2 February 18, 2013 Attention to whom it may concern, Statica Project Engineering was established as an engineering and consultancy company in Ankara at Statica has gained lots of experience and know how while serving in many different types of engineering and consultancy project since then. The main target to be achieved is to be one of the leading companies in engineering sector both at home and abroad. Statica Project Engineering has a great capability and capacity to design many types of engineering structure as his past performance in huge project showed so. He gained the trust of all big construction companies all over the world by his tools and personnel which have been brought together to succeed in all engineering duties and his command on all universal standards and specifications. The main goal of Statica is to submit accurate and reliable projects with economy being considered together. Statica Project Engineering is leading a multi disciplined team in order to serve all engineering projects. Apart from his own civil and structural functions, under his umbrella, architectural, electrical, mechanical, plumbing, fire protection and communication services have been being provided to clients. He has the capacity to complete all projects that he is contracted from scratch to the final. The work completion certificates are his biggest references. Statica Project Engineering 100. Yıl Mah Cad Rüya Apt. No:22/4 Çankaya 18 February 2013 Ankara / Turkey Page 1 of 2 Tel :+90(312) Fax :+90(312)

3 Statica Project Engineering with his valuable personnel has been being involved in many infrastructure and superstructure projects in the Airports of developing countries especially in Iraq and Afghanistan. Runway, numerous aprons, ramps, taxiways, aircraft and helicopter runways have been designed by civil and electrical infrastructure specialist. Besides horizontal structures, vertical structures have been being designed by his experts. The following pages show the up to date project list Statica completed since We look forward working with your company in the near future. We would like to thank to you for your interest. Sincerely yours. Oğuz Altuğ AKSARAY Civil Engineer, M.Sc. Company Shareholder Hakan BAYRAM Civil Engineer, M.Sc. Company Shareholder Statica Project Engineering 100. Yıl Mah Cad Rüya Apt. No:22/4 Çankaya 18 February 2013 Ankara / Turkey Page 2 of 2 Tel :+90(312) Fax :+90(312)

4 Project Number # 56 Garrison Support Kandak (GSK) & Special Mission Wing (SMW) Headquarters, South KAIA, Kabul, Afghanistan Client/Owner: USACE CONTRACK INT. Client POC: [email protected] $36M Feb 2013 Buildings Roads WWTP The project consists of the design, site adaptation and construction of new permanent facilities for the Garrison Support Kandak (GSK) and Special Mission Wing (SMW) Headquarters, South KAIA, Kabul Province, Afghanistan. The project is defined as the design, site adaptation, material, labor, and equipment to construct buildings, parking, aircraft pavement, utilities and other infrastructure for a design population of approximately 525 personnel. Work also includes demolition and renovation of existing structures. The Contractor shall provide for the design, material, labor, and equipment to construct buildings, roads, utilities and other additional infrastructure.

5 Project Number # 55 KAIA Airwing Phase V, Kabul, Afghanistan Client/Owner: USACE CH2M HILL YUKSEL Client POC: [email protected] $20M Feb 2013 Buildings Pavement The project consists of the design, site adaptation and construction of new permanent facilities at Kabul International Airport (KAIA) for the Afghan National Army (ANA) Air Wing Phase V in Kabul District, Kabul Province, Afghanistan. The project is defined as the design, site adaptation, material, labor, and equipment to construct buildings, parking, paving, ECP, utility tie in and other infrastructure for a design population as shown for specific facilities listed in this section. Work also includes demolition and renovation of existing features/facilities. This includes the estimated populations of future developments within the compound that will tie into and make use of its utility systems.

6 Project Number # 54 Communication and Information Systems Depot Kandahar, Afghanistan Client/Owner: NAMSA OBD Client POC: [email protected] $8M Jan 2013 Building The contactor will design a Theatre CIS Depot the purpose of which is to centrally locate all geographic information required to conduct effective operations in theatre. Kandahar Airfield (KAF) as the theatre main Airport of Debarkation (APOD) is the key node for distribution of CIS material to the RC South and RC West. This one story rectangular building will have approximate overall dimensions of 30 m x 20 m (600 m2) with a clear height of 6m to allow operation of mechanical load handling equipment. The floor level shall be 30 cm above surrounding surface area. The building will have a 17 m2 secure office for 4 personnel, second office, workshop and restroom for 6 personnel. In front of the building has to be building two roofs left and right side to cover the heavy equipment (10 x 8m with a high of lowest point 4 m). The area has to be fenced 2,5 m high, including gates.

7 Project Number # 53 Primary Health Care Facility, Role 1 KAIA North, Kabul, Afghanistan Client/Owner: NAMSA YUKSEL Client POC: [email protected] $8M Dec 2012 Building This project provides ~150 m2, two story reinforced concrete building.

8 Project Number # 52 Camp Alvarado Transition Apron Expansions Kandahar AB, Afghanistan Client/Owner: INL DYNCORP YUKSEL Client POC: [email protected] $8M Dec 2012 Airfield Pavement This project provides ~30,000 SQM of Portland Cement Concrete Pavement Expansion for parking of several helicopters. Design includes site layout planning, demolition, joint and marking plans, static grounding and mooring layouts and details of construction.

9 Project Number # 51 Westside Utilities Infrastructure, Bagram AB, Afghanistan Client/Owner: USACE CONTRACK INT. Client POC: [email protected] $12M Dec 2012 Buildings Roads WWTP Various improvement and expansions to the Bagram Airfield utility network, focused primarily on providing utility service to the Western Expansion Zone; Area 82 WTTP Service connections of 66 Buildings to Base Network Various Lift Stations. Additional Utility Network around CAS Apron, Additional Utility Network around Bypass road

10 Project Number # 50 Camp Valdes Transition Phase I Apron Expansion Kandahar AB, Afghanistan Client/Owner: INL DYNCORP YENIGUN Client POC: [email protected] $8M Nov 2012 Airfield Pavement This project provides ~17,000 SQM of Portland Cement Concrete Pavement for parking of several helicopters and a link taxiway to existing Taxiway Foxtrot. Design includes site layout planning, demolition, joint and marking plans, static grounding and mooring layouts and details of construction.

11 Project Number # 49 ANCOP 1 st Brigade Expansion, Kabul, Afghanistan Client/Owner: USACE EMTA Client POC: [email protected] $7M Nov 2012 Buildings Roads The project includes the facilities necessary to establish Life Support and Service Facilities for ANCOP 1 st Brigade Expansion, Kabul, Afghanistan. Vehicle Maintenance Building, Barracks, Joint Fuel Storage, Storage Facility, Kitchen Renovation, Internal Roads, All utilities

12 Project Number # 48 Embassy West, Baghdad, Iraq Client/Owner: OBO ARKEL DK Client POC: [email protected] $27M Nov 2012 Buildings Roads The project includes the facilities necessary to establish Life Support and Service Facilities for Embassy West in Baghdad, Iraq. Perimeter Wall, Compound Access Control, Guard Towers, Dry CHU Pods, Office Building for Refugee Center / RSO Support Facilities, Dog Kennels Overhead Protection Cover Power Plant Utilities

13 Project Number # 47 Eastside Utilities Infrastructure, Bagram AB, Afghanistan Client/Owner: USACE SERKA Client POC: [email protected] $33M Oct 2012 Buildings Roads WTP, WWTP Various improvement and expansions to the Bagram Airfield utility network, focused primarily on providing utility service to the Eastern Expansion Zone; Expansion to WTP #3, 12,000 meters of water distribution piping, Expansion to WWTP. 6,000 meters of gravity sanitary sewer collection piping, 2,200 meters of sanitary force main piping

14 Project Number # 46 Afghan Air ce Expansion Shindand Air Wing, Phase II Central Utilities Infrastructure, ATCALS Shindand AB, Herat Province, Afghanistan Client/Owner: US AFCEE LES Client POC: [email protected] Overall Contract Value Value Firm Responsible $74M Sep 2012 Buildings Roads Airfield Electrical Infrastructure The Phase II project is defined as providing the design, material, labor, and equipment to construct buildings, utilities and to renovate and repair an existing structure. Structures shall be constructed of a K Span style construction with stem walls unless otherwise indicated. This project is for the expansion of the existing Afghan Air ce (AAF) facilities at Shindand Air Base to accommodate increased use by the AAF both in terms of aircraft and personnel. The intent of Central Utilities project is to increase power and sewer capacity to support the Afghan Army and Air ce garrisons on the west side of the Shindand Air Base. Design and construction of new waste water system and a Prime Power plant with medium voltage distribution to include service to RMTC, Shindand Phase 1, Shindand Phase 2, 2nd CDO Kandak, 4th SF Kandak, 207th Corps Training Area, Air Traffic Control and Landing Systems. In ATCALS project, the contractor installs infrastructure and infrastructure requirements only for government furnished and installed Air Traffic Control and Landing Systems (ATCALS) equipment and Navigation Aids (NAVAIDs). The infrastructure support includes, but is not limited to all runway navigational and control lighting conduit runs, manholes/hand holes, airfield lighting and control vault with back up generation, concrete equipment pads for NAVAIDS, NAVAID equipment shelters and power and communication conduit infrastructure connecting control tower to airfield NAVAID sites and airfield lighting vault.

15 Project Number # 45 KAIA Consolidated & Integrated CIS Hardened Facility Kabul, Afghanistan Client/Owner: NAMSA / FEKA Client POC: [email protected] $5M August2012 Building Roads The purpose of this project is to provide a new hardened consolidated Communication and Information system (CIS) facility at the Kabul International Airport (KAIA) North. The new CIS Facility design provides a RC structure building, two stories height, appropriately hardened to meet the specified threat and compliant with safety and fire standard requirements. The building footprint measures about 1,150 square meters.

16 Project Number # 44 KAIA Entry Control Point Kabul, Afghanistan Client/Owner: NAMSA / FEKA Client POC: [email protected] $5M August2012 Buildings Roads The purpose of this project is to deliver Phase 2b of Civil works of the Entry Control Points and Perimeter ce Protection measures at HQ ISAF.

17 Project Number # 43 North Rumaila BP Camp Facility Basrah, Iraq Client/Owner: BP Zafer Cons.Co. Client POC: [email protected] $50M July 2012 Buildings Roads This project provides reinforced concrete with CMU and steel composite type building design, site master planning and utility infrastructure design.

18 Project Number # 42 ANAAC Phase III North Ramp Expansion Shindand AB, Herat Province, Afghanistan Client/Owner: US AFCEE LES Client POC: [email protected] Overall Contract Value Value Firm Responsible $14M June 2012 Airfield Pavement This project provides approximately a 30,500 square meters (m 2 ) of aircraft ramp area dedicated for parking of training aircrafts. This facility supports the North Atlantic Treaty Organization (NATO) Coalition forces operations in the Herat Province of Afghanistan.

19 Project Number # 41 Bagram UMMC P 341 Project Bagram AB, Afghanistan Client/Owner: USACE CH2M Hill Client POC: [email protected] $7M June 2012 Buildings Roads This project provides reinforced concrete with CMU and steel composite type building design, site master planning and utility infrastructure design.

20 Project Number # 40 Simon Bolivar International Airport Pavement Renovation Project Caracas, Venezuela Client/Owner: Venezuelian Government SUMMA Client POC: [email protected] $1M Feb 2012 April 2012 Runway, Parallel Taxiway, Ladder Taxiways, Aprons This is a pavement renovation and expansion project and it includes 2x 3,500 m long Runway, 2,850 m long Parallel Taxiway, Ladder Taxiways and Aprons. Since the air traffic increases daily, existing pavements are about to finish their lifetime. There are visible deterioration of the existing pavements, both asphalt and concrete. Existing drainage structures do not function at all. All the pavements and drainage structures will be renewed. Design follows ICAO and FAA standards.

21 Project Number # 39 Bagram Coalition Operations Center Bagram, Afghanistan Client/Owner: USACE CH2M HILL YUKSEL Client POC: [email protected] $39M Feb 2012 Building The primary facility is an square meter reinforced concrete administrative building which includes conference rooms, secure rooms/sensitive Compartmented Information Facilities (SCIF), training areas, a command center, communication equipment, day rooms, entry control space, and an operations bridge. Supporting facilities include electrical and mechanical infrastructure, water and sewage connections, information systems infrastructure, access roads, walks and drainage.

22 Project Number # 38 Runway Repair Manas AB, Manas Province, Krygyzstan Client/Owner: USACE SERKA Client POC: [email protected] $18M Feb 2012 Runway Airfield Lighting The purpose of this project is to repair the existing runway at the Transit Center at Manas International Airport, Kyrgyzstan, in 2 phases while maintaining flight operations at all times. Phase 1 reconstructs the west end of the runway and part of the concrete turnaround area. Phase 2 reconstructs the east end of the runway. Work includes demolition and replacement of the existing concrete pavement, excavation, site preparation, airfield lighting, airfield painting, and all necessary work for a complete and usable facility.

23 Project Number # 37 Taxiway Foxtrot Kandahar AB, Afghanistan Client/Owner: NAMSA YENIGUN Client POC: [email protected] $8M Feb 2011 Airfield Drainage This project provides drainage solution to the existing Parallel Taxiway Foxtrot.

24 Project Number # 36 Bagram Entry Control Point 1 Bagram AB, Afghanistan Client/Owner: USACE 77 CONS. CO Client POC: [email protected] $7M Feb 2012 Buildings Roads This project provides reinforced concrete with CMU and steel composite type building design, site master planning and utility infrastructure design.

25 Project Number # 35 Bagram Drainage Phase II Bagram AB, Afghanistan Client/Owner: USACE YUKSEL Client POC: [email protected] $18M Nov 2011 Feb 2012 Under the scope of the project, Open channels, Culverts, Catch basin, Manholes, Excavation support systems, Steel bridge calculations and drawings have been handled.

26 Project Number # 34 Bagram Theatre Command Facility Bagram AB, Afghanistan Client/Owner: USACE YUKSEL Client POC: [email protected] $22M Feb 2012 Buildings Roads This project consists of a square meter reinforced concrete Command and Control Facility building and square meter secure storage yard. Supporting facilities include electric service and utilities, paving, walks, curbs, gutters, site improvement and demolition.

27 Project Number # 33 ANAAC Phase I Aprons & Taxiway Bravo Shindand AB, Herat Province, Afghanistan Client/Owner: US AFCEE LES YUKSEL Client POC: [email protected] Overall Contract Value Value Firm Responsible $54M Sep 2011 Airfield Pavement Fixed Wing & Rotary Wing Aprons This project provides approximately a 30,500 square meters (m 2 ) of aircraft ramp area dedicated for parking of training aircrafts. This facility supports the North Atlantic Treaty Organization (NATO) Coalition forces operations in the Herat Province of Afghanistan. Taxiway Bravo This project provides approximately a 3,500 square meters (m 2 ) of taxiway between main runway and parallel taxiway. This facility supports the North Atlantic Treaty Organization (NATO) Coalition forces operations in the Herat Province of Afghanistan.

28 Project Number # 32 Bagram Troop Housing Phase IV, V & VI Bagram AB, Kabul Province, Afghanistan Client/Owner: USACE YUKSEL Client POC: [email protected] $50M Sep 2011 Housing Troop Housing Phase IV This project provides Barracks Buildings of concrete framed structure with CMU walls. Facilities include 8 barracks to provide housing for personnel. Supporting facilities are electrical, water, and sewage distribution systems, mechanical systems, information systems, site improvements, and drainage at Bagram. Troop Housing Phase V This project provides Barracks Buildings of concrete framed structure with CMU walls. Facilities include 10 barracks to provide housing for personnel. Supporting facilities are electrical, water, and sewage distribution systems, mechanical systems, information systems, site improvements, and drainage at Bagram. Troop Housing Phase VI This project provides Barracks Buildings of concrete framed structure with CMU walls. Facilities include 10 barracks to provide housing for personnel. Supporting facilities are electrical, water, and sewage distribution systems, mechanical systems, information systems, site improvements, and drainage at Bagram.

29 Project Number # 31 Chapel Building KAIA, Kabul Province, Afghanistan Client/Owner: NAMSA YUKSEL Client POC: [email protected] $54M Oct 2011 Dec 2011 Building Chapel Building This project provides app. 600 m2 reinforced concrete and steel composite structure. Due to force protection exterior face of the structure is composed of reinforced concrete shear walls. Both first floor and second floor slabs are constructed with steel girders over concrete supporting by trapezoidal metal sheet.

30 Project Number # 30 Air Traffic Control Tower Manas Airport, Manas Province, Krygyzstan Client/Owner: USACE RAYTHEON SERKA Client POC: [email protected] $18M Oct 2011 Building / Tower Air Traffic Control Tower, 8 storey 27m high reinforced concrete building with steel cab portion at Manas IAP. Architectural Civil Structural Plumbing Mechanical HVAC Fire Protection Electrical Communication

31 Project Number # 29 C IED Facility Bagram AB Bagram AB, Kabul Province, Afghanistan Client/Owner: USACE KBR SERKA Client POC: [email protected] $12M Oct 2011 Building This project consists of design of a Counter Improvised Explosive Device (C IED) Task ce Compound at BAF. Primary facilities include a consolidated Command and Control building including Administrative Facilities, Secure Compartmented Information Facility (SCIF), Armory, Classroom and Warehouse which fall under one roof having 5,761 m2. Supporting facilities include site preparation, paving, walks, information systems, electric, water distribution systems.

32 Project Number # 28 Afghan National Police Regional Police Training Center Shindand Province, Afghanistan Client/Owner: USACE YUKSEL Client POC: [email protected] $55M July 2011 Building Fire Ranges Roads This project consists of the specified site adaptation, site and infrastructure design and construction for/of a new campus facility for the Afghanistan National Police (ANP), Regional Police Training Center (RPTC) in Shnidand, Herat Province, Afghanistan. This facility will house approximately 3,000 personnel consisting of trainees and staff. The RPTC is an ANP Training Establishment including 40 buildings, parking areas, all utilities and other infrastructure.

33 Project Number # 27 Strategic Airlift Apron & Helicopter Apron Mazar e Sharif, Afghanistan Client/Owner: USACE YUKSEL Client POC: [email protected] $26M Feb 2011 Shelters Airfield Pavements Roads The purpose of the project is to provide complete Strategic Airlift Apron and Helicopter Apron at Mazar esharif. (1) Strategic Airlift Apron : A medium load (C 5 or equivalent), PCC apron with connecting taxiways and shoulders. Work also includes pavement markings, grounding points, utilities (power and electrical connections) and other necessary site improvements. (2) Helicopter Apron : A medium load, PCC apron, connecting taxiways and shoulders for rotary winged aircraft. Work will also include pavement markings, grounding points, aircraft shelters, utilities (including but not limited to power and electrical connections), and other necessary site improvements.

34 Project Number # 26 Afghan National Defense University Phase II Qargha Province, Afghanistan Client/Owner: AFCEE LES Client POC: [email protected] $75M Feb 2011 Buildings Fire Ranges Roads WTP This project consists of providing facilities for continuing officer and senior noncommissioned officer professional education courses for the Afghan National Army (ANA). This project is Phase II of the overall effort to provide for the completion of the Afghan National Defense University (ANDU) site at Qargha, Afghanistan. Afghan National Defense University Design and construction of facilities for the Afghan National Defense University Phase II at Qargha, Afghanistan. Joint Services Academy Legal Branch School Religious and Cultural Affairs School The required facilities are designing and constructing Life Support Area (LSA), buildings, roads, utilities, tie in for approximately 4,000 personnel to include; barracks with shower/latrine/ablution and storage facilities, classroom buildings, a campus multi purpose building with HQ offices, electrical distribution systems and tiein to existing power plant, sanitary sewer collection system tie in to existing lines, tie in to existing water lines and distribution system; and tie into sand expand the road network inside the compound.

35 Project Number # 25 Dog Kennel Kandahar AB, Afghanistan Client/Owner: NAMSA YENIGUN Client POC: [email protected] $5M Feb 2011 April 2011 Buildings This project provides 20 bay dog kennel with administrative area and 30 bay dog kennel at Kandahar Airfield. Both kennels will be housed cast in place reinforced concrete building.

36 Project Number # 24 Theatre Vehicle Maintenance Buildings Kandahar AB, Afghanistan Client/Owner: USACE YENIGUN Client POC: [email protected] $25M Dec 2010 Dec 2011 Buildings The work includes eleven major facilities, six support structures, and various factory fabricated equipment needed to support sustainment level maintenance of tactical equipment for the Afghan theater located in the Deep South Park at Kandahar Airfield Afghanistan. Major facilities : There are eleven major structures associated with the Theater Vehicle Maintenance Facility including two Vehicle Maintenance Buildings, two Administration Buildings, a CE/MHE Building, a Robotics/Shop Stock Storage Building, a T.A.R.P./Paint Building, a Fire Pump House, a Paint Booth, a Vehicle Wash Station and a T.A.R.P. Storage Shed. Vehicle Maintenance and Administration are joined into a single structure. The CE/MHE, Robotics/Shop Stock Storage and T.A.R.P./Paint Building form a single large complex.

37 Project Number # 23 Taxiway Hotel Extension KAIA, Kabul Province, Afghanistan Client/Owner: NAMSA CH2MHILLYUKSEL Client POC: [email protected] $15M June 2011 Oct 2011 Airfield Pavement This project provides reinforced concrete with CMU and steel composite type building design.

38 Project Number # 22 RLBs FOB Airborne Wardak Province, Afghanistan Client/Owner: USACE OBD Const. Client POC: [email protected] $3,3M Feb 2011 Aug 2011 Buildings Roads This project consists of Government Furnished Re Locatable Building (RLB) container modules and related support facilities for 774 personnel at ward Operating Base (FOB) Airborne located near Kane Ezzat in Wardak Province, Afghanistan. The modules are 2 story buildings. Support facilities are vehicle access roads and parking areas, utilities and any other necessary infrastructure such as, above ground water storage tank(s), chlorination system, booster pumps, pump house, a buries sanitary sewer collection system and sewage holding tank, transformers, power and communication systems.

39 Project Number # 21 Administration Building Kandahar AB, Afghanistan Client/Owner: NAMSA OBD Constr. Client POC: [email protected] $3,4M Dec 2010 Sep 2011 Buildings This project consists of two story reinforced concrete Administration building approximately 400 m2 in total. Due to force protection, all sides of the building is designed with reinforced concrete shear walls.

40 Project Number # 20 RLBs Phase II Kandahar Airfield, Afghanistan Client/Owner: USACE YENIGUN Const. Client POC: [email protected] Value Firm Responsible $3,0M Sep.2010 Dec.2010 Buildings Roads The project consists of Government Furnished Re Locatable Building (RLB) container modules for 888 personnel and related support facilities at Kandahar, Afghanistan. Each structure will be with external walkways and stairs. Support facilities are parking, utilities and other infrastructure for the RLB Housing project. The work includes concrete foundations; reinforced concrete bunker and blast protection barriers an above ground water storage tank(s), chlorination system, booster pumps, jockey pump, hydro pneumatic tanks; pump house and buried water distribution system; a buried sanitary sewer collection system and sewage lift station and force main(s); electrical generators; fuel tanks and spill containment area; transformers; buried power distribution and communication systems and perimeter lighting.

41 Project Number # 19 Inteeligence Fusion Cell Kandahar Airfield, Afghanistan Client/Owner: USACE YENIGUN Const. Client POC: [email protected] Value Firm Responsible $1,5M Sep.2010 Dec.2010 Buildings The project involves two story reinforced concrete building around 380 m2.

42 Project Number # 18 FY10 Rotary Wing Parking Apron Shindand AB, Herat Province, Afghanistan Client/Owner: USACE TETRA TECH YUKSEL Client POC: [email protected] $15M Nov 2010 Feb 2011 Airfield Pavement This project provides 110,000 sqm of concrete pavement for helicopter parking apron.

43 Project Number # 17 FY10 Aviation Complex, Shelters, Maintenance Facility, Mission Planning Facility Mazar e Sharif, Afghanistan Client/Owner: USACE YUKSEL Client POC: [email protected] $29M Nov 2010 Dec 2011 Buildings Airfield Pavements Roads Shelters This project includes three C 12, CH 47, CV 22 capable fabric maintenance hangars, reinforced concrete aviation maintenance facility, reinforced concrete mission planning facility, aircraft apron for 6 rotor and 2 fixed wing aircraft and taxiways. Supporting facilities are, airfield pavement markings, grounding points and tie downs, prefabricated aircraft protective revetment system, electrical generators and distribution system, water and sewage distribution system, miscellaneous site improvements and drainage.

44 Project Number # 16 FY09 10 CAS Apron Expansion, Expeditionary Fighter Shelters, Aviation Operation and Maintenance Building Bagram AB, Kabul Province, Afghanistan Client/Owner: USACE CH2MHILL 77 Client POC: [email protected] $32M Nov 2010 Buildings Shelters Roads Airfield Pavements This project provides 50,000 sqm of concrete apron, two fighter shelters, one hangar for maintenance.

45 Project Number # 15 Camp Bastion BLAHA Hot Cargo Pad, Camp Bastion AB, Helmand Province, Afghanistan Client/Owner: US AFCEE CH2MHILL 77 CO Client POC: [email protected] $24M 01 Sep March 2011 Building Runway Road Basic Load Ammo Holding Area Project Number This project provides approximately a 22,500 square meters (m 2 ) of aircraft ramp area dedicated for handling hazardous cargo (referred to as hot cargo) in Camp Bastion, Afghanistan. This facility supports the North Atlantic Treaty Organization (NATO) Coalition forces operations in the Helmand Province of Afghanistan. The ramp is located to the northeast of new Runway The primary facilities includes a ramp parking area, ladder connecting taxiway, and vehicular access road. Support facilities include electrical service (edge lights and high mast lights), tie down/grounding, and site improvements. Aircraft design for the ramp is for C 5.

46 Project Number # 14 Camp Bastion Phase IV Project, CAS Apron Expansion, Armed/De armed Apron Expansion, ISR Apron, Expeditionary Fighter Shelters, Aviation Operations and Maintenance Hangar, Camp Bastion AB, Helmand Province, Afghanistan Client/Owner: US AFCEE LAKESHORE Client POC: [email protected] $32M 01 Agu July 2011 Building Runway Road CAS Apron Expansion Project Number CMBA This project entails constructing a 43,000 square meters (m 2 ) paved aircraft parking expansion for 12 CAS fighter type aircraft. Additionally, the work includes 12,600 m 2 expansions to two existing Arm/De Arm pads for use by aircraft. The work includes apron and pad design and construction including pavement markings, tie down/grounding, edge lighting, utilities and other site improvements. ISR Apron Project Number CMBA The Contractor constructs a 46,700 m 2 paved apron and shoulders sized to accommodate parking for 20 ISR type aircraft. The project includes all connecting taxi lanes, shoulders, aircraft shelters, site improvements, pavement markings, tie down/grounding, utilities and all other necessary site improvements. Expeditionary Fighter Shelters Project Number CMBA The Contractor constructs two 1,050 m 2 expeditionary fighter shelters for conducting minor field maintenance on deployed aircraft. Work includes pavements, fire protection system, supporting and other necessary site improvements. The shelters are expeditionary fabric type. Aviation Operations and Maintenance Facilities Project Number CMBA The scope of work for this project entails developing an aircraft maintenance facility to support fighter aircraft operations. The Contractor constructs a 2,400 m 2 aviation and operations facility for flight line maintenance. Work includes pavements, supporting infrastructure and other necessary site improvements. This task is for the provision of an avionics, aircraft engine and aerospace ground equipment (AGE) repair and maintenance facility at the Camp Bastion airfield to accommodate the expanded number of aircraft operating out of this base.

47

48 Project Number # 13 Camp Bastion Phase III Project, Strategic Ramp Expansion and Link Taxiway, RSOI Passenger Terminal Building & Facility, Cargo Handling Yard, Cargo Warehouse & Facility, Camp Bastion AB, Helmand Province, Afghanistan Client/Owner: US AFCEE LAKESHORE Client POC: [email protected] Overall Contract Value Value Firm Responsible $27M 01 June July 2011 Building Runway Road Strategic Airlift Apron Expansion Project Number CMBA ,600 square meter (m 2 ) Portland Cement Concrete (PCC) paved apron with asphalt paved shoulders expansion and other necessary site improvements. The project consists of enlarging an existing strategic airlift apron (under construction) to accommodate two additional parking for C 5/An 124 or equivalent aircraft. An additional ladder connecting taxiway of approximately 3,900 m 2 is constructed for more efficient direct access to the apron. Appropriate edge lights, grounding/tie down, marking, site drainage, and other site improvements is required to complete this project. Secure RSOI Facility Project Number CMBA The project consists of constructing a passenger terminal as part of the RSOI facility. Work includes a parking area, roadways connecting other areas, and bus loops at the terminal. The primary facility is the secure RSOI building, accommodated within a 2,400 m 2 pre engineered building (PEB). It is designed to accommodate American, British, and very important personnel (VIP) in a secure and functional manner. The supporting facilities include a parking area for vehicles and buses. A service road is included to connect the facility with the strategic airlift apron expansion and the cargo handling area. Utilities include a point source for power created by a generator farm. Site improvements include drainage and site leveling and grading. Cargo Handling Area Project Number CMBA The project consists of a 35,000 m 2 paved cargo handling yard, cargo warehouse with utilities, lighting, site improvements, drainage, and fire suppression. The primary facility consists of an 1,000 m 2 cargo warehouse with offices for the United States (U.S.) personnel and operations and large paved handling yard. The supporting facilities include fencing and gates suitable for trucks, a fire suppression system, and high mast lighting. Utilities include point source power generation, security fence, site improvements, and drainage.

49

50 Project Number # 12 Camp Bastion MSA & ASP Project, Munitions Storage Area and Ammunition Supply Point Camp Bastion AB, Helmand Province, Afghanistan Client/Owner: US AFCEE LAKESHORE Client POC: [email protected] $57M 01 June July 2011 Building Runway Road Munitions Storage Area Project Number: CMBA The Contractor constructs a new MSA to include perimeter fence, paved roadways, pre engineered buildings, concrete paved munitions storage pads, lightning protection, site lighting, electrical power generation, and all site works, earthworks and drainage improvements for a fully functional MSA. Work includes civil, mechanical, electrical, and communications infrastructure required for a fully operational facility. Ammunition Storage Point Project Number: The Contractor constructs a new ASP to include storage buildings, workshops, concrete paved storage pads, site work, drainage improvements, roads, lightning protection, site lighting, fencing, and electrical generation. Work includes civil, mechanical, electrical, guard towers, and communications.

51 Project Number # 11 Kandahar Airfield FY09 and FY10 Projects, Strategic Airlift Apron, Tactical Apron Kandahar AB, Helmand Province, Afghanistan Client/Owner: USACE CONTRACK INT Client POC: [email protected] $27M 01 AGU March 2011 Building Runway Road Strategic Airlift Apron Concrete Paved Airlift Ramp approximately 100,000m2, parking space for two strategic and nine tactical airlift aircrafts, pavement markings, edge lighting, high mast lighting and utilities (power and storm water). Tactical Airlift Apron Concrete Paved Airlift Ramp approximately 39,000m2, parking space for six tactical airlift aircrafts, pavement markings, edge lighting, high mast lighting and utilities (power and storm water).

52 Project Number # 10 Camp Bastion UK Strategic Airlift Ramp Charlie Camp Bastion AB, Helmand Province, Afghanistan Client/Owner: UK WORKGROUPS LAKESHORE Client POC: [email protected] Overall Contract Value Value Firm Responsible $30M 01 Feb Nov 2010 Building Runway Road Strategic Airlift Apron Concrete Paved Airlift Ramp approximately 100,000m2, parking space for 3 strategic and 3 tactical airlift aircrafts, and utilities (power and storm water). Design follows UK Codes.

53 Project Number # 9 Camp Bastion Phase I Project, Strategic Airlift Apron and Link Taxiways, Runway, Parallel Taxiway and Lateral Taxiways A and E, Rotary Wing Apron and Link Taxiways, Circulation Road, Vault Building, Complete Airfield Lighting Camp Bastion AB, Helmand Province, Afghanistan Client/Owner: US AFCEE LAKESHORE Client POC: [email protected] $165M 01 May March 2011 Building Runway Road The project is composed of a parallel taxiway extension (an extension to the existing runway 01 19), three new connecting taxiways, a new runway 01 19, a strategic ramp and a rotary wing parking apron. The parallel taxiway extension is a 1350m (900m Base Bid Length+450m Optional Bid Length) addition to the existing runway in north south direction. In this case, the existing runway is planned to be used as parallel taxiway and connected to the new runway. The new taxiway extension is 28m wide and has 15m paved shoulders. It matches the geometry and construction of the existing runway in all aspects. The existing runway shoulder are only 3m wide but is extended to 15 m wide in accordance with the RFP. Three connecting taxiways are the facilities which are aiming to connect the new parallel taxiway to new runway. These are 23m wide and have 15m paved shoulders. The new runway is 3500m long runway. It is 46m wide and has 15m paved shoulder and 15m wide unpaved shoulder. It is located on north south direction and parallel to taxiway extension. The direction of the new runway is that is the same as the existing runway. The strategic ramp has approximately SM plan area and accommodates two C 5 or AN 124 aircraft and 4 C 130 aircraft. It is located west of existing runway and connected to existing runway and parallel taxiway extension with two access taxiways. There is 15 meter wide paved shoulder on the perimeter of the apron and the access taxiways. The rotary wing parking apron has approximately SM plan area and accommodates 15 CH47/CH53 aircraft. It is located east of new runway and connected to new runway with two access taxiways. Also there is a connection road which is located at the center of east edge of the apron. It provides a connection to circulation road that is a part of this project. There are 7.5 wide paved shoulders on the perimeter of the apron and the access taxiways. In addition, there area circulation road and access roads in order to provide access to the facilities for new and future planned aprons. The circulation road is passing through the perimeter of the camp on the south of the airbase and then runs parallel to the new runway and provide access to the aprons connecting to the new

54 runway. There is a new fence line installed at the south, east and north side of the facilities for security requirement. There is a temporary perimeter road running parallel to the new fence line in order to provide access to the LSA camp and Batch Plant that are on located on the east of the new runway. The project access has been planned to be at the entrance of the south side of the Batch Plant.

55

56 Project Number # 8 Convoy Support Center, Phase II Ali AB, Tallil Province, Iraq Client/Owner: USACEE KBR KULAK Client POC: [email protected] $15M 01 June March 2010 Building Runway Road Paving of Option 2 Roads Constructing 12 MW Power Plant Waste Water Collection System including lift stations, sewer tanks, manholes. Potable Water Distribution Loop with 12 fire hydrants Two New Reverse Osmosis Water Purification Units with required tanks, pumps and pipings

57 Project Number # 7 Strategic Airlift Ramp, Armed Helicopter Apron, Unarmed Helicopter Apron Ali AB, Tallil Province, Iraq Client/Owner: USACEE KBR KULAK Client POC: [email protected] $35M 01 Oct March 2009 Building Runway, Aprons Road ISR Airlift 183x208m, Unarmed Helicopter Apron 195x795m Armed Helicopter Apron 228X428m Layouts, Jointing, Grading, Drainage, Marking, Utility Relocations, Structural Utility Bridging, T wall and Bob wall Layout for ce Protection, Floodlighting, Static Grounding, Tie down and Edge Lighting Design and Drawings. Rigid Pavement Thickness Design.

58 Project Number # 6 Air Traffic Control Tower, Ali AB, Tallil Province, Iraq Client/Owner: USACEE KBR KULAK Client POC: [email protected] $8M 01 Oct March 2009 Building Runway Road Air Traffic Control Tower, 8 storey 28m high reinforced concrete building with steel cab portion. Architectural Civil Structural Plumbing Mechanical HVAC Fire Protection Electrical Communication

59 Project Number # 5 DFAC Facility Delta AB, Tallil Province, Iraq Client/Owner: USACEE KBR KULAK Client POC: [email protected] $21M 01 Oct March 2009 Building Runway Road DFAC dining facility building, 6000m2 of steel structure, has to serve 5900 personnel with 5 cycles of 1,180 personnel.. Support facilities are, power production and distribution systems, water and sewage distribution systems, mechanical systems and other features such as, roads, curbs, walkways, parking pavement, walkways and site drainage.

60 Project Number # 4 Fighter Ramp & Taxiway Foxtrot Anaconda AB, Balad Province, Iraq Client/Owner: USACEE KBR YUKSEL Client POC: [email protected] $14M 01 Oct March 2009 Building Runway11 Road Fighter Ramp 183x208m, Taxiway 800x23 m Layouts, Jointing, Grading, Drainage, Marking, Utility Relocations, Structural Utility Bridging, T wall and Bob wall Layout for ce Protection, Floodlighting, Static Grounding, Tie down and Edge Lighting Design and Drawings. Rigid Pavement Thickness Design.

61 Project Number # 3 Sather Airbase Airfield Pavement Repair Projects Sather AB, Baghdad Province, Iraq Client/Owner: USACEE KBR 77 Co Client POC: [email protected] $27M 01 Oct March 2009 Building Runway Road There are many locations over the main runway and aprons where pavement repairs will be done. 23 repair scenarios have been developed for repair works.

62 Project Number # 2 Tokat Waste Water Treatment Plant Tokat, Türkiye Client/Owner: Tokat Municipality Client POC: [email protected] EUR 7.5M 01 Oct March 2009 Water Tanks Buildings The overall aim of this project is to accelerate Turkey's accession by enabling Turkey to achieve a high level of environmental protection and compliance with the EU directives concerning quality in the water sector. The specific purpose is to improve the environmental condition of the Yeşilirmak River by reducing the pollution load through the construction of Tokat Wastewater Treatment Plant (Tokat WWTP). The treatment plant will be a mechanical biological plant (Biological Nitrogen Removal BNR) with physical and biological stages servicing a population of 200,000 persons and 33,000 industrial p.e. (Stage one) The plant shall be designed for an expansion to cover 270,000 persons and 44,000 industrial p.e. (Stage two). This plant includes many water retaining structures together with building type of structures listed below. Aeration Tanks Final Sedimentation Tanks Primary Sedimentation Tanks Digesters Screens Collection and Distribution Chambers Return Sludge Pumping Stations Grit and Grease Removal Tanks Sludge Buffer Tanks Scum Pumping Station Sludge Thickening Units Sludge Homogenisation Tanks

63 Cascade Aeration Units Parshall Flume Chlorination Building Sludge Dewatering Building Administration Building Blower and Transformer Building Guard House

64 Project Number # 1 Nevşehir Waste Water Treatment Plant Nevşehir, Türkiye Client/Owner: Nevşehir Municipality Client POC: [email protected] EUR5.5M 01 June December 2008 Water Tanks Buildings The overall aim of this project is to accelerate Turkey's accession by enabling Turkey to achieve a high level of environmental protection and compliance with the EU directives concerning quality in the water sector. The specific purpose of this project is to improve the environmental condition of the Karaağaç Creek and Kızılırmak River by reducing the pollution load through the construction of Nevşehir Wastewater Treatment Plant (Nevşehir WWTP). The treatment plant will be an extended aeration activated sludge plant with physical and biological stages servicing a population of 125,000 persons and 9,000 industrial p.e. (stage one) The plant shall be designed for an expansion to cover 170,000 persons and 14,000 industrial p.e. (stage 2). This plant includes many water retaining structures together with building type of structures listed below. Aeration Tanks Final Sedimentation Tanks Screens Collection and Distribution Chambers Return Sludge Pumping Stations Grit and Grease Removal Tanks Sludge Buffer Tanks Scum Pumping Station Cascade Aeration Units Parshall Flume Chlorination Building

65 Sludge Dewatering Building Administration Building Blower and Transformer Building Guard House

ESER was established in 1968 under the name of Tekser Technical Services Inc. Following a change in its name in 1985, it has served its customers under the name of ESER Consulting Engineering Inc. ESER

More information

Hartsfield-Jackson Atlanta International Airport s

Hartsfield-Jackson Atlanta International Airport s Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

MCAS Miramar Construction. Christopher Manis Deputy S-4, MCAS Miramar

MCAS Miramar Construction. Christopher Manis Deputy S-4, MCAS Miramar MCAS Miramar Construction Christopher Manis Deputy S-4, MCAS Miramar PV streetlights ongoing, and they save ~750 KW-hr per year each 342,000 KW-hrs per year from this carport enough to power a 35Ksf bldg

More information

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,

More information

CENTRAL OHIO NORTHEAST OHIO

CENTRAL OHIO NORTHEAST OHIO CENTRAL OHIO Military Defense Supply Center Columbus Warehouse upgrades Columbus 1,000,000 Military Defense Supply Center Columbus Fire protection Columbus 500,000 Military Defense Supply Center Columbus

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES 1.0 GENERAL 1.1 Article 12 of the Suffolk County Sanitary Code requires that toxic/hazardous material

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Virginia American Recovery and Reinvestment Act 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair/Replace Bathrooms in Wilcox Barracks Army

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

SECTION XI OPINION OF PROBABLE COST

SECTION XI OPINION OF PROBABLE COST SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 [email protected] General

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

School Construction Authority Architecture & Engineering

School Construction Authority Architecture & Engineering SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following

More information

NOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions.

NOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions. ATTACHMENT AA DETAILED SCOPE OF WORK Demolition & Removal Services for SR-7/US-441 from North of Fillmore Street to South of Stirling Road Hollywood, Broward County, Florida 1.0 Structures Structures are

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Author: Gary L. Mitchell, P.E. Director Airports, American Concrete Pavement Association

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect

The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect Form follows PerFormance FKI Headquarters Tower Exterior Wall FKI Headquarters Tower Exterior Wall Energy Collection FKI Headquarters

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016. Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections NAICS Code Work Description Work Item 115310 - Support Activities for Forestry 221310 Water Supply and Irrigation Systems 221320 - Sewage Treatment Facilities 236118 Residential Remodelers 236220 Commercial

More information

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8

More information

Sydney Airport District

Sydney Airport District Sydney Airport Business District 1 0 The abd: where business takes off This brand new commercial precinct, Sydney Airport Business District, features a combination of modern office towers, retail facilities,

More information

PART 4: SITE INFORMATION

PART 4: SITE INFORMATION TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

The City of Basehor, Kansas

The City of Basehor, Kansas The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The

More information

5703 South Sossaman Road Aviation Center

5703 South Sossaman Road Aviation Center 5703 South Sossaman Road Aviation Center has an available Class A aviation center with a 10,000 s.f. hangar. This facility includes 10,000 s.f. of space for offices, avionics repair, or other uses. It

More information

AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX. 46,000 + to 1,200,000 + SF Available

AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX. 46,000 + to 1,200,000 + SF Available exclusively marketed by AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX 46,000 + to 1,200,000 + SF Available Aircraft Hangar, Maintenance Facilities and Support Office on USAF Base Tarmac

More information

DEBRECEN INTERNATIONAL AIRPORT. Prepared by Tamás Sápi Technical Director

DEBRECEN INTERNATIONAL AIRPORT. Prepared by Tamás Sápi Technical Director DEBRECEN INTERNATIONAL AIRPORT Prepared by Tamás Sápi Technical Director Location of the Debrecen Airport Debrecen International Airport Abandoned Russian military airport The Municipality took over the

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

Strategic Business Plan

Strategic Business Plan Williams Gateway Airport Authority Strategic Business Plan Fiscal Years 2011-2015 Adopted May 24, 2010 by the Phoenix-Mesa Gateway Airport Authority Board of Directors Page 2 TABLE OF CONTENTS Purpose...4

More information

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW JULY 2012 NEW PRODUCTION AND COMMERCIAL FACILITIES FOR RENT The production

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP 5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal

More information

National Archives and Record Administration

National Archives and Record Administration National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

Close-Out Documents... 9

Close-Out Documents... 9 Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Cuyahoga County Airport - A Guide to Funding Capital Improvements

Cuyahoga County Airport - A Guide to Funding Capital Improvements 7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

Existing Facilities. Current and Forecast Demand

Existing Facilities. Current and Forecast Demand Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway

More information

Executive Flight Office & Hangar

Executive Flight Office & Hangar ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 Exceptional value for world class 64,305 sq. ft. hangar facility in Eastern Washington ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 THE

More information

SITE SAFETY LOGISTIC PLAN

SITE SAFETY LOGISTIC PLAN SITE SAFETY LOGISTIC PLAN SHEET #1 Title Sheet Site Safety Logistic Plan For Project name & Address as it appears on the NB permit Or as it appears in the BIS system, with Borough Also include the following;

More information

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to

More information

LogisticsCentre IV Distribution Center

LogisticsCentre IV Distribution Center KCI Intermodal BusinessCentre LogisticsCentre IV LogisticsCentre IV Distribution Center Modern Warehouse/Distribution Space Ranging From 108,000± SF to 432,000± SF 10221 NW Transcon Drive 112th Street

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Application For General Liability Coverage

Application For General Liability Coverage HOLMAN INSURANCE BROKERS LTD. Application For General Liability Coverage Instructions Please read carefully This application form deals with all areas of operations that may require this type of coverage.

More information

NAVFAC HAWAII. NAVFAC Hawaii Construction Outlook. CAPT John Coronado. CAPT David Bustamante

NAVFAC HAWAII. NAVFAC Hawaii Construction Outlook. CAPT John Coronado. CAPT David Bustamante NAVFAC Hawaii NAVFAC Hawaii Construction Outlook Billy Borengasser Construction Product Line Coordinator, NAVFAC Hawaii 10/18/2011 1 NAVFAC HAWAII Commanding Officer: CAPT John Coronado Executive Officer:

More information

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

How To Install An Overhead Sewer

How To Install An Overhead Sewer Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,

More information

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R Legislation passed by the 82 nd legislature has modified the Texas Engineering Practice Act and the Texas Architect Practice Act. In order to give the public a clearer understanding of these changes, the

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

STATE OF ARIZONA Department of Revenue

STATE OF ARIZONA Department of Revenue STATE OF ARIZONA Department of Revenue ARIZONA TRANSACTION PRIVILEGE TAX NOTICE Janice K. Brewer Governor David Raber Director NOTE: This document addresses various questions and provides examples involving

More information

MANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE

MANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE MANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE This management plan is to be used in association with procedures outlined in Chapter of the Historic Buildings Management Handbook.

More information

DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS

DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS FEEDER SYSTEM: 1 HIGH SCHOOLS = (3) Garrett Academy of Technology Academic Magnet HS Septima Clark Academy MIDDLE SCHOOL + HIGH SCHOOL = (2) School of

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information