1 REQUEST FOR DIRECTOR DECISION DD537 Title: Securing and using additional external resources to support Health Inequalities Strategy delivery Executive Summary: The Greater London Authority Act 1999 requires the Mayor to lead preparation of a strategy which identifies health inequalities in Greater London, the priorities for reducing them, and the roles to be played by key partners in implementing the strategy. The Mayor s Health Inequalities Strategy and First Steps to Delivery plan were published in April This paper seeks approval to enter into a funding agreement with the Department of Health under which they will contribute 18, toward the GLA s costs of delivering expert health inequalities support to the London Health and Wellbeing Board Partnership Support Programme led jointly by London Councils and NHS London. This paper also seeks approval to use this funding and an additional 10,000 already received from the Department of Health (see MD724) to pay increased fees of GLA s contractor (UCL-Consultants) for the provision of related expert support. This will help to deliver agreed early priorities of the Mayor s Health Inequalities Strategy. Decision: Approval is sought for the: GLA to enter into a funding agreement with the Department of Health (Regional Public Health Group) under which they will contribute 18, toward the GLA s costs of delivering expert health inequalities support to the London Health and Wellbeing Board Partnership Support Programme led jointly by London Councils and NHS London; and variation of the GLA s contract with UCL-Consultants for services required to establish a Marmot Review team regional pilot on health inequalities to include expert health inequality services (with a value of up to 28,000.00) required by the GLA to deliver expert health inequalities support to the London Health and Wellbeing Board Partnership Support Programme (led jointly by London Councils) and NHS London and to the London Health Inequalities Public Health Network. AUTHORISING DIRECTOR/HEAD OF UNIT I have reviewed the request and am satisfied it is correct and consistent with the Mayor s plans and priorities. It has my approval. Name Jeff Jacobs Position Executive Director of Communities and Intelligence Signature Date 1

2 PART I - NON-CONFIDENTIAL FACTS AND ADVICE Decision required supporting report 1. Introduction and background 1.1 Section 309E of the Greater London Authority Act 1999 (the Act ) requires the Mayor to develop a strategy setting out proposals and policies for promoting the reduction of health inequalities between persons living in Greater London. The London Health Inequalities Strategy (HIS) was published by the Mayor in April Preparation of the HIS was supported by an Advisory Group including the London Regional Director of Public Health who is also the Mayor s Health Advisor. Successful delivery of the HIS requires ongoing investment in London-wide partnership action, close cooperation with local partnerships, and the continued building of expertise and evidence at both regional and local levels. Delivery structures and processes include involvement from the Department of Health s London Regional Public Health Team (RPHG-L). 1.3 The initial RPHG-L contribution of 45,000 of funding towards HIS delivery was approved under DD328. Arrangements for this work were formalised through a Memorandum of Understanding between the GLA Health Team and the RPHG-L. This funding was used to meet the costs of the award of a contract to UCL-Consultants to further facilitate regional delivery of action on health inequalities, drawing on both the HIS and the evidence from the Marmot Review (award approved under DD399). 1.4 The additional RPHG-L contribution of 18,000 will be used to meet the costs of varying the GLA s contract with UCL-Consultants in order to deliver a series of health inequalities workshops for NHS, local authority and voluntary sector leaders from each borough. In addition UCL-Consultants will support London Boroughs in implementing local health inequalities strategies through workshops, master-classes and consultancy as negotiated between the Marmot Review Team and key stakeholders 1.5 The existing 10,000) funding from the Department of Health (the receipt of which income was approved by MD724) will be used to meet the costs of varying the GLA s contract with UCL- Consultants in order to deliver a practical framework for local authorities to monitor and respond to the impact of changes in housing, employment and income benefits on health and health inequalities in London. 1.6 The Health Team (Health and Communities Unit) within the Communities and Intelligence Directorate will ensure that value for money is achieved by: ensuring that the revised contract with UCL-Consultants clearly specifies how performance will be measured and monitored, including by clearly outlining the activities, deliverables, roles/responsibilities, milestones and timetables expected of UCL-Consultants; project managing all work associated with the Health Inequalities Strategy, including this contract, according to the GLA project management methodology; regularly monitoring performance of the contractor once the contract is awarded; regularly assessing activities in the light of intended outcomes, and meeting with the provider to discuss performance and budgetary issues. 1.7 Officers are satisfied that UCL-Consultants offer value for money, their rates being identified as 2

3 comparable to other London consultancy providers. Their ability to draw on their extensive evidence-base and directly relevant experience enables them to provide the required consultancy support without the need for time-consuming and costly preparatory and background work. The appointment of an alternative provider following a competitive procurement exercise risks losing this expertise and experience, that provider would have to undertake more work than UCL Consultants to reach the same objectives and this would be likely lead to greater project costs being incurred and the review taking significantly longer than would be the case if UCL Consultants were engaged. In any event because of their expertise and experience it is highly unlikely that any other bidder would score more highly than UCL-Consultants in any competitive exercise 1.8 Payment will be made to UCL-Consultants on receipt of an invoice following the delivery of milestones. 1.9 Accordingly, approval is sought to enter to arrangements with Department of Health (Regional Public Health Group) (funding) and UCL-Consultants (variation of current contract) to facilitate the GLA s enhanced HIS delivery. 2. Other issues for consideration These pieces of work form a small addition to the overall programme of delivery of early HIS priorities. For this reason the links to the strategic plan, impact assessments and consultation and assessment of risk are as for the overall HIS delivery plan (see below). Links to strategies and Strategic Plan 2.1 The Strategic Plan commits to finalising and publishing the HIS Delivery Plan, and coordinating delivery of early HIS priorities. The Strategic Plan Delivery Form reference number that relates to this proposal is 89SP10/ The HIS has significant implications for both current and planned GLA strategies and has been drafted in parallel with their development to ensure consistency. The First Steps to Delivery plan references GLA strategies and programmes of particular relevance to HIS action. In some cases the plan specifies initiatives already identified in conjunction with other GLA strategy policies. Impact assessments and Consultation 2.3 Development of the HIS was influenced by an Integrated Impact Assessment (IIA) process and the IIA report was published on the GLA website to support the consultation process. Development of the strategy also involved extensive stakeholder engagement at every stage. Within the GLA, policy and strategy leads have been consulted at key stages in the strategy s development; as have external health experts including the Regional Director of Public Health for London. 2.4 During the formal public consultation stage 95 written responses were received, many of them composite (for example, from a number of NHS or community groups, from networks of individuals, or from partnerships such as the London Health Commission). In addition, 57 responses (a mixture of individual and organisational) were made to the online questionnaire. 3

4 Risk 2.5 Development of the HIS and associated documents has been subject to rigorous project management procedures including risk management. This included preparing and updating risk registers, in accordance with GLA project management guidance, and regular HIS project team meetings to track progress. Risks were also identified and shared with members of the HIS Steering Group and HIS Advisory Group. The risks associated with delivery are being identified and action to reduce these will be agreed with key partners over the coming months. 3. Financial Comments 3.1 DD399 approved the award of a consultancy contract with UCL Consultants in order to establish a Marmot Review Regional Pilot on health inequalities in London and to support the implementation of priorities relating to the Health Inequalities Strategy at a contract value of up to 45,000, that was to be funded by income from the Department of Health, the receipt of which was approved by DD This approval is seeking to secure and provide additional resources to support the Health Inequalities Strategy. This includes the following: the receipt of grant funding of 18,000 from the Department of Health (Regional Public Health Group) to deliver expert health inequalities support to the London Health and Wellbeing Board Partnership Support Programme led jointly by London Councils and NHS London; the variation of the GLA s contract with UCL-Consultants for services required to establish a Marmot Review team regional pilot on health inequalities to include expert health inequality services (with a value of up to 28,000.00) required by the GLA to deliver expert health inequalities support to the London Health and Wellbeing Board Partnership Support Programme (led jointly by London Councils and NHS London) and to the London Health Inequalities Public Health Network; and the use of the grant funding and additional funds of 10,000 to pay the increased fees associated with the variation of the GLA s contract with UCL-Consultants (from 45,000 to 73,000). 3.3 The increase in the proposed contract with UCL Consultants from 45,000 to 73,000 requires additional budget provision of 28,000, which will be funded from a new income stream from the Department of Health ( 18,000) for which approval is being sought above and a separate income stream from the Department of Health ( 10,000), of which the receipt of income was approved by MD724 as further support for the Health Inequalities Strategy work stream. 3.4 The receipt of the income and associated expenditure will be accounted for within the Health Programme budget. All appropriate budget adjustments will be made. 3.5 Any changes to this proposal, including budgetary implications will be subject to further approval via the Authority s decision-making process. 3.6 The Health Team within the Communities & Intelligence Directorate will be responsible for managing this project and contract. 4

5 4. Legal Comments 4.1 Under section 309E of the Greater London Authority Act 1999 (the `Act ), the Mayor must prepare and publish a Health Inequalities Strategy. The Strategy must contain the Mayor s proposals and policies for promoting the reduction of health inequalities between persons living in Greater London. 4.2 Under section 34 of the Act, the Authority, acting by the Mayor, may do anything which is calculated to facilitate, or is conducive or incidental to, the exercise of any functions of the Authority exercisable by the Mayor. 4.3 Officers have indicated that the proposed entry into a funding agreement with the Department of Health variation of the Authority s contract with UCL-Consultants is required to facilitate and which may be considered conducive to the implementation of agreed early priorities of the Health Inequalities Strategy. On this basis the proposed award of contract may be considered to fall within the Authority s section 34 powers. 4.4 The GLA s contract with UCL-Consultants provides expressly for the variation of the contract in writing by the parties. 4.5 Therefore, the director may approve officers recommendations if satisfied with the content of this report. 4.6 Officers should ensure that funding and variation agreements are put in place and executed by the Authority, Department of Health and UCL-Consultants before any reliance is placed on the funding or the additional services commence. 5. Background/supporting papers MOU between GLA and DH DD328 DD399 MD724 Agreement between GLA and NHS Lambeth to receive Spearheads funding 5

6 Public access to information Information in this form is subject to the Freedom of Information Act 2000 (FOI Act) and other legislation. Information on this decision will be included in the Mayor s report and decision list. The form will be available publically from then. Any facts and advice that should not be made automatically available on request should not be included in Part 1 but instead on the separate Part 2 form. Deferment is only applicable where release before that date would compromise the implementation of the decision being approved. Is the publication of this approval to be deferred? NO If yes, for what reason: Until what date: Is there a part 2 form NO ORIGINATING OFFICER DECLARATION: Legal Advice: The Commercial Law and Projects team have commented on this proposal. Tick to indicate approval () Financial Advice: The Communities and Intelligence finance team has commented on this proposal on behalf of the Assistant Director of GLA Finance. Executive Director, Resources I have been consulted about the proposal and confirm that financial and legal advice have been taken into account in the preparation of this report. Signature Date 6

Procurement of communications support for the launch of Healthy Schools London

Procurement of communications support for the launch of Healthy Schools London REQUEST FOR DIRECTOR DECISION DD923 Title: Procurement of communications support for the launch of Healthy Schools London Executive Summary: The Healthy Schools London programme ( HSL Programme ) is one

More information

Procurement of call-off contract from SASPAC s Framework Agreement.

Procurement of call-off contract from SASPAC s Framework Agreement. REQUEST FOR DIRECTOR DECISION DD383 Title: Procurement of call-off contract from SASPAC s Framework Agreement. Executive Summary: The GLA manages the support, maintenance and development of the SASPAC

More information

GLA/NHS Information Revolution Project for London staffing support

GLA/NHS Information Revolution Project for London staffing support REQUEST FOR DIRECTOR DECISION DD520 Title: GLA/NHS Information Revolution Project for London staffing support Executive Summary: This project is creating a webpage and intranet page for London s GP practices

More information

Procurement of IT software and support for housingmoves service

Procurement of IT software and support for housingmoves service REQUEST FOR DIRECTOR DECISION DD447 Title: Procurement of IT software and support for housingmoves service Executive Summary: Housingmoves will transfer to the GLA on 1 st April 2011. The efficient running

More information

REQUEST FOR MAYORAL DECISION MD405. Title: Disaster Recovery Services

REQUEST FOR MAYORAL DECISION MD405. Title: Disaster Recovery Services REQUEST FOR MAYORAL DECISION MD405 Title: Disaster Recovery Services Executive Summary: In May 2006, the GLA entered into an agreement with a recovery partner to offer immediate replacement IT equipment

More information

Expenditure of up to 140,000 to pay for London Statistical Support from the Office for National Statistics in 2015-16.

Expenditure of up to 140,000 to pay for London Statistical Support from the Office for National Statistics in 2015-16. REQUEST FOR DIRECTOR DECISION DD1372 Title: ONS London Statistical Support Executive Summary: The GLA has a memorandum of understanding with the Office for National Statistics (ONS) to supply statistical

More information

lb. 2_C GREATERLONDONAUTHORITY Title: Provision of media & communications support for the Lsndon Healthy Workplace Charter LHWC) Executive Summary:

lb. 2_C GREATERLONDONAUTHORITY Title: Provision of media & communications support for the Lsndon Healthy Workplace Charter LHWC) Executive Summary: GREATERLONDONAUTHORITY REQUEST FOR ASSISTANT DIRECTOR DECISION - ADD377 Title: Provision of media & communications support for the Lsndon Healthy Workplace Charter LHWC) Executive Summary: This decision

More information

REQUEST FOR MAYORAL DECISION MD670. Title: Storage Area Network Maintenance Contract

REQUEST FOR MAYORAL DECISION MD670. Title: Storage Area Network Maintenance Contract REQUEST FOR MAYORAL DECISION MD670 Title: Storage Area Network Maintenance Contract Executive Summary: Approval is sought for the award of a two-year contract (with provision for the extension of the contract

More information

REQUEST FOR DIRECTOR DECISION DD899. Drain London programme

REQUEST FOR DIRECTOR DECISION DD899. Drain London programme REQUEST FOR DIRECTOR DECISION DD899 Title: Drain London programme Executive Summary: A predicted 1.3 million properties in London are at risk from flooding from heavy rainfall (surface water flooding),

More information

I have reviewed the request and am satisfied it is correct and consistent with the Mayor s plans and priorities. It has my approval.

I have reviewed the request and am satisfied it is correct and consistent with the Mayor s plans and priorities. It has my approval. REQUEST FOR DIRECTOR DECISION DD1375 Title: Data Storage Expansion Executive Summary: The GLA s Technology Group (TG) seeks authorisation to conduct a procurement exercise for a 12 month contract for a

More information

The procurement is for hardware only and the cost will not exceed 85,000.

The procurement is for hardware only and the cost will not exceed 85,000. REQUEST FOR DIRECTOR DECISION DD1155 Title: Additional IT data replication appliance Executive Summary: Approval is sought to conduct a procurement exercise to purchase an additional data replication appliance.

More information

REQUEST FOR DIRECTOR DECISION DD431. Sports Participation Fund Views Monitoring Software

REQUEST FOR DIRECTOR DECISION DD431. Sports Participation Fund Views Monitoring Software REQUEST FOR DIRECTOR DECISION DD431 Title: Sports Participation Fund Views Monitoring Software Executive Summary: Playsport London is the Mayor s programme of investment in grass-roots sport, set according

More information

REQUEST FOR DIRECTOR DECISION DD1369. Title: Indie Camp TV Business Accelerator. Executive Summary:

REQUEST FOR DIRECTOR DECISION DD1369. Title: Indie Camp TV Business Accelerator. Executive Summary: x REQUEST FOR DIRECTOR DECISION DD1369 Title: Indie Camp TV Business Accelerator Executive Summary: The London Enterprise Panel has given its in-principle agreement to funding an accelerator programme

More information

The Mayor s London Housing Strategy includes a policy to create Housing Zones across London.

The Mayor s London Housing Strategy includes a policy to create Housing Zones across London. REQUEST FOR MAYORAL DECISION MD1438 Title: Housing Zone Consultancy Support Executive Summary: The Mayor s London Housing Strategy includes a policy to create Housing Zones across London. The Housing Zone

More information

Title: Funding London Business Plan 2014/15 and Governance Changes [Funding London is the new trading name of SME Wholesale Finance London Ltd]

Title: Funding London Business Plan 2014/15 and Governance Changes [Funding London is the new trading name of SME Wholesale Finance London Ltd] REQUEST FOR MAYORAL DECISION MD1447 Title: Funding London Business Plan 2014/15 and Governance Changes [Funding London is the new trading name of SME Wholesale Finance London Ltd] Executive Summary: In

More information

GREATERLONDONAUTHORITY

GREATERLONDONAUTHORITY GREATERLONDONAUTHORITY REQUEST FOR MAYORAL DECISION MD1 648 Title: Hockey additional grant funding Executive Summary: This decision seeks approval to commit a further 300,000 from the major sports events

More information

Glossary of Building & Housing New Homes in Greenwich Square NHS Acquisition

Glossary of Building & Housing New Homes in Greenwich Square NHS Acquisition REQUEST FOR MAYORAL DECISION MD1454 Title: Greenwich Square NHS Acquisition Executive Summary: This Mayoral Decision seeks to approve expenditure in relation to the acquisition by GLA Land and Property

More information

The annual total cost to Lambeth is approximately 100k. Introduction of this surcharge provides a cost saving of 100K per annum.

The annual total cost to Lambeth is approximately 100k. Introduction of this surcharge provides a cost saving of 100K per annum. b Officer delegated decisions August 2012 Implementation of credit card surcharges All Wards Report authorised by: Mike Suarez - Executive Director of Finance & Resources. Executive summary As part of

More information

REQUEST FOR ASSISTANT DIRECTOR DECISION ADD225. Title: Low Carbon Entrepreneur 2015

REQUEST FOR ASSISTANT DIRECTOR DECISION ADD225. Title: Low Carbon Entrepreneur 2015 REQUEST FOR ASSISTANT DIRECTOR DECISION ADD225 Title: Low Carbon Entrepreneur 2015 Executive Summary: This ADD sets out plans and seeks approval to organise and hold the Low Carbon Entrepreneur 2015 Prize

More information

REQUEST FOR DIRECTOR DECISION DD1250. Title: Drain London Programme 2014-16

REQUEST FOR DIRECTOR DECISION DD1250. Title: Drain London Programme 2014-16 REQUEST FOR DIRECTOR DECISION DD1250 Title: Drain London Programme 2014-16 Executive Summary: A predicted 1.4 million properties in London are at risk from surface water flooding caused by heavy rainfall,

More information

MAIDSTONE BOROUGH COUNCIL CABINET MEMBER FOR COMMUNITY SERVICES REPORT OF DIRECTOR OF RESOURCES AND PARTNERSHIPS

MAIDSTONE BOROUGH COUNCIL CABINET MEMBER FOR COMMUNITY SERVICES REPORT OF DIRECTOR OF RESOURCES AND PARTNERSHIPS MAIDSTONE BOROUGH COUNCIL CABINET MEMBER FOR COMMUNITY SERVICES REPORT OF DIRECTOR OF RESOURCES AND PARTNERSHIPS Report prepared by: Zena Cooke Date Issued: 8 October 2009 1. EQUITY RELEASE 1.1 Issue for

More information

GREATERLONDONAUTHORITY

GREATERLONDONAUTHORITY GREATERLONDONAUTHORITY REQUEST FOR ASSISTANT DIRECTOR DECISION ADD37B Title: Hosting and development of London DataStore Executive Summary: The London DataStore is one of the GLA s flagship projects and

More information

REQUEST FOR DIRECTOR DECISION DD1296. Title: Croydon Innovation Centre. Executive Summary:

REQUEST FOR DIRECTOR DECISION DD1296. Title: Croydon Innovation Centre. Executive Summary: REQUEST FOR DIRECTOR DECISION DD1296 Title: Croydon Innovation Centre Executive Summary: This paper seeks approval to release funds of up to 800,000 from the London Enterprise Fund for the London Borough

More information

PROCUREMENT PROGRAMME PROCUREMENT OF CONSULTANTS HEAD OF WASTE STRATEGY AND CONTRACTS

PROCUREMENT PROGRAMME PROCUREMENT OF CONSULTANTS HEAD OF WASTE STRATEGY AND CONTRACTS NORTH LONDON WASTE AUTHORITY Agenda Item No: REPORT TITLE: PROCUREMENT PROGRAMME PROCUREMENT OF CONSULTANTS REPORT OF: HEAD OF WASTE STRATEGY AND CONTRACTS FOR SUBMISSION TO: DATE: AUTHORITY MEETING 11

More information

Investment & Performance Board (IPB)

Investment & Performance Board (IPB) Investment & Performance Board (IPB) Date of IPB meeting: 18 December 2014 Title of paper: To be presented by: Cleared by: (name Adviser & Director) Classification: Junior Electricity Supply Licence Update

More information

Investment & Performance Board (IPB)

Investment & Performance Board (IPB) Investment & Performance Board (IPB) Date of IPB meeting: 23 October 2012 Title of paper: To be presented by: Cleared by: (name Adviser & Director) Classification: Developing a new junior electricity supply

More information

UNSOLICITED PROPOSALS

UNSOLICITED PROPOSALS UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY

More information

DIRECTORATE OF AUDIT, RISK AND ASSURANCE

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Appendix 2 DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA DRAFT Review of Millennium Mills Grant Declaration 2014/15 DISTRIBUTION LIST Audit Team David Esling, Head of Audit

More information

CONTRACT MANAGEMENT POLICY

CONTRACT MANAGEMENT POLICY CONTRACT MANAGEMENT POLICY Section Finance Approval Date 25/08/2014 Approved by Directorate Next Review Aug 2016 Responsibility Chief Operating Officer Key Evaluation Question 6 PURPOSE The purpose of

More information

POSITION INFORMATION DOCUMENT

POSITION INFORMATION DOCUMENT POSITION INFORMATION DOCUMENT Position Title: Senior Manager, ICT Contracts Classification Code: ASO8 Division: ICT Services Directorate: ICT Contracts & Performance Management Type of Appointment: Branch:

More information

Chapter 6 Implementation Planning

Chapter 6 Implementation Planning Chapter 6 Planning Planning- Division into Work Packages The following are the recommended Work Packages Overall Change Programme Work Package 1 E-Cabinet Model Work Package 2 Security Policy Design Work

More information

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors Procurement guidance Engaging and managing consultants Includes definitions for consultants and contractors Procurement guidance: Engaging and managing consultants Page 2 of 17 Table of contents Table

More information

Royal Holloway University of London

Royal Holloway University of London Royal Holloway University of London Consultancy Policy December 2008 1.0 Introduction 1.1 Consultancy is defined as: The deployment of existing knowledge to meet the specific requirements of a client either

More information

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000 Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE

More information

A Guide to Pre-Application Advice and Fees and Planning Performance Agreements

A Guide to Pre-Application Advice and Fees and Planning Performance Agreements A Guide to Pre-Application Advice and Fees and Planning Performance Agreements V3 Sept 2014 Contents 1. Introduction 2. The Benefits of Pre-Application Advice 3. How do I obtain pre-application advice?

More information

IV! 0 P /3 C; The above request has my approval. REQUEST FOR DMPC DECISION DMPCD 2013-144. Procurement Request National Uniform Managed Service (NUMS)

IV! 0 P /3 C; The above request has my approval. REQUEST FOR DMPC DECISION DMPCD 2013-144. Procurement Request National Uniform Managed Service (NUMS) IV! 0 P /3 C; REQUEST FOR DMPC DECISION DMPCD 203-44 Title: Procurement Request National Uniform Managed Service (NUMS) Executive Summary: This paper requests the approval to initiate procurement for the

More information

Procurement, Contracting and Contract Management Policy

Procurement, Contracting and Contract Management Policy Procurement, Contracting and Contract Management Policy Corporate policy 8.4 Responsible Officer: Group Manager Accounting and Taxation Policy Custodian: Chief Finance Officer Division: Finance and Resources

More information

Part E: Contract management

Part E: Contract management Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

REPORT FOR: HEALTH AND WELLBEING BOARD

REPORT FOR: HEALTH AND WELLBEING BOARD REPORT FOR: HEALTH AND WELLBEING BOARD Date of Meeting: October 2 nd 2013 Subject: INFORMATION REPORT Review of School Nursing and Health Visiting in Harrow and Barnet Responsible Officer: Dr Laura Fabunmi

More information

Appendix 1e. DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA. Performance Management Framework

Appendix 1e. DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA. Performance Management Framework Appendix 1e DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA Performance Management Framework DISTRIBUTION LIST Audit Team David Esling, Head of Audit and Assurance - Risk Management

More information

Project Athena Phase 1 Human Resources and Payroll

Project Athena Phase 1 Human Resources and Payroll Executive 14 November 2011 Report from the Director of Finance and Corporate Services Project Athena Phase 1 Human Resources and Payroll Wards Affected: [ALL] 1.0 Summary 1.1 This report concerns the transfer

More information

Heat Networks Delivery Unit

Heat Networks Delivery Unit Heat Networks Delivery Unit HNDU Round 6: Overview April 2016 Crown copyright 2016 URN 16D/056 You may re-use this information (not including logos) free of charge in any format or medium, under the terms

More information

JOB DESCRIPTION. TITLE: Corporate Property Manager SALARY RANGE: 55,000-70,000

JOB DESCRIPTION. TITLE: Corporate Property Manager SALARY RANGE: 55,000-70,000 TITLE: Corporate Property Manager SALARY RANGE: 55,000-70,000 JOB DESCRIPTION DEPARTMENT: Property Management Services REGION: North East / North West / Midlands / London / South ACCOUNTABILITIES: The

More information

To be used in conjunction with the Invitation to Tender for Consultancy template.

To be used in conjunction with the Invitation to Tender for Consultancy template. GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small

More information

A joint plan to foster a healthy and vibrant Healthcare IT market. Intellect & DH Informatics Directorate. Initial Issue

A joint plan to foster a healthy and vibrant Healthcare IT market. Intellect & DH Informatics Directorate. Initial Issue A joint plan to foster a healthy and vibrant Healthcare IT market Intellect & DH Informatics Directorate Initial Issue Crown Copyright 2012 Page 1 of 8 Amendment History: Version Date Amendment History

More information

Entrepreneurs Programme - Business Growth Grants

Entrepreneurs Programme - Business Growth Grants Entrepreneurs Programme - Business Growth Grants Version: 15 July 2015 Contents 1 Purpose of this guide... 4 2 Programme overview... 4 2.1 Business Management overview... 4 3 Business Growth Grant... 5

More information

Page 5. The Adult Social Services and Health Committee. The Strategic Director of Adult Social Services, Housing and Health

Page 5. The Adult Social Services and Health Committee. The Strategic Director of Adult Social Services, Housing and Health Page 5 Agenda Item 5 Report to: The Adult Social Services and Health Committee Date: 20 th November 2012 Report of: The Strategic Director of Adult Social Services, Housing and Health Ward Location: All

More information

Conference Room, Office of the Police & Crime Commissioner, Clemonds Hey, Oakmere Road, Winsford, CW7 2UA. Agenda Page

Conference Room, Office of the Police & Crime Commissioner, Clemonds Hey, Oakmere Road, Winsford, CW7 2UA. Agenda Page MANAGEMENT BOARD Friday 18 December 2015 9.00am Conference Room, Office of the Police & Crime Commissioner, Clemonds Hey, Oakmere Road, Winsford, CW7 2UA Agenda Page 1 NOTES OF MANAGEMENT BOARD ON 9 DECEMBER

More information

Invitation to Quote for consultancy services: a review of business planning arrangements

Invitation to Quote for consultancy services: a review of business planning arrangements Invitation to Quote for consultancy services: a review of business planning arrangements 1.0 Overview 1.1 The General Pharmaceutical Council (GPhC) is undertaking a review of the following processes and

More information

North Middlesex University Hospital NHS Trust. Annual Audit Letter 2005/06. Report to the Directors of the Board

North Middlesex University Hospital NHS Trust. Annual Audit Letter 2005/06. Report to the Directors of the Board North Middlesex University Hospital NHS Trust Annual Audit Letter 2005/06 Report to the Directors of the Board 1 Introduction The Purpose of this Letter 1.1 The purpose of this Annual Audit Letter (letter)

More information

1. Senior Adviser, Disability, Mayor s Office

1. Senior Adviser, Disability, Mayor s Office Appendix 1. Senior Adviser, Disability, Mayor s Office Case for the post The Senior Disability Adviser will play a lead role in promoting equality for disabled Londoners. At the Mayor s Disability Conference

More information

WA NDIS My Way Reference Group Progress Report

WA NDIS My Way Reference Group Progress Report Report to end of April 2014 1. Governance Joint Steering Committee LSW Local Advisory Panel Legislation 2. Operations Evaluation Mental Health ICT Quality 3. Communications and Engagement Advertising Campaign

More information

Recognition of Prior Learning (RPL) Kit. BSB51407 Diploma of Project Management

Recognition of Prior Learning (RPL) Kit. BSB51407 Diploma of Project Management Recognition of Prior Learning (RPL) Kit BSB51407 Diploma of Project Management Applicant: Date: Diploma of Project Management RPL Kit 1 Applicant declaration: I have completed the following RPL application

More information

Standard operating procedure

Standard operating procedure Standard operating procedure Title: How to conduct a procurement procedure Status: PUBLIC Document no.: SOP/EMA/0121 Lead author Approver Effective date: 04.09.14 Name: Caroline Maignen Name: Stefano Marino

More information

MASSEY UNIVERSITY COLLEGE RESEARCH CENTRE AGREEMENT

MASSEY UNIVERSITY COLLEGE RESEARCH CENTRE AGREEMENT MASSEY UNIVERSITY COLLEGE RESEARCH CENTRE AGREEMENT Agreement effective from: PARTIES: Between the Vice-Chancellor and the Pro Vice-Chancellor of the College of College of Sciences concerning the operation

More information

Highlands and Islands Broadband Pathfinder Project - Background

Highlands and Islands Broadband Pathfinder Project - Background ITEM: 22(a) PAGE: 1 REPORT TO: The Moray Council on 5 July, 2006 SUBJECT: BY: Highlands and Islands Broadband Pathfinder Project - Background Chief Executive 1. Reason for Report 1.1 The Pathfinder Broadband

More information

Enterprise governance framework: Align your enterprise to make better decisions

Enterprise governance framework: Align your enterprise to make better decisions Enterprise framework: Align your enterprise to make better decisions By Joanna Clark, Principal, Enterprise Governance Group Enterprise involves making decisions about performance and risk at four levels

More information

INFORMATION GOVERNANCE POLICY

INFORMATION GOVERNANCE POLICY INFORMATION GOVERNANCE POLICY Version: 3.2 Authorisation Committee: Date of Authorisation: May 2014 Ratification Committee Level 1 documents): Date of Ratification Level 1 documents): Signature of ratifying

More information

Commissioning and Financial Plan Guidance 2013/14

Commissioning and Financial Plan Guidance 2013/14 Page 127 Agenda Item 6 Appendix C Commissioning and Financial Plan Guidance 2013/14 Agenda Item 6 Page 128 INTRODUCTION 1. This document sets out the formal guidance to the London Borough of Sutton for

More information

Investment & Performance Board (IPB)

Investment & Performance Board (IPB) Investment & Performance Board (IPB) Date of meeting: 19 January 2016 Title of paper: Developing a New Junior Electricity Supply Licence - Progress Report To be presented by: Cleared by: Classification:

More information

Alternative infrastructure funding and financing

Alternative infrastructure funding and financing Alternative infrastructure funding and financing Research Paper (commissioned by the Queensland Government) 21 March 2016 Department Of Infrastructure, Local Government and Planning This page intentionally

More information

Date 15.6.09. Date 17.6.09. Date 18.06.09. Date Name of TU rep. N/A Date. Date 19.06.09. Date 19.06.09. Date 19.06.09. Date 19.06.09. Date 4.09.

Date 15.6.09. Date 17.6.09. Date 18.06.09. Date Name of TU rep. N/A Date. Date 19.06.09. Date 19.06.09. Date 19.06.09. Date 19.06.09. Date 4.09. DELEGATED POWERS REPORT NO. 839 SUBJECT: Tender acceptance for the provision of the Client Caseload Information System (CCIS) Database Control sheet All of the following actions MUST be completed at each

More information

IT1T Integrated Recruitment Systems 2015

IT1T Integrated Recruitment Systems 2015 UCD IT Services IT1T Integrated Recruitment Systems 2015 Project Initiation Document Version 1.0 2 December 2014 Version History Version Date Summary of Changes Changed by 1.0 02/12/2014 Initial Draft

More information

Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development)

Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development) Meeting: Cabinet Date: 6 October 2005 Subject: Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development) Contact Officer: Portfolio Holder: Key

More information

PSPPROC506A Plan to manage a contract

PSPPROC506A Plan to manage a contract PSPPROC506A Plan to manage a contract Revision Number: 2 PSPPROC506A Plan to manage a contract Modification History PSPPROC506A Release 2: PSPPROC506A Release 1: Unit Descriptor Layout adjusted. No changes

More information

REQUEST FOR PROPOSAL FOR THE DEVELOPMENT OF A CUSTOMISED SOLUTION DRIVEN PERFORMANCE MANAGEMENT PROGRAM RFP NUMBER: TIA 2012/RFP001/02

REQUEST FOR PROPOSAL FOR THE DEVELOPMENT OF A CUSTOMISED SOLUTION DRIVEN PERFORMANCE MANAGEMENT PROGRAM RFP NUMBER: TIA 2012/RFP001/02 REQUEST FOR PROPOSAL FOR THE DEVELOPMENT OF A CUSTOMISED SOLUTION DRIVEN PERFORMANCE MANAGEMENT PROGRAM RFP NUMBER: TIA 2012/RFP001/02 1. PROJECT TITLE Development of a customised solution driven performance

More information

SPECIFICATION DOCUMENT PROCUREMENT OF EXTERNAL AUDIT SERVICES

SPECIFICATION DOCUMENT PROCUREMENT OF EXTERNAL AUDIT SERVICES BID NO: NMISA (12-13) T0009 SPECIFICATION DOCUMENT PROCUREMENT OF EXTERNAL AUDIT SERVICES NB. On the last page of this document the bidder needs to declare and indicate that they have read and understood

More information

1. Introduction. 2. Scope of Work. 30 September 2015 Enquiries: Kathryn Kasavel: 031 311 7920 Email: Kathryn.Kasavel@durban.gov.za

1. Introduction. 2. Scope of Work. 30 September 2015 Enquiries: Kathryn Kasavel: 031 311 7920 Email: Kathryn.Kasavel@durban.gov.za 30 September 2015 Enquiries: Kathryn Kasavel: 031 311 7920 Email: Kathryn.Kasavel@durban.gov.za Re-Advertisement: Request for Quotation Development of a Greening Programme for the City of Durban in preparation

More information

CABINET - 26 JULY 2011 REPORT OF THE DIRECTOR OF CORPORATE RESOURCES EAST MIDLANDS SHARED SERVICES: PROCUREMENT OF MANAGED HOSTING SERVICE

CABINET - 26 JULY 2011 REPORT OF THE DIRECTOR OF CORPORATE RESOURCES EAST MIDLANDS SHARED SERVICES: PROCUREMENT OF MANAGED HOSTING SERVICE N CABINET - 26 JULY 2011 REPORT OF THE DIRECTOR OF CORPORATE RESOURCES EAST MIDLANDS SHARED SERVICES: PROCUREMENT OF MANAGED HOSTING SERVICE Purpose 1. The purpose of the report is to: advise Cabinet of

More information

Part B1: Business case developing the business case

Part B1: Business case developing the business case Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

Statement of responsibilities of auditors and audited small bodies

Statement of responsibilities of auditors and audited small bodies Statement of responsibilities of auditors and audited small bodies The Audit Commission is a public corporation set up in 1983 to protect the public purse. The Commission appoints auditors to councils,

More information

GREATERLONDONAUTHORITY

GREATERLONDONAUTHORITY GREATERLONDONAUTHORITY REQUEST FOR DIRECTOR DECISION DD200S Title: THERMOS European Union (EU) Horizon 2020 Heat Mapping Project Executive Summary: In January 2016 the GLA was part of a project consortium

More information

HEALTHCARE DEVELOPMENT CENTER

HEALTHCARE DEVELOPMENT CENTER HEALTHCARE DEVELOPMENT CENTER Partnership Guide Hanover Research s Health Care Development Center (HDC) was founded in response to overwhelming demand from Hanover Research clients for assistance identifying

More information

Procurement guidance Managing and monitoring suppliers performance

Procurement guidance Managing and monitoring suppliers performance Procurement guidance Managing and monitoring suppliers performance Procurement guidance: Managing and monitoring suppliers performance Page 2 of 16 Table of contents Table of contents... 2 Purpose of the

More information

Process for advising on the feasibility of implementing a patient access scheme

Process for advising on the feasibility of implementing a patient access scheme Process for advising on the feasibility of implementing a patient access scheme INTERIM September 2009 Patient Access Schemes Liaison Unit at NICE P001_PASLU_Process_Guide_V1.3 Page 1 of 21 Contents (to

More information

Greater London Authority. Financial Regulations. These Regulations came into force on 1 June 2014 under MD1333

Greater London Authority. Financial Regulations. These Regulations came into force on 1 June 2014 under MD1333 Greater London Authority Financial Regulations These Regulations came into force on 1 June 2014 under MD1333 Index of Regulations Part A: Financial Management 2 1. Scope of these Regulations 2 2. Financial

More information

Preparing an effective bid

Preparing an effective bid Vascular Risk Assessment (Vascular Checks) - a new Local Enhanced Service Part 2 Preparing an effective bid Version 1.1 Guidance prepared by PSNC to support Local Pharmaceutical Committees About this guidance

More information

Board of Directors 30/07/2015

Board of Directors 30/07/2015 CATEGORY OF PAPER Specific action required: Provides Assurance: For Information: Agenda item: 23 Report title: Board of Directors 30/07/2015 NHS Staff Survey Action Plan and Actions Against Core Priorities

More information

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr

More information

Review of insolvency engagements questionnaire

Review of insolvency engagements questionnaire Review of insolvency engagements questionnaire Introduction This questionnaire is to be used for formal insolvency engagements under the Corporations Act and Bankruptcy Act. The questionnaire is based

More information

15.4 DELIVERY PROGRAM PROGRESS REPORT JANUARY TO JUNE 2015 & UPDATE ON FUTURE PERFORMANCE MEASUREMENT & REPORTING

15.4 DELIVERY PROGRAM PROGRESS REPORT JANUARY TO JUNE 2015 & UPDATE ON FUTURE PERFORMANCE MEASUREMENT & REPORTING 15.4 DELIVERY PROGRAM PROGRESS REPORT JANUARY TO JUNE 2015 & UPDATE ON FUTURE PERFORMANCE MEASUREMENT & REPORTING ATTACHMENT: RESPONSIBLE OFFICER: AUTHOR: DELIVERY PROGRAM ITEM: DELIVERY PROGRAM PROGRESS

More information

MAIDSTONE BOROUGH COUNCIL RECORD OF DECISION OF THE CABINET MEMBER FOR COMMUNITY SERVICES

MAIDSTONE BOROUGH COUNCIL RECORD OF DECISION OF THE CABINET MEMBER FOR COMMUNITY SERVICES MAIDSTONE BOROUGH COUNCIL RECORD OF DECISION OF THE CABINET MEMBER FOR COMMUNITY SERVICES Equity Release Decision Made: 08 October 2009 Issue for Decision To conisder endorsing the council s involvement

More information

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy. Senior Project Manager Job Description Reference: 102014/51 Job Title: Senior Project Manager Purpose of Role: The University is committed to providing an environment conducive to high quality teaching

More information

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1 Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1. Introduction 1.1 The Service s key responsibilities are: o The achievement of proper and effective

More information

ORDER FORM. Part 1 - Order Form

ORDER FORM. Part 1 - Order Form ORDER FORM Part 1 - Order Form This Order Form is issued subject to the provisions of the framework agreement entered into between the Authority and the Supplier on 27/01/2010 ("Framework Agreement").

More information

Intensive Support Service Administration of Funding Policy Statement

Intensive Support Service Administration of Funding Policy Statement Disability Services Intensive Support Service Administration of Funding Policy Statement Subject: Intensive Support Service Administration of Funding Policy Number: DS 065 - ISS 016 Related Legislation,

More information

London Centre of Excellence Development Programme

London Centre of Excellence Development Programme MEETING Finance, Procurement and Property Committee AGENDA ITEM 11 MEETING DATE SUBJECT REPORT 20 July 2006 DOCUMENT NUMBER FEP 889 London Centre of Excellence Development Programme (8 th July 2006) by

More information

TRUST BOARD. Date of Meeting: 05/04/2011 Enclosure: 5

TRUST BOARD. Date of Meeting: 05/04/2011 Enclosure: 5 TRUST BOARD Date of Meeting: 05/04/2011 Enclosure: 5 Title of Report: Merger and Acquisition Update Agenda Item No: 7.1 Aims: This report informs and updates the Board on the development of the process

More information

Professional indemnity insurance Management consultants proposal form

Professional indemnity insurance Management consultants proposal form Professional indemnity insurance Management consultants proposal form Instructions Please provide a full answer to every question. Please ensure that all answers are typewritten or printed in block letters

More information

MOPAC C:? Programme for 2014/15 for the re-building of the MPS cyber capability to deliver a transformational

MOPAC C:? Programme for 2014/15 for the re-building of the MPS cyber capability to deliver a transformational Title: Funding Application 2014/15 Cyber Crime Unit JEQUE5T FOR DMPC DECISION - DMPCD 2014 41 DMPCDv3 June 2012 1 F / Signature Date The aboyçjçest has my approval. Authority. Any such interests are recorded

More information

Standard operating procedure

Standard operating procedure Standard operating procedure Title: Steps involved in outsourcing of services Status: PUBLIC Document no.: SOP/EMA/0083 Lead author Approver Effective date: 18-12-2014 Name: Caroline Maignen Name: Stefano

More information

NOT PROTECTIVELY MARKED. Company Policy: Supply Chain NOT PROTECTIVELY MARKED

NOT PROTECTIVELY MARKED. Company Policy: Supply Chain NOT PROTECTIVELY MARKED Company Policy: 1 Company Policy: Policy Statement The purpose of this policy is to state the strategic objectives and to identify the minimum standards that must be implemented across activities to ensure

More information

Position Description

Position Description To apply for this position, please provide an up to date resume, covering letter, and statement addressing the Key Selection Criteria in section 6 of this Position Description. Your application will not

More information

Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting

Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting Framework Agreement between the Department of Health and the NHS Trust Development Authority Annex C: Finance and Accounting 2014 1. The Framework Agreement sets out the governance and accountability arrangements

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA Appendix 2c DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA Review of Programme and Project Management Framework- Strategic Land and Property DISTRIBUTION LIST Audit Team David

More information

Advisory Note - October 2005. Disclosure and management of conflict of interest for advisers

Advisory Note - October 2005. Disclosure and management of conflict of interest for advisers Advisory Note - October 2005 Disclosure and management of conflict of interest for advisers The Secretary Department of Treasury and Finance 1 Treasury Place, Melbourne Victoria 3002 Australia Telephone:

More information

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement Asset Protection Agreement Templates - Customer Explanatory Notes Explanatory Notes on Asset Protection Agreement Clause Heading Background The Asset Protection Agreement is intended for use where the

More information

PROJECT MANAGEMENT GUIDELINES NATIONAL TRANSPORT AUTHORITY

PROJECT MANAGEMENT GUIDELINES NATIONAL TRANSPORT AUTHORITY PROJECT MANAGEMENT GUIDELINES FOR PROJECTS FUNDED BY THE NATIONAL TRANSPORT AUTHORITY (UP TO 20 MILLION IN VALUE) december 2011 Table of Contents Section A 1. Introduction 4 1.1 Purpose 4 1.2 Applicability

More information

Report of Don McLure, Corporate Director of Resources

Report of Don McLure, Corporate Director of Resources AUDIT COMMITTEE 29 June 2015 Annual Review of the System of Internal Audit 2014 / 2015 Report of Don McLure, Corporate Director of Resources Purpose of the Report 1. The purpose of this report is for members