1 Flood Protection & control works Whakamarumaru i ngā waipuke Environment Canterbury is the joint lead agency with territorial authorities for flood risk reduction. Under changes to the Local Government Act 2002 made in 2010, we now report our flood protection and control works activities as a separate group of activities from our other work on Natural Hazards (see page 49). There are three programmes of work in this group of activities. The Flood Protection & Control Works Programme deals with the management of flood protection infrastructure and general flood management. The Regional Parks programme used to sit within the Land group of activities but we have moved it, as shown, into the Flood Protection & Control Works portfolio because of its close alignment and level of contribution to the Flood Protection & Control Works programme. Council endowment land outside of rivers and berms, which is not required for flood control infrastructure, is leased which generates over $4m revenue towards the flood protection works noted within this programme area. The Dams programme of work authorises the safe and sustainable design and construction of dams and associated structures and monitors and enforces ongoing dam safety. Total expenditure in Flood Protection & Control Works $18.0 MILLION What s changed since the Long-Term Plan ? Work programmes for the Rangitata and Lower Waitaki have been revised to include flood damage repair works recommended by Liaison Committees. 38

2 Programme of work - Flood Protection & Control Works This programme of work aims to reduce the risks to people and property arising from river flooding. Many of Canterbury s communities are built on the floodplains of rivers rising in the Southern Alps and their foothills. Reducing flood risk requires a combination of measures, including land use planning, public education, river catchment engineering works, monitoring river levels and providing flood warnings. New rating districts may be established in consultation with local communities to address specific flood risks. Environment Canterbury, the Canterbury Civil Defence Emergency Management Group, territorial authorities, infrastructure providers and other organisations also need accurate information about flood hazards and vulnerabilities so they can make informed decisions about risk reduction, readiness, response and recovery. We provide this information. Part of our work includes the management of gravel extraction from river beds. The demand for gravel for construction and roading exceeds supply in some parts of the region. Gravel extraction from rivers helps to maintain the flood capacity of those rivers, but it can also compromise the integrity of infrastructure such as bridges and stopbanks if not managed properly. Gravel extraction is currently managed through land use resource consents. Once the Land & Water Regional Plan is adopted, Council will be able to issue written authorisations for gravel extraction through the new Canterbury River Gravel Management Strategy. Flood protection work is linked to our work in implementing the Canterbury Water Management Strategy. What we will do: Flood alerts will be issued and staff will be rostered at all times to manage flood events. Capital works programmes to provide increased levels of flood protection will be continued for the Waimakariri River, the Ashley River and will start for Washdyke Creek. Infrastructure condition and performance reports will be presented to liaison committees. High quality hazard advice will be made available to the public via Environment Canterbury s website. Data on gravel management will be collected. A gravel management strategy will be implemented and reports will be made available to liaison committees. Asset management plans will be updated. Leases and licences over Council land will be administered. Opportunities to improve lease revenue will be sought. Indigenous biodiversity will be protected and enhanced. Asset Management Planning Asset management planning is a key function of this programme and is one that guides the bulk of the flood protection and control works undertaken each year. The primary focus of each Asset Management Plan for Environment Canterbury is to set out the minimum levels of service to be maintained. Due to the nature of flood protection assets, they are vulnerable to flood damage and repair costs can have significant effects on the maintenance budget for the affected rating district(s). The emergency reserves, and a Council loan, can be used to help smooth out increased funding requirements. The level of service, asset condition, emergency reserves, and funding programme are discussed annually with liaison committees. Advice from the committees goes towards guiding the Hazards group of activities to achieve the rating districts committees outcomes, as well as guiding the work done in that group of activities. When communities desire an increased level of service, capital works programmes are set up to construct and fund the relevant works. An example of an existing capital works programme is the Waimakariri Flood Protection Project, which is being constructed over a 10 year period and funded over 25 years. ISSUES/UNCERTAINTIES FOR THIS PROGRAMME OF WORK: The amount of funding required to repair flood and erosion control works damaged by major flood events is uncertain. However the costs of immediate works during flood events will be met from catchment rating district reserves and, if required, from other funding arrangements that Environment Canterbury has put in place. The amount of maintenance work required to maintain design capacity in any one year is uncertain, due to the dynamic nature of river systems. Forecast levels of maintenance expenditure are based on historical levels of damage. As with previous years, no budget provision has been made for repairing significant flood damage. 39

3 Programme of work - Regional Parks This programme of work used to sit within the Land group of activities, but it is now included in Flood Protection. This programme of work provides the community with open space leisure and recreational opportunities on Council owned land and a ranger service for Northern Pegasus Bay. The Regional Parks programme has strong links with, and supports the flood protection and control works programme and the biodiversity programme. Protection of flood protection infrastructure and biodiversity, whilst providing recreational opportunities, make up the integrated nature of this programme. We also work with our partners, Hurunui and Waimakariri District Councils, to manage and protect the beaches and coastal dunes of Northern Pegasus Bay. Our work includes development and maintenance of cycle and walking tracks, picnic areas, and the protection and enhancement of natural values (including biodiversity, freshwater and landscape). Work in this programme will help to meet CWMS recreational and amenity opportunity and biodiversity targets. What we will do: We will continue to promote our Regional Parks and Northern Pegasus Bay as places for recreation in Canterbury. We will continue to operate and develop the Waimakariri River, Tekapo and Ashley/ Rakahuri Regional Parks and provide a ranger service for Northern Pegasus Bay. ISSUES/UNCERTAINTIES FOR THIS PROGRAMME OF WORK: Environment Canterbury holds extensive areas of reserve and endowment land associated with its flood and erosion protection work. There is increasing demand for outdoor recreation and leisure opportunities, particularly biking and walking. Visitors to our regional parks have increasing expectations of services and maintenance as well as development of new tracks and access-ways. Region-wide risks to regional parks include wind, fires and floods and resulting possible consequences of vegetation and productive forest loss, restricted recreation access, losses of natural character, and possible risks to park users. The wind storm in early 2013 was such an event. It was the most damaging storm in Canterbury since 1975 and resulted in several thousand hectares of forest across the region, being destroyed. The damage in the Waimakariri and Ashley Rakahuri Regional Parks was severe, resulting in the temporary closure of McLeans Forest. Work is continuing to reopen this area and restore the recreation values which existed before the storm. This work will be a priority for 2014/15. Programme of work - Dams This programme of work contributes to reducing the risks to people and property arising from dams. The construction and maintenance of dams is regulated by the Building Act 2004, under which Environment Canterbury has a Regional Authority function (sections 13 & 14). Our job is to authorise the safe and sustainable design and construction of dams and associated structures and to monitor and enforce ongoing dam safety. We regulate dangerous dams, earthquake-prone and flood-prone dams, and ensure the safety of dams in the region (this function is general rate funded). We maintain an up-to-date register of dams in the region, and a Dangerous Dams Policy. As a Building Consent Authority and as a Regional Authority we issue Project Information Memoranda (PIM). We must ensure that Dam Safety Assurance Programmes are received for each dam in the region that is classified as a medium or high potential impact and Potential Impact Classifications (PICs) for all large dams. Specifically, as a Building Consent Authority we also: process building consents for dams. co-ordinate compliance monitoring for building consents for dams. issue code compliance certificates, certificates of acceptance and notices to fix. What we will do: The Dams programme of work has an ongoing commitment to maintain adequate information and provide support for dam owners. We will work as follows: Maintain adequate information and support for dam owners, including meeting the Building Act requirements of a Building Consent Authority, maintain an up-to-date Dams Register and provide a dam advisory service. ISSUES/UNCERTAINTIES FOR THIS PROGRAMME OF WORK: During the recent dam register aerial photography project, about 50 dams in the trial area (Waimakariri District 2200 km 2 ) were identified as possible large dams, whereas before the project around 5-10 were estimated. Extrapolating from this trial area, there are likely to be about 750 possible large dams, but this number may be reduced once the data is reviewed and some 'ground-truthing' is carried out. All areas previously loaded with GIS data have been reviewed. A large section of mid/south Canterbury has just had new GIS data loaded and is currently being reviewed. The lack of information about unknown/unconsented dam owners results in a high risk of not meeting the Dam Safety Regulations or Building Code, because they currently have no recorded consent against the title (for dams post 1992); the consequence of a failure is unknown and this is a risk that is acknowledged as a potential liability for Environment Canterbury. 40

4 Levels of service Level of service 1: Providing information during floods Levels of service describe the services you will receive from the Council. Measures show you how we will measure and report on our progress in our Annual Report. Targets define what we plan to achieve in 2014/15. Measures and Targets - Flood Protection & control works Measure 1: The provision of flood prediction information and river flood warnings to key agencies when agreed trigger levels are exceeded. Measure 2: The real-time flood prediction system provides accurate region-wide warnings in accordance with established flood protocols. Target 1: Police, Civil Defence Management, radio stations and Territorial Authorities will receive flood warnings in accordance with established flood protocols. Target 2: Our Flood Warning Protocols will be reviewed after each significant flood event. Measure 3: The percentage of time that up-to-date river level and flood information is available on Environment Canterbury s website and River Report info line. Target 3: Information is available at all times through providing on-site assessment of river flows with direct links to Environment Canterbury website. Level of service 2: Reducing flood risk Measure 1: River and drainage schemes perform as designed during flood events. Target 1: Engineering staff undertake immediate site assessments of specific locations following hazard events (earthquake/flood/fire). Measure 2: Flood Protection infrastructure is maintained against agreed levels of service in consultation with River Rating District Committees. Target 2: Construction of flood protection infrastructure will be completed in accordance with Capital Expenditure Programme. Level of service 3: Sustainably manage the extraction of gravel for flood management and erosion purposes Measure 1: Sustainably manage the extraction of gravel for flood management and erosion purposes. Target 1: Extraction of gravel from rivers does not exceed Minimum Bed Level limits. 41

5 Level of service 4: Providing open space leisure and recreation opportunities on council-owned land Measure 1: Visitors rating of the quality of their experience in visiting McLeans Forest, in the Waimakariri River Regional Park. Target 1: 80% of visitors surveyed are satisfied or very satisfied (on a scale of very dissatisfied, dissatisfied, satisfied and very satisfied). Changes to Levels of Service from the Long-Term Plan. Levels of service around Regional Parks have been added here, moved from the Land portfolio. This reflects minor rewiring of our internal processes. Measure 2: Families rating of the suitability of the McLeans Forest mountain bike track for family riding. Measure 3: Restoration projects on wetland and lowland forest. Measure 4: Management of Council ground lease and licences reflects best practice. Measure 5: Management of Environment Canterbury lands demonstrates environmental best practice. Target 2: 80% of families using the track are satisfied or very satisfied (on a scale of very dissatisfied, dissatisfied, satisfied and very satisfied). Target 3: Restoration management will be applied to 170 ha of wetland and lowland regenerating forest. Target 4: 95% of leases monitored comply with lease terms and conditions. Target 1: Stock are excluded from natural waterways on leased land. Target 2: Indigenous plant communities are protected and enhanced. Level of service 5: The safe and sustainable design and construction of dams and associated structures Measure 1: Processing of building consents for dams. Measure 2: Dam owners register their dams with Environment Canterbury within 3 months from commencement of the Dam Safety Regulations 1 July Measure 3: Dams classified as medium or high potential impact have a registered dam safety assurance programme. Measure 4: Registering large dams that require a Potential Impact Classification (PIC) and Dam Safety Assurance Programmes (DSAP) into the RMA Database. Target 1: 100% of consents processed within 20 working days (as per Building Act 2004 requirements). Target 2: 100% compliance. Target 3: 100% of high or medium potential impact dams have registered a dam safety assurance programme. Target 4: 100% of registrations are done within 5 working days from consent being issued or upon receipt of new information about existing dams. 42

6 Financial summary Asset management and capital expenditure Refer to Appendix 3 on pages 127 for a summary of proposed asset additions involved in the delivery of Environment Canterbury s groups of activities. The appendix describes the assets to be purchased, the funding and the planned capacity changes, renewals, replacements and maintenance. How this work is funded For more information on how we fund our activities and the rationale for their selection see the Funding and Financial Policies in Part B of the Long-Term Plan Funding impact statement The funding impact statement in relation to this activity is recorded in Appendix 2 on page 119. This summarises the sources of funding to be used, the amount of funds expected to be produced and how the funds are to be applied. FINANCIAL CHANGES SINCE THE LONG-TERM PLAN Expenditure relating to property development on reserve land has increased, reflecting our contribution to the roads of national significance programme. In addition, projects previously allocated to the Flood Protection group of activities have now been reclassified as Hazard works, comparative imformation has not been restated. No significant impact on levels of service Financial projection ($000 s) for Flood protection & control works Annual Report Annual Plan Long-Term Plan Annual Plan 2012/ / /15 (Y3) 2014/15 General rates 3,046 2,023 3,351 2,153 Targeted rates 7,411 8,861 8,144 9,384 Grants User Pays/Other 5,970 5,241 5,885 5,398 Total Income 16,946 16,502 17,726 17,283 Operating Expenditure 13,782 17,136 14,065 18,010 Operating Surplus / (Deficit) taken to reserves 3,164 (634) 3,662 (727) 43

Revenue and Financing Policy

Revenue and Financing Policy Current Revenue Policy Revenue and Financing Policy Group Activity Environmental Activity - Air Ambient Air Quality Monitor and report on strategy development and implementation. benefits from clean air.

More information

HAWKE S BAY REGIONAL COUNCIL Job Description

HAWKE S BAY REGIONAL COUNCIL Job Description Position Title: Responsible to: Responsible for: Salary Range: Job Context: Asset Engineer HAWKE S BAY REGIONAL COUNCIL Job Description Manager Engineering N/A Progress above the Estimated Market Value

More information

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives Rivers Group Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers Flooding & Drainage Perspectives Waimakariri River Catchment Waimakariri River Hydrology Catchment area - 3,990

More information

Revenue and Financing Policy

Revenue and Financing Policy Revenue and Financing Policy Adopted Council 29 June 2012 See following page for policy. Revenue and Financing Policy Section 102(4) (a) of the Government Act 2002 requires each Council to adopt a Revenue

More information

Activity Summary: Flood Protection and Control Works

Activity Summary: Flood Protection and Control Works Activity Summary: Flood Protection and Control Works Activity name Activity description Flood Protection and Control Works The Annual Plan 2014/2015 states that Flood Protection and Control Works covers

More information

Revenue and Financing Policy

Revenue and Financing Policy Revenue and Financing Policy Purpose To present Bay of Plenty Regional Council s (Council) policies for financing its planned groups of activities including proposed funding sources. Under Sections 102

More information

DRAFT Revenue and Financing Policy 2015-2025

DRAFT Revenue and Financing Policy 2015-2025 DRAFT Revenue and Financing Policy 2015-2025 Table contents 1 Background 3 2 Guiding principles 4 2.1 Affordability 4 2.2 Paying for benefits received 4 2.3 Paying for costs imposed 4 2.4 Transparency

More information

Revenue and Financing Policy

Revenue and Financing Policy Revenue and Financing Policy Objective Provide the funding mechanisms to ensure the equitable distribution of costs to those who benefit, and provide for the financial sustainability of the activities

More information

MITIGATION STRATEGY OVERVIEW

MITIGATION STRATEGY OVERVIEW ALL-HAZARDS MITIGATION PLAN MITIGATION STRATEGY Code of Federal Regulations (CFR) Requirement 44 CFR Part 201.6(c)(3)(i): The mitigation strategy shall include a description of mitigation goals to reduce

More information

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE

More information

Our Environment, Our Future

Our Environment, Our Future Our Environment, Our Future OUR ENVIRONMENT, OUR FUTURE Under the Liberals, our environment is going backwards. Energy efficiency targets were abolished, renewable energy industries have collapsed, national

More information

Long Term Financial Plan 2014 2023 Adopted December 2013

Long Term Financial Plan 2014 2023 Adopted December 2013 Long Term Financial Plan 2014 2023 Adopted December 2013 District Council of Mallala CONTENTS 1 Introduction 1 2 Planning Framework 2 3 Assumptions 7 4 Summary & Financial Statements 10 Estimated Comprehensive

More information

Flood Risk Mitigation Plan

Flood Risk Mitigation Plan Environment Waikato Technical Report 1997/13 Flood Risk Mitigation Plan Prepared by: M Malcolm and D Parkin Natural Hazards Programme For: Environment Waikato PO Box 4010 HAMILTON EAST June 1997 Document

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

AS 4708:2013. Interpretation of Requirements relating to the Recovery of Forest Products from a Water Body

AS 4708:2013. Interpretation of Requirements relating to the Recovery of Forest Products from a Water Body AS 4708:2013 Interpretation of Requirements relating to the Recovery of Forest Products from a Water Body BACKGROUND Australian Forestry Standard Limited has been asked for an interpretation of the Australian

More information

(Adopted July 26, 2005 Resolution No. 05-24) Prepared by: Kevin Marstall, PE, Senior Civil Engineer, CRS Coordinator

(Adopted July 26, 2005 Resolution No. 05-24) Prepared by: Kevin Marstall, PE, Senior Civil Engineer, CRS Coordinator On The Floodplain Management Components Of The Association of Bay Area Governments (ABAG) Multi-Jurisdictional Hazard Mitigation Plan Including The Annex to the Plan as the City s Local Hazard Mitigation

More information

Chapter 6: Mitigation Strategies

Chapter 6: Mitigation Strategies Chapter 6: Mitigation Strategies This section of the Plan describes the most challenging part of any such planning effort the development of a Mitigation Strategy. It is a process of: 1. Setting mitigation

More information

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents AMENDMENTS TO THE REGIONAL PLANS RELATING TO LAND REPAIR ON EARTHQUAKE DAMAGED RESIDENTIAL LAND UNDER s27 OF THE CANTERBURY EARTHQUAKE RECOVERY ACT 2011 1. This memorandum outlines the specific changes

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

As amended at General Meeting 04 November 2015 (Item 11.1.2)

As amended at General Meeting 04 November 2015 (Item 11.1.2) As amended at General Meeting 04 November 2015 (Item 11.1.2) Operational Plan 2015-2016 What is an operational plan? Under the Local Government Act 2009, Council must adopt an operational plan each financial

More information

Approved Natural Disaster Recovery Round Green Army projects

Approved Natural Disaster Recovery Round Green Army projects Approved Natural Disaster Recovery Round Green Army projects Project Title Project Description State Territory Belmont Wetlands East Coast This project will reduce erosion and revegetate and control weeds

More information

Revenue and Financing Policy

Revenue and Financing Policy Revenue and Financing Policy Introduction The Revenue and Financing Policy sets out the ways in which the Council intends to pay for each activity it is involved in, and why. The Council is required to

More information

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy Melbourne Water s Submission Draft Victorian Floodplain Management Strategy Waterways, drainage and floodplains are essential to life and liveability. The rivers, creeks, estuaries, wetlands and floodplains

More information

Revenue and Financing Policy

Revenue and Financing Policy Revenue and Financing Policy Background Section 102(4)(a) of the Local Government Act 2002 states that a local authority must adopt a revenue and financing policy. The revenue and financing policy must

More information

Anchorage All-Hazard Mitigation Plan October 2004

Anchorage All-Hazard Mitigation Plan October 2004 EXECUTIVE SUMMARY The Municipality of Anchorage (MOA) is vulnerable to a wide range of natural, technological, and human/societal hazards including earthquakes, avalanches, and hazardous material accidents.

More information

Councillor Norm Bruning. Councillors Lyall Thurston and Jane Nees. Steve Everitt (Waterline Engineering)

Councillor Norm Bruning. Councillors Lyall Thurston and Jane Nees. Steve Everitt (Waterline Engineering) Notes from the Kaituna Catchment Control Scheme Liaison Group meeting, held in the Conference Room of Kiwi360 on Thursday, 28 November 2013 commencing at 1:00 pm. Present: Chairperson: Councillors: Liaison

More information

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan Preliminary Environmental Information Report: Appendix 16.C Flood Warning and Evacuation Plan THIS PAGE IS LEFT INTENTIONALLY BLANK Page 2 of 30 Contents SUMMARY 1. INTRODUCTION... 9 1.1 Background...

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Revenue and Financing Policy

Revenue and Financing Policy Revenue and Financing Policy The purpose of the Council s Revenue and Financing Policy is to provide predictability and certainty about sources and levels of funding for all its activities. The Policy

More information

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape Spring 2014 The flood of September 2013 changed the landscape of the Boulder and Canyon Lakes Ranger Districts.

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

Records Retention and Disposal Schedule. Property Management

Records Retention and Disposal Schedule. Property Management Records Retention and Disposal Schedule Property Management Version control Version Author Policy Approved By Approval Date Publication Date Review Due V 1.0 Information Governance Unit Philip Jones, Head

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK...

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK... Department for Environment, Food and Rural Affairs Climate Ready Co-creation progress update and an invitation to respond July 2012 Contents Overview of ideas from co-creation activities towards a Climate

More information

2015 2016 - Council Tax Facts and Figures on Finance

2015 2016 - Council Tax Facts and Figures on Finance 2015 2016 - Council Tax Facts and Figures on Finance 1 Contents R Foreword 3 Facts and figures on finance 1 Your Council Tax helps pay for the following 4 2 Our spending plans 5 3 How your Council services

More information

PROJECT LEVELS OF SERVICE, KEY DELIVERABLES & OUTPUTS

PROJECT LEVELS OF SERVICE, KEY DELIVERABLES & OUTPUTS PROJECT LEVELS OF SERVICE, KEY DELIVERABLES & OUTPUTS Project levels of service, key deliverables and outputs 2010-11 Annual Plan This document lists the projects, levels of service, key deliverables and

More information

APPENDIX A : 1998 Survey of Proprietary Risk Assessment Systems

APPENDIX A : 1998 Survey of Proprietary Risk Assessment Systems APPENDIX A : 1998 Survey of Proprietary Risk Assessment Systems In its 1997 paper, the working party reported upon a survey of proprietary risk assessment systems designed for use by UK household insurers

More information

Property & Asset Maintenance Business Unit Service Plan 2015/16

Property & Asset Maintenance Business Unit Service Plan 2015/16 Business Unit Leader: Emma Grundy Head of Service: Tom Clark 1. Service Objectives for 2015/16 Property & Asset Maintenance Business Unit Service Plan 2015/16 Issue Work to be undertaken Impact / outcome

More information

Engineering Policy 146. Severe Weather Management Plans

Engineering Policy 146. Severe Weather Management Plans Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...

More information

Asset Management Policy

Asset Management Policy Asset Management Policy Our policy To set guidelines for implementing consistent asset management processes throughout Woollahra Municipal Council. Objective To ensure adequate provision is made for the

More information

Maryland Emergency Operations Plan

Maryland Emergency Operations Plan Maryland Emergency Operations Plan Purpose The purpose of the Maryland Emergency Operations Plan (EOP) is to outline an approach and designate responsibilities intended to minimize the consequences of

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

Flood Emergency Management at Morava River

Flood Emergency Management at Morava River Flood Emergency Management at Morava River an example for emergency management planning from Austria Albert SCHWINGSHANDL Markus VOLLMANN Consulting Engineers for Water Management and Environmental Informatics

More information

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0

More information

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan.

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan. Public Submission No.: 2014-I17e To: Board of Directors For: INFORMATION Date: 2014-11-19 1. TITLE Greenbelt Master Plan Implementation 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors

More information

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami). Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall

More information

Financial Management (Sustainability) Guideline 2013 Version 1.1

Financial Management (Sustainability) Guideline 2013 Version 1.1 Financial Management (Sustainability) Guideline 2013 Version 1.1 For the purposes of explaining the concept of sustainability and to provide guidance for calculating the relevant financial sustainability

More information

Long-Term Asset Management Plan 2011-2021

Long-Term Asset Management Plan 2011-2021 Long-Term Asset Management Plan 2011-2021 Contents Introduction...3 A shared vision...4 Strategic planning to achieve our goals...4 Towards 2031...5 A long-term vision, communicated by our community...5

More information

Flood Evacuation Strategy Hawkins Lane, Burton on Trent

Flood Evacuation Strategy Hawkins Lane, Burton on Trent Flood Evacuation Strategy Hawkins Lane, Burton on Trent Tesco Stores Ltd 10-Apr-14 Issue and Revision Record Rev Date Changes Originator Checker Approver - 10.09.10 N/A BS GB NK A 10.04.14 Amended to suit

More information

REVENUE AND FINANCING POLICY

REVENUE AND FINANCING POLICY REVENUE FINANCING POLICY BACKGROUND The Revenue and Financing Policy describes who pay s for the Council s activities and how these will be funded. The Local Government Act 2002 (the Act) sets out the

More information

Chairperson and Committee Members CORPORATE BUSINESS COMMITTEE 20 FEBRUARY 2014

Chairperson and Committee Members CORPORATE BUSINESS COMMITTEE 20 FEBRUARY 2014 Chairperson and Committee Members CORPORATE BUSINESS COMMITTEE 20 FEBRUARY 2014 Meeting Status: Public Purpose of Report: For Decision ACTIVITY REPORTS: 1 JULY 2013 31 DECEMBER 2013 PURPOSE OF REPORT 1

More information

National Directorate for Fire and Emergency Management

National Directorate for Fire and Emergency Management National Directorate for Fire and Emergency Management Guide to Works and Development Consents for Repairing Infrastructure Damaged in Storms or other Emergency Events Document Title Guide to Works and

More information

South Somerset District Council

South Somerset District Council South Somerset District Council Asset Management Strategy 2014-2017 Contents Foreword... 2 Introduction and Purpose... 3 Aims... 3 Our Asset Portfolio... 4 Asset Values and Costs... 5 Performance Measurement...

More information

Stormwater harvesting

Stormwater harvesting Stormwater harvesting How to collect and re-use stormwater from Sydney Water s stormwater system Most of the stormwater pipes and channels in the Sydney metropolitan area are the responsibility of local

More information

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property. 6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment

More information

9.1 Draft Revenue and financing policy

9.1 Draft Revenue and financing policy 1. Policy purpose and overview The purpose of the Revenue and financing policy is to provide predictability and certainty about sources and levels of funding available to the council. It explains the rationale

More information

CONSERVING OUR RURAL ENVIRONMENT

CONSERVING OUR RURAL ENVIRONMENT HUME CITY COUNCIL CONSERVING OUR RURAL ENVIRONMENT Grant Guidelines 2015 2016 hume.vic.gov.au CONTENTS 1. GRANT OVERVIEW 1 1.1 Program introduction 1 1.2 Who can apply? 1 1.3 Grant types 1 2. GRANT SELECTION

More information

AMENDMENT TO LONG TERM COUNCIL COMMUNITY PLAN

AMENDMENT TO LONG TERM COUNCIL COMMUNITY PLAN 2011 AMENDMENT TO LONG TERM COUNCIL COMMUNITY PLAN This document contains the 2011 amendment to the Revenue and Financing Policy of the 2009 Long Term Council Community Plan. This amendment was adopted

More information

ANNUAL REPORT UNALIENATED CROWN LAND ANIMAL PEST CONTROL

ANNUAL REPORT UNALIENATED CROWN LAND ANIMAL PEST CONTROL ANNUAL REPORT UNALIENATED CROWN LAND ANIMAL PEST CONTROL Financial Year 2008-2009 Prepared for Land Information New Zealand by Landward Management Ltd PO Box 5627 DUNEDIN June 2009 TABLE OF CONTENTS LIST

More information

Aiding the Hydro-scheme development process. Web-links to useful information sources

Aiding the Hydro-scheme development process. Web-links to useful information sources Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information

Flood damaged road infrastructure: Can a rapid response be effected within the parameters of South Africa s environmental legislation?

Flood damaged road infrastructure: Can a rapid response be effected within the parameters of South Africa s environmental legislation? Claire Blanché Kim White Flood damaged road infrastructure: Can a rapid response be effected within the parameters of South Africa s environmental legislation? 1 WESTERN CAPE WEATHER Cabo das Tormentas

More information

Animals in Disasters

Animals in Disasters MODULE B UNIT 6 Animals in Disasters Recovering from a Disaster Overview Federal, State, and local governments work together in any major emergency. Emergency assistance funding is based on the concept

More information

HOSPITALITY DEVELOPMENT AT WEMBLEY GOLF COURSE BUSINESS PLAN FOR MAJOR LAND TRANSACTION

HOSPITALITY DEVELOPMENT AT WEMBLEY GOLF COURSE BUSINESS PLAN FOR MAJOR LAND TRANSACTION HOSPITALITY DEVELOPMENT AT WEMBLEY GOLF COURSE BUSINESS PLAN FOR MAJOR LAND TRANSACTION 1. Background The Town of Cambridge proposes to undertake further development of Wembley Golf Course with improved

More information

Summary: Introduction

Summary: Introduction Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with

More information

FLOOD CONTINGENCY PLAN

FLOOD CONTINGENCY PLAN Unrestricted Copy DERBYSHIRE LOCAL RESILIENCE FORUM FLOOD CONTINGENCY PLAN Issued January 2013 Revised Flood Contingency Plan CONTENTS CONTENTS RECORD OF AMENDMENTS CIRCULATION LIST Page i iii iv 1 BACKGROUND

More information

Greater Wellington Regional Parks Health and Safety Plan

Greater Wellington Regional Parks Health and Safety Plan Greater Wellington Regional Parks Health and Safety Plan Health and Safety template Health Safety in Employment Act 1992 The Health Safety in Employment Act 1992 requires that all employers develop emergency

More information

Management of flooding downstream of dams

Management of flooding downstream of dams Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of

More information

Note on Draft Progress Report Template

Note on Draft Progress Report Template Note on Draft Progress Report Template The Draft Progress Report template is provided as a guide to applicants on possible reporting requirements for the Biodiversity Fund. This actual report will be provided

More information

REVENUE AND FINANCING POLICY

REVENUE AND FINANCING POLICY REVENUE AND FINANCING POLICY In this document we use the words public or private to reflect who benefits from the services Council provides. When the word public is used it means the community at large

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section: Click here to access definitions SECTION 12 FLOODPLAIN LANDS 12.1 INTERPRETATION In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes

More information

Appendix C Asset Risk Model Data

Appendix C Asset Risk Model Data Appendix C Asset Risk Model Data S:\ADV JOBS\48305 ENV WAIKATO\027 THAMES COAST FLOOD RISK\6000 - DELIVERABLES\FINAL REPORT\APPENDIX C.DOC\16-JUL-03 Contents Appendix C Asset Risk Model Data Asset Risk

More information

Executive summary. The Council was successful in meeting its funding policies under the Revenue and Financing Policy.

Executive summary. The Council was successful in meeting its funding policies under the Revenue and Financing Policy. Executive summary This report reviews the Taranaki Regional Council's performance and achievement in relation to its Revenue and Financing Policy, Investment Policy and Liability Management Policy for

More information

STATEMENT OF COMPLIANCE AND BASIS OF MEASUREMENT

STATEMENT OF COMPLIANCE AND BASIS OF MEASUREMENT Accounting policies REPORTING ENTITY The Waikato Regional Council is a territorial local authority governed by the Local Government Act 2002, and is domiciled in New Zealand. The main purpose of prospective

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

WATER RESOURCES ENGINEERING DESIGN LANDSCAPE ECOLOGY AND RIVER RESTORATION. www.sindlar.eu

WATER RESOURCES ENGINEERING DESIGN LANDSCAPE ECOLOGY AND RIVER RESTORATION. www.sindlar.eu Geomorphological processes of watercourse development, system of typology and application of the results in practice Part 01 Analysis of geomorphological processes in watercourses Part 02 Applications

More information

Advice note. Linking River and Floodplain Management

Advice note. Linking River and Floodplain Management Advice note Linking River and Floodplain Management Advice note Linking River and Floodplain Management Demonstrating STrategic REstoration And Management (STREAM) is a 1 million four-year conservation

More information

New environmental liabilities for EU companies

New environmental liabilities for EU companies New environmental liabilities for EU companies The ELD applies to all businesses that operate within the EU, even if the parent company is located outside of the EU. The ELD applies to all businesses,

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

Draft Revenue and Financing Policy

Draft Revenue and Financing Policy Draft Revenue and Financing Policy Draft Revenue and Financing Policy The purpose of the Council s Revenue and Financing Policy is to provide predictability and certainty about and levels of for all its

More information

The Control of Major Accident Hazards Regulations (Northern Ireland) 2015

The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September

More information

Whangarei District Council Policy

Whangarei District Council Policy Whangarei District Council Policy Revenue and Financing Policy Policy 0060 Table of contents Background... 4 Review process... 4 Funding of operating expenses... 6 Funding source for activities... 7 Definitions...

More information

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Appendix 1. The Existing Regulatory Scheme Comprises:

Appendix 1. The Existing Regulatory Scheme Comprises: The Existing Regulatory Scheme Comprises: A. An Act about management of the radiofrequency spectrum and other matters. The short title is Radiocommunications Act (Cth) No. 174 1992 as amended; B. An Act

More information

PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE

PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE 1 The most common cause of flooding is when the river catchment area receives far greater amounts of water than normal,

More information

Chapter 3 Outcomes over the 2005 regulatory period 15 24. Chapter 5 Outcomes over the 2008 regulatory period 31 48

Chapter 3 Outcomes over the 2005 regulatory period 15 24. Chapter 5 Outcomes over the 2008 regulatory period 31 48 Executive summary i xxxiii Chapter 1 Background 1 8 Chapter 2 Industry context 9 14 Chapter 3 Outcomes over the 2005 regulatory period 15 24 Chapter 4 Framework for economic regulation 25 30 Chapter 5

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal

More information

MassDEP Natural Disaster Guidance for Coastal and Inland Wetland Resource Area Impacts: Hurricane or Tropical Storm Sandy

MassDEP Natural Disaster Guidance for Coastal and Inland Wetland Resource Area Impacts: Hurricane or Tropical Storm Sandy MassDEP Natural Disaster Guidance for Coastal and Inland Wetland Resource Area Impacts: Hurricane or Tropical Storm Sandy Tropical Storm Sandy may cause severe flooding, erosion and other impacts to wetland

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South

More information

Asset and Development Coordinator

Asset and Development Coordinator Department: Section: Location: Works and Services Technical Services City Offices Position Overview The is a critical role within Council s Technical Services section of the Works and Services Department

More information

ANNUAL REPORT UNALIENATED CROWN LAND WEED CONTROL TASMAN-NELSON DISTRICT

ANNUAL REPORT UNALIENATED CROWN LAND WEED CONTROL TASMAN-NELSON DISTRICT ANNUAL REPORT UNALIENATED CROWN LAND WEED CONTROL TASMAN-NELSON DISTRICT Financial Year 2008-2009 Prepared for Land Information New Zealand by Landward Management Ltd PO Box 5627 DUNEDIN June 2009 TABLE

More information

SUMMARY: COMMUNITY FACILITIES AND PROPERTY ASSET MANAGEMENT PLAN

SUMMARY: COMMUNITY FACILITIES AND PROPERTY ASSET MANAGEMENT PLAN SUMMARY: COMMUNITY FACILITIES AND PROPERTY ASSET MANAGEMENT PLAN Contribution to Council outcomes (AMP Chapter 2) Council s Parks, Swimming Pools, Libraries and Buildings services are provided for the

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal

More information

66 REFERRAL AND NOTICE PROVISIONS. Scope

66 REFERRAL AND NOTICE PROVISIONS. Scope 66 REFERRAL AND NOTICE PROVISIONS 29/10/2015 VC101 Scope These provisions set out the types of applications which must be referred under Section 55 of the Act or for which notice must be given under Section

More information

Long Term Financial Plan

Long Term Financial Plan Gladstone Regional Council Long Term Financial Plan Revision No. 6 02/2016 1 Our Charter We are Gladstone Regional Council. Our Vision Our vision is to be the best local government in Queensland. Our Purpose

More information

Karlstad, Sweden. Local progress report on the implementation of the Hyogo Framework for Action (2013-2014)

Karlstad, Sweden. Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Karlstad, Sweden Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Mayor: Ulf Nyqvist Name of focal point: -Anna -Sjödin Organization: -Karlstad Municipality Title/Position:

More information