1 (,(liil hoi,ii I flyiiilililllll1 Ii.IIIJ \X'\l1 r I~l'!lut, I IIglllttllll" Operations, Maintenance and Monitoring Plan Halesite Former MGP Site Halesite, Suffolk County, N ew York AOC Index No. Dl Submitted to: National Grid 175 East Old Country Road Hicksville, NY Submitted by: GEl Consultants, Inc. 110 Walt \'Xlhitman Road, Suite 204 Huntington Station, NY May 6, 2009 Project # , Tcil, PE l)wject Manager

2 Table of Contents Abbreviations and Acronyms ii 1. Introduction 1 2. Lowland Area Oxygen Injection System Engineering Control (EC) Plan Identification/Statement of Engineering Controls Performance Monitoring Plan Soil Vapor and Ambient Air Monitoring Groundwater Monitoring System Operation and Maintenance Plan System Operation and Maintenance Schedule Operation and Maintenance for Mechanical Systems Operation and Maintenance for the Injection Wells Tools and Spare Parts System Shutdown and Restart Non-Aqueous Phase Liquid Monitoring and Potential Recovery Long-term Groundwater Monitoring Quality Control/Quality Assurance References 13 Tables 1 Soil Vapor Monitoring Schedule 2 Groundwater Monitoring Well Sampling Schedule Figure 1 Proposed System Location and Monitoring Network Appendices A Maintenance Checklist B Oxygen Injection Operation and Maintenance Log (Typical) H:\WPROC\Project\KEYSPAN\Halesite\OMM Plan\Final \HalesiteOMMPlan.doc i

3 Abbreviations and Acronyms EC ELAP EPA GEI HPC LIPA MGP msl NAPL NGRID NYSDEC NYSDOH PAH PID O&M OM&M OVM SOP TAL VOC Engineering Controls Environmental Laboratory Approval Program United States Environmental Protection Agency GEI Consultants, Inc. Heterotrophic Plate count Long Island Power Authority Manufactured Gas Plant mean sea level Non-Aqueous Phase Liquid National Grid New York State Department of Environmental Conservation New York State Department of Health Polycyclic Aromatic Hydrocarbon Photoionization Detector Operations and Maintenance Operations, Maintenance and Monitoring Organic Vapor Monitor Standard Operating Procedure Target Analyte List Volatile Organic Compound MEASUREMENTS ppm Parts Per Million ii

4 1. Introduction This Operations, Maintenance, and Monitoring (OM&M) Plan details the operation, maintenance and monitoring plans for the proposed oxygen injection system in the Lowland Area of the Halesite Former Manufactured Gas Plant (MGP) Site located in Halesite, Suffolk County, New York (Site). This OM&M Plan is prepared and provided in accordance with the requirements of the New York State Department of Environmental Conservation (NYSDEC) comment letter dated March 5, The Halesite former MGP (also known as the Huntington MGP) is believed to have initiated operations around 1892 and continued to operate through approximately Structures that had been used for the manufacture of gas were later dismantled and removed from the Site. Following the merger between Long Island Lighting Company and the Brooklyn Union Gas Company, the Halesite former MGP site became the property of Long Island Power Authority (LIPA) due to the presence of the electric substation facility. Additional details regarding the history of the site are provided in the December 2002 Remedial Investigation Report. The Site is about 1-acre in size and is located along North New York Avenue, approximately 200 feet east of Huntington Harbor. An active LIPA electric substation is located on the western third, or Lowland Area, of the Site. The remaining eastern two thirds of the property, or Upland Area, is undeveloped land that is characterized by a steep slope that was formerly heavily vegetated, but was cleared and stabilized with new plantings during site remediation. The surrounding area is primarily residential with a mixture of commercial properties along New York Avenue. The topography of the Site is relatively flat around the existing electric substation in the Lowland Area. The undeveloped Upland portion of the site rises sharply eastward from approximately 20 feet to 60 feet above mean sea level (msl) and continues to slope upward to a highpoint near the northeast corner of the property. The elevation of the Site ranges from about 16 feet above msl near the western boundary of the site in the Lowland Area to approximately 86 feet above msl at the eastern boundary of the Site in the Upland Area. An oxygen injection system will be installed in the Lowland Area to treat groundwater contamination from residual soil contamination that cannot be excavated due to the accessibility issues associated with the steep slopes in the Upland Area and the active electrical substation in the Lowland Area. Oxygen injection enhances the biological degradation of organic contaminants, including petroleum hydrocarbons, by increasing dissolved oxygen concentrations in groundwater to stimulate the growth of indigenous aerobic microbes that degrade these contaminants. Oxygen injection is suitable for shallow 1

5 groundwater conditions or areas with nearby sensitive receptors since there is no generation of hazardous vapors. This OM&M Plan details the engineering controls (EC) put in place within the Lowland Area of the Site. ECs are defined as the remediation systems or structures intended to treat or facilitate treatment of soil and groundwater impacted with MGP-related compounds. Performance monitoring for the EC will include assessments of their impacts to soil vapor and the groundwater throughout the Site. These monitoring plans are detailed in this OM&M Plan and are intended to evaluate and monitor the effectiveness and performance of the EC. Finally, this OM&M Plan will describe the operation and maintenance plans for the EC. 2

6 2. Lowland Area Oxygen Injection System 2.1 Engineering Control Plan Identification/Statement of Engineering Controls (EC) An oxygen injection system distributing oxygen to six separate oxygen injection banks will be installed as the primary engineering control within the Lowland Area. The system will inject oxygen gas at a pulsed rate into the groundwater at various depths through injection lines. These injection lines are constructed to traverse the groundwater plume s flow path and to provide treatment surrounding the LIPA substation. The injected oxygen will create an aerobic environment or treatment zone within the Lowland Area. This environment will stimulate the growth of the native aerobic bacteria and facilitate the biodegradation of the MGP-related contaminant mass as it passes through the treatment zone. Therefore, the oxygen injection system will hasten the reduction of the contaminant mass in the groundwater. 2.2 Performance Monitoring Plan Soil Vapor and Ambient Air Monitoring The following soil vapor sampling and frequency protocol will be followed to monitor the performance of the proposed oxygen injection system. The sampling protocol for the oxygen injection system may be modified if directed by NYSDEC. Soil vapor sampling protocol will be at a minimum: Prior to system start-up, at least one complete pre-injection round of soil vapor will be collected from all permanent soil vapor monitoring points in the immediate vicinity of the oxygen injection line. During the first day of system start-up, soil vapor samples will be collected from targeted locations twice per day. One of the two sets of samples will be collected immediately prior to system start-up. The second set will be collected during the first injection cycle. Targeted locations will be those soil vapor monitoring points located near or at the oxygen injection points. The locations of the soil vapor monitoring points are summarized in Table 1 and depicted on Figure 1. During Weeks 1-4 of the system start-up period, soil vapor samples will be collected from the targeted soil vapor monitoring point locations twice per week. 3

7 After the completion of the first four weeks of system operation, the frequency of soil vapor monitoring for the targeted soil vapor monitoring point locations may be reduced to quarterly sampling based on review of analytical sampling results and NYSDEC approval. All soil vapor samples will be analyzed for volatile organic compounds (VOCs) and Naphthalene via Modified United States Environmental Protection Agency (EPA) Method TO-15 by a New York State Department of Health (NYSDOH) Environmental Laboratory Approval Program (ELAP)-certified laboratory. The samples will also be analyzed for Helium and Carbon Dioxide. Samples will be submitted for expedited turn-around time of one week. Soil vapor analytical results will be tabulated prior to validation and transmitted to the NYSDEC and NYSDOH as soon as the data is available. Approximately four weeks after system start-up, NYSDEC and NYSDOH will review the available soil vapor data. Preliminary data, including the baseline and first two weeks of the oxygen injection system operation, will be provided within three weeks of system startup. The laboratory turnaround time accommodates this reporting schedule. If no indications of elevated soil vapor concentrations are observed at any sampling event, then soil vapor sampling will continue according to protocol unless otherwise directed by NYSDEC. Elevated soil vapor concentrations are defined as concentrations above the NYSDOH 95 th percentile concentration for outdoor air or concentrations above pre-start-up data. If elevated soil vapor concentrations are observed after any sampling event, then the data will be compared to the data collected prior to system start-up. This comparison will be conducted to determine if the elevated concentrations are indicative of background concentrations and to identify any potential data trends. If the comparison indicates that the concentrations are background related, then no further action is required. However, if the concentrations do not appear related to background, both the soil vapor point and the background soil vapor point will be re-sampled and analyzed with an expedited laboratory sample turnaround time. The system will be temporarily shut down as soon as the additional samples are collected and will remain down until the analytical results have been received and transmitted to the NYSDEC and NYSDOH. The results of the re-sampling will be transmitted to the NYSDEC and NYSDOH upon receipt and appropriate measures may be taken to mitigate the soil vapor issue. This may include: Temporarily shut-down of the system and additional re-sampling Conduct a soil vapor intrusion sampling event in any occupied property immediately adjacent to the soil vapor sample location (if any) 4

8 A photoionization detector (PID) or similar organic vapor monitor (OVM) will be used to collect real-time data from one permanent soil vapor point at or near the point of injection during the system start-up period. Per NYSDEC recommendation, a 15-minute time weighted average trigger of 5 parts per million (ppm) over background total VOCs would require a temporary shutdown of the system. Background VOC levels would be determined based on a statistical review of PID readings from soil vapor sampling rounds prior to system start-up. The system may be restarted once the PID readings return to within 5 ppm of background. The permanent soil vapor point sample schedule is summarized in Table 1 for the oxygen injection system, and their locations are detailed on Figure 1. Soil Vapor Sampling procedures are outlined below. The permanent soil vapor points will not be sampled or purged for a minimum of 24 hours after installation. The purge rate shall not exceed 0.2 liters per minute. A suction pump will be used to remove a minimum of three implant/vapor screen volumes from the permanent soil vapor points prior to sampling. Samples will be collected in an individually laboratory certified clean SUMMA canister (or equivalent) using a flow controller. The flow rate will not exceed 0.2 liters per minute. A helium tracer gas will be used to identify any potential migration or short circuiting of ambient air during sampling. All analysis will be performed by a laboratory that holds a current ELAP certification for the appropriate analyte and environmental matrix combinations. All laboratory analytical data will be validated by a data validation professional in accordance with the EPA Contract Laboratory Program National Functional Guidelines for Organic Data Review, January 2005 and the EPA Region II Standard Operating Procedure (SOP) for the Validation of Organic Data modified to accommodate the EPA Method TO-15 and natural gas analysis by ASTM D Groundwater Monitoring The following groundwater sampling and frequency protocol will be followed to monitor the performance of the proposed oxygen injection system. NYSDEC requires that targeted groundwater monitoring wells need to be sampled before system start-up and then once per month (monthly) for three months, thereafter. Following the three-month period after startup, NYSDEC may reduce the sampling frequency to quarterly. Otherwise, sampling of the targeted wells will proceed monthly. The analytical results and field measurements will be 5

9 used to evaluate the performance of the oxygen injection system. Specifically, the data set is focused on monitoring the aerobic environments created by the oxygen injection lines and the bioactivity of the aquifer. The groundwater samples collected from targeted monitoring wells prior to system start-up will be analyzed for: VOCs via EPA Method 8260 Polycyclic aromatic hydrocarbons (PAHs) via EPA Method 8270 Sulfate via EPA Method Total Sulfide via EPA Method Nitrogen via EPA Method Nitrate/Nitrite via EPA Method Ammonia via EPA Method Target analyte list (TAL) (23) Metals Phosphate via EPA Method 3651 Heterotrophic Plate count (HPC) via ASTM Method 9215B Dissolved Carbon Dioxide via ASTM Method 4500CO2D The groundwater samples collected monthly after system start-up from the targeted monitoring wells will begin one to two weeks after the system is turned on. These samples will be analyzed for: VOCs via EPA Method 8260 PAHs via EPA Method 8270 HPC via ASTM Method 9215B (during the first three months of operation only) The targeted groundwater samples collected on a quarterly basis after system start-up, per NYSDEC approval, will be analyzed for: VOCs via EPA Method 8260/624 PAHs via EPA Method 625/8270 Sulfate via EPA Method Total Sulfide via EPA Method Nitrogen via EPA Method Nitrate/Nitrite via EPA Method Ammonia via EPA Method TAL (23) Metals Phosphate via EPA Method 3651 HPC via ASTM Method 9215B Dissolved Carbon Dioxide via ASTM Method 4500CO2D 6

10 The remaining monitoring wells that were not sampled in association with an oxygen injection system start-up will be collected according to its current quarterly sampling schedule. These samples will be analyzed for: VOCs via EPA Method 8260 PAHs via EPA Method 8270 All samples will be collected using low-flow sampling methods. During sample collection, several field parameters will be collected and utilized as additional performance metrics. These field parameters include at a minimum: Dissolved Oxygen Oxidation-Reduction Potential ph conductivity The proposed monitoring well sampling schedule for the oxygen injection system is summarized in Table 2 and the monitoring well locations are detailed on Figure 1. National Grid (NGRID) will report the results of the pre-startup and first monthly sampling event to the NYSDEC in a Remediation System Startup Summary 45 days after the monthly sample results are received and validated. Subsequent sample results will be reported as available in the quarterly OM&M reports as further discussed in Section System Operation and Maintenance Plan The system operation and maintenance (O&M) plan will be focused on ensuring the oxygen injection system is operating according to design and manufacture. This includes inspecting the integrity of the injection lines, injection points, oxygen generating equipment and machinery. More specifically, the primary objectives of O&M tasks will be focused on the following: Inspect the oxygen injection system and all of its components (i.e. oxygen generator, air compressor, etc.). Inspections will ensure the remediation equipment is performing as designed (injection rates, cycles, and pressures; injected oxygen concentrations, etc.). Inspection of the remote communication abilities with the remediation systems will be checked weekly throughout the duration of the system s operation. Perform routine operation and maintenance on the mechanical equipment per manufacture s instruction. 7

11 Measure and record system injection parameters. Compare these parameters to the monitoring data generated by the activities described in subsections 2.2 and 2.3. Based on this data comparison, the injection system may be adjusted to optimize its performance. Record operational and monitoring data, as well as major system adjustments (e.g., an increase or decrease in oxygen injection cycle rates) for documentation in the quarterly OM&M reports. Monitor the purity of the oxygen being manufactured by the system and subsequently injected into the groundwater. These objectives are described in more detail below. In order to accomplish the objectives of the post construction operation and monitoring program, the schedule and tasks described below will be followed. A binder that contains manuals provided by the equipment manufacturers will be stored in each equipment enclosure for as-needed reference during performance of the O&M activities System Operation and Maintenance Schedule During the first week of system start-up, O&M activities will be performed daily. For the rest of the first month of operation, O&M activities will be performed weekly. Following the first month of operation, O&M activities will be performed monthly. If needed, system adjustment and maintenance of fluid levels, lubrication, filtration units, and connectors will be performed during each site visit. Full maintenance of the mechanical components of the oxygen injection system will be performed every six months or as recommended by the equipment manufacturers Operation and Maintenance for Mechanical Systems O&M tasks for the mechanical components include system inspection, data recording, and field measurements. During each O&M inspection visit, the following tasks will be performed: Inspection of the system enclosure and mechanical equipment for security problems (i.e., vandalism, system damage, operating anomalies, equipment or conveyance malfunction, connection integrity, power outages, or environmental effects). Inspection of fluid levels, filter conditions, connectors, and timer settings. Recording of Airsep Oxygen Generator, Kaesar Compressor, and Pulse Cycle Timer settings and/or readings. Recording of the Oxygen Purity from the Oxygen Feed Tank. 8

12 Documentation of the inspection results on the field log form. Samples of a maintenance checklist and O&M Log Sheet are included in Appendix A and Appendix B of this O&M Plan. Approximately every six months, or as recommended by the equipment manufacturers, additional maintenance tasks will be performed on the oxygen injection mechanical equipment. These tasks will include changing out air and oil filters, replacing gaskets on the filter housings, and replacing lubricating oils used in the mechanical equipment. In addition, valves, motors, and belts will be checked to ensure that they are in good condition and additional maintenance will be performed if warranted. Used lubricating oils and oil filters will be taken to an off-site recycling facility for proper disposal. Air filters and gaskets replaced during system maintenance will be disposed of as solid waste Operation and Maintenance for the Injection Wells O&M tasks for the injection wells are minimal because there are no mechanical components. During each monthly inspection visit, the following tasks will be performed: Record oxygen injection pressures and flow rates for each of the injection wells that are connected to the injection manifold in the system enclosure. Document the inspection results in a field book and on the field log form. During the O&M visits, periodic field adjustments in delivery pressures and flow rates may be needed and will be based upon evaluation of the collected field and groundwater analytical data. In addition, recorded data will be evaluated in the field to determine if there is a problem with any of the injection wells (e.g., any injection well with high flow rates but lower than expected pressures may have leaks) Tools and Spare Parts All tools required for the O&M tasks will be stored in the oxygen injection equipment enclosure. One complete set of spare parts used in the six-month maintenance tasks (e.g., oil, filters, and gaskets) will be obtained from the equipment vendors and stored in the system enclosure. These spare parts will be available at all times in case repairs are required during any of the O&M site visits. An additional set will be ordered prior to performance of the six month maintenance tasks so that they can be available for future site visits. 9

13 Personal protective equipment, (e.g., gloves, earplugs), will be maintained in the system enclosure for use during the site visits. Housekeeping supplies, (e.g., towels, broom) will also be stored in the system enclosure so that the working space and equipment can be kept clean and in orderly condition. Used person protective equipment and cleaning supplies will be disposed of as solid waste System Shutdown and Restart The oxygen injection system is equipped with a pressure sensor on the outlet of the receiver tank attached to the compressor. If the system shuts down, pressure in the compressor tank will drop and the sensor will activate telemetry that will be programmed to contact the system operator. The telemetry is also interfaced with the digital output of the compressor unit allowing for remote access to system information. Following notification of shutdown, the operator will go to the system enclosure location to determine the cause of the shutdown and make the system operational, if possible. Specialized support from the remedial system or equipment vendors may be needed and this will be arranged if needed. 2.4 Non-Aqueous Phase Liquid Monitoring and Potential Recovery The 13 passive non-aqueous phase liquid (NAPL) recovery wells, installed on the perimeter of the Lowland, will be monitored for the presense of NAPL. The locations of the NAPL recovery wells are depicted on Figure 1. The passive recovery wells will be gauged for the presense of NAPL twice per week for Weeks 1-4 of system startup. The gauging will be conducted concurrent with the soil vapor sampling (described in subsection 2.2.1). The NAPL gauging will be conducted using an interface probe. The interface probe will be decontaminated between wells. If NAPL is encountered, attempts will be made to recover it, to the extent feasible. The NAPL recovery may involve bailing or pumping. The product will be transferred to DOT-approved 55- gallon drums, and staged on site for appropriate subsequent disposal. The NAPL gauging and recovery information (including thickness, volume recovered, time and date, and other pertinent information) will be recorded in a dedicated field notebook and transcribed onto a well gauging information sheet. The NYSDEC will be immediately notified if trace or recoverable product is observed in any of the recovery wells. If warranted, based on the findings of this 4-week gauging, a long term NAPL monitoring and recovery program will be coordinated between NYSDEC and NGRID. The well gauging sheets will be provided to NYSDEC on, at the least, a weekly basis. 10

14 3. Long-term Groundwater Monitoring Long-term groundwater monitoring will consist of the monitoring conducted as part of the existing quarterly groundwater monitoring program along with the groundwater monitoring conducted as part of the oxygen injection performance monitoring described in subsection The specific wells for each of these programs are identified in Table 2 and the well locations are depicted in Figure 1. The scope of each program will be evaluated on at least an annual basis. Any recommendations for modifications to the monitoring program will be provided to the NYSDEC and NYSDOH for approval. 11

15 4. Quality Control/Quality Assurance Duplicate samples, matrix spike/matrix spike duplicates, and field blanks will be collected for all soil and groundwater samples. A minimum of one duplicate sample, one matrix spike/matrix spike duplicate, and one field blank will be collected for every twenty samples collected. Trip blanks will be included with each data set submitted to the laboratory. Following the completion of soil vapor and monitoring well sampling, the analytical results will be validated by qualified data validation professionals in accordance with EPA Contract Laboratory Program National Functional Guidelines for Organic Data Review, January 2005 and the EPA Region II SOP for the Validation of Organic Data acquired using SW B and 8270C, modified to accommodate the SW-846 methodologies. 12

16 5. References Dvirka and Bartilucci (D&B), December 2002, Halesite Former Manufactured Gas Plant Site Remedial Investigation Report. New York State Department of Health, 2005, Guidance for Evaluating Soil Vapor Intrusion in the State of New York, revised April svi_guidance/index.htm New York State Department of Environmental Conservation, December Draft DER-10 Technical Guidance for Site Investigation and Remediation. Vanasse Hangen Brustlin, Inc. (VHB), April Halesite Former Manufactured Gas Plant Site Final Remedial Investigation Report, Town of Huntington, New York. GEI Consultants, Inc. (GEI), March 2006, Halesite former Manufactured Gas Plant Site Remedial Action Plan. AKRF Engineering P.C., February 2008, Remedial Design Work Plan, Halesite Former Manufactured Gas Plant Site. 13

17 Tables

18 Table 1 Soil Vapor Monitoring Schedule Operations, Maintenance and Monitoring Plan Halesite Former MGP Site Halesite, New York Monitoring Well ID Pre-System Start-up Twice Daily Sampling (Day 1) Daily Sampling (Day 3-5) Weekly Sampling (Week 2-4) Quarterly Sampling Total Samples Collected in Year 1 Location Proposed Permanent Soil Vapor Point SG-1 1 2* 1 6 3** 13 Southern Injection Line SG-2 1 2* 1 6 3** 13 Southern Injection Line SG-3 1 2* 1 6 3** 13 Southern Injection Line SG-4 1 2* 1 6 3** 13 Southern Injection Line SG-5 1 2* 1 6 3** 13 Northern Injection Line SG-6 1 2* 1 6 3** 13 Northern Injection Line SG-7 1 2* 1 6 3** 13 Northern Injection Line SG-8 1 2* 1 6 3** 13 Northern Injection Line Notes: * - First round of samples will be collected immediately prior to system start-up. The second round of samples will be collected after one complete injection cycle. ** - Soil vapor sampling frequency may move to quarterly with approval from NYSDEC. All samples will be analyzed using Modified TO-15 including Naphthalene and C02. A duplicate sample will be collected for every 20 samples for QA/QC. Page 1 of 1 H:\WPROC\Project\KEYSPAN\Halesite\OMM Plan\Final \Table 1 and 2 Halesite OMM.xls

19 Table 2 Groundwater Monitoring Well Sampling Schedule Operations, Maintenance and Monitoring Plan Halesite Former MGP Site Halesite, New York Monitoring Well ID Screen Interval (Feet bgs) Pre-System Start-up Monthly VOC, PAH and HPC Sampling Quarterly Performance Sampling Quarterly VOC and PAH Sampling Total Samples Collected in Year 1 Performance Monitoring Wells HHMW-05S1-R * 3 3* -- 7 HHMW-05S2-R * 3 3* -- 7 HHMW-16S * 3 3* -- 7 HHMW-16S * 3 3* -- 7 HHMW-17S * 3 3* -- 7 HHMW-17S * 3 3* -- 7 HHMW-18S * 3 3* -- 7 HHMW-18S * 3 3* -- 7 HHMW-19S * 3 3* -- 7 HHMW-19S * 3 3* -- 7 HHMW-20S * 3 3* -- 7 HHMW-20S * 3 3* -- 7 HHMW-21S * 3 3* -- 7 HHMW-21S * 3 3* -- 7 HHMW-22S * -- 3* -- 4 HHMW-22S * -- 3* -- 4 HHMW-15S Supplemental Monitoring Wells (sampled as part of existing Quarterly Monitoring Program) MW Q MW Q HHMW-04I Q HHMW-06S Q HHMW-06S Q HHMW-06I Q HHMW-07S1 3-8 Q HHMW-07S Q HHMW-07I Q HHMW-07D HHMW-08S 2-12 Q HHMW-08I HHMW-09S Q HHMW-09S Q HHMW-09I Q HHMW-09D Q HHMW-11S 3-13 Q HHMW-11I Q HHMW Q HHMW Q Notes: 1) * Samples will be analyzed for VOCs, PAHs, Sulfate, Sulfide, Nitrogen, Nitrate/Nitrite, Ammonia, TAL (23) Metals, Phosphate, Heterotrophic Plate Count (HPC), and Dissolved Carbon Dioxide. 2) HHMW-15S, HHMW-22S1, HHMW-22S2 will not be sampled as part of the monthly monitoring due to the property access restrictions. Page 1 of 1 H:\WPROC\Project\KEYSPAN\Halesite\OMM Plan\Final \ Table 1 and 2 Halesite OMM.xls

20 Figure

21

22 Appendix A Maintenance Checklist

23 Maintenance Checklist 1) Inspect site enclosure and landscaping, record condition of fencing and landscaping noting any vandalism or other problems. Also record any corrective actions or contacts made to initiate corrective actions. 2) Inspect trailer (interior and exterior) and mechanical equipment, record condition of trailer and the presence of any problems with mechanical equipment (e.g., oil leaks). Also record any corrective actions or contacts made to initiate corrective actions. 3) Perform operation and maintenance tasks and list observations on Oxygen Injection Operation and Maintenance Log Sheet. 4) Record system condition when leaving the site (e.g., trailer and enclosure locked, trash removed from interior and exterior of trailer, whether or not the system is functioning, and any abnormal site conditions).

24 Appendix B Oxygen Injection Operation and Maintenance Log (Typical)

25 OXYGEN INJECTION OPERATION AND MAINTENANCE LOG Halesite Former Manufactured Gas Plant Site Oxygen Injection Remedial System National Grid Corporation Project No Date: Time: Weather: Inside Trailer Temperature: Performed By: O 2 Generator (AirSep AS-E PSA) Compressor (Kaesar Rotary Screw) Hours Compressor Tank * (psi) Feed Air Pressure * (psi) (readings below are made from control panel) Delivery Air (psi) Cycle Pressure * (psi) Element Outlet Temperature ( o F) Dewpoint Oxygen Receiver Pressure * Running Hours (hours) (psi) Loading Hours (hours) Oxygen Receiver Tank Pressure Motor Starts (reading from blue tank) Regular Hours (hours) (psi) Maximum Pressure (psi) Oxygen Purity (percent) * maximum reading during loading cycle * maximum reading during loading cycle Injection Bank 1 Injection Bank 2 Injection Bank 3 Depth scfh psi Depth scfh psi Depth scfh psi Point 1 - Point 9 - Point 17 - Point 2 - Point 10 - Point 18 - Point 3 - Point 11 - Point 19 - Point 4 - Point 12 - Point 20 - Point 5 - Point 13 - Point 21 - Point 6 - Point 14 - Point Point 7 - Point 15 - Point 23 - Point 8 - Point 16 - Point 24 - Comments: Page 1 of 3 H:\WPROC\Project\KEYSPAN\Halesite\OMM Plan\Final \ Generic Monthly System O&M Log.xls

26 Date: OXYGEN INJECTION OPERATION AND MAINTENANCE LOG Injection Bank 4 Injection Bank 5 Injection Bank 6 Depth scfh psi Depth scfh psi Depth scfh psi Point 25 - Point 33 - Point 41 - Point 26 - Point 34 - Point 42 - Point 27 - Point 35 - Point 43 - Point 28 - Point 36 - Point 44 - Point 29 - Point 37 - Point 45 - Point 30 - Point 38 - Point 46 - Point 31 - Point 39 - Point 47 - Point 32 - Point 40 - Point 48 - Comments: OPERATIONAL NOTES GA5 Air Compressor 1) Oil Level Checked with system unloaded* Yes No * Unload system, wait until Delivery Air Pressure is less than 9 psi 2) Oil Level with system unloaded Low (red) Normal (green) High (orange) 3) Oil added Yes No 4) Oil changed Yes No 5) Oil filter changed Yes No 6) Air filter Changed Yes No 7) Oil separator changed Yes No 8) Terminal strips checked Yes No AS-80 O 2 Generator 1) Prefilter changed Yes No 2) Coalescing changed Yes No Page 2 of 3 H:\WPROC\Project\KEYSPAN\Halesite\OMM Plan\Final \ Generic Monthly System O&M Log.xls

27 Date: OXYGEN INJECTION OPERATION AND MAINTENANCE LOG Halesite Former MGP Site GENERAL SYSTEM NOTES Trailer 1) Performed general housekeeping (i.e. sweep, collect trash inside and out, etc.) Yes No 2) Abnormal conditions observed (e.g. vandalism) 3) Other major activities completed 4) Supplies needed 5) Visitors Record routine activities such as any alarm/shutdowns, sampling, maintenance, material transported off-site, oil/filter/gasket and/or any other abnormal operating conditions: Action Items Page 3 of 3 H:\WPROC\Project\KEYSPAN\Halesite\OMM Plan\Final \ Generic Monthly System O&M Log.xls

Street Address (number and street): City: County: ZIP Code: B. CURRENT SITE PRIORITY INFORMATION Was free product present this quarter?

Street Address (number and street): City: County: ZIP Code: B. CURRENT SITE PRIORITY INFORMATION Was free product present this quarter? QUARTERLY MONITORING REPORT (QMR) COVER SHEET AND REPORT FORMAT State Form 56087 (6-16) 329 IAC 9-5 Indiana Department of Environmental Management Office of Land Quality Leaking Underground Storage Tank

More information

SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: PREPARED BY:

SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: PREPARED BY: SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: FLOWER CITY MANAGEMENT & DEVELOPMENT THE MEDICAL ARTS BUILDING (USGBC

More information

Site Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point

Site Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point Site Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point Prepared for Maryland Port Administration 2310 Broening Highway Baltimore, MD 21224 (410) 631-1022 Maryland

More information

BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS

BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS DRAFT ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS PREPARED BY: Office of Sustainability

More information

RELEASE TRACKING NUMBER 4-19466 December 2010. Prepared For: New England Gas Company P.O. Box 911 Fall River, Massachusetts 02722.

RELEASE TRACKING NUMBER 4-19466 December 2010. Prepared For: New England Gas Company P.O. Box 911 Fall River, Massachusetts 02722. RELEASE ABATEMENT MEASURE COMPLETION REPORT REGULATOR DECOMMISSIONING AND WATER SERVICE LINE REPAIR 120 CHARLES STREET FALL RIVER, MASSACHUSETTS RELEASE TRACKING NUMBER 4-19466 December 2010 Prepared For:

More information

Presented by: Craig Puerta, PE, MBA December 12, 2012

Presented by: Craig Puerta, PE, MBA December 12, 2012 Presented by: Craig Puerta, PE, MBA December 12, 2012 Established in 2010 under charter from New York State to transfer lower priority sites from State s program. First municipally-run brownfield cleanup

More information

STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS TECHNICAL GUIDANCE DOCUMENT - 008

STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS TECHNICAL GUIDANCE DOCUMENT - 008 STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS TECHNICAL GUIDANCE DOCUMENT - 008 Effective Date - January 13, 1992 Revised Date - November 19, 1993

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION 1000 FRENCH STREET SITE Wilmington, Delaware DE 1115 June 1999 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation

More information

APPENDIX B. Magna Reservoir Leak Detection & Water Quality Sampling Plan (Revised June 2011)

APPENDIX B. Magna Reservoir Leak Detection & Water Quality Sampling Plan (Revised June 2011) APPENDIX B Magna Reservoir Leak Detection & Water Quality Sampling Plan (Revised June 2011) 1.0 Introduction The Magna Reservoir System, located in the North Concentrator facilities area, acts as a central

More information

Ambient Air Monitoring at Deployment Locations in the Middle East

Ambient Air Monitoring at Deployment Locations in the Middle East Ambient Air Monitoring at Deployment Locations in the Middle East Presented by: John E. Kolivosky, P.E. 01 May 2015 DISCLAIMERS The views expressed in this presentation are those of the author and do not

More information

Facilities Maintenance Standards rev 9-1-2015

Facilities Maintenance Standards rev 9-1-2015 Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will

More information

Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015

Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015 Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015 Underground Injection Control Program 700 NE Multnomah Street Suite 600 Portland, OR 97232 Phone: 503-229-6371 800-452-4011

More information

BP Texas City Refinery

BP Texas City Refinery BP Texas City Refinery ENVIRONMENTAL STATEMENT FOR YEAR 2010 (Review of Y2009 Performance) Introduction Recognizing the complex nature of petroleum refining operations and to ensure that we meet our stated

More information

COST AND PERFORMANCE REPORT

COST AND PERFORMANCE REPORT COST AND PERFORMANCE REPORT Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon September 1998 Prepared by: SITE INFORMATION Identifying Information: United

More information

Site Description and History

Site Description and History 3130 Southwest 17 th Street Pembroke Park, Florida County: Broward District: Southeast Site Lead: EPA Placed on National Priorities List: July 22, 1987 HWC # 023 Site Description and History The Petroleum

More information

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND

More information

Bioremediation of contaminated soil. Dr. Piyapawn Somsamak Department of Environmental Science Kasetsart University

Bioremediation of contaminated soil. Dr. Piyapawn Somsamak Department of Environmental Science Kasetsart University Bioremediation of contaminated soil Dr. Piyapawn Somsamak Department of Environmental Science Kasetsart University Outline Process description In situ vs ex situ bioremediation Intrinsic biodegradation

More information

In-Situ Remediation Strategies as Sustainable Alternatives to Traditional Options. Ryan Bernesky, B.Sc., P.Ag. February 26, 2013

In-Situ Remediation Strategies as Sustainable Alternatives to Traditional Options. Ryan Bernesky, B.Sc., P.Ag. February 26, 2013 In-Situ Remediation Strategies as Sustainable Alternatives to Traditional Options Ryan Bernesky, B.Sc., P.Ag. February 26, 2013 Outline Introduction to Contaminated Sites and Remediation Strategies In-Situ

More information

N O T E S. Environmental Forensics. Identification of Natural Gas Sources using Geochemical Forensic Tools. Dispute Scenarios

N O T E S. Environmental Forensics. Identification of Natural Gas Sources using Geochemical Forensic Tools. Dispute Scenarios Environmental Forensics N O T E S V o l u m e 2 9 Identification of Natural Gas Sources using Geochemical Forensic Tools By Paul Boehm, Ph.D. and Tarek Saba, Ph.D. F o r m o r e i n f o r m a t i o n o

More information

AESTHETIC AND NOISE CONTROL REGULATIONS

AESTHETIC AND NOISE CONTROL REGULATIONS AESTHETIC AND NOISE CONTROL REGULATIONS 801. INTRODUCTION The rules and regulations in this section are promulgated to control aesthetics and noise impacts during the drilling, completion and operation

More information

San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil

San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil INTRODUCTION San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil This guidance relates to the on-site reuse of non-hazardous petroleum hydrocarbon impacted

More information

U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist

U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist Installation Name Site Name / I.D. Evaluation Team Site Visit Date This checklist is meant to aid in evaluating

More information

History of the SPCC Rule

History of the SPCC Rule 2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally

More information

FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001

FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001 FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001 I. INTRODUCTION Section 121(c) of the Comprehensive Environmental Response, Compensation and Liability Act

More information

Waste Handling & Disposal

Waste Handling & Disposal Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended

More information

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE (Adopted January 6, 1978)(Amended August 3, 1979)(Amended July 11, 1980) (Amended August 3, 1990)(Amended December 7, 1990) (Amended November 17, 2000) RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN

More information

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012 DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines

More information

Imagine the result. First Quarter 2009 Corrective Action Progress Report. Lockheed Martin Corporation

Imagine the result. First Quarter 2009 Corrective Action Progress Report. Lockheed Martin Corporation Imagine the result Lockheed Martin Corporation First Quarter 2009 Corrective Action Order on Consent Index Number: 6-20080321-5 Solvent Dock Area Former Lockheed Martin Facility Utica, New York April 2009

More information

Spill Prevention, Control & Cleanup SC-11

Spill Prevention, Control & Cleanup SC-11 Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Spills and leaks, if not properly controlled, can adversely impact the storm drain system and receiving waters. Due to

More information

Standard Hydraulic Piping Flushing Procedure

Standard Hydraulic Piping Flushing Procedure Page 1 of 6 1.0 Scope This procedure covers the minimum technical requirements for cleaning and flushing of Hydraulic and Piping, and related accessories. 2.0 Introduction In hydraulic fluid power systems,

More information

Bioremediation of Petroleum Contamination. Augustine Ifelebuegu GE413

Bioremediation of Petroleum Contamination. Augustine Ifelebuegu GE413 Bioremediation of Petroleum Contamination Augustine Ifelebuegu GE413 Bioremediation Bioremediation is the use of living microorganisms to degrade environmental contaminants in the soil and groundwater

More information

ATTACHMENT 12 CONTAINERS

ATTACHMENT 12 CONTAINERS ATTACHMENT 12 CONTAINERS Attachment 12 - Page 1 Table of Contents Table of Contents List of Tables List of Acronyms 12.1 Applicability 12.2 Description of 12.3 Reserved 12.4 Reserved 12.5 Description of

More information

Vapor Intrusion Pathway: A Practical Guideline

Vapor Intrusion Pathway: A Practical Guideline Vapor Intrusion Pathway: A Practical Guideline John Boyer New Jersey Dept. of Environmental Protection November 2009 2 ITRC Shaping the Future of Regulatory Acceptance Host organization Network State regulators

More information

Validation of process gas systems

Validation of process gas systems Validation of Process Gas Systems By Jeff Hargroves Alza Corporation Validation of process gas systems involve documenting the expected system behavior, and verifying that the system performs as expected.

More information

Treatment options for hydrogen sulfide. Testing for hydrogen sulfide

Treatment options for hydrogen sulfide. Testing for hydrogen sulfide Sometimes hot water will have a sour smell, similar to that of an old damp rag. This smell often develops when the thermostat has been lowered to save energy or reduce the potential for scalding. Odor-causing

More information

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS BAY AREA AIR QUALITY MANAGEMENT DISTRICT RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS (ADOPTED: January 17, 1979) (AMENDED: November 1, 1989; October 6, 1993; June 15, 1994;

More information

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.

More information

Guide to the Remediation Report & Fee Submission Form

Guide to the Remediation Report & Fee Submission Form Guide to the Remediation Report & Fee Submission Form May 1, 2012 TABLE OF CONTENTS 1 DEFINITIONS... 1 2 INTRODUCTION... 3 3 BACKGROUND... 3 3.1 EXISTING POLICY/GUIDELINES FRAMEWORK... 3 Domestic Fuel

More information

MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration)

MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration) MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration) Van Nuys Fire Station 39 W.O. E170094B The California Environmental Quality Act (CEQA)

More information

Bioremediation. Biodegradation

Bioremediation. Biodegradation Bioremediation A technology that encourages growth and reproduction of indigenous microorganisms (bacteria and fungi) to enhance biodegradation of organic constituents in the saturated zone Can effectively

More information

Spill Plan Reviewer s Guidance

Spill Plan Reviewer s Guidance Spill Plan Reviewer s Guidance WSDOT Hazardous Materials Program May 2013 2 Overview Purpose: Spill prevention planning is a key element for protecting the environment during construction. The Spill Plan

More information

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County FORWARD In 1991, the Broward County Environmental Protection and Growth Management Department, who was then known as the Department of Natural Resource Protection (DNRP), initiated the development of Pollution

More information

State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01

State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01 State of Rhode Island Department of Environmental Management Division of Site Remediation Policy Memo 95-01 Guidelines for the Management of Investigation Derived Wastes 1.0 Purpose The purpose of this

More information

Bioremediation. Introduction

Bioremediation. Introduction Bioremediation Introduction In the twentieth century, the ever increase in the global human population and industrialization led to the exploitation of natural resources. The increased usage of heavy metals

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Quality Assurance Program Quality Assurance Plan Periodic Audits Standard Operating Procedures Preventive Maintenance Outline Quality Assurance Plan (QAP) What is a QAP Why is a QAP required? What does

More information

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills. WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the

More information

Analysis of Brownfields Cleanup Alternatives. Axles & Gears Facility 4808 South 26 th Street Omaha, Nebraska. Prepared For:

Analysis of Brownfields Cleanup Alternatives. Axles & Gears Facility 4808 South 26 th Street Omaha, Nebraska. Prepared For: Analysis of Brownfields Cleanup Alternatives Axles & Gears Facility 4808 South 26 th Street Omaha, Nebraska Prepared For: Metropolitan Area Planning Agency MAPA) 2222 Cuming Street Omaha, Nebraska 68102

More information

Bioremediation of Petroleum Hydrocarbons and Chlorinated Volatile Organic Compounds with Oxygen and Propane Gas infusion

Bioremediation of Petroleum Hydrocarbons and Chlorinated Volatile Organic Compounds with Oxygen and Propane Gas infusion Bioremediation of Petroleum Hydrocarbons and Chlorinated Volatile Organic Compounds with Oxygen and Propane Gas infusion Walter S. Mulica Global Technologies Fort Collins, CO Co-Authors Mike Lesakowski

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland 21230-1719 1-800-633-6101 http://www.mde.state.md.

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland 21230-1719 1-800-633-6101 http://www.mde.state.md. MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland 21230-1719 1-800-633-6101 http://www.mde.state.md.us Colonial Pipeline Dorsey Junction Facility 929 Hood s Mill Road,

More information

DECISION MEMORANDUM FOR ENVIRONMENTAL RESPONSE ACTIONS

DECISION MEMORANDUM FOR ENVIRONMENTAL RESPONSE ACTIONS DECISION MEMORANDUM FOR ENVIRONMENTAL RESPONSE ACTIONS Small Business Liability Relief and Brownfields Revitalization Act United States Environmental Protection Agency CERCLA Section 128(a) State Response

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

GROUNDWATER MONITORING WORK PLAN FOR BOCA CHICA FLYING CLUB WITH TRANSMITTAL LETTER NAS KEY WEST FL 6/3/2003 TETRA TECH NUS

GROUNDWATER MONITORING WORK PLAN FOR BOCA CHICA FLYING CLUB WITH TRANSMITTAL LETTER NAS KEY WEST FL 6/3/2003 TETRA TECH NUS N00213.AR.000585 NAS KEY WEST 5090.3a GROUNDWATER MONITORING WORK PLAN FOR BOCA CHICA FLYING CLUB WITH TRANSMITTAL LETTER NAS KEY WEST FL 6/3/2003 TETRA TECH NUS AIK-03-0121 June 3, 2003 Project Number

More information

1 Quality Assurance and Quality Control Project Plan

1 Quality Assurance and Quality Control Project Plan 1 Quality Assurance and Quality Control Project Plan The purpose of this section is to describe the quality assurance/quality control program that will be used during the system specific field testing

More information

Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination

Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination H. Keith Moo-Young, Professor, Villanova University Ronald Wilhelm, Senior Scientist, U.S. EPA, Office

More information

A Comparison of Two MGP Site Remediation Perimeter Ambient Air Monitoring Programs

A Comparison of Two MGP Site Remediation Perimeter Ambient Air Monitoring Programs A Comparison of Two MGP Site Remediation Perimeter Ambient Air Monitoring Programs Leo J. Gendron ENSR Corporation September 2008 Introduction Presentation Focus Comparison of design specifications and

More information

Sample Management SOP 2v8 Page 1 STANDARD OPERATING PROCEDURE NO. 2 SAMPLE MANAGEMENT REVISION LOG. Revision Number Description Date

Sample Management SOP 2v8 Page 1 STANDARD OPERATING PROCEDURE NO. 2 SAMPLE MANAGEMENT REVISION LOG. Revision Number Description Date Sample Management SOP 2v8 Page 1 STANDARD OPERATING PROCEDURE NO. 2 SAMPLE MANAGEMENT REVISION LOG Revision Number Description Date 2.0 Original SOP 2.1 Revisions by McLemore after field testing 1/3/04

More information

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

Outdoor Storage of Raw Materials SC-33

Outdoor Storage of Raw Materials SC-33 Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.

More information

Risk-Based Decision Making for Site Cleanup

Risk-Based Decision Making for Site Cleanup July 2013 Risk-Based Decision Making for Site Cleanup The Oklahoma Department of Environmental Quality (DEQ) has adopted a risk based decision making process to provide a framework for determining cleanup

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas ACTIVITY NAME Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas CY 2014 BOTTOM LINE UP FRONT To prevent oil discharges

More information

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks. Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some

More information

In-situ Chemical Oxidation via Ozone at a Multiple-Remedy UST Site - 9124

In-situ Chemical Oxidation via Ozone at a Multiple-Remedy UST Site - 9124 ABSTRACT In-situ Chemical Oxidation via Ozone at a Multiple-Remedy UST Site - 9124 Frederic R. Coll and R.A. Moore URS Corporation Foster Plaza 4, Suite 300 501 Holiday Drive Pittsburgh, PA 15220 URS Corporation

More information

Utilizing an Innovative, Effective Site Assessment and Monitoring Tool

Utilizing an Innovative, Effective Site Assessment and Monitoring Tool Utilizing an Innovative, Effective Site Assessment and Monitoring Tool Jay W. Hodny, Ph.D. W. L. Gore & Associates, Inc., Elkton, MD, USA Laurie LaPlante, P.E. Kleinfelder, Inc., Salt Lake City, UT, USA

More information

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer Background San Antonio, the seventh largest city in the United States, covers approximately 515 square miles of Bexar County in south central Texas.

More information

APPROVED. PXP 2009 Tank Leak Detection and Containment at Inglewood Oil Field. Baldwin Hills CSD Conditions L.18. and E.29.e.

APPROVED. PXP 2009 Tank Leak Detection and Containment at Inglewood Oil Field. Baldwin Hills CSD Conditions L.18. and E.29.e. PXP 2009 Tank Leak Detection and Containment at Inglewood Oil Field Baldwin Hills CSD Conditions L.18. and E.29.e. WORKING DRAFT SUBJECT TO CHANGE BASED ON COUNTY REVIEW AND ACCEPTANCE Prepared for: May

More information

STATEMENT OF BASIS HYPERGOL SUPPORT BUILDING SWMU 65 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION KENNEDY SPACE CENTER BREVARD COUNTY, FLORIDA

STATEMENT OF BASIS HYPERGOL SUPPORT BUILDING SWMU 65 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION KENNEDY SPACE CENTER BREVARD COUNTY, FLORIDA STATEMENT OF BASIS HYPERGOL SUPPORT BUILDING SWMU 65 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION KENNEDY SPACE CENTER BREVARD COUNTY, FLORIDA PURPOSE OF STATEMENT OF BASIS This Statement of Basis (SB)

More information

SOP-A13 Spill Prevention, Containment, and Control Measures for Monitoring Well Sampling Standard Operating Procedures for PG&E Topock Program

SOP-A13 Spill Prevention, Containment, and Control Measures for Monitoring Well Sampling Standard Operating Procedures for PG&E Topock Program SOP-A13 Spill Prevention, Containment, and Control Measures for Monitoring Well Sampling Standard Operating for PG&E Topock Program This standard operating procedure (SOP) addresses the procedures and

More information

How To Safely Handle A Spill

How To Safely Handle A Spill WD DWGB 22 6 2010 Best Management Practices for Fueling and Maintenance of Excavation and Earthmoving Equipment Env Wq 401, Best Management Practices for Groundwater Protection, applies to a variety of

More information

APPENDIX 7-B. Hazardous Materials Management Plan

APPENDIX 7-B. Hazardous Materials Management Plan S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT A SSESSMENT APPENDIX 7-B Hazardous Materials Management Plan SX03733 Section 6.0 1.1.1 Hazardous Materials Management Plan 1.1.1.1 Introduction

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

EMERGENCY PETROLEUM SPILL WASTE MANAGEMENT GUIDANCE. Hazardous Materials and Waste Management Division (303) 692-3300

EMERGENCY PETROLEUM SPILL WASTE MANAGEMENT GUIDANCE. Hazardous Materials and Waste Management Division (303) 692-3300 EMERGENCY PETROLEUM SPILL WASTE MANAGEMENT GUIDANCE Hazardous Materials and Waste Management Division (303) 692-3300 First Edition January 2014 This guidance is meant to provide general information to

More information

New Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting

New Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting New Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting Fairview Township, York County, Pennsylvania April 23, 2013 N US Army Corps of Engineers Depot

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Bioremediation of Sandy Soiled, Vegetated Area Contaminated by Oily Floodwaters Aug 2013

Bioremediation of Sandy Soiled, Vegetated Area Contaminated by Oily Floodwaters Aug 2013 Bioremediation of Sandy Soiled, Vegetated Area Contaminated by Oily Floodwaters Aug 2013 Overview: On August 3, an extremely heavy rainstorm fell on a Colorado natural gas processing facility causing flood

More information

Incorporating Greener Cleanups into Remedy Reviews

Incorporating Greener Cleanups into Remedy Reviews Association of State and Territorial Solid Waste Management Officials (ASTSWMO) Incorporating Greener Cleanups into Remedy Reviews Prepared by the Greener Cleanups Task Force Under the Sustainability Subcommittee

More information

Robert D. Trimborn Airport Director Santa Monica Airport

Robert D. Trimborn Airport Director Santa Monica Airport Robert D. Trimborn Airport Director Santa Monica Airport Association of California Airports Conference - September 18, 2009 Noise Air Emissions Ground Support Equipment Alternative Fuels and Green

More information

Focus on Developing Ground Water Cleanup Standards Under the Model Toxics Control Act

Focus on Developing Ground Water Cleanup Standards Under the Model Toxics Control Act Focus on Developing Ground Water Cleanup Standards Under the Model Toxics Control Act from Department of Ecology s Toxic Cleanup Program Background The Washington Department of Ecology (Ecology) adopted

More information

Partnering with Nature for a Cleaner Tomorrow

Partnering with Nature for a Cleaner Tomorrow VERDE ENVIRONMENTAL, INC. HOME OF Emergency Liquid Spill Control Verde Environmental, Inc. 9223 Eastex Freeway Houston, TX 77093 Office: 713.691.6468 Toll Free: 800.626.6598 Fax: 713.691.2331 www.micro-blaze.com

More information

BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT

BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT Butte County Water Advisory Committee Member John Scott Contact Information Phone Number: (530) 533-8394 Email Address: john_lewis_scott@msn.com Description

More information

NSPS Subpart OOOO: Applicability and Compliance Basics

NSPS Subpart OOOO: Applicability and Compliance Basics NSPS Subpart OOOO: Applicability and Compliance Basics Kentucky Oil & Gas Association 2013 Western Kentucky Meeting September 12, 2013 Roy Rakiewicz All4 Inc. Rob Flynn Environmental Standards, Inc. www.all4inc.com

More information

Developing Quality Assurance Project Plans using Data Quality Objectives and other planning tools. Developing QAPPs 5/10/2012 1

Developing Quality Assurance Project Plans using Data Quality Objectives and other planning tools. Developing QAPPs 5/10/2012 1 Developing Quality Assurance Project Plans using Data Quality Objectives and other planning tools 1 Introductions 2 Agenda I. Developing a QAPP II. Systematic Planning using Data Quality Objectives III.

More information

Ammonia Detection System Codes and Design Specifications

Ammonia Detection System Codes and Design Specifications Ammonia Detection System Codes and Design Specifications December 28, 2015 Revision 5 920 N Trade Winds Pkwy Columbia, MO 65201 Ammonia detection system codes and design specifications Following is a discussion

More information

Environmental and Economical Oil and Groundwater Recovery and Treatment Options for hydrocarbon contaminated Sites

Environmental and Economical Oil and Groundwater Recovery and Treatment Options for hydrocarbon contaminated Sites 2014 5th International Conference on Environmental Science and Technology IPCBEE vol.69 (2014) (2014) IACSIT Press, Singapore DOI: 10.7763/IPCBEE. 2014. V69. 15 Environmental and Economical Oil and Groundwater

More information

This example of a completed sampling plan worksheet has been included to illustrate the information

This example of a completed sampling plan worksheet has been included to illustrate the information APPENDIX B EXAMPLE OF A COMPLETED SAMPLING PLAN WORKSHEET This example of a completed sampling plan worksheet has been included to illustrate the information necessary to document a sampling program for

More information

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION GAS WELL/WATER WELL SUBSURFACE CONTAMINATION Rick Railsback Professional Geoscientist CURA Environmental & Emergency Services rick@curaes.com And ye shall know the truth and the truth shall make you free.

More information

Process Safety Management of Highly Hazardous & Explosive Chemicals. Operating Procedures

Process Safety Management of Highly Hazardous & Explosive Chemicals. Operating Procedures Process Safety Management of Highly Hazardous & Explosive Chemicals Operating Procedures Now that the PHA s Are Competed or Underway Operating Procedures & Safety Programs Must Be Developed PHA Information

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant

Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant Michigan Indiana Ohio www.sme-usa.com consultants in the environment, geosciences and materials OVERVIEW Site Description and History

More information

Vapor Intrusion in New York City Greenpoint: The Tip of the Iceberg

Vapor Intrusion in New York City Greenpoint: The Tip of the Iceberg Vapor Intrusion in New York City Greenpoint: The Tip of the Iceberg Lenny Siegel February 2009 For years New York State s environmental agencies have been conducting highprofile vapor intrusion responses

More information

Green Seal Best Practices Guide for Fleet Vehicle Maintenance Operations

Green Seal Best Practices Guide for Fleet Vehicle Maintenance Operations Green Seal Best Practices Guide for Fleet Vehicle Maintenance Operations June 4, 1996 Green Seal, Inc. 1001 Connecticut Ave. NW, Ste 872 Washington, DC USA 20036-5525 (202) 872-6400 FAX (202) 872-4324

More information

COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history.

COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history. Revision History COPY The top row of this table shows the most recent changes to this controlled document. For previous revision history information, archived versions of this document are maintained by

More information

RCRA Corrective Action Environmental Indicator (EI) RCRIS code (CA750) Migration of Contaminated Groundwater under Control

RCRA Corrective Action Environmental Indicator (EI) RCRIS code (CA750) Migration of Contaminated Groundwater under Control Page 1 DOCUMENTATION OF ENVIRONMENTAL INDICATOR DETERMINATION RCRA Corrective Action Environmental Indicator (EI) RCRIS code () Migration of Contaminated Groundwater under Control Facility Name: Veolia

More information

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Air Conditioner Water Heater - A Product of HotSpot Energy LLC Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform

More information

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation GTRDD SERIES HEATLESS DRYER INSTALLATION, OPERATION & MAINTENANCE MANUAL TABLE OF CONTENTS SECTION 1 General Information: Pg 2 Description of Operation SECTION 2 Safety Instructions: Pg 3 Installation

More information