1 Page 127 Agenda Item 6 Appendix C Commissioning and Financial Plan Guidance 2013/14

2 Agenda Item 6 Page 128 INTRODUCTION 1. This document sets out the formal guidance to the London Borough of Sutton for the 2013/14 business and financial planning round. This guidance was approved by the Strategy and Resources Committee on 2 July 2012 and is the guidance that all staff must follow. The purpose of the business and financial planning round is to ensure that Members priorities and objectives are translated into practical plans for delivery and that there are sound financial plans for these within the resources available. The overall timetable to be followed is at the end of this document. 2. This guidance continues the integrated approach to business and financial planning over the past three year. As the London Borough of Sutton moves towards being more of a commissioning council the guidance builds on previous approaches so the intention is that by February 2013 we will be able to set out commissioning intentions at a council-wide and a Directorate level. Each Directorate will produce a one year Commissioning and Financial Plan, where the commissioning intentions should reflect the core business of the directorate. This guidance sets out the process and timetable that will culminate in March 2013 with the final agreement at Council of a council-wide Commissioning and Financial Plan for 2013/14 that will be made available on the website. 3. The Council's financial outlook is extremely challenging both in the current year and over the period of the Medium Term Financial Plan. The approach for the coming year and beyond is to ensure that business planning and financial planning are integrated into Commissioning and Financial Plans and that these are driven by business need, and that resources are allocated in line with the council's strategic objectives. In particular Strategic Directors will need to ensure that not only do plans meet any current financial targets, but they are also starting to plan now for the greater challenges ahead in 2015/16 and 2016/ The key elements of the approach are: Production of this joint commissioning and financial planning guidance together with a timetable that s approved by the Strategy and Resources Committee All Directorates following the same timetable. Early production of first draft Directorate Commissioning and Financial Plans in September. Internal challenge by CMT, SMT and Members in September. Public engagement November/December Final draft plans in January 2013 Budget approval in March 2013 Publication of Commissioning and Financial Plans on the Internet by the end of the financial year Freedom for Directorates to develop service and team commissioning and financial plans in a format that best suits their needs and that demonstrates the 'golden thread' from the council s strategic objectives to individual work objectives. 5. As a result of this approach we intend to achieve: A set of council-wide commissioning intentions for 2013/14. 2

3 Page 129 Agenda Item 6 Directorate Commissioning and Financial Plans for 2013/14 including risk registers and People Plans A clear focus on Directorate-level commissioning intentions (around 7 to 10) against which Strategic Directors will be accountable through our in-year performance management arrangements. 6. The Commissioning and Financial Plans will need to reflect the existing corporate plan, 2013/14 priorities as set out by the Leader, the updated Medium Term Financial Plan, the savings required from Smarter Services Sutton and the recently agreed Smarter Council programme of change. 7. The Council continues to face a number of significant financial challenges for the coming period. Further reductions in government funding are likely after the end of the spending review period in 2014/15 in view of the overall public expenditure plans announced in the Chancellor s 2012 budget. Current NHS funding for social care that benefits health is not guaranteed beyond 2014/14 either and a further reduction in funding due to the conversion of schools to academies is expected. Additional provision for pay inflation will be required from 2015/16 when the government s policy of a pay freeze followed by two years of 1% increases expires. Also provision needs to be made for additional pension costs and for general growth and to fund revenue investment in Council priorities. 8. These challenges suggest a funding gap in excess of 30m by 2016/17 before allowing for the impact of new savings initiatives. Measures outlined in the joint report of the Strategic Director - Resources and the Executive Head of Policy and Customer Services to the Strategy and Resources Committee (2 July 2012) reduce this gap to about 23.5m, equivalent to a 15% saving against net service budgets over a four year period, on top of any SSS savings that have still to be delivered. By Directorate this is provisionally equivalent to the following sums (before adjusting for uncontrollable items): Adult Social Services, Housing and Health Chief Executive s Children, Families and Learning Environment and Neighbourhoods Resources 9.7m 1.4m 5.2m 5.1m 1.6m 9. It is crucial that the Council has robust arrangements in place that ensure commissioning and financial planning is fully integrated through the production of Commissioning and Financial Plans. While taking more of a commissioning approach to the delivery of internal and external services will go some way towards achieving the required savings, this alone will not be enough to close the medium term budget gap. It is also essential that Directorates continue to implement the savings identified from Smarter Services Sutton reviews. While Strategic Directors will mostly need to focus on 2013/14 commissioning intentions and financial proposals, it is essential, given the medium term financial pressures that these commitments are sustainable and that plans have regard to the need to make savings by 2016/17 of the order of the amounts set out above. Given the time needed to identify and analyse options and take proposals through necessary consultation and decision-making processes it is expected that the 2013/14 plans will include initial preparatory work to achieve the necessary budget savings. The report to the Strategy and Resources Committee (2 July 2012) sets out the integrated approach to business and financial planning. The report provides key background 3

4 Agenda Item 6 Page 130 information that will inform the Commissioning and Financial Plans for 2013/14 and should be read in conjunction with this guidance. 10. The process itself is similar to last year and will run to the same timetable. The key changes are: The change from Delivery and Financial Plans to Commissioning and Financial Plans The requirement to identify a high level, indicative cost of delivering each key commissioning intention The requirement to consider the impact on the cross cutting areas of Equalities, Health and Sustainability via Integrated Impact Assessments, (where relevant) Directorate People Plans being mandatory rather than discretionary and drawn from the council-wide People Plan. 11. There are a number of key milestones that need to be met to ensure the above is achieved. The full timetable is at Appendix A. They are: What First draft Directorate Commissioning and Financial Plans to be sent to Abigail Macklin for dispatch to CMT on 12 September. (All sections of the template should be completed in draft form). Presentation of draft Commissioning and Financial Plans by Strategic Directors to a meeting of the Extended Management Team Final drafts of Directorate Commissioning Plans sent Abigail Macklin for dispatch to CMT on 16 January 2012 When By 3 September September 2011 By 4 January 2012 Publication of Commissioning Plans on the Internet By 30 th March The overall process will be managed jointly by the Finance Unit and the Policy and Customer Services Division on behalf of CMT. The key contacts are: Policy and Customer Services Division: Rebecca Escott-New x 6880 Abigail Macklin x 5147 Finance and Procurement Unit: Phil Butlin x 4949 KEY ELEMENTS OF THE COMMISSIONING APPROACH 13. Commissioning is the process of specifying, securing and monitoring services to meet people s needs at a strategic level. This applies to all services, whether they are provided by the local authority, NHS or other public agencies or by the private or voluntary sectors - (Sutton s Residents First Implementing the Smarter Council, October 2011) 14. As set out in Sutton s Residents First Implementing the Smarter Council, the new approach to commissioning will be applied across all services whether they are provided for internal or external customers. Importantly, the approach to commissioning does not mean that services will be automatically outsourced nor does it mean that services will necessarily be directly provided by the Council. Rather the approach will lead to more mixed methods of service delivery including in house, mutualisation, social enterprise and 4

5 Page 131 Agenda Item 6 management buy-out proposals, for example, as well as more traditional out sourcing solutions. 15. The four key stages to the commissioning cycle can be summarised as follows: Analyse What do residents, partners, similar authorities, and our data and learning tell us is needed locally? Plan What would any services need to provide, to whom, and how will we know they have succeeded? Do Who should provide a service, for how long and how much will it cost? Review Was what we commissioned successful and what can we learn for future commissioning? Review new service and lessons learned to inform future commissioning activity Evaluate Initiate Begin commissioning activity Gather data/information to review effectiveness of new service Consolidate Review Analyse Investigate Analyse data, stakeholder opinion and market potential Begin service delivery Activate Do Plan Collaborate Draw up outcomes/success criteria/service specification with key partners Begin procurement process, choose provider, agree costs. The 8 Steps to Commissioning Negotiate Incubate Liaise with stakeholders to refine initial ideas and agree final output. 16. At a corporate level the approach to business and financial planning for 2013/14 fits into a strategic commissioning cycle, spanning both the analyse and review stages. The Directorate Commissioning and Financial plans will set out annual directorate level commissioning intentions, the core business (i.e. outcomes) the directorate will be accountable for through the Council s performance management framework. Intentions may take longer than one year to deliver and so it is perfectly possible for them to carry forward, however it is expected that outputs that underpin those intentions would fall within the relevant calendar year. 17. As in previous years the individual Directorate s commissioning intentions will need to demonstrate how they contribute to Members high level community priorities for 2013/14 (set out together on page 7 of this document). It is 5

6 Agenda Item 6 Page 132 crucial at an early stage that the first drafts of commissioning intentions are discussed with the relevant lead Member(s). 18. The council-wide People Plan will be a key document to set out the changes we need to make to our internal staffing arrangements to support the transition to a commissioning council. It will focus on three main areas: the development of skills; the further development of leadership behaviours and the future development of our approach to pay and rewards. As part of the production of the Commissioning and Financial plans, each Directorate will be required to work with the relevant HR business partner to develop a short Directorate level People Plan setting out the key workforce implications for the delivery of the commissioning intentions. PRIORITIES TO INFORM DIRECTORATE COMMISSIONING INTENTIONS AND CORPORATE CORE SUPPORT 19. The commissioning and financial planning development process is designed to ensure that the budget proposals are an accurate reflection of Members priority aims and objectives. These balance manifesto commitments with statutory responsibilities and priorities arising from national, regional and local policy agendas including the overall financial context for public services. The table below shows the high-level long term priorities grouped into themes that the residents of Sutton can expect to see over the lifetime of the current corporate plan to 2014/15. Safer Fairer Greener Smarter Reduce crime Improve educational Maintain resident Review of all council attainment for those most satisfaction with street services to reduce in need cleaning and road costs by 30 million maintenance (now 35 million) Reduce fear of crime Safeguard children, young people and adults High quality services for looked after children Increase the number of young people who are in education, employment or training Fewer children with special needs placed outside the borough Support more adults to live independently Increase the amount of recycled waste with less being sent to landfill Reduce congestion on roads with fewer people using their cars Maintain the quality of the public space in parks, playgrounds and district centres Reduce health inequalities Improve resident understanding of the impact of their behaviour on the environment Improve the quality of social housing and number of affordable homes Support growth in the local economy Maintain resident satisfaction with Sutton as a place to live Reduce costs on council accommodation Provide more council services and on line 20. The Commissioning and Financial Plans should include information on any resources required to deliver the plans, highlighting where these cannot be funded from within existing revenue budgets and showing how any funding shortfall will be managed. 21. The key building blocks for the Directorate and Commissioning and Financial Plans are the priorities that have been agreed by members for 2013/14 as set 6

7 Page 133 Agenda Item 6 out below, and these priorities should be directly reflected as corporate commissioning intentions in the plans. Safer Reducing crime and fear of crime with a focus on the link to drug and alcohol misuse Ensuring vulnerable adults and children are safe with a focus on prevention and the development of multi-agency approaches Zero tolerance on all kinds of anti-social behaviour including litter, graffiti and dog fouling. Fairer Economic prosperity through inward investment, local employment and a skilled workforce Working with our residents and business to build capacity and capability to improve the quality of life and well-being of local communities. Increased provision of new social housing and improving the standard of existing housing Reducing health inequalities and improvements to public health Greener Continued delivery of One Planet Sutton priorities Maintain satisfaction with street cleaning services, waste collection and disposal and recycling Implementation of sustainable transport measures Smarter Increase opportunities to deliver savings through smarter commissioning and continued implementation of Smarter Services Sutton savings THE HALLMARKS OF HOW WE DELIVER THE PRIORITIES 22. Our councillors are keen to ensure that the ways in which these priorities are achieved reflects their ambitions for creating a creating a community in which all can take part and take pride. To reflect this there are three key areas they want us to focus on: 7

8 Agenda Item 6 Page First, to reflect the importance of meaningfully involving and engaging residents and businesses at every stage of the commissioning cycle. In particular in assessing needs and in the ways in which performance is managed. Councillors expect to see practical ways in which we intend to build the social capital of the borough through our delivery of services and be clear about how we will know if that is being achieved. 24. Second, to reflect the importance that members attach to the work of local committees and for the active engagement of residents through them. This means that you need to consider and demonstrate the role of the local committee through the commissioning cycle, including the opportunities for local committees to be involved in assessing need, making decisions about funding allocations, managing performance etc. 25. Third, to ensure that in everything we do we are clear about the need to continue to cut costs, transform services and maintain resident satisfaction. This includes a continued focus on the implementation of Smarter Services Sutton savings. There are also three cross-cutting impacts that plans are expected to address in relation to equality and diversity, sustainability and the promotion of health and wellbeing. The council s priorities in relation to these cross-cutting issues are set out at the end of this guidance SUPPORT AVAILABLE FOR DIRECTORATES 26. A wide range of support is available to Directorates in order to guide and assist you through the process. Two Workshop Sessions to explain the new approach, guidance and template, including finance support around savings and HR support on the requirement for the Directorate level People Plan. (aimed at Directorate Plan and Directorate Finance leads). When: mid June 2012 Four Workshop Sessions, a summary version of the above, explaining the overall approach and to support you in working through the commissioning intentions (aimed at EMT) When: by early July 2012 Support from your lead Member(s) When: early drafts of the Commissioning and Financial Plans must be discussed with the relevant lead Member(s) and at all key stages of the planning process Guidance and support from HR business partners on People Plans Guidance, template and support on Integrated Impact Assessment Four tiered quality assurance feedback provided to Directorates and Members. When: September January 2013 through Policy & Finance Teams high level quality assurance throughout the year at the key 8

9 Page 135 Agenda Item 6 stages, EMT challenge of draft plans in September, CMT to review of draft plans in September and ongoing member review 9

10 Agenda Item 6 Page 136 BUSINESS AND FINANCIAL PLANNING 2013/14 OVERVIEW TIMETABLE DATE MEETING/ ACTIVITY 2 July 2012 Strategy and Resources Committee 3 September September September 2012 Directorates Extended Management Team CMT NOTES/COMMENTS Report to agree business and financial planning framework including Commissioning and Financial Plan guidance and timetable First draft Directorate Commissioning and Financial Plans (to include commissioning intentions, risks and finance sections) submitted and reviewed by CMT on 12 September. Capital bids also submitted for early review by members. Presentation of draft Directorate Commissioning and Financial Plans by Strategic Directors to the Extended Management Team Review overall position and first draft of capital programme and finalise draft proposals for Strategy and Resources Committee Early October Members Member challenge of Commissioning and Financial Plans. 15 October 2012 Strategy and Resources Report on progress and to agree proposals for resident engagement. Committee November/ December 2012 Early December January February 2013 Budget Engagement Final Grant Settlement announcement CMT Strategy and Resources Committee Resident, staff and business engagement process. Final drafts of Directorate Commissioning and Financial Plans (to include in addition People Plans and Capital finances) sent by 4 January 2013 Agree commissioning intentions, Budget and recommend council tax level to full Council. March 2013 Council Agree commissioning intentions, Budget and Council Tax for 2013/14 31 March 2013 Internet Publish final council-wide and Directorate Commissioning and Financial Plans. 10

11 Page 137 Agenda Item 6 One Planet Action Plan Aims Zero Carbon Buildings- Our aim is to eliminate carbon dioxide emissions from energy use within buildings, becoming a Zero Carbon council by 2017 and a Zero Carbon-enabled borough by Zero Waste- Our aim is to reduce the waste that we create, reusing where possible, and ultimately sending zero waste to landfill. Eventually we want to create a culture where everything is reusable and recyclable. Sustainable Transport- Our aim is to make getting around the borough as environmentally friendly and fuel efficient as possible, making Sutton a cleaner, greener and healthier place to live. Local and Sustainable Materials- Our aim is to reduce the impact of the things we buy, using products made from sustainable supplies that have a low or positive impact on the environment. Local and Sustainable Food- Our aim is to create a borough where communities are involved in growing local produce from leafy window boxes to a fully fledged community farm; where residents can walk to buy fresh, affordable produce, and have the skills to grow and prepare healthy sustainable meals. Natural Habitats and Wildlife- Our aim is to protect and expand existing natural habitats and create new spaces for wildlife. Sustainable Water- Our aim is to use water more efficiently in buildings and in the products we buy, tackling water stress, local flooding and water pollution. Culture and Heritage- Our aim is to increase participation in community life, encouraging residents to take part and take pride in local culture, sports and recreational activities. Equity and Local Economy- Our aim is to make Sutton fairer, creating an inclusive borough where residents feel empowered in their communities. We want Sutton to have a thriving, diverse and resilient local economy that supports fair employment and international fair trade. Health and Happiness- Our aim is for everyone living in Sutton to be able to improve their health and wellbeing. Climate Change Adaptation- Beyond the ten One Planet Living principles, our aim is to make plans so that we are prepared and able to adapt to changes in climate. Equality and Diversity Priorities 1. Embedding and mainstreaming equalities, so that it s everyone s job 2. Improving how we communicate equality information and outcomes to give the work more external and internal profile, and so that residents can hold us to account 3. Improving the quality and relevance of Equality Impact Assessments 11

12 Agenda Item 6 Page Building a workforce that is representative of our local communities 5. Involving equality and diversity groups in decision making Health Priorities Improving and protecting health and wellbeing Improving the health and wellbeing of those who have an illness or disability Improving mental health and wellbeing Empowering communities and individuals to lead healthy lives 12

Page 7. London Borough of Sutton

Page 7. London Borough of Sutton Page 7 Agenda Item 3 London Borough of Sutton The Executive - 5 July 2011 Joint Report of the Strategic Director Resources and Executive Head of Policy and Customer Services BUSINESS AND FINANCIAL PLANNING

More information

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1 City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary

More information

Financial Plan 2014/15 to 2018/19: Draft Revenue Budget and Capital Programme for Consultation

Financial Plan 2014/15 to 2018/19: Draft Revenue Budget and Capital Programme for Consultation Agenda item Cabinet 23 October 2013 Financial Plan 2014/15 to 2018/19: Draft Revenue Budget and Capital Programme for Consultation Portfolio: Councillor Towe Resources (Lead Portfolio) Related Portfolios:

More information

Stratford on Avon District Council. The Human Resources Strategy

Stratford on Avon District Council. The Human Resources Strategy Stratford on Avon District Council The Human Resources Strategy Page 1 1 Purpose of The Human Resources (HR) Strategy The purpose of this document is to review the role and effectiveness of human resource

More information

The City of Edinburgh Council Business plan 2015 18. A thriving, sustainable capital city

The City of Edinburgh Council Business plan 2015 18. A thriving, sustainable capital city The City of Edinburgh Council Business plan 2015 18 A thriving, sustainable capital city Introduction This business plan sets out the strategic direction and priorities for the City of Edinburgh Council

More information

Staffordshire LAA Cross Cutting Priorities

Staffordshire LAA Cross Cutting Priorities Appendix A Staffordshire LAA Cross Cutting Priorities This matrix sets out the four cross cutting priorities identified as underpinning the LAA. It identifies where these priorities occur across the different

More information

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08 Performance Detailed Report May 2008 Review of Performance Management Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution

More information

Page 329. Integrated Impact Assessment Community Wellbeing Programme

Page 329. Integrated Impact Assessment Community Wellbeing Programme Page 329 Agenda Item 10 Integrated Impact Assessment Community Wellbeing Programme Appendix 1 This template sets out questions for the full IIA. The sections you must complete are sections 1, 2, 3 and

More information

1 PURPOSE AND SUMMARY 1.1 This report seeks approval to consult on the draft 2015/16 2019/20 Revenue Financial Plan.

1 PURPOSE AND SUMMARY 1.1 This report seeks approval to consult on the draft 2015/16 2019/20 Revenue Financial Plan. ITEM NO. 11(a) 2015/1 201/20 REVENUE FINANCIAL PLAN Report by the Chief Financial Officer SCOTTISH BORDERS COUNCIL 18 December 2014 1 PURPOSE AND SUMMARY 1.1 This report seeks approval to consult on the

More information

Community Investment Strategy

Community Investment Strategy Community Investment Strategy Introduction Sanctuary Group is one of the largest providers of housing and care services in the UK. We are a not-for-profit organisation and reinvest our surplus income into

More information

Services for children and young people in North Ayrshire 28 October 2013. Report of a pilot joint inspection

Services for children and young people in North Ayrshire 28 October 2013. Report of a pilot joint inspection Services for children and young people in North Ayrshire 28 October 2013 Report of a pilot joint inspection Contents 1. Introduction 1 2. Background 1 3. The Community Planning Partnership area 2 4. Particular

More information

Commissioning Strategy

Commissioning Strategy Commissioning Strategy This Commissioning Strategy sets out the mechanics of how Orkney Alcohol and Drugs Partnership (ADP) will implement its strategic aims as outlined in the ADP Strategy. Ensuring that

More information

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK July 2013 1 P age Contents Page 1.0 Definition 3 2.0 Context 3 3.0 Purpose and aim of the policy 4 4.0 Policy Statement 4 5.0 Framework for Performance Management

More information

Bath and North East Somerset Council - Resources Directorate Plan 2016/17 to 2019/20

Bath and North East Somerset Council - Resources Directorate Plan 2016/17 to 2019/20 Bath and North East Somerset Council - Resources Directorate Plan 2016/17 to 2019/20 Introduction This plan sets out the future direction of the Resources Directorate over the next 3 years. Legal & Democratic

More information

MEDIUM TERM FINANCIAL STRATEGY: COUNCIL S STRATEGIC PRIORITIES 2011/12 2012/13

MEDIUM TERM FINANCIAL STRATEGY: COUNCIL S STRATEGIC PRIORITIES 2011/12 2012/13 MEDIUM TERM FINANCIAL STRATEGY: COUNCIL S STRATEGIC PRIORITIES 2011/12 2012/13 1. INTRODUCTION 1.1 The Council and its partners have been working together on producing a meaningful and succinct set of

More information

Responsibilities. Responsible for managing Legal Services and Procurement functions of the Council.

Responsibilities. Responsible for managing Legal Services and Procurement functions of the Council. Responsibilities Chief Executive In the role of Head of Paid Service in line with the Council s constitution be responsible for the effective management of the authority, and key strategic policy objectives

More information

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT Report No. DRR14/089 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive Date: 15 th October 2014 Decision Type: Non-Urgent Executive Key Title: COMMISSIONING - PROPOSED TOTAL FACILITY

More information

Workforce Strategy 2015-2020

Workforce Strategy 2015-2020 Workforce Strategy 2015-2020 Introduction 1. The aim of this workforce strategy is to support delivery of the sustained transformation necessary to achieve faster, fitter, more flexible, citizen and customer

More information

Partnership commissioning arrangements for children and young people in Hertfordshire

Partnership commissioning arrangements for children and young people in Hertfordshire Partnership commissioning arrangements for children and young people in Hertfordshire DRAFT Summary of Commissioning Strategy for D R A F T Early Intervention and Prevention 2012-2013 2012-2013 What is

More information

Housing, Environmental and Economic Development. HEED Strategic Plan

Housing, Environmental and Economic Development. HEED Strategic Plan Housing, Environmental and Economic Development HEED Strategic Plan 2014-18 Foreword The Housing, Environmental and Economic Development department delivers a wide range of services, including housing,

More information

Charnwood Borough Council. Corporate Performance Management Framework

Charnwood Borough Council. Corporate Performance Management Framework Charnwood Borough Council Corporate Performance Management Framework Contents 1 Introduction... 1 2 Background... 1 3 Role of the Performance Team... 2 4 Charnwood Framework... 2 4.1 Corporate Plan...2

More information

Performance Review Report Q3 2010/11

Performance Review Report Q3 2010/11 Sutton Tracker Appendix A Performance Review Report Q3 20/11 An overview of performance against Sutton s priorities. This report is divided into two sections. The first highlights progress made over the

More information

Richmond-upon-Thames Performance Management Framework

Richmond-upon-Thames Performance Management Framework Richmond-upon-Thames Performance Management Framework Introduction Everyone at the Council has a role in Performance Management. It is therefore important that we all understand what is involved. This

More information

Sustainable Development Strategy

Sustainable Development Strategy Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for

More information

one council one plan falkirk council corporate plan 2012-17

one council one plan falkirk council corporate plan 2012-17 one council one plan falkirk council corporate plan 2012-17 Foreword 5 Introduction 7 we are one Council with clear priorities and ambitions Our Vision and Ambition 8 Goals, Outcomes and Priorities 13

More information

Subject: ANNUAL GOVERNANCE STATEMENT 2014/15

Subject: ANNUAL GOVERNANCE STATEMENT 2014/15 ITEM NO: 7 Report To: OVERVIEW (AUDIT) PANEL Date: 21 September 2015 Reporting Officer: Ben Jay Assistant Executive Director (Finance) Wendy Poole Head of Risk Management and Audit Services Subject: ANNUAL

More information

FACS Strategic Statement

FACS Strategic Statement FACS Strategic Statement Secretary s message This statement sets out the vision, values and objectives that will guide and unite our department over the next few years. Family and Community Services (FACS)

More information

PROCUREMENT INVESTING IN CAMDEN

PROCUREMENT INVESTING IN CAMDEN PROCUREMENT INVESTING IN CAMDEN Procurement Strategy 2012-2015 London Borough of Camden Contents Front Page Page 1 Contents Page 2 Introduction Page 3 Camden Plan-Procurement contribution Page 4 01 Social

More information

2 Vision and objectives

2 Vision and objectives 14 Vision and objectives 2 Vision and objectives Summary This chapter outlines the local context set by the Community Strategy and the Council s own priorities for developing the long-term vision for local

More information

Annual Governance Statement 2014/2015

Annual Governance Statement 2014/2015 Annual Governance Statement 2014/2015 This is a signed statement by the Executive Leader and Chief Executive certifying that governance arrangements are adequate and operating effectively within the Council.

More information

Highways Maintenance - Asset Management Policy and Strategy 2015

Highways Maintenance - Asset Management Policy and Strategy 2015 Corporate Report Format To the Portfolio Holder for Regeneration and Transportation Highways Maintenance - Asset Management Policy and Strategy 2015 Relevant Cabinet Wards Affected Key Decision Member(s)

More information

A Health and Wellbeing Strategy for Bexley Listening to you, working for you

A Health and Wellbeing Strategy for Bexley Listening to you, working for you A Health and Wellbeing Strategy for Bexley Listening to you, working for you www.bexley.gov.uk Introduction FOREWORD Health and wellbeing is everybody s business, and our joint aim is to improve the health

More information

Building Resilient Families and Communities- A Performance Management Framework

Building Resilient Families and Communities- A Performance Management Framework Building Resilient Families and Communities- A Performance Management Framework April 2013 Document details Document version Version 7 Date revised Contributors: 31 st May 2013 Sharon Moore Staffordshire

More information

Directors of Public Health in Local Government

Directors of Public Health in Local Government Directors of Public Health in Local Government i) Roles, responsibilities and context 1 DH INFORMATION READER BOX Policy Clinical Estates HR / Workforce Commissioner Development IM & T Management Provider

More information

Stroud Constituency Labour Party

Stroud Constituency Labour Party Stroud Constituency Labour Party 5a Lansdown, Stroud GL5 1BB 01453 840080 stroudclp@tiscali.co.uk www.stroudlabour.org.uk Stroud District Council Election Manifesto 2015 Since 2012 the Labour group on

More information

Finance and Budget Committee Policy. Overview of Long-Term Financial Plan and Revenue Budget 2014/15 update

Finance and Budget Committee Policy. Overview of Long-Term Financial Plan and Revenue Budget 2014/15 update Finance and Budget Committee Policy Development and Review Sub-Committee 2pm, Wednesday 24 April 2013 Overview of Long-Term Financial Plan and Revenue Budget 2014/15 update Item number Report number Wards

More information

Cabinet 9 February 2009

Cabinet 9 February 2009 b Cabinet 9 February 2009 A new Housing Strategy for Lambeth All Wards Cabinet Portfolio: Cabinet Member for Housing and Regeneration: Councillor Lib Peck Report authorised by: Executive Director for Housing,

More information

Getting funding and planning successful projects. Big Lottery Fund guide to outcomes

Getting funding and planning successful projects. Big Lottery Fund guide to outcomes Getting funding and planning successful projects Big Lottery Fund guide to outcomes Getting funding and planning successful projects: Big Lottery Fund s guide to outcomes Further copies available from:

More information

People Strategy 2013/17

People Strategy 2013/17 D a t a L a b e l : P U B L I C West Lothian Council People Strategy 2013/17 Contents 1 Overview 2 2 Council Priorities 8 3 Strategy Outcomes 10 1 Engaging and motivating our employees 13 2 Recognised

More information

ROLE KEY RESPONSIBILITIES GROSS REVENUE BUDGET FTE STAFF REPORTS

ROLE KEY RESPONSIBILITIES GROSS REVENUE BUDGET FTE STAFF REPORTS READING BOROUGH COUNCIL MANAGERS PAID MORE THAN 50K 2014 /15 ROLE KEY RESPONSIBILITIES GROSS REVENUE BUDGET FTE STAFF REPORTS Acting Housing Needs Manager Adult Social Care Solicitor Assistant Chief Accountant

More information

Derbyshire County Council Performance and Improvement Framework. January 2012

Derbyshire County Council Performance and Improvement Framework. January 2012 Derbyshire County Council Performance and Improvement Framework January 2012 Contents 1. Introduction 3 2. About the framework 4 3. Planning 7 5. Monitoring Performance 8 6. Challenge and Review 11 7.

More information

Derbyshire County Council Senior Salaries 2014/2015

Derbyshire County Council Senior Salaries 2014/2015 Dept Chief Executives Job Title Chief Executive Responsibilities including services and functions the individual is responsible for Responsible for all aspects of the overall running of the Council and

More information

Assistant Director for Human Resources

Assistant Director for Human Resources Assistant Director for Human Resources Indicative Salary Range: 90,000 to 105,000 p/a Reports to Chief Operating Officer Job Purpose The purpose of the role is to lead, manage and be accountable for the

More information

CARBON MANAGEMENT PERFORMANCE

CARBON MANAGEMENT PERFORMANCE CARBON MANAGEMENT PERFORMANCE Report from: Director of Environment & Culture Wards affected County-wide. Purpose To introduce the national indicators on climate change and outline the major sources of

More information

LONDON GROWTH DEAL. Building London s skills base and supporting businesses; Helping Londoners into sustainable employment; and

LONDON GROWTH DEAL. Building London s skills base and supporting businesses; Helping Londoners into sustainable employment; and LONDON GROWTH DEAL The London Growth Deal will support jobs and growth in the capital, including in key new sectors such as the digital economy. It will ensure the capital s businesses and individuals,

More information

SUBJECT: Talent Management Strategy 2016 2020. Councillor Sandra Walmsley (Cabinet Member for Resources and Regulation)

SUBJECT: Talent Management Strategy 2016 2020. Councillor Sandra Walmsley (Cabinet Member for Resources and Regulation) REPORT FOR DECISION DECISION OF: CABINET DATE: 13 APRIL 2016 SUBJECT: Talent Management Strategy 2016 2020 REPORT FROM: Councillor Sandra Walmsley (Cabinet Member for Resources and Regulation) CONTACT

More information

House of Commons Corporate Governance Framework

House of Commons Corporate Governance Framework House of Commons Corporate Governance Framework What is Corporate Governance? 1. Good corporate governance is fundamental to any effective organisation and is the hallmark of any well-managed corporate

More information

LONDON BOROUGH OF HAVERING

LONDON BOROUGH OF HAVERING LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN 2015-2019 Sections LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN CONTENTS 1 Introduction and Context 2 Corporate Vision 3 Policy

More information

Business planning and strategic management

Business planning and strategic management Business planning and strategic management Councillor workbook Improvement Contents Foreword 3 Business planning and strategic management 5 The nature of business planning and strategic management 5 Strategic

More information

PROCUREMENT STRATEGY

PROCUREMENT STRATEGY PROCUREMENT STRATEGY 2013-2017 Contents Introduction 3 Strategic Procurement in Context 4 Key Principles for Effective Procurement 6 Priorities for Improving Procurement 11 Procurement Action Plan 14 Forward

More information

CSCI Regional Office Caledonia House 223 Pentonville Road London, N1 9NG

CSCI Regional Office Caledonia House 223 Pentonville Road London, N1 9NG CSCI Regional Office Caledonia House 223 Pentonville Road London, N1 9NG Tel: 020 7239 0330 Fax: 020 7239 0318 Email: apa.london@csci.gsi.gov.uk Web: www.csci.org.uk Ms Irene Findlay (OBE) Adult Social

More information

PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN IRELAND

PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN IRELAND PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN IRELAND DRAFT JULY 2011 PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN

More information

Directors of Public Health in Local Government. Roles, Responsibilities and Context

Directors of Public Health in Local Government. Roles, Responsibilities and Context Directors of Public Health in Local Government Roles, Responsibilities and Context October 2013 You may re-use the text of this document (not including logos) free of charge in any format or medium, under

More information

Appendix 4 - Statutory Officers Protocol

Appendix 4 - Statutory Officers Protocol Appendix 4 - Statutory Officers Protocol Accountability Protocol for role of Director of Children s Services within the London Borough of Barnet Introduction In September 2014, the Chief Executive of the

More information

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013

Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1 Business Plan for Financial Management and Business Effectiveness Unit - May 2011 to 30 September 2013 1. Introduction 1.1 The Service s key responsibilities are: o The achievement of proper and effective

More information

Submitted to: NHS West Norfolk CCG Governing Body, 29 January 2015

Submitted to: NHS West Norfolk CCG Governing Body, 29 January 2015 Agenda Item: 11.2 Subject: Draft Financial Plan 2015/16 Presented by: John Ingham, Chief Financial Officer Submitted to: NHS West Norfolk CCG Governing Body, 29 January 2015 Purpose of Paper: For information

More information

BIRMINGHAM CITY COUNCIL SERVICE REVIEWS GREEN PAPER: THE FUTURE CITY COUNCIL

BIRMINGHAM CITY COUNCIL SERVICE REVIEWS GREEN PAPER: THE FUTURE CITY COUNCIL BIRMINGHAM CITY COUNCIL SERVICE REVIEWS GREEN PAPER: THE FUTURE CITY COUNCIL INTRODUCTION Birmingham City Council is facing a big challenge, having to cut our budget by half over seven years. In the past

More information

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA SOCIAL SERVICES COMMITTEE -13TH JUNE 2001 REPORT BY THE EXECUTIVE DIRECTOR OF HOUSING AND SOCIAL SERVICES

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA SOCIAL SERVICES COMMITTEE -13TH JUNE 2001 REPORT BY THE EXECUTIVE DIRECTOR OF HOUSING AND SOCIAL SERVICES THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA SOCIAL SERVICES COMMITTEE -13TH JUNE 2001 REPORT BY THE EXECUTIVE DIRECTOR OF HOUSING AND SOCIAL SERVICES BEST VALUE REVIEW OF ADULT LEARNING DISABILITY SERVICES

More information

Appendix 1: Performance Management Guidance

Appendix 1: Performance Management Guidance Appendix 1: Performance Management Guidance The approach to Performance Management as outlined in the Strategy is to be rolled out principally by Heads of Service as part of mainstream service management.

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

Building and implementing an effective local workforce strategy

Building and implementing an effective local workforce strategy Inspiring leaders to improve children s lives Building and implementing an effective local workforce strategy Module 4: project managing the workforce strategy development process August 2010 Resource

More information

Open Report on behalf of Glen Garrod, Director of Adult Care. Date: 03 February 2015 Subject: All-Age Autism Strategy for Lincolnshire

Open Report on behalf of Glen Garrod, Director of Adult Care. Date: 03 February 2015 Subject: All-Age Autism Strategy for Lincolnshire Agenda Item 7 Executive Report to: Open Report on behalf of Glen Garrod, Director of Adult Care Executive Date: 03 February 2015 Subject: All-Age Autism Strategy for Lincolnshire 2015-2018 Decision Reference:

More information

Overview of Public Outreach Survey

Overview of Public Outreach Survey Appendix A Public Outreach Overview of Public Outreach Survey To engage the public in the process of developing the Milwaukee Sustainability Plan, the Milwaukee Green Team and CH2M HILL created a survey

More information

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL CABINET THE COUNCIL S 2016/2017 REVENUE BUDGET REPORT OF THE GROUP DIRECTOR CORPORATE & FRONTLINE SERVICES

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL CABINET THE COUNCIL S 2016/2017 REVENUE BUDGET REPORT OF THE GROUP DIRECTOR CORPORATE & FRONTLINE SERVICES AGENDA ITEM 2 RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL CABINET 11 TH FEBRUARY 2016 THE COUNCIL S 2016/2017 REVENUE BUDGET REPORT OF THE GROUP DIRECTOR CORPORATE & FRONTLINE SERVICES AUTHOR: Chris Lee (01443

More information

Costain Cares... about you

Costain Cares... about you Costain Cares vision 2014 01 Costain Cares Our primary focus is to both understand and meet the needs of stakeholders. In every relationship and facet of operation, we are focused on one simple but powerful

More information

Job Description. Director of Corporate Services. Staff: Head of Customer Services, Head of Libraries plus staff group of c.

Job Description. Director of Corporate Services. Staff: Head of Customer Services, Head of Libraries plus staff group of c. Job Description Job Title: Reports to: Assistant Director Customer Services Director of Corporate Services Staff: Head of Customer Services, Head of Libraries plus staff group of c. 200+ Budget: 11 million

More information

ITEM NO: 5. Date: 21 September 2015. Reporting Officer:

ITEM NO: 5. Date: 21 September 2015. Reporting Officer: ITEM NO: 5 Report To: OVERVIEW (AUDIT) PANEL Date: 21 September 2015 Reporting Officer: Cllr J M Fitzpatrick - First Deputy (Performance and Finance) Ben Jay - Assistant Executive Director, (Finance) Subject:

More information

Procurement and Contract Management Strategy 2013-2017

Procurement and Contract Management Strategy 2013-2017 Procurement and Contract Management Strategy 2013-2017 Title Owner Version 1 Distribution Procurement and Contract Management Strategy 2013 2017 Procurement and Performance Manager Corporate Issue date

More information

Page 5. The Adult Social Services and Health Committee. The Strategic Director of Adult Social Services, Housing and Health

Page 5. The Adult Social Services and Health Committee. The Strategic Director of Adult Social Services, Housing and Health Page 5 Agenda Item 5 Report to: The Adult Social Services and Health Committee Date: 20 th November 2012 Report of: The Strategic Director of Adult Social Services, Housing and Health Ward Location: All

More information

Well-being of Future Generations (Wales) Bill

Well-being of Future Generations (Wales) Bill Well-being of Future Generations (Wales) Bill i ACCOMPANYING DOCUMENTS Explanatory Notes and an Explanatory Memorandum are printed separately. Well-being of Future Generations (Wales) Bill [AS INTRODUCED]

More information

DEVELOPING AN EFFECTIVE PERFORMANCE MANAGEMENT SYSTEM. Ross Fraser HouseMark

DEVELOPING AN EFFECTIVE PERFORMANCE MANAGEMENT SYSTEM. Ross Fraser HouseMark DEVELOPING AN EFFECTIVE PERFORMANCE MANAGEMENT SYSTEM Ross Fraser HouseMark Raising the Bar on Performance and Sector Revitalization July 5 and 6, 2007 Contents Page 1. Introduction 2 2. What should a

More information

Financial Resilience Assessment Bridgend County Borough Council. Audit year: 2015-16 Issued: March 2016 Document reference: 210A2016

Financial Resilience Assessment Bridgend County Borough Council. Audit year: 2015-16 Issued: March 2016 Document reference: 210A2016 Financial Resilience Assessment Bridgend County Borough Council Audit year: 2015-16 Issued: March 2016 Document reference: 210A2016 Status of report This document has been prepared as part of work performed

More information

The Audit of Best Value and Community Planning The City of Edinburgh Council. Best Value audit 2016

The Audit of Best Value and Community Planning The City of Edinburgh Council. Best Value audit 2016 The Audit of Best Value and Community Planning The City of Edinburgh Council Best Value audit 2016 Report from the Controller of Audit February 2016 The Accounts Commission The Accounts Commission is the

More information

INTEGRATED OFFENDER MANAGEMENT KEY PRINCIPLES

INTEGRATED OFFENDER MANAGEMENT KEY PRINCIPLES INTEGRATED OFFENDER MANAGEMENT KEY PRINCIPLES March 2010 CONTENTS Introduction Overview of Integrated Offender Management (IOM) Principles of IOM PPO refresh and traffic light assessments DIP review Hallmarks

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

Business Plan Wiltshire Council A new perspective 2013 2017

Business Plan Wiltshire Council A new perspective 2013 2017 Business Plan Wiltshire Council A new perspective 2013 2017 Business Plan 2013 2017 1 Foreword Contents Looking ahead Welcome to our business plan 2013 2017. At its heart is our vision to create stronger

More information

Introduction. Chris Harrop, Chief Executive

Introduction. Chris Harrop, Chief Executive Page 1 of 10 Introduction I am proud to be the Chief Executive of the Walton Centre NHS Foundation Trust with its reputation for excellent patient care, quality services and sustainability. Over the last

More information

Bath and North East Somerset Council People and Communities Directorate Plan

Bath and North East Somerset Council People and Communities Directorate Plan Bath and North East Somerset Council People and Communities Directorate Plan Introduction There are three Directorate Plans covering the Councils three directorates. This is the People and Communities

More information

Mole Valley District Council Corporate Communications Strategy 2002-2005

Mole Valley District Council Corporate Communications Strategy 2002-2005 Mole Valley District Council Corporate Communications Strategy 2002-2005 CONTENTS Content Section 1: Introduction Section 2: Stakeholders Section 3: Objectives Section 4: Targets Section 5: Principles

More information

HAVERING S BUDGET 2013-2014. Cheryl Coppell Chief Executive Andrew Blake-Herbert Group Director, Finance & Commerce. www.havering.gov.

HAVERING S BUDGET 2013-2014. Cheryl Coppell Chief Executive Andrew Blake-Herbert Group Director, Finance & Commerce. www.havering.gov. HAVERING S 2013-2014 Cheryl Coppell Chief Executive Andrew Blake-Herbert Group Director, Finance & Commerce www.havering.gov.uk CONTENTS Page Number Section A SUMMARY REVENUE POSITION 2 Budget Summary

More information

Human Resources and Training update

Human Resources and Training update 4 November 2014 Performance and Resources Board 11 To consider Human Resources and Training update Issue 1 This report provides an update on policy developments relating to Human Resources and Training.

More information

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability CLACKMANNANSHIRE COUNCIL THIS PAPER RELATES TO ITEM 05 ON THE AGENDA Report to: Resources and Audit Committee Date of Meeting: 24 September 2015 Subject: External Audit BV Performance Report: Delivering

More information

Climate change: Everyone s business

Climate change: Everyone s business Climate change: Everyone s business A summary report from the CBI Climate Change Task Force November 2007 Copyright CBI 2007 The content may not be copied, distributed, reported or dealt with in whole

More information

Consultation and Engagement Strategy

Consultation and Engagement Strategy Consultation and Engagement Strategy Contents: 1. Introduction 2 2. Purpose 3 3. Aims and Objectives 4 4. Key principles 5 5. Delivery of the Strategy 6 6. Action Plan 2011-12 7 Appendix 1 Understanding

More information

EARLY INTERVENTION AND PREVENTION STRATEGY 2012-15 Summary

EARLY INTERVENTION AND PREVENTION STRATEGY 2012-15 Summary EARLY INTERVENTION AND PREVENTION STRATEGY 2012-15 Summary Plymouth Children, Young People and Families Partnership INTRODUCTION Why do we need early intervention in Plymouth? We know that effective early

More information

RETURNED TO OPEN SESSION

RETURNED TO OPEN SESSION RECOMMENDATIONS TO CABINET 5 FEBRUARY 2014 FROM THE MEETING OF THE RESOURCES AND PERFORMANCE PANEL 27 JANUARY 2014 RP101: EXCLUSION OF PRESS AND PUBLIC RESOLVED: That under Section 100(a)(4) of the Local

More information

Gateshead Economic Growth Acceleration Plan 2014-18

Gateshead Economic Growth Acceleration Plan 2014-18 Gateshead Economic Growth Acceleration Plan 2014-18 Foreword by Councillor Mick Henry, Leader of Gateshead Council I m delighted to introduce the Gateshead Economic Growth Acceleration Plan 2014-18. This

More information

JOB DESCRIPTION. Chief Nurse

JOB DESCRIPTION. Chief Nurse JOB DESCRIPTION Chief Nurse Post: Band: Division: Department: Responsible to: Responsible for: Chief Nurse Executive Director Trust Services Trust Headquarters Chief Executive Deputy Chief Nurse Head of

More information

Sustainable Supply Chain Policy

Sustainable Supply Chain Policy Sustainable Supply Chain Policy 1. Contents Page 2. Introduction & Purpose 1 3. Definitions 1 4. Benefits of a Sustainable approach to the Supply Chain 2 5. Operational Context 2 6. Elements & Principles

More information

A Vision for Young Londoners to 2025

A Vision for Young Londoners to 2025 A Vision for Young Londoners to 2025 Invest in young Londoners, young Londoners will in turn invest in London Young people in London are 25% of the population, but 100% of its future A Vision for Young

More information

Business Charter for Social Responsibility

Business Charter for Social Responsibility Business Charter for Social Responsibility This Charter describes the spirit, style and behaviours we will adopt and will expect our partners/suppliers to adopt as we jointly work together in an open,

More information

2. The Aims of a Dual Diagnosis Accommodation Based Support Service

2. The Aims of a Dual Diagnosis Accommodation Based Support Service SERVICE SPECIFICATION FOR: Dual Diagnosis Mental Health and Substance Misuse Supported Housing Service The specification describes the Service to be delivered under the Steady State Contract for Provision

More information

Adelaide Statement on Health in All Policies moving towards a shared governance for health and well-being

Adelaide Statement on Health in All Policies moving towards a shared governance for health and well-being Taking account of health means more effective government More effective government means improved health Report from the International Meeting on Health in All Policies, Adelaide 2010 The Adelaide Statement

More information

Glasgow City Council. Assurance and Improvement Plan Update 2013 16

Glasgow City Council. Assurance and Improvement Plan Update 2013 16 Glasgow City Council Assurance and Improvement Plan Update 2013 16 April 2013 Introduction Contents Introduction... 3 Summary... 4 National risk... 5 Areas that remain no scrutiny... 8 Areas that remain

More information

WARWICKSHIRE POLICE AUTHORITY 22 February 2012

WARWICKSHIRE POLICE AUTHORITY 22 February 2012 Agenda No 11 WARWICKSHIRE POLICE AUTHORITY 22 February 2012 Medium Term Financial Planning Strategy including 2012/13 Revenue Budget, 2012/13 2015/16 Capital Programme and Reserve Strategy Joint Report

More information

HIGH PEAK BOROUGH COUNCIL. Report to the Corporate Select Committee. 19th January 2016

HIGH PEAK BOROUGH COUNCIL. Report to the Corporate Select Committee. 19th January 2016 AGENDA ITEM 5 HIGH PEAK BOROUGH COUNCIL Report to the Corporate Select Committee 19th January 2016 TITLE: EXECUTIVE COUNCILLOR: CONTACT OFFICER: WARDS INVOLVED: Housing Revenue Account (HRA) Business Plan

More information

MEDIUM TERM FINANCIAL PLAN 2014 to 2019

MEDIUM TERM FINANCIAL PLAN 2014 to 2019 CONTENTS Page 2 Page 7 Page 12 Page 14 Page 16 Page 21 Page 26 Page 28 Page 30 Page 31 Page 32 Sections 1: Introduction, Financial and Corporate Planning Section 2: The Council s Overall Financial Position

More information

Carol Perry. Director, Liverpool First

Carol Perry. Director, Liverpool First Carol Perry Director, Liverpool First Liverpool Liverpool Docks North Liverpool Liverpool City Region City Centre Liverpool South Suburbs River Mersey London Liverpool John Lennon Airport Background Liverpool's

More information

The Region s Transport Authority

The Region s Transport Authority Agenda Item No. 12 The Region s Transport Authority Meeting: Integrated Transport Authority Date: Monday 28 April 2014 From: Subject: Lead Member: Head of Sustainability Cycle Charter Fair, Accessible

More information

Corporate Director and Chief Financial Officer

Corporate Director and Chief Financial Officer Report to Cabinet Subject: Provisional Local Government Finance Settlement 2014/15 Date: Wednesday 15 January 2014 Author: Corporate Director and Chief Financial Officer Wards Affected Borough-wide Purpose

More information