Maymorn Structure Plan: Infrastructure Costs Estimate

Size: px
Start display at page:

Download "Maymorn Structure Plan: Infrastructure Costs Estimate"

Transcription

1 Report Maymorn Structure Plan: Infrastructure Costs Estimate Prepared for Upper Hutt City Council (Client) By Beca Carter Hollings & Ferner Ltd (Beca) 22 June 2010 Beca 2012 (unless Beca has expressly agreed otherwise with the Client in writing). This report has been prepared by Beca on the specific instructions of our Client. It is solely for our Client s use for the purpose for which it is intended in accordance with the agreed scope of work. Any use or reliance by any person contrary to the above, to which Beca has not given its prior written consent, is at that person's own risk.

2 Revision History Revision Nº Prepared By Description Date A Greg Lee Document Acceptance Action Name Signed Date Prepared by Greg Lee Reviewed by Lucie Desrosiers Approved by Greg Pollock on behalf of Beca Carter Hollings & Ferner Ltd Beca // 22 June // NZ

3 Table of Contents 1 Introduction Limitations Method Urban Design Concepts Review Infrastructure Development and Triggers Water Supply and Waste Water Road Network Open Space, Reserves and Public Art Cost Estimates for Proposed Works Roads Water and Waste Water Utilities Infrastructure Parks, Reserves and Play Grounds Summary Phasing and Development Cost Model Delivery Issues Case Study Lots and development areas analysis Conclusions Appendices Appendix 1: Road Enhancement Cost Estimate Appendix 2: Staging of Development and Implementation Costs Detail Appendix 3: Proportion of Residential Development per Lot Beca // 22 June 2010 // Page // NZ

4 1 Introduction This report provides advice on infrastructure likely to be required in order to support the development of the Maymorn Structure Plan area. This report focuses on the infrastructure that is to be provided by the public sector, identify when it will be required and how much it will cost (indicative and at present day values). The advice is based on the Maymorn Structure Plan, which provides a framework for development, identifying broad locations for future land uses and infrastructure. It is expected that developers will provide onsite infrastructure, including roads and utilities reticulation, as it traverses their land holdings. 1.1 Limitations It is understood that this report will be used by the Councils financial advisors. Whilst this report provides a breakdown of development triggers and costing, advice is provided on a strategic basis and no detailed design or modelling having been undertaken. Infrastructure triggers and costing may change if the development of the Maymorn Structure Plan is adjusted or is brought about in an different sequence or time frame to that shown in this report. 2 Method This study followed the steps detailed below: Develop a GIS based spatial model which breaks down all infrastructure and land to be developed into individual parcels, to allow for scenario testing to improve staging and cash flow forecasts. Identify trigger points for when upgrades to trunk water supply, trunk waste water, trunk stormwater and roading infrastructure is required, based on the ultimate scale of development envisaged. Identify interim infrastructure enhancements that could accommodate smaller scales of development if sensible. Provide a schedule for the delivery of trunk infrastructure enhancements needed relative to development and provide cost estimates (present day values) for its development, including interim enhancements where applicable. Identify the opportunity to maximise development ahead of infrastructure triggers. Prepare an annualised schedule showing housing development rates, contributions collected and infrastructure investment required. Provide drawings showing where development and infrastructure enhancement needed are located. The drawings will identify larger than annualised development areas providing flexibility in terms of how development of individual land areas are brought forward. Assess the urban design layout, land use mix and density assumptions for the Structure Plan area and reconfigure phases shown in Draft Structure Plan, as appropriate. Reviewing the planning implications of each decision re staging and the degree of incentive to be provided in terms of increasing density or achieving specific Structure Plan outcomes. Approximate the costs to service new lots created by estimating development contributions required based on cost estimates to provide infrastructure (stormwater, water supply, waste water and reserves). Comment on commercial viability based on likely land values (provided by others). Beca // 22 June 2010 // Page // NZ

5 Undertake a review of urban design concepts for small staged areas (part of the Gabites land area and roading specification) to ensure that these can be self contained while also supporting the long-term vision for Maymorn. 3 Urban Design Concepts Review A detailed examination of the northern most part of the Gabites land was undertake to ensure efficiency in the use of land, given the site s location near the train station and proposed neighbourhood centre, and the site s ability to deliver the vision for Maymorn at an early stage. This assessment provides the basis for the site s potential development yield. The review entailed preparing a more detailed layout for the area. As per the Draft Structure Plan, the layout retains the steeper part of the site undeveloped and vegetated (revegetation by native bush should be encouraged) to create a landscape buffer between the flatter lower and upper parts of the site and in doing so, retain a green backdrop for the Mangaroa Valley and the Maymorn area. The review determined that subdivision should include a mix of 400m 2 and 800m 2 lots with the smaller lots fronting the streets and the larger lots located behind and including more pronounced slopes than the relatively flat smaller lots. The road layout was also extended slightly to achieve more development in the northern corner of the site. The proposed subdivision layout is shown below. Figure 1: Illustrative Subdivision of the Upper Gabites Area As part of the urban design review, the road cross-sections were also revisited. Road corridors are proposed to be made slightly narrower than originally shown in the Structure Plan which provides the twin benefits of reducing costs for their construction, and providing designed-in speed Beca // 22 June 2010 // Page // NZ

6 management measures as narrower carriageways lead to slower speeds and higher pedestrian and cycle safety. The revised designs for all road types are provided below. Figure 2: Revised Road Typology The changes to the road layouts can be summarised as follows: Primary Main Roads Reduce carriageway from 9m to 7m Decrease width of cycle path from 4m to 3.5m Overall road corridor reduced from 21m to 18.3m. Secondary Connector Road Reduce carriageway from 8m to 6m Beca // 22 June 2010 // Page // NZ

7 Increase width of footpath (on one side of road) from 2.5m to 3.5m so that can be shared with cyclists Reduces width of footpath (on other side of road from 2.5m to 1.8m) Retain intermittent on-street parking in 2.5m wide berm, in-between street trees. Parking could be provided on both sides of the street or alternate side Overall road corridor reduced from 20m to 18.3m. Tertiary Residential Lanes Reduce berm from 2.75m to 2.5m Remove verges from both sides of road Reduce footpaths on both sides of road from 2.5m to 1.8m Retain 2.5m wide berm to accommodate intermittent on-street parking in-between street trees Overall road corridor reduced from 18m to 14.1m. Tertiary Shared Streets* Increase width of landscaping area from 0.4m to 3m Remove footpaths from both sides of road Maintain width of shared space at 5m as opposed to variation between 3.5m to 5m Overall road corridor reduced from 18.2m to 11m. * the Shared Street concept sits at the bottom of the road hierarchy and is designed to accommodate the least amount of traffic. Shared Streets should be located where they will only be used by people who live on that particular street and are unlikely to accommodate any through vehicular movements due to their location and the provision of more convenient, higher ranking streets nearby. The Draft Structure Plan erroneously showed a Shared Street next to the neighbourhood centre. Within the neighbourhood centre the road design should incorporate on-street car parking and frequent pedestrian crossings. A Connector Road should be used in lieu of a Shared Street in this location. 4 Infrastructure Development and Triggers 4.1 Water Supply and Waste Water An indicative wastewater and water supply network for the entire subdivision was prepared on the basis of the Structure Plan and the known location and limitations of existing utilities infrastructure. The design is indicative only as no modelling has been undertaken. Infrastructure has been designed to be laid out along the existing and proposed road network. Specific design assumptions are set out below in respect to each type of infrastructure Water Supply The Structure Plan area is currently served by a water main which runs along Maymorn Road (comprising both a 150mm and a 225mm diameter pipe) and a Parkes Line Road (150mm diameter pipe). A pump station is located on Maymorn Road which boosts pressure. There is limited capacity for additional development to be adequately supplied with water. A new water reservoir will be needed to serve the ultimate scale of development and located on higher grounds located to north east of the site, north of the railway line. Water would be pumped Beca // 22 June 2010 // Page // NZ

8 along Maymorn Road via a 150mm diameter pipe to the reservoir. Water supply to new homes (lots) would be from the new reservoir and via a 225mm diameter pipe that runs from the reservoir down to and along Maymorn Road and along Parkes Line. 150mm diameter pipes would run off this network and provide supply to residential streets. A pumped rising main would be needed to supply water to lots located immediately north of the reservoir because that land is at a higher elevation than the reservoir. Figure 3 below shows a proposed layout of the water network. Figure 3: Potential Water Supply Reticulation Layout Overall, approximately 19,800 metres of 225mm diameter and 1,000 metres of 225mm diameter pipe are anticipated to be needed in order to serve the whole site. Detailed design would however be required to confirm the design of the water supply network as shown. Implementation In order to deliver the above water network system the following is assumed: New reservoir to be located in northern part of the development, west of the rail way line Existing 225mm pipe along Maymorn Road can be used to supply the network from the reservoir Existing 150mm diameter pipes along Maymorn Road can be used to supply the reservoir Pump station to supply the proposed new reservoir is needed to be upgraded All other pipes shown in the network are new, including new 225mm diameter pipe along Parkes Line and pumped rising main. Beca // 22 June 2010 // Page // NZ

9 Triggers It is assumed that Council would only be responsible for implementing the trunk main and reservoir to supply the development areas. Individual site developers will need to provide local reticulation as part of their development proposals. Triggers for implementation of the public water supply network are, as follows: Table 1: Development Triggers for Water Supply Network Description Specification Development Trigger 1. Piped main network - trunk only (main and connector roads) Replacement of existing 150mm Φ pipes along Parkes Line Existing pipes along Maymorn Road assumed to be in place and operational 2. Minor modifications to existing pump station 225mm Φ 150mm Φ 225mm Φ Needed to serve development along Parkes Line Road and east of railway line. Develop as part of Parkes Line Road upgrade works (see section 3.2) None pipes already in place. Needed to serve new reservoir. Estimate work completed by the second year of development 3. Reservoir Additional water capacity needed to serve entire development. Assume commence development in year 0 with reservoir operational in year 2 of development Water supply to reservoir 150mm Φ Needed as part of reservoir. Water supply from reservoir 225mm Φ Needed as part of reservoir Stormwater The stormwater system is to be provided as part of the roading network as a kerb and channel system, with pipes located underground. Stormwater will be directed to stormwater detention ponds or swales in order to reduce contaminants from the Maymorn development area and to provide attenuation of storm flows for the discharge to the Mangaroa River so that flows are similar to current conditions. The size of the detention ponds has not been calculated but it is proposed that all swales and ponds be located within the proposed network of green spaces. It is estimated that up to 5 detention ponds will be required and that these should be provided at intervals in the development process to match the rate of residential development Waste Water The Structure Plan area is connected to the district sewage reticulation system by a 150mm diameter gravity sewer that runs along Parkes Line Road and then to a 225mm diameter sewer along Maymorn Road via a pump station (known as Maymorn Valley Pump Station) located west of the railway line close to the train station. Sewage gravity flows to the Maymorn Plateau Pump Station and then to SH2 Pump Station. Upgrades to all of the existing pump stations and existing pipe network will be required in order to serve the proposed development. Wastewater west of the railway line will be gravity fed from Beca // 22 June 2010 // Page // NZ

10 individual lots via a 150mm diameter piped network which will connect to a new 300mm diameter pipe along Maymorn Road. Wastewater will be gravity fed to the upgraded Plateau Pump Station and then to SH2 Pump Station. Wastewater east of the railway line will be gravity fed from lots via 150mm diameter pipes to a 225mm diameter pipe along Parkes Line Road. This will feed into the Maymorn Valley Pump Station located north of the railway line (it will cross the railway line at the proposed pedestrian underpass). Wastewater will then be pumped into the Maymorn Road gravity main comprising a 300mm diameter pipe. It is noted that an upgrade to the Sewage Treatment Works that serves Upper Hutt will in time be needed. This upgrade is needed to support development in the district and not just development proposed at Maymorn. Consequently, for the purpose of this report, no assessment has been made in this regard. Figure 4 below shows a proposed layout of the waste water network. Figure 4: Potential Waste Water Reticulation Layout Implementation In order to deliver the above waste water network the following is assumed: All pump stations will need to be upgraded All existing main pipes will need to be upgraded 150mm diameter rising main needed between Valley Pump Station and Maymorn Road gravity main 225mm diameter pipes needed along Parkes Line Road 300mm diameter pipes needed along Maymorn Road 150mm diameter pipes needed along all other roads. Beca // 22 June 2010 // Page // NZ

11 Triggers It is assumed that Council would only be responsible for development of the trunk main (along Parkes Line and Maymorn Road), upgrades to pump stations and provision of the rising main. Individual site developers will need to provide the local waste water reticulation network as part of their development proposals. Triggers for implementation of the public water supply network are, as follows: Description Table 2: Development Triggers for Waste Water Network Specificatio n Piped main network - trunk only (along main roads) Replacement of existing gravity pipes along Parkes Line Replacement of existing gravity pipes along Maymorn Road 225mm Φ 300mm Φ Development Trigger Required when development commences east of railway line relative to Parkes Line Road. Upgrade required when approximately 1,250 dwellings have been developed. Installation of new rising main 150mm Φ Linked to upgrade of Maymorn Valley Pump Station. Upgrades to pump stations Plateau Pump Station - Needed to be upgraded in year 1. Maymorn Valley Pump Station - Needed in order to serve development along Parks Line Rd (east of railway). Capacity for approximately 500 dwellings. SH2 Pump Station - Sufficient capacity for 1,000 dwellings. 4.2 Road Network In order to serve the Maymorn Structure Plan area, upgrades are needed to the roading connections to the strategic road network. In addition the existing road network within the Structure Plan area will also need to be enhanced. Anticipated works are described below Connections to the Strategic Road Network A transport model will need to be used to confirm the location and nature of roading enhancements needed. The scale of upgrade works to the Plateau Road junction with SH2 will need to be agreed with NZTA. The following road improvements are anticipated to be required: Parkes Line Road and Mangaroa Hill Road to the Mangaroa Bridge the road outside the Structure Plan area will need to be widened in order to accommodate expected levels of traffic. The roads are proposed to be enhanced as follows: 7 metre carriageway. Place stormwater pipe in ditch along length of road and fill as needed. Build 2.5 meter wide cycleway (gravel finish) above. Mangaroa Bridge widen to provide a 7 metre carriageway. Beca // 22 June 2010 // Page // NZ

12 Maymorn Road and Plateau Road Within the Structure Plan area Maymorn Road needs to be upgraded by providing pedestrian footpaths only. The road between the edge of the Structure Plan area the junction of Plateau Road with SH2 is assumed to be suitable, ie 7 metre carriageway. SH2 junction it is assumed that additional safety and capacity is need to be provided at the junction of Plateau Road with SH2. These are likely to entail a seagull junction providing right turn off and right turn on to SH Connections within Maymorn Structure Plan Area A network of roads is shown in the Structure Plan and is assumed to be provided as follows: Parkes Line Road and Maymorn Road to be upgraded to become Primary Main Roads with the following specification: Kerb and channel Trees located on each side every 15 to 32.5 metres No on-street parking 7 metre carriageway with centre line 3.5 metre pedestrian and cycleway on one side and 1.8 metre pedestrian path on other side. Bitumen finish 1 metre grass verge either side Street lighting Secondary Connector Roads which provide main circulation within the urban areas and connections to the Primary Roads: Kerb and channel Trees located on each side at 32.5 metre centres On-street parking both side and in blocks of 5 spaces (30 metres) separated by build outs 2.5 metre x 2.5 metre which accommodate trees. 6 metre carriageway with centre line 3.5 metre pedestrian and cycleway on one side and 1.8 metre pedestrian path on other side. Bitumen finish 1 metre grass verge either side Street lighting Tertiary Residential Lanes which provide local access: Kerb and channel Trees located on each side at 32.5 metre centres On-street parking both side and in blocks of 5 spaces (30 metres) separated by build outs 2.5 metre x 2.5 metre which accommodate trees. 5.5 metre carriageway with centre line 1.8 metre pedestrian footpath on both sides of road. Bitumen finish. Street lighting Shared Street to provided in discrete locations where pedestrian friendly, low speed environments are desirable: On-street parking on one side in blocks of five spaces (30 metres) separated by trees and swale 5 metre carriageway 3 metre landscaped swale Beca // 22 June 2010 // Page // NZ

13 Streetlighting Pedestrian connection under railway line to train station Road connection under railway line Maymorn Road and Parkes Line junction improvements (underpass improvements). Triggers It is assumed that Council would only be responsible for development of the main roads and upgrading connections to the strategic road network. Individual site developers will need to provide the local (secondary and tertiary) roads (connector roads, residential lanes and shared surfaces). Triggers for implementation of the public component of the transport network are, as follows: Roading/Rail Table 3: Development Triggers for Transport Infrastructure Network Parkes Line from McLaren to Mangaroa Bridge (outside of Structure Plan area) Mangaroa Bridge SH2/Plateau Road intersection upgrade Maymorn Rd upgrade to Maymorn Station (within Structure Plan area but also beyond) Parkes Line Road within Structure Plan area New pedestrian footpath along Maymorn Road from northern edge of development to train station Upgrade of the existing road underpass (under rail track) New pedestrian underpass (under track) New road underpass (under track) Railway Station upgrade and access works Park & Ride car parking area Upgrade at McLaren St - flood protection works Development Trigger In place by 1,100 dwellings. Upgrade could be undertaken as part of programme of works to upgrade of Parkes Line Road within the Structure Plan area. Linked to upgrade of Parkes Line Road from McLaren. Upgrade needed by 850 dwellings in place. Estimating as being 800 dwellings (not possible to check with NZTA at this time). Delivered by time 500 dwellings constructed. In place by 1,100 dwellings. Upgrade work could be linked on a pro rata basis to urban development east of railway line. Develop as part of Maymorn Road upgrade (trigger is 500 dwellings). Not needed from a traffic perspective so long as pedestrian access to station is provided elsewhere. Assume provided as part of Parkes Line upgrade programme but before development occurs east of rail way line, ie at approximately 1,000 dwellings. Not required from a traffic perspective, but provides for better community and urban design outcomes. Trigger to be development east of railway line to provide safe pedestrian connection if existing underpass has not been enhanced (see above). Not required from a traffic perspective but provides better connectivity and, hence, better urban design outcome. Trigger and could be when adjacent urban areas west and east of railway are developed. Not required from a traffic perspective. Should be brought forward as part of adjacent urban development. Not required from a traffic perspective. Should be brought forward as part of adjacent urban development. Not required from a traffic perspective. Brought forward as part of urban development at south eastern edge of Structure Plan area. Beca // 22 June 2010 // Page // NZ

14 4.3 Open Space, Reserves and Public Art Open spaces and reserves will comprise the retention of existing riparian areas, provision of open space areas for informal recreation and children s playgrounds. Some parts of the existing riparian areas may be enhanced through planting and provision of walkways. The playgrounds will be colocated with open spaces for informal recreation and are shown in the Structure Plan. Triggers There are no firm standards as to when public open space needs to be provided. However, in order to provide a range of facilities that can meet the demands of a growing community and to establish robust patterns of land use and social networking, it is propose that active recreation areas are provided earlier rather than later. Therefore, it is proposed that children s playgrounds and associated public open spaces are implemented in tandem with the development of the adjacent residential land. However the acquisition and enhancement of riparian areas along the Mangaora River and its main tributaries are proposed to be delayed towards the end of the Structure Plan implementation period. In this way the community could be involved in the design and layout of these areas, thus enhancing the sense of custodianship by the community. 5 Cost Estimates for Proposed Works In order to develop cost estimates, infrastructure lengths were measured using GIS. Whilst the lengths of infrastructure are measured accurately, some variation might occur when detailed site subdivision layouts are produced, taking into consideration the detailed topography and exact alignment of resultant lots. 5.1 Roads Cost rates for infrastructure were developed for roads on the basis of the design specification provided in section 3 and assuming that street lighting and stormwater services are provided at the same time. These workings, prepared by our quantity surveying team, are provided at Appendix 1 and can be summarised, as follows: Road construction Stormwater (component)* Main Road Table 4: Cost per Linear Metre of Road Connector Road Residential Lane Shared Street Parkes Line to Mangaroa Bridge Maymorn Footpath upgrade $2,800 $3,100 $2,100 $1,700 $2,300 $380 $2,200 $1,200 $700 $650 $2,200 n/a Total $5,000 $4,300 $2,800 $2,350 $4,500 $380 * costs for stormwater assume constructed at same time as the road. As indicated above it is assumed that individual developers will provide internal roads (connector roads, residential lanes and shared streets) as part of their site development, ie a condition of any land development will be that roads (and utilities) are provided in accordance with the Structure Plan. The Council will be responsible for improving Maymorn Road and Parkes Line Road within the study area and for implementing identified improvements to the wider network. Beca // 22 June 2010 // Page // NZ

15 Therefore, the costs associated with public road enhancement and related works are estimated, as follows: Table 5: Cost Estimates for Roads (assumes that no land is needed to be acquired) Road Enhancement Units Cost per unit Costs Primary / main roads Plateau Rd / Maymorn Rd upgrade between SH2 and Maymorn Station 1,266m $5,000 $6,368,000 Parkes Line to McLaren 531m $4,500 $2,391,795 New pedestrian footpath along Maymorn Road 100m $380 $38,000 Parkes Line Road through to Mangaroa Bridge (assume Mangaroa Hill Road excluded) Streetscape associated with Neighbourhood centre SH2 / Maymorn road intersection upgrade (assumed that a seagull type junction improvement needed)* 2,580m $2,300 $5,934, m $3,925 $785,000 1 $1,500,000* $1,500,000* Mangaroa Bridge upgrade* 1 $2,000,000* $2,000,000* Upgrade of existing road underpass (under track) 1 $1,500,000* $1,500,000* New road underpass (under track)* 1 $1,500,000* $1,500,000* New pedestrian underpass (under track)* 1 $600,000* $600,000* Railway Station upgrade and access works* 1 $150,000* $150,000* Park & Ride carparking area** 3700m 2 $60* $222,000* Upgrade at McLaren St - flood protection works* 1 $800,000* $800,000* * costs estimates for major works are based on experience of projects undertaken of a similar nature. No allowance is provided for land acquisition. Providing more reliable estimates will require preliminary design work and discussions with relevant stakeholders. ** area allocated for car parking is as shown on the Structure Plan and costs shown allow for space for accommodate approximately 150 car parking spaces. Total costs for road enhancements is estimated to be approximately $22.9 million (including stormwater and flood protection works). 5.2 Water and Waste Water Utilities Infrastructure The following rates have been provided by Upper Hutt City Council in respect of costs rates for utilities pipes. The costs associated with reservoir construction, pump stations and rising main are based on recently completed project work by Beca. The costs associated with detention ponds are based on costs of development of a detention pond at Aotea, Porirua and in Manukau. The costs of detention ponds depend on their size and on site conditions including topography. Beca // 22 June 2010 // Page // NZ

16 Table 6: Cost per Linear Metre of Water and Waste Water Utilities Infrastructure Type Specification Cost Water Piped main network - trunk only (main and connector roads) Replacement of existing pipes 150mm Φ $360 per metre Replacement of existing pipes 225mm Φ $460 per metre Installation of new pipes 150mm Φ $360 per metre Water supply from reservoir 225mm Φ $460 per metre Water supply to reservoir 150mm Φ $360 per metre Minor modifications to existing pump station - $100,000 Reservoir (x1) 2,200m 3 $1,430,00 Water booster pump station (x1) - $250,000 Wastewater Piped main network - trunk only (main and connector roads) a Replacement of existing gravity pipes 225mm Φ $730 per metre Replacement of existing gravity pipes 300mm Φ $890 per metre b Installation of new gravity pipes 150mm Φ $600 per metre c Installation of new rising main 150mm Φ $600 per metre Upgrades to pump stations (x1) $250,000 Stormwater* Detention Pond (x1) $600,000 * reticulation network costs contained in road network upgrade and development costs. As indicated above it is assumed that individual developers will provide utilities within individual lot areas (along internal roads comprising connector roads, residential lanes and shared streets) as part of their site development, ie a condition of any land development will be that utilities are provided in accordance with the Structure Plan. Utilities required to service individual development will be provided by the developer. The Council will be responsible for providing trunk mains which are largely along Maymorn Road and Parkes Line Road, but also include water reservoirs, pump stations and waste water rising main. Beca // 22 June 2010 // Page // NZ

17 Therefore, the costs associated with water and waste water utilities is estimated, as follows: Water Table 7: Cost Estimates for Water and Waste Water Utilities Piped main network - trunk only (main and connector roads) a Installation of new pipes Specification Units Cost per unit Cost Water supply from reservoir 225mm Φ 325m $460 $149,500 Water supply to reservoir 150mm Φ 325m $360 $117,000 Minor modifications to existing pump station 1 $100,000 $100,000 Reservoir 2,200m 3 - $1,430,000 Wastewater Piped main network - trunk only (main and connector road) a Replacement of existing gravity pipes 225mm Φ 929m $730 $678, mm Φ 1580m $890 $1,406,200 c Installation of new rising main 150mm Φ 283m $600 $169,800 Upgrades to pump stations x3 $250,000 $750,000 Stormwater* Detention Pond x5 $600,000 $3,000,000 * reticulation network costs contained in road network upgrade and development costs. Overall, costs for all water, waste water and the detention ponds component of the stormwater utilities infrastructure is estimated to be $7.8 million. stormwater reticulation system has been costed as part of the road network. 5.3 Parks, Reserves and Play Grounds The Structure Plan proposes that open space be provided in the form of reserves, parks and play grounds. These are to be used as community facilities and as such they are an important component of the Maymorn Structure Plan. Steep land located in the north (part of the Gabites block) comprises a large area of regenerating bush and is not intended to be for public use. It is instead proposed to be retained to play a key role in the integration of new land uses into the landscape. Subdivision of this land should only be allowed with suitable provisions for its long term protection from development ie any dwelling should be located outside of the protected area which could form part of the dwelling curtillage and be part of the private land titles. This could be achieved by means of covenant on the area to be protected from development. Thus, the total amount public open space that is proposed to be provided is 34.29ha as shown on drawing contained in the SP (estimate provided below). The table below provides cost rates and total cost for upgrading and enhancing undeveloped areas to provide reserves, playgrounds, footpaths and public artworks. Beca // 22 June 2010 // Page // NZ

18 Table 8: Estimated Costs to Create Parks and Reserves Open Space Units Cost per Unit Cost Reserves (general)* 193,852m 2 $30 $5,815,568 Riparian revegetation 100,000m 2 $10 $1,000,000 Neighbourhood Playground 1 $350,000 $350,000 Pocket park Playground 2 $80,000 $160,000 Pathway along historic railway alignment 1,600m (length) $45 $72,000 Public Artworks* 1 $100,000 $100,000 Total $7.5m * assumes significant proportion of floodplain area is upgraded, but not. Notably only 1/3 of land adjacent to Mangora River is upgraded. The above costs are based on previous project experience, and using typical examples to form a m 2 rate that could then be applied across the Maymorn area, taking into consideration, the following: Reserves (General) A typical 10,000m2 reserve project was analysed / broken down to amount of site preparation, pathways, planting, grassing, lighting, etc., Thus, in terms of works, site was developed in the following approximate proportions: 13% shrub and groundcover planting; 79% open grass area with trees; and, 8% paved areas comprising paths, etc. Total cost for this type of project is $300,000 which equates to a $30 per m 2. this allows for a fairly complete redevelopment of identified reserve areas. Therefore, it could be argued that the existing rural areas within Maymorn already provides significant amenity and therefore less expenditure is required with change and modifications occurring in focussed nodes and the existing rural pasture land left as is / or with minimal additional work required, eg additional tree planting, pathway through existing pasture grassland. Exclusions on the cost schedule do not for allow for formation of sportsfields, hardcourts, etc (active recreation facilities). Riparian Revegetation Allow for native revegetation of riparian corridor strips. The cost rate is based on native revegetation costs, plant supply and install costs. Neighbourhood Playground Creation of a 'destination' playground in the area. Lump sum based on previous project experience eg Wanaka Roys Bay playground. Sum allows for playground items (including 1-2 larger iconic items, eg space-net plus associated seating, paving, soft-fall and planting. Pocket Park Playground Small playgrounds to service surrounding residential area. Lump sum based on providing a small number of playground items and associated seating, paving, soft-fall and planting. Pathway Along Historic Railway Alignment Supply and install of a 2m wide gravel path. Beca // 22 June 2010 // Page // NZ

19 Public Artworks Lump sum for several artworks to allow for commissioning, design and installation. May need to be supplemented by other art funding. Open space will need to be acquired (or in lieu of development contributions) and the value of land has been estimated based on the value of adjacent land following adoption of the Structure Plan into the District Plan (by means of plan change or otherwise), as follows: Location by Stage Table 9: Estimated Costs to Acquire Land Needed to Parks and Reserves Value per hectare*** Density of adjacent land* (area in hectares) 26dph 20dph 10dph 4dph Flood plain/ river $1,666,500 $1,562,500 $843,750 $380,000 $35,000 Acquisition cost estimate $2,233, $656, $1,683,165 Between 6,7,13 Between 9,10 Between 11, 10, 14 Between 12,13 West of Parkes Line Road East of Parkes Line Road West of Parkes Line Road East of Parkes Line Road All land adjacent to River Pathway along historic railway alignment ** $843, ** $329, ** $3,521, ** $229, ** $2,961, $619, $608,000 Total Hectares Acquisition costs $4,916,175 $6,203,125 $885,938 $836,000 $57,888 $13,685,438 * assumes land is split evenly between where open space located between 2 density types ** assumes that half of land located between proposed urban areas is undevelopable because comprises riparian environment and flood plain. *** Land value based on following assumptions: Density of between 20 and 26 dwellings per hectare (DPH): 50% of serviced land value; 10dph: 45% of service land value; 4dph: 40% of serviced land value where values are sourced from Colin Jenkins (correspondence dated 6 April 2010 and 19 June 2009). Percentages based on assumption that average cost of creating a service lot is $40k and developer profit equals 20%. The total amount of investment anticipated to be required to enhance open space is approximately $7.5 million + land acquisition costs of $13.7 million, equals $21.2 million. Beca // 22 June 2010 // Page // NZ

20 5.4 Summary The above sections summarise costs associated with providing roading, water supply, stormwater and foul water utilities needed to serve the entire Maymorn Structure Plan development. Excluding costs associated with individual land development where it is assumed that infrastructure needed to service individual land development parcels (and lots) will be provided by developers, the total outlay by the public is estimated as follows: Road enhancements and upgrades: $22.9 million* Water and foul water: $7.8 million Open space, reserves and parks: $21.2 million TOTAL $51.9 million (note due to rounding does not add up to above) * includes stormwater Thus overall costs are approximately $51.9 million. The total cost of infrastructure provides a robust basis for establishment of a development contribution levy for the Maymorn Structure Plan area, ie the development pays for the infrastructure needed. It is assumed that the Structure Plan area could achieve 1,717 dwellings and therefore the development contribution on a per dwelling basis is $30,227 per dwelling. Parks and reserves land acquisition equates to 26% of the total development contribution payable. It is noted that the Council s current contribution levies are provided on an area by area basis. Whilst capital works equate to between $2,000 and $50,000 per additional lot created, levies are in some areas heavily subsidised and so range between $2,000 and $19,300, (LTCCP ). The Maymorn Structure Plan area would be the second highest development contribution rate on a per dwelling basis. 6 Phasing and Development Cost Model The above section identifies the infrastructure that is anticipated to be needed to support the Maymorn Structure Plan development and its staging. The development triggers provided show when infrastructure can be phased to occur relative to completion of new homes. This section shows how year by year costs of development could be matched by development contributions based on an even rate of development and a progressive sequence. This provides a basis for managing the development so it occurs in serviced areas only rather than across the entire Structure Plan area. The following sequence of phasing was chosen with land areas brought forward for development programmed to achieve an even rate over time. This means that as one development area is being completed the next one begins. Beca // 22 June 2010 // Page // NZ

21 Figure 5: Proposed Staging Plan Below is a summary of infrastructure provided per stage: Stage Infrastructure Stage 1 Reservoir (including connections and pump station) Upgrade Waste water pump station Reserve Stage 2 Detention pond N o 1 Reserve and pocket playground Stage 3 Stage 4 Maymorn Road upgrade to SH2 Stage 5 Reserves Stage 6 Railway station upgrade and park and ride Detention pond N o 2 Neighbourhood playground Stage 7 SH2 / Plateau Road upgrade Stage 8 Mangaroa Bridge Upgrade Parkes Line Road (within Structure Plan) Upgrade existing road underpass (under track) Stage 9 Parkes Line Road from McLaren to Mangaroa Bridge Beca // 22 June 2010 // Page // NZ

22 Stage Stage 10 Stage 11 Stage 12 Stage 13 Stage 14 Infrastructure Detention Pond N o 3 Replace wastewater gravity pipes 225mm Upgrade Waste water pump station x2 Install new rising main New pedestrian underpass (under track) Replace wastewater gravity pipes 300mm New pedestrian underpass Reserves Reserves and pocket playground Detention Pond N o 4 Reserves Reserves Detention Pond N o 5 Riparian planting Pathway along historic railway alignment Public artworks Flood protection at McLaren New road underpass (under track) Development scenarios were developed on the basis of 50 and 75 dwellings per annum and infrastructure introduced to match that development. This approach means that development contributions collected can be compared with public sector investment (in infrastructure) in order to establish the likely extent for a public sector loan. The tables provided in Appendix 2 provide details of phasing of development and delivery of infrastructure. Infrastructure is proposed to be provided just in time as opposed to in advance of being required. This means that development needs to be managed and monitored to ensure that infrastructure is planned for and provided when it is needed to service the level of development. It also means that development contributions are being collected in advance of public sector investment as much as is practicable. This reduces the level of council borrowing and minimises risk. The graph below shows council spend against development contributions collected (in present day values and not allowing for any costs of borrowing). Beca // 22 June 2010 // Page // NZ

23 Figure 6: Development Contributions Compared with Public Sector Investment (50 dwellings per annum) (present day values and with no consideration of loan costs) $60,000,000 $50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $ $10,000,000 Years Running total implementation costs Development contributions accumulation Surplus / Deficit Figure 7: Development Contributions Compared with Public Sector Investment (75 dwellings per annum) (present day values and with no consideration of loan costs) $60,000,000 $50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $ $10,000,000 Years Running Total Public implementation costs Development contributions accumulation Surplus / Deficit The above graphs show that assuming an even rate of development, sufficient development contributions are generally able to be collected in advance of infrastructure investment. In general the slower the development rate the greater is council s financial exposure. This can be reduced by Beca // 22 June 2010 // Page // NZ

24 managing development so that there is an acceleration in applications (and contributions collected) over periods when large investment is required. The charts show public investment exceeds contribution in one instance in both scenarios shown above, by between $17k (75dph scenario) and $300k (50dph scenario). This debt is best managed by ensuring high rates of lot development around periods of high expenditure by Council, i.e. the faster the rate of development the less that Council is exposed to debt. Overall, the graphs show that in general terms council investment can be balanced against development contributions accumulated. 7 Delivery Issues The above sections have focussed on public sector costs and the degree to which the public sector is likely to become exposed financially. This section examines the commercial viability for developers given likely overall development costs. 7.1 Case Study The table below is a case study of stages 1 and 2 only, and shows likely development costs (associated with providing roads and utilities) plus development contribution and compares this with land value. Total infrastructure costs $18,984,202 Total development contribution (293 dwellings) $8,780,425 Land value $31,856,210* Difference between improvement costs and land value $4,091,583 * Land values provided by Colin Jenkins (correspondence dated 6 April 2010 and 19 June 2009) The above table shows that the capital investment required to enable the development equates to a land value uplift of $4m. Not all of this figure will constitute profit because no allowance has been made in our calculation for financing, professional fees or holding costs. Based on a rule of thumb, the creation of dwellings would appear to be viable as the value of the home created will be roughly twice construction cost. The table above would indicate that the development contribution can be afforded by the land developer who creates the lots. However, given that the level of development contribution suggested is relatively high for the district this may require further consideration. Council could consider either subsidising the infrastructure or reducing costs further, for example through a reduction of the amount of public open space and equivalent increase in development area in the Structure Plan area. There may also be opportunities for reserve land to be vested in lieu of payment. This report has not considered the implication of either approaches. 7.2 Lots and Development Areas Analysis The table provided in Appendix 3 compares land development (as shown in the Structure Plan) against Certificate of Title in order to identify whether any lots have a high proportion of noncommercial development. Beca // 22 June 2010 // Page // NZ

25 The table shows that most lots have in excess of 80% of their area used for residential land use and hence individual lot deliverability issues are unlikely to arise. There are approximately 13 lots which have less than 50% of their land allocated for residential development as indicated in the current Structure Plan. These lots will need to be considered as part of detailed site design and staging process and monies allowed for acquisition (of reserves) to enable land development to occur. Where a very high proportion (or all) of a site is allocated for reserve then Council may want to consider site acquisition earlier. 8 Conclusions The triggers provided in this report comprise a mixture of (i) essential infrastructure that must be provided in order to properly service the development and, (ii) non-essential infrastructure that is nevertheless needed to support the creation of a sustainable community. The staging of the latter form of infrastructure affords some flexibility. The staging advice provided in this report has assumed that essential infrastructure is provided when required ( just-in-time ) and has delayed other non time critical items. On this basis this report has shown that it is possible to phase infrastructure provision so that Council s exposure to borrowing can be minimised. The Councils exposure to debt risk can be reduced by increasing the rate of development during periods when public sector investment is high. Based on land value assumptions and given servicing and development contribution costs the increase in land value following subdivision results in some degree of profit (approximately 15%). Development contributions (approximately $30k) equate to some 30% of total costs and of that, land acquisition costs for reserves and open space is 25%. Thus, a more detailed assessment of commercial viability may be required. This may lead to some refinement of parts of the Structure Plan to, for example, reduce the area of proposed reserves in order to reduce development contributions and hence ensure commercial viability for individual lots. Beca // 22 June 2010 // Page // NZ

26 Report Maymorn Structure Plan: Infrastructure Costs Estimate Prepared for Upper Hutt City Council (Client) By Beca Carter Hollings & Ferner Ltd (Beca) 22 June 2010 Beca 2010 (unless Beca has expressly agreed otherwise with the Client in writing). This report has been prepared by Beca on the specific instructions of our Client. It is solely for our Client s use for the purpose for which it is intended in accordance with the agreed scope of work. Any use or reliance by any person contrary to the above, to which Beca has not given its prior written consent, is at that person's own risk.

27 Revision History Revision Nº Prepared By Description Date A Greg Lee Document Acceptance Action Name Signed Date Prepared by Greg Lee Reviewed by Lucie Desrosiers Approved by Greg Pollock on behalf of Beca Carter Hollings & Ferner Ltd Beca // 22 June // NZ

28 Table of Contents 1 Introduction Limitations Method Urban Design Concepts Review Infrastructure Development and Triggers Water Supply and Waste Water Road Network Open Space, Reserves and Public Art Cost Estimates for Proposed Works Roads Water and Waste Water Utilities Infrastructure Parks, Reserves and Play Grounds Summary Phasing and Development Cost Model Delivery Issues Case Study Lots and development areas analysis Conclusions...23 Appendices Appendix 1: Road Enhancement Cost Estimate Appendix 2: Staging of Development and Implementation Costs Detail Appendix 3: Proportion of Residential Development per Lot Beca // 22 June 2010 // Page // NZ

29 1 Introduction This report provides advice on infrastructure likely to be required in order to support the development of the Maymorn Structure Plan area. This report focuses on the infrastructure that is to be provided by the public sector, identify when it will be required and how much it will cost (indicative and at present day values). The advice is based on the Maymorn Structure Plan, which provides a framework for development, identifying broad locations for future land uses and infrastructure. It is expected that developers will provide onsite infrastructure, including roads and utilities reticulation, as it traverses their land holdings. 1.1 Limitations It is understood that this report will be used by the Councils financial advisors. Whilst this report provides a breakdown of development triggers and costing, advice is provided on a strategic basis and no detailed design or modelling having been undertaken. Infrastructure triggers and costing may change if the development of the Maymorn Structure Plan is adjusted or is brought about in an different sequence or time frame to that shown in this report. 2 Method This study followed the steps detailed below: Develop a GIS based spatial model which breaks down all infrastructure and land to be developed into individual parcels, to allow for scenario testing to improve staging and cash flow forecasts. Identify trigger points for when upgrades to trunk water supply, trunk waste water, trunk stormwater and roading infrastructure is required, based on the ultimate scale of development envisaged. Identify interim infrastructure enhancements that could accommodate smaller scales of development if sensible. Provide a schedule for the delivery of trunk infrastructure enhancements needed relative to development and provide cost estimates (present day values) for its development, including interim enhancements where applicable. Identify the opportunity to maximise development ahead of infrastructure triggers. Prepare an annualised schedule showing housing development rates, contributions collected and infrastructure investment required. Provide drawings showing where development and infrastructure enhancement needed are located. The drawings will identify larger than annualised development areas providing flexibility in terms of how development of individual land areas are brought forward. Assess the urban design layout, land use mix and density assumptions for the Structure Plan area and reconfigure phases shown in Draft Structure Plan, as appropriate. Reviewing the planning implications of each decision re staging and the degree of incentive to be provided in terms of increasing density or achieving specific Structure Plan outcomes. Approximate the costs to service new lots created by estimating development contributions required based on cost estimates to provide infrastructure (stormwater, water supply, waste water and reserves). Comment on commercial viability based on likely land values (provided by others). Beca // 22 June 2010 // Page // NZ

Footpath Extension Policy

Footpath Extension Policy 16.6.9 Footpath Extension Policy 1.0 FOOTPATH EXTENSION POLICY - INTENTION The Footpath Extension Policy provides for the ranking of new footpaths in the Council s footpath construction programme. The

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

Sector Design Concepts

Sector Design Concepts Section C Sector Design Concepts C7 Sector 7 Great North Road Underpass 6 6 6 C7. Existing situation Sector 7 refers to the cut and cover section of the project linking the northern end of the deep tunnels

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

Amex Site Residential Development, Tarneit

Amex Site Residential Development, Tarneit Amex Site Residential Development, Tarneit Local Area Traffic Management Report Client: Amex Corporation Project No. 114430 Draft Report 13/12/13 Suite 1, 1 st Floor 132 Upper Heidelberg Road Ivanhoe Vic

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

How To Plan For A County Budget

How To Plan For A County Budget CHAPTER 10 CAPITAL IMPROVEMENTS ELEMENT The 1978 and 1985 Levy County Comprehensive Plans contained a statement of economic feasibility as a part of the Future Land Use Plan. This chapter updates that

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

Land at Cofton Lake Road Cofton Hackett

Land at Cofton Lake Road Cofton Hackett Land at Cofton Lake Road Cofton Hackett Prepared by Pegasus Planning Group Richborough Estates February 2009 Bir.3085 1 2 Introduction This Background Document has been produced on behalf of Richborough

More information

3. QUALITY ASSURANCE REQUIREMENTS

3. QUALITY ASSURANCE REQUIREMENTS 3. QUALITY ASSURANCE REQUIREMENTS 3.1 General This section covers the Kaipara District Council requirements for monitoring and testing of physical asset construction to ensure that the final asset delivered

More information

21.03 SETTLEMENT AND HOUSING

21.03 SETTLEMENT AND HOUSING 21.03 SETTLEMENT AND HOUSING 09/10/2014 C187Prop osed C189 21.03-1 Housing 09/10/2014 C187 This clause provides local content to support Clause 11 (Settlement) and 15 (Built Environment and Heritage) and

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Lawson Outline Plan External Traffic Analysis Working Paper

Lawson Outline Plan External Traffic Analysis Working Paper Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site

More information

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

LONDON ROAD SEVENOAKS

LONDON ROAD SEVENOAKS WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

St. Clair College Planning Area Introduction

St. Clair College Planning Area Introduction Introduction What is the Study Area? St. Clair College Planning Area is bounded by Highway 3 to the west, Cabana Road to the north, the residential community of South Windsor to the east and Cousineau

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Page 69. Sutton Living Business Plan and Loan Agreement. Mary Morrissey, Strategic Director of Environment, Housing and Regeneration

Page 69. Sutton Living Business Plan and Loan Agreement. Mary Morrissey, Strategic Director of Environment, Housing and Regeneration Page 69 Agenda Item 5b Report to: Opportunity Sutton Limited Sub- Committee Date: 4 August 2015 Report title: Report from: Ward/Areas affected: Chair of Committee/Lead Member: Author(s)/Contact Number(s):

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Thames Water key Messages for London Borough of Ealing 25 th October 2005

Thames Water key Messages for London Borough of Ealing 25 th October 2005 Thames Water key Messages for London Borough of Ealing 25 th October 2005 Item 1: Drainage & ownership The area of drainage is complex. Thames Water, the Local Authority, the Environment Agency and property

More information

Urban Vehicle Crossing Application To be completed and fees paid for prior to approval

Urban Vehicle Crossing Application To be completed and fees paid for prior to approval Urban Vehicle Crossing Application To be completed and fees paid for prior to approval Applicant Details Name: Postal Address: Telephone Home: Work: Signed: Date: Proposed Contractor: Proposed Start Date:

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals: Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota Land Use Goals: 1. Growth in Wadena will be undertaken in such a manner as to create a full range of living, working, shopping,

More information

OUR WORK IN DETAIL. Ngā mahinga whānui

OUR WORK IN DETAIL. Ngā mahinga whānui Ngā mahinga whānui Whakatāne District Council ANNUAL PLAN 2013/14 21 This chapter provides an overview of the activities we will undertake during the 2013/14 year. We currently have 48 internal and external

More information

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO MARCH 2014 BLOCK 53 Ferris Drive Plan 58M-379 & Part of Lot 4, Registered Plan 622 WELLESLEY, ONTARIO DOCUMENT

More information

AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS

AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS Page 1 of 22 PLANNING COMMITTEE REPORT Agenda Item 5.7 AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS 7 August 2007 Division Sustainability & Regulatory

More information

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing

More information

ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE

ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE 1.1 The National Planning Policy Framework sets out what good design should aim to achieve, in a set of six statements that are complementary to policies contained

More information

Townsville Industry Breakfast

Townsville Industry Breakfast Townsville Industry Breakfast Tuesday, 1 December 2015 CBD Utilities Upgrade Project Project Overview Project Overview Townsville Water and Waste has been experiencing numerous performance failures of

More information

Assessment of Site Deliverability in the Market Towns

Assessment of Site Deliverability in the Market Towns East Cambridgeshire District Council of Site Deliverability in the Market Towns August 2014 Annex 1 to the Site Results Technical Background Paper (February 2013) 0 Contents: 1. Introduction 1.1 Role of

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

INFRASTRUCTURE POLICIES

INFRASTRUCTURE POLICIES PART 7 INFRASTRUCTURE POLICIES 7.1 INTRODUCTION This Section sets out policies related to the development of services and utilities which are essential to the proper functioning and well being of the municipality.

More information

Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth

Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth Melbourne Water Principles for Provision of Waterway and Drainage Services for Urban Growth Contents About Melbourne Water 3 Principles for Creating Development Services Schemes 4 Preface 4 (Original)

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

22.01 SETTLEMENT 24/04/2014 C73

22.01 SETTLEMENT 24/04/2014 C73 22.01 SETTLEMENT 24/04/2014 C73 22.01-1 Urban Growth and Development 24/04/2014 C73 This policy applies to the urban areas and fringes of Portland, Heywood, Casterton, Dartmoor, Nelson, Cape Bridgewater,

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

Section 19C 19C Education Centre 2 Zone (Faith Bible College - Sub-Zones A & B)

Section 19C 19C Education Centre 2 Zone (Faith Bible College - Sub-Zones A & B) Section 19 19 Education entre 2 Zone (Faith Bible ollege SubZones A & B) All activities in the Education entre 2 Zone shall have the status identified in Table 19.1: Education entre Zones (Faith Bible

More information

RICHARD REID & ASSOCIATES LTD CITYMAKERS

RICHARD REID & ASSOCIATES LTD CITYMAKERS RICHARD REID & ASSOCIATES LTD CITYMAKERS 3/9 Tudor Street Devonport Auckland 0624 NEW ZEALAND T: (09) 445 3289 M: (027) 640 8367 F: (09) 445 4307 richard@richardreid.co.nz www.richardreid.co.nz 2 December

More information

6 Streetscape character 6.1

6 Streetscape character 6.1 6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Version 3 - Final Adopted 19 February 2013 NAMS.PLUS Burnie City Council Asset Strategy Document Control Document Control NAMS.PLUS Asset www.ipwea.org.au/namsplus Document ID:

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

Christchurch Cycle Design Guidelines

Christchurch Cycle Design Guidelines Christchurch Cycle Design Guidelines 2013 Acknowledgements We would like to thank the contributions from ViaStrada and other contributors including Glen Koorey, Spokes, NZTA, Canterbury Public Health,

More information

Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan

Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan Revised May 2007 CAPITAL FACILITIES FINANCIAL PLAN 2007-2012 CLARK COUNTY 20-YEAR GROWTH MANAGEMENT

More information

The Community Infrastructure Levy: advice note for culture, arts and planning professionals

The Community Infrastructure Levy: advice note for culture, arts and planning professionals The Community Infrastructure Levy: advice note for culture, arts and planning professionals Martin J Elson, Emeritus Professor in Planning, Oxford Brookes University April 2012 Contents Aims of the advice

More information

Campbelltown City Council Asset Management Strategy 2012-2022

Campbelltown City Council Asset Management Strategy 2012-2022 Campbelltown City Council Asset Management Strategy 2012-2022 Disclaimer This document was first published on 1 July 2012. The information contained in this document is to be considered general in nature

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014 Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

ROADING ASSET MANAGEMENT PLAN

ROADING ASSET MANAGEMENT PLAN ROADING ASSET MANAGEMENT PLAN 1 EXECUTIVE SUMMARY 1.1 Overview This Roading Asset Management Plan (RAMP) follows the format recommended by the National Asset Management Steering Group (NAMS) and is largely

More information

Richmond upon Thames College. Draft Planning Brief. May 2008

Richmond upon Thames College. Draft Planning Brief. May 2008 Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of

More information

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project. The purpose of this meeting is inform the public of the updates the project, and get input before the finalization of the project. The following panels describe the purpose and hisry of the project, along

More information

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place. 15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places

More information

Glenorchy City Council Asset Management Strategy for Infrastructure Assets

Glenorchy City Council Asset Management Strategy for Infrastructure Assets Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Long Term Financial Plan 2014 2023 Adopted December 2013

Long Term Financial Plan 2014 2023 Adopted December 2013 Long Term Financial Plan 2014 2023 Adopted December 2013 District Council of Mallala CONTENTS 1 Introduction 1 2 Planning Framework 2 3 Assumptions 7 4 Summary & Financial Statements 10 Estimated Comprehensive

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

Infrastructure Asset Management Strategy

Infrastructure Asset Management Strategy Infrastructure Asset Management Strategy Strategy Owner Manager Parks and Assets Engineering and Infrastructure Creation Date 27 March 2006 Revision Date 4 March 2015 Please check Council s Intranet to

More information

Public Landscape Aids And Protection Of Assets

Public Landscape Aids And Protection Of Assets Territory and Municipal Services Reference Document 4 LANDSCAPE MANAGEMENT AND PROTECTION PLANS (LMPP) Requirements for the Protection of Public Landscape Assets Adjacent to Development Works Issue 2 Revision

More information

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME EAST AYRSHIRE COUNCIL CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME Report by the Depute Chief Executive/Executive Director of Neighbourhood Services PURPOSE OF REPORT 1 The

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange Newsletter: Issue 1 (May 2014) Welcome + This newsletter announces the start of Goodman Shepherd s consultation on its proposals for the East Midlands Intermodal Park (EMIP) in South Derbyshire. Goodman

More information

Flood Protection & control works

Flood Protection & control works Flood Protection & control works Whakamarumaru i ngā waipuke Environment Canterbury is the joint lead agency with territorial authorities for flood risk reduction. Under changes to the Local Government

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this

More information

VEHICLE CROSSOVER INFORMATION PACK

VEHICLE CROSSOVER INFORMATION PACK VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)

More information

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

Draft Section 106 Heads of Terms schedule Wing

Draft Section 106 Heads of Terms schedule Wing Draft Section 106 Heads of Terms schedule Wing Planning Obligation Details of obligation Cost or percentage to Wing/Marshall Affordable Housing 1 AAP policy requirement 2 Affordable housing clustering

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

Asset Management Strategy

Asset Management Strategy Asset Management Strategy File Ref: CM.STD.6 Synergy Ref: NMP1331737 Version: 25/06/2013 City of Albany 2013 102 North Road, Yakamia WA 6330 PO Box 484, ALBANY WA 6331 Tel: (08) 9841 9333 Fax: (08) 9841

More information

Site Specific Policies

Site Specific Policies Local Development Framework Site Specific Policies Development Plan Document 03450 450 500 www.scambs.gov.uk Local Development Framework Site Specific Policies Development Plan Document Published by South

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition

More information