1 Release Notes Assistance PSA 2015 Summer Release (August 2015) Advanced Opportunity Management The Microsoft Dynamics CRM Opportunity functionality has been extended with Assistance PSA functionality. Enter a Budget for an Opportunity Budget Amount Enter a Forecast for an Opportunity Estimated Revenue A Budget for an Opportunity is entered in the same way as with a Project except that there are no Project Items. In the field Budget amount an amount can be entered, but as soon as you start entering Budget lines, Assistance PSA will auto populate this field with the total amount of all Budget lines. A Forecast for an Opportunity is entered in the same way as for a Project except that there are no Project Items. In the field Est. Revenue an amount can be entered, but as soon as you start entering Forecast lines, Assistance PSA will auto populate this field with the total amount of all Forecast lines. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 1 of 18

2 Define Hourly Rates for an Opportunity Convert the Opportunity into a Project Hourly Rates specific to an Opportunity are entered in a section of the Opportunity form (from the navigation dropdown menu). The Hourly Rates that you enter for an Opportunity are added to the Hourly Rates in Assistance PSA and can be consulted in Microsoft Dynamics CRM, PSA Settings, Hourly Rates. Assistance PSA has an out-of-the-box Business Process Flow 'Opportunity to Project'. You can make it your default process or choose to switch to this process during the course of the Opportunity. At the Close stage click on 'Next Stage', and then 'Create'. This brings you to the Project form to create a new Project. The following Opportunity information is copied to the new Project: - Originating Opportunity - Account - Contact (becomes Principal Contact of Project) - Legal Entity - Currency - Hourly Rates - Budget (amount is copied to first active Project Item) - Forecast If you do not wish to make the Business Process Flow Opportunity to Project your default Business Process Flow, then you can use the button 'More Commands' and choose the option 'Switch Process' when you are in the Close stage. This allows you to switch from the current Business Process Flow 'Opportunity Sales Process' to the 'Opportunity to Project' Business Process Flow. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 2 of 18

3 Budget Changes in Budget Entry The column Regarding of the Budget lines presents the user with Budget Types based on the Project Item Type. The following table describes the options for each Project Item Type: Item Type Available Budget Types T&M (Hourly Rate) - n.a. - Employee* T&M (Day Rate) - n.a. - Employee* Fixed Fee - n.a. - Employee* Expenses Billable - n.a. - Equipment - Equipment Type - Fee - Price List (Product) Expenses Fixed Fee - n.a. - Equipment - Equipment Type - Fee - Price List (Product) Products - n.a. - Price List (Product) Recurring - n.a. - Price List (Product) * Initially only Employees (CRM Users) belonging to the Legal Entity of the project can be selected. But you can search for Employees of other Legal Entities. Recalculate Budget button When you click this button rate changes are applied to the Budget. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 3 of 18

4 Refresh button The Refresh (Retrieve Records) button retrieves all budget lines, so new budget lines will be displayed as well. Update from Gantt includes Equipments When using the button Update from Gantt, in addition to hours, planned Equipments will be added to the Budget as well. Forecast Changes in Forecast Entry The column Regarding of the Forecast lines presents the user with a Forecast Type based on the Project Item type. The following table describes the options per Project Item Type: Item Type Available Forecast Types T&M (Hourly Rate) - n.a. - Employee* T&M (Day Rate) - n.a. - Employee* Fixed Fee - n.a. - Employee* Expenses Billable - n.a. - Equipment - Equipment Type - Fee Expenses Fixed Fee - n.a. - Equipment - Equipment Type - Fee * Initially only Employees (CRM Users) belonging to the Legal Entity of the project can be selected. But you can search for Employees of other Legal Entities. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 4 of 18

5 Overall Forecast - In the Overall Forecast (in Microsoft Dynamics CRM, PSA, Forecast) ) a link is available which will open the Forecast or Opportunity of the selected Project in a new window and allow direct update. - With a button the user can choose to view the Forecast data in a chart. The same button will be used to show and hide the Forecast chart. Forecast Scope The Forecast Scope setting in the PSA User record determines which projects the PSA User is allowed to view in the overall Forecast. For a description of the settings, see the section PSA User of this document. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 5 of 18

6 Gantt Chart Plan Equipments Project Equipments were introduced in Assistance PSA 2015 Service Update 1 (March 2015). Consult its Release Notes here: rvice_update_march_2015.pdf Equipments can be scheduled on Project Items of Item Type Expenses Billable and Expenses Fixed Fee. They are recognized by the tool icon In the (Project) Gantt Chart, in the graphical display on the right, the color for an expense item is dark brown, the color for an Equipment is light brown. In the Equipment details in the Gantt Chart the combination of the values in the fields Equipment and Rate Type determine the Budget and Forecast amount. The Quantity value in the Budget lines is determined by the number of days from Start Date to End Date of the Equipment including weekends. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 6 of 18

7 Overall Gantt Chart - In Microsoft Dynamics CRM, PSA, Gantt Chart the overall Gantt Chart displays Project Item Activities with Employees as Resource, grouped by Resource (examples below: Consultants and David Brown) and, under each resource, the project related to the Project Item Activity (some examples below: Training prep, High design and Initial configuration). - The Resource can be an Equipment as well, in that case the owner of the activity is SYSTEM - In the Overall Gantt Chart, in the graphical display on the right, the color for an Equipment is dark brown, the color for an planned activity is light brown. - Note!: the Overall Gantt Chart does not display Project Item Activities with no Resource (with for example only Hour Type) - In the header of the overall Gantt Chart a series of fields allows filtering based on Project information; e.g. you can select to display Project Item Activities of the Legal Entity and Department of your projects. - The selected Gantt Chart Scope In the PSA User record of the current user determines which projects are listed - It is not possible to edit records here, except for the start and end dates of Equipments, which you will need to save if modified. - The Context Menu (right mouse click on a Project Item Activity) however will provide you with the following capacities: Release Notes Assistance PSA 2015 Summer Release August 2015 Page 7 of 18

8 - Activity information : opens the tab General of the Activity Information form of the Gantt Chart of a single project - View Record in CRM: opens the CRM form of a Project Item Activity - View Project in CRM: opens the CRM form of the project of the Project Item Activity - View Project Gantt Chart: opens the Gantt Chart of the project of the Project Item Activity Lag Time In the details of a Project Item Activity a lag between Predecessor and Successor can be configured in the Successor. A number of days can be set. Gantt Chart Scope The Gantt Chart Scope setting in the PSA User record determines which projects the PSA User is allowed to view in the overall Gantt Chart. For a description of the settings, see the section PSA User of this document. Utilization Sheet Release Notes Assistance PSA 2015 Summer Release August 2015 Page 8 of 18

9 Appointments are displayed In the filter Show the option Appointments can be selected. This option displays CRM Appointments related to a project as well as not related to a project. In both cases, if the the appointments are created in Microsoft Outlook, they must be tracked in CRM in order to appear in the Utilization Sheet. - Non-recurring and Recurring appointments have a distinct icon, respectively and - Appointments that are not related to a Project are grouped under the label Appointments not related to a Project of the resource - Appointments have the same utiliziation colors as Project Item Activities - The filter option Show All (Project Item Activities and Appointments) is expected to be functional in a next release - The displayed Hour Type is the Employee s default Hour Type as configured in the PSA User record Utilization Sheet Scope The Utilization Sheet Scope setting in the PSA User record determines which activities the PSA User is allowed to view in the Utilization Sheet. For a description of the settings, see the section PSA User of this document. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 9 of 18

10 Update Work Hours When the Work Hours of an Employee change, the Utilization Sheet can be updated with the new work hours. After you have updated the Work Hours in the CRM User record, click on the button Update Utilization Sheet in the ribbon of the User form. In the screen that appears you select the period to update. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 10 of 18

11 Hours Hourly Rate End Date An Hourly Rate End Date can be entered for any Hourly Rate. - In the case of a Project Rate, after the End Date the Project Rate is no longer applied. Assistance PSA will then use the Hourly Rates hierarchy as defined in the Hourly Rate entity. - Note!: In the case of an End Date on an Hourly Rate for only an Employee or Hour Type, the rate after the End Date is a zero rate (0.00). - End dates on Hourly Rates are not applied to Budgets and Forecasts. Fields Alias and Reference in Hourly Rates The field Alias of an Hourly Rate is a text field where the user can enter a description that will be added to an hour entry where the rate is applied. The description can be used on an invoice report. An example is an alternative description for the Hour Type. The field Reference is the same type of field that is intended to enter a customer s reference. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 11 of 18

12 Project Project Status Report At Project level a financial Status Report* is available. It displays Project KPI s and includes Export to Excel and an interactive chart. * Not to be confused with the Status Report Solution that can be installed on top of the Assistance PSA Solution! Release Notes Assistance PSA 2015 Summer Release August 2015 Page 12 of 18

13 Program Program Status Reports At Program level a financial Status Report* is available. It displays Program KPI s and includes Export to Excel and an interactive chart. * Not to be confused with the Status Report Solution that can be installed on top of the Assistance PSA Solution! PSA Settings Weekends are Workdays In Microsoft Dynamics CRM, PSA Settings, in the PSA Settings record, in the section Hours, the option Weekends are Workdays can be activated. If activated, Weekend Days are Work Days in the Gantt Chart; i.e. hours are planned on Saturdays and Sundays (these days are not skipped). Note!: This option has no influence on planning Equipments. In the case of Equipments weekends cannot be excluded. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 13 of 18

14 Chart of Accounts In Microsoft Dynamics CRM, PSA Settings, Chart of Accounts replaces Ledgers. In addition to Ledger Code and Description the following fields have been added for PSA Financials: - Ledger Type - Ledger Group - Currency - Tax Group - Project Ledger - Budget If you have not installed PSA Financials, then the values in these fields are only informative. The grid in the form displays financial transactions in PSA Financials. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 14 of 18

15 Day Rate Settings Day Rate Settings determine how Day Rate amounts are calculated. A Day Rate is set by using a Project Item with Item Type 'T&M (Day Rate)' and an Hourly Rate marked as 'Day Rate'. Hours Hours are entered in units of hours. In the case where the applied Rate is a Day Rate, then the total Hours amount is calculated on the basis of the Day Rate setting in the general settings record PSA Settings in Microsoft Dynamics CRM, PSA Settings. The options are: - One full Day Rate per Hour Booking - Calculate back to Hourly Rate based on Hours per Day setting in PSA Settings - Calculate back to Hourly Rate based on Hours per Day setting in User Settings Example scenario: - The Day Rate in the Hourly Rates table is Number of hours booked: 2 - Hours per Day Employee (in CRM User record) setting: 8 - Hours per Day in PSA Settings: 6 Hours Amount Calculated amount if the setting 'One full Day Rate per Hour Booking' is used: Calculation: no matter how many hours are booked on a day, the fixed Day Rate is used. Calculated amount if the setting 'Calculate back to Hourly Rate based on Hours per Day setting in PSA Settings' is used: Calculation: 1000/6 = * 2 = Calculated amount if the setting 'Calculate back to Hourly Rate based on Hours per Day setting in User Settings' is used: 250. Calculation: 1000/8 = 125 * 2 = 250. Budget Amount Budgets are entered in quantities. This means that a Budget entry on a Project Item with Item Type 'T&M (Day Rate)' is calculated as a quantity of days. So the calculated amount is the number of days * Day Rate. Release Notes Assistance PSA 2015 Summer Release August 2015 Page 15 of 18

16 Forecast Amount Forecasts are entered in numbers of hours. The Forecast uses the setting 'Calculate back to Hourly Rate based on Hours per Day setting in PSA Settings'. So in the above scenario the rate would be When updating Budget and Forecast from Gantt Chart When the Budget lines are created, the number of hours is converted into days if the Project Item's Item Type is 'T&M (Day Rate)'. For this purpose the setting in 'Hours per Day' in PSA Settings is used. The calculation of the amounts is as described as above (Budget and Forecast). PSA User 3 additional Scope Settings in the PSA User record that determine which information a PSA User can view Gantt Chart Scope: Access to view Overall Gantt Chart data is given to PSA Users with following settings: - None - Own Projects (projects that belong to the Legal Entity and Department of the current PSA User and where he or she is the Project Manager) - Projects in Own Department (projects that belong to the the Department of the current PSA User) - Projects in Own Legal Entity (projects that belong to the Legal Entity of the current PSA User) - All Projects Release Notes Assistance PSA 2015 Summer Release August 2015 Page 16 of 18

17 Utilization Sheet Scope: Access to view Utilization Sheet data is given to PSA Users with the following settings: - None - Own Activities (activities of which the current PSA User is the resource, i.e. owner of the Project Item Activity record) - Activities in Own Department (activities of Resources (Employees), i.e. owners of the Project Item Activity records, that belong to the same Department as the current PSA User) - Activities in own Legal Entity (activities of Resources (Employees), i.e. owners of the Project Item Activity records, that belong to the Legal Entity of the current PSA User) - All Activities Forecast Scope: Access to view Overall Forecast data is given to PSA Users with following settings: - None - Own Projects (of which you are the Project Manager) - Projects in Own Department (projects that belong to the Department of the current PSA User) - Projects and Opportunities in Own Legal Entity (projects and opportunities that belong to the Legal Entity of the current PSA User) - All Projects and Opportunities Bug Fixes/Changes/Improvements Project - Unchecking Project Account in Copy Project does not function - Forecast Export to Excel does not function - Creating Projects from a Program in CRM 2015 not possible - Error Project Item Activity with ID <id> does not exist when deleting a Project Item Activity in the Gantt Chart if it is the only one for a Project Item - Database field names are displayed instead of values in Budget and Forecast lines after a change in CRM 2015 Release Notes Assistance PSA 2015 Summer Release August 2015 Page 17 of 18

18 Hours Expenses - Hours Analysis Export to Excel does not support accented characters - Cases for Contacts are not available to select in Timesheet - Incorrect Hour Types picklist when changing user, not containing those related to user on whose behalf time is entered - Expense entries timestamp set to noon instead of midnight prevents time zone issues - Delegate PM Approver can not approve Expenses Release Notes Assistance PSA 2015 Summer Release August 2015 Page 18 of 18

Module A2 Item Activities, Gantt Chart and Utilization Sheet. A2.1 Project item activities A2.2 Gantt chart A2.3 Utilization sheet

Module A2 Item Activities, Gantt Chart and Utilization Sheet. A2.1 Project item activities A2.2 Gantt chart A2.3 Utilization sheet Module A2 Item Activities, Gantt Chart and Utilization Sheet A2.1 Project item activities A2.2 Gantt chart A2.3 Utilization sheet 1 Assistance PSA: Advanced Functionalities Welcome to the Advanced Functionalities

More information

PSA 2015 Step by Step Guide is published by Assistance Software. All rights reserved. No part of this publication may be Projects reproduced.

PSA 2015 Step by Step Guide is published by Assistance Software. All rights reserved. No part of this publication may be Projects reproduced. Step by Step Guide PSA 2015 Module 4 4.1 BAFPA Methodology 4.2 & Budget 4.3 Project sales forecast 4.4 Project & Resource planning 4.5 Utilization Sheet 4.6 CRM Appointments and Group calendar 4.7 Programs

More information

Module A2 Item Activities, Gantt Chart and Utilization Sheet

Module A2 Item Activities, Gantt Chart and Utilization Sheet Module A2 Item Activities, Gantt Chart and Utilization Sheet A2.1 Project item activities A2.2 Gantt chart A2.3 Utilization sheet 1 Module 1. Project item activities, Gantt Chart & Utilization Sheet Contents...

More information

INTRODUCTION... 4 MODULE 5. TIMESHEET... 5. Overview... 5 5.1 TIMESHEET CALENDAR VIEW... 7 INTRODUCTION... 7. What you will learn in this section...

INTRODUCTION... 4 MODULE 5. TIMESHEET... 5. Overview... 5 5.1 TIMESHEET CALENDAR VIEW... 7 INTRODUCTION... 7. What you will learn in this section... Step by Step Guide PSA 2015 Module 5 5.1 calendar view 5.2 by line 5.3 Instant Time Entry PSA 2015 (Release 2.3.0.243) PSA 2015 Step by Step Guide is published by Assistance Software. All rights reserved.

More information

Module 2 Settings. PSA 2015 Step by Step Guide. 2.1 Organization & Financials (basic) 2.2 PSA settings 2.3 PSA security roles 2.

Module 2 Settings. PSA 2015 Step by Step Guide. 2.1 Organization & Financials (basic) 2.2 PSA settings 2.3 PSA security roles 2. PSA 2015 Step by Step Guide Module 2 2.1 Organization & Financials (basic) 2.2 PSA settings 2.3 PSA security roles 2.4 PSA users PSA 2015 (Release 2.3.0.243) PSA 2015 Step by Step Guide is published by

More information

Module 7 Invoicing. Step by Step Guide PSA 2015. 7.1 Single project invoicing 7.2 Batch invoicing projects 7.3 Program invoicing 7.

Module 7 Invoicing. Step by Step Guide PSA 2015. 7.1 Single project invoicing 7.2 Batch invoicing projects 7.3 Program invoicing 7. Step by Step Guide PSA 2015 Module 7 7.1 Single project invoicing 7.2 Batch invoicing projects 7.3 Program invoicing 7.4 Invoice approval PSA 2015 (Release 2.3.0.243) PSA 2015 Step by Step Guide is published

More information

Module 1 Concept & Navigation

Module 1 Concept & Navigation PSA 2015 Step by Step Guide Module 1 Concept & Navigation 1.1 Vision and Concept 1.2 Navigation PSA 2015 (Release 2.3.0.243) PSA 2015 Step by Step Guide is published by Assistance Software. All rights

More information

Release Notes Assistance PSA 2013 2 nd Release (2.3.0.122) - February 2014

Release Notes Assistance PSA 2013 2 nd Release (2.3.0.122) - February 2014 Release Notes Assistance PSA 2013 2 nd Release (2.3.0.122) - February 2014 IMPORTANT! Please read these release notes for Assistance PSA 2013 Second Release very carefully before importing and using this

More information

PSA Suite for Microsoft Dynamics CRM License Matrix

PSA Suite for Microsoft Dynamics CRM License Matrix In the following license matrix you will find the user capabilities divided by license type. This new License structure is applicable from July 2015. Overview Capabilities by License Type * All prices

More information

AbleBridge: Project Management 2013 v7.1.0

AbleBridge: Project Management 2013 v7.1.0 AbleBridge: Project Management 2013 v7.1.0 Plugins have been restructured to better support running as an admin and performance. Installation and Configuration process have been updated to be quick and

More information

Virto SharePoint Gantt Chart App for Office 365 Release 1.0.3. User and Installation Guide

Virto SharePoint Gantt Chart App for Office 365 Release 1.0.3. User and Installation Guide Virto SharePoint Gantt Chart App for Office 365 Release 1.0.3 User and Installation Guide 2 Table of Contents OVERVIEW... 3 FEATURES LIST... 3 SYSTEM/DEVELOPER REQUIREMENTS... 3 OPERATING SYSTEM... 3 SERVER...

More information

Increase your Performance with the PSA Suite for Microsoft Dynamics CRM

Increase your Performance with the PSA Suite for Microsoft Dynamics CRM Increase your Performance with the PSA Suite for Microsoft Dynamics CRM With the PSA Suite you will increase your Performance and you will have insight in all the major Key Performance Indicators of your

More information

1. Introduction. P2O is automatically loaded when you open Ms Project (2010 or 2013). The add-in can be found under the M5 Tools menu. 2.

1. Introduction. P2O is automatically loaded when you open Ms Project (2010 or 2013). The add-in can be found under the M5 Tools menu. 2. 1. Introduction Project 2 Outlook (P2O) will help Microsoft Project users to improve project communication by exporting MS Project tasks and information to MS Outlook Task or Appointments. Users don t

More information

CRM 2013 Customizations

CRM 2013 Customizations We are going to build a CRM Solution! CRM 2013 Chris Isbell A simple Project solution Track tasks, notes, and more Relate it to Accounts and Contacts Add custom fields Customize forms Customize business

More information

CMU/SCS Computing Facilities. Microsoft Outlook 2010 Calendar Guide

CMU/SCS Computing Facilities. Microsoft Outlook 2010 Calendar Guide CMU/SCS Computing Facilities Microsoft Outlook 2010 Calendar Guide Table of Contents Opening Outlook... 2 Finding your Calendar... 2 Creating entries on your calendar... 2 Appointments... 2 Meetings...

More information

BAT Smart View for Budget Users. Miami-Dade County. BAT Smart View Training Activity Guide

BAT Smart View for Budget Users. Miami-Dade County. BAT Smart View Training Activity Guide Miami-Dade County BAT Smart View Training Activity Guide 1 Table of Contents Activity 1: Launch Microsoft Excel, Check User Options and Use the Connection Panel.... 3 Activity 2: Opening BAT Web Forms

More information

EditAble CRM Grid. For Microsoft Dynamics CRM. How To Guide. Trial Configuration: Opportunity View EditAble CRM Grid Scenario

EditAble CRM Grid. For Microsoft Dynamics CRM. How To Guide. Trial Configuration: Opportunity View EditAble CRM Grid Scenario EditAble CRM Grid For Microsoft Dynamics CRM How To Guide Trial Configuration: Opportunity View EditAble CRM Grid Scenario Table of Contents Overview... 3 Opportunity View EditAble CRM Grid... 3 Scenario...

More information

Time & Expense Entry WalkThrough

Time & Expense Entry WalkThrough PRACTICE CS Time & Expense Entry WalkThrough Version 2014.x.x TL 27573a (01/16/2015) Copyright Information Text copyright 2004-2015 by Thomson Reuters. All rights reserved. Video display images copyright

More information

Title: SharePoint Advanced Training

Title: SharePoint Advanced Training 416 Agriculture Hall Michigan State University 517-355- 3776 http://support.anr.msu.edu support@anr.msu.edu Title: SharePoint Advanced Training Document No. - 106 Revision Date - 10/2013 Revision No. -

More information

ACCOUNT RECEIVABLES TABLE OF CONTENTS

ACCOUNT RECEIVABLES TABLE OF CONTENTS ACCOUNT RECEIVABLES TABLE OF CONTENTS 1. SETUP CUSTOMER...2 2. CUSTOMER LISTING...6 3. CUSTOMER INVOICE...7 4. CUSTOMER INVOICE LISTING...12 5. ENTER CREDITS / REFUNDS...14 6. CUSTOMER CREDITS LISTING...20

More information

ICP Data Entry Module Training document. HHC Data Entry Module Training Document

ICP Data Entry Module Training document. HHC Data Entry Module Training Document HHC Data Entry Module Training Document Contents 1. Introduction... 4 1.1 About this Guide... 4 1.2 Scope... 4 2. Step for testing HHC Data Entry Module.. Error! Bookmark not defined. STEP 1 : ICP HHC

More information

MICROSOFT ACCESS TABLES

MICROSOFT ACCESS TABLES MICROSOFT ACCESS TABLES Create a New Table... 1 Design View... Datasheet View... 5 Table Tools in Datasheet View... 6 Sorting and Filtering Data... 8 Import and Export Data... 10 Relationships... 11 Relationship

More information

Lab: Case Resolution Processing

Lab: Case Resolution Processing Lab: Case Resolution Processing Objectives Create a case. Associate a phone call with the case. Resolve the case. Reactivate the case. Manage the case through the case resolution process ribbon. Resolve

More information

MS Project Tutorial for Senior Design Using Microsoft Project to manage projects

MS Project Tutorial for Senior Design Using Microsoft Project to manage projects MS Project Tutorial for Senior Design Using Microsoft Project to manage projects Overview: Project management is an important part of the senior design process. For the most part, teams manage projects

More information

INTRODUCTION 5 COLLABORATION RIBBON 5 SELECT THE UPDATING METHOD 6 MAKE YOUR PROJECT COLLABORATIVE 8 PROCESSING RECEIVED TASK UPDATES 9

INTRODUCTION 5 COLLABORATION RIBBON 5 SELECT THE UPDATING METHOD 6 MAKE YOUR PROJECT COLLABORATIVE 8 PROCESSING RECEIVED TASK UPDATES 9 Contents Contents INTRODUCTION 5 COLLABORATION RIBBON 5 SELECT THE UPDATING METHOD 6 MAKE YOUR PROJECT COLLABORATIVE 8 PROCESSING RECEIVED TASK UPDATES 9 IMPORT UPDATES 12 CUSTOM TEXT FIELDS MAPPING 13

More information

Maximizer CRM 12 Winter 2012 Feature Guide

Maximizer CRM 12 Winter 2012 Feature Guide Winter Release Maximizer CRM 12 Winter 2012 Feature Guide The Winter release of Maximizer CRM 12 continues our commitment to deliver a simple to use CRM with enhanced performance and usability to help

More information

Microsoft Project Server 2010 Project Manager s Guide for Project Web App

Microsoft Project Server 2010 Project Manager s Guide for Project Web App Microsoft Project Server 2010 Project Manager s Guide for Project Web App Copyright This document is provided as-is. Information and views expressed in this document, including URL and other Internet Web

More information

Open Workbench. User Guide. v2.0.00

Open Workbench. User Guide. v2.0.00 Open Workbench User Guide v2.0.00 This documentation, which includes embedded help systems and electronically distributed materials, (hereinafter referred to as the Documentation ) is for your informational

More information

Table of Contents. I. Using ical... pg. 1. Calendar views and formats..pg. 1 Navigating the calendar.pg. 3 Searching the calendar..pg.

Table of Contents. I. Using ical... pg. 1. Calendar views and formats..pg. 1 Navigating the calendar.pg. 3 Searching the calendar..pg. ical Manual Table of Contents I. Using ical... pg. 1 Calendar views and formats..pg. 1 Navigating the calendar.pg. 3 Searching the calendar..pg. 4 II. Administering the Calendar. pg. 5 Display options.pg.

More information

Trigger. Perform this procedure when using the CRM Worklist. Helpful Hints

Trigger. Perform this procedure when using the CRM Worklist. Helpful Hints Purpose The purpose of this Work Instruction is to navigate the CRM Worklist and identify tools required to process and complete workflow tasks and alerts. Trigger Perform this procedure when using the

More information

User Manual - Sales Lead Tracking Software

User Manual - Sales Lead Tracking Software User Manual - Overview The Leads module of MVI SLM allows you to import, create, assign and manage their leads. Leads are early contacts in the sales process. Once they have been evaluated and assessed,

More information

Project Management. For Microsoft Dynamics CRM

Project Management. For Microsoft Dynamics CRM Project Management For Microsoft Dynamics CRM Contents Solution Relationships... 3 Main Menu End User Navigation... 4 Main Menu - Administration Navigation... 5 Projects... 6 Creating a New Project...

More information

OVERVIEW. Microsoft Project terms and definitions

OVERVIEW. Microsoft Project terms and definitions PROJECT 2003 DISCLAIMER: This reference guide is meant for experienced Microsoft Project users. It provides a list of quick tips and shortcuts for familiar features. This guide does NOT replace training

More information

FINACS INVENTORY Page 1 of 9 INVENTORY TABLE OF CONTENTS. 1. Stock Movement...2 2. Physical Stock Adjustment...7. (Compiled for FINACS v 2.12.

FINACS INVENTORY Page 1 of 9 INVENTORY TABLE OF CONTENTS. 1. Stock Movement...2 2. Physical Stock Adjustment...7. (Compiled for FINACS v 2.12. FINACS INVENTORY Page 1 of 9 INVENTORY TABLE OF CONTENTS 1. Stock Movement...2 2. Physical Stock Adjustment...7 (Compiled for FINACS v 2.12.002) FINACS INVENTORY Page 2 of 9 1. Stock Movement Inventory

More information

Shark Talent Management System Performance Reports

Shark Talent Management System Performance Reports Shark Talent Management System Performance Reports Goals Reports Goal Details Report. Page 2 Goal Exception Report... Page 4 Goal Hierarchy Report. Page 6 Goal Progress Report.. Page 8 Goal Status Report...

More information

CMU/SCS Computing Facilities. Microsoft Outlook 2011 for Mac Calendar Guide

CMU/SCS Computing Facilities. Microsoft Outlook 2011 for Mac Calendar Guide CMU/SCS Computing Facilities Microsoft Outlook 2011 for Mac Calendar Guide Table of Contents Opening Outlook... 2 Finding your Calendar... 2 Creating entries on your calendar... 2 Appointments... 2 Meetings...

More information

Salesforce Customer Portal Implementation Guide

Salesforce Customer Portal Implementation Guide Salesforce Customer Portal Implementation Guide Salesforce, Winter 16 @salesforcedocs Last updated: December 10, 2015 Copyright 2000 2015 salesforce.com, inc. All rights reserved. Salesforce is a registered

More information

Release Document Version: 1.4-2013-05-30. User Guide: SAP BusinessObjects Analysis, edition for Microsoft Office

Release Document Version: 1.4-2013-05-30. User Guide: SAP BusinessObjects Analysis, edition for Microsoft Office Release Document Version: 1.4-2013-05-30 User Guide: SAP BusinessObjects Analysis, edition for Microsoft Office Table of Contents 1 About this guide....6 1.1 Who should read this guide?....6 1.2 User profiles....6

More information

Tutorial 3 Maintaining and Querying a Database

Tutorial 3 Maintaining and Querying a Database Tutorial 3 Maintaining and Querying a Database Microsoft Access 2013 Objectives Session 3.1 Find, modify, and delete records in a table Hide and unhide fields in a datasheet Work in the Query window in

More information

Implementing Mission Control in Microsoft Outlook 2010

Implementing Mission Control in Microsoft Outlook 2010 Implementing Mission Control in Microsoft Outlook 2010 How to Setup the Calendar of Occasions, Not Doing Now List, Never Doing Now List, Agendas and the Vivid Display In Outlook 2010 Handout Version 3

More information

Non-Profit Solution for Microsoft Dynamics CRM

Non-Profit Solution for Microsoft Dynamics CRM Non-Profit Solution for Microsoft Dynamics CRM 1 Non-Profit Solution for Microsoft Dynamics CRM Users Guide Table of Contents Introduction... 2 Overview... 2 Default Objects... 2 Screen Elements... 3 Required

More information

Manager. User. Guide

Manager. User. Guide Meeting Manager Room7 User Guide Copyright 2008, NetSimplicity Software 8 th Edition, MRM 7.8 User Guide June 2008 Written for Meeting Room Manager 7.8 Written by Barry Shanko ActiveX, Internet Explorer,

More information

DataPA OpenAnalytics End User Training

DataPA OpenAnalytics End User Training DataPA OpenAnalytics End User Training DataPA End User Training Lesson 1 Course Overview DataPA Chapter 1 Course Overview Introduction This course covers the skills required to use DataPA OpenAnalytics

More information

Results CRM 2012 User Manual

Results CRM 2012 User Manual Results CRM 2012 User Manual A Guide to Using Results CRM Standard, Results CRM Plus, & Results CRM Business Suite Table of Contents Installation Instructions... 1 Single User & Evaluation Installation

More information

Access Tutorial 3 Maintaining and Querying a Database. Microsoft Office 2013 Enhanced

Access Tutorial 3 Maintaining and Querying a Database. Microsoft Office 2013 Enhanced Access Tutorial 3 Maintaining and Querying a Database Microsoft Office 2013 Enhanced Objectives Session 3.1 Find, modify, and delete records in a table Hide and unhide fields in a datasheet Work in the

More information

Outlook 2011 For the Macintosh Self Help Guide

Outlook 2011 For the Macintosh Self Help Guide Overview Outlook 2011 For the Macintosh Self Help Guide Outlook 2011 is a program that includes email, calendar, contacts (address book), task list and notes. Menu Bar Tool Bar Tabs Ribbon Navigation Pane

More information

Microsoft Dynamics CRM Clients

Microsoft Dynamics CRM Clients Microsoft Dynamics CRM Clients A user can work with Microsoft Dynamics CRM in two ways: By accessing the Microsoft Dynamics CRM application using Microsoft Internet Explorer, Google Chrome, FireFox, and

More information

Microsoft Business Contact Manager 2010 - Complete

Microsoft Business Contact Manager 2010 - Complete Microsoft Business Contact Manager 2010 - Complete Introduction Prerequisites Section 1: Getting Started with Business Contact Manager Lesson 1.1: Setting up Business Contact Manager What is Business Contact

More information

Excel Database Management Microsoft Excel 2003

Excel Database Management Microsoft Excel 2003 Excel Database Management Microsoft Reference Guide University Technology Services Computer Training Copyright Notice Copyright 2003 EBook Publishing. All rights reserved. No part of this publication may

More information

Microsoft Access 2010 handout

Microsoft Access 2010 handout Microsoft Access 2010 handout Access 2010 is a relational database program you can use to create and manage large quantities of data. You can use Access to manage anything from a home inventory to a giant

More information

Optomate Training Compendium Appointment Book Page 2

Optomate Training Compendium Appointment Book Page 2 2. Appointment Book The Optomate Premier Series Appointment Book has been developed based on the Microsoft Outlook calendar. It offers a quick and easy method for finding and entering new appointments,

More information

ELECTRO-MECHANICAL PROJECT MANAGEMENT

ELECTRO-MECHANICAL PROJECT MANAGEMENT CHAPTER-9 ELECTRO-MECHANICAL PROJECT MANAGEMENT Y K Sharma,SDE(BS-E), 9412739241(M) E-Mail ID: yogeshsharma@bsnl.co.in Page: 1 Electro-mechanical Project Management using MS Project Introduction: When

More information

DarwiNet Client Level

DarwiNet Client Level DarwiNet Client Level Table Of Contents Welcome to the Help area for your online payroll system.... 1 Getting Started... 3 Welcome to the Help area for your online payroll system.... 3 Logging In... 4

More information

Sage 200 v5.10 What s New At a Glance

Sage 200 v5.10 What s New At a Glance Introducing Sage 200 v5.10 Sage 200 v5.10 What s New At a Glance Sage 200 v5.10 sees the release of a number of new features including support for Microsoft Vista (Business and Ultimate Edition) and Microsoft

More information

Using Microsoft Office to Manage Projects

Using Microsoft Office to Manage Projects (or, Why You Don t Need MS Project) Using Microsoft Office to Manage Projects will explain how to use two applications in the Microsoft Office suite to document your project plan and assign and track tasks.

More information

Using the CORES Online Reservation System

Using the CORES Online Reservation System Using the CORES Online Reservation System Core facilities that manage shared equipment may opt to use the CORES Resource Reservation module. This functionality allows for all shared equipment to be reserved

More information

Welcome to the topic on Master Data and Documents.

Welcome to the topic on Master Data and Documents. Welcome to the topic on Master Data and Documents. In this topic, we will look at master data in SAP Business One. After this session you will be able to view a customer record to explain the concept of

More information

Kaseya 2. User Guide. Version 7.0. English

Kaseya 2. User Guide. Version 7.0. English Kaseya 2 Time Tracking User Guide Version 7.0 English September 3, 2014 Agreement The purchase and use of all Software and Services is subject to the Agreement as defined in Kaseya s Click-Accept EULATOS

More information

USER CONVERSION P3, SURETRAK AND MICROSOFT PROJECT ASTA POWERPROJECT PAUL E HARRIS EASTWOOD HARRIS

USER CONVERSION P3, SURETRAK AND MICROSOFT PROJECT ASTA POWERPROJECT PAUL E HARRIS EASTWOOD HARRIS P.O. Box 4032 EASTWOOD HARRIS PTY LTD Tel 61 (0)4 1118 7701 Doncaster Heights ACN 085 065 872 Fax 61 (0)3 9846 7700 Victoria 3109 Project Management Systems Email: harrispe@eh.com.au Australia Software

More information

Quick Start Guide for Outlook Mac 2011

Quick Start Guide for Outlook Mac 2011 Outlook 2011 for Mac is the email client for Microsoft Exchange. It is a comprehensive collaboration tool for organizing all your email, calendars, contacts and appointments. 1 6 2 3 4 7 5 The Outlook

More information

Outlook 2007 EXPLORE THE OUTLOOK USER INTERFACE. Microsoft. Basic Tasks

Outlook 2007 EXPLORE THE OUTLOOK USER INTERFACE. Microsoft. Basic Tasks Microsoft Outlook 2007 Basic Tasks EXPLORE THE OUTLOOK USER INTERFACE 1. Instant Search box: Helps you quickly find items in Microsoft Outlook. The Instant Search pane is always available in all of your

More information

Virto SharePoint Gantt Chart Web Part for SharePoint 2013 Release 4.3.0. User and Installation Guide

Virto SharePoint Gantt Chart Web Part for SharePoint 2013 Release 4.3.0. User and Installation Guide Virto SharePoint Gantt Chart Web Part for SharePoint 2013 Release 4.3.0 User and Installation Guide Table of Contents FEATURES LIST... 3 SYSTEM/DEVELOPER REQUIREMENTS... 3 OPERATING SYSTEM... 3 SERVER...

More information

Customer Transaction FBL5N

Customer Transaction FBL5N Customer Transaction FBL5N Use this job aid to: Display customer transaction details and determine if a customer was paid BEFORE YOU BEGIN You should make sure that you have access to transaction FBL5N

More information

CHAPTER 2: INTERCOMPANY POSTINGS

CHAPTER 2: INTERCOMPANY POSTINGS CHAPTER 2: INTERCOMPANY POSTINGS Objectives Introduction The objectives are: Review the IC feature and prepare the database to complete Intercompany Postings. Explain the IC Partner Card and the process

More information

PROJECT ON MICROSOFT ACCESS (HOME TAB AND EXTERNAL DATA TAB) SUBMITTED BY: SUBMITTED TO: NAME: ROLL NO: REGN NO: BATCH:

PROJECT ON MICROSOFT ACCESS (HOME TAB AND EXTERNAL DATA TAB) SUBMITTED BY: SUBMITTED TO: NAME: ROLL NO: REGN NO: BATCH: PROJECT ON MICROSOFT ACCESS (HOME TAB AND EXTERNAL DATA TAB) SUBMITTED BY: SUBMITTED TO: NAME: ROLL NO: REGN NO: BATCH: INDEX Microsoft Access- An Overview 2 Datasheet view 4 Create a Table in Datasheet

More information

BillQuick 2009 Quick Start Tutorial

BillQuick 2009 Quick Start Tutorial Time Billing and Project Management Software Built With Your Industry Knowledge BillQuick 2009 Quick Start Tutorial For Accountants BQE Software, Inc. 2601 Airport Drive Suite 380 Torrance CA 90505 Support:

More information

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by Paul E Harris Administration Evacuation Timings, meals and facilities Mobile phones

More information

Lab 1: Create and Disqualify a Lead

Lab 1: Create and Disqualify a Lead Lab 1: Create and Disqualify a Lead Scenario You work at Contoso as a sales representative and receive a phone call from Teresa Atkinson, a potential customer interested in a new product line. In order

More information

PAYROLL and BILLING TRAINING GUIDE

PAYROLL and BILLING TRAINING GUIDE PAYROLL and BILLING TRAINING GUIDE The following is our recommended best practices for processing your billing and payroll within HomeTrak Companion. These functions may be done by different staff members

More information

How To Manage Inventory On Q Global On A Pcode (Q)

How To Manage Inventory On Q Global On A Pcode (Q) Pearson Clinical Assessment Q-global User Guide Managing Inventory PEARSON 2 MANAGING INVENTORY Managing Inventory Overview When inventory is purchased, you will need to set up the allocations for the

More information

CHAPTER 11: SALES REPORTING

CHAPTER 11: SALES REPORTING Chapter 11: Sales Reporting CHAPTER 11: SALES REPORTING Objectives Introduction The objectives are: Understand the tools you use to evaluate sales data. Use default sales productivity reports to review

More information

Create task relationships by linking tasks. Switch task scheduling from manual to automatic. Set nonworking days for the project plan.

Create task relationships by linking tasks. Switch task scheduling from manual to automatic. Set nonworking days for the project plan. 2 In this chapter, you will learn how to: Start Microsoft Project Standard or Professional and save a new project plan. Enter task names. Estimate and record how long each task should last. Create a milestone

More information

Project Management within ManagePro

Project Management within ManagePro Project Management within ManagePro This document describes how to do the following common project management functions with ManagePro: set-up projects, define scope/requirements, assign resources, estimate

More information

Market Pricing Override

Market Pricing Override Market Pricing Override MARKET PRICING OVERRIDE Market Pricing: Copy Override Market price overrides can be copied from one match year to another Market Price Override can be accessed from the Job Matches

More information

Analyzing Excel Data Using Pivot Tables

Analyzing Excel Data Using Pivot Tables NDUS Training and Documentation Analyzing Excel Data Using Pivot Tables Pivot Tables are interactive worksheet tables you can use to quickly and easily summarize, organize, analyze, and compare large amounts

More information

Project Management. For Microsoft Dynamics CRM WWW.ABLEBRIDGE.COM

Project Management. For Microsoft Dynamics CRM WWW.ABLEBRIDGE.COM Project Management For Microsoft Dynamics CRM Contents Solution Relationships... 3 Main Menu End User Navigation... 4 Projects... 4 Creating a New Project... 4 Shift Project... 5 Shift Project Task...

More information

Excel 2010: Create your first spreadsheet

Excel 2010: Create your first spreadsheet Excel 2010: Create your first spreadsheet Goals: After completing this course you will be able to: Create a new spreadsheet. Add, subtract, multiply, and divide in a spreadsheet. Enter and format column

More information

EXCEL PIVOT TABLE David Geffen School of Medicine, UCLA Dean s Office Oct 2002

EXCEL PIVOT TABLE David Geffen School of Medicine, UCLA Dean s Office Oct 2002 EXCEL PIVOT TABLE David Geffen School of Medicine, UCLA Dean s Office Oct 2002 Table of Contents Part I Creating a Pivot Table Excel Database......3 What is a Pivot Table...... 3 Creating Pivot Tables

More information

Fast Track: Applications in Microsoft Dynamics CRM 2015 / CRM Online (Microsoft Training Course: F1082) - 2 days

Fast Track: Applications in Microsoft Dynamics CRM 2015 / CRM Online (Microsoft Training Course: F1082) - 2 days Fast Track: Applications in Microsoft Dynamics CRM 2015 / CRM Online (Microsoft Training Course: F1082) - 2 days TARGET AUDIENCE This course provides both an introduction to Microsoft Dynamics CRM 2015

More information

AvePoint Tags 1.1 for Microsoft Dynamics CRM. Installation and Configuration Guide

AvePoint Tags 1.1 for Microsoft Dynamics CRM. Installation and Configuration Guide AvePoint Tags 1.1 for Microsoft Dynamics CRM Installation and Configuration Guide Revision G Issued August 2014 Table of Contents About AvePoint Tags for Microsoft Dynamics CRM... 3 Required Permissions...

More information

Strategic Asset Tracking System User Guide

Strategic Asset Tracking System User Guide Strategic Asset Tracking System User Guide Contents 1 Overview 2 Web Application 2.1 Logging In 2.2 Navigation 2.3 Assets 2.3.1 Favorites 2.3.3 Purchasing 2.3.4 User Fields 2.3.5 History 2.3.6 Import Data

More information

File Management Utility User Guide

File Management Utility User Guide File Management Utility User Guide Legal Notes Unauthorized reproduction of all or part of this guide is prohibited. The information in this guide is subject to change without notice. We cannot be held

More information

Prospect module. Quick reference guide. Opmetrix app version 4.10 onwards

Prospect module. Quick reference guide. Opmetrix app version 4.10 onwards Prospect module Quick reference guide Opmetrix app version 4.10 onwards Contents Introduction... 3 Head office... 4 Business process considerations... 4 Setting up prospects... 5 Prospect transaction types...

More information

CRM Global Search: Installation & Configuration

CRM Global Search: Installation & Configuration Installation ***Important: It is highly recommended that you first take a backup of your current CRM Application Ribbons prior to importing this solution. Please do so by navigating to Settings > Solutions

More information

WebEx Integration to Outlook. User Guide

WebEx Integration to Outlook. User Guide WebEx Integration to Outlook User Guide 072310 Copyright 1997 2010 Cisco and/or its affiliates. All rights reserved. WEBEX, CISCO, Cisco WebEx, the CISCO logo, and the Cisco WebEx logo are trademarks or

More information

TOPS v3.2.1 Calendar/Scheduler User Guide. By TOPS Software, LLC Clearwater, Florida

TOPS v3.2.1 Calendar/Scheduler User Guide. By TOPS Software, LLC Clearwater, Florida TOPS v3.2.1 Calendar/Scheduler User Guide By TOPS Software, LLC Clearwater, Florida Document History Version Edition Date Document Software Trademark Copyright First Edition Second Edition 02 2007 09-2007

More information

Microsoft Project 2013 Guide to Task and Resource Planning

Microsoft Project 2013 Guide to Task and Resource Planning Starting a Project The Microsoft Project 2013 Start screen Double click Blank Project, select a Recent project, or click Open Other Projects to work on a saved project stored on disk or on SkyDrive. To

More information

MICROSOFT OUTLOOK 2011 READ, SEARCH AND PRINT E-MAILS

MICROSOFT OUTLOOK 2011 READ, SEARCH AND PRINT E-MAILS MICROSOFT OUTLOOK 2011 READ, SEARCH AND PRINT E-MAILS Lasted Edited: 2012-07-10 1 Find the Inbox... 3 Check for New Mail... 4 Manually check for new messages... 4 Change new incoming e-mail schedule options...

More information

MICROSOFT OUTLOOK 2010 WORK WITH CONTACTS

MICROSOFT OUTLOOK 2010 WORK WITH CONTACTS MICROSOFT OUTLOOK 2010 WORK WITH CONTACTS Last Edited: 2012-07-09 1 Access to Outlook contacts area... 4 Manage Outlook contacts view... 5 Change the view of Contacts area... 5 Business Cards view... 6

More information

for Sage 100 ERP Business Insights Overview Document

for Sage 100 ERP Business Insights Overview Document for Sage 100 ERP Business Insights Document 2012 Sage Software, Inc. All rights reserved. Sage Software, Sage Software logos, and the Sage Software product and service names mentioned herein are registered

More information

SAP BusinessObjects Financial Consolidation Web User Guide

SAP BusinessObjects Financial Consolidation Web User Guide SAP BusinessObjects Financial Consolidation Document Version: 10.0 Support Package 18 2016-02-19 SAP BusinessObjects Financial Consolidation Web User Guide Content 1 General user functions....12 1.1 To

More information

Lesson 07: MS ACCESS - Handout. Introduction to database (30 mins)

Lesson 07: MS ACCESS - Handout. Introduction to database (30 mins) Lesson 07: MS ACCESS - Handout Handout Introduction to database (30 mins) Microsoft Access is a database application. A database is a collection of related information put together in database objects.

More information

The Welcome screen displays each time you log on to PaymentNet; it serves as your starting point or home screen.

The Welcome screen displays each time you log on to PaymentNet; it serves as your starting point or home screen. PaymentNet Cardholder Quick Reference Card Corporate Card ffwelcome to PaymentNet The Welcome screen displays each time you log on to PaymentNet; it serves as your starting point or home screen. PaymentNet

More information

K12 Spam Management http://spam.k12.sd.us Blocked Emails from parents

K12 Spam Management http://spam.k12.sd.us Blocked Emails from parents K12 Spam Management http://spam.k12.sd.us Blocked Emails from parents If a person (student, parent, etc ) has indicated they sent you an email, but you did not receive it, it s possible it was blocked

More information

Last Updated on 11/06/2008. www.jobprotech.com

Last Updated on 11/06/2008. www.jobprotech.com Last Updated on 11/06/2008 www.jobprotech.com Copyright JobPro Technology, 2008 How to Use this Guide This manual is designed as a reference for JobPro customers. It is not intended to be a replacement

More information

NOTE: The settings may be configured as read-only. If settings are read-only, an administrator must be contacted to make settings changes.

NOTE: The settings may be configured as read-only. If settings are read-only, an administrator must be contacted to make settings changes. Covene Cohesion Web Interface User Guide A Modular Platform for Video Conferencing Management March 14, 2016 Software Version 3.0.0 Document Revision 1.2 2016 Covene LLC, All Rights Reserved. Covene, the

More information

Chapter 10 Encryption Service

Chapter 10 Encryption Service Chapter 10 Encryption Service The Encryption Service feature works in tandem with Dell SonicWALL Email Security as a Software-as-a-Service (SaaS), which provides secure data mail delivery solutions. The

More information

Exam Name: Customization & Configuration in MS Dynamics CRM 4 Exam Type: Microsoft Exam Code: MB2-631 Total Questions: 50

Exam Name: Customization & Configuration in MS Dynamics CRM 4 Exam Type: Microsoft Exam Code: MB2-631 Total Questions: 50 Question: 1 You are a Microsoft CRM Consultant and have been asked to advise a company on their Business Unit structure. When the company installed Microsoft Dynamics CRM 4.0 they named the root Business

More information

USER MANUAL (PRO-CURO LITE, PRO & ENT) [SUPPLIED FOR VERSION 3]

USER MANUAL (PRO-CURO LITE, PRO & ENT) [SUPPLIED FOR VERSION 3] Pro-curo Software Ltd USER MANUAL (PRO-CURO LITE, PRO & ENT) [SUPPLIED FOR VERSION 3] CONTENTS Everyday use... 3 Logging on... 4 Main Screen... 5 Adding locations... 6 Working with locations... 7 Duplicate...

More information

PeopleSoft Query Training

PeopleSoft Query Training PeopleSoft Query Training Overview Guide Tanya Harris & Alfred Karam Publish Date - 3/16/2011 Chapter: Introduction Table of Contents Introduction... 4 Navigation of Queries... 4 Query Manager... 6 Query

More information