1 East Ayrshire Local Development Plan: Proposed Plan Programme 1 MARCH 2015

2 CONTENTS 1 INTRODUCTION 3 2 THE PLACEMAKING MAPS: LDP POLICIES 31 4 VOLUME 2 LDP PROPOSALS 35 2

3 1 INTRODUCTION This Draft Programme supports the delivery of the East Ayrshire Local Development Plan (LDP) by setting out the actions and partnerships that are necessary to implement the strategy and proposals of the Plan. In accordance with legal requirements, the Programme contains: A list of actions required to deliver each of the Plan s policies and proposals; The name of the organisation and/or person required to carry out each action; and The timescale for carrying out each action. Additionally, the Programme sets out progress as at the date of publication. The Programme consists of three main parts: 1. The placemaking maps each of the projects shown on the placemaking maps have been listed as separate actions 2. The LDP Policies 3. The LDP Proposals The action programme is a live document reflecting the continuous process of delivering the LDP. It is based on information currently available and will be updated to include further information as it comes forward. It will also be used to provide an update on the progress of key actions, particularly as new placemaking maps are prepared for all communities in East Ayrshire. To deliver this Programme the Council will work with its partners on specific actions. Where this is the case and where partners are required to feed into the identified actions they are named in the Programme. Following the adoption of the East Ayrshire Local Development Plan the Programme will be updated as a minimum every 2 years. Abbreviations used- AGN - Ayrshire Green Network AGNP - Ayrshire Green Network Partnership ARA - Ayrshire Roads Alliance CARS - Conservation Area Regeneration Scheme CSGN - Central Scotland Green Network DP&R - Development Planning and Regeneration D & G - Dumfries and Galloway Council EAC - East Ayrshire Council LDP - Local Development Plan NHS - National Health Service SAC - South Ayrshire Council SNH - Scottish Natural Heritage SPT - Strathclyde Partnership for Transport SG - Supplementary Guidance 3

4 2 THE PLACEMAKING MAPS: 4

5 Key Kilmarnock Green Infrastucture Project - cycle / path route Proposed housing growth areas (2025) Future Housing growth areas (2025+) Proposed business/industrial areas Miscellaneous opportunity areas Proposed future business/industrial growth areas Existing Green Network Temporary greening/improvements to greenspace required Search area for new learning campus Protect the landscape setting of the town Blue network Improve blue network links in town Centre Improve green network links in town centre Gateway features required Kilmarnock Town Centre Inset Kilmarnock settlement wide placemaking map 12 This map is reproduced from Ordnance Survey material with permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office (c) Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. East Ayrshire Council

6 18 Kilmarnock town centre placemaking map Key Housing Improvement Area Cycle / footpath route opportunities for improvement Proposed housing growth areas (2025) Existing Green Network Miscellaneous opportunity areas Temporary greening Town centre wi-fi Civic space opportunities Retain enhance historic core Key development opportunities Improvements to one way system Improved links to Hill Street & Cultural Quarter Blue network Active street frontage required Business hub Specialist shopping hub Create nightime economy Cultural quarter New link required from Western Road This map is reproduced from Ordnance Survey material with permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office (c) Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. East Ayrshire Council

7 Kilmarnock 1 Development of Northcraig site 319H Consideration of new planning application and implementation by Hallam Land Management Hallam Land Management/ house builders New planning application for site submitted. 2 Development of site 152B at Meiklewood, North Kilmarnock A partnership between all owners is required. Alternatively, a single developer to take ownership of whole site and develop primarily for business/industrial use. High infrastructure costs may mean the site is a longer term prospect and may require a public/private partnership to be formed. A master plan for the development of the site will be required, as well as a business plan to unlock its development potential. Land owners/ developer(s)w Some interest in the northern portion of the site for uses linked to existing Rowallan Activity Centre. Residential uses at this site are being resisted by the Council. 3 Development of remainder of Rowallan Business Park for Class 4 and 6 uses. Attract business/appropriate industrial uses to the remaining 4 plots at Rowallan Business Park. EAC to investigate options for purchasing remaining plots at Rowallan. Scottish Enterprise/ EAC Economic Development Four units already built and occupied over the past 15 years. Four plots remaining. 4 Development of Altonhill sites 136H and 413H for housing and site 232M for a small shopping area Build out remaining Taylor Wimpey controlled land at 136H, install football pitches. Submit detailed planning application for new housing site 413H and shopping area at 232M. Taylor Wimpey/ landowners/ developers Site 136H progressing well. Planning permission in principle granted for sites 413H and 232M. 5 & 6 Development of future growth area to West of Kilmarnock. Detailed assessment required for residential use post Capacity of local schools will require to be examined as part of this development. A master plan approach, based on a thorough investigation of the site, will be required. Land owner/ developer Post 2025 No current development proposals or developer secured. 7

8 Kilmarnock 7 Development of Fardalehill (site 318H) to the west of Kilmarnock Implementation of Infrastructure Delivery Plan and development of the site on a phased basis in line with phasing plan Land Improvement Holdings/ House builders 2025 Submission of Infrastructure Delivery Plan and Phasing Plan complete. Initial infrastructure works underway. First phase detailed planning application pending consideration. 8 Development of sites 418H, 417H and 145H. Implementation of existing planning consents for sites 417H and 418H. Promotion of housing development at 145H Landowners/ developers Planning permission in principle granted for sites 417H and 418H. 9 Completion of Development of Moorfield Park Phase 2 for business /industrial uses, promotion and development of new Moorfield Park Phase 3 Secure occupation of newly built unit within phase 2 to new occupier and promote remainder of site for business/ industrial development. EAC to purchase land for Phase 3 from landowner and progress with the planning and implementation of infrastructure works. A master plan will be required, following investigation of the site. EAC Planning and Economic Development/ EAC Estates Significant progress with Phase 1 6 occupiers. Phase 2 Council secured European finding to construct new 20,000sqft unit. Soon to be occupied by new tenant. Council starting to progress with purchase of Phase Development of future growth area to south of Moorfield roundabout. Develop site for residential use post Capacity of local schools will require to be examined as part of this development. A master plan approach, based on a thorough investigation of the site, will be required. Land owner/ developer Post 2025 No developer proposals have been submitted to the Council as yet 11 Development of site at Caprington for housing development/ remodelling of golf course. Develop site for housing and remodel/upgrade existing golf course. Residential development is conditional on golf course being remodelled. A master plan will be required. Landowner/ developer/ Caprington Golf Club 2025 Land owner in discussions with golf club over future development and improvements to golf course. 12 Development of site at Treesbank for housing Secure developer for site, develop site for housing in phases. A master plan will be required. Land owner / developer No developer secured for site as yet. 8

9 Kilmarnock 13 Kilmarnock Green Infrastructure Project Secure funding package and upgrade existing paths/ construction of new cycle route/ foot path in a figure of 8 in and around Kilmarnock. This includes the improvement and linking up of existing green and blue networks particularly within the town centre from King Street to Howard Park. EAC Kilmarnock Green Infrastructure Working Group Funding bid submitted to SNH Green Infrastructure Fund and also to SPT. *Developer Contributions Project 14 Gateway feature at northern entrance to town Public art as entrance feature to north Kilmarnock EAC Planning and Economic Development No current proposals. 15 Temporary greening of site 327M at West Shaw Street Enter negotiations with site owner/future developer to prepare landscaping/tree planting proposals around the edges of the site of the former supermarket to reduce the detrimental impact of the vacant/derelict site on adjacent areas. Assemble funding package. EAC Planning and Economic Development / Ayrshire Green Network 2017 No current proposals. 17 Future Growth Area for business/ industrial growth Examine feasibility of this area for future industrial and business expansion area as part of establishment of a M77 corridor concept to strengthen links with Prestwick Airport EAC Planning and Economic Development/ ARA/Scottish Enterprise/ Transport Scotland/NHS/ Landowner(s) 2025 Feasibility Study has not yet commenced. 9

10 Kilmarnock 18 Housing Improvement Area at Hill Street/ Montgomery Street/ Witchhill Place 3 storey Council housing stock in need of improvement. EAC Cabinet has approved demolition and new build of site 438H, scheduled for 2015/16. Opportunities for the wider regeneration of this area, to include refreshing the housing stock, will be further explored by the Council s Housing Service. This is part of a wider strategy to create a high quality corridor of new development leading to the major regeneration opportunity at the former Diageo factory site. EAC Housing Service 2016/17 Cabinet decision taken to demolish existing stock on Montgomery Street. Tenants are currently being rehoused elsewhere and the site is included in this year s SHIP. 19 Major Regeneration Opportunity site at former Diageo site, Hill Street Redevelopment of whole site required. Construction of a new college on the southern portion of the site and the northern portion to be developed for a range of uses. Active street frontage required for the northern portion of the site that takes account of the Councils proposals for Hill Street / Montgomergy Street (described in 18 above). A link from Western Road into Balmoral Road may be required as part of any new development on the northern portion of the site. A master plan for the northern portion of the site will be required. Kilmarnock College/Klin Holdings 2025 College is under construction. The development potential of the northern portion is currently being investigated by Klin Holdings. 20 Development of council housing at Witch Road corner site Construction of development to be completed and units to be appropriately allocated/let. EAC Housing Services 2015 Housing under construction 21 Development of council housing at former car park on Portland Street Construction of development to be completed and units to be appropriately allocated/let. EAC Housing Services 2015 Housing under construction 10

11 Kilmarnock 22 Improve links from town centre to Hill Street regeneration site 23 Improvements to the Multi storey car park 24 Create a night-time economy on King Street 25 Development Opportunity at former Bank building, The Cross, King Street This is a prominent location and this grand building has been vacant for most of the last 20 years. Its reuse will contribute greatly to placemaking. Work with Scotrail/Network Rail/ SPT/Ayrshire College to make improvements to the train station underpass. This is a key entry point into the town and the quickest route from the new college into the town centre. It is in a poor state of disrepair and offers unacceptable levels of service to those with mobility issues. Improvement of the underpass is a high priority for the Council. Development and funding options study is required. Investigate potential for further improvements including stairwell security and installation of lifts to improve security and access Relax town centre retailing policy to allow a range of town centre uses on King Street. Work with owner to release the building for appropriate development. Restaurant use is most desirable to encourage night time use. EAC DP&R/ ARA/Network Rail/Scotrail/ Ayrshire College/ SPT ARA A joint working group has been established. An application has been submitted to SPT seeking funding for a feasibility study. Feasibility Study to be undertaken in 2015 EAC DP&R 2015 Proposed LDP contains more relaxed town centre policies. EAC DP&R 2017 Discussions with owner have not started. 11

12 Kilmarnock 26 Establishment and enhancement of Cultural Quarter including Dick Institute and Kilmarnock Academy building/ site, with improved linkages to the town centre. 27 Develop existing Kilmarnock college site for housing 28 Develop former cattle market site at West Langlands Street for housing 29 Potential for riverside café at top of Sandbed Street Working group to be established consisting of officers from Community Planning, Planning, EA Leisure Trust, EA Estates to examine feasibility of cultural quarter, currently focussed on the Dick Institute. The working group to examine potential uses that should be promoted within the soon to be vacated Kilmarnock Academy building and site to complement the existing cultural facilities at the Dick Institute. Investigate the potential of expanding the cultural offer at the open spaces around the Dick Institute. Once Kilmarnock college has transferred to new site at Hill Street, Kilmarnock, demolish existing College buildings and sell on to a housing developer Construction of development to be completed and units to be appropriately allocated/let. Examine opportunity for Riverside Café by establishing land ownership and engaging with owner to look at development of riverside café with public spaces and making Sandbed Street more of a priority pedestrian street. EAC/ARA Kilmarnock College EAC Housing Service EAC DP&R and ARA As part of the improvements to the one way system, a bid for funding has been made to SPT for the design of improvement works to the eastern side of this circulatory route. This project is being called the London Road Gateway project and will involve sustainable transport and public realm improvements. Once implemented, links to the Cultural Quarter will be greatly improved. This links to No 34. College building still occupied Site under construction Initial investigations have taken place into land ownership. 12

13 Kilmarnock 30 Improve riverside routes through town centre from King Street to Howard Park. Improvements to include footpath/ cycle path improvements and landscaping. Examine potential for the Kilmarnock Green Infrastructure Project or figure of 8 route to incorporate Sandbed Street. Look at opportunities and requirements for improvements along the riverside from Portland Road to Howard Park. EAC Leisure trust EAC DP&R/ ARA / AGN Discussions ongoing. 31 Re-use of former cinema Titchfield Street Promote listed former cinema building as development opportunity in LDP encouraging a wide range of town centre uses. EAC DP&R, Owner of Former Cinema Site is identified in LDP as a miscellaneous development 32 Development of former St Columbas School site, Elmbank Street for housing, community or educational uses. Listed School building now demolished due to fire damage. Promote for development through LDP. EAC DP&R Site is identified in LDP as a miscellaneous development opportunity. 33 Temporary greening of Vacant/Derelict site West Netherton Street/Titchfield Street Site has planning consent for Class 1 retail use. However, there have been delays with starting the development. EAC to establish when development is expected. If some years away, EAC to work with owner/developer to negotiate temporary greening measure around the perimeter of the site to reduce the detrimental impact this cleared site currently has on the wider town centre. EAC 2017 No temporary greening measures have been progressed as yet. 13

14 Kilmarnock 34 Environmental/ junction Improvements to one way system Continue to develop proposals for softening the appearance of, and slowing traffic on the one way system around Kilmarnock Town Centre, to improve safety, the amenity of the town centre and connectivity between the town centre and neighbouring areas. *Developer Contributions Project EAC Planning/ ARA/SPT 2025 The consultant study looking at the most effective environmental/ junction improvements for one way system, focussing on east of town centre at Sturrock Street, has now been completed. However, further work is required to prepare detailed designs for potential improvements. Links with No: Top of the Town environmental improvement scheme to the Foregate North car park New pedestrian links to be formed around the car park to improve pedestrian connectivity between the town centre and High Street. EAC Planning and Economic Development / ARA 2015 The development of the scheme will commence in January New Learning Campus, site of James Hamilton Academy, Sutherland Drive Merging of James Hamilton Academy, Kilmarnock Academy, New Farm Primary School and Early Childhood Centre and Silverwood Primary School and construction of new Learning Campus. EAC Education/ EAC Corporate Infrastructure/ EAC Estates/ ARA 2019 Initial design work has started for the New Learning Campus Trust The Council has set aside a capital allocation for the construction of the new campus. Additional revenue support from Scottish Futures Trust has been applied for. Town Centre Wifi Liaise with telecommunications industry to investigate feasibility of rolling out town centre free wifi for public use EAC Planning, EAC corporate infrastructure, Broadband Providers 2016/17 No progress as yet. 14

15 1 2 3 Cumnock settlement wide placemaking map Key Cycle / footpath route Cycle / footpath route opportunities for improvement Link footpaths & provide signs Proposed housing growth areas (2025) Existing Green Network Temporary greening/improvements to greenspace required Proposed mix use areas Gateway features required Search area for new learning campus Protect the landscape setting of the town Improved links to Dumfries House Blue network New bridge required This map is reproduced from Ordnance Survey material with permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office (c) Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. East Ayrshire Council

16 Cumnock town centre placemaking map Key Civic space opportunities Retain enhance historic core Key development opportunities Town centre wi-fi Streescape improvements Existing green network Blue network This map is reproduced from the Ordnance Survey material with permission of Ordnance Survey on behalf of the Controller of Her Majesty`s Stationery Office(C) Crown copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. East Ayrshire Council

17 Cumnock 1 Develop Knockroon (LDP site 263H) as a sustainable community comprising a range of uses including 770 houses, open space and community and employment uses. Construct development phase by phase as per approved master plan and Design Code. Include gateway feature as part of the overall development. Hope Homes 2035 First phase of the development is well underway. Includes residential and commercial uses. 2 Develop Rigg Road and former Holmhead Hospital (LDP site 264H) for housing. Owners of sites to engage with developers to release land for development Land owners/ developers 2025 No developer proposals have been submitted to the Council as yet 3 Develop remainder of Holmhead housing site 015H. 4 Improvements to Woodroad Park including new accessible bridge. Developer to continue with development of site Undertake preparation of detailed park wide landscape design proposals to make the park more accessible and appealing to visitors. Wider path links to Dumfries Estate and the River Ayr Way should be included within this proposal. King Homes 2025 EAC Outdoor Amenities/EAC Leisure Trust/ ARA Development is ongoing with active planning permission in place. Implementation dependent on developer contributions coming forward. *Developer Contributions Project 5 Upgrade and promotion of paths and habitat networks along Lugar Water including consideration of how these can link to Dumfries Estate 6 Link up wider path network within town centre. In line with the Green Infrastructure Strategy, draw up proposals (including funding package) to improve paths along the Lugar Water. Ensure that all new developments coming forward include proposals to upgrade footpaths and/or habitat networks where the Lugar Water falls within the planning application site. Provide linkages, signs and interpretation boards. EAC Leisure Trust, EAC Planning, developers EA Leisure Trust/Retail Developer/ARA/ EAC P&ED No current proposals No current proposals 17

18 Cumnock 7 Potential new learning campus at Broomfield Playing fields 8 Footbridge links across the A76 to link Caponacre area with disused railway line, to be developed as footpath 9 Promote Caponacre for mixed use development 10 Develop Cairn Road north (LDP site 262H) for housing. 11 Improvements to disused railway to create footpath to Lugar and beyond 12 Improvements to streetscape within town centre 13 Civic space opportunity adjacent to the Gorbals Bridge 14 Improvements to existing civic space at corner of Ayr Road/Glaisnock Street Undertake feasibility study of new school proposals at Broomfield Playing fields incorporating new rugby and football pitches Undertake feasibility of providing a footbridge across the A76 Relax permitted uses at this site. A master plan approach is required, building upon the Cumnock Strategy report prepared by the Princes Trust. Owners to promote site for development and seek detailed planning consent Investigate improvements required to create quality footpath/cycle route to Lugar Upgrade of road and footpath surfaces in town centre and additional landscaping at The Square, in support of the Cumnock CARS project *Developer Contributions Project Include new civic space area within wider retail development proposals on the site of the Glaisnock Centre and prepare proposals including potential funding package. Carry out improvements to existing area of civic space EAC Corporate Infrastructure, EAC Education and Social Services / EAC Estates / ARA / EAC Planning and Economic Development ARA EAC Planning, EAC Economic Development 2025 Land owner 2018 Potential AGN project ARA 2025 Retail Developers, EAC Planning 2018 EAC 2018 Initial consultation being undertaken with parents of pupils at all schools that could potentially be affected and Cumnock Rugby Club. No current proposals. LDP allows wider range of uses at Caponacre Planning consent previously granted on site. Ayr Road footpath has been upgraded. Black Bull Close has been upgraded. Dependent on developer contributions coming forward. No current proposals. No current proposals. 18

19 Cumnock 15 Redevelopment of Glaisnock Centre and erection of 7 new build units on Townhead Street 16 Development of town centre gap site at Lugar Street Town Centre Wifi Demolish Glaisnock Centre and build new retail units in keeping with location adjacent to conservation area and provide compensatory parking. Relocate tenants of Glaisnock centre to new retail units. The proposals will examine the option to create additional car parking space on the Greenholm Road side of the Glaisnock Water with a road bridge link from the existing car park. Promote brownfield site for redevelopment Liaise with telecommunications industry to investigate feasibility of rolling out town centre free wifi for public use EAC Estates, Retail developer 2018 Land owner EAC Planning, EAC corporate infrastructure, Broadband Providers Cabinet approval of the principle of rehousing existing retailers in new retail units on Townhead Street, demolition of existing Glaisnock Centre and rebuild of new retail units. Planning application submitted for proposed new retail units on Townhead Street. It is anticipated that construction of the retail units will commence in Spring 2015 with completion in 2016 Owner has previously intimated willingness to work with the Council 2016/17 No progress as yet. 19

20 3 17 Galston Placemaking map ` Key Cycle / footpath route Cycle / footpath route opportunities for improvement New Cycle / footpath route required Proposed housing growth areas (2025) Future Housing growth areas (2025+) Temporary greening/improvements to greenspace required Gateway features required Civic space / Development opportunity Retain enhance historic core Key development opportunities Streescape improvements Protect the landscape setting of the town Improved links to school & Loudoun Castle Estate Blue network This map is reproduced from Ordnance Survey material with permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office (c) Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. East Ayrshire Council

21 Galston Whole conser -vation area Conservation Area Regeneration Scheme (CARS) for Galston implementation of Conservation Area Regeneration Scheme (CARS) Plan, targeting priority buildings. EAC DP&R / property owners 2018 underway on a number of projects 1 Development of housing site to south of Belvedere View 2 Development of future growth area for housing Landowner to sell site to developer/house builder. Site to be developed to a high quality in line with SG and Designing Streets Develop site for residential use post Land owner to engage with developer for future development of the site. Landowner/ Developer Landowner/ Developer No developer proposals have been submitted to the Council as yet No progress as is future growth area Capacity of local schools will require to be examined as part of this development. A master plan approach, based on a thorough investigation of the site, will be required. 3 New riverside footpath/cycle route to north of town 4 Improvements to Portland Park 5 Improvements to Barmill running track 6 Barmill Road/ Henrietta Street: Temporary Greening Creation of new path to cycle route standard to link with existing network of paths around the town encompassing new flood prevention scheme. Improve quality of open space at the park including peripheral landscape enhancements as the park is currently used as a 7-a-side football pitch. A Landscape Design and Management Plan is required to consider play provision and paths without compromising recreational areas Upgrade and resolve drainage issues at the running track Landscaping of the site to reduce detrimental impact of existing derelict site. EAC to negotiate with land owner to jointly prepare proposals. EA Leisure Trust /ARA/SPT EA Outdoor Services/ Leisure Trust Galston Community as part of asset transfer process EAC/AGNP/ Land Owner Bid has been submitted to SPT No current proposals No current proposals Flagged as potential AGNP project 21

22 Galston 7 Gateway Feature for Galston on Polwarth Street 8 Development of gap site at Titchfield Street for Housing 9 Improvement to Bridge Street 10 Vacant site on station Road opposite war memorial 11 Chapel Lane: site of demolished Council housing 12 Repairs and reuse of property at 4-8 Polwarth Street 13 Vacant site at Bridge Street Improvement of former Balmoral Knitwear building, with implementation of proposals coordinated by CARS project officer / building owner. Implementation of current planning consent CARS priority building. Grants available for the repair of the building and its reuse for footfall generating uses. Development of site of former council building for housing or community uses. Complete site for council housing and allocate new houses to appropriate tenants. CARS Priority Building. Grants available for the repair of the building and its reuse. Priority site for re-use for footfall generating uses. EAC DP&R and CARS project officer to act as intermediary for the development scheme Cross Street Opportunity to better utilise prominent building space in conjunction with adjacent property. Revised options study required. 15 Former Portland Arms building, Brewland Street/ Cross Street CARS Priority Building for repair and to bring back into use for commercial/community and residential uses. Undertake feasibility study to include comprehensive repair schedule. EAC DP&R/ Galston CARS Landowner/ Developer EAC DP&R/ Owner EAC Estates/ Developer EAC 2016 EAC DP&R/ Owner EAC DP&R/ Land Owner EAC Estates & EAC DP&R EAC DP&R Galston Community Trust (GCT) Feasibility Study carried out on potential future use. On-going meetings with owners of building. A potential CARS funded project Detailed planning consent granted for 8 flats in 2012 A condition survey has been carried out by the owner. Proposals are currently being drawn up by the owners professional design team. No developer proposals have been submitted to the Council as yet Work has started on site No current progress. Building was demolished in A planning application has been submitted. Awaiting the outcome of negotiations with the adjoining landowner. GCT progressing with purchase of building and is actively seeking new users 22

23 Galston 16 Streetscape and public realm improvements Upgrade of road and footpath surfaces in conservation area and new seating/planting at key locations. Proposals and cost report to be prepared. EAC DP&R Dependent on developer contributions coming forward. *Developer Contributions Project 17 Improved links to school and Loudon Castle Estate Ensure that any redevelopment of Loudoun Castle Estate incorporates improved links to Galston town centre and Loudoun Academy EAC Planning Planning application has been submitted for a mixed use tourism based scheme at Loudoun Castle for up to 450 holiday lodges, up to 12 glamping pitches, restoration of Castle to shell & conversion to hotel; new leisure facilities including: lake, indoor water park with retail plaza & restaurants (6,500sqm), water sports building (600sqm), indoor sports (5,000sqm), spa (2,000sqm) & cycle store. Erection of distillery (1,552sqm) & community heat plant (476sqm). Erection of enabling development of up to 1,025 dwellings. 23

24 1 Stewarton Placemaking map Key Cycle / footpath route Civic space opportunities 16 Cycle / footpath route opportunities for improvement Retain enhance historic core New cycle / footpath route required Extend historic core Proposed housing growth areas (2025) Key development opportunities Future Housing growth areas (2025+) Gateway features required Existing Green Network Proposed business/industrial growth areas Links to North Ayrshire & M77 Blue Network Protect the landscape setting of the town This map is reproduced from Ordnance Survey material with permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office (c) Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. East Ayrshire Council

25 Stewarton 1 Stewarton Dunlop Cycle Route 2 Stewarton Cycle Route 4 Development of gap site, Dean Street 5 Business and Industrial Site, Bridgend 6 Extension of Conservation Area Upgrading of existing route to cycle route standard Create new path and bridge to provide cycle path and footway between Kirk Glebe and Kirkford Construction of new housing development Development of site for industrial purposes (potential expansion space for adjacent industrial use) Carry out Conservation Area Appraisal for Stewarton. Consult the public and Historic Scotland and advertise proposed extension 7 Western Cycle Route Upgrade of existing paths to cycle route standard 9 Gap site at 10 Lainshaw Street Redevelopment of prominent gap site close to Stewarton Cross ARA ARA Springfield Homes Initial feasibility options study has been undertaken. Land agreements being sought. Planning application for 6 residential units submitted Land Owner Unknown No developer proposals have been submitted to the Council as yet EAC Planning EA Leisure Trust/Housing Developer/ARA Land Owner/ developer Planning consent granted in December 2012 for ground floor commercial and upper floor residential development Conservation Area Appraisal has not yet commenced. No current development proposals Planning consent not yet implemented 10 Improvements to civic space at the Cross Undertake public realm improvements to the civic space at the Cross. Prepare proposals and identify potential funding package. EAC Dependent on developer contributions coming forward. *Developer Contributions Project 11 Lighting of the viaduct (gateway feature) 12 Lighting of Corsehill Castle Undertake Feasibility Study for the lighting of the viaduct. Identify funding sources and take project forward Undertake feasibility study in association with property owner EAC DP&R / Network Rail EAC DP&R / Property owner Feasibility Study has not yet commenced. Feasibility Study has not yet commenced. (Gateway feature) 25

26 Stewarton 13 Development of Housing site at Draffen East 14 Development of Housing site at Dunlop Road 15 Development of future growth area to West of Stewarton 16 Improve links to M77 Develop site for low density residential development (circa 100 units) Develop site for residential development (circa 130 units) Investigate possibility of upgrade to Cocklebie Park and adjacent open space in lieu of on site open space provision, through Section 75 legal obligation. Detailed assessment required for residential use post Capacity of local schools will require to be examined as part of this development. A master plan approach, based on a thorough investigation of the site, will be required. B778 Stewarton Fenwick road requires upgrading to improve safety. This is a developer contributions project carried over from the EALP All residential developments will be required to make a contribution towards this project. Prepare transport corridor study, highlighting locations and probable costs for future improvements. *Developer Contributions Project Housing Developer EAC Planning/ Housing Developer Land owner/ developer ARA/EAC Planning 2016 Planning Permission in Principle approved in Pre-app discussions taking place with a national house builder Post Discussions with national house builder ongoing. Planning application expected early No developer proposals have been submitted to the Council as yet Funding for improvements have already been gathered through EALP 2010 policy RES

27 Key Cycle / footpath route New Cycle / footpath route required Proposed housing growth areas (2025) 1 Existing Green Network Temporary greening/improvements to greenspace required Gateway features required Civic space opportunities Retain enhance historic core Key development opportunities Streescape improvements 14 Improved links to Craigengillan, Dark Sky Observatory, Loch Doon & Galloway Forrest Blue network Protect the landscape setting of the town This map is reproduced from Ordnance Survey material with permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office (c) Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. East Ayrshire 27 Council

28 Dalmellington Whole conser -vation area Conservation Area Regeneration Scheme (CARS) for Dalmellington 1 Development of housing site at Sillyhole Apply to Historic Scotland for CARS for Dalmellington, and if successful, appoint CARS officer and in partnership with building owners, prepare proposals to improve priority buildings within the Conservation Area Development of site for housing 2 8 Main Street Redevelopment/ reuse of vacant buildings for town centre/tourism uses through implementation of CARS action plan. EAC DP&R / property owners Land owner/ developer Owner/ Developer A revised application has to be submitted to Historic Scotland for a CARS for Dalmellington by September Previous PPP consent lapsed in 2012 no current proposals for development No developer proposals have been submitted to the Council as yet 3 Gap site adjacent to 8 Main Street Development/use of gap site through implementation of CARS action plan High Main Street Redevelopment/reuse of vacant buildings for town centre/tourism uses, through implementation of CARS action plan 5 1 Church Hill Redevelopment/reuse of vacant commercial property for residential/town centre/tourism uses, through implementation of CARS action plan 6 1 New Street Redevelopment of vacant building for residential/tourism/town centre uses, through implementation of CARS action plan 7 Former Ye Old House and adjacent building, 5-9 High Street Redevelopment of vacant building for residential/tourism/town centre uses, through implementation of CARS action plan Owner/ Developer Owner/ Developer/ Potential for CARS grant through EAC DP&R Owner/ Developer/ Potential for CARS grant through EAC DP&R Owner/ Developer/ Potential for CARS grant through EAC DP&R Owner/ Developer/ Potential for CARS grant through EAC DP&R / 2017/ 2017/ 2017/ No developer proposals have been submitted to the Council as yet No developer proposals have been submitted to the Council as yet Planning consent for change of use to 3 flats granted consent in August 2013 No developer proposals have been submitted to the Council as yet No developer proposals have been submitted to the Council as yet 28

29 Dalmellington 8 Land adjacent to 6 Townhead 9 Vacant land adjacent to 11 High Street 10 Band Stand improvements 11 Streetscape and public realm improvements Development of site for residential use Development of gap site for residential/tourism/town centre uses or for civic space purposes, through implementation of CARS action plan Undertake environmental improvements to band stand, following development of proposals. Upgrade of road and footpath surfaces in town centre and new seating/planting at key locations, through implementation of CARS action plan. Owner/ Developer Owner/ Developer Owner / Developer/ EAC DP&R ARA/ EAC DP&R Unknown 2017/ Unknown Unknown Previous consent for two residential units lapsed. No current applications. No current proposals No current proposals Dependent on developer contributions coming forward. *Developer Contributions Project 12 Improvements to Motte 13 Improvements to Playing fields Further environmental improvements to enhance the setting of the Scheduled Monument and improve access to it. Detailed proposals to be prepared under auspices of CARS. Upgrade of playing fields including improved access *Developer Contributions Project EAC Estates/EA Leisure Trust/ EAC Outdoor Amenities/ EA Woodlands EAC Outdoor Amenities/East Ayrshire Leisure No current proposals Dalmellington Community Futures Steering Group has made general improvements to the playing field by laying a path to enable better community access. Further improvements are dependent on developer contributions coming forward. 29

30 Dalmellington 14 Gateway feature at junction of B741/ A713 at Buchan s bridge 15 Gateway feature to A713 southern entrance to town 16 New riverside cycle path/footpath 17 Potential camping/ caravan site at near western entrance to Dalmellington - land to south of A Civic Space opportunities at A713 near playing fields 19 Redevelopment of old primary school site, 16 Ayr Road 20 Redevelopment of Croft Street site 21 Development of Ayr Road Housing site 22 Development of Carsphairn Road Housing Site 23 Improved links to Craigengillan Estate, Dark Sky Observatory, Loch Doon and the Galloway Forest New entrance sign with potential associated public art to act as gateway into town from the west. Prepare detailed proposals and funding plan. New entrance sign with potential associated public art to act as gateway into town from the south Establishment of new path of cycle path standard to join up existing routes Prepare feasibility study for the establishment of well screened tourist caravan campsite Prepare feasibility study for upgrade of car park and environmental improvements to introduce civic space Redevelopment of site to include conversion of listed former school house building to residential/ community/tourism uses Consolidation of sites and redevelopment for housing/town centre uses Development of site for housing Development of site for housing Upgrade of roads and signage from Dalmellington to key tourism attractions, following feasibility study. Owner/ EAC P & ED/ Craigengillan Estate and Dark Sky Observatory/ Biosphere Partnership Forestry Commission/ EAC P & ED EAC Outdoor Amenities/ East Ayrshire Leisure/ARA Tourism Developer EAC Estates/ ARA/EAC D & PR Unknown EAC Estates EAC Estates Land owner/ developer Land owner/ developer Landowners/ EAC Planning/ ARA No current proposals No current proposals No current proposals No current proposals No current proposals No developer proposals have been submitted to the Council as yet No developer proposals have been submitted to the Council as yet No developer proposals have been submitted to the Council as yet No developer proposals have been submitted to the Council as yet No current proposals 30

31 3 ACTION PROGRAMME - LDP POLICIES Policy Timescale Overarching Policy 1 (OP1) Overarching Policy 2 (OP2) Policy RES 1: Policy RES 2: Policy RES 3: Policy RES 4: Policy RES 5: Policy RES 6: Policy RES 7: Policies RES 8 - RES 12: Policy RES 13: Policies TC 1-TC 4 and TC 6 Policy TC 5 Ensure all new development meets with all policy criteria Ensure that developers take on board any mitigation measures arising in the Environmental Report Development of new housing on identified LDP housing sites and on suitable gap sites. All new development must provide a master plan/design statement where indicated in Volume 2 of the LDP. Ensure that there is a 5 year supply of housing land at all times. Prepare, consult on and adopt SG on Affordable Housing Ensure proposals meet with the policy, monitor effectiveness of policy. Ensure proposals meet with the policy, monitor effectiveness of policy Submission of extensive supporting information to accompany planning applications for new agricultural worker s houses. Submission of detailed supporting information including business plans to accompany planning applications for new houses for rural enterprise workers Ensure proposals meet with policy criteria Submission of detailed financial and phasing information to demonstrate that policy requirements are met. Ensure development proposals are consistent with policy criteria Encourage development which improves town centre environments and which delivers projects identified in placemaking section of the LDP EAC Planning, developers EAC Planning, developers Developers, EAC Planning EAC DP&R EAC DP&R 2016 SG prepared EAC Planning EAC Planning Applicants Applicants Applicants, EAC Planning Applicants Applicants, EAC Planning Applicants, EAC Planning 31

32 Policy Timescale Policy IND1: Policy IND 2 & 3 Policy IND 4 Policy IND 5 & 6 Policy TOUR 1 Policy TOUR 2 & 3 Policy TOUR 4 Policy TOUR 5 Policy RE 1 Policy RE 2 Policy RE 3 Policy RE4 Ensure that strategic business and industrial proposals are directed to appropriate sites Ensure development proposals are consistent with policy criteria Submission of master plan to include business plan for proposed developments as part of planning application. Appropriate Section 75 Obligations will be required, Ensure development proposals are consistent with policy criteria Actively promote locations in East Ayrshire for tourism development Ensure development proposals are consistent with policy criteria Prepare Supplementary Guidance on Dark Sky Park Lighting Encourage development which supports the aims of the Biosphere. Support development and implementation of relevant projects in the Biosphere Partnership Plan. Ensure that all renewable energy developments meet with Schedule 1 of the LDP Prepare Supplementary Guidance on Heat Generation Ensure that proposals are in line with the Spatial Framework and relevant policies. Prepare and consult on Supplementary Guidance on Planning for Wind Energy Ensure cumulative limits at Whitelee are adhered to and revise SG on Planning for Wind Energy to take into account changes in the cumulative impact in the southern part of East Ayrshire if necessary Applicants, EAC Planning, EAC Economic Development, Scottish Enterprise Applicants, EAC Planning Applicants, EAC Planning Applicants, EAC Planning EAC, Ayrshire & Arran Tourism Team Applicants, EAC Planning EAC DP&R in conjunction with SAC and D&G Council EAC Planning, Developers, Galloway & Southern Ayrshire Biosphere Partnership EAC Planning, Applicants Ayrshire & Arran Tourism Strategy approved SG under preparation EAC DP&R 2015/16 EAC Planning, Wind Energy Developers EAC DP&R, applicants Draft SG on Planning for Wind Energy prepared. Published alongside LDP 32

33 Policy Timescale Policy RE5 Policy RE 6 & 7 Policy RE 8 Policy RE 9 Policy RE 10 Policies T1, T2 & T3 Policy T4 Policy INF 1 Policy INF 2 Policy INF 3 Policy INF 4 Policy INF 5 Policy INF 6 & 7 Policy INF 8 Policies WM 1 WM8 Ensure that landscape impacts are considered carefully in preparing and assessing applications for wind energy Ensure development proposals are consistent with policy criteria Encourage developers to make contributions to both the Renewable Energy Fund and direct to communities. Prepare Supplementary Guidance on Community Benefits from Wind Energy Development Ensure that appropriate financial guarantees are in place to cover the full cost of restoration at all times and that these are secured through Section 75 obligations. Ensure that provision for any financial contributions being made through S75 obligations are fully complied with. Ensure development proposals are consistent with policy criteria Develop comprehensive local footpath and cycle path network, promote and seek funding for national development 8 Long Distance footpath from Darvel to Muirkirk Encourage infrastructure provision to meet future demands. Maintain regular contact with service providers. Ensure that developers enable connection to fibre optic broadband technology where available Ensure development proposals are consistent with policy criteria Ensure that Green Infrastructure and projects under the CSGN are an integral part of all new development where relevant. Prepare Supplementary Guidance on Developer Contributions Ensure that important areas of open space and playing fields are protected from inappropriate development Encourage and promote the temporary greening of vacant and derelict land. Seek funding options. Ensure development proposals are consistent with all policy criteria EAC Planning, applicants Applicants, EAC Planning Applicants, EAC DP&R, EAC Democratic Services EAC Legal, Finance, Planning, developers EAC Legal, Finance, Planning, developers EAC Planning, applicants EA Leisure Trust, EAC Planning EAC, Developers EAC Planning, developers EAC Planning, applicants EAC Planning, AGNP, applicants EAC DP&R 2016 EAC Planning EAC DP&R, land owners EAC Planning, applicants, SEPA 33

34 Policy Timescale Policies ENV 1 ENV 6 Policy ENV 7 Policy ENV 8, policies ENV Policy ENV 14 Ensure development proposals are consistent with all policy criteria Prepare background paper on what makes the Sensitive landscape Area valuable and important. Ensure development proposals are consistent with all policy criteria Ensure compliance with required reduction in carbon emissions through installation and operation of zero carbon generating technologies. EAC Planning, applicants, Historic Scotland, SNH EAC DP&R 2015 Complete EAC Planning, applicants, SNH, SEPA EAC DP&R, EAC Building Standards 34

35 4 VOLUME 2 LDP PROPOSALS Policy Timescale PROP 1, 2, 6, 7, 9, 10, 11, 13, 14, 16, 18, 19, 21, 22, PROP 3 PROP 4, 8, 12, 15, 23 PROP 5 PROP 17 PROP 20 PROP 24 PROP 25 PROP 26 PROP 27 Produce placemaking maps for all remaining settlements in line with the Community Plan Programme and amend the Programme as required. Undertake extensions to various Council owned and managed cemeteries, following preparation of detailed proposals (including funding) for each site. Investigate options for upgrading junction of B713 road linking Catrine and Sorn and the B705 road to Auchinleck Encourage and support implementation of placemaking maps for Kilmarnock, Cumnock, Stewarton, Galston, Dalmellington Investigate the feasibility of locating a new school campus at Broomfield Park, Cumnock ensuring no loss in the existing sporting facilities Investigate new bus and rail park and ride at appropriate locations in Kilmarnock Investigate potential funding mechanisms to enable construction of by-pass for Mauchline. Follow existing procedures to expand Stewarton Conservation Area Prepare and implement upgrading and improvement scheme for B778 Fenwick to Stewarton road Identify route and funding to implement a long distance route from Darvel to Muirkirk in line with NPF3 Work in partnership with Transport Scotland and SPT to investigate future options for increasing the capacity of the Bellfield Interchange EAC Planning 2015/20 EAC Outdoor Amenities 2025 ARA All parties named in section 1 above EAC E&SS ARA Feasibility studies have commenced ARA, EAC DP&R, A76 Partnership EAC DP&R ARA EAC Leisure Trust, ARA EAC DP&R, ARA, TS, SPT PROP 28 Investigate options for improving links to the M74 EAC DP&R, ARA, SPT Developer contributions are being collected for improvements 35

East Ayrshire Local Development Plan: Proposed Plan. Planning for wind energy. Draft Supplementary Guidance MARCH 2015

East Ayrshire Local Development Plan: Proposed Plan. Planning for wind energy. Draft Supplementary Guidance MARCH 2015 East Ayrshire Local Development Plan: Proposed Plan Planning for wind energy Draft Supplementary Guidance 1 MARCH 2015 CONTENTS 1 Context and Purpose of Supplementary Guidance. 3 2 A Spatial Framework

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular

More information

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

05 AREA/SITE SPECIFIC GUIDELINES

05 AREA/SITE SPECIFIC GUIDELINES 05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.

More information

RENEWABLE ENERGY FUND CRITERIA

RENEWABLE ENERGY FUND CRITERIA RENEWABLE ENERGY FUND CRITERIA Eligible Areas Currently only Whitelee Windfarm monies are available for distribution. Accordingly only projects for settlements within the 10km radius of the Whitelee windfarm

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS 2015/16 Council LOGO 0 ABOUT US Strathclyde Partnership for Transport (SPT) is the Regional Transport Partnership for the west of Scotland and is a partnership of twelve councils. SPT was established by

More information

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME EAST AYRSHIRE COUNCIL CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME Report by the Depute Chief Executive/Executive Director of Neighbourhood Services PURPOSE OF REPORT 1 The

More information

City Plan Part 1 Sustainability Appraisal Summary February 2012

City Plan Part 1 Sustainability Appraisal Summary February 2012 City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY.

Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY. Originator: Victoria Hinchliff Walker Tel: 39 51343 Report of the Chief Planning Officer PLANS PANEL EAST Date: 28 th October 2010 Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE,

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

Council Objective: Improve road network and influence improvements in public transport. Quarter 2 Progress Report 2015-16

Council Objective: Improve road network and influence improvements in public transport. Quarter 2 Progress Report 2015-16 Council Objective: Improve road network and influence improvements in public transport Quarter 2 Progress Report 2015-16 If you need this information in another language or format, please contact us to

More information

www.thefurlongphase2.co.uk

www.thefurlongphase2.co.uk Welcome Thank you for coming along today to view our plans for Phase 2 of The Furlong Shopping Centre. We are undertaking a consultation programme that will run up to and beyond submission of the planning

More information

EAST AYRSHIRE COUNCIL CABINET REPORT 18 JUNE 2014 PROPERTY AND ESTATE RATIONALISATION COMMUNITY ASSET TRANSFER UPDATE

EAST AYRSHIRE COUNCIL CABINET REPORT 18 JUNE 2014 PROPERTY AND ESTATE RATIONALISATION COMMUNITY ASSET TRANSFER UPDATE EAST AYRSHIRE COUNCIL CABINET REPORT 18 JUNE 2014 PROPERTY AND ESTATE RATIONALISATION COMMUNITY ASSET TRANSFER UPDATE Report by Executive Director of Educational and Social Services and Executive Director

More information

EAST AYRSHIRE COUNCIL CABINET 7 MARCH 2012 TRAFFIC, TRANSPORTATION AND ROAD SAFETY PROGRAMMES 2012-13

EAST AYRSHIRE COUNCIL CABINET 7 MARCH 2012 TRAFFIC, TRANSPORTATION AND ROAD SAFETY PROGRAMMES 2012-13 EAST AYRSHIRE COUNCIL CABINET 7 MARCH 2012 TRAFFIC, TRANSPORTATION AND ROAD SAFETY PROGRAMMES 2012-13 Report by Depute Chief Executive/Executive Director of Neighbourhood Services 1. PURPOSE OF REPORT

More information

Major and Minor Schemes

Major and Minor Schemes 1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment

More information

Richmond upon Thames College. Draft Planning Brief. May 2008

Richmond upon Thames College. Draft Planning Brief. May 2008 Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of

More information

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0

More information

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Moray Economic Strategy Implementation Programme Status Update September to December 2013

Moray Economic Strategy Implementation Programme Status Update September to December 2013 Moray Economic Strategy Implementation Programme Status Update September to December 2013 Overall A media centre newsroom has been purchased by members of the partnership to provide information about implementation

More information

1327 Stratford Road, Hall Green, Birmingham, B28 9HH

1327 Stratford Road, Hall Green, Birmingham, B28 9HH Committee Date: 08/01/2015 Application Number: 2014/03089/PA Accepted: 19/06/2014 Application Type: Full Planning Target Date: 14/08/2014 Ward: Hall Green 1327 Stratford Road, Hall Green, Birmingham, B28

More information

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid

More information

Assessment of Site Deliverability in the Market Towns

Assessment of Site Deliverability in the Market Towns East Cambridgeshire District Council of Site Deliverability in the Market Towns August 2014 Annex 1 to the Site Results Technical Background Paper (February 2013) 0 Contents: 1. Introduction 1.1 Role of

More information

Report to Planning applications committee Item Date 6 March 2014 Head of planning services

Report to Planning applications committee Item Date 6 March 2014 Head of planning services Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

LONDON BOROUGH OF HAVERING

LONDON BOROUGH OF HAVERING LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN 2015-2019 Sections LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN CONTENTS 1 Introduction and Context 2 Corporate Vision 3 Policy

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

FIVE. Employment. Strategic Objectives. Total Amount of Additional Employment Floorspace by Type 31 CORE OUTPUT INDICATOR BD1

FIVE. Employment. Strategic Objectives. Total Amount of Additional Employment Floorspace by Type 31 CORE OUTPUT INDICATOR BD1 FIVE Employment Strategic Objectives 5.1 The Council s spatial strategy for the future development of the Borough, set out in Sutton s Core Planning Strategy DPD (Adopted December 29), seeks to achieve

More information

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers FOR SALE On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers Land at Teville Gate, Teville Road, Worthing, West Sussex BN11 1AZ ibrochure - www.cbre-ibrochure.co.uk/worthing ENTER

More information

Relating to Supplementary Guidance Rural Development (RD) 1 and Special Types of Rural Land (STRL) type 2.

Relating to Supplementary Guidance Rural Development (RD) 1 and Special Types of Rural Land (STRL) type 2. PLANNING ADVICE 13/2012 HOUSING AND BUSINESS DEVELOPMENT IN THE COUNTRYSIDE AND GREENBELT Relating to Supplementary Guidance Rural Development (RD) 1 and Special Types of Rural Land (STRL) type 2. CONTENTS

More information

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn. P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes

More information

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder

More information

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

FIRST STREET NORTH CREATING PLACES FOR PEOPLE About This Consultation Manchester City Council and Ask Property Developments are seeking to develop First Street North, a 2.2 acre site to the north of the Number One Building, within the 20 acre First

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

Neil Taylor Programme Manager Royal Borough of Kingston

Neil Taylor Programme Manager Royal Borough of Kingston Neil Taylor Programme Manager Royal Borough of Kingston James Berry MP for Kingston and Surbiton Greg Hughes Chair, kingstonfirst Opportunity Area Planning Framework Eric Owens Group Manager

More information

Elephant & Castle Regeneration TRADERS CHARTER

Elephant & Castle Regeneration TRADERS CHARTER Elephant & Castle Regeneration TRADERS CHARTER June 2007 Elephant and Castle Shopping Centre Tenants Association 1 Elephant & Castle Regeneration TRADERS CHARTER June 2007 As small business traders at

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

Healthcare and New Housing Development

Healthcare and New Housing Development Healthcare and New Housing Development Supplementary Guidance SG11 Consultative Draft SG11 SG11 Supplementary Guidance A suite of supplementary guidance (SGs) is currently being produced by the Council.

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Report To: The Planning Board Date: 2 April 2014. Report By: Head of Regeneration and Planning Report No: 14/0023/IC

Report To: The Planning Board Date: 2 April 2014. Report By: Head of Regeneration and Planning Report No: 14/0023/IC Agenda Item No. 2 Report To: The Planning Board Date: 2 April 2014 Report By: Head of Regeneration and Planning Report No: 14/0023/IC Local Application Development Contact Officer: Subject: Michael Martin

More information

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1 Cornwall Local Plan 2010-2030: Proposed Monitoring Framework Part 1: Strategic Policies Policy 1: Presumption in Favour of Sustainable Development Policy 2: Spatial Strategy Policy 2a Key Targets Job provision

More information

Proposal for a Demonstration Exemplar at British Sugar, York

Proposal for a Demonstration Exemplar at British Sugar, York Executive 21 July 2009 Report of the Director of City Strategy URBAN ECO SETTLEMENT Proposal for a Demonstration Exemplar at British Sugar, York Summary 1. This paper outlines a proposal for funding a

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

Towns: Ardrossan. Key

Towns: Ardrossan. Key Towns: Ardrossan The development of Ardrossan is well underway with the recent development of the marina and adjacent housing by Clyde Port. The strategy seeks to extend and improve the quality of this

More information

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place. 15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

CASTLE HOUSE, 71-75 DESBOROUGH ROAD, HIGH WYCOMBE HP11 2PR AND VALLEY WAREHOUSE, 77-83 DESBOROUGH ROAD, HIGH WYCOMBE HP11 2PR

CASTLE HOUSE, 71-75 DESBOROUGH ROAD, HIGH WYCOMBE HP11 2PR AND VALLEY WAREHOUSE, 77-83 DESBOROUGH ROAD, HIGH WYCOMBE HP11 2PR A RARE OPPORTUNITY TO ACQUIRE TWO SIGNIFICANT FREEHOLD PROPERTIES IN HIGH WYCOMBE TOWN CENTRE; COMBINING LONG TERM INCOME AND RE- DEVELOPMENT POTENTIAL CASTLE HOUSE, 71-75 DESBOROUGH ROAD, HIGH WYCOMBE

More information

WELCOME WELCOME TO THE PUBLIC EXHIBITION FOR THE ILONA ROSE HOUSE REDEVELOPMENT. ILONA ROSE HOUSE www.ilonarosehouse.com

WELCOME WELCOME TO THE PUBLIC EXHIBITION FOR THE ILONA ROSE HOUSE REDEVELOPMENT. ILONA ROSE HOUSE www.ilonarosehouse.com WELCOME Manette Street from Charing Cross Road WELCOME TO THE PUBLIC EXHIBITION FOR THE REDEVELOPMENT. Corner of Charing Cross Road and Manette Street SOHO ESTATES Soho Estates began as a collection of

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015

London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 Workshop agenda Presentations Breakout workshop sessions Feedback and outcomes for the masterplan

More information

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T "Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T Gorzów Wielkopolski Gorzów Wielkopolski is an important regional city centre

More information

Galloway and Southern Ayrshire Biosphere Developing the Biosphere Next steps 2013 2016. Year 1 Report. The Southern Uplands Partnership.

Galloway and Southern Ayrshire Biosphere Developing the Biosphere Next steps 2013 2016. Year 1 Report. The Southern Uplands Partnership. Galloway and Southern Ayrshire Biosphere Developing the Biosphere Next steps 2013 2016 Year 1 Report The Southern Uplands Partnership May 7 th 2015 Galloway and Southern Ayrshire Biosphere progress report

More information

Supplementary Planning Document. Radlett. District Centre Key Locations. Planning brief. March 2011. Hertsmere Borough Council

Supplementary Planning Document. Radlett. District Centre Key Locations. Planning brief. March 2011. Hertsmere Borough Council Supplementary Planning Document Radlett District Centre Key Locations Planning brief March 2011 Hertsmere Borough Council Large print and languages Hertsmere Borough Council aims to provide information

More information

DALMELLINGTON PARISH COMMUNITY ACTION PLAN 2012-2017

DALMELLINGTON PARISH COMMUNITY ACTION PLAN 2012-2017 DALMELLINGTON PARISH COMMUNITY ACTION PLAN 2012-2017 HEADING CONTENTS 2 INTRODUCTION 3 OUR COMMUNITY NOW 4 LIKES 6 DISLIKES 7 OUR VISION FOR THE FUTURE 8 MAIN STRATEGIES AND PRIORITIES 9 ACTION 11 MAKING

More information

No colour scheme has been specified for the painting of the hardwood.

No colour scheme has been specified for the painting of the hardwood. Steve Rogers Head of Planning & Regulatory Services Kirkbank, English Street, Dumfries, DG1 2HS Telephone (01387) 260199 - Fax (01387) 260188 Planning Applications Committee Report ALTERATIONS TO SHOP

More information

Commodity Government - A Guide to Regional Development

Commodity Government - A Guide to Regional Development 1. INTRODUCTION EAST AYRSHIRE COUNCIL COUNCIL MEETING: 25 JUNE 2009 SIX MONTHLY UPDATE ON CABINET ACTIVITIES Report by the Leader of the Council 1.1 As the second year of the Council nears an end I am

More information

Tewkesbury. March 2015

Tewkesbury. March 2015 Tewkesbury March 2015 1. Market Update Retailer Trends International retailers still entering the UK but more selective about their store footprint. Right-sizing existing retailers want representation

More information

Welcome & background. www.theperfumefactory.info

Welcome & background. www.theperfumefactory.info Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE

More information

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager 4(9) 09/161 Alteration and Extension to Existing Public House to Provide a New Bookmakers

More information

WELCOME TO OUR EXHIBITION

WELCOME TO OUR EXHIBITION WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough

More information

EBBARK HOUSE 93-95 BOROUGH HIGH STREET LONDON SE1 FREEHOLD OFFICE REFURBISHMENT/DEVELOPMENT OPPORTUNITY FOR SALE

EBBARK HOUSE 93-95 BOROUGH HIGH STREET LONDON SE1 FREEHOLD OFFICE REFURBISHMENT/DEVELOPMENT OPPORTUNITY FOR SALE FREEHOLD OFFICE REFURBISHMENT/DEVELOPMENT OPPORTUNITY FOR SALE SUMMARY Freehold office building arranged over lower ground, ground and three upper floors Comprising approximately 530 sq m (5,705 sq ft)

More information

HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.

HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. HurlinghamRetailPark Aerial view of site Welcome Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. Londonewcastle, a specialist residential developer, has been

More information

EAST AYRSHIRE COUNCIL GRANTS COMMITTEE 8 AUGUST 2013 ANNUAL REPORT ON EXTERNAL FUNDING SECURED

EAST AYRSHIRE COUNCIL GRANTS COMMITTEE 8 AUGUST 2013 ANNUAL REPORT ON EXTERNAL FUNDING SECURED EAST AYRSHIRE COUNCIL GRANTS COMMITTEE 8 AUGUST 2013 ANNUAL REPORT ON EXTERNAL FUNDING SECURED Report by the Executive Director of Finance and Corporate Support 1. PURPOSE OF REPORT 1.1 The purpose of

More information

Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.

Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. WELCOME Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. The site covers approximately 0.37 hectares and

More information

Review of Land Supply for Business & Industry in East Ayrshire

Review of Land Supply for Business & Industry in East Ayrshire for Business & Industry in East Ayrshire CONTENTS. Introduction 2. Economic & Property Market Context 3. Supply of Employment Land & Business Space 4. Future Forecast Demand 5. Consultations 6. Benchmarking

More information

EAST AYRSHIRE COUNCIL PLANNING COMMITTEE: 16 MAY 2014 14/0237/PP REPLACEMENT WINDOWS AND INSTALLATION OF COMFORT COOLING CONDENSERS

EAST AYRSHIRE COUNCIL PLANNING COMMITTEE: 16 MAY 2014 14/0237/PP REPLACEMENT WINDOWS AND INSTALLATION OF COMFORT COOLING CONDENSERS EAST AYRSHIRE COUNCIL PLANNING COMMITTEE: 16 MAY 2014 14/0237/PP REPLACEMENT WINDOWS AND INSTALLATION OF COMFORT COOLING CONDENSERS AT: 2 THE CROSS, KILMARNOCK KA1 1LR BY: EAC CORPORATE INFRASTRUCTURE

More information

AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS

AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS Page 1 of 22 PLANNING COMMITTEE REPORT Agenda Item 5.7 AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS 7 August 2007 Division Sustainability & Regulatory

More information

EAST AYRSHIRE COUNCIL CABINET 19 MARCH 2014 HOUSING INVESTMENT PROGRAMME 2014/15 2018/19

EAST AYRSHIRE COUNCIL CABINET 19 MARCH 2014 HOUSING INVESTMENT PROGRAMME 2014/15 2018/19 EAST AYRSHIRE COUNCIL CABINET 19 MARCH 2014 HOUSING INVESTMENT PROGRAMME 2014/15 2018/19 Report by the Acting Executive Director of Neighbourhood Services and the Executive Director of Finance and Corporate

More information

74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790

74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790 74 Rivington Street Planning Statement JULY 2013 DP9 100 Pall Mall London SW1Y 5NQ Tel: 020 7004 1700 Fax: 020 7004 1790 CONTENTS Page 1.0 Introduction 1 2.0 Site Description 2 3.0 The Proposed Development

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

Reference BA/2012/0220/CU Target date 12/09/2012. 113-115 Bridge Road, Lowestoft, Suffolk, NR33 9JU

Reference BA/2012/0220/CU Target date 12/09/2012. 113-115 Bridge Road, Lowestoft, Suffolk, NR33 9JU Broads Authority Planning Committee 17 August 2012 Application for Determination Parish Oulton Broad Reference BA/2012/0220/CU Target date 12/09/2012 Location Proposal Applicant Recommendation Reason referred

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

7-8 Waterloo Street, City Centre, Birmingham, B2 5PQ

7-8 Waterloo Street, City Centre, Birmingham, B2 5PQ Committee Date: 22/01/2015 Application Number: 2014/09031/PA Accepted: 09/12/2014 Application Type: Full Planning Target Date: 10/03/2015 Ward: Ladywood 7-8 Waterloo Street, City Centre, Birmingham, B2

More information

Foreword. I look forward to future bulletins sharing the success stories and accomplishments of pupils working in our BESCs.

Foreword. I look forward to future bulletins sharing the success stories and accomplishments of pupils working in our BESCs. Issue No: 1 Foreword On 17 August 2011, Cabinet approved the establishment of individual Business Enterprise and Skills Centre programmes in each of the nine East Ayrshire secondary schools. Cabinet also

More information

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable

More information

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR) HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS

More information

The Mersey Gateway Project

The Mersey Gateway Project The Mersey Gateway Project The Mersey Gateway Project is a major scheme to build a new six-lane toll bridge over the River Mersey in the north west of England. It will link the towns of Runcorn and Widnes

More information

Property & Asset Maintenance Business Unit Service Plan 2015/16

Property & Asset Maintenance Business Unit Service Plan 2015/16 Business Unit Leader: Emma Grundy Head of Service: Tom Clark 1. Service Objectives for 2015/16 Property & Asset Maintenance Business Unit Service Plan 2015/16 Issue Work to be undertaken Impact / outcome

More information

Outdoor Advertising. Policy and Guidelines. CITY OF DAREBIN 350 High Street, Preston 3072 Telephone 9230 4444. January 2001

Outdoor Advertising. Policy and Guidelines. CITY OF DAREBIN 350 High Street, Preston 3072 Telephone 9230 4444. January 2001 Outdoor Advertising Policy and Guidelines January 2001 CITY OF DAREBIN 350 High Street, Preston 3072 Telephone 9230 4444 CONTENTS PREAMBLE... 1 PURPOSE AND OBJECTIVES OF THE POLICY AND GUIDELINES... 2

More information

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340. SITE DESCRIPTION The site is occupied by a large single dwelling house which was built in 2007. The building is surrounded by large trees and has a substantial rear garden. The land is allocated within

More information

Central Cardiff Enterprise Zone. Strategic Plan 2015

Central Cardiff Enterprise Zone. Strategic Plan 2015 Central Cardiff Enterprise Zone Strategic Plan 2015 June 2015 1 Contents Contents Page 1. BACKGROUND 3 2. VISION 5 3. KEY PRIORITIES 6 4. CROSS SECTORAL PRIORITIES 7 Transport Skills ICT Other Infrastructure

More information

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force ACHIEVING THE VISION FOR RESTON Reston Master Plan Special Study Task Force The Reston Master Plan Special Study Task Force was appointed by Hunter Mill District Supervisor Catherine Hudgins to review

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

Manchester City Council Planning and Highways Committee 2 June 2011

Manchester City Council Planning and Highways Committee 2 June 2011 Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

Design for Independent Schools

Design for Independent Schools Design for Independent Schools Developing Your School Re-Format is an award-winning architecture and design studio which has been specialising in buildings for the education sector for twenty years. We

More information

Shannon Corner Service Centre, 208-212 Burlington Road, New Malden, KT3 4NP

Shannon Corner Service Centre, 208-212 Burlington Road, New Malden, KT3 4NP Shannon Corner Service Centre, 08-1 Burlington Road, New Malden, KT NP S1 Total site area (ha) 0.05ha Current MOT Car Repair Undeveloped land (ha) 0 Number of units 1 Grid reference TQ 680 Sequential status

More information

EAST AYRSHIRE COUNCIL CABINET27 NOVEMBER 2013 STEP CHANGE 2015 PROJECT UPDATE. Report by the Acting Executive Director of Neighbourhood Services

EAST AYRSHIRE COUNCIL CABINET27 NOVEMBER 2013 STEP CHANGE 2015 PROJECT UPDATE. Report by the Acting Executive Director of Neighbourhood Services PURPOSE EAST AYRSHIRE COUNCIL CABINET27 NOVEMBER 2013 STEP CHANGE 2015 PROJECT UPDATE Report by the Acting Executive Director of Neighbourhood Services 1 The purpose of this report is to provide an update

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

Corporate Director Environment and Community Services

Corporate Director Environment and Community Services CABINET Meeting date: 27 November 2014 From: Corporate Director Environment and Community Services RESPONSE TO SOUTH LAKELAND DISTRICT COUNCILS COMMUNITY INFRASTRUCTURE LEVY REGULATION 16 CONSULTATION

More information

Policy Background Reports

Policy Background Reports Supporting Document for Proposed Local Development Plan 2015 East Dunbartonshire Policy Background Reports Strategic Environmental Assessment: Environment Report Action Programme Habitats Regulations Appraisal

More information

South Ash Manor Ash Lane, Ash, Sevenoaks, Kent. savills.co.uk

South Ash Manor Ash Lane, Ash, Sevenoaks, Kent. savills.co.uk South Ash Manor Ash Lane, Ash, Sevenoaks, Kent savills.co.uk Substantial 16th Century Manor House and Stable Block set within the grounds of the prestigious London Golf Club South Ash Manor, Ash Lane,

More information

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON Page 1 of 57 PLANNING COMMITTEE REPORT Agenda Item 5.4 PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON 4 September 2007 Division Sustainability and Regulatory Services

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Decision Due Date: 18 April 2015

Decision Due Date: 18 April 2015 App.No: 150195 Decision Due Date: 18 April 2015 Ward: Devonshire Officer: Richard Elder Site visit date: 8 May 2015 Site Notice(s) Expiry date: 27 March 2015 Neighbour Con Expiry: 27 March 2015 Press Notice(s):

More information

21.04 LAND USE. Managing amenity through land use strategies

21.04 LAND USE. Managing amenity through land use strategies 21.04 LAND USE This section contains objectives and strategies for land use, under the themes of: Housing and community Retail, entertainment and the arts Office and commercial use Industry Education and