1 Process Safety Management of Highly Hazardous & Explosive Chemicals Operating Procedures

2 Now that the PHA s Are Competed or Underway Operating Procedures & Safety Programs Must Be Developed PHA Information Can Be Used

3 Operating Procedures (f) The employer shall develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and shall address at least the following elements.

4 & Safety Programs Must Consider: Initial start-up Normal operations Temporary operations Emergency shutdown Emergency operations Normal shutdown Start-up following turnaround Consequences of deviation Steps required to correct or avoid deviation

5 or Standard Operating Procedures (SOP s) Where Did This Methodology Come From? Answer: The Military Definition: A standard operating procedure is a set of instructions having the force of a directive, covering those features of operations that lend themselves to a definite or standardized procedure without loss of effectiveness. Standard Operating Policies and Procedures can be effective catalysts to drive performance improvement and improving organizational results. Every good quality system is based on its standard operating procedures (SOPs).

6 Operating Procedures Develop and implement written operating procedures* consistent with the process safety information and addresses at least the following elements: Initial start-up, normal and temporary operations Normal and emergency shut-down procedures Operating limits and consequences of deviation Hazards presented by the process *Must be Readily accessible to employees

7 Operating Procedures The operating procedures addressing operating parameters will contain operating instructions about: pressure limits temperature ranges flow rates and what to do when an upset condition occurs what alarms and instruments are pertinent if an upset condition occurs, and other subjects.

8 Many Covered Processes are Operated by Automated & Manual Procedures

9 Operators Must be Trained in Software Use

10 Operating Procedures Must Provide Procedures for Controlling the Process

11 Operating Procedures Compliance Directive Asks: Do written operating procedures exist for each covered process? Do the procedures provide clear instructions for conducting activities safely? Do the operating instructions address, as a minimum, step for each operating phase?

12 Operating Procedures Compliance Directive Asks: Do the operating procedures include operating limits that outline consequences of process deviation and steps required to correct or avoid deviations?

13 Operating Procedures Compliance Directive Asks: Have safety and health considerations been included in the operating procedures? Properties of, and hazards presented by, chemicals used in the process? Precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment? Control measures to be taken if physical contact or airborne exposure occurs? Quality control for raw materials and control of hazardous chemical inventory levels? Any special or unique hazards?

14 Operating Procedures From the OSHA PSM NEP for Refineries Information typically listed in EOP and/or ESP includes, but is not limited to the responsibilities for performing actions during an emergency, required PPE, additional hazards not present during normal operations, consequences of operating outside operating limits, steps to shutdown the involved process in the safest, most direct manner, conditions when operators must invoke the emergency response plan, or scenarios when they themselves must stop and evacuate.

15 Operating Procedures From the OSHA PSM NEP for Refineries From interviews with at least three control board operators in the Selected Unit(s), have these operators received sufficient training, initial and refresher, to be qualified to shutdown the Selected Unit(s) per the requirements of 119(f)(1)(i)(D)?

16 - Start Up We Must Describe normal SOP's Describe start-up SOP's Describe Shut-down SOP s

17 Operating Procedures Company Must Have a Method for Developing Procedures With Elements Such As: SOP Preparation SOP Review and Approval Frequency of Revisions and Reviews Checklists Document Control SOP Document Tracking and Archival Standardized Format

18 - Start Up We Must Include Sections such as: Objectives Purpose Concerns Procedures Department Operator Equipment Involved Location Related Documents

19 Let s Look at an Example

20 Operating Procedure for NASA E-Complex 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this procedure is to establish a step-by-step detailed method for assuring a safe transfer of liquid hydrogen at the E-1 facility low pressure liquid hydrogen transfer and storage system by purging/inerting and transfer of liquid hydrogen from trucks at the trailer transfer stations to the liquid hydrogen storage sphere. 1.2 SCOPE This procedure contains only those instructions pertaining directly with control of the systems configuration to perform necessary purging/inerting of the system to assure elimination of oxygen and the transfer of liquid hydrogen. The LH2 will be transferred from trailers to the liquid hydrogen (LH2) storage sphere. The procedure contains instruction for a. Facility Status/Set Up b. Pre-transfer Purging/Inerting c. Liquid Hydrogen Transfer d. Facility Securing/Shutdown

21 1.0 REFERENCES 2.1 DOCUMENTS SSP John C. Stennis Space Center Safety and Health Handbook SSTD FLUIDS SSC Facility Cleanliness Requirements for Propellant, Gas and Hydraulic Systems SOI Preparation and Use of Detailed Operating Procedures (DOP) SOI Contamination Prevention, Field Cleaning and Temporary Closures STP John C. Stennis Space Center Technical Procedure Commodity Receipt and inspection 2.2 DRAWINGS PSK-E FAC, Sheet 1 LH Trailer Unloading Storage and Transfer Piping and Instrument Diagram PSK-E FAC, Sheet 9 E1 LH2 Storage Area MFP

22 3.0 RESPONSIBILITIES 3.1 Personnel Test Team The Test Stand Director shall be responsible for the operations as outlined in the procedure and personnel requirements. Personnel must either be certified per the requirements or be approved as trainees. The number of Test Operations personnel required to perform the operating tasks and functions set forth in this procedure is three. The test team shall comprise of the test conductor, two LH2 Storage Area Valve Operators and an LH2 Trailer crew. Any change in the number of personnel must be approved by the Test Stand Director or supervisor Sign-Off Instructions The assigned personnel performing this DOP shall buy off each Step upon completion on the buy off sheet.

23 3.2 Safety General Personnel Safety The test conductor shall be responsible for ensuring compliance with established safety policies and practices by the personnel in the team during the performance of this procedure. Safe working conditions and personnel compliance with applicable safety rules and regulations is the responsibility of safety personnel Hazard Control In the event of system and/or component leaks, malfunctions and/or failures that occur during the performance of this procedure, the test conductor shall ensure that systems are secured per the Lockout/Tagout provisions of the SSC Safety and Health Procedures and Guidelines, and that no residual energy hazards are present prior to inspections or repairs. The primary hazards associated with this procedure are: a. Bodily exposure to a cryogen b. Bodily exposure to a hydrogen flame

24 3.1.1 Personal Protective Equipment Required Cryogenic, flame retardant coveralls Cryogenic gloves Face Shields Ear muffs or ear plugs 4.1 General Requirements Personnel not directly involved with the transfer operation shall be cleared back from the transfer/storage area during offloading operations Hot work activity (i.e., welding, cutting, usage of spark producing equipment, smoking, etc.) shall not be permitted within 100 feet of the transfer system/operation Communications between all work stations via standard headset or radio is required.

25 5.0 PREREQUISITES 5.1 Verify Facility Status An Open Item Review of all work activities at the E-1 facility shall be accomplished to determine if any constraints exist against the perform of this procedure Verify LH sphere vacuum system is operational. Verify GN2 system is operational. Verify LH2 Storage Area emergency shower is operational Verify LH2 Storage Area washdown hose is operational Verify LH2 Storage Area Flare System is operational Verify deluge system is operational Verify control system is operational Verify DAS is operational Verify GHe system is operational Verify that LH2 delivery has been scheduled Verify GH system is operational

26 6.0 FACILITY SETUPS 6.1 Verify Flex Hoses are secured in holders with caps installed. 6.2 Verify Site GN2 at LH2 Storage Area Panel pressure is > 2,000 psig using PI-10H41-GN. 6.3 Verify Site GHE at LH2 Storage Area Panel pressure is > 1,800 psig using PI-10H39-HE. 6.4 Verify Site GH2 at LH2 Storage Area Panel pressure is > 1,500 psig using PI-10H42-GH. 6.5 Verify/Set E1 LH2 Storage Area MFP as follows: Station 1 to 1,500 ア 50 psig Station 2 to 1,500 ア 50 psig Station 3 to 225 ア 10 psig Station 4 to 20 ア 10 psig Station 5 to 50 ア 10 psig Station 6 to 50 ア 10 psig Station 7 to 80 ア 5 psig Station 8 to 300 ア 50 psig Station 9 to 50 ア 10 psig Station 10 to 60 ア 10 psig Station 11 to 50 ア 10 psig

27 7.0 PRETRANSFER PURGING/INERTING 7.1 Purging and connection of trailer unloading station flex hoses Make the following announcement. Attension E-1 personnel. LH will be transferred from LH trailers to the E-1 LH storage tank. All nonessential personnel maintain a clearance of 100 feet from the liquid hydrogen storage tank and trailer unloading area. area. Repeat Set the area warning light(s) to Flashing Amber Verify Deluge Water System is in Standby Verify LH2 Storage Area Deluge Water Isolation Valve VA- 10G32-DW is Open on East Side of Sphere Verify the LH2 transfer crew is ready to proceed. Position trailer and the unloading station and note which unloading station(s) are used.

28 Perform Steps if there is a trailer at the Trailer Unloading Station No. 1. Else DNA Open VA-10J34-HE, Unloading Station No. 1 GHe purge block valve Open VA-10B01-GH, Unloading Station No. 1 Fill Line Bleed. Purge line for 2 minutes Close VA-10B01-GH, Unloading Station No. 1 Fill Line Bleed Close VA-10J34-HE, Unloading Station No. 1 GHe purge block valve Verify/connect grounding cable to the trailer at Trailer Unloading Station No Open VA-10J34-HE, Unloading Station No. 1 LH2 Transfer Line GHe purge block valve, partially to cause a slight helium flow out of the flex hose during connection. Sniff the connection with an LEL meter prior to disconnection for presence of hydrogen ( > 20% LEL unacceptable) in the line. MIP Request the Truck Driver to disconnect the liquid transfer flex hose from the holder and connect to the trailer at Trailer Unloading Station No. 1. Maintain clean to Level 2. MIP

29 Operating Procedures Operating Procedures May be a Combination of Written Instructions and Graphic Illustrations

30 Refinery Operation Flow Chart

31 Operating Procedures Must be Developed for Each Equipment Operation in the Covered Process Refer to Block Diagrams Refer to P&ID Must Cover Normal Operating Conditions, Normal Operating Parameters, i.e.. Pressure/Flow/Current/ etc.

32 Operating Procedures Must Follow Procedures & Recommendations in PHA s Must Follow Form Remember the 3rd Grade Rule Write Clear Enough that a 3rd Grader Could Follow the Procedure

33 Operating Procedures For Shut-down Procedures Remember: Most operations must be shut down in a specific order! Failure to follow these shut down procedures could results in a catastrophic release or system failure

34 Ammonia Plant Explosion Caused by Improper Shut-down of Engine Room

35 Operating Procedures Operating Limits Operating Limits Must be Understood Pressures Flows Electrical Potential Tolerances

36 Operating Procedures Team Exercise Will be Performed in the Next Session with Safe Work Practices

37 What s Next? Now That We ve Completed the Operating Procedures We Must Develop Safety Work Practices, Programs & Procedures for Covered Processes

On-Site Risk Management Audit Checklist for Program Level 3 Process

On-Site Risk Management Audit Checklist for Program Level 3 Process On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:

More information

WHITE PAPERS. Process Safety Management

WHITE PAPERS. Process Safety Management WHITE PAPERS Process Safety Management The building blocks of a successful Process Safety Management (PSM) program are detailed piping and instrumentation diagrams (P&IDs) and standard operating procedures

More information

Process Safety Management of Highly Hazardous & Explosive Chemicals. Safe Work Practices

Process Safety Management of Highly Hazardous & Explosive Chemicals. Safe Work Practices Process Safety Management of Highly Hazardous & Explosive Chemicals Safe Work Practices Safe Work Practices 1910.119(f)(1) The employer shall develop and implement safe work practices to provide for the

More information

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600 OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done

More information

Process Safety Management of Highly Hazardous & Explosive Chemicals. Management of Change

Process Safety Management of Highly Hazardous & Explosive Chemicals. Management of Change Process Safety Management of Highly Hazardous & Explosive Chemicals Management of Change What if Our PHA s Reveal the Need to Change Something In our System to Minimize the Potential for Release We Must

More information

Process Safety Management Program

Process Safety Management Program Process Safety Management Program Title: Compliance Guidelines for Operating Procedures Document #: PSM-SY-UN-014 Issued: 08/20/2014 Responsible Dept.: EHS Version: New Approved By: PSM Focus Group Page:

More information

WORKING IN CONFINED SPACES GUIDELINES

WORKING IN CONFINED SPACES GUIDELINES WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...

More information

Millersville University - Office Of Environmental Health & Safety Scope & Application

Millersville University - Office Of Environmental Health & Safety Scope & Application Confined Space Entry Millersville University - Office Of Environmental Health & Safety Scope & Application The Confined Space Entry (CSE) program applies to the safe working practices for entering and

More information

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program Sample Permit-Required Confined Space Written Program Purpose The purpose of this document is to communicate Employer s compliance with MIOSHA s requirements for a permit-required confined space entry

More information

1.0 Purpose... 4. 2.0 Definitions...4. 3.0 Hot Work Operations. 5

1.0 Purpose... 4. 2.0 Definitions...4. 3.0 Hot Work Operations. 5 HOT WORK PROGRAM Introduction The University of Kentucky recognizes a potential for fire from hot work operations. For that reason this program should be implemented in all departments at the University

More information

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR 1910.147

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR 1910.147 Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR 1910.147 Contents I. Introduction II. Scope and Application III. Definitions IV. Lockout/Tagout Manual V. Energy Control Procedures 1. Applying Energy

More information

3088 Lockout-Tagout Training Program Course Outline

3088 Lockout-Tagout Training Program Course Outline 3088 Lockout-Tagout Training Program Course Outline The following outline summarizes the major points of information presented in the course. The outline can be used to review the course before conducting

More information

SAFETY AND HEALTH PROGRAM

SAFETY AND HEALTH PROGRAM PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of

More information

Confined Space Entry Procedure Worksheet

Confined Space Entry Procedure Worksheet 1. Location Exact name and location of space to be entered. Confined Space Entry Procedure Worksheet 2. Hazard Identification & Determination - (circle all that apply) a. Tasks to be performed. Welding/Cutting

More information

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.147 THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.147 THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400 OSHA REGULATION: 29 CFR 90.7 THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) DATE: 0/5/2008 DATE: /2/202 A. POLICY. This procedure follows requirements set forth in 29 CFR 90.7. 2. It is the policy

More information

BWC Division of Safety and Hygiene

BWC Division of Safety and Hygiene BWC Division of Safety and Hygiene A SAMPLE LOCKOUT/TAGOUT PROCEDURE A good Lockout/Tagout Procedure, at a minimum, should contain the following elements: 1. All maintenance personnel shall be provided

More information

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result

More information

In progress. Basically a Confined Space Entry Plan has to answer the following questions:

In progress. Basically a Confined Space Entry Plan has to answer the following questions: In progress Basically a Confined Space Entry Plan has to answer the following questions: -what s a confined space? -what conditions make a permit space (specify hazardous atmosphere and acceptable atmosphere)?

More information

Confined Space Training. Developed and Presented by: Scott Cole, CSP (440) 520-9499 scole@amhigley.com

Confined Space Training. Developed and Presented by: Scott Cole, CSP (440) 520-9499 scole@amhigley.com Confined Space Training Developed and Presented by: Scott Cole, CSP (440) 520-9499 scole@amhigley.com Objectives To understand and recognize a confined space, To understand the difference in a permit required

More information

CONFINED SPACE ENTRY NON-MARINE FACILITES

CONFINED SPACE ENTRY NON-MARINE FACILITES CONFINED SPACE SAFETY CONFINED SPACE ENTRY NON-MARINE FACILITES EM-385 Chapter 34 CONFINED SPACE ENTRY NON- MARINE FACILITIES UFGS 013526 OSHA 29 CFR 1910.146 A space that: What is a Confined Space? Is

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

Process Safety Management

Process Safety Management Process Safety Management U.S. Department of Labor Occupational Safety and Health Administration OSHA 3132 2000 (Reprinted) This informational booklet is intended to provide a generic, non-exhaustive overview

More information

Compressed Gas Cylinders Safety Policy

Compressed Gas Cylinders Safety Policy Compressed Gas Cylinders Safety Policy This is an example of a compressed gas safety policy for a client whose operations include welding. Oxygen and acetylene tanks are in use and in storage at this client's

More information

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3 SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE SAFETY - LIFE SAVING RULES Verify isolations of hazardous energy before any work begins. Date Issued: February

More information

TEMPORARY EMPLOYEES SAFETY PROCEDURES

TEMPORARY EMPLOYEES SAFETY PROCEDURES TEMPORARY EMPLOYEES SAFETY PROCEDURES Temporary Agencies will ensure that any temporary employee sent to work at Modern will have received and understand the General Safety Rules. GENERAL SAFETY RULES

More information

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM 1 UNIVERSITY OF WEST FLORIDA LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM (EQUIPMENT HAZARD DE-ENERGIZING AND ISOLATION) DEPARTMENT OF ENVIRONMENTAL HEALTH AND SAFETY 11000University Parkway Pensacola, FL 32514

More information

CONFINED SPACE PROGRAM

CONFINED SPACE PROGRAM California Institute of Technology CONFINED SPACE PROGRAM Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028 Email:

More information

Sample Written Program. For. Confined Space OSHCON

Sample Written Program. For. Confined Space OSHCON Sample Written Program For Confined Space Provided as a public service by OSHCON Occupational Safety and Health Consultation Program Texas Department of Insurance, Division of Workers Compensation Publication

More information

SITE CONTRACTOR PROCEDURES

SITE CONTRACTOR PROCEDURES SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment

More information

CONFINED SPACE ENTRY WORK STANDARD

CONFINED SPACE ENTRY WORK STANDARD CONFINED SPACE ENTRY WORK STANDARD CONFINED SPACE ENTRY WORK STANDARD Copyright 2007 All rights reserved. Reproduction of this document in whole or in part by any means is prohibited, unless authorized

More information

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES Leader s Guide 2005, CLMI Training LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES This easy-to-use Leader s Guide is provided to assist in conducting a successful

More information

Topics of the Presentation

Topics of the Presentation Drill Rig Safety Topics of the Presentation Personnel safety and monitoring PPE Health (Drugs and Alcohol) Drill Rig operation Safe set up procedures Safe operation of machine Safety related accidents

More information

HOT WORK PERMIT PROGRAM TRAINING. John Braun

HOT WORK PERMIT PROGRAM TRAINING. John Braun HOT WORK PERMIT PROGRAM TRAINING John Braun 1.0 INTRODUCTION 1.2 Purpose The Hot Work Permit Program has been developed for University employees that work on or around hot work activities. This program

More information

(Italicized items underlined and in parentheses should be modified to personalize

(Italicized items underlined and in parentheses should be modified to personalize Model Confined Space Entry Policy and Procedures for Public Works Departments and State Agencies in Massachusetts This model plan, based on OSHA Confined Space Entry Standards, was developed by the Massachusetts

More information

OSHA Training Guidelines (An Unofficial Summary)

OSHA Training Guidelines (An Unofficial Summary) OSHA Training Guidelines (An Unofficial Summary) Many standards promulgated by the Occupational Safety and Health Administration (OSHA) explicitly require the employer to train employees in the safety

More information

Pressure Testing Procedures for Building Services Piping

Pressure Testing Procedures for Building Services Piping Pressure Testing Procedures for Building Services Piping Document Number Revision 0 Approved By Ric Morris McMurdo, Palmer, and South Pole February 25, 2005 Active Divisions/Departments FEMC Raytheon Polar

More information

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident

More information

Powered Industrial Truck Safety Program

Powered Industrial Truck Safety Program Powered Industrial Truck Safety Program TABLE OF CONTENTS Forklift Safety Program 1.0 Overview... 3 2.0 Policy.....3 3.0 Requirements 3 4.0 Purpose. 3 5.0 Scope......4 6.0 Forklift Procedures 4 6.0 Responsibilities.....6

More information

Tooele Army Depot South August 5, 2015 Explosive Destruction System

Tooele Army Depot South August 5, 2015 Explosive Destruction System ATTACHMENT 9 -PERSONNEL TRAINING 9.1 General Provisions The Permittee shall ensure site operating personnel have the necessary knowledge and skills to perform hazardous waste duties safely and efficiently,

More information

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components TITLE Pipelines and Terminals Manual/Volume 3 - SECTION 02: SUBJECT 20: PURPOSE AND SCOPE During the normal lifetime of a pipeline it becomes necessary to add or remove piping, modify existing piping or

More information

Employer Name. Confined Space Entry Program

Employer Name. Confined Space Entry Program Employer Name Confined Space Entry Program Permit Required Confined Spaces Program Prepared by: Effective Date: Revision Number: 0 TABLE OF CONTENTS 1. Introduction 2. Policy Statement 3. Definitions 4.

More information

Safe Operating Procedure

Safe Operating Procedure Safe Operating Procedure (Revised 07/09) HOT WORK PERMIT OPERATIONS (For assistance, please contact EHS at (402) 472-4925, or visit our web site at http://ehs.unl.edu/) Authority In recognition of the

More information

Page85. Lock-out Tag-out Plan

Page85. Lock-out Tag-out Plan Page85 Lock-out Tag-out Plan Page86 Lock-out / Tag-Out Plan Table of Contents 1. Policy 2. Purpose 3. Scope 4. General Procedures 5. Application of Control Procedure 6. Release from Control Procedure 7.

More information

Course Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree Type

Course Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree Type GENERAL INFORMATION Name: Diane King Phone #: 77021 Course Prefix/Number: ETI3704 Course Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree

More information

Standard Hydraulic Piping Flushing Procedure

Standard Hydraulic Piping Flushing Procedure Page 1 of 6 1.0 Scope This procedure covers the minimum technical requirements for cleaning and flushing of Hydraulic and Piping, and related accessories. 2.0 Introduction In hydraulic fluid power systems,

More information

Safety Meeting Topic: Chemical Spills and Emergency Action Plans for General Industry

Safety Meeting Topic: Chemical Spills and Emergency Action Plans for General Industry Company Name: Safety Meeting ID: 16 Date: Grainger Safety Services Inc. 2012 Safety Meeting Topic: Chemical Spills and Emergency Action Plans for General Industry UPDATED: This safety meeting has been

More information

Compressed Gas Cylinder Storage and Handling Guide

Compressed Gas Cylinder Storage and Handling Guide Overview Compressed gas cylinders are used in many workplaces to store gases that vary from extremely flammable (acetylene) to extremely inert (helium). Many compressed gas cylinders are stored at extremely

More information

Control of Hazardous Energy (Lockout / Tagout)

Control of Hazardous Energy (Lockout / Tagout) WAUKESHA COUNTY TECHNICAL COLLEGE Control of Hazardous Energy (Lockout / Tagout) Release Date: March 26, 2012 Revision Date: March 26, 2012 Revision Level: 1 TABLE OF CONTENTS Purpose... 1 Scope... 1 Responsibilities...

More information

A Safe Workplace A Workplace Safety and Health Manual for Your Community Section: III-C Subject: G-9

A Safe Workplace A Workplace Safety and Health Manual for Your Community Section: III-C Subject: G-9 Page 1 of 7 The following procedure provides the requirements for. Refer to part 15 Confined Spaces, part 6 Personal Protective Equipment, part 14 Fall Protection, of The Manitoba Workplace Safety and

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

CONTRACTOR SAFETY POLICY

CONTRACTOR SAFETY POLICY CONTRACTOR SAFETY POLICY Revised September 2012 TABLE OF CONTENTS COMPLIANCE ACKNOWLEDGMENT COMPLIANCE GENERAL SAFETY REQUIREMENTS/HOUSEKEEPING INSURANCE COVERAGE SIGN IN AND OUT INCIDENT REPORTING CHEMICAL

More information

Lockout / Tagout Program

Lockout / Tagout Program Lockout / Tagout Program Table of Contents Page Scope... 2 Definitions... 2 Authorization... 3 Responsibilities... 4 Compliance and Enforcement... 4 When to Lockout/Tagout (LOTO)... 5 Lockout Procedure...

More information

EXHIBIT A SCOPE OF WORK

EXHIBIT A SCOPE OF WORK EXHIBIT A SCOPE OF WORK 1. (Contractor) shall provide fire alarm system maintenance/repair/testing services as described herein to the California Department of Veterans Affairs (hereinafter CDVA, CalVet,

More information

How To Improve Process Safety In Singapore

How To Improve Process Safety In Singapore Contents Preface... 2 1. Introduction... 3 1.1 The Process Industry... 3 1.2 Process Safety versus Personnel Safety... 4 1.3 Business Case for Process Safety Performance Indicators... 6 2. Performance

More information

Compressed Gas Cylinder Program

Compressed Gas Cylinder Program Department of Environmental Health & Safety Procedures Compressed Gas Cylinder Program March 2010 Compressed Gas Cylinder Program Page 1 of 8 Table of Contents I. Introduction II. III. IV. Policy Scope

More information

CONFINED SPACE POLICY

CONFINED SPACE POLICY UNIVERSITY OF ALASKA FAIRBANKS SAFETY SYSTEM POLICY AND PROCEDURE DOCUMENT NUMBER: 804 ISSUE DATE: SEPTEMBER 1996 SUBJECT: Confined Space Policy CONFINED SPACE POLICY PURPOSE: The purpose of this policy

More information

LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN

LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN March 2003 (Revised) St. Louis Community College Table of Contents Section # Title Page # 1 Purpose 1 2 Applicability 2 3 Program Overview 3 4 Energy Control

More information

Confined Space Procedures

Confined Space Procedures Confined Space Procedures Table of Contents Purpose... 2 Primary Objectives... 2 Operational Objectives... 2 Legislation... 2 Definitions... 2 Responsibilities... 4 1. Vice-President (Administration) 2.

More information

SURVIVE INSIDE: Employee Safety in Confined Spaces

SURVIVE INSIDE: Employee Safety in Confined Spaces SURVIVE INSIDE: Employee Safety in Confined Spaces This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description of the

More information

LOCKOUT/TAGOUT PROGRAM. Table of Contents

LOCKOUT/TAGOUT PROGRAM. Table of Contents Western University of Health Sciences IIPP SUB-PROGRAM LOCKOUT/TAGOUT PROGRAM Table of Contents 1.0 INTRODUCTION 1 2.0 PURPOSE 1 3.0 RESPONSIBILITIES 1 Supervisors 1 Employees 1 4.0 TRAINING 2 5.0 WRITTEN

More information

C-A OPERATIONS PROCEDURES MANUAL. 18.3.2 Response to Low Oxygen Alarm in Building 912 Accelerator R&D Area. Hand Processed Changes

C-A OPERATIONS PROCEDURES MANUAL. 18.3.2 Response to Low Oxygen Alarm in Building 912 Accelerator R&D Area. Hand Processed Changes If you are using a printed copy of this procedure, and not the on-screen version, then you MUST make sure the dates at the bottom of the printed copy and the on-screen version match. The on-screen version

More information

CSB Public Meeting February 7, 2010, Natural Gas Explosion Kleen Energy Middletown, Connecticut

CSB Public Meeting February 7, 2010, Natural Gas Explosion Kleen Energy Middletown, Connecticut CSB Public Meeting February 7, 2010, Natural Gas Explosion Kleen Energy Middletown, Connecticut June 28, 2010 www.csb.gov 1 Tonight s Speakers Lauren Wilson Chemical Incident Investigator Dan Tillema Chemical

More information

Pressure Vessels (Air Compressors) and LPG Tanks

Pressure Vessels (Air Compressors) and LPG Tanks Pressure Vessels (Air Compressors) and LPG Tanks 1. Identification of Workplace Hazard Any container, tank or vessel that contains pressurized material is a potential hazard to employees due to the force

More information

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016 RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 3 Related Documents 3.1 Occupational Health and Safety Act, R.S.O. 1990 3.2 Regulations for Industrial Establishments, R.R.O.

More information

HEALTH, SAFETY AND ENVIRONMENT HANDBOOK HSE

HEALTH, SAFETY AND ENVIRONMENT HANDBOOK HSE HEALTH, SAFETY AND ENVIRONMENT HANDBOOK HSE CNOOC Limited 1 Message from CEO Dear Colleagues, CNOOC Limited is the largest producer of offshore oil & gas in China and is one of the largest oil & gas exploration

More information

contractors, etc. and establish relationships with lease and rental companies.

contractors, etc. and establish relationships with lease and rental companies. The following may serve as a checklist when preparing for a Tropical Storm or Hurricane. Although Tornadoes usually provide little advance warning, locations subject to Tornadoes may apply much of the

More information

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed? work permits What is a work permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done, the hazards involved, and the necessary

More information

WEEKLY SAFETY MEETING All Euramax Subsidiaries LOCKOUT / TAGOUT. Safety Meeting Contents. Meeting Notice. Leaders Guide.

WEEKLY SAFETY MEETING All Euramax Subsidiaries LOCKOUT / TAGOUT. Safety Meeting Contents. Meeting Notice. Leaders Guide. Safety Meeting Contents Meeting Notice Leaders Guide Employee Handout Employee Quiz Meeting Sign-In Sheet Employee Puzzle PRIOR TO THE WEEKLY MEETING: - Post the meeting notice by the timeclock - Read

More information

IMPORTANT SAFETY NOTICE

IMPORTANT SAFETY NOTICE IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will minimize your risk of injury. ITT Goulds

More information

Water System Disinfection

Water System Disinfection Water System Disinfection Document Number Revision 1 Approved By Ric Morris All 6/2/04 Active Divisions/Departments FEMC Raytheon Polar Services Company HARD COPY NOT CONTROLLED-CONTROLLED COPY AVAILABLE

More information

Presented by: Rich Perry Marsh Risk Consulting

Presented by: Rich Perry Marsh Risk Consulting Flammable and Combustible Liquids Presented by: Rich Perry Marsh Risk Consulting What s the Big Deal? Flammable and combustible liquids are easily ignited Ignite with explosive force Burn readily and give

More information

HOT WORK PERMIT PROCEDURES

HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY MEDICAL CENTER February 2010 1 TABLE OF CONTENTS A. PURPOSE 3 B. SCOPE 3 C. POLICIES AND PROCEDURES 3-4

More information

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training Occupational Health Program Safety Training Series Lockout/Tagout Safety Awareness Training 1 Lock out/tag out Lock out: the placement of a lockout device (lock) on an energy isolating device in accordance

More information

PBX Series Quick Fit Connector Bimetallic Steam Traps

PBX Series Quick Fit Connector Bimetallic Steam Traps 6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE

Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will

More information

Facilities Maintenance Standards rev 9-1-2015

Facilities Maintenance Standards rev 9-1-2015 Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will

More information

Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety

Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety Integrated Risk Management Master Workplace Inspection Checklist for General Shop Safety Document Type: Form Control Number: UIRM- FM_012_50 File Code: UIRM-001 Last Reviewed: March 2014 Department/Unit:

More information

identify hazards, analyze or evaluate the risk associated with that hazard, and determine appropriate ways to eliminate or control the hazard.

identify hazards, analyze or evaluate the risk associated with that hazard, and determine appropriate ways to eliminate or control the hazard. What is a risk assessment? Risk assessment is the process where you: identify hazards, analyze or evaluate the risk associated with that hazard, and determine appropriate ways to eliminate or control the

More information

PERSONNEL WORK PLACE SAFETY PROGRAM

PERSONNEL WORK PLACE SAFETY PROGRAM 5440 PERSONNEL WORK PLACE SAFETY PROGRAM Accidents are undesirable, unplanned occurrences which can be prevented and which often result in bodily harm, loss of school time, property damage, expensive legal

More information

Title: Aircraft Parking

Title: Aircraft Parking Environmental Standard Operating Procedure Originating Office: Revision: Prepared By: Approved By: MCAS Miramar Environmental Original Environmental Management Department William Moog Management Department

More information

LOCK-OUT/TAG-OUT PROGRAM I. Purpose

LOCK-OUT/TAG-OUT PROGRAM I. Purpose LOCK-OUT/TAG-OUT PROGRAM I. Purpose This procedure establishes requirements for the lockout of energy isolating devices. It should be used to ensure that the machine or piece of equipment is isolated from

More information

EUROPEAN INDUSTRIAL GASES ASSOCIATION

EUROPEAN INDUSTRIAL GASES ASSOCIATION WORK PERMIT SYSTEMS IGC Doc 40/02/E EUROPEAN INDUSTRIAL GASES ASSOCIATION AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel : +32 2 217 70 98 Fax : +32 2 219 85 14 E-mail : info@eiga.org Internet : http://www.eiga.org

More information

READ FIRST. Confined Space Entry Procedure. San José State University Environmental Health and Safety. Confined Space Entry Procedure

READ FIRST. Confined Space Entry Procedure. San José State University Environmental Health and Safety. Confined Space Entry Procedure READ FIRST 1. The purpose of a is to save lives by controlling the inherent hazards of a confined space prior to entry. a. If possible, avoid entering a confined space. Every consideration should be given

More information

PSE&G Response to Super Storm Sandy. NGA Operations Conference - 4/11/13

PSE&G Response to Super Storm Sandy. NGA Operations Conference - 4/11/13 PSE&G Response to Super Storm Sandy NGA Operations Conference - 4/11/13 41,547 Premise Inspections Performed by PSE&G Employees Super Storm Sandy 10/29 to 11/12 25 Towns Impacted by Significant Flooding

More information

Lockout - Tagout Program

Lockout - Tagout Program Created by: Nora Velazquez Date: 02/13/03 Approved by: Nora Velazquez Supersedes: New Lockout - Tagout Program 3.1 Purpose 3.1.1 The safe control of hazardous energy is the purpose of the Lockout- Tagout

More information

Installation Instructions for Alarm Module Kit A043F059

Installation Instructions for Alarm Module Kit A043F059 Instruction Sheet 07-2013 Installation Instructions for Alarm Module Kit A043F059 1 Introduction The information contained within is based on information available at the time of going to print. In line

More information

Safety at Kaiser Permanente Los Angeles Medical Center Environmental Health & Safety Department

Safety at Kaiser Permanente Los Angeles Medical Center Environmental Health & Safety Department Safety at Kaiser Permanente Los Angeles Medical Center Environmental Health & Safety Department Environmental Health and Safety (EHS) The Los Angeles Medical Center (LAMC) is committed to providing a safe

More information

POLICY: CONFINED SPACES

POLICY: CONFINED SPACES TITLE: POLICY: CONFINED SPACES Version TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced Date(s) modified Next scheduled review date Related

More information

PITTSBURG TANK AND TOWER CO., INC.

PITTSBURG TANK AND TOWER CO., INC. PITTSBURG TANK AND TOWER CO., INC. HEALTH, SAFETY & ENVIROMENTAL PROGRAM INDEX 1.SAFETY POLICY & MANAGEMENT RESPONSIBILITIES - Safety Policy - Administrative Duties * Top Management * Safety Director *

More information

FACILITY SAFETY SIGNAGE GUIDE: 10 SIGNS TO SPOT DURING A PLANT WALKTHROUGH

FACILITY SAFETY SIGNAGE GUIDE: 10 SIGNS TO SPOT DURING A PLANT WALKTHROUGH FACILITY SAFETY SIGNAGE GUIDE: 10 SIGNS TO SPOT DURING A PLANT WALKTHROUGH Safety signs are the primary way to communicate important warnings and messages to your employees, on-site contractors and other

More information

Lockout/Tagout Compliance Guide and Checklist

Lockout/Tagout Compliance Guide and Checklist Lockout/Tagout Compliance Guide and Checklist Scope: The OSHA Control of Hazardous Energy (Lockout/Tagout) standard (29 CFR 1910.147) covers the servicing and maintenance of machines and equipment in which

More information

A Truck Driver s Guide to Care and Maintenance of Diesel Particulate Filters (DPFs)

A Truck Driver s Guide to Care and Maintenance of Diesel Particulate Filters (DPFs) A Truck Driver s Guide to Care and Maintenance of Diesel Particulate Filters (DPFs) Disclaimer: This handbook is not a substitute for the detailed instructions/warranty limitations supplied by the manufacturer

More information

How To Stop A Gas Leak

How To Stop A Gas Leak Natural Gas / Propane Emergencies Probationary Firefighter Academy Properties of Natural Gas / Propane Natural Gas and Propane are gaseous fossil fuels Natural Gas is primarily Methane(CH 4 ) Propane is

More information

USER MANUAL. 10 GPM Small Single Line Cryogenic Coupling

USER MANUAL. 10 GPM Small Single Line Cryogenic Coupling JC Carter LLC LNG Couplings USER MANUAL 10 GPM Small Single Line Cryogenic Coupling Models 50E722 Nozzle and 50E721 Receptacle User s Manual and Installation Guide! Warning: Read the User s Manual and

More information

CONFINED SPACES MANAGEMENT PROGRAM (REGIONAL CAMPUSES AND RESEARCH STATIONS)

CONFINED SPACES MANAGEMENT PROGRAM (REGIONAL CAMPUSES AND RESEARCH STATIONS) CONFINED SPACES MANAGEMENT PROGRAM (REGIONAL CAMPUSES AND RESEARCH STATIONS) January 2007 TABLE OF CONTENTS 1.0 PURPOSE AND SCOPE 1.1 Intent 1.2 Scope 1.3 Program Elements 2.0 REGULATORY REQUIREMENTS 3.0

More information

Confined Space Program

Confined Space Program Confined Space Program Scope This program outlines the procedures, precautions, responsibilities, and methods used by Name of Company to assure and provide employees a safe and healthy work environment

More information

Independent Contractor Policy

Independent Contractor Policy Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor

More information

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR CERTIFICATION EXAMINATION November 2015, March 2016, July 2016 and November 2016 (Replaces October 2013) This API Individual Certification Examination is

More information

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit? A Health and Safety Guideline for Your Workplace What is a Work Permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done,

More information

Confined Space Entry Policy

Confined Space Entry Policy University of Illinois at Urbana-Champaign Facilities & Services Division of Safety and Compliance Confined Space Entry Policy Reviewed November 2012 UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN CONFINED

More information