1 Kursdagene i Trondheim Januar 2009 CO 2 håndtering Er vi i rute? CO 2 transport i rør Flow assurance Oddmund Kvernvold < >

2 Content What is flow assurance? CO 2 characteristics and related flow assurance aspects Available software capabilities and limitations Storage of CO 2 from Kårstø and Mongstad - Storage concepts - Operational requirements - OLGA simulation steady state and blow down - Impact/dispersion analysis Concluding remarks Slide 2

3 Flow Assurance

4 Flow Assurance Introduced by Petrobras in the early 1990 s as 'Garantia de Fluxo' which literally translates as 'Guarantee the Flow', or "Flow Assurance". The term originally covered the thermal hydraulic and production chemistry technical issues faced when exploiting deepwater oil reserves. Now, it is generally understood under a much broader definition: "Flow Assurance" includes all issues important maintaining the flow from reservoir/export to reception facilities "Flow Assurance" is a multi-discipline activity, requiring engineers with detailed technical backgrounds to "follow the flow" from export through to reception. Slide 4

5 Flow assurance Covers Pipeline sizing/capacity Thermohydraulic Insulation design Flow characteristics Slugging Corrosion Hydrate, wax and scale formation Blow down Transient operation - start up and shut downs Sand accumulation in pipeline Erosion due to solids production Impacts on Well growth Pipe sizing and schedule Insulation Weight coating Trenching/backfill requirements Upheaval buckling Snaking Pipeline creep Free span Slide 5

6 CO 2 characteristics and FA related issues

7 Pressure (bara) CO 2 characteristics Mol weight 44kg/kmol Critical point 31 o C and 73.3bara Triple point -56 o C and 5.2bara Sublimation temperature at 1bara o C Latent heat of sublimation 570kJ/kg Density of dry ice kg/m3 Latent heat of evaporation 285kJ/kg Phase diagram CO Solid Tripple point Temperature (DegC) Liquid/dense phase Critical point Gas CO2 Slide 7

8 CO 2 /flow assurance aspects Capacity pipe dimensioning - Export pressure - Reservoir pressure - Injection requirement Hydrate formation Dense phase Corrosion Transient operation/blow down - Feasibility - Low temperature in pipe line - Solid formation Dispersion impact evaluation - Impact on property/environment - Humans - Safety zones Slide 8

9 Software capacity and limitations

10 OLGA flow simulations OLGA commercial code - Developed for analysis of analysis of multi component systems - Gets problems for single component systems and operation close to the boiling curve - Applicable in dense phase and in gas phase - Not able to predict solid formation OLGA new module not commercial - Able to treat single component CO 2 systems. - Not able to predict solid formation, but can be assessed from temperature results Slide 10

11 PHAST dispersion of CO 2 from blow down PHAST commercial code - Developed for simulation of dispersion of gas in atmosphere - Not able to handle gas jets with solids - Sublimation in jet - Solid drop out and accumulation at ground PHAST next generation - Work is ongoing to develop a code which may handle also solid behaviour in jet - Commercial code available mid next year Slide 11

12 Water in stream

13 Consequences of water in CO 2 gas Hydrate Corrosion Will require automatic shut down if water content exceeds set value Slide 13

14 Storage of CO 2 from Kårstø and Mongstad

15 Alternative storage solutions Pipeline from Kårstø to subsea templates and storage in the reservoirs at either the Utsira or Johansen formation Pipeline from Mongstad to subsea templates and storage in the reservoirs at either the Utsira or Johansen formation Johansen formation Mongstad Via Sleipner platform Kårstø Plant/CO2 source Impermeable soil/rock Reservoir Utsira formation Sleipner Slide 15

16 Depth (m) Elevation (m) System specifications Pipeline length - Kårstø Utsira 230km - Kårstø Johansen 235km - Mongstad Utsira 352km - Mongstad Johansen 98km Kårstø to Utsira Reservoir conditions KP (km) Utsira Johansen Horizontal well - Utsira formation Depth (m) Pressure (bara) Temperature ( o C) Horizontal deviation (m) Slide 16

17 Operational requirements Three injection rates Maximum export pressure Minimum design temperature ( Million tons/year) 200bar -25/50 o C normal operation -40/50 o C during blow down System operated in dense phase Slide 17

18 Case example Operation and blow down Pipeline from Kårstø to Utsira (10 ) Base case injection requirements Will be showing - Steady state operational conditions - Shut down of pipeline followed by settle out for 24houres - Blow down of pipeline through constant size vent Simulations performed with new OLGA module - Simulation work performed by SPT Slide 18

19 Steady state - pipeline Holdup Pipeline profile Pressur e Temperature Note: Two phase flow from approximately KP = 200 Required export pressure approximately 100bara Slide 19

20 Steady state - well Note: Two phase flow from approximately 500m into the well Slide 20

21 Settle out conditions 24hours after shut down Slide 21 21

22 1day after initiation of blow down Boil off close to Utsira Pushes liquid to low point in Buknafjorden Some liquid transported uphill from bottom of Buknafjorden to Kårstø Note: Pipeline topography acts as water lock Balance between boil of rate/volume and release rate at Kårstø Minimum temperature -30 o C Slide 22 22

23 2days after initiation of blow down Boil off at close to Utsira Pushes liquid to low point in Buknafjorden Gas flow high enough to transport liquid uphill to Utsira Slide 23 23

24 4days after initiation of blow down CO 2 boiled off close to Utsira No liquid transported uphill to Kårstø Slide 24 24

25 5.5days after initiation of blow down Nearly all liquid has boiled off Slide 25 25

26 8days after initiation of blow down Blow down finalised Slide 26 26

27 Blow down rate Mixture of CO 2 in liquid and gas phase released during the first two days After two days only gas is released Maximum vent rate 60kg/s (only for a short period after initiation of blow down Reduces to 15-30kg/s for the next 4-5days Total 9000 ton of CO 2 released during blow down Slide 27

28 Pressure and temperature upstream/downstream of vent Minimum temperature upstream of vent -35 o C Temperature downstream of vent -79 o C for the first two days Release of a mixture and CO 2 in both solid and gas phase in first two days After two days CO 2 will be released to atmosphere in gas phase Total blow down time 7-8days Slide 28

29 Impact evaluation

30 CO2 Hazards Above 25% can cause quick death! Above 10% can cause unconsciousness Not able to escape! Safe distance is assumed with a maximum of 5% concentration 0.5-1% is the concentration for the workplace, for a 10-hr work shift (NIOSH CO 2 exposure limits) Slide 30

31 Proposed venting solution Vent directed at 45 o with vertical - High momentum/velocity will result in violent mixing with air and no critical concentration of CO 2 at ground level - Solid CO 2 will deposit in dedicated area - Sublimation of CO 2 onshore is a very slow process 0.5% concentration curves Direct the venting towards the sea - Solid CO 2 will deposit on the sea and sublimate - Will result in violent boiling from the sea - Safety zones at sea have to be established Slide 31

32 Concluding remarks The concept of transporting CO 2 in pipelines from onshore plants at Kårstø and Mongstad for storage into reservoirs has been demonstrated to be feasible both with respect to normal operation and pipeline blow down scenarios A design case is to be selected and detail engineering to be initiated Shortcomings (handling of CO 2 in solid form) of existing codes to be emphasized. Development work is required "Flow Assurance" is a multi-discipline activity Slide 32

33 Slide 33

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software th International Conference on Structural Mechanics in Reactor Technology (SMiRT ) Espoo, Finland, August 9-4, 9 SMiRT -Division 3, Paper 56 Investigations of a Long-Distance MW Heat Transport System with

More information

Optimize Pipeline Hydraulics with Multiphase Flow Modeling

Optimize Pipeline Hydraulics with Multiphase Flow Modeling Optimize Pipeline Hydraulics with Multiphase Flow Modeling Below are questions asked by attendees during the webinar on February 22, 2012, followed by answers provided by our presenters. Will you also

More information

Flow Assurance A System Perspective

Flow Assurance A System Perspective MEK4450-FMC Subsea technologies Flow Assurance A System Perspective By Tine Bauck Irmann-Jacobsen Contact: TineBauck.Irmann-Jacobsen@fmcti.com, MobPhone: 9175 9872 The objective of this part is to familiarize

More information

Thermodynamic and Kinetic Hydrate Inhibition Performance of MEG Solution and its Synergistic Inhibition with PVCap

Thermodynamic and Kinetic Hydrate Inhibition Performance of MEG Solution and its Synergistic Inhibition with PVCap October 27-29, 2014 Petrochemistry and Chemical Engineering Thermodynamic and Kinetic Hydrate Inhibition Performance of MEG Solution and its Synergistic Inhibition with PVCap Yutaek Seo Division of Ocean

More information

Havbunnsproduksjon. NTNU, 15 april 2013 Eldar Lundanes System Responsible for Controls and Data Management, Eastern Region.

Havbunnsproduksjon. NTNU, 15 april 2013 Eldar Lundanes System Responsible for Controls and Data Management, Eastern Region. Havbunnsproduksjon NTNU, Eldar Lundanes System Responsible for Controls and Data Management, Eastern Region Objectives The student shall be able to describe, with respect to a subsea production system;

More information

A basic introduction to steam

A basic introduction to steam A basic introduction to steam FOR HOT, COLD, MOIST AND DRY, FOUR CHAMPIONS FIERCE. STRIVE HERE FOR MASTERY Milton 1666 Steam Wonderful Steam Very high heat content Recyclable Clean, non toxic Biodegradable

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION Page: 1/6 This checklist recognizes the major accident hazards found by experience of previous HAZID studies. It is not intended to be totally exhaustive and feedback from users should be incorporated

More information

Norway s s Commercial CCS Projects

Norway s s Commercial CCS Projects Status: Draft Norway s s Commercial CCS Projects CCS Workshop Tokyo November 19, 2007 Presentation by Dr. Per Christer Lund, Science and Technology Counsellor, Norwegian Embassy in Tokyo on behalf of StatoilHydro

More information

EMERGENCY VESSELS BLOWDOWN SIMULATIONS

EMERGENCY VESSELS BLOWDOWN SIMULATIONS EMERGENCY VESSELS BLOWDOWN SIMULATIONS AGENDA INTRODUCTION TYPICAL FIRST STUDIES IN TOTAL UPSTREAM INTERNAL RULES BASED ON API METHODOLOGY STUDY RESULTS DEVELOPMENT WORK - COLLABORATION BETWEEN SIMSCI

More information

Guidelines for FEASIBILITY STUDY

Guidelines for FEASIBILITY STUDY Guidelines for FEASIBILITY STUDY INTRODUCTION This document describes the best practices to be followed during the preparation of a Feasibility Study for the Facilities Development of an upstream asset.

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering Hoannn@pidc.com.vn PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

7 Periodical meeting CO2Monitor. Synthetic seismograms from the Sleipner injection site

7 Periodical meeting CO2Monitor. Synthetic seismograms from the Sleipner injection site 7 Periodical meeting CO2Monitor Synthetic seismograms from the Sleipner injection site Davide Gei, Stefano Picotti, Jose Carcione Objective Modelling of the Sleipner overburden to study the sensitivity

More information

Pressure Drop Analysis of Natural Gas Transmission Line in Bangladesh

Pressure Drop Analysis of Natural Gas Transmission Line in Bangladesh Pressure Drop Analysis of Natural Gas Transmission Line in Bangladesh Mohd Atiqueuzzaman Khan, Md Shamsuddoha,Syed Al Imran Quraishy Abstract--The main objective of this study is to implement a virtual

More information

Periodical meeting CO2Monitor. Leakage characterization at the Sleipner injection site

Periodical meeting CO2Monitor. Leakage characterization at the Sleipner injection site Periodical meeting CO2Monitor Leakage characterization at the Sleipner injection site Stefano Picotti, Davide Gei, Jose Carcione Objective Modelling of the Sleipner overburden to study the sensitivity

More information

APPENDIX D RISK ASSESSMENT METHODOLOGY

APPENDIX D RISK ASSESSMENT METHODOLOGY APPENDIX D RISK ASSESSMENT METHODOLOGY There are numerous human-health and ecological issues associated with the construction and operation of any large coal-fueled electric power generation facility.

More information

An Integrated Approach to Modeling Pipeline Hydraulics in a Gathering and Production System

An Integrated Approach to Modeling Pipeline Hydraulics in a Gathering and Production System WHITE PAPER An Integrated Approach to Modeling Pipeline Hydraulics in a Gathering and Production System By Product Marketing, Aspen Technology, Inc. Executive Summary In recent years, as oil and gas fields

More information

Engineering Software Enables Designing for the Deep

Engineering Software Enables Designing for the Deep An Industry White Paper By Kevin Gomez, Editor PACE Magazine, Cirrus Media, Australia The content of this paper originally appeared in PACE Magazine, February 26, 2013. www.pacetoday.com.au Overview What

More information

Saeid Rahimi. Effect of Different Parameters on Depressuring Calculation Results. 01-Nov-2010. Introduction. Depressuring parameters

Saeid Rahimi. Effect of Different Parameters on Depressuring Calculation Results. 01-Nov-2010. Introduction. Depressuring parameters Effect of Different Parameters on Depressuring Calculation Results Introduction Saeid Rahimi 01-Nov-2010 Emergency depressuring facilities are utilized to accomplish at least one of the following objectives:

More information

FPS new entrant coordination process

FPS new entrant coordination process FPS new entrant coordination process Technical studies are normally necessary to determine whether access to FPS is possible, at what cost, requiring what modifications and to understand any specific risks.

More information

Improved fluid control by proper non-newtonian flow modeling

Improved fluid control by proper non-newtonian flow modeling Tekna Flow Assurance 2015, Larvik Improved fluid control by proper non-newtonian flow modeling Stein Tore Johansen, SINTEF Sjur Mo, SINTEF A general wall friction model for a non-newtonian fluid has been

More information

Use of OpenFoam in a CFD analysis of a finger type slug catcher. Dynaflow Conference 2011 January 13 2011, Rotterdam, the Netherlands

Use of OpenFoam in a CFD analysis of a finger type slug catcher. Dynaflow Conference 2011 January 13 2011, Rotterdam, the Netherlands Use of OpenFoam in a CFD analysis of a finger type slug catcher Dynaflow Conference 2011 January 13 2011, Rotterdam, the Netherlands Agenda Project background Analytical analysis of two-phase flow regimes

More information

DEEPSEALSM SERVICE SOLUTIONS

DEEPSEALSM SERVICE SOLUTIONS DEEP WATER CHEMICAL SOLUTIONS DEEPSEALSM SERVICE SOLUTIONS (DEEP SEA ENGINEERING ASSURANCE LEADERSHIP) Solving challenges. Deepwater Solutions from Multi-Chem ABOUT HALLIBURTON Founded in 1919, Halliburton

More information

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL Siniša Stojan, Ph.D. student Damir Dražić, Ph.D. student Brodotrogir, HR - 21220 Trogir, Croatia sinisa.stojan@brodotrogir.hr,

More information

VAL-MATIC VALVE AND MANUFACTURING CORP. 905 RIVERSIDE DRIVE, ELMHURST, IL 60126 TEL. (630) 941-7600 FAX.

VAL-MATIC VALVE AND MANUFACTURING CORP. 905 RIVERSIDE DRIVE, ELMHURST, IL 60126 TEL. (630) 941-7600 FAX. Cavitation in Valves VAL-MATIC VALVE AND MANUFACTURING CORP. 905 RIVERSIDE DRIVE, ELMHURST, IL 60126 TEL. (630) 941-7600 FAX. (630) 941-8042 www.valmatic.com CAVITATION IN VALVES INTRODUCTION Cavitation

More information

TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT

TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT I / 7 Natural Gas Transport. General principle The most efficient and effective method of natural gas distribution from the place of production to the

More information

Classification: Statoil internal Status: Draft. Key Technology Challenges. Flow Assurance and Subsea processing

Classification: Statoil internal Status: Draft. Key Technology Challenges. Flow Assurance and Subsea processing Classification: Statoil internal Status: Draft Key Technology Challenges Flow Assurance and Subsea processing Presented by Pål P l Hedne Technology Development in Statoil A 20-year History of Successful

More information

Chapter 4 Practice Quiz

Chapter 4 Practice Quiz Chapter 4 Practice Quiz 1. Label each box with the appropriate state of matter. A) I: Gas II: Liquid III: Solid B) I: Liquid II: Solid III: Gas C) I: Solid II: Liquid III: Gas D) I: Gas II: Solid III:

More information

Classification: Internal Status: Draft. Peon discovery. Unlocking unconventional resources in the North Sea

Classification: Internal Status: Draft. Peon discovery. Unlocking unconventional resources in the North Sea Classification: Internal Status: Draft Peon discovery Unlocking unconventional resources in the North Sea 2 Agenda Introduction to Peon Geology Peon reservoir properties Drainage strategy Technical challenges

More information

Putting a chill on global warming

Putting a chill on global warming Carbon capture and storage Putting a chill on global warming SABINE SULZER SULZER PUMPS MARKUS DUSS SULZER CHEMTECH Whenever fuel is burned, carbon dioxide (CO ) is emitted into the atmosphere. The subsequent

More information

Flow Assurance & Operability

Flow Assurance & Operability Flow Assurance & Operability Erosion due to sand production Date Business Name Overview 1. What causes erosion? 2. Sand production and transport 3. Sand management 4. Instrumentation / monitoring of sand

More information

FXA 2008. Candidates should be able to : Define and apply the concept of specific heat capacity. Select and apply the equation : E = mcδθ

FXA 2008. Candidates should be able to : Define and apply the concept of specific heat capacity. Select and apply the equation : E = mcδθ UNIT G484 Module 3 4.3.3 Thermal Properties of Materials 1 Candidates should be able to : Define and apply the concept of specific heat capacity. Select and apply the equation : E = mcδθ The MASS (m) of

More information

CO 2 41.2 MPa (abs) 20 C

CO 2 41.2 MPa (abs) 20 C comp_02 A CO 2 cartridge is used to propel a small rocket cart. Compressed CO 2, stored at a pressure of 41.2 MPa (abs) and a temperature of 20 C, is expanded through a smoothly contoured converging nozzle

More information

Liquefied Natural Gas (LNG)

Liquefied Natural Gas (LNG) Graduate Diploma in Petroleum Studies Major in Liquefied Natural Gas (LNG) INDUCTION Launching ceremony Week 39, 2012 Administration / Plant visit / Fundamentals of LNG and LNG main risks awareness Module

More information

Geothermal. . To reduce the CO 2 emissions a lot of effort is put in the development of large scale application of sustainable energy.

Geothermal. . To reduce the CO 2 emissions a lot of effort is put in the development of large scale application of sustainable energy. Geothermal Energy With increasing fossil fuel prices, geothermal energy is an attractive alternative energy source for district heating and industrial heating. In recent years the use of geothermal energy

More information

Total Subsea Solutions

Total Subsea Solutions Total Subsea Solutions Total Subsea Solutions Developing new energy reserves, managing, and improving producing fields means an unprecedented number of technical challenges. In partnership with our customers,

More information

Consequence Analysis: Comparison of Methodologies under API Standard and Commercial Software

Consequence Analysis: Comparison of Methodologies under API Standard and Commercial Software 511 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 36, 2014 Guest Editors: Valerio Cozzani, Eddy de Rademaeker Copyright 2014, AIDIC Servizi S.r.l., ISBN 978-88-95608-27-3; ISSN 2283-9216 The

More information

Type: Single Date: Homework: READ 12.8, Do CONCEPT Q. # (14) Do PROBLEMS (40, 52, 81) Ch. 12

Type: Single Date: Homework: READ 12.8, Do CONCEPT Q. # (14) Do PROBLEMS (40, 52, 81) Ch. 12 Type: Single Date: Objective: Latent Heat Homework: READ 12.8, Do CONCEPT Q. # (14) Do PROBLEMS (40, 52, 81) Ch. 12 AP Physics B Date: Mr. Mirro Heat and Phase Change When bodies are heated or cooled their

More information

Unsteady State Relief Valve Evaluation. External Pool Fire Scenario

Unsteady State Relief Valve Evaluation. External Pool Fire Scenario Unsteady State Relief Valve Evaluation External Pool Fire Scenario By Rame Sulaiman Process Engineer Process Engineering Associates, LLC Copyright 2009 Process Engineering Associates, LLC. All rights reserved.

More information

FIBER-OPTIC SENSING TECHNOLOGIES

FIBER-OPTIC SENSING TECHNOLOGIES PRODUCTION ENHANCEMENT FIBER-OPTIC SENSING TECHNOLOGIES FOR WELL MONITORING TO RESERVOIR MANAGEMENT Solving challenges. A H A L L I B U R T O N S E R V I C E Fiber-Optic Sensing Technologies CUTTING-EDGE

More information

Introduction to the Ideal Gas Law

Introduction to the Ideal Gas Law Course PHYSICS260 Assignment 5 Consider ten grams of nitrogen gas at an initial pressure of 6.0 atm and at room temperature. It undergoes an isobaric expansion resulting in a quadrupling of its volume.

More information

16. Heat Pipes in Electronics Cooling (2)

16. Heat Pipes in Electronics Cooling (2) 16. Heat Pipes in Electronics Cooling (2) 16.1 Pulsating Heat Pipes 16.1.1Introduction Conventional heat pipe technology has been successfully applied in the last thirty years for the thermal management

More information

Test Report No. C908LPEN

Test Report No. C908LPEN Institut für Solartechnik Hochschule für Technik Rapperswil Oberseestrasse 10, CH 8640 Rapperswil Tel +41 55 222 48 21, Fax +41 55 222 48 44 www.solarenergy.ch Ordered by: Changzhou He Jia Solar Energy

More information

Measurement & Analytics. VIS Multiphase Flow Meter High gas content applications solved with no radioactive source - Measurement made easy

Measurement & Analytics. VIS Multiphase Flow Meter High gas content applications solved with no radioactive source - Measurement made easy Measurement & Analytics VIS Multiphase Flow Meter High gas content applications solved with no radioactive source - Measurement made easy ABB s VIS Multiphase Flow Meter Easy to operate, accurate and fieldproven

More information

Chapter Test A. States of Matter MULTIPLE CHOICE. a fixed amount of STAs2 a. a solid. b. a liquid. c. a gas. d. any type of matter.

Chapter Test A. States of Matter MULTIPLE CHOICE. a fixed amount of STAs2 a. a solid. b. a liquid. c. a gas. d. any type of matter. Assessment Chapter Test A States of Matter MULTIPLE CHOICE Write the letter of the correct answer in the space provided. 1. Boyle s law explains the relationship between volume and pressure for a fixed

More information

1-4 kg/m3. Long in-line calibration cycles of the gamma density systems may improve measurement accuracy, but this is often not practical subsea.

1-4 kg/m3. Long in-line calibration cycles of the gamma density systems may improve measurement accuracy, but this is often not practical subsea. Generating Greater Accuracy and Robustness from Subsea Multiphase Meters By Finn Erik Berge, Emerson Process Management Subsea multiphase meters have faced a growing number of challenges linked to the

More information

Influence of fire source locations on the actuation of wet-type sprinklers in an office fire

Influence of fire source locations on the actuation of wet-type sprinklers in an office fire Influence of fire source locations on the actuation of wet-type sprinklers in an office fire Ko-Jen Chen 1 Chun-Ta Tzeng 2 Chi-ming Lai 3 Abstract An experiment is conducted on a full-scale model office

More information

Test Report No. C1319LPEN

Test Report No. C1319LPEN Institut für Solartechnik Hochschule für Technik Rapperswil Oberseestrasse 10, CH 8640 Rapperswil Tel +41 55 222 48 21, Fax +41 55 222 48 44 www.solarenergy.ch Ordered by: Thermics S.r.l. Via dell'olmo

More information

UNIT 2 REFRIGERATION CYCLE

UNIT 2 REFRIGERATION CYCLE UNIT 2 REFRIGERATION CYCLE Refrigeration Cycle Structure 2. Introduction Objectives 2.2 Vapour Compression Cycle 2.2. Simple Vapour Compression Refrigeration Cycle 2.2.2 Theoretical Vapour Compression

More information

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s Babcock & Wilcox Canada TSSG TM - SAGD-MC a n d I n d u s t r i a l A p p l i c a t i o n s w i t h M u l t i - C

More information

ENGINEERING INFORMATION Hot water and steam service

ENGINEERING INFORMATION Hot water and steam service ENGINEERING INFORMTION Hot water and steam service WHT IS STEM? Like other substances, water can exist in the form of a solid, when we call it ice; as a liquid when we call it water or as a gas when we

More information

Chapter 12 - Liquids and Solids

Chapter 12 - Liquids and Solids Chapter 12 - Liquids and Solids 12-1 Liquids I. Properties of Liquids and the Kinetic Molecular Theory A. Fluids 1. Substances that can flow and therefore take the shape of their container B. Relative

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Forgotten savings: Heat recovery from surface blowdown

Forgotten savings: Heat recovery from surface blowdown Forgotten savings: Heat recovery from surface blowdown 1. Introduction The purpose of this article is to inform thermal plant operators of the interesting fuel savings that can be obtained by recovering

More information

جامعة البلقاء التطبيقية

جامعة البلقاء التطبيقية AlBalqa Applied University تا سست عام 997 The curriculum of associate degree in Air Conditioning, Refrigeration and Heating Systems consists of (7 credit hours) as follows: Serial No. Requirements First

More information

RS-52 (R428A) RS-52: PHYSICAL PROPERTIES RS-52 R502 Molecular weight 107.5 111.6 Temperature glide o C 0.5 0.2 Boiling point (1 atm)

RS-52 (R428A) RS-52: PHYSICAL PROPERTIES RS-52 R502 Molecular weight 107.5 111.6 Temperature glide o C 0.5 0.2 Boiling point (1 atm) RS-52 (R428A) COMPOSITION % HFC 125 77.5 HFC 143a 20.0 R600a 1.9 R290 0.6 HCFC replacement Temperature glide R22, 502 & interim blends Approximately 0.8 o C Drop-in or long term Both Lubricant MO/AB/POE

More information

IGEMA BOILER LEVEL & TDS CONTROLS

IGEMA BOILER LEVEL & TDS CONTROLS IGEMA BOILER LEVEL & TDS CONTROLS IGEMA offers boiler level and TDS control products of the highest quality standard, being certified to ISO 9001. Made in Germany, IGEMA products are manufactured in compliance

More information

Goliat Produced Water Management

Goliat Produced Water Management Goliat Produced Water Management Hans Tore Nordbø, Process Engineer, Eni Norge AS Tekna Produced Water Management, 21.01.10-22.01.10, Clarion Hotel Stavanger www.eninorge.no PL229 Goliat location, ownership

More information

The soot and scale problems

The soot and scale problems Dr. Albrecht Kaupp Page 1 The soot and scale problems Issue Soot and scale do not only increase energy consumption but are as well a major cause of tube failure. Learning Objectives Understanding the implications

More information

Fundamentals of Mass Flow Control

Fundamentals of Mass Flow Control Fundamentals of Mass Flow Control Critical Terminology and Operation Principles for Gas and Liquid MFCs A mass flow controller (MFC) is a closed-loop device that sets, measures, and controls the flow of

More information

Refrigeration Basics 101. By: Eric Nelson

Refrigeration Basics 101. By: Eric Nelson Refrigeration Basics 101 By: Eric Nelson Basics Refrigeration is the removal of heat from a material or space, so that it s temperature is lower than that of it s surroundings. When refrigerant absorbs

More information

DecisionSpace Well Engineering Software

DecisionSpace Well Engineering Software DATA SHEET DecisionSpace Well Engineering Software DecisionSpace Drilling & Completions Key features Configure the right tools to drill any type of well Dramatically simple to use, complete complex fluids

More information

So T decreases. 1.- Does the temperature increase or decrease? For 1 mole of the vdw N2 gas:

So T decreases. 1.- Does the temperature increase or decrease? For 1 mole of the vdw N2 gas: 1.- One mole of Nitrogen (N2) has been compressed at T0=273 K to the volume V0=1liter. The gas goes through the free expansion process (Q = 0, W = 0), in which the pressure drops down to the atmospheric

More information

Perspective on R&D Needs for Gas Turbine Power Generation

Perspective on R&D Needs for Gas Turbine Power Generation Perspective on R&D Needs for Gas Turbine Power Generation Eli Razinsky Solar Turbine Incorporated 2010 UTSR Workshop October 26, 2011 1 Research Requirements Overview Specific Requirements 2 Society Requirements

More information

TOXIC AND FLAMMABLE GAS CLOUD DETECTORS LAYOUT OPTIMIZATION USING CFD

TOXIC AND FLAMMABLE GAS CLOUD DETECTORS LAYOUT OPTIMIZATION USING CFD Introduction to the case Gas detectors are commonly installed in process facilities to automatically alarm and trigger safety measures in response to hazardous leaks. Without effective leak detection,

More information

V-Cone, An Alternative to Orifice Meter in Wet Gas Applications

V-Cone, An Alternative to Orifice Meter in Wet Gas Applications V-Cone, An Alternative to Orifice Meter in Wet Gas Applications Stephen A. Ifft McCrometer Inc. Hemet, California, USA Abstract This paper will discuss the use of the V-Cone differential pressure flowmeter

More information

How To Use A Water Source Heat Pump

How To Use A Water Source Heat Pump Geothermal Energy Using Water-Source Heat Pumps By VIRSTAR Corporation Geothermal Expertise Since 1978 All information contained herein is the exclusive property of VIRSTAR Corporation, all rights reserved.

More information

AMEC 6007: Linear Velocity and Acceleration Learning Outcome. CHEM 6012: Oil and Gas Compositions and Sales Specifications Learning Outcome

AMEC 6007: Linear Velocity and Acceleration Learning Outcome. CHEM 6012: Oil and Gas Compositions and Sales Specifications Learning Outcome s/objectives Level F ADMN 6044: Post Job Management It is important to know the proper procedures for closing out a job so that rigging and equipment is maintained for future use and personnel are adequately

More information

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2 Introduction Canadian Oilwell Systems Company and it s subsidiaries are suppliers of oil well Electric Submersible Pumping systems (ESPs). Such pumps are used to lift oil from oil wells so that the oil

More information

No. Name Description Main input Data Main Output Data. cooling duty, process in/out temperature, inlet air temperature

No. Name Description Main input Data Main Output Data. cooling duty, process in/out temperature, inlet air temperature 1 AIRCOOLER Air cooler preliminary sizing cooling duty, process in/out temperature, inlet air temperature No of fans, Air cooler Dimension, bare area, no of rows, Fan Diameter, fan power 2 BLOW DOWN FACILITATOR

More information

We will try to get familiar with a heat pump, and try to determine its performance coefficient under different circumstances.

We will try to get familiar with a heat pump, and try to determine its performance coefficient under different circumstances. C4. Heat Pump I. OBJECTIVE OF THE EXPERIMENT We will try to get familiar with a heat pump, and try to determine its performance coefficient under different circumstances. II. INTRODUCTION II.1. Thermodynamic

More information

Process retrofitting. Davide Manca. Lesson 5 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano

Process retrofitting. Davide Manca. Lesson 5 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano Process retrofitting Davide Manca Lesson 5 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano L5 Process retrofitting Retrofitting refers to the addition of new

More information

Name Class Date. In the space provided, write the letter of the term or phrase that best completes each statement or best answers each question.

Name Class Date. In the space provided, write the letter of the term or phrase that best completes each statement or best answers each question. Assessment Chapter Test A Chapter: States of Matter In the space provided, write the letter of the term or phrase that best completes each statement or best answers each question. 1. The kinetic-molecular

More information

5.2. Vaporizers - Types and Usage

5.2. Vaporizers - Types and Usage 5.2. Vaporizers - Types and Usage 5.2.1. General Vaporizers are constructed in numerous designs and operated in many modes. Depending upon the service application the design, construction, inspection,

More information

Chemistry 13: States of Matter

Chemistry 13: States of Matter Chemistry 13: States of Matter Name: Period: Date: Chemistry Content Standard: Gases and Their Properties The kinetic molecular theory describes the motion of atoms and molecules and explains the properties

More information

Kodiak Deepwater Project Challenges and Solutions

Kodiak Deepwater Project Challenges and Solutions Kodiak Deepwater Project Challenges and Solutions Marine Technology Society September 24, 2015 Deep Gulf Energy II, LLC Overview of Deep Gulf Energy Companies Deep Gulf Energy Background Exploration and

More information

Investigating Flexible Generating Capabilities at The Geysers. Geysers Power Company, LLC December 03, 2015

Investigating Flexible Generating Capabilities at The Geysers. Geysers Power Company, LLC December 03, 2015 Investigating Flexible Generating Capabilities at The Geysers Geysers Power Company, LLC December 03, 2015 California Energy Commission (Grant # EPC-14-002) Agenda 1. Overview Of The Geysers Geothermal

More information

VAD Variable Area Desuperheaters

VAD Variable Area Desuperheaters Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without

More information

Press Kit Jette Well PL 027D, PL 169C og PL 504 REV. : 01 DATE : 16.5.2013 PAGE : 2 of 6

Press Kit Jette Well PL 027D, PL 169C og PL 504 REV. : 01 DATE : 16.5.2013 PAGE : 2 of 6 02 151007 Update 01 130516 Utkast Stein Risstad Larssen Anita Grimsrud Torgeir Anda Rev. Date Reason for Issue Prep. Checked Accepted Press Kit Jette well Wells 25/8-E-1 H og 25/8-D-1 AH T3 No. of Sheets:

More information

A.Pannirselvam*, M.Ramajayam, V.Gurumani, S.Arulselvan and G.Karthikeyan *(Department of Mechanical Engineering, Annamalai University)

A.Pannirselvam*, M.Ramajayam, V.Gurumani, S.Arulselvan and G.Karthikeyan *(Department of Mechanical Engineering, Annamalai University) A.Pannirselvam, M.Ramajayam, V.Gurumani, S.Arulselvan, G.Karthikeyan / International Journal of Vol. 2, Issue 2,Mar-Apr 212, pp.19-27 Experimental Studies on the Performance and Emission Characteristics

More information

OUTCOME 1 STATIC FLUID SYSTEMS TUTORIAL 1 - HYDROSTATICS

OUTCOME 1 STATIC FLUID SYSTEMS TUTORIAL 1 - HYDROSTATICS Unit 41: Fluid Mechanics Unit code: T/601/1445 QCF Level: 4 Credit value: 15 OUTCOME 1 STATIC FLUID SYSTEMS TUTORIAL 1 - HYDROSTATICS 1. Be able to determine the behavioural characteristics and parameters

More information

Fluids and Solids: Fundamentals

Fluids and Solids: Fundamentals Fluids and Solids: Fundamentals We normally recognize three states of matter: solid; liquid and gas. However, liquid and gas are both fluids: in contrast to solids they lack the ability to resist deformation.

More information

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar 26.11.

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar 26.11. Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions Nici Bergroth, Fortum Oyj FORS-seminar 26.11.2009, Otaniemi Loviisa 3 CHP Basis for the Loviisa 3 CHP alternative Replacement

More information

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011 Subsea Technology Alain Marion, Senior VP Assets & Subsea Technology Investor Day in Brazil, October 4, 2011 Subsea Technology Technip s Commitment to Subsea R&D Technip Leadership Position Emerging Technologies

More information

Trenching and Excavation Safety

Trenching and Excavation Safety 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking

More information

Hydraulic Pipeline Application Modules PSI s Tools to Support Pipeline Operation

Hydraulic Pipeline Application Modules PSI s Tools to Support Pipeline Operation Hydraulic Pipeline Application Modules PSI s Tools to Support Pipeline Operation Inhalt 1 Leak Detection and Location Modules... 3 1.1 Dynamic Balance Leak Detection... 3 1.2 Transient Model Leak Detection...

More information

Elements Elements describe the essential outcomes.

Elements Elements describe the essential outcomes. Application Competency Field Unit Sector Elements Elements describe the essential outcomes. This unit describes the performance outcomes required to service air conditioning systems, including heating,

More information

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities Fats, Oil and Grease Best Management Practices Manual Information, Pollution Prevention, and Compliance Information For Food Service Facilities Pinellas County Utilities Water Quality Management Division

More information

SOLAR WATER PURIFICATION WITH THE HELP OF CSP TECHNOLOGY

SOLAR WATER PURIFICATION WITH THE HELP OF CSP TECHNOLOGY Sci. Revs. Chem. Commun.: 3(2), 2013, 128-132 ISSN 2277-2669 SOLAR WATER PURIFICATION WITH THE HELP OF CSP TECHNOLOGY JINESH S. MACHALE *, PRACHI D. THAKUR, PIYUSH S. LALWANI and GAYATRI M. APTE Department

More information

Certificate Programs in. Program Requirements

Certificate Programs in. Program Requirements IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: certificate@ihrdc.com Copyright International Human

More information

CHAPTER II. This chapter contains a simplified description of the pipeline safety requirements. The complete text can be found in 49 CFR Part 192.

CHAPTER II. This chapter contains a simplified description of the pipeline safety requirements. The complete text can be found in 49 CFR Part 192. CHAPTER II REGULATOR AND RELIEF DEVICES This chapter contains a simplified description of the pipeline safety requirements. The complete text can be found in 49 CFR Part 192. BASIC CONCEPT In understanding

More information

Improving pre-operational production efficiency estimates

Improving pre-operational production efficiency estimates Improving pre-operational production efficiency estimates ESRA seminar 28 th January 2015 Classification: Internal Production efficiency (PE) 100% Estimated production loss PE Production efficiency (PE)

More information

Help Shape the Future of Energy as an Engineer at Chevron

Help Shape the Future of Energy as an Engineer at Chevron Help Shape the Future of Energy as an Engineer at Chevron Chevron is one of the world s leading integrated energy companies. Our success is driven by our people and their commitment to get results the

More information

Module No. # 02. Impact of oil and gas industry on marine environment

Module No. # 02. Impact of oil and gas industry on marine environment Health, Safety and Environmental Management in Petroleum and offshore Engineering Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module No. # 02 Lecture

More information

A Response Surface Model to Predict Flammable Gas Cloud Volume in Offshore Modules. Tatiele Dalfior Ferreira Sávio Souza Venâncio Vianna

A Response Surface Model to Predict Flammable Gas Cloud Volume in Offshore Modules. Tatiele Dalfior Ferreira Sávio Souza Venâncio Vianna A Response Surface Model to Predict Flammable Gas Cloud Volume in Offshore Modules Tatiele Dalfior Ferreira Sávio Souza Venâncio Vianna PRESENTATION TOPICS Research Group Overview; Problem Description;

More information

Thermische Speicherung von Solarenergie

Thermische Speicherung von Solarenergie Thermische Speicherung von Solarenergie Dr. Thomas Bauer Institut für Technische Thermodynamik Stuttgart, Köln 15. Kölner Sonnenkolloquium, 12.6.2012 www.dlr.de/tt Slide 2 > 15. Kölner Sonnenkolloquium

More information

Science Standard Articulated by Grade Level Strand 5: Physical Science

Science Standard Articulated by Grade Level Strand 5: Physical Science Concept 1: Properties of Objects and Materials Classify objects and materials by their observable properties. Kindergarten Grade 1 Grade 2 Grade 3 Grade 4 PO 1. Identify the following observable properties

More information

Residential Plumbing BCN 1058

Residential Plumbing BCN 1058 Residential Plumbing BCN 1058 CHAPTER 7 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System MICHAEL KNOTEK 74 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System PLUMBING FIXTURES

More information

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN Authors: Presenter: T. Efrat, Yu Haimiao Tomer Efrat Deputy Manager, Thermal Process Dept. IDE Technologies

More information

COMPARISON OF PROCESS FLOWS: FLUID BED COMBUSTOR AND GLASSPACK

COMPARISON OF PROCESS FLOWS: FLUID BED COMBUSTOR AND GLASSPACK COMPARISON OF PROCESS FLOWS: FLUID BED COMBUSTOR AND GLASSPACK PURPOSE The purpose of this document is to present the assumptions and calculations used to prepare Minergy Drawing 100-0204-PP00 (attached).

More information

Ammonia Detection System Codes and Design Specifications

Ammonia Detection System Codes and Design Specifications Ammonia Detection System Codes and Design Specifications December 28, 2015 Revision 5 920 N Trade Winds Pkwy Columbia, MO 65201 Ammonia detection system codes and design specifications Following is a discussion

More information