1 JOINT PERMIT APPLICATION PACKAGE Delaware City Refining Company LLC Shoreline Stabilization & Restoration Project Date: Prepared For: Delaware City Refining Company LLC 4550 Wrangle Hill Road Delaware City, Delaware, Prepared By: In Association With: Cardno ENTRIX 10 Corporate Circle, Suite 300 New Castle, Delaware Living Shoreline Solutions, Inc Grand Traverse Drive Dade City, Florida 33525

2 Joint Permit Application In an effort to maintain the highest level of written communication and transparency between agencies, this permit application package contains the required permit application elements for both the State of Delaware (DNREC) and the U.S. Army Corps of Engineers (USACE). Both agencies have been sent identical applications for their records. The USACE has also received an electronic copy of this application. This submittal is being provided: 1) Based on the USACE s communicated preference to consider this project under an Individual Permit (IP) application, which includes the additional information incorporated into this submittal; 2) To respond to the USACE s request for additional information; 3) To reflect design modifications, primarily associated with the extent of proposed nourishment, as suggested by the USACE; and 4) Modifications to the State of Delaware permit application to maintain consistency. A Request for Department of the Army Jurisdictional Determination (JD), CENAP Form 1891 was submitted as part of the original permit application. A Preliminary JD is still requested. This application is organized as follows: Part 1 Project Narrative Part 2 Department of the Army, General Engineering Form 4345, rev. October 2012 Part 3 Environmental Questionnaire Part 4 Delaware Department of Natural Resources and Environmental Control, Wetland and Subaqueous Lands Section Permit Application Form Part 5 Delaware Department of Natural Resources and Environmental Control, Wetland and Subaqueous Lands Section Permit Application Form Appendix H Part 6 Delaware Coastal Zone Consistency Review Part 7 Consultation Letters and Responses Part 8 Adjacent Property Owners & Mailing Addresses Part 9a Project Design 8.5 X 11 Part 9b Project Design 11 X 17 Part 10 Model Delaware City WAD s Installation Wave Study and Layout Design Part 11 Survey Information Part 12 Laboratory Data Prepared for Delaware City Refining Company LLC Page i

3 PART 1 Project Narrative

4 Delaware City Refining Company Shoreline Stabilization & Restoration Project Part 1: Project Narrative Presentation of Project Needs and Project Purpose: The shoreline located on the Delaware City Refining Company property, New Castle, Red Line Hundred, New Castle County, Delaware, in the vicinity of the Dock Area, is being impacted by erosional forces predominantly associated with wave energy from storm events. Review of the National Wetland Inventory map (NWI), dated circa 1982, depicts the tidal limits at the time the map was created (Figure 1). Overlaying the NWI information on more recent aerial photography depicts the former tide line as being well within the current intertidal zone. The extent of tidal encroachment is obvious. A similar evaluation was performed comparing the amount of encroachment between 1982, 2007, 2012, and 2013 over a portion of the project site (Figure 2). Between 2007 and 2013 approximately 9,500 square feet of uplands have been lost within that portion of the project evaluated. Between 2012 and 2013 approximately 3,200 square feet of uplands have been lost within the portion of the project evaluated. Review of historical photography suggests that the rate of shoreline erosion is increasing. Panoramic photography of this area is provided at the end of Part 1. The extent of the shoreline erosion has reached a point where facility infrastructure is at risk. One area of particular concern is associated with the firefighting infrastructure, used for vessel and dock fire response. The less visible shoreline located under the piers, and especially the boat house, is also experiencing erosion. The erosion is greatest in the southern portion of the Dock Area, referred to as the Phase 1 (of 2) Area. The project purpose is to meet the following goals: > Eliminate the majority of the wave energy causing the erosion from reaching the shoreline; > Provide a designed solution that has the resilience to deal with Sea Level Rise (SLR) for at least 50 years; > Meet stabilization goals and restore the shoreline to be more ecologically functional (i.e., provide for eco-function up-lift); and > Provide for natural accretion, a small portion of which will initially be supplemented with the placement of dredged material from an on-site designated dredge material storage area (DMSA) (re-use). Consideration of Alternatives: The consideration of alternatives focused predominantly on the project goals noted above. Four alternatives were considered for this project: 1. No Action; 2. Shoreline Riprap; 3. Energy Attenuation (with complete nourishment for the Phase I portion); and 4. Energy Attenuation (with minimal nourishment for the Phase I portion). Prepared for Delaware City Refining Company LLC Page 1

5 Alternative 1 No Action The No Action alternative would result in the continued severe erosion along the Dock Area. Structural foundations would continue to be compromised. Facility infrastructure (e.g., that critical for firefighting) would continue to be destroyed, eventually preventing the dock facility to function within required parameters. The No Action alternative could expectantly and eventually lead to dock facility failures resulting in human risk. None of the project goals are met under the No Action alternative. Alternative 2 Shoreline Riprap Approximately 2,700 linear feet of shoreline riprap (mixed new riprap placement and additions to existing riprap) has the ability to protect a shoreline for a period of time. Under this scenario, the riprap may be placed below the intertidal zone and in the uplands immediately above the high tide line. The riprap has been used in the project area previously with limited success. The tidal waters have continued to encroach landward using this technique. In addition, this approach does not meet the project goals for SLR or storm resilience, wave energy reduction, or ecological functional uplift. This technique is no longer a preferred alternative by most resource agencies because of its resulting low ecological uplift and the inhibitions to intertidal and supratidal habitat utilization by certain species (e.g., turtles, horseshoe crabs, and certain birds). This alternative would require limited nourishment channelward of the riprap. Alternative 3 Energy Attenuation with Complete Nourishment for the Phase I Portion Alternative 3 would include the deployment of 934 wave attenuation devices (WADs) parallel to approximately 2,714 linear feet of the shoreline near the mean low tide line. The alternative would also include dredged material nourishment re-use, involving the placement of approximately 11,000 cubic yards of dredged material over a 3.05-acre (132,660 square feet) area located landward of the WADs. Approximately 1,015 cubic yards of the 11,000 cubic yards of dredged material was determined to be necessary for infrastructure and foundation protection (restoring pre-existing intertidal elevations). The nourishment volume will restore soft bottom habitat to a pre-existing intertidal elevation suitable for intertidal benthic populations and volunteer re-establishment of intertidal vegetation. An additional approximately 800 cubic yards of material would also be used above the high tide line to restore a natural grade between the top of bank cut and the high tide line (non-regulated work). This alternative met all of the project goals. The energy attenuation technology is a relatively new applied science, providing opportunity for a larger array of ecological uplifts throughout the entire coastal regime (supratidal through subtidal). The nourishment of approximately 11,000 cubic yards of dredged material would bring the site to the ideal elevation for volunteer repopulation of intertidal vegetation. Absent the dredged material, the site would passively accrete to a targeted elevation at a slower and more stormdependent pace. Since this project is the first application of this technique in the Delaware River Basin, the spreading of approximately 11,000 cubic yards of dredged material over more than 3 acres of intertidal surface may raise concerns with certain agencies until the technology is proven successful locally. Alternative 4 Energy Attenuation with Minimal Nourishment for the Phase I Portion Alternative 4 would include the deployment of 934 WADs parallel to approximately 2,714 linear feet of the shoreline near the mean low tide line. The alternative would also include dredged material nourishment re-use, involving the placement of approximately 1,015 cubic yards of dredged material necessary for infrastructure and foundation protection (restoring to pre-existing intertidal elevations). The 1,015 cubic yards of re-use would have a dual purpose of restoring soft bottom habitat to a pre-existing intertidal elevation suitable for intertidal benthic populations and the volunteer re-establishment of intertidal Prepared for Delaware City Refining Company LLC Page 2

6 vegetation. An additional approximately 800 cubic yards of material would also be used above the high tide line to restore a natural grade between the top of bank cut and the high tide line (non-regulated work). This alternative met all of the project goals. The short-term ecological uplift would be less than that of Alternative 3, due to the reduced nourishment volume and extent. However, this alternative does limit the nourishment to that which was determined to be necessary to protect current investments and maintain facility safety. Based on the cumulative feedback from the regulatory agencies, the incorporation of a reduced volume of dredged material appears to be the more universally acceptable approach. Selection of Alternative Alternatives 3 and 4 appear to meet all of the project goals and represent green approaches. Alternative 4 appears to be a more universally acceptable approach compared to Alternative 3. Alternative 1 was rejected outright, because the severe erosion at the project area cannot be ignored. Alternative 2, while offering some short-term benefit, falls short of many of the project goals (e.g., ecologically appropriateness and resiliency). Therefore, Alternative 4 was selected. Description of the Proposed Applied Technology: The proposed applied technology is wave energy attenuation. Unlike breakwaters or sills which deflect or diffract a great deal of the wave energy, wave energy attenuation breaks up the majority of the concentrated wave energy as the wave passes through the attenuation devices prior to reaching the shoreline. This technology affects the primary cause of shoreline erosion and impairment; it converts the effected shoreline from a higher energy system to a lower energy system, promoting passive accretion. The project will involve placing a double row of WADs near the mean low tide line. The WADs will be placed parallel to the shoreline, running approximately 2,714 linear feet. Prepared for Delaware City Refining Company LLC Page 3

7 JOINT PERMIT APPLICATION PACKAGE Delaware City Refining Company Shoreline Stabilization & Restoration Project Prepared for Delaware City Refining Company LLC Page 4

8 JOINT PERMIT APPLICATION PACKAGE Prepared for Delaware City Refining Company LLC Page 5

9 Delaware City Refining Company Shoreline Stabilization & Restoration Project The WADs would be installed over two to three independent phases (i.e., WAD Installation Phase I (1,446 l ft.; 497 WADs) and Phase II (1,268 l ft.; 437 WADs)), see Part 9a or 9b, Sheet 4 of 9. The passive accretion will improve the sediment profile and grade. Combined with the reduced energy, the project will allow for shoreline configuration, substrate, and benthic and vegetative community uplifts. Within the Phase I Area, the foundation of the boat house (south area) and the firefighting infrastructure (north area) are experiencing increasingly severe erosion during the past nearly two years. Nourishment extending up to 50 feet below the foundation and infrastructure, mimicking preexisting intertidal elevations, is being proposed (see Part 9a or 9b, Sheet 7 of 9). The remainder of earthwork will occur landward of the high tide line (HTL). Nourishment will be performed in areas having non-vegetated shoreline in Phase I. The Phase II area currently has intertidal vegetation, so nourishment will not occur in this area. The maximum accretion elevations landward of the WAD arrays were designed to mimic the elevation of the low marsh (E2EM1P) observed on-site. The end product will be a low-grade intertidal area that will work with the WAD arrays as a system to reduce energy and allow for marsh vegetation recovery/reestablishment. Additionally, the improved marsh habitat will also help to naturally protect DCRC s ship dock infrastructure. This project design has incorporated safety, security, and spill prevention elements. These elements include two emergency vessel access openings in the WAD arrays. In addition, the placement of the WAD arrays affected the current emergency boom deployment strategy. As such, the emergency boom deployment configuration warranted modification, resulting in new boom deployment structures (44 individual pilings). The modification will result in improved emergency spill containment, channelward of the WAD arrays. The project is planned to commence in the summer of 2014 and run through Positioning of Structures: Two sets of structures will be placed as part of this project. One set of structures to be placed is pilings associated with boom anchoring for spill response improvements. These pilings will be placed at a maximum spacing of 90 feet, approximately 20 feet channelward of the WAD arrays, but landward of the dock structure. This separation distance allows for small emergency response vessels to deploy and manage the booms during responses and allow for boom line sag. A total of 44 pilings are proposed, inclusive of landward anchor posts; 22 pilings in Phase I and 22 pilings in Phase II. The top of piling elevation will be 12 feet. The 12-foot elevation was specified based on the Super Storm Sandy maximum HTL of 9.74 feet recorded at the Delaware City tidal gage, plus two feet. The pilings will be installed using a barge-mounted pile driver or similar equipment. To stabilize the barge during operations, steel or wood Prepared for Delaware City Refining Company LLC Page 6

10 columns (spuds) would be extended to the river bottom to anchor the barge. Piles will be driven to their design depth and cut off at an elevation of 12 feet. The boom material will be comparable to that currently used. Note the stone, brick, and other debris in substrate preventing establishment of vegetation. WADs will be placed in a linear double array with the center line approximately following the mean low water (MLW) line, average elevation 1 foot (with the mean lower low water (MLLW) line being at a tidal datum elevation of 0 foot). The mean high water (MHW) line is 5.52 feet. The HTL was visibly estimated to be approximately 6.5 feet. Since the WAD arrays will be approximately following the MLW line, the distance from the uneven shoreline will vary slightly. Refer to the design plans for specific details on WAD array placement. Each WAD is three-sided pyramidal, hollow, and has beveled triangular openings on each side. The WADs are approximately 5 feet high with a 10-foot base. The WADs will have up to 1-foot spacing. Because the WADS are hollow, the footprint of each WAD on soft bottom substrate is only an approximate 14 square feet. New threedimensional hard surface created per WAD is more than 256 square feet. Table 1 provides a summary of associated habitat matrices. There are no similar structures in the area. WAD arrays do not require any riprap outflanking. The USACE method, as included in the ACES (Automated Coastal Engineering System) software, was used to estimate the wave conditions generated by the 5 percent and 2 percent extreme (see Part 9). Using the proposed WAD array configuration, worst case 2 percent extreme storm waves (slightly less than 2 feet) would be reduced to less than 4 inches in height, virtually eliminating the erosive energy contacting the shoreline. Table 1. WAD Habitat Matrices Phase I II Length (l ft) 1,446 1,268 # of WADs SBC- Soft Bottom Coverage (ft 2 ) (lower is better) 6,958 6,118 SBC/l ft NHS - New Hard Surface Area (ft 2 ) (higher is better) 140, ,229 NHS/l ft SHS Soft/Hard Surface Index (SBC/NHS) (lower is better) Nourishment: Nourishment will occur only during Phase I of the project at two specific locations where erosion is significantly affecting foundations and/or facility firefighting infrastructure. The intertidal area associated Prepared for Delaware City Refining Company LLC Page 7

11 with Phase II contains considerable vegetated areas and portions contain a layer of semi-suspended organic/silt layer sitting atop a harder bottom. As such, only passive accretion will occur in Phase II. The nourishment in Phase I will cover rock, stone, and concrete currently layering this portion of shoreline, which is impacting the establishment of vegetation and optimum soft bottom ecological functions. The proposed project will use approximately 1,015 cubic yards of dredged material, settled volume. The dredge material for re-use will be trucked in from an on-site designated DMSA; sand-based material with limited fines will be targeted within the DMSA. Prior to transport and placement of the dredged material, representative sediment quality data will be provided to DNREC and the USACE for review and approval. Ecological Up-Lift: There is a considerable amount of ecological uplift associated with this project. The stabilization of the shoreline allows for a stable shoreline ecosystem to develop. The intertidal zone will receive limited nourishment and natural accretion. The nourishment and accretion will start to re-establish a gently sloped, soft bottom, intertidal zone for natural establishment of vegetation, creating a more amiable environment for eventual marsh establishment. The structural component of the project also provides significant benefits. This portion of the river has predominantly soft bottom shorelines and limited hard surface for sessile organisms. The placement of the 44 pilings will result in the cumulative loss of approximately 34 square feet of soft bottom substrate. However, each piling will provide between 6 and 15.7 square feet of sub and intertidal hard surface for sessile organisms (depending on piling location), totaling approximately 400 square feet of hard surface. The hard surface area provided by the WADs within the intertidal zone will be approximately 263,528 square feet (256.5 square feet per smooth WAD, square feet per corrugated WAD). This structure will also provide excellent fish habitat without the risk of trapping organisms landward of the structures during low tide periods. When comparing the use of a double WAD array to a stone sill or breakwater of similar height (e.g., 5 feet high with a 5-foot crest with 3:1 slope channelward side and a 2:1 slope landward side), the loss of soft bottom substrate would be 81,420 square feet; 725 percent more soft bottom impact compared to the impact if using the WAD arrays. Comparing a hard surface area provided by the same sill (multiplying the surface face by 1.45 to account for roughness), a hard surface area of 125,890 square feet was calculated, just 54 percent of that provided by the WAD arrays. The soft bottom/hard surface ratio (SHS) for the WAD arrays was 5.0 percent; the comparable sill was 64.8 percent (lower is better). In addition, the WAD arrays provide a greater dimensional (vertical) profile, with habitat throughout the entire intertidal elevation and across the entire array, where sills are much more surficial (planar). Proposed Monitoring: Note the existing heavy daily turbidity. The proposed monitoring will involve establishing six base (preconstruction) elevation points per phase. Elevation at these points will be measured immediately post WAD placement, and at a minimum, twice a year for three years. Changes in elevation will be documented. In addition, shallow borings (up to 24 inches) will be collected carefully at low tide to document depositional profiles. Vegetation establishment will also be documented within the intertidal zone. Plots of new volunteer vegetation greater than 50 square feet will be located with GPS and plotted Prepared for Delaware City Refining Company LLC Page 8

12 on a plan. Smaller populations of vegetation, not GPS located, will be noted. Structural stability and integrity will be documented for the WADs, as well as evidence of ecological utilization. Photodocumentation will also be collected. Permits Requests: This application is seeking a DNREC Subaqueous Lands Permit and a Department of the Army Individual Permit. 401 Water Quality Certification and Coastal Zone Management Consistency Concurrence are also being requested from the state. As previously communicated, a Preliminary JD is being requested. Due to the clear ecological uplift relative to the minimal negative impact, this project is believed to be selfmitigating. Prepared for Delaware City Refining Company LLC Page 9

13 Prepared for Delaware City Refining Company LLC Page 10

14 JOINT PERMIT APPLICATION PACKAGE Prepared for Delaware City Refining Company LLC Page 11

15 Prepared for Delaware City Refining Company LLC Page 12

16 JOINT PERMIT APPLICATION PACKAGE Beginning to lose fire safety infrastructure Prepared for Delaware City Refining Company LLC Page 13

17 About Cardno ENTRIX Cardno ENTRIX joined global consulting firm Cardno in 2010 and operates within Cardno s Natural Resources Management and Health Sciences Division. Cardno ENTRIX is an environmental, natural resource, and health sciences consulting firm specializing in water and natural resources management, environmental permitting and compliance, environmental liability management, economics, and health sciences. Cardno ENTRIX helps clients navigate complex environmental, natural resource, and business challenges with teams of multi-disciplinary specialists well-versed in creative problem-solving techniques. To learn more, visit About Cardno ChemRisk Cardno ChemRisk is an internationally recognized risk assessment consulting firm specializing in understanding the hazards posed by chemicals in foods, soil, sediment, air, water, and medical devices. Cardno ChemRisk, as a Cardno division and operating unit of Cardno ENTRIX, helps clients characterize the health and environmental risks associated with complex exposures involving chemicals, pharmaceuticals, or radionuclides in a variety of media and environments. About Cardno Cardno is a professional infrastructure and environmental services company, with expertise in the development and improvement of physical and social infrastructure for communities around the world. Cardno s team includes leading professionals who plan, design, manage and deliver sustainable projects and community programs. Cardno is an international company listed on the Australian Securities Exchange [ASX:CDD]

Most informed people realize that cumulative impacts have had

Most informed people realize that cumulative impacts have had Welcome to the First Issue of Rivers & Coast! The goal of the new Rivers & Coast newsletter is to keep readers well informed of current scientific understanding behind key environmental issues related

More information

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan State of Louisiana Coastal Protection and Restoration Authority of Louisiana 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan for East Marsh Island Marsh Creation State Project Number TV-21

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting Coastal

More information

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014 Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors Recreational Boating Educational Conference December 11, 2014 Operators Face Change and Challenges Environmental Conditions Fluctuating

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

PROGRAMMATIC ESA 1 CONSULTATION Specific Project Information Form For Scientific Measurement Devices Version: May 2012

PROGRAMMATIC ESA 1 CONSULTATION Specific Project Information Form For Scientific Measurement Devices Version: May 2012 PROGRAMMATIC ESA 1 CONSULTATION Specific Project Information Form For Scientific Measurement Devices Version: May 2012 Eligibility for Programmatic Consultation To be filled out by Corps This application:

More information

Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration

Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration Future of our coasts: Potential for natural and hybrid infrastructure Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration Green

More information

COST AND MAINTENANCE OF LIVING SHORELINES

COST AND MAINTENANCE OF LIVING SHORELINES COST AND MAINTENANCE OF LIVING SHORELINES Photo: C. Verlinde, University of Florida Sea Grant Extension Debbie L. DeVore South Florida Coastal Program Coordinator What are Living Shorelines? Shoreline

More information

LOCATION: In Elliott Bay, Puget Sound at Seattle, King County, Washington.

LOCATION: In Elliott Bay, Puget Sound at Seattle, King County, Washington. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Illinois Coastal Management Program 2011

Illinois Coastal Management Program 2011 4 Coastal Erosion Assessment and Planning The Lake Michigan coast is a dynamic setting influenced by waves, ice, and changing lake levels. The potential for coastal erosion exists along nearly the entire

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN Performed February 2003 Performed by: Dr. Lee E. Harris, Ph.D., P.E. Associate Professor of Ocean Engineering & Oceanography

More information

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.: SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters. Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,

More information

The project site lies within an AE Zone and portions lie within the regulated floodway. Development of this site is subject to TCLUO, Section 3.060.

The project site lies within an AE Zone and portions lie within the regulated floodway. Development of this site is subject to TCLUO, Section 3.060. Introduction This application is for the Southern Flow Corridor-Landowner Preferred Alternative, a flood mitigation and tidal wetland restoration project. The Port of Tillamook Bay is the applicant in

More information

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons

More information

Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic Modeling Summary Report

Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic Modeling Summary Report Port of New York and New Jersey Feasibility Analysis for a Dredged Material Public Processing Facility Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic

More information

Section 401 Water Quality Certification

Section 401 Water Quality Certification Section 401 Water Quality Certification Department of Health Environmental Management Division Clean Water Branch Voice: (808) 586-4309 Fax: (808) 586-4352 http://www.hawaii.gov/health/environmental/water/cleanwater/index.html

More information

CONTAINMENT BOOM OBJECTIVE & STRATEGY TACTIC DESCRIPTION. Mechanical Recovery Containment and Recovery

CONTAINMENT BOOM OBJECTIVE & STRATEGY TACTIC DESCRIPTION. Mechanical Recovery Containment and Recovery Mechanical Recovery Containment and Recovery CONTAINMENT BOOM OBJECTIVE STRATEGY ing is a fixed- tactic. The objective is to corral spilled oil on the water, usually near the source, thus minimizing spreading

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

a. For all activities that would result in the discharge of fill material into any vernal pool;

a. For all activities that would result in the discharge of fill material into any vernal pool; Final Sacramento District Nationwide Permit Regional Conditions for Nevada and the Lake Tahoe Basin in California (Effective March 19, 2012 until March 18, 2017) 1.* When pre-construction notification

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

Appendix H Dredging and Stream Channel Restoration

Appendix H Dredging and Stream Channel Restoration Appendix H Dredging and Stream Channel Restoration Mankind s intrusion into the natural environment in West Virginia began in earnest following the Civil War when extractive industries and settlement all

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY

APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY PORTLAND HARBOR RI/FS APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY DRAFT Prepared for The Prepared by Anchor QEA, LLC TABLE OF CONTENTS TABLE OF CONTENTS... I LIST OF FIGURES... II LIST OF TABLES...

More information

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

San Francisco Bay Margin Conservation Decision Support System (DSS)

San Francisco Bay Margin Conservation Decision Support System (DSS) San Francisco Bay Margin Conservation Decision Support System (DSS) Presented by Brian Fulfrost1, MS David Thomson2, MS 1 Brian Fulfrost and Associates 2 San Francisco Bay Bird Observatory Transitional

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

Remaining Wetland Acreage 1,500,000 915,960 584,040-39%

Remaining Wetland Acreage 1,500,000 915,960 584,040-39% NEW JERSEY Original Wetland Acreage Remaining Wetland Acreage Acreage Lost % Lost 1,500,000 915,960 584,040-39% New Jersey Wetlands: Nearly 99 percent of New Jersey s wetlands are palustrine or estuarine.

More information

Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs

Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Oakwood Beach Storm Damage Prevention Project NJDEP- Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Branch Dwight Pakan, Project Manager, Philadelphia District The State of New Jersey

More information

Shoreline Master Programs Handbook Chapter 15, Shoreline Stabilization

Shoreline Master Programs Handbook Chapter 15, Shoreline Stabilization Shoreline Master Programs Handbook Chapter 15, Shoreline Stabilization Publication Number: 11-06-010 7/15 Contents Introduction... 1 Chapter overview... 2 Description of shoreline stabilization... 2 Design

More information

Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier

Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier University of Maryland & National Oceanic and Atmospheric Administration

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

Block and Gravel Inlet Protection (BIP)

Block and Gravel Inlet Protection (BIP) Block and Gravel Inlet Protection (BIP) Practice Description Block and gravel inlet protection is a sediment control barrier formed around a storm drain inlet by the use of standard concrete block and

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

SEAPRO has both foam filled flotation boom and inflatable boom systems.

SEAPRO has both foam filled flotation boom and inflatable boom systems. BOOMING OPERATIONS SEAPRO Response Operations Manual General Information Booming operations are necessary for the containment and concentration of spilled oil on water. By containing product, potential

More information

JOINT PUBLIC NOTICE June 28, 2016

JOINT PUBLIC NOTICE June 28, 2016 DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT CORPS OF ENGINEERS REGULATORY FUNCTIONS BRANCH P.O. BOX 60267 NEW ORLEANS, LA 70160 JOINT PUBLIC NOTICE June 28, 2016 STATE OF LOUISIANA DEPARTMENT OF ENVIRONMENTAL

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project

PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project Regulatory Division 1455 Market Street, 16 th Floor San Francisco, CA 94103-1398 PUBLIC NOTICE NUMBER: 2004-28512S PUBLIC

More information

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update July 16, 2015 Policy Committee FEMA Map Update Costal Analysis and mapping study by FEMA in 2009 Changes

More information

Beach Management Funding Assistance Program

Beach Management Funding Assistance Program FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATER RESOURCE MANAGEMENT Beach Management Funding Assistance Program Local Government Funding Requests: Ranking Criteria for Beach and Inlet

More information

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses. 4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS .-ro:'j - I US Army Corps of Engineers r& New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Craig Martin nae-pn-nav@usace.army.mil Programs/Project Management

More information

Flood Damage Mitigation And Insurance Costs

Flood Damage Mitigation And Insurance Costs Flood Damage Mitigation And Insurance Costs Friday, September 25, 2015 at 7:00 PM Saturday, September 26, 2015 at 10:00 AM This presentation was prepared by the Town of South Bethany using Federal Funds

More information

Updates: LUR Rulemaking & FEMA Flood Mapping. Vince Mazzei, PE

Updates: LUR Rulemaking & FEMA Flood Mapping. Vince Mazzei, PE Updates: LUR Rulemaking & FEMA Flood Mapping Vince Mazzei, PE New Jersey Department of Environmental Protection Division of Land Use Regulation February 11, 2015 Today s topics: Brief overview of NJ s

More information

Using LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine

Using LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine Geologic Site of the Month February, 2010 Using LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine 43 o 20 51.31 N, 70 o 28 54.18 W Text by Peter Slovinsky, Department of Agriculture, Conservation

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

An Initial Assessment of the Impacts of Sea Level Rise to the California Coast

An Initial Assessment of the Impacts of Sea Level Rise to the California Coast An Initial Assessment of the Impacts of Sea Level Rise to the California Coast Photo by D. Revell 2/23/08 California Coastal Records Project Dr. David Revell and Matt Heberger, P.E. Dr. Peter Gleick, Bob

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

Managing Our Water Retention Systems

Managing Our Water Retention Systems Managing Our Water Retention Systems 29th Annual USSD Conference Nashville, Tennessee, April 20-24, 2009 Hosted by Corps of Engineers On the Cover Wolf Creek Dam is on the Cumberland River in South Central

More information

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS:

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS: Date Received: Received By: Project/Permit Number: Fee: (To be Completed by MOA) FLOOD HAZARD PERMIT APPLICATION (Please fill out application completely; Indicate NA if necessary. Property information

More information

http://library1.municode.com/default/docview/10251/1/101/103

http://library1.municode.com/default/docview/10251/1/101/103 Page 1 of 8 ARTICLE II. FLOOD DAMAGE PREVENTION* *Cross references: Buildings and building regulations, ch. 67; floor elevation standards, 67-32; flood damage prevention for utility systems, 67-34; drainage

More information

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT PUBLIC NOTICE Engineering/Planning 696 Virginia Road Concord, MA 01742 Date: 10 November, 2015 Comment Period Ends: 10 December, 2015 In Reply, Refer To: Robert Russo Or by e-mail: Robert.S.Russo@usace.army.mil

More information

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for: EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

JOINT APPLICATION FOR ENVIRONMENTAL RESOURCE PERMIT/ AUTHORIZATION TO USE SOVEREIGN SUBMERGED LANDS/ FEDERAL DREDGE AND FILL PERMIT

JOINT APPLICATION FOR ENVIRONMENTAL RESOURCE PERMIT/ AUTHORIZATION TO USE SOVEREIGN SUBMERGED LANDS/ FEDERAL DREDGE AND FILL PERMIT JOINT APPLICATION FOR ENVIRONMENTAL RESOURCE PERMIT/ AUTHORIZATION TO USE SOVEREIGN SUBMERGED LANDS/ FEDERAL DREDGE AND FILL PERMIT FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION/ WATER MANAGEMENT DISTRICTS/

More information

Evaluating the Condition of Seawalls/Bulkheads

Evaluating the Condition of Seawalls/Bulkheads Volume 2 Evaluating the Condition of Seawalls/Bulkheads By: Coastal Systems International, Inc. Typical bulkhead under construction Seawalls and bulkheads (walls) provide shoreline stabilization for many

More information

SHORELINE STABILIZATION RECOMMENDATIONS FOR PLAYA DEL SECRETO MAYA RIVIERA, Q.R., MEXICO

SHORELINE STABILIZATION RECOMMENDATIONS FOR PLAYA DEL SECRETO MAYA RIVIERA, Q.R., MEXICO SHORELINE STABILIZATION RECOMMENDATIONS FOR PLAYA DEL SECRETO MAYA RIVIERA, Q.R., MEXICO NOVEMBER 2007 PHOTOGRAPH LOOKING SOUTH ALONG PLAYA DEL SECRETO PREPARED BY: Lee E. Harris, Ph.D., P.E. Consulting

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

Windmill Hill Bulkhead Improvements Project. Community Meeting 2 April 13, 2015

Windmill Hill Bulkhead Improvements Project. Community Meeting 2 April 13, 2015 Windmill Hill Bulkhead Improvements Project Community Meeting 2 April 13, 2015 Tonight s Meeting Agenda A. Introductions and overview B. Community Meeting 1 summary C. Recap of current conditions D. Improvement

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

MINIMUM STANDARDS FOR ACCEPTANCE OF AQUATIC RESOURCES DELINEATION REPORTS

MINIMUM STANDARDS FOR ACCEPTANCE OF AQUATIC RESOURCES DELINEATION REPORTS MINIMUM STANDARDS FOR ACCEPTANCE OF AQUATIC RESOURCES DELINEATION REPORTS U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG January 2016 The U.S Army Corps of Engineers, through its Regulatory Program, regulates

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT 2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the

More information

The Hudson River Sustainable Shorelines Project

The Hudson River Sustainable Shorelines Project The Hudson River Sustainable Shorelines Project Jon K. Miller, Ph.D. and Andrew Rella Stevens Institute of Technology And a cast of thousands including: Betsy Blair, Emilie Hauser, Dan Miller, Stuart Findlay,

More information

5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 2009 2010 2011 2012 2013 Year

5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 2009 2010 2011 2012 2013 Year Figures Wave Height (ft) 5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 2009 2010 2011 2012 2013 Year Figure 1. Annual mean wave height (feet) at the Massachusetts Bay A buoy. The red line is the 2001-2009

More information

Little Lake Shoreline Protection & Marsh Creation Project BA-37

Little Lake Shoreline Protection & Marsh Creation Project BA-37 Little Lake Shoreline Protection & Marsh Creation Project BA-37 SCI PROJECT NO. 116478 POST CONSTRUCTION SURVEY REPORT AUGUST 2007 Prepared for: Louisiana Department of Natural Resources Prepared By: Shaw

More information

Summary of the Proposed 2017 Nationwide Permits 1

Summary of the Proposed 2017 Nationwide Permits 1 Summary of the Proposed 2017 Nationwide Permits 1 Nationwide Permit NWP 1 Aids to Navigation 10 none PCN not no navigable waters of the U.S. none NWP 2 Structures in 10 none PCN not no navigable waters

More information

Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida

Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida Draft Tiered Site-Specific Environmental Assessment Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida Port Security Grant Program Project # 2008-GB-T8-K019 November

More information

Connecting Science and Management for Virginia s Tidal Wetlands. In this issue...

Connecting Science and Management for Virginia s Tidal Wetlands. In this issue... In this issue... We review the relationship between science and the management of tidal wetlands in Virginia. The program has evolved over the past four decades to address: E the public benefits provided

More information

Inlets Online: A Tutorial for Evaluating Inlet/Beach Processes Using Aerial Photography

Inlets Online: A Tutorial for Evaluating Inlet/Beach Processes Using Aerial Photography Inlets Online: A Tutorial for Evaluating Inlet/Beach Processes Using Aerial Photography by Mark R. Byrnes, Feng Li, and Julie D. Rosati PURPOSE: This Coastal and Hydraulics Engineering Technical Note (CHETN)

More information

2011 Annual Inspection Report

2011 Annual Inspection Report State of Louisiana Office of Coastal Protection and Restoration 2011 Annual Inspection Report for TERREBONNE BAY SHORE PROTECTION DEMONSTRATION State Project Number TE45 Priority Project List 10 February

More information

Instrumentation for Monitoring around Marine Renewable Energy Devices

Instrumentation for Monitoring around Marine Renewable Energy Devices Instrumentation for Monitoring around Marine Renewable Energy Devices 1 Introduction As marine renewable energy has developed, a set of consistent challenges has emerged following attempts to understand

More information

Town of Chatham Department of Community Development

Town of Chatham Department of Community Development Town of Chatham Department of Community Development TOWN ANNEX 261 GEORGE RYDER ROAD 02633 CHATHAM, MA TELEPHONE (508) 945-5168 FAX (508) 945-5163 FEMA FLOOD MAP UPDATE & PROPOSED ZONING BYLAW AMENDMENT

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

The Buffalo River Restoration Project Frequently Asked Questions

The Buffalo River Restoration Project Frequently Asked Questions The Buffalo River Restoration Project Frequently Asked Questions The Buffalo River Restoration Partnership is a public-private collaborative effort to clean up sediment in the Buffalo River. Although discharges

More information

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

Summary of the 2012 Nationwide Permits

Summary of the 2012 Nationwide Permits Summary of the 2012 Nationwide Permits Nationwide Permit NWP 1 Aids to Navigation 10 PCN not required NWP 2 Structures in 10 PCN not required Artificial Canals NWP 3 Maintenance 10/404 Does not authorize:

More information

COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA

COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA Brendan J. Holden SOPAC Technical Secretariat July 1992 SOPAC Technical Report 148 Prepared for: South Pacific Applied Geoscience

More information

Scour and Scour Protection

Scour and Scour Protection Design of Maritime Structures Scour and Scour Protection Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and Development Center Waterways Experiment Station 3909 Halls

More information

Please consider substituting the following short narrative on wetland regulatory issues:

Please consider substituting the following short narrative on wetland regulatory issues: DNREC comments on Town of Ellendale Comp Plan This plan identifies natural resource protection as a priority, and this goal will be accomplished by developing new Town of Ellendale municipal zoning ordinances,

More information

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

Prepared By: Tom Parker Geum Environmental Consulting, Inc. Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs

More information

REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS. Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 INTRODUCTION

REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS. Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 INTRODUCTION REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 ABSTRACT: Regional sediment management (RSM) requires the capability

More information