Less obvious access openings/leak points in steel buildings that should be permanently sealed:

Size: px
Start display at page:

Download "Less obvious access openings/leak points in steel buildings that should be permanently sealed:"

Transcription

1 Sealing Concrete and Steel Grain Storage Oklahoma Grain Elevator Workshops Ronald T. Noyes, Ph.D, P.E. Extension Agricultural Engineer Biosystems & Agricultural Engineering Dept. Oklahoma State University Besides keeping grain dry, grain storages should be well sealed for two other basic reasons: (1) To minimize grain insect entry problems into base and sidewall grain, and (2) to minimize leakage losses of phosphine or other fumigants during fumigation. Besides improved insect kill (efficacy), tighter sealed structures require lower dosage rates, which reduces the cost of future fumigations and paying for the sealing materials and labor. When clean grain is transferred into a clean, sanitized structure with base and sidewalls well sealed, the main insect infestation and population growth should be on the grain surface in the structure headspace. Permanently sealing all non-functional base, sidewall and roof openings is the first priority of sealing storages. The second sealing priority is to seal functional openings at all times during the year when the component is not being used. In addition to being potential moisture entry and fumigant gas leakage points, openings of any size in grain storage silo, bin or building bases, sidewalls and roofs are major access points for grain insect entry. Thus, one of the most beneficial, cost effective projects that a grain elevator manager can do is to permanently seal non-essential grain storage structure openings, and semi-permanently seal all other functional openings to the structure except roof vent sources of air ingress/egress to the headspace, such as roof vents on bins, silos and flat storage and grain fill doors on silos. Permanent Sealing of Non-essential Structural Openings Primary sealing points of non-essential structural openings are: exterior under-roof vents in concrete silos; steel bin roof eave gaps. silo roof deck-to-wall gaps Concrete annex and head house silos sometimes have irregular width gaps between the roof deck and the top of outside silo walls that need to be sealed. Exterior walls should be inspected from inside the silos during bright sunny days to see if light shows any where along the top of the silo outer wall, except at rectangular exterior vents. Less obvious access openings/leak points in steel buildings that should be permanently sealed: clearance openings around centrifugal direct drive motor shafts, bolts missing from bolt holes,

2 gaps between flanges on aeration fans connected to transition ducts, aeration duct entrance through the bin wall or concrete foundation at the base. Semi-permanent Sealing of Functional Openings The second level of sealing involves sealing functional equipment and openings that are used on a limited basis during the year. Examples of equipment/limited-use openings to be sealed: discharge spouts or conveyors (conveyor outlets connected to other conveyors), gravity fill downspouts from elevator legs/distributors sidewall doors on steel bins and flat storages, gable end-wall fans and louvers in flat storage end gable walls, push/pull rod discharge slide gate controls on steel bins and flat storages, concrete silo fill doors and manhole covers Temporary Sealing for Fumigation To maintain healthy grain, all grain storage headspaces should be ventilated -- have fresh air access during the entire storage period up to the time of fumigation. For steel bins, the only roof venting this should be through roof vents. Flat storages should have roof vents and gable fan and louvers free to operate. Concrete silo headspace ventilation usually be provided by surface roof vents or by fresh air movement provided through air gaps around manhole covers or closed grain inlet doors caused by temperature and barometric pressure changes. Grain should be visually inspected at least bi-weekly during the storage season, so bin roof entry doors or hatches should remain unsealed until time to fumigate. Thus, with a properly sealed storage, the only sealing at the time of fumigation should be roof entry hatches and vents on steel bins. Flat storages should have roof vents and gable venting systems sealed in addition to side and gable fill conveyor entry doors. The only additional sealing at the time of fumigation for concrete silos should be grain fill or man-entry hatches on the roof deck. However, if downspouts to bins or silos have not previously been sealed, they should be sealed just before each fumigation. Sealing Materials -- The Tools of Sealing The starting point to sealing all storage openings is to have the correct sealing materials. Primary bulk grain storage sealing tools are listed below with brand names listed where specific materials are recommended. Otherwise, generic materials available at a wide range of building supply companies can be used. Figure 1 shows a selection of primary sealing materials used at OSU for sealing silos and steel bins. A partial list of sealing materials, not listed in any priority or sequence, are: Great Stuff (or similar product) -- pressurized expandable closed-cell foam (Great Stuff manufactured by Flexible Foam, Inc., Joliet, IL -- supplied by Walmart, Lowes, Home Depot, lumber yards, commercial and home building supply stores and other outlets). Make sure you buy closed-cell foam, to decrease fumigant movement.

3 Rubberflex Bin Seal -- concrete silo repair and bin seal kit (bin bases) with gray or white acrylic based elastomeric coating applied over 6 inch wide polyester screed cloth material. Polyester cloth is extremely strong. Pliable elastomeric coating and polyester cloth material sets up and stays flexible in wide range of temperatures, with 400% or more elongation/contraction, stretching and compressing as bin foundation ring moves. Product manufactured by Republic Coatings (Marketed by Specialized Coatings, Inc., P.O. Box 642 Atwood, IL 61913; Ph ). Durathane Sealant -- urethane caulking compound. Has high adhesion but remains flexible for life of product (guaranteed 10 years). Urethane remains more pliable with age than silicone and has better resistance to phosphine gas penetration (Durathane still flexible after years). Product manufactured by Republic Coatings (Available from Specialized Coatings, Inc., P.O. Box 642 Atwood, IL 61913; Ph ). Ultra high reflectivity white elastomeric roof coating (Kool Seal or similar product-- supplied by Lowes, Home Depot, and many lumber yards, commercial and home building supply stores and other outlets); Use 4- to 6-inch wide polyester mesh screed with Kool Seal elastomeric roof coating to reinforce and seal gaps between concrete and steel. Kool Seal white acrylic patching cement (in caulking tube), a flexible acrylic cement for sealing seams, holes, and gaps. GE -- high quality silicone caulking compound for outdoor use (Opaque or colored material preferred to block light). GE has a high quality outdoor silicone caulk with a rating score of 7 (maximum) in all rating categories. Camie high strength fast tack pressurized contact spray adhesives - - (available from Industrial Fumigant Company (IFC), Olathe, KS; 3M has similar spray adhesive products) Camie general purpose spray adhesive -- (available from Industrial Fumigant Company (IFC), Olathe, KS; 3M has similar spray adhesive products). Plastic sheeting -- 6 mil polyethylene sheeting in 10 to 20 ft widths and variable lengths up to 100 ft -- available from most building supply outlets. Tough plastic bags -- heavy duty 35 to 55 gallon trash bag liners of 4 mil plastic -- available from home and building supply outlets. High quality duct tape or heating and air conditioning tape -- 2-inch and 3-inch width; price is usually a good indicator on this product. Top of the line is recommended here for use in long term outside weather conditions. High quality brown/tan paper fumigation sealing tape -- a strong tape with excellent adhesive quality with better resistance to phosphine gas passage than duct tape. Available from IFC, other fumigation suppliers and elevator equipment outlets. Fine wire mesh duct screen mesh to 50 mesh -- tape over roof vent inlet openings as insect barrier seals (pressure aeration systems only). Concrete Silo Sealing Exterior under-roof vents The primary silo sealing problem in concrete silos are exterior under-roof vents. Sealing these rectangular openings containing vertical steel or cast-iron bars can be done from the outside by using a safety harness, laying on a pad with harness lanyard firmly anchored to the elevator structure, and reaching over the roof edge to apply Great Stuff (or other suitable closed cell

4 expandable foam), Figure 2. An alternative is to seal the vents from the grain surface inside the silos. The vents should be cleaned with a pressure air nozzle, broom or brush before sealing to minimize leaks where dirt is blown out under or above the foam by air pressure inside the silo. With either method, a backer board should be used on the opposite side of the re-bars from the side that the spray foam is applied. Cardboard cut about 1-inch smaller in each dimension than the rectangular opening (use a 7 x 9-inch cardboard panel for an 8 x 10-inch vent) works well as there is often small chunks of cement mortar or dirt buildup that makes the openings irregular in shape. A 12-inch piece of stiff wire is looped through two 1/8-inch holes punched 1-inch apart at the center of the cardboard, Figure 3. The short end is twisted around the remaining 10-inch longer wire end to provide a loose loop through the cardboard and a pivotal handle to push the cardboard between the two center bars, then turn it flat and pull it up behind the bars. This cardboard backstop reduces by half or more the foam volume needed to seal each vent and keeps foam from falling into the silo. In Figure 4, the millwright is positioned and equipped to seal a silo external under-roof vent with cardboard foam stop panel and supply of foam containers. In Figure 5, the vent is partially filled with foam, with the retainer wire "handle" to the cardboard foam backstop visible. The wire can be left hanging through the foam or can be wrapped around a steel bar. With the cardboard block about 1 inch behind the bars, one can of Great Stuff can do 1.5 to 2 exterior 8 x 10-inch vents. Once the gaps between the re-bars has been filled, the foam should be applied in two to three layers in front of the bars to allow each layer to expand and harden before the next "lift" is added. A 5-inch or 6-inch pickup or truck mirror with mounting arm attached, Figure 6, with a small rope lanyard connecting the mirror to the safety harness to keep it from falling, is a good way to apply the foam, or to check for holes that need to be foam filled along the top of the vent. Figure 7 shows a sealed under-roof vent after complete foam fill has been applied. Another method that makes the foam application easier is to use a 1/8 to 3/16 inch ID "extension" tube of about 4 to 6 feet in length so the applicator does not have to hold and operate the can. A short length of 3/16inch "Tygon" rubber tubing provides a flexible connector between a less flexible length of 1/8-inch ID tubing. A second person with a supply of cans can release the foam while the applicator guides the foam into place using the long flex tubing. An alternative method of sealing vents is to fill the opening with a close fitting plywood or steel plate with a "J-bolt" and wing nut assembly through a hole in or near the center of the plate (depending on the positioning of the vertical steel or cast-iron bars). This plate could be pushed into the opening from the outside so the J-bolt is hooked around a vertical steel bar near the center, then the panel can be pulled tight against the vertical bars with the wing nut. This should be close to a "press-fit" if the rectangular vent openings are of uniform dimensions. For an 8 x 10-inch vent, using a 7.75 x 9.75-inch exterior grade or marine grade plywood board will leave a 1/8 inch gap on all sides of the panel. Apply a urethane sealant caulk around the edges of the opening as shown in Figure 6 and check caulking seal along the top of the plate by using a truck mirror. A small extension tube attached to the silicone tube nozzle using Tygon tubing can also be used to apply the silicon around the seal plate border gap. If a silicone gun is used by the person sealing, use a small rope lanyard attached between the caulking gun and the safety harness to prevent dropping the caulking gun.

5 If the under-roof vent sizes are consistent, a slight variation of the above method would be to develop a "press-fit" board of marine grade plywood or steel plate that will just fit the opening and can be tapped into place against the steel re-bar. A single bolt can be placed through the middle of the board or plate as a "handle". Test the fit of the board/plate, then coat the edges of the board or plate with urethane caulk, and push it into place against the steel bars. Then run a filet of urethane caulk bead around the plate to concrete junction. With clean concrete, the urethane will adhere to the concrete and plywood or steel, locking it in place permanently. Another alternative vent sealing method would be to fill the opening with expandable cement mortar, but this may require a millwright working from a boatswains chair on a safety system cable or rope system over the side of the elevator, or from the grain surface inside the silos. If the person applying the cement mortar works from the grain surface inside the silos, and a backer board can be wired to the outside face of the concrete silo, covering the vent, then the mortar can more easily be applied by just filling the box and smoothing up the interior face of vent flush with the inside silo wall. Two plywood work platform boards cut to fit into the silos can provide a grain surface platform for the operator to stand on with the other board used as the mortar mix platform or the foam supply operator platform (use the buddy system when working inside silos) can make the work easier when sealing from inside. Each board should have a rope attached for easy movement of the board in and out of the silos. Concrete silo discharge spouts in basement or conveyor tunnel Discharge spouts in basement tunnels are relatively easy to seal. Two areas of sealing are involved: (1) the flange where the rectangular spouts passes through the concrete tunnel wall or roof, and (2) the rack and pinion (R&P) slide gate, Figure 8. The spout wall flange is an area that requires permanent sealing as this will definitely be a phosphine gas leak point. Thorough cleaning is mandatory. Use soapy water, then rinse water to wash the concrete wall and the flanges and let dry. After the flange area is thoroughly cleaned, apply a urethane caulk seal bead around the edges of the flange plate to provide a continuous seal between steel flange and concrete wall completely around the flange. The area that needs the most attention is against the wall under the sloped spouts from the main silos. Take a good trouble light (with rough duty safety bulb) or portable lantern that will provide plenty of light under the spout. The urethane caulk seal must be well-bonded between steel and concrete as phosphine gas is under pressure inside the discharge duct as the gas is forced upwards through the silo. The R&P slide gate needs to be sealed throughout the year as a functional piece of equipment until needed. Be sure the R&P slide gate is fully seated before sealing the slot in the housing that the slide gate goes through. Use urethane caulk across both sides of the plate where it slides through the flange slot across the top or side of the spout and around the R&P track. Since this is a semi-permanent seal, use a relatively small bead of urethane caulk on this application as it has much higher adhesion than silicone and may be more difficult to break loose. Both sides of the flange (open between the flange plates in many elevators) should be permanently sealed.. If the flange slide plate has open sides, force urethane caulk 1/4 to 3/8- inch down into the space between the flange plates which the slide plate slides against so the

6 edges of the slide plate flange housing is completely sealed. Check the depth from the open edge of the flange to the edge of the slide plate. Urethane caulk should not be in contact against the edge of the slide plate, or it may "weld" it in place. There should be sufficient gear ratio to open and close the slide gate so the urethane caulk seal against the face of the place can be broken. One or two R&P slide gates could be tested using urethane caulk for all sealing to see how difficult it is to open the slide gate after it has been sealed for two or three weeks. If it is not difficult, then use urethane caulk on all gates. If reopening the slide gate is a problem, use silicone across both faces of the plate. After the seal has been disrupted from the previous fumigation, it may be necessary to reseal along both sides of the plate where it slides into the spout. Make sure the slide plate is seated hard against the bottom or side of the spout when the gate is closed, before sealing to minimize gas leakage around the end of the slide plate. A third area in the discharge tunnel that might be sealed is the outlet of the spout, but this is often covered by a dust control suction air hood over the belt in older belt unload conveyor systems. If there are no dust hoods, or if dust hoods are easily removed, then the spout should be double plastic bag sealed to contain gas that may slip past the end of the R&P slide gate end seat inside the discharge spout. If the discharge conveyor is a drag conveyor, the inclined and vertical silo discharge spouts will be connected through the top of the drag conveyor housing. Drag conveyors are usually fairly well sealed for dust containment, but they should be rechecked for sealing at dust leak points or where it appears that gas might leak out at flanges. Seal as needed. Headhouse silo discharge spout slide gates Although headhouse silo R&P slide gates are similar to annex silo gates, headhouse designs vary widely. Some newer headhouse designs use rectangular discharge spouts, but round spouts were quite often used for fill and discharge spouts in older elevators. R&P slide gates on round spouts may be somewhat different than nearby annex slide gates in the same elevator complex because the headhouse was built first. The annex was quite likely designed and built years later by different companies. Headhouse designers often placed the R&P slide gate very close to or right against the concrete basement wall, making sealing more difficult. Sometimes the slide gates are inside walls. In those cases, the addition of a new slide gate for fumigation sealing may have to be added in the pipe outside the wall. Usually, the same methods of sealing headhouse silos should be used as described above for annex silo discharge slide gates. Steel Bin Sealing Steel sidewall to base joints A good starting point on steel bins is to seal the wall base to concrete joint to prevent water and insect entry, Figure 9. A recommended sealing material is Rubberflex Bin Seal, an acrylic based elastomeric roof and concrete sealant. This relatively thick coating material should be applied in two relatively thick layers. After the foundation and steel is clean and dry, apply an initial light to moderate coating of Rubberflex to the concrete foundation and about 4 inches up

7 the bin wall sheet, covering only about 3 feet at a time. Apply a 6-inch wide high strength polyester screed cloth with about 3 inches on the horizontal and 3 inches on the vertical. Press the cloth into the initial coating layer using the applicator brush, then apply a heavy coating over the cloth so the cloth is not visible. If the concrete base does not extend over inches from the bin wall base ring, cover the entire concrete horizontal surface, stopping at the vertical edge. After the first layer has become firm but before it fully dries, apply a second coating of Rubberflex. When properly applied the two coatings should be 3/32 to 1/8 inch thick. One gallon of Rubberflex should coat about feet of concrete base and steel sidewall. Use the polyester cloth and Rubberflex to fill around corners, bolt heads, aeration duct transitions, vertical bin stiffeners and other bin base elements on or near the concrete base. Kool Seal and other elastomeric roof and concrete coating sealants should be applied in the same manner as Rubberflex. However, due to different chemical compositions and manufacturers application recommendations, the coverage may differ between sealing products. Roof eave gaps Roof eave gaps are a major gas leak point during fumigations. In older bins, gaps were often considered as free roof venting, and a means for under-roof condensate to drip outside the bin. However, if a sufficient number of roof vents are installed to provide adequate roof openings for proper aeration fan exhaust velocity (750-1,000 ft/min), roof headspace moisture condensate on the grain should not be a serious problem. Newer bin roofs usually set directly in contact with the top edge of the steel sidewall. However irregular width gaps ranging from 1/16 to 3/8 inch are still common. For gaps greater than 1/8 to 3/16-inch widths, the sealing material of choice is an adhesive based closed-cell foam, like Great Stuff or similar material, Figure 9. Foam insulation can be applied from outside or inside the bin. Make sure the bin wall to roof junction is wiped clean before applying the foam. Figure 10 shows foam application method inside an empty steel bin. For narrow gaps 1/4 inch width or less, use a high quality opaque (white or grey colors) urethane or silicone caulk rated for outdoor application. Durathane Sealant is an excellent urethane caulking compound. GE Silicone II is a high quality silicone with maximum ratings of 7 in almost all application quality scale categories. Although urethane caulk costs about 40-50% more, it is better for permanent sealing applications with its strong adhesive qualities, better UV resistance and superior long term flexibility and pliability. These or similar materials are recommended caulking materials for grain storage sealing. Figure 11 shows to a bin roof eave gap being caulk sealed. If the bin has the stiffening rib filler plates as shown in Figure12, urethane or silicone seal around the edges of the plate overlapping the roof rib (from inside or outside the bin based on ease of access) will provide a good seal of the roof stiffening rib at the wall junction. If steel seal plates were not installed during bin erection, the roof stiffening rib opening will need to be foam filled to seal. Multiple layers of foam may need to be applied.

8 A third method of sealing roof eave gaps on clean galvanized steel is to apply a high strength adhesive spray such as Camie 363 in a 2-inch band along the top of the wall and another 2-inch band along the lower roof surface right above the junction as a base layer, then apply 3-inch wide fumigation tape across the angle joint with approximately equal tape contact on sidewall and roof. The adhesive/tape seal should provide a long lasting tight seal across the roof gap except for the roof section stiffening ribs, which will need to be foam filled. Screening Roof Vents for Insect Barrier OSU plans to conduct research on new vent inlet screen designs to retrofit or adapt to fit goose neck and mushroom style vents currently used on most steel grain bins in Oklahoma. This will involve using one or two separate fine mesh cloth screens (1-2-inches apart) of 30x30 to 50x50 wire mesh. Research concerns are restrictions to airflow, exposure to freezing rain, and determining largest mesh opening size in a design that will exclude all life stages of insects. This may require that the screen panel be spring loaded so it opens with aeration fan operation, but seals against gaskets when airflow stops. More will be reported as the barrier screen laboratory and field research work proceeds. Sealing aeration fans The major reason for sealing aeration fans year-round is to exclude insects from entering the grain bin base. All fan openings should be sealed completely and left sealed until time to operate the aeration fans to cool the grain in the fall. Sealing aeration fans involves sealing the fan inlet or discharge, as well as any other fan housing or junction openings. Figure 13 shows the fan inlet sealing for a centrifugal fan set up for pressure aeration. The fan shown in this figure still needs the bottom of the plastic sheet duct taped to the fan housing for proper sealing. Direct drive centrifugal fans have a clearance opening through the blower sidewall around the motor shaft that must be sealed. Figure 14 shows the shaft being sealed by foam filling the space between the motor end plate and fan housing. Sealing down spouts Down spouts should be sealed by installing an in-line gravity actuated flap valve like the one shown in Figure 15, or by adding a gravity weight actuated flap valve to the original cushion box shown in the right photo in Figure 16. The gravity actuated, weight controlled flap valve serves several important functions: It blocks flow of phosphine gas up the fill spout during fumigation. It greatly reduces convection air currents in the bin, keeping grain more uniformly cool. It blocks moist air from going up the fill spout and condensing into a stream of water that creates a wet, moldy grain core from the peak down into the grain mass. The modified flap valve in the modified cushion box will act as a grain cushion and at low grain flows, will slow grain velocity and turn it downward toward the center of the bin below, before it hits the back plate of the cushion box, reducing impact velocity.

9 Another less desirable alternative is to spread the flange connection where the spout connects to the cushion box (right view) in Figure 16, so a thin metal slide plate can be inserted to block the spout opening. This would need the flange to be blocked on three sides with one side or the top open. A wide plate would be inserted during fumigation, while a stub plate about 1 inch wide would be inserted to seal the gap for full pipe flow. Although this will provide an excellent fumigation seal, the other advantages of the gravity actuated flow plate would not be available. Sealing discharge conveyors Bin discharge conveyors have a natural partial seal in the discharge auger unload slide gate. The discharge slide gate should be closed fully before the bin is loaded as it is not a good practice to have grain laying in the auger trough for long periods. However, closed slide gates do not provide an insect tight seal. The unload auger should be kept completely sealed year-round except when grain needs to be unloaded from the bin. If the unload auger discharge is open and not welded to a cross conveyor like the unit shown in Figure 17, the opening can be sealed using spray adhesive, 6 mil poly sheeting and duct tape, or large heavy duty plastic bags (double bag to provide two layer protection) taped over or around the motor, drive and outlet. For unload augers with the outlet welded directly to another conveyor like the drag conveyor unit in Figure 17, an alternative sealing method must be used. One option is to "square cut" the connecting spout leaving at least a 1/4-inch or larger gap in the rectangular spout. Then weld two sets of flanges or flange rings with the flat faces facing separated by a 1/8-inch gap. This will allow a 12 gage steel plate to slide between the flanges providing a temporary, removable seal between the two conveyors. For rectangular flange rings, three sides can be sealed by punching matching bolt holes in 1/8 inch steel shim plates, leaving an opening on one side for a full width shut-off slide plate. When unloading grain with the slide plate removed and the slide plate slot can be taped shut to prevent grain leakage. An alternative sealing method is to cut an opening in the top of the auger that is closed by a hinged cover. The auger can then be foamed to completely fill the cross-section of the tube or U-trough opening, so the foam plug is about 6-12 inches thick along the auger shaft. When the bin is ready to be unloaded, the inspection door can be opened, part or most of the foam can be cut out, then the auger can be run to break out most of the foam. As grain flow slowly increases, the rest of the foam will be removed by the grain flow. For U-trough conveyors, cut a short section of the U-trough cover so it can be removed separately from the standard long cover panels. Foam directly under the opening until the foam rises slightly above the top flange of the open u-trough all the way across. Then set the cover plate down over the foam to provide a complete blockage of the U-trough. When it's time to use the unload conveyor, remove the short cover section and cut/dig out most of the foam. Food grade foam should be used so pieces of the foam in the grain will not be a significant contributor to contamination.

10 Sealing fill conveyors Fill conveyors often have a discharge spout welded directly to the top of grain bins that can be modified like the unload conveyor system described above by cutting a slot out of the connecting spout, adding two facing flange rings and adding a cut-off slide plate, or bolting in a divider plate. The second option would be to cut an inspection opening and add a hinged door, or cut a short section of U-trough opening, as discussed above, then foam sealing the tube like the discharge conveyor. Unload slide gate push-rod openings Unload slide gate push-rods have a clearance opening through a plate in the foundation ring of the bin that will allow insect entry and gas loss, Figure 18. With the slide gate fully closed, tape seal the rod and opening gap around the rod to seal the opening. An alternative is to use grease or foam to fill the opening with the gate fully closed. Do not use urethane or silicone caulk as these materials have strong adhesive bonds which may make it difficult to move the slide gate. Elevator leg grain distributor and leg head-section vent sealing Downspouts are suspected of inducing strong convection air movement up through grain bins and silos due to the differential wind velocities and associated negative pressure or suction created around the leg head section, vent and grain distributor that feeds the downspouts. Sealing the head section vent would minimize some convection movement, but the leg head vent should be open when the leg operates for proper leg discharge into the distributor. Sealing elevator leg head-section vents The elevator leg head-section vent should be taped off with duct tape, but a flag marker should be attached to the sealed vent that will catch someone's attention after the fumigation, so the seal will be removed at the end of the fumigation. If not removed, the lack of vent air flow into the leg head-section may effect the discharge characteristic of the leg, causing some grain to drop out of its normal discharge trajectory and "back-leg." The double-handling of grain dropping back to the leg boot section may slow the handling rate of the leg. One method to permanently "seal" the elevator leg head-section vent except when the leg is running would be to add a motorized valve on a pipe extension connected to the vent inlet with the valve motor or coil wired in parallel with the leg motor starter. Thus, the normally closed valve would open each time the leg motor started, then be closed the remainder of the time. Sealing leg distributors and leg trunks Manufacturers of elevator leg grain distributors have not been concerned with sealing distributors against air leaks. The distributor manufacturer's main concern has been keeping rain water out of the distributor. However, to minimize convection air suction, the distributor inspection plates, down spout flanges and/or connecting band joints on the distributor outlet

11 tubes should be well sealed with silicone caulk. The inspection door should be removed and a heavy silicone caulk bead placed around the opening to provide an air tight seal. The leg head discharge flange connected to the distributor inlet flange should also be well sealed. The distributor outlet should always be set on a "blank" position to minimize any suction of air up one of the spouts. Most legs are built in modular sections of 10 ft or 5 ft lengths with flanges that are jig welded in jigs or fixtures for flush fit with mating flanges and which keeps the leg plumb during assembly. However, not all flanges are tightly sealed at the time of assembly and erection. The joint at each leg trunk section should be silicone sealed around the flange on both the up-flow and downflow trunk legs at each trunk section junction. Sealing leg downspouts Sealing downspouts from bucket elevator distributors is very difficult, especially with elevator legs inside concrete head-houses. The ideal seal would be a gravity activated hinged flap valve with a rubber gasket face that fits flat against a square cut end of the downspout, preferably with the spout directed vertically. Most spouts on concrete elevators enter the silos at an angle, but if the ends were square cut, a hinged gravity spout could be bolted to the topside of the spout. These flap valves have a lever arm or a plate extension past the mounting hinge that is fitted with an adjustable counter-weight. The counter-weight is designed such that the weight and the leverarm (distance from the pivot point) keeps the flap valve closed until a small amount of grain flows against the plate, then the valve will open. The degree of opining is related to the grain flow mass. Under full-flow, the valve should be almost completely open -- almost a 90 degree angle to the spout.).

12 Figure 1. Selection of primary sealing materials used for sealing silos and steel bins. Figure 2. Sealing concrete silo under-roof external vents with expandable closed cell foam. Applicator lies on foam pad and wears safety harness with lanyard tied to elevator structure.

13 Figure 3. Cardboard panels cut undersized to fit through vertical steel bars in under-roof vents for use as a backstop 1-2 inches behind steel bars to minimize foam volume. Figure 4. Foam sealant and cardboard back plate with wire handle read to seal exterior underroof vent. Note plastic bag with foam pad/blankets that applicator lies on near roof edge.

14 Figure 5. Partially foam-sealed cast iron under-roof vent grate with wire to cardboard foam backstop pulled to within 1-2 inches behind grate. Figure 6. Applicator using truck mirror (attached to rope lanyard) to check foam or caulking application of vent under roof deck for leak openings that need more foam. Figure 7. Silo exterior under-roof vent after foam sealing. Note foam backer panel wire handle.

15 Figure 8. Silo discharge spout ready for sealing of wall flange and R&P slide gate with urethane sealant or silicone caulk.

16 Figure 9. Great Stuff closed cell foam insulation used to seal bins and silo openings. Figure 10. Foam sealing the roof-eave gap inside an empty steel bin using expandable foam.

17 Figure 11. Caulk sealing a bin with urethane or silicone sealants. Right view shows roof vent panel with caulking between two roof ribs that have been foam sealed. Figure 12. Roof panel stiffening rib seal plate. Caulk seal around the edges of the plate form inside or outside the bin, based on access convenience.

18 Figure 13. Pressure aeration centrifugal aeration fan inlet sealed. Note plastic below opening has been glued to the fan housing, but the plastic should still be duct taped across the bottom. Figure 14. Foam is best way to seal direct drive centrifugal blower motor shaft clearance hole.

19 Figure 15. Gravity flow activated adjustable counter-weighted flap valve installed in-line minimizes moist air and fumigant leakage up the fill spout. Grain flow opens valve as needed. Figure 16. Fill spout cushion box at right was modified on left with gravity flap valve added. Bottom slop of cushion box was too shallow. Steeper back slope is evident on left view.

20 Figure 17. Steel grain bin unload auger showing discharge welded to top of cross conveyor, typical of millwright dust control sealing methods. Figure 18. Steel grain bin unload auger showing slide gate push-rod opening on left side

Design of Closed-loop Fumigation Systems for Grain Storage Structures

Design of Closed-loop Fumigation Systems for Grain Storage Structures Oklahoma Cooperative Extension Service BAE-1111 Design of Closed-loop Fumigation Systems for Grain Storage Structures Carol Jones Assistant Professor, Stored Products Engineering James Hardin Research

More information

Draft - Fumigation Management Plan

Draft - Fumigation Management Plan Draft - Fumigation Management Plan This Fumigation Management Plan is intended to comply with label requirements, state and federal pesticide laws and provide information to insure a safe and effective

More information

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table

More information

Air Conditioner Duct Construction & Repair

Air Conditioner Duct Construction & Repair PROPER ROOF AIR CONDITIONER MOUNTING At Newmar, there are two different models of air conditioners available on all towable and motorized units. The different models are the Dometic Brisk and Penguin models,

More information

T R A N S F E R A B L E F U L LY

T R A N S F E R A B L E F U L LY HSTOPS A WALL OF WATER 22 FT. HIG! F U L LY T R A N S F E R A B L E RESISTS10 PSI ! 1 F U L LY T R A N S F E R A B L E HSTOPS A WALL OF WATER 22 FT. HIG RESISTS10 PSI Guaranteed To Stop Water Even Under

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Installation Instructions

Installation Instructions Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money EASY$ TIP SHEETS Energy Advice Saving Yukoners Money Quick Links How to check for leaks Draftproofing products Sealants Draft proofing your home Draftproofing can be a cost-effective measure you take to

More information

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions For Slider Casement Air Conditioners Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Barewood Octagon and Elongated Windows Installation Instructions

Barewood Octagon and Elongated Windows Installation Instructions Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and

More information

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

CONTROL METHODS. There are five ways to control the release of asbestos fibers: Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

TERMINATION EQUIPMENT INSTRUCTION MANUAL TELE-PIERCE P/N 356-246

TERMINATION EQUIPMENT INSTRUCTION MANUAL TELE-PIERCE P/N 356-246 TERMINATION EQUIPMENT INSTRUCTION MANUAL TELE-PIERCE P/N 356-246 OPERATION AND SERVICE INSTRUCTIONS AMPHENOL 157 SERIES TELE-PIERCE MULTI-WIRE TERMINATION TOOL 356-246 AMPHENOL TERMINATION SYSTEMS 1830

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

GENERAL RUBBER LINING PRINCIPLES

GENERAL RUBBER LINING PRINCIPLES GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface

More information

Packaged Terminal Air Conditioner Wall Sleeve Installation

Packaged Terminal Air Conditioner Wall Sleeve Installation Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation

More information

Finding and Fixing Leaks

Finding and Fixing Leaks Finding and Fixing Leaks Where did all that water go? Could we have splashed all that water out of the tub? These are all common thoughts that can run through your mind when you open up the hot tub cover

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

Manual piston sampler...m 11

Manual piston sampler...m 11 SAMPLING Manual piston sampler...m 11 Screw sampler...prec 22...PREC 100 Slide sampler...pr 55 Rotative screw sampler...prv Piston sampler...p 11 Sampler on belt conveyor...pba Rotating cup sampler...pgr

More information

Minor Cracks in Horizontal Surfaces

Minor Cracks in Horizontal Surfaces Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.

More information

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders

More information

Installation Manual for STANDING SEAM ROOFING

Installation Manual for STANDING SEAM ROOFING Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

5 Mechanisms and accessories

5 Mechanisms and accessories 5 Mechanisms and accessories 51A SIDE OPENING ELEMENT MECHANISMS 52A NON-SIDE OPENING ELEMENT MECHANISMS 54A WINDOWS 55A EXTERIOR PROTECTION 56A EXTERIOR EQUIPMENT 57A INTERIOR EQUIPMENT X79 NOVEMBER 2009

More information

2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure

2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure 2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure Derek Guenther 1/28/2015 Rev. Purpose The purpose of this document is to describe the procedure necessary to replace one of the ball nuts

More information

WINDOW REPAIR MANUAL & REFERENCE GUIDE

WINDOW REPAIR MANUAL & REFERENCE GUIDE WINDOW REPAIR MANUAL & REFERENCE GUIDE TABLE OF CONTENTS DOUBLE HUNG & SINGLE HUNG PARTS 4-5 CASEMENT PARTS 6 SCREEN PARTS 7-8 HOW TO REMOVE TILT-IN SASH 9 HOW TO REMOVE A BALANCE 10 HOW TO INSTALL BALANCE

More information

Roof Curbs, Extensions and Equipment Supports

Roof Curbs, Extensions and Equipment Supports Roof s, Extensions and Equipment Supports December 2012 Roof Page s, Header Extensions and Equipment Supports Table of Contents Model GPI Standard and Optional Construction Features... 3 Model Number Code....

More information

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS Table of Contents Chapter 1: FLAT ROOF REPAIR - CUT COST WITHOUT CUTTING CORNERS Chapter 2: PVC RECOVER SYSTEM HOW IT WORKS Chapter 3: 8 STRATEGIES TO

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

Finegan Inspection Services, Inc.

Finegan Inspection Services, Inc. Finegan Inspection Services, Inc. Report Prepared For: Phone 513-683-0733 Fa 513-697-0163 Owners Property Address City, State, ZIP Phone FAX Owners Realtor Realty Company Phone FAX OWNER INFORMATION PROPERTY

More information

Section 5: Machine Overview

Section 5: Machine Overview Section 5: Machine Overview Machine Floor Plan Machine Specifications Sequence of Operation Theory of Operation Sensor Location Floor Plan 2007 Douglas Machine Inc. 5.1 Machine Floor Plan Figure 5.1: Machine

More information

MGB Chrome Bumper Conversion

MGB Chrome Bumper Conversion MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different

More information

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray.

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

Fiberstars Lighted Laminar Flow Fountain Installation Manual

Fiberstars Lighted Laminar Flow Fountain Installation Manual Fiberstars Lighted Laminar Flow Fountain Installation Manual 79-15037-00 REV Xx http://www.fiberstars.com Page 1 of 8 SAVE THESE DIRECTIONS! These directions are provided to ensure the proper installation

More information

I BEAM TRACK INSTALLATION

I BEAM TRACK INSTALLATION PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must

More information

Commodity Fumigation

Commodity Fumigation Commodity Fumigation In-Transit Fumigation of Rail Cars Techniques to Fumigate Rail Cars Rail cars, also known as free running cars, are not insect-proof. Rail cars have been known to harbor insect infestations.

More information

Preventing Ice Dams on Roofs

Preventing Ice Dams on Roofs Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the

More information

Sikaflex Sealant Installation. Sika Corporation

Sikaflex Sealant Installation. Sika Corporation Sikaflex Sealant Installation 1 Critical Success Factors Substrate preparation If done properly would probably eliminate 95% of all call backs Most common mode of sealant failure Must remove all weak material

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS OVENS MANUFACTURED BY: EARTHSTONE OVENS-6717 SAN FERNANDO RD GLENDALE CA 91201 TELEPHONE: 800-840-4915 818-553-1134 FAX: 818-553-1133

More information

Important Information for Installer & Homeowner

Important Information for Installer & Homeowner Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side

More information

How to Install UnderDeck The Original.

How to Install UnderDeck The Original. How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter

More information

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Rehabilitation of an Aging Concrete Reservoir Adit Tower Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco

More information

Best Basement Water Management Practices

Best Basement Water Management Practices Best Basement Water Management Practices Guide written by Patrick Sluss Sluss Construction (330) 224 5394 When a home owner is faced with a leaking basement there is a way to correct the problem and a

More information

ROOFS, SNOW AND ICE DAMS

ROOFS, SNOW AND ICE DAMS ROOFS, SNOW AND ICE DAMS The Problem Ice dams are a common roof performance problem in cold climate buildings. Simply put, they are ridges of ice and icicles caused by melt water from further up the roof

More information

Basement Window Installation Guide Hopper and Sliding

Basement Window Installation Guide Hopper and Sliding Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

GENUINE PARTS INSTALLATION INSTRUCTIONS

GENUINE PARTS INSTALLATION INSTRUCTIONS GENUINE PARTS INSTALLATION INSTRUCTIONS DESCRIPTION: Illuminated Kick Plate APPLICATION: Rogue (2011) PART NUMBER: 999G6 GX010 KIT CONTENTS: Item A B C G H QTY 1 1 1 D 1 E 1 F 3 15 6 Description Kick Plate,

More information

Installation Instructions

Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:

More information

Computer Lane Monitor HOW TO MAKE A TAPE AND HOW TO READ A TAPE

Computer Lane Monitor HOW TO MAKE A TAPE AND HOW TO READ A TAPE Computer Lane Monitor T M HOW TO MAKE A TAPE AND HOW TO READ A TAPE April, 2003 SP03-8 General Description The Brunswick Lane Monitor System is designed to permanently record and read the amount of dressing

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

Cooktop Low-Profile Ventilation Hoods

Cooktop Low-Profile Ventilation Hoods INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............

More information

Installation Instructions 6028.801

Installation Instructions 6028.801 DAZZLE Installation Instructions 08.80 Spread Lavatory Faucet with Speed Connect Drain* Congratulations on purchasing your American Standard faucet with Speed Connect drain, a feature found only on American

More information

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast

More information

One Year Warranty. Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches NATURAL GAS* Six Year Warranty

One Year Warranty. Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches NATURAL GAS* Six Year Warranty One Year Warranty ELECTRIC Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches Fused Ceramic Shield tank lining is corrosion-resistant for years of dependability. Adjustable

More information

METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE

METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Transportation Laboratory 5900 Folsom Blvd. Sacramento, California 95819-4612

More information

How to repair your existing low slope flat roof.

How to repair your existing low slope flat roof. How to repair your existing low slope flat roof. Recycled Rubber Roofing is not a "Roof Coating." It is a liquid emulsion used as the underlayment of a new or retrofit, built-up roofing system. One of

More information

SunMor SM-V30 Solar Water Heater Installation Manual

SunMor SM-V30 Solar Water Heater Installation Manual SunMor SM-V30 Solar Water Heater Installation Manual Rev. 1.02 Congratulations on the purchase of your new SunMor SM-V30 from Nature s Comfort LLC! You must read this entire instruction manual before beginning

More information

5800 Temperature Sensor Cable Assembly

5800 Temperature Sensor Cable Assembly 5800 Temperature Sensor Cable Assembly Removal and Replacement Instruction Sheet #60-4702-070 Revision D, January 14, 2013 Overview The 5800 has two refrigeration temperature sensors, one attached to the

More information

10/03. Water Entry Into Vehicle Possible Causes Guidelines

10/03. Water Entry Into Vehicle Possible Causes Guidelines SERVICE XK DATE 10/03 TECHNICAL BULLETIN Water Entry Into Vehicle Causes Guidelines MODEL VIN 501-53 1997 MY-ON XK Range 001001-on In the event of customers complaining of water leaks on their vehicle,

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

TABLE OF CONTENTS. I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2

TABLE OF CONTENTS. I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2 BAL Accu-Slide System I. Table of Contents TABLE OF CONTENTS I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2 II. GETTING STARTED... 5 - Section 2.01: Tools You Will Need... 5 - Section

More information

Acumen Enterprises, Inc.

Acumen Enterprises, Inc. Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

19" Data Racks. Adjustable feet To compensate for uneven floors and assure great stability all feet can be up to 20 mm adjusted.

19 Data Racks. Adjustable feet To compensate for uneven floors and assure great stability all feet can be up to 20 mm adjusted. 19" Data Racks Attractive design and high quality are characteristic. Basic framework is welded from multiple bent metal plate, which assures great rigidity suitable for heavier equipment. All profile

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

GreenGuard Housewrap Installation Guide

GreenGuard Housewrap Installation Guide 000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be

More information

RODENT PROOFING CHECKLIST

RODENT PROOFING CHECKLIST RODENT PROOFING CHECKLIST The most important part of a rodent control job is a thorough inspection of the problem areas/building. Since we warranty the control of rodents with our standard pest control

More information

Refrigeration Installation 101

Refrigeration Installation 101 Refrigeration Installation 101 Hundreds of Installations Refrigerated Cases 2 Compressor Racks 3 Condensing Units 4 Walk-in Boxes 5 Some were done very well 6 Some had some issues... 7 8 Some seemingly

More information

Plugging Home Drains to Prevent Sewage Backup

Plugging Home Drains to Prevent Sewage Backup AE-1476 Plugging Home Drains to Prevent Sewage Backup Why plug drains For homes in areas of the country prone to flooding or heavy rain, taking a few steps to prepare for water levels that could result

More information

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE 1 Which tool is used to correct internal hi-low when preparing a 4-in. steel pipe for welding? A. 4-in. grinder with cutting disc. B. Mini-grinder with flapper disc. C. Pencil grinder with cone stone.

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards

More information

Installer s Guide 18-AH39D1-13

Installer s Guide 18-AH39D1-13 18-AH39D1-13 Cased Aluminum "Convertible" Coils 4TXCA018BC3HC** 4TXCA024BC3HC** 4TXCB025BC3HC** 4TXCB026BC3HC** 4TXCB031BC3HC** 4TXCB032BC3HC** ALL phases of this installation must comply with NATIONAL,

More information

COMMERCIAL GAS DRYER

COMMERCIAL GAS DRYER COMMERCIAL GAS DRYER MODELS CGD8990XW0 4 12 Litho In U.S.A. (CMS) (psw) c 2012 WHIRLPOOL CORPORATION Part No. Rev. B TOP AND CONSOLE PARTS 2 TOP AND CONSOLE PARTS 1 Literature Parts W10184516 Installation

More information

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg Thank you for selecting JeLd-weN products. Attached are JeLd-weN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to

More information

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes:

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes: BRIDGE & SUPPLY COMPANY Installation Guide Ultra 2000 Includes: Ultra 2000 Installation Guide Stock Trim Profiles Ultra 2000 Trim Installation Guide Page 2 Table of Contents Ultra 2000 Profile, Colors

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1967-72 CHEVROLET PICKUP

specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1967-72 CHEVROLET PICKUP specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1967-72 CHEVROLET PICKUP CONTROL & OPERATING INSTRUCTIONS The controls on your new Perfect

More information

WARNING! WARNING! ALWAYS WEAR A TMA APPROVED FALL ARREST SYSTEM WHEN USING ANY TREESTAND

WARNING! WARNING! ALWAYS WEAR A TMA APPROVED FALL ARREST SYSTEM WHEN USING ANY TREESTAND WARNING! You must read and understand all of the following instructions before first use. If you do not, it could result in serious injury up to and including death. Any questions please call 309-691-9653.

More information

How to Install Hardwood Flooring Over a Sub Floor

How to Install Hardwood Flooring Over a Sub Floor How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product

More information

VXT. Open Cooling Towers. Open Cooling Towers. Product Detail VXT - B 1. Engineering Data... B2. Structural Support... B6

VXT. Open Cooling Towers. Open Cooling Towers. Product Detail VXT - B 1. Engineering Data... B2. Structural Support... B6 - B 1 Product Detail Engineering Data... B2 Structural Support... B6 Engineering Specifications... B9 - B 2 Engineering Data REMARK: Do not use for construction. Refer to factory certified dimensions &

More information