The options will be implemented over the 25 year planning period. The first six options selected are active leakage control in 5Ml/d phases to provide a total of 30Ml/d demand reduction before implementation of R6 South Yorkshire Groundwater Option 1 in year 10. These options provide sufficient yield to meet the deficit in the next two AMP periods, up to 2024/ Going forward a combination of further demand reduction and resource options are brought in as the deficit increases. The largest scheme selected is the D20 Ouse Raw Water Transfer, which delivers 40Ml/d in 2027/ The model selects the least cost options for the 25 year planning period. In some instances it can be more economical to build a scheme with a large yield which provides the zone with a surplus for a number of years, such as D20 Ouse Raw Water Transfer. 57. The next stages of the options appraisal take into account non-monetised factors that influence the solution. We aim to ensure our plan is not creating an unacceptable risk to the environment, driving unnecessary investment or implementing options that oppose our customers preferences. 7.5 SEA and Habitats Regulation Assessment 58. The non-monetised environmental, social and carbon impacts of each option have been considered in a Strategic Environmental Assessment (SEA). The full output of the SEA is provided in an Environmental Report, which is published on our website alongside this document. 59. We have reviewed all available guidance; Strategic Environmental Assessment and Habitats Regulation Assessment Directive (UKWIR, 2012) and A Practical Guide to the Strategic Environmental Assessment (ODPM, 2005), and determined that the WRMP falls under the SEA. This is because the options for the plan include schemes which require Environmental Impact Assessment (EIA), for example pipeline installation schemes. 60. The SEA and the WRMP options appraisal have been informed by a Habitats Regulations Assessment (HRA) Screening Report. A WFD Assessment was also carried out to inform the SEA and assess the impact of the least-cost plan on WFD requirements for no deterioration to waterbodies. The SEA, HRA and WFD assessments have influenced the options appraisal to determine a preferred solution that reduces the risk of detrimental impact to the environment. Figure 7.4 outlines the process for integrating the SEA and HRA into the options appraisal.

17 Yorkshire Water Water Resources Management Plan Figure 7.4: Integration of SEA, HRA and WFD in the WRMP Process 61. The SEA can add value to the options appraisal process by identifying a wider range of impacts that cannot be monetised. It considers both adverse and beneficial potential environmental and social effects of feasible options, and identifies the cumulative effects of a supply demand solution. 62. A cumulative, or in-combination, assessment has been undertaken on the preferred solution. This involved examining the potential impacts of each of the water resources management options in combination with each other, as well as in combination with the implementation of other relevant plans and programmes. 63. We have ensured the environmental and social impacts are not double-counted in both the monetisation process and the SEA, as this could potentially skew the options and programme appraisal process. 64. The overall findings of the SEA describe the extent to which objectives for eight environmental topics are met by each of the WRMP options. Table 7.2 lists the topics and associated objectives.

18 Yorkshire Water Water Resources Management Plan SEA Topic Ref. SEA Objectives Biodiversity, flora and fauna To protect and enhance biodiversity, ecological functions, capacity, and habitat connectivity within our supply and source areas. To strengthen the connections between people and nature and to realise the value of biodiversity. Population and human health 2.1 To improve human health and well-being of the area, improve access to recreation and the environment, and reduce inequalities. Material assets and resource use Water Soil, geology and land use Air and climate Archaeology and cultural heritage Landscape and visual amenity To reduce, and make more efficient, the domestic, industrial and 3.1 commercial consumption of resources, minimise the generation of waste, encourage its re-use and eliminate waste sent to landfill. 4.1 To maintain or improve the quality of rivers, lakes, groundwater, estuarine and coastal waterbodies. To ensure appropriate and sustainable management of 4.2 abstractions. Safeguarding reliable, resilient and sustainable water resources for people, economy and the environment. 4.3 To reduce and manage flood risk. 4.4 To increase awareness of water sustainability, its efficient use and the ecosystem functions which rely on water resources. 5.1 To protect and enhance geology, the quality and quantity of soils and promote a catchment-wide approach to land management. 6.1 To reduce air pollutant and greenhouse gas emissions. 6.2 To adapt and improve resilience to the threats of climate change Table 7.2: SEA topics and objectives To conserve and enhance the historic environment, the heritage assets therein and their setting. To protect and enhance the quality of, and improve access to, designated and undesignated landscapes, townscapes and the countryside. 65. A nine point impact assessment scale was used, using the effect categories: major adverse; moderate adverse, minor adverse; neutral/negligible; mixed; uncertain; minor beneficial; moderate beneficial and major beneficial. This report considers the outputs of the SEA on the least cost solution and the preferred solution. The SEA outputs for all the feasible options can be found in the SEA Environmental Report. 66. Table 7.3 provides a summary of the SEA outputs for the least cost solution. The majority of impacts are negligible but there are a number of moderate and minor adverse impacts, and there is one solution that has a major adverse impact in relation to one SEA objective. 67. To reduce the impact of our solution on the environment, we have chosen to remove the R6 South Yorkshire Groundwater Option 1 selected in the least cost solution from our feasible options This scheme has a risk of unsustainable impacts on parts of the Sherwood Sandstone aquifer.

19 Yorkshire Water Water Resources Management Plan The South Yorkshire Groundwater Option was removed as it is highlighted by the SEA to have a major adverse impact on one of the objectives. This was particularly driven by the poor quantitative and chemical status classification for the groundwater body as identified through the WFD option assessment process. This option involves installation of new infrastructure to link an existing group of licensed boreholes in the South Yorkshire area. The new infrastructure would allow the yield from the boreholes to be transferred elsewhere in the Grid SWZ and increase utilisation of the licensed source. 69. The boreholes abstract from the Sherwood Sandstone aquifer, in an area that is classed as over licensed by the Environment Agency Catchment Abstraction Management Strategy (CAMS). The area is classified as medium stressed in the Water Stressed Areas Final Classification (Environment Agency and Natural Resources Wales, 2013) and has previously been classed as seriously stressed. There is a risk we could have an adverse impact on the environment if we were to increase our abstraction in this area. There is also a risk that the Environment Agency could revoke some of our existing permitted abstraction volume. 70. Based on the SEA and the over licensed status, we have chosen to remove this scheme from the feasible options available in the optimisation model. This is to avoid any potential major impacts on the environment as highlighted by the SEA and WFD assessment, and to avoid investing in new infrastructure that could be redundant if the licence is reduced in the future. 71. It is not practical to constrain out all schemes where there are potential negative impacts, as the remaining schemes would not meet the deficit and the cost would be disproportionately high. For this plan we have chosen to constrain out options the SEA classifies as having a major adverse impact on the environment. We have also reviewed the SEA results of all the selected options to consider the actions we can take to mitigate the environmental and social impacts. If the SEA highlights an adverse impact that is not classed as major adverse but presents an impact that is disproportionate to the yield gain or a risk that could increase in the future, we remove the scheme from the feasible options list. 72. The optimisation model selected R12 East Yorkshire Groundwater Option 1 as part of the least cost solution. This scheme is similar to R6 as it involves installing new infrastructure to enable existing underutilised licence capacity to be transferred elsewhere in the Grid SWZ. The licences are from the Sherwood Sandstone aquifer, but the SEA for this option does not raise major adverse impacts, as for R Minor adverse effects were assigned to the scheme, taking account of the good status of the Aire and Don groundwater body and the fact that the scheme involves no increase to existing abstraction licence volumes. There would be no deterioration to the WFD status as a consequence of this scheme. The remaining negative impacts of R12 identified in the SEA are construction related and of a temporary nature only. The minor temporary adverse effects relating to the construction of the pumping station and pipeline can largely be mitigated at relatively low additional cost. 74. For the reasons outlined above, we do not associate the same risks as R6 with the R12 East Yorkshire Groundwater Option 1 scheme and have not constrained it out of the feasible options.

20 Yorkshire Water Water Resources Management Plan The SEA and WFD assessment have identified the R49 East Yorkshire Groundwater Option 2 scheme could have potential moderate impacts on the environment. This scheme plans to increase our use of an existing abstraction licence that we are currently underutilising due to water quality issues. 76. The boreholes associated with this scheme abstract from the Sherwood Sandstone aquifer and within a WFD groundwater body that is classified as having poor chemical status and poor status in relation to saline intrusion due to depressed groundwater levels. Although the abstraction would be within existing abstraction licence limits, the increase in actual abstraction associated with the scheme could have a moderate adverse effect on groundwater quality. 77. The East Yorkshire Groundwater Option 2 scheme involves relocating an unused borehole previously used to abstract from this source to higher ground, where the risk of saline intrusion will be largely reduced. We would monitor the water quality of the source and stop abstracting if chloride was detected, then start again once levels had recovered. Due to these mitigation measures we will continue to include this scheme as a feasible option. 78. Appendix 14 of the Water resources planning guideline (Environment Agency et al., 2013) recommends water companies include the net impacts of the solution on waterbody status under the WFD in the environmental and social assessment. We have assessed the impacts of the preferred solution on the WFD in Section and provided a WFD assessment report to the Environment Agency.

21 Biodiversity, flora and fauna Population and human health Material assets and resource use Water Soil, geology and land use Air and climate Archaeology and cultural heritage Landscape and visual amenity Yorkshire Water Water Resources Management Plan Option Category Scheme Ref. Scheme Name SEA Topic Corresponding SEA Objective Number Customer Business customer audits C1a (i) + N N + N + N ++ n/a - N n/a n/a --- conservation and retrofit one off Active Leakage Control in Leakage D1a to D1g + N - M + ++ N ++ N - + N N -- DMAs Leakage D2a to D2e Pressure management + N N + N + N + N N N N N - N Major adverse Moderate adverse Minor adverse Internal Ouse Raw Water D20 - N N N N N U Uncertain Transfer Transfer South Yorkshire Groundw ater R6 N N - N N N N - N N - M Mixed Groundw ater Option 1 North Yorkshire Groundw ater R9 - N N N N N N N N N N N N + Groundw ater Groundw ater R12 East Yorkshire Groundw ater Option 1 N N - N - - N N N - N N - ++ Groundw ater R49 East Yorkshire Groundw ater Option 2 -- N - N N N N - N N N +++ Key Negligible Minor benefits Moderate benefits Major benefits Table 7.3: SEA outputs of Grid SWZ least cost solution

22 Yorkshire Water Water Resources Management Plan Customer views on options 79. We carried out research into customer preference and prioritisation of the different investment options available. 80. A two stage approach using qualitative and quantitative research was used. An exploratory, qualitative phase was used to refine the options to ensure they were understood by customers, and the quantitative phase was used to establish which options consumers preferred. 81. For the qualitative research, four discussion groups were carried out at two separate locations (Leeds and Bridlington). To cover the key demographics of Yorkshire the groups were selected to be representative of factors such as socio-economic profile, age, metered/unmetered supply and urban/rural location. 82. In addition, ten face to face interviews were conducted with businesses. The business selected were a sample of small, medium and large water volume users. 83. To establish the investment options consumers preferred, and why, 1000 online quantitative interviews were conducted with domestic customers. All participants were responsible (either fully or partially) for paying the water bill and quotas were placed on region, socio-economic group, age and gender to ensure a sample representative of our customers. 84. Customers were asked to rate a range of options before and after being provided with information on the cost, environmental impact and security of the yield for each option. 85. Initially customers preference was for mains replacement and leakage reduction. Priority was also given to schemes such as reservoir de-silting, water efficiency and supply pipe renewal. 86. When provided with cost, environmental impact and yield security information, preference was for leakage reduction, metering and water mains replacement. 87. In both the qualitative and quantitative research preference was towards options that saved water. Options that increase available supply were less attractive to customers due to a perceived negative environmental impact. 88. Business customers also preferred leakage reduction, mains replacement and metering over the other options presented. The prioritisation was to use existing water supplies more efficiently and to conserve existing supplies before increasing available supply Willingness to pay surveys 89. In addition to customer preferences from the options survey, we must consider customer views expressed through our willingness to pay survey (WTP). Following the guidelines Carrying Out Willingness to Pay Surveys (UKWIR, 2011) we asked a

23 Yorkshire Water Water Resources Management Plan sample of customers for their preferences to a change in levels of service, including security of supply. Security of supply was presented as frequency of temporary use bans/hosepipe bans. 90. Qualitative and quantitative surveys were carried out as part of the PR14 WTP survey. The quantitative survey was completed by 1,200 domestic customers at 20 locations across Yorkshire. Information was collected through door to door interviews lasting approximately 40 minutes. We also collected quantitative information from 500 business customers through telephone conversations where discussion information was sent in advance by or post. 91. Customers were asked their preferences for: Maintaining the current level of service for 1 temporary use ban in 25 years Improving the level of service to1 temporary use ban in 35 years Improving the level of service to 1 temporary use ban in 50 Years Reducing the level of service to 1 temporary use ban in 15 years Reducing the level of service to 1 temporary use ban in 10 years 92. Customers were made aware that an improvement in level of service would increase annual bills and a reduction would reduce annual bills. Due to the current economic and financial situation of many customers, the majority of customers who participated in the WTP study preferred to stay with the current levels of service across the business. 93. Fewer customers wanted an increase in performance in return for a higher bill or a deterioration in service in return for a lower bill. A reduced level of service would reduce the total supply we would have to secure for each year of the 25 year plan, and therefore reduce the number of options we would have to implement to secure supply. As customers were not willing to accept an increased risk of restrictions we did not include an option for a reduced level of service in this WRMP. 94. Customers were also asked about willingness to pay for environmental enhancements such as pollution reduction and river and bathing water quality but the enhancements included were not relevant to the development of the WRMP Customer Challenge Group 95. In developing our plans for PR14, we have worked closely with an independent Customer Challenge Group, known as the Customer Forum. The forum includes customer and local government representatives, as well as a number of our regulators. Their purpose is to ensure that we keep customers at the centre of all that we do. The Customer Forum were involved in all aspects of the WTP research. The WRMP was also presented to the group by . Members were invited to return comments directly back to Yorkshire Water or as part of the formal consultation.

24 Yorkshire Water Water Resources Management Plan Our plan aims to maintain the current level of service without increasing bills above inflation. We must therefore ensure we consider this alongside customer preferences for demand reduction options and do not deviate too far from the least cost solution. 97. Our least cost solution will meet the deficit through implementing 13 demand reduction schemes. The first six of these will deliver an additional 30Ml/d of active leakage control by 2024/25. We will not require any new infrastructure in AMP The deficit is due to climate change reducing available supply however, population is forecast to increase by over 800,000 during the planning period. To secure supply for our customers we will need to invest in new resources alongside demand reduction in the future. The first resource development scheme is required in year 10 of the planning period with a further two required in years 12 and 13. The largest resource development scheme is required in 2027/28, when the D20 Ouse Raw Water Transfer will be implemented. By this stage we will have reduced demand by 37Ml/d. 99. R6 South Yorkshire Groundwater Option 1 has been highlighted by the SEA to be a potential risk to the environment. Our customers would prefer us to invest in demand reduction options and reduce our impact on the environment. This supports our decision to constrain this option out of our feasible options To ensure demand reduction schemes are used to meet the deficit in AMP6, we have selected to constrain in the two 5Ml/d active leakage control options the optimisation model selected to meet the deficit in years 4 and 5. This is consistent with our customers preferences, government aspirations for demand reduction and our own strategic objectives for reducing demand. 7.7 Grid Surface Water Zone preferred solution 101. In selecting our preferred solution, we have aimed to provide a solution that minimises the environmental and social risks of the least cost solution and is flexible to an uncertain future, while remaining cost efficient Our preferred solution, to meet the forecasted Grid SWZ dry year annual average deficit, has been determined using the following criteria: Meets the supply demand deficit whilst maintaining the current level of service of 1 temporary use ban in 25 year Is a cost efficient solution Takes a balanced view of our customers preferences Aligns with the aspirations of our Blueprint for Yorkshire Aligns with the business plan outcomes Minimises the environmental and social impacts as determined by the SEA. Table 7.4 below summarises the changes we have made to the feasible options following the least cost optimisation model run. We re-ran our optimisation model with the feasible options amended as described in Table 7.4.

25 Yorkshire Water Water Resources Management Plan Option Brief description Comment R6 South Yorkshire Groundwater Option 1 Install infrastructure that allows existing underutilised licence capacity to be transferred to other areas of the Grid SWZ. The SEA has highlighted this option as having a risk of major adverse impact to groundwater. The Environment Agency has classed this area as water stressed and there is a risk the existing licence could be reduced in future sustainability reductions. We have removed this option from the feasible options available in our optimisation model. D1a Active leakage control 5-10Ml/d Reduce annual leakage target by 5Ml/d through additional find and fix activity. This scheme has been constrained into the solution in 2018/19 to ensure the AMP6 target is met through active leakage control. This meets with our customers preferences for further leakage reduction and our Strategic Business Objectives to create water efficient regions. D1b Active leakage control 10-15Ml/d Reduce annual leakage target by 5Ml/d (in addition to D1a) through additional find and fix activity. This scheme has been constrained into the solution in 2019/20 for the same reasons as D1a. Table 7.4: Summary of option changes following least cost solution 103. The preferred solution from the optimisation selected four pressure management schemes to be delivered in year 11. Although this could be feasible in a normal year it may be more difficult to achieve in a cold year, when leakage can be higher than usual. To ensure all four schemes would be in place by year eleven we adjusted the implementation years of the first three pressure management options so they would be in place before year To ensure we can meet the additional deficit due to the demand forecast update we have brought forward D2b Pressure Management, D20 Ouse Raw Water Transfer, R12 East Yorkshire Groundwater Option 1, D2e Pressure Management and Vale of York Phase 2 by one year. This meant the R9 North Yorkshire Groundwater Option could be delayed from 2024/25 to 2031/32. This ensures no additional resource schemes are required to meet the additional deficit The schemes included in our preferred solution to the Grid SWZ dry year annual average deficit are listed in Table 7.5 and Figure 7.5 shows implementation of the preferred solution over the 25 years.

26 Yorkshire Water Water Resources Management Plan Ref. Option Build start year Yield start year Scheme yield (Ml/d) D1a D1a Active Leakage Control in DMAs 0-5Ml/d 2018/ / D1b D1b Active Leakage Control in DMAs 5-10Ml/d 2019/ / D1c D1d D1c Active Leakage Control in DMAs 10-15Ml/d D1d Active Leakage Control in DMAs 15-20Ml/d 2021/ / / / D2a D2a Pressure management 2.2Ml/d 2021/ / D2b D2b Pressure management 1.8Ml/d 2021/ / D1e D1e Active Leakage Control in DMAs 20-25Ml/d 2023/ / D1f D1f Active Leakage Control in DMAs 25-30Ml/d 2023/ / D1g D1g Active Leakage Control in DMAs 30-35Ml/d 2024/ / D2c D2c Pressure management 1.6Ml/d 2023/ / D2d D2d Pressure management 1.4Ml/d 2024/ / D20 D20 Ouse Raw Water Transfer 2020/ / R9 R9 North Yorkshire Groundwater 2029/ / C1a (i) C1a (i) Business customer audits and retrofit one off implementation 2032/ / R12 R12 East Yorkshire Groundwater Option / / D2e D2e Pressure management 1.2Ml/d 2035/ / R8b R8b Vale of York Phase / / C8 C8 Supply pipe leakage reduction 2038/ / Total Table 7.5: Start date and yield of schemes to deliver the Grid SWZ preferred solution

27 Yorkshire Water Water Resources Management Plan Figure 7.5: Grid SWZ preferred solution for the baseline dry year annual average scenario

28 Yorkshire Water Water Resources Management Plan The preferred solution provides a balance of demand reduction options and options to increase supply. The demand side options will meet our customers aspirations and our business objectives to take less from the environment and reduce leakage further. The additional supply side solutions will ensure water is available for supply in the future, and add further adaptability and resilience to the grid A total of 47.96Ml/d demand reduction will be achieved by delivering 14 demand side schemes over the 25 years. Our leakage target will be reducing from year four onwards through additional active leakage control, pressure management and supply pipe leakage reduction. Business customer retrofit starting in year 18 will also reduce the need for additional supply Four supply side options will be delivered providing 61.95Ml/d additional resource. The first will be in year 11 when we implement our largest resource solution, the D20 Ouse Raw Water Transfer, to provide 40Ml/d. In year 17 we will increase abstraction form an existing borehole in North Yorkshire by 2Ml/d and in year 18 we will implement the East Yorkshire Groundwater Option 1 to provide 6.55Ml/d. Our final resource solution will provide a yield of 5.36Ml/d in year 21 that will increase to 13.4Ml/d by year SEA of preferred solution 109. The main difference between the least cost and the preferred solution SEA (Table 7.6), results from the omission of R6 South Yorkshire Groundwater Option 1 and the R49 East Yorkshire Groundwater Option 2. R6 was constrained out of the feasible options so that it could no longer be selected. This leads the optimisation model to select a different set of options and R49 is no longer selected as part of the solution. However, R8b Vale of York Boreholes Option 2 and C8 Supply Pipe leakage reduction, which were not included in the least cost solution, are part of the preferred solution R8b Vale of York Boreholes Option 2 is the only additional resource option included in the preferred solution. This scheme has a number of minor adverse impacts. The scheme involves construction of several new borehole abstractions in the Vale of York area. Yield from the boreholes would be released to the River Ouse at low flows to be abstracted further downstream to treat at an existing treatment works. This scheme is dependent on the Environment Agency granting abstraction licences. Licences would be required to abstract from the new boreholes and for the subsequent downstream of the water we release to the river, in addition to the water we are already permitted to abstract at low flows There is uncertainty around the exact location of the boreholes and we will need to carry out investigations to show the abstractions would not have an adverse impact on the surrounding surface water. The SEA, HRA and WFD assessments have all indicated that adverse effects on the environment can be avoided by careful siting of the boreholes to ensure no adverse effect on surface waters. There would be no adverse effects on river flows as the groundwater in this area is not in hydrological connection with the river. A study by Arup consultants in 2007 concluded up to 60Ml/d was potentially available. We have planned for a yield benefit of 13.4Ml/d and have allowed a five year lead in time for the investigations to be complete. This allows for an alternative scheme to be found if 13.4Ml/d is not available.

Water Resources Management Plan

Water Resources Management Plan Yorkshire Water Water Resources Management Plan 2014 1 Water Resources Management Plan Yorkshire Water Services Ltd August 2014 Kelda Group Water Resources Management Plan Yorkshire Water Services Ltd

More information

Contents. Executive Summary

Contents. Executive Summary Contents Executive Summary Executive Summary Background, technical approach, objective and scope Scale of our future challenge Our 25-year plan to maintain the supply demand balance Water trading and collaborative

More information

Water Resources Management Plan 2014 Main Report

Water Resources Management Plan 2014 Main Report Water Resources Management Plan 2014 Main Report Final Water Resources Management Plan 2014 Page 2 FINAL WATER RESOURCES MANAGEMENT PLAN 2014 PART 1 MAIN REPORT Contents 1 EXECUTIVE SUMMARY... 9 1.1 Progress

More information

Water resources planning guideline

Water resources planning guideline Water resources planning guideline The guiding principles for developing a water resources management plan June 2012 Development by Environment Agency, Ofwat, Defra and the Welsh Government Environment

More information

2014 Price Review Business Plan Supporting Appendices Network Management. Published 2 December 2013

2014 Price Review Business Plan Supporting Appendices Network Management. Published 2 December 2013 2014 Price Review Business Plan Supporting Appendices Network Management Published 2 December 2013 2 Executive Summary This appendix summarises our approach to Network Management. The appendix focuses

More information

Water resources planning guideline

Water resources planning guideline Water resources planning guideline The technical methods and instructions Developed by Environment Agency, Ofwat, Defra and the Welsh Government Environment Agency Horizon house, Deanery Road Bristol BS1

More information

United Utilities Water Limited Page 2 of 223

United Utilities Water Limited Page 2 of 223 Contents Summary of our Water Resources Management Plan... 3 1 Introduction... 14 2 Customer and stakeholder involvement... 19 3 Our water supply system... 31 4 Water supply availability... 40 5 Demand

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

Trading theory for practice

Trading theory for practice Trading theory for practice A report on opportunities for water resource sharing in East Anglia Water trading is a potential answer to one of the biggest challenges facing the future viability of our industry

More information

12 ENERGY. 12.1 Introduction

12 ENERGY. 12.1 Introduction 12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

Moving water around the UK is part of the solution

Moving water around the UK is part of the solution Moving water around the UK is part of the solution Water Industry Forum 15 th Oct David Essex General Manager - Water Strategy & Innovation Severn Trent Water The problem is clear By the middle / end of

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Northern Ireland Water Limited Water Resources Management Plan

Northern Ireland Water Limited Water Resources Management Plan Northern Ireland Water Limited Water Resources Management Plan Notice This document and its contents have been prepared and are intended solely for NI Water s information and use in relation to its Water

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and

More information

Draft Water Services Strategic Plan

Draft Water Services Strategic Plan Draft Water Services Strategic Plan A Plan for the Future of Water Services Customer Water Wastewater Environment Growth Investment Safeguarding your water for your future Irish Water at a glance... Irish

More information

South Staffs Water. PR14 Customer Research Willingness to Pay Results. 18th June 2013

South Staffs Water. PR14 Customer Research Willingness to Pay Results. 18th June 2013 South Staffs Water PR14 Customer Research Willingness to Pay Results Scott Reid Amanda Borrmann 18th June 2013 Contents Overview of the survey Key findings Service and bill priorities (qualitative questions)

More information

Public Consultation Series - The Strategic and Cost Planning Process in Dublin

Public Consultation Series - The Strategic and Cost Planning Process in Dublin Consultation Summary DOCUMENT CONTROL SHEET Client Project Title Document Title Document No. This Document Comprises National Transport Authority 2030 Vision Consultation Summary MDE0758RP0012 DCS TOC

More information

EU China River Basin Management Programme

EU China River Basin Management Programme Ministry of Water Resources Ministry of Environmental Protection EU China River Basin Management Programme Technical Report 075 Water Resource Supply Security Strategy Analysis Ben Piper, Zhang Wang and

More information

City Plan Part 1 Sustainability Appraisal Summary February 2012

City Plan Part 1 Sustainability Appraisal Summary February 2012 City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and

More information

Risk and Compliance Statement 2013/14

Risk and Compliance Statement 2013/14 Risk and Compliance Statement 2013/14 June 2014 Purpose of this statement The purpose of this statement is: To confirm that we have complied with all our relevant statutory, licence and regulatory obligations;

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

Risk and Compliance Statement 2015

Risk and Compliance Statement 2015 Risk and Compliance Statement 2015 Yorkshire Water Risk and Compliance Statement 2015 2 Endorsement of the Risk and Compliance Statement The Board has confirmed that it has sufficient processes and internal

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop

Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop Held on 20 March 2014 at the Black Country Consortium The Deckhouse Brierley Hill, Dudley. Produced on behalf of the Black

More information

Draft Final PR14 Water Resources Management Plan. Addendum

Draft Final PR14 Water Resources Management Plan. Addendum Draft Final PR14 Water Resources Management Plan Addendum January 2014 Purpose of this document The Environment Agency has asked for further clarification relating to our metering strategy, climate change

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

Changing course through water trading

Changing course through water trading Changing course through water trading How water trading can make a contribution to solving future water scarcity to the benefit of customers and the environment For further information on this report,

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Sustainable Development Strategy

Sustainable Development Strategy Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Official Journal of the European Communities. (Acts whose publication is obligatory)

Official Journal of the European Communities. (Acts whose publication is obligatory) 22.12.2000 L 327/1 I (Acts whose publication is obligatory) DIRECTIVE 2000/60/EC OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 23 October 2000 establishing a framework for Community action in the field

More information

Living & Working Managing Natural Resources and Waste

Living & Working Managing Natural Resources and Waste Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency. Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.

More information

Water Security Action Plan 2011-2016

Water Security Action Plan 2011-2016 Water Security Action Plan 2011-2016 Approved on: 30 May 2011 Owner: Program Manager, Sustainable City 8203 7723 Trim Reference: ACC2011/59983 Net Review Date: 2013 1 1. Introduction Why Has Council Developed

More information

Macro water sharing plans the approach for unregulated rivers

Macro water sharing plans the approach for unregulated rivers Macro water sharing plans the approach for unregulated rivers Access and trading rules for pools Leading policy and reform in sustainable water management Publisher NSW Office of Water Level 18, 227 Elizabeth

More information

The Strategic Environmental Assessment Directive: Guidance for Planning Authorities

The Strategic Environmental Assessment Directive: Guidance for Planning Authorities The Strategic Environmental Assessment Directive: Guidance for Planning Authorities Practical guidance on applying European Directive 2001/42/EC on the assessment of the effects of certain plans and programmes

More information

Managing water abstraction

Managing water abstraction Managing water abstraction May 2013 We are The Environment Agency. It's our job to look after your environment and make it a better place - for you, and for future generations. Your environment is the

More information

Water Resource Plan 2015 (Summary Report) Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond

Water Resource Plan 2015 (Summary Report) Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond () Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond November 2014 Overview Our Water Resource Plan sets out our strategy to secure the reliable supply of drinking water to

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

CATCHMENT MANAGEMENT USING PAYMENTS FOR ECOSYSTEM SERVICES TO RESTORE AND MAINTAIN UPLAND PEAT

CATCHMENT MANAGEMENT USING PAYMENTS FOR ECOSYSTEM SERVICES TO RESTORE AND MAINTAIN UPLAND PEAT CATCHMENT MANAGEMENT USING PAYMENTS FOR ECOSYSTEM SERVICES TO RESTORE AND MAINTAIN UPLAND PEAT There is growing interest in the potential for Payments for Ecosystem Services (PES) to fund conservation

More information

edms 8. AUSTRALIA 8.1 Water Resources Management Policies and Actions

edms 8. AUSTRALIA 8.1 Water Resources Management Policies and Actions 8. AUSTRALIA 8.1 Water Resources Management Policies and Actions In Australia, an Intergovernmental Agreement for a National Water Initiative (NWI) was signed by the Australian Government, all state and

More information

Hydro Power Projections Report. Jennifer Palmer

Hydro Power Projections Report. Jennifer Palmer Hydro Power Projections Report Jennifer Palmer Abstract- The purpose of this report is to assess the current and future role of hydro power in the UK energy supply market. The historical trends and barriers

More information

CLEAN GREEN & SUSTAINABLE NS1439215

CLEAN GREEN & SUSTAINABLE NS1439215 CLEAN GREEN & SUSTAINABLE NS1439215 1 Contents 2 Introduction Strategic Alignment 1 - Energy Efficiency 2 - Water Management 3 - Fleet and Plant Management 4 - Carbon Offsets 5 - Waste Management Everything

More information

Guide to Integrated Strategic Asset Management

Guide to Integrated Strategic Asset Management Guide to Integrated Strategic Asset Management Issue date: 14 November 2011 Acknowledgements This guide is based on the Australasian Procurement and Construction Council Inc. s (APCC) publication, Asset

More information

Impact Assessment (IA)

Impact Assessment (IA) Impact Assessment Review of current funding restrictions for community radio IA No: 1814 Lead department or agency: Department for Culture, Media and Sport Other departments or agencies: Summary: Intervention

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

Managing the Island s Water Resources Planning for the future

Managing the Island s Water Resources Planning for the future Managing the Island s Water Resources Planning for the future www.jerseywater.je Executive summary The Water Resources Management Plan identifies the effects of climate change and population, on the water

More information

Infrastructure Plan. Scoping Report

Infrastructure Plan. Scoping Report Infrastructure Plan Scoping Report November - I - 2009 Infrastructure Plan Scoping Report Contents: Page 1.0 Introduction 1 2.0 Approach 5 3.0 Timetable 7 - I - 1.0 Introduction 1.1 The Infrastructure

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Adapting Northern Adelaide - Submission towards the new Climate Change Strategy for South Australia

Adapting Northern Adelaide - Submission towards the new Climate Change Strategy for South Australia 16 October 2015 Adapting Northern Adelaide Project City of Salisbury and City of Playford Polaris Innovation Centre Mawson Lakes SA 5095 Climate Change Team, GPO Box 1047 Adelaide SA 5001 climatechange@sa.gov.au

More information

december 08 tpp 08-5 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper

december 08 tpp 08-5 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper december 08 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper Preface The NSW Government is committed to the ongoing improvement of public services by ensuring

More information

Basics of Sustainability. Environmental Impact Assessments (EIA)

Basics of Sustainability. Environmental Impact Assessments (EIA) Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6

More information

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries.

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries. Appendix 1 Denbighshire County Council PLANNING STRATEGY DEVELOPER GUIDANCE NOTE November 2015 SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries. Context

More information

Capital Planning Guidelines

Capital Planning Guidelines Capital Planning Guidelines Contents Capital Planning Guidelines... 1 1. INTRODUCTION... 3 2. CAPITAL PROJECTS EVALUATION PROCESS... 3 3. APPRAISAL PROCESS UNDERTAKEN BY DEPARTMENTS... 4 3.1 Extension

More information

Appendix 5. Brighouse and Elland. Fire Station. Business Case

Appendix 5. Brighouse and Elland. Fire Station. Business Case Appendix 5 Brighouse and Elland Fire Station Business Case At a Glance the Key Points for this Proposal Proposal: Key Points: The construction of a new fire station to replace Brighouse and Elland fire

More information

Appendix A. Wiltshire Core Strategy DPD SA/SEA Plans, Policies and Programmes Atkins

Appendix A. Wiltshire Core Strategy DPD SA/SEA Plans, Policies and Programmes Atkins Wiltshire County Council: Wiltshire Site Allocations DPD and Chippenham Site Allocations DPD: Sustainability Appraisal/ Strategic Environmental Assessment Appendix A. Wiltshire Core Strategy DPD SA/SEA

More information

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company (DCC) price control guidance: process and procedures Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required

More information

HUNTER WATER CORPORATION. Greenprint For Sust ainable Urb an Wat er Managem ent

HUNTER WATER CORPORATION. Greenprint For Sust ainable Urb an Wat er Managem ent HUNTER WATER CORPORATION Greenprint For Sust ainable Urb an Wat er Managem ent NOVEMBER 2012 Table of Contents Message from the Managing Director 4 1. Introduction 5 1.1 Cities of the Future 5 1.2 Our

More information

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK...

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK... Department for Environment, Food and Rural Affairs Climate Ready Co-creation progress update and an invitation to respond July 2012 Contents Overview of ideas from co-creation activities towards a Climate

More information

THE BLACK COUNTRY LOCAL FLOOD RISK MANAGEMENT STRATEGY

THE BLACK COUNTRY LOCAL FLOOD RISK MANAGEMENT STRATEGY 50600596 THE BLACK COUNTRY LOCAL FLOOD RISK MANAGEMENT STRATEGY STRATEGIC ENVIRONMENTAL ASSESSMENT OCTOBER, 2015 THE BLACK COUNTRY LOCAL FLOOD RISK MANAGEMENT STRATEGY THE BLACK COUNTRY LOCAL FLOOD RISK

More information

A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS

A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS Introduction Toby Bourke (MWHSoft), Graham McGonigal (MWH) There is currently widespread concern

More information

Carbon Management Plan

Carbon Management Plan E-2015-02-02 Addendum Carbon Management Plan Date: 14 May 2014 Owners: Approval: K.W.Bullimore & M.Sackett A.Burrell Executive Summary This document sets out the Carbon Management Plan (CMP) for The Open

More information

Climate Local Hampshire County Council Our progress on November 2013

Climate Local Hampshire County Council Our progress on November 2013 Climate Local Hampshire County Council Our progress on November 2013 Since signing up to Climate Local on in July 2013 we have made the following progress towards achieving the commitments and actions

More information

Tendring Hundred Water Services Providing a high quality water efficient service

Tendring Hundred Water Services Providing a high quality water efficient service Providing a high quality water efficient service April 2009 Tendring Hundred Water Providing a high quality water efficient service Customer summary of draft Business Plan for 2010 to 2015 Tendring Hundred

More information

The world s leading sustainability consultancy. Sustainable Solutions for the Oil and Gas Industry

The world s leading sustainability consultancy. Sustainable Solutions for the Oil and Gas Industry The world s leading sustainability consultancy Sustainable Solutions for the Oil and Gas Industry The oil and gas industry currently faces the greatest environmental, health and safety challenges in its

More information

6 CONSIDERATION OF ALTERNATIVES

6 CONSIDERATION OF ALTERNATIVES 6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements

More information

Water Forever: South West Margaret River Forum

Water Forever: South West Margaret River Forum Questions from the MRREC 1. How much water is currently being taken from each well/bore and region in the South West? This is a question for the water regulator the Department of Water. Please note information

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Estimating the economic impact of Leeds City Council Capital Expenditure

Estimating the economic impact of Leeds City Council Capital Expenditure Estimating the economic impact of Leeds City Council Capital Expenditure Commissioned by the Regional Economic Intelligence Unit and Funded by Leeds City Region. Appendix D Estimating the economic impact

More information

2014 Residential Electricity Price Trends

2014 Residential Electricity Price Trends FINAL REPORT 2014 Residential Electricity Price Trends To COAG Energy Council 5 December 2014 Reference: EPR0040 2014 Residential Price Trends Inquiries Australian Energy Market Commission PO Box A2449

More information

Dairy Companies Association of New Zealand (DCANZ) Submission to Emissions Trading Scheme Review Select Committee

Dairy Companies Association of New Zealand (DCANZ) Submission to Emissions Trading Scheme Review Select Committee PO BOX 3413 Shortland street Auckland New Zealand ~ h ns. z7a szs7 Dairy Companies Association of New Zealand (DCANZ) Submission to Emissions Trading Scheme Review Select Committee FEBRUARY 2009 INTRODUCTION

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2 2.0

More information

action plan water for life water for life action plan 1

action plan water for life water for life action plan 1 action plan water for life water for life action plan 1 ISBN 978-0-7785-7672-3 November 2009 2 water for life action plan TABLE OF CONTENTS Introduction 3 Alberta Water Council renewal recommendations

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

Sustainability appraisal of the Norwich development management policies local plan:

Sustainability appraisal of the Norwich development management policies local plan: Norwich Local Plan Sustainability appraisal of the Norwich development management policies local plan: Environmental adoption statement (December 2014) DM policies plan Environmental adoption statement

More information

Industrial Water Use in the United States. U.S. Department of the Interior U.S. Geological Survey

Industrial Water Use in the United States. U.S. Department of the Interior U.S. Geological Survey Industrial Water Use in the United States Methods, Status, t and Trends U.S. Department of the Interior U.S. Geological Survey Water withdrawals by category Livestock Self-Supplied Supplied Domestic Public

More information

Envision Framework and Rating System. Melissa Peneycad November 2015

Envision Framework and Rating System. Melissa Peneycad November 2015 Envision Framework and Rating System Melissa Peneycad November 2015 Outline 1 Introducing Envision 2 Two key ways to think about Envision 3 Become an Envision Sustainability Professional (ENV SP) Like

More information

Kristina Veidemane, Baltic Environmental Forum Panevezys, 12.05.2015

Kristina Veidemane, Baltic Environmental Forum Panevezys, 12.05.2015 Priority 2 Protection and restoration of biodiversity and soil and promotion of ecosystem services, including through Natura 2000, and green infrastructure Kristina Veidemane, Baltic Environmental Forum

More information

OUR ASSURANCE PLAN 2016/17 MARCH 2016. 1 Our Assurance Plan 2016/17

OUR ASSURANCE PLAN 2016/17 MARCH 2016. 1 Our Assurance Plan 2016/17 OUR ASSURANCE PLAN 2016/17 MARCH 2016 1 Our Assurance Plan 2016/17 ABOUT THIS DOCUMENT We publish a range of information about our services and performance. This helps to provide our customers and stakeholders

More information

V1.0 - Eurojuris ISO 9001:2008 Certified

V1.0 - Eurojuris ISO 9001:2008 Certified Risk Management Manual V1.0 - Eurojuris ISO 9001:2008 Certified Section Page No 1 An Introduction to Risk Management 1-2 2 The Framework of Risk Management 3-6 3 Identification of Risks 7-8 4 Evaluation

More information

Page 97. Executive Head of Asset Planning, Management and Capital Delivery

Page 97. Executive Head of Asset Planning, Management and Capital Delivery Page 97 Agenda Item 7 Report to: Strategy and Resources Committee Date: 16 December 2013 Report of: Executive Head of Asset Planning, Management and Capital Delivery Ward Location: Not applicable Author

More information

Bespoke Gas CHP Policy

Bespoke Gas CHP Policy Bespoke Gas CHP Policy Summary of Analysis Results & Conclusions December 2014 Crown copyright 2014 URN 14D/469 You may re-use this information (not including logos) free of charge in any format or medium,

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Staff Paper 6. Allowed for operating costs. 6.1 Introduction

Staff Paper 6. Allowed for operating costs. 6.1 Introduction Staff Paper 6 Allowed for operating costs This staff paper has been produced by our office to assist stakeholders in responding to the Draft Determination. The material reflected in this staff paper has

More information

White Rose Carbon Capture and Storage (CCS) Project Document Ref: 8.5 - Rev. 2 PINS Ref: EN10048

White Rose Carbon Capture and Storage (CCS) Project Document Ref: 8.5 - Rev. 2 PINS Ref: EN10048 White Rose Carbon Capture and Storage (CCS) Project Document Ref: 8.5 - Rev. 2 PINS Ref: EN10048 The White Rose CCS (Generating Station) Order Land adjacent to and within the Drax Power Station, Drax,

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Oil Sands Environmental Coalition

Oil Sands Environmental Coalition Oil Sands Environmental Coalition 2 December 2013 Canadian Environmental Assessment Agency Attention: David Haddon Panel Manager 160 Elgin Street, 22nd Floor Ottawa ON K1A 0H3 Frontier.Review@ceaa-acee.gc.ca

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Project Evaluation Guidelines

Project Evaluation Guidelines Project Evaluation Guidelines Queensland Treasury February 1997 For further information, please contact: Budget Division Queensland Treasury Executive Building 100 George Street Brisbane Qld 4000 or telephone

More information

Thames Water is pleased to comment on the proposed changes to the London Plan 2014.

Thames Water is pleased to comment on the proposed changes to the London Plan 2014. Boris Johnson Mayor of London (London Plan) Greater London Authority City Hall More London The Queen s Walk London SE1 2AA Thames Water Property Services Your ref Our ref Name Phone Email London Plan Review

More information

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects REnescience Northwich Quality Management Prepared by: Tom Dearing Senior Environmental Consultant 02/10/15 Reviewed & checked by:

More information