Svenska Kraftnät s requirements for documentation in cable projects
|
|
|
- Brooke Stafford
- 10 years ago
- Views:
Transcription
1 UNIT, BUSINESS AREA AD, Plant documentation OUR DESIGNATION TR08-05 DATE CONSULTATION NT, NK, NL, AS, AFL, KI TECHNICAL GUIDELINES ISSUE 3 Td APPROVED Svenska Kraftnät s requirements for documentation in cable projects - Applies for installation underground, underwater or in a tunnel This technical guideline defines Svenska Kraftnät s requirements for documentation in power cable projects. The guideline is to be applied in both new construction projects and in reconstruction projects.
2 Updates Revision Change notification Date 1 First issue of the document Chapter 2.1 Project documentation has been issued and general clarification and grammatical adjustments have taken place. 3 Parts of TR08-05:2 submarine cable and TR08-05:3 tunnel and bridge have been transferred to this TR. OF opto has been omitted and a new TR08-07 has been produced for fibre-optic cable. TR08-05:1 renamed TR The entire document has been updated throughout and partially reworked. Document lists for underground and submarine power cables as well as those laid in tunnels have been collected in the same document. (revised by Gunnar Gehlin, AFL)
3 Contents 1 Introduction General Drawing requirements Sample drawings File and folder name Document lists Division into document groups Contents Drawings Situation documentation Technical specifications Earthing presentation Soil investigations/bottom investigations Calculations Measurements List of suppliers Technical quality documentation Technical descriptions Material specifications Photographs Maintenance document Document list underground cable Explanations for document list underground cable Document list submarine cable Explanations for document list submarine cable Document list cable laid in tunnel Explanations for document list cable laid in tunnel Appendices Sample drawings... 28
4 1 Introduction 1.1 General This technical guideline (TR08-05) itemises the documents, drawings and other documents which are to be supplied to Svenska Kraftnät (Svk) in connection with projects that involve new construction or reconstruction of power cable installations in ground, water, tunnels or bridge structures. The documentation according to this technical guideline shall include all plant components and all equipment included in relevant cable projects. Project boundary to adjacent projects is normally in terminal clamp for top bolt on the respective cable termination. Racks for installation of cable terminations are normally included in the cable project. Every cable project will be unique with respect to design and scope. The requirements for documents according to document lists in this TR must therefore be read as applicable where appropriate. A cable project can be either a purely underground, submarine or tunnel cable project, or a combination of them. In the latter case, the specific requirements for the documentation for the respective part is derived from the appropriate section 2.2, 2.4 or 2.6 below. 1.2 Drawing requirements All drawings produced in the project with Svenska Kraftnät s drawing number shall be delivered in file format according to the document list further down in this TR. Furthermore, all drawings for final documentation produced in the project shall also be delivered in the file format Portable Document Format (PDF). All drawings are to be supplied in a scale suitable for the respective drawing, so that the plant sections, components or equipment that the drawing presents are clearly set out and the drawing is reasonably legible. Standard scales according to Svenska Kraftnät s technical guideline for drawings TR08-02 shall be used. An appropriate standard scale shall be selected so that the plant sections, components or equipment that the drawing presents are clear and legible. All drawings are to be of the As built type. All drawings described in this technical guideline where the file format is DWG, shall have Svenska Kraftnät s drawing frame and drawing number in accordance with TR The requirements for some drawings are clarified in section 2.3 below. 1.3 Sample drawings To ensure that the drawings contain the information which Svenska Kraftnät intends, a number of sample drawings have been produced. The sample drawings only show how the documentation of the technical content should be configured, and not how actual designs should be configured. Sample drawings are shown in appendices. For detailed requirements for drawings see TR08-02.
5 1.4 File and folder name The document list in chapter 2 presents the documents which are to be delivered to Svenska Kraftnät. The documents are to be delivered in a folder structure which corresponds with the order in the document list. The table headings constitute folder level 1, the section designations constitute folder level 2, and so on. The file names shall comprise an informative text which makes it possible to determine the file s contents without the file having to be opened and read. Below is an example of a limited part of the folder structure. 2 Document lists 2.1 Division into document groups The document lists below list the drawings and other documents which are to be supplied as final technical documentation from the project. The following groups of documents apply: Contents Shall provide a summary of what is included in the technical documentation Drawings Drawings shall be supplied presenting the built plant s design and construction both in outline and in detail. The drawings can be general plans, detailed drawings, design drawings or construction drawings. Drawings shall be dimensioned to the extent required for the respective drawing s interpretation and legibility. Construction drawings shall be provided with bills of materials Situation documentation The aim of the situation documentation is to present the built plant s geographic location (coordinates) based on data entered. The situation documentation shall include both x/y coordinates and z coordinate. TR Technical specifications Document which shall present detailed technical data for plant section, apparatus, component, equipment or similar supplied. The document is usually a data sheet, but can also comprise an equivalent brief summary. The content can be electrical, mechanical, thermal data/performance/requirement, material, dimensions, weights, etc.
6 2.1.5 Earthing presentation The document group shall show how the built cable installation's earthing system is designed and constructed. This applies to both so-called "functional" and "protective" earthing. Design and earth electrode resistances measured are to be presented. Svenska Kraftnät s earth electrode protocol shall be used and adjusted when necessary Soil investigations/bottom investigations Shall present implementation and results of any soil investigations (cable underground or in a tunnel) or bottom investigations (submarine cable). Can apply to, for example, geotechnical investigations with the aim of examining the ground's character, soil type, stability etc., thermal surveys, or investigations of underground water levels. For submarine cables it entails documenting bottom conditions and finding a suitable route etc Calculations Any electrical, thermal or mechanical calculations that the cable supplier or contractor in the project has performed with the aim of ensuring the function and/or dimensioning a part of the plant supplied are to be presented here Measurements This document group comprises the results from the measurements performed within the framework of the project. It might involve measurements of thermal resistivity in the ground, measurements of earth electrode resistance or something else. The results from the impedance measurement of the cable system which take place after completion shall also be presented here. However, measurements that are included in the supplier s final testing after installation are not referred to under this heading, Site Acceptance Test (SAT) List of suppliers Information about suppliers of different materials and equipment is presented here. It might involve material included in the cable system per se, but also material in contracts Technical quality documentation Records of tests performed according to relevant standards are presented here. This concerns both qualification tests (Type Test) and tests during manufacturing/production (Factory Acceptance Test, FAT) and tests after installation (Site Acceptance Test, SAT). Inspection records and similar from surveys and inspections during the course of the project are also presented here Technical descriptions Documents produced which have the aim of providing a technical account of the cable system, and/or parts of it. The documents can also provide a technical description of assembly, laying or installation of the plant or parts of it Material specifications Documents that present composition/content of certain materials used in cable systems, components, equipment, filling material or similar. It might involve environmentally-
7 related declarations, or quality/performance-related declarations (e.g. the composition of thermal protective filling) Photographs Photographs are primarily to be used to document plant sections which are not normally visible, but which for various reasons it is beneficial to show in a photograph, e.g. equipment for and design of joint locations in the ground. Photographs can also be used to advantage to document elements in the production process, or to document tests and checks performed on equipment delivered Maintenance document Examples of what is presented here are the supplier s method descriptions for cable splicing and assembly of cable terminations, recommendations for maintenance and service of equipment delivered, as well as recommendations for storage of spare parts. 2.2 Document list underground cable In this technical guideline, underground power cable refers to power cable that is designed to be laid on land, and which is either laid directly in the ground (excavated or blasted cable trench), in a pipe in a cable trench, in a concrete-encased pipe or equivalent, in a culvert at ground level, or through laying without excavating, e.g. guided drilling. In exceptional cases, cable designed to be laid on land (provided that it is equipped with secure radial water barriers), may be laid in shallow lakes or equivalent. Such laying is also included in this document list. MK Underground cable Document/Item Description MK00 Contents MK00.01 Document list Complete list of all documents and other items included in the documentation. Document name, revision number, issue/revision date shall be shown. MK01 Drawings MK01.01 Drawing list Complete list of drawings. Drawing number shall be indicated. Drawings shall be furnished with Svk drawing number MK01.02 List of cancelled drawings in the Bank File type xls/xlsx xls/xlsx xls/xlsx MK01.03 General plan cable route The drawing shall present an overview of the cable s route and geographic location. See in addition description under section 2.3. MK01.04 Plan drawing & Profile drawing The drawing shall present the power cables surveyed in plan and profile. Height scale shall be shown. Any marking poles shall be set out with surveyed positions. MK01.05 General plan station installation The drawing shall show location of cable terminations within station area. The drawing (which can be a site plan of the station) shall show other vital parts of the station. Wiring connected to the power cables shall be shown.
8 MK Underground cable Document/Item Description MK01.06 General plan joint location The drawing shall present the joint location s design and arrangement. Joint locations with different designs are to be presented in separate drawings. See in addition under section 2.3. MK01.07 Detailed drawings/cross sections with normal underground cables (Direct Buried). Where applicable, the drawings shall show trench sections, i.e. cross sections of the cables positions in the cable trench. See in addition under section 2.3. File type MK01.08 Detailed drawings/cross sections when laying piping. Where applicable, the drawings shall show cross sections of piping. See in addition description under section 2.3. MK01.09 Detailed drawings/cross sections when laying culverts. Where applicable, the drawings shall show cross sections of the cable installation when laying culverts. See in addition description under section 2.3. MK01.10 MK01.11 Detailed drawings/cross sections when intersecting other infrastructure Assembly drawing of cable termination The drawings shall show relevant cross sections of the cable installation at crossing point with other infrastructure, such as other mains or roads/railway etc. See in addition description under section 2.3. The drawing shall show the cable termination fitted on its rack, as well as cable current transformers, junction boxes, PD-measuring boxes etc. and wiring and earthings. Location of PD-sensors shall be set out. MK01.12 Detailed drawing of joint location The detailed drawing shall present the joint location s complete design in more detail than the general plan. See in addition under section 2.3. MK01.13 Design drawings concrete Drawings which show design of any base plates for joint location, or design of any concrete enclosures for junction boxes or similar. MK01.14 Design drawings steel Design drawings for racks for cable terminations shall be presented, as well as design drawings for any assembly components for junction boxes etc. If adapters or similar are required for assembly of cable terminations on racks, design drawings for these shall also be presented. MK01.15 Detailed drawings cable joints This refers to the supplier s/manufacturer s detailed drawing of the cable joint s construction. MK01.16 Detailed drawings cable termination This refers to the supplier s/manufacturer s detailed drawing of the cable termination s construction. MK01.17 Detailed drawings cable clamps This refers to the supplier s/manufacturer s detailed drawing of the design of cable clamps supplied. (Cable clamps are used for cable terminations and if necessary for securing joint location.) MK01.18 Detailed drawings junction boxes etc. This refers to the supplier s/manufacturer s detailed drawings of junction boxes/link boxes or measuring boxes supplied. MK01.19 Phase sequence diagram See description under section 2.3. MK01.20 Earthing diagram See description under section 2.3. MK02 Situation documentation MK02.01 Coordinate lists and files The entire cable installation including vital parts such as joint locations, concrete enclosures, connection chambers, fibre-optic chambers, pipe laying etc. shall be surveyed and presented according to Svk s instructions, see TR MK03 Technical specifications See TR08-06 MK03.01 Technical specification power cable This refers to the supplier s technical specification (Design Report), partly in words, of design/construction of the cable, as well as data sheets which present electrical, thermal and mechanical data, as well as information about dimensions and weight and handling the cable. MK03.02 Technical specification cable joints This refers to the supplier s technical specification in words of the design of the cable joint supplied, as well as data sheets which present electrical, thermal and mechanical data, as well as information about dimensions and weight for complete joint housings.
9 MK Underground cable Document/Item Description MK03.03 Technical specification cable This refers to the supplier s technical specification in termination words of the design of the cable termination supplied, as well as data sheets which present electrical, thermal and mechanical data, as well as information about dimensions and weight for complete cable termination. MK03.04 Technical specification ducting pipe The supplier s data sheet and drawings for product supplied. MK03.05 MK03.06 MK03.07 MK03.08 MK03.09 MK03.10 MK03.11 MK03.12 MK03.13 Technical specification cable current transformers Technical specification fibre-optic cables Technical specification junction boxes and earthing boxes Technical specification cable ties, stripes or means of attachment for cable Technical specification fibre-optic chambers or any other chambers Technical specification hoses/pipes for communication cables Technical specification equipment for temperature monitoring (DTS) Technical specification equipment for PD-measurement Technical specification and marking of pipe system in electric power installations The supplier's data sheet and drawings for component supplied The supplier s data sheet/technical specification for fibreoptic cables supplied for communication or DTS The supplier s data sheet/technical specification for component supplied The supplier s data sheet/technical specification for component supplied. Here, means of attachment refers to any cable clamps or equivalent at joint locations. The supplier s data sheet/technical specification for chambers supplied The supplier s data sheet/technical specification for pipes and/or hoses supplied The supplier s data sheet/technical specification for system solution supplied. The system s performance shall be specified. Shall be supplemented with a technical description. The supplier s data sheet/technical specification for solution supplied. Measurement performance etc. shall be specified. Shall be supplemented with a technical description Cable marking poles. AMA EL. YTB.1632 Shall be entered with coordinates in Sweref99 TM MK04 Earthing presentation MK04.01 Earthing description A comprehensive description of the earthing system s design. The description shall be sufficiently detailed to enable understanding of the technical construction. Integral components/equipment shall be specified. MK04.02 Earthing map Planimetric map in scale 1:2,000 of cable installation, earth wires and earth electrodes drawn in. MK04.03 Measuring protocol for step and touch voltages If this is required: Protocol which shows results of measurements performed of step and touch voltages incl. mapping of low voltage network File type MK05 Soil investigations MK05.01 Soil investigation records Results of soil investigations performed are to be presented. Relevant investigations are mapping of soil types, stability assessments, surveys of ground resistivity etc. Exploratory drilling is also accommodated under this heading. Where cables are laid in shallow lakes and similar, results from bottom surveys can also be included. MK06 Calculations MK06.01 Capacity calculations The supplier s calculation results for the expected thermal fan out for cable systems supplied, under given/assumed conditions. Likewise, results from calculation of the cable system s short-circuit resistance shall be presented. MK06.02 Mechanical calculations Any mechanical calculations performed within the framework of the project shall be presented here. For example, it might involve calculations due to modifications or additions to original designs. MK06.03 Geotechnical calculations Any geotechnical calculations performed within the framework of the project shall be presented here. For example, it might involve stability calculations to ensure carrying capacity. MK07 Measurements (not included in testing)
10 MK Underground cable MK07.01 MK07.02 MK07.03 Document/Item Measuring protocol ground resistivity Measuring protocol compaction control Measuring protocol sheath test after cable laying Description Provided that such measurements are performed, results of measurements of the ground s thermal resistivity in [K m/w] before excavating the cable trench are to be presented here The results of measurements taken of degree of compaction in cable foundation and protective filling (Troxler measurement or equivalent method) are to be presented here. The results from sheath tests performed in connection with laying power cables (not to be confused with sheath test included in SAT) are to be presented here. File type MK07.04 MK07.05 Measuring protocol impedance measurement Measuring protocol earth electrode measurements The results of measurements taken of cable joint s plus-, minus- and zero-sequence impedances after completion, but before commissioning, shall be presented here. To be performed by cable supplier or another party. In accordance with Svenska Kraftnät Excel template (modified for cable project). MK08 List of suppliers MK08.01 List of materials suppliers A list of qualified suppliers of critical materials, such as insulating oil, PEX-material, compound material joints etc. xls/xlsx MK08.02 List of equipment suppliers A list of suppliers of accessories/equipment, such as SVLs, DTS systems etc. MK09 Technical quality documentation MK09.01 Inspection record Records from surveys and inspections performed are to be presented here. Relevant inspections are checking cable trench, conduit foundation, protective filling, checking after laying cable, backfilling, assembly work, as well as Final inspection, Operational inspection, Guarantee inspection. MK09.02 Measuring protocol thermal protective filling The supplier s records showing that the thermal sand supplied meets the set requirements are to be presented here. MK09.03 Measuring protocol bentonite filling The supplier s records showing that the thermal filling supplied (bentonite) meets the requirements are to be presented here. MK09.04 Records Type Test Records of tests the supplier has performed on cable and all accessories included (cable joints and cable terminations). Type test of complete cable systems shall be presented. Type testing of junction boxes shall also be presented. The type test shall be performed according to applicable IEC standards. Tests for HVDC cables shall be performed according to Cigré TB 496 MK09.05 Records of Sample Test Records of sample tests performed by the supplier. According to applicable IEC standard. Tests for HVDC cables shall be performed according to Cigré TB 496 MK09.06 Routine test Records of routine tests performed by the supplier. According to applicable IEC standard. Tests for HVDC cables shall be performed according to Cigré TB 496 MK09.07 After Installation Tests Records of Sheath Tests (included in SAT) Records of sheath tests (DC) of complete cable systems the supplier has performed, as well as crossconnection systems where applicable. According to IEC MK09.08 Records of Phase Sequence Tests Records of phase sequence tests the supplier has performed. According to customary standards. MK09.09 Records of PD measurement Test records from PD measurements on all accessories fitted with PD sensors. If PD sensors are installed and performed according to the supplier s standard. MK09.10 Records Impedance measurement Test records from measurements performed by the supplier of plus-, minus- and zero-sequence impedance data. MK09.11 Records of AC or DC test (Operational test) Records of AC tests performed by the supplier. The test is to be performed according to applicable IEC standards and/or according to agreement.
11 MK Underground cable MK09.12 Document/Item Records TDR (Time Domain Reflectometry) Description Where appropriate: Records of TDR measurements performed by the supplier. MK09.13 ITP (inspection and test plan) Information test and quality control shall be implemented File type MK09.14 NCR (non conformance report) Deviation reports, ISO9001 MK10 Technical descriptions MK10.01 Technical description cable systems MK10.02 Technical description cable installation The supplier s overall technical description of cable systems installed. The description shall present the system s fundamental structure and function, including main integral components and screen connection. Description of cable installation s construction, based on AMA MK10.03 Technical description DTS system The supplier s overall description of structure and function of system supplied for measurement of the cable temperature, DTS system (if installed). The description shall set out functional principle, as well as how and where measurement/monitoring takes place, installation of measurement fibre etc. MK11 Material specifications MK11.01 MK11.02 Material specification protective filling Material specification filling material for pipe laying The supplier s data sheet/technical specification for thermal material supplied. Screening curve shall be presented. The supplier s data sheet for bentonite mixture or equivalent supplied MK11.03 List of materials (MSDS) The supplier s summary of content declarations for relevant material included in cable and accessories. Primarily applies to insulating oils, any compound materials, plastics. MK12 Photographs MK12.01 Photographic documentation of joint locations The photographs shall document all joint locations. The photographs shall be taken when the joint location is fully completed technically, but before protective filling/backfilling has been implemented. A sketch with a north arrow to show where north is, is to be placed in the trench when photographing the joints in the trench. MK13 Maintenance document MK13.01 Maintenance manual Cable system The supplier s specific advice and instructions for operation and maintenance of cable system supplied. MK13.02 Instructions cable laying The supplier s specific advice and instructions for cable laying and handling of power cable supplied. MK13.03 Method description cable splicing The supplier s description as a basis for correct assembly of cable joints (spare parts) supplied MK13.04 Method description Assembly of cable terminations The supplier s description as a basis for correct assembly of cable terminations (spare parts) supplied. MK13.05 Repair agreement Cable splicing A repair agreement shall be signed with the cable supplier to ensure rapid access to repair staff and resources in the event of a cable fault. MK13.06 List of spares The supplier shall compile a list of all spare parts (cable, joints, end parts etc.) which have been supplied. The document shall also include instructions for storage and handling of the spare parts, as well as information about the predicted useful service life. MK13.07 Operation and Maintenance Instruction for DTS system Where appropriate: The supplier s specific advice and instructions for operation and maintenance of DTS equipment supplied. The instruction shall include operation of the system. MK13.08 Traceability documentation Protocol presenting which cable lengths (unique number) are installed where, ID no. of all joints, cable terminations, etc. installed shall be set out. JPEG
12 2.3 Explanations for document list underground cable Explanations and clarifications of certain of the points in the document list according to the above are provided below. MK01.03 General plan cable route A general plan shall function as an overall document which clearly shows the cable installation's route. The general plan shall refer to underlying drawings. The type and number of the various underlying drawings shall be clearly set out on the general plan. The general plan shall be according to scale and drawn up in such a way as to clearly set out the cable connection s geographic location. Roads, buildings etc. in the vicinity of the cable route shall be shown. Any pipe installations, intersections with other mains structures and similar shall be marked on the drawing. If legibility requires it, the general plan shall be divided into a number of drawings. For example, see appendix 1. MK01.06 General plan joint location The drawing shall present the joint location s design and arrangement. The locations of the joint housings shall be set out, as well as other equipment such as junction boxes, boxes for PD measurement etc. Any concrete enclosures or chambers for these boxes shall also be shown. If a concrete slab or equivalent has been placed in the jointing pit, this shall be shown. MK01.07 Cross sections with normal cable laying in the ground Sectional drawings which show the cable trench s dimensions and the power cables positions in the cable trench shall be produced for the different installation configurations that occur along the cable route. Sectional drawing with direct burial in the ground shall as a minimum show: Trench depth Trench bottom width Dimensions of protective filling (cable sand or equivalent) Depth of filling above the cables The power cables positions, with reciprocal distance between cables. Location of cable protection and warning mesh or equivalent Type of backfill/cable sand Type of surrounding ground (moraine, earth, clay, etc.) Any surface layer over the cable installation Location of earth wires. Location of any fibre-optic cables/empty pipes for communication Location of any fibre-optic cables for temperature measurement (DTS) Other mains structures (electricity, sewage, water, district heating, telecoms, fibre-optic) parallel to the cable installation which are located at a distance of 5 m from outer cable. Each sectional drawing shall be marked with coordinates (starting point) according to Svenska Kraftnät s technical guideline for surveying, TR08-06, and shall also be given an ID-number. Coordinates shall agree with coordinates entered for the cable installation. The sectional drawing s starting point and ID shall be set out in the general plan. Each sectional drawing shall apply until reference to another sectional drawing is made. Direction in relation to the next sectional drawing that applies is governed by the surveying.
13 Breakpoint for production of new sectional drawing is when there is a significant change in the particular cross section. Examples of significant changes are when trench depth and/or filler depth changes by more than 20 cm, if the power cables (or groups of cables) reciprocal distance changes by more than 10 cm, if protective filling or surrounding soil type changes, or if a change occurs in the location of cable protection/warning mesh. There is also a breakpoint if a change occurs in the installation of earth wires or fibre-optic/telecoms lines, or in a jointing chamber. For example, see appendix 3. Sectional drawings for joint locations and intersections with another infrastructure are dealt with separately. MK01.08 Cross sections for pipe laying Pipe laying here refers to all pipe laying, i.e. normal pipe laying in an excavated cable trench, pipe laying after guided drilling, hammer drilling or similar, or e.g. ducting pipe embedded in concrete or similar. In this context, pipe laying also includes crossing water courses or other catchment areas, where the installation cannot be regarded as submarine cables. Sectional drawing for pipe laying shall as a minimum show: Installation depth The pipes positions, with reciprocal distance between them. Pipe diameter and pipe thickness Pipe material and pipe filling (material) Location of any cable cover and warning mesh or equivalent Type of backfill/cable sand and/or type of surrounding soil Any surface layer over the cable installation Any reinforced cable protection, for example concrete slabs or similar. Location of earth wires. Location of any fibre-optic cables/empty pipes for communication Location of any fibre-optic cables for temperature measurement (DTS) Other mains structures (electricity, sewage, water, district heating, telecoms, fibre-optic) parallel to the cable installation which are located at a distance of 5 m from outer cable. Each sectional drawing shall be marked with coordinates according to the same principle described under MK01-07 above. Breakpoint for production of new sectional drawing is the same as for normal laying in the ground, when significant changes occur in applicable cross sections. With, for example, guided drilling with a substantial installation depth and a substantial distance between pipe/cables, there is less sensitivity for deviations and assessment of significant changes may therefore be made from case to case here. For example, see appendix 2. MK01.09 Cross sections with culvert laying Culvert laying refers here to all cable laying in closed or open (with cover or grate) culverts/trough of concrete or equivalent, located at ground level. Sectional drawing for pipe laying shall as a minimum show: Trench depth for the culvert The culverts/trough s dimensions (width and height) Material thickness and material in the construction The power cables positions with reciprocal distance Any occurrence of filling material and/or cable sand
14 Any spacers, brackets or cable clamps etc. Location of earth wires. Location of any fibre-optic cables/empty pipes for communication Location of any fibre-optic cables for temperature measurement (DTS) Other mains structures (electricity, sewage, water, district heating, telecoms, fibre-optic) parallel to the cable installation which are located at a distance of 2 m from outer cable. Each sectional drawing shall be marked with coordinates according to the same principle described under MK01-07 above. Breakpoint for production of new sectional drawing is the same as for normal laying in the ground, when significant changes occur in applicable cross sections. For culvert laying a change in the culvert s dimensions of more than 20 cm is counted as significant. MK01.10 Cross sections when intersecting with other infrastructure Specific sectional drawings shall be produced at points where the cable installation intersects with another infrastructure. Infrastructure here refers to roads, railways etc., as well as other mains structure (electricity, telecoms, fibre-optic, water, sewage, district heating etc.). In addition to the specifications under MK01.07, MK01.08 or MK01.09 above, sectional drawings for intersections with other infrastructure shall as a minimum also show: Positioning/location for intersecting infrastructure Distance between power cables and intersecting infrastructure With roads/railway: Dimensions of and material in roadbed resp. embankment and its substructure. Any protective or strengthening measures. With mains structure: Type of mains, mains dimension and material. Where appropriate, voltage level. Number of intersecting mains (if more than one). Each sectional drawing shall be marked with coordinates according to the same principle described under MK01-07 above. MK01.12 Detailed drawing joint location In addition to what is stipulated for general plan according to MK01.06, the detailed drawing shall also present the power cables locations, any cross-connection cables, earthing cables, measurement cables, as well as earth wires/counterpoise wires. Location of any PD sensors shall be shown. Individual cables shall be ID marked. MK01.19 Phase sequence diagram A phase sequence diagram shall be presented, where the location of phases L1, L2 and L3 is clearly set out along the entire cable route from station to station, through any pipe ducting and past joint locations. Any transposition points shall be clearly shown, and the phases location before and after such transposition points shall be presented. Linear measurement in m at each transposition point shall be given. The phases positions within the respective cable group shall be shown in the cross section. For example, see appendix 4. MK01.20 Earthing diagram A diagram of the cable system's earthing system shall be produced. The diagram shall present earth wires/counterpoise wires, earth electrode, as well as the cable shields' connections in all relevant connecting points such as station connections, jointing points and earthing points. Dimensions of earthing cables shall be specified. Earthing points
15 shall be drawn in and lengths in m to earthing points shall be indicated. Any crossconnection boxes and/or earthing boxes shall be drawn in and the cable shields connections and interconnections in them shall be clearly set out. For example, see appendix Document list submarine cable In this technical guideline, submarine power cable refers to power cable which is designed to be laid in water (lake, sea, river or equivalent) and, where appropriate, on land close to the shore. Boundary for submarine cable is set at transition joints at the shoreline. The transition joints belong to the submarine cable project. SK Submarine cable Document/Item Description SK00 Contents SK00.01 Document list Complete list of all documents and other items included in the documentation. Document name, revision no., issue/revision date shall be given. SK01 Technical descriptions SK01.01 Technical description cable systems SK01.02 Technical description cable installation ( As built Report) The supplier s overall technical description of cable systems installed. The description shall present the system s fundamental structure and function, including main integral components and screen connection. The project s/contractor s description of the cable installation s design. The description shall include how the submarine cables are laid, protective measures such as flushing, ploughing, covering etc., as well as descriptions of any crossing of obstacles. SK01.03 Technical description DTS system The supplier s overall description of structure and function of system supplied for measurement of the cable temperature, DTS system (if installed). The description shall set out functional principle, as well as how and where measurement/monitoring takes place, installation of measurement fibre etc. SK02 Drawings SK02.01 Drawing list Complete list of drawings. Drawing number shall be indicated. Drawings shall be furnished with Svk drawing SK02.02 List of cancelled drawings in the Bank number SK02.03 General plan cable route The drawing shall present an overview of the cable s route and geographic location. See in addition description under section 2.5. SK02.04 Plan drawing & Profile drawing The drawing shall present the power cables surveyed in plan and profile. Height scale shall be shown. Any marking poles and warning signs shall be set out with surveyed positions. SK02.05 SK02.06 General plan for land/water intersection for location of transition joints Detailed drawings/cross sections cable trench close to shoreline The drawing shall present an outline of the land/water intersection, as well as present design and arrangement of transition joint locations. See in addition under section 2.5 The drawings shall show trench sections present, i.e. cross sections of the cables installation in any cable trench. See in addition under section 2.5 File type xls/xlsx xls/xlsx xls/xlsx SK02.07 Detailed drawings/cross sections for laying underwater. The drawings shall show normal cross sections of installation in areas close to the shoreline and at sea. See in addition description under section 2.5. SK02.08 Detailed drawings at intersections with other mains and submarine cables The drawings shall show relevant cross sections of the cable installation at crossing points with other submarine mains/cables. See in addition description under section 2.5. SK02.09 Detailed drawing of location of transition joints The detailed drawing shall present the joint location s complete design in more detail than the general plan. See in addition under section 2.5
16 SK Submarine cable Document/Item Description SK02.10 Design drawings concrete Drawings which show design of any base plates at joint location, design of any concrete enclosures for junction boxes or concrete construction for Hang-off. SK02.11 Detailed drawings cable joints This refers to the supplier s/manufacturer s detailed drawing of structure of transition joints and any submarine joints. SK02.12 Detailed drawings cable clamps This refers, where applicable, to the supplier s//manufacturer s detailed drawing of design of cable clamps supplied (can be used at transition joints). File type SK02.13 Detailed drawings junction boxes etc. This refers to the supplier s/manufacturer s detailed drawings of junction boxes/link boxes or measuring boxes supplied. SK02.14 Phase sequence diagram See description under section 2.5. SK02.15 Earthing diagram See description under section 2.5. SK03 Situation documentation SK03.01 Coordinate lists and files The entire cable installation including vital parts such as joint locations, concrete enclosures, connection chambers, fibre-optic chambers, pipe laying etc. shall be surveyed and presented according to Svk s instructions, see TR SK04 Technical specifications SK04.01 Technical specification power cable This refers to the supplier s technical specification (Design Report), partly in words, of design/construction of the cable, as well as data sheets which present electrical, thermal and mechanical data, as well as information about dimensions and weight and handling the cable. SK04.02 Technical specification cable joints This refers to the supplier s technical specification, partially in words, of the design of the cable joint supplied, data sheets which present electrical, thermal and mechanical data, as well as information about dimensions and weight for complete joint housing. Applies to both transition joints and submarine joints. SK04.03 Technical specification cable termination The supplier's data sheet and drawings for component supplied. SK04.04 Technical specification ducting pipe The supplier s data sheet and drawings for product supplied. (Where appropriate). SK04.05 SK04.06 SK04.07 SK04.08 SK04.09 SK04.10 Technical specification hoses/pipes for communication cables Technical specification fibre-optic chambers or any other chambers Technical specification fibre-optic cables Technical specification cable current transformers Technical specification junction boxes and earthing boxes Technical specification cable ties, stripes or means of attachment for cable The supplier s data sheet/technical specification for pipes and/or hoses supplied The supplier s data sheet/technical specification for chambers supplied The supplier s data sheet/technical specification for fibreoptic cables supplied for communication or DTS The supplier's data sheet and drawings for component supplied. (Where appropriate) The supplier s data sheet/technical specification for component supplied The supplier s data sheet/technical specification for product supplied. Here, means of attachment refers to any cable clamps or equivalent at joint locations. See TR08-06 SK04.11 SK04.12 SK04.13 Technical specification equipment for temperature monitoring (DTS) Technical specification equipment for PD-measurement Technical specifications equipment for laying submarine cable The supplier s data sheet/technical specification for system solution supplied. The system s performance shall be specified. Shall be supplemented with a technical description. The supplier s data sheet/technical specification for solution supplied. Measurement performance etc. shall be specified. Shall be supplemented with a technical description The contractor s/supplier s technical specifications for cable laying vessel and other laying equipment such as ROVs, flushing equipment, ploughing equipment etc. SK04.14 Technical specification equipment for locating faults SK05 Material specifications The supplier s data sheet/technical specification for equipment supplied. Measurement performance etc. shall be specified. Shall be supplemented with a technical description
17 SK Submarine cable SK05.01 SK05.02 Document/Item Material specification protective filling Material specification filling material for pipe laying etc. Description The supplier s data sheet/technical specification for thermal material supplied. Screening curve shall be presented. The supplier s data sheet for bentonite mixture or equivalent supplied SK05.03 List of materials (MSDS) The supplier s summary of content declarations for relevant material included in cable and accessories. Primarily applies to insulating oils, any compound materials, plastics. SK06 List of suppliers SK06.01 List of materials suppliers A list of qualified suppliers of critical material, such as insulating oil, PEX-material, compound-material for joints etc. SK06.02 List of equipment suppliers A list of suppliers of accessories/equipment, such as SVLs, DTS systems etc. SK07 Photographs SK07.01 Photographic documentation of joint locations SK07.02 Photographic documentation submarine cables Photographs shall document locations for transition joints. The photographs shall be taken when the joint location is completed technically, but before protective filling/backfilling takes place. Relevant photographic documentation from submarine cable installation SK08 Earthing presentation SK08.01 Earthing description A comprehensive description of the earthing system s design. The description shall be sufficiently detailed to enable understanding of the technical construction. Integral components/equipment shall be specified. SK08.02 Earthing map Planimetric map in scale 1:2,000 of cable installation, earth wires and earth electrodes drawn in. (If relevant) File type JPEG JPEG SK08.03 Measuring protocol for step and touch voltages If this is required: Protocol which shows results of measurements performed of step and touch voltages incl. mapping of low voltage network SK09 Soil investigations SK09.01 Soil investigation records The results from any soil investigations performed in connection with cable coming onto land shall be presented here. Relevant investigations are surveying soil types, stability, investigation of ground resistivity etc. SK09.02 Records and reports from surveys and bottom surveys Results shall be presented from surveys performed, bottom surveys, dredging, hydrographical surveys etc. SK09.03 Marine biology investigations SK09.04 marine biology investigations SK10 Calculations SK10.01 Capacity calculations The supplier s calculation results for the expected thermal fan out for cable systems supplied, under given/assumed conditions. Likewise, results from calculation of the cable system s short-circuit resistance shall be presented. SK10.02 Mechanical calculations Any mechanical calculations performed within the framework of the project shall be presented here. It might, for example, involve calculations for dimensioning Hangoff. SK10.03 Geotechnical calculations Any geotechnical calculations performed within the framework of the project shall be presented here. For example, it might involve stability calculations to ensure carrying capacity. SK11 Measurements (not incl. in testing)
18 SK Submarine cable SK11.01 SK11.02 SK11.03 SK11.04 Document/Item Measuring protocol ground resistivity Measuring protocol compaction control Measuring protocol impedance measurement Measuring protocol earth electrode measurements Description Provided that such measurements are performed, results of measurements of the ground s thermal resistivity in [K m/w] before excavating the cable trench are to be presented here The results from measurements taken of degree of compaction in cable foundation and protective filling are to be presented here (Troxler-measurement or equivalent method) (If relevant). The results of measurements taken of cable joint s plus-, minus- and zero-sequence impedances after completion, but before commissioning, shall be presented here. To be performed by cable supplier or another party. In accordance with Svenska Kraftnät Excel template (modified for cable project). SK12 Technical quality documentation SK12.01 Inspection record Records from surveys and inspections performed are to be presented here. Relevant inspections are ongoing checks of work carried out, assembly work, as well as Final inspection, Operational inspection, Guarantee inspection. SK12.02 Measuring protocol thermal protective filling The supplier s records showing that the thermal sand supplied meets the set requirements are to be presented here. SK12.03 Measuring protocol bentonite filling The supplier s records showing that the thermal filling supplied (bentonite) meets the requirements are to be presented here. SK12.04 Records Type Test Records of type tests the supplier has performed on cable and all accessories included (cable joints) and components. Type test of complete cable systems shall be presented. Type testing of junction boxes and similar shall also be presented. The type test shall be performed according to Cigré Electra 171, Cigré Electra 189 and applicable IEC standard. For HVDC-cables testing shall be performed according to Cigré TB 496. File type xls/xlsx SK12.05 Records of Sample Test Records of sample tests performed by the supplier. According to applicable IEC standard. For HVDCcables testing shall be performed according to Cigré TB 496. SK12.06 Routine test Records of routine tests performed by the supplier. According to applicable IEC standard. For HVDCcables testing shall be performed according to Cigré TB 496. SK12.07 After Installation Tests Records of Sheath Tests (included in SAT) Records of sheath tests (DC) of complete cable systems the supplier has performed, as well as crossconnection systems where applicable. According to IEC SK12.08 Records of Phase Sequence Tests Records of phase sequence tests the supplier has performed. According to customary standards. Records of PD measurement Test records from PD measurements on all accessories fitted with PD sensors. If PD sensors are installed and performed according to the supplier s standard. SK12.10 Records Impedance measurement Test records from measurements performed by the supplier of plus-, minus- and zero-sequence impedance data. SK12.11 Records of AC-test (Operational test) Records of AC tests performed by the supplier. The test is to be performed according to applicable IEC standards and/or according to agreement. SK12.12 Records TDR (Time Domain Reflectometry) Records of TDR measurements performed by the supplier. SK12.13 Record OTDR of fibre optic cables Test records from OTDR-measurement performed by the installation engineer. Damping measurements shall be presented. SK12.14 ITP (inspection and test plan) Information test and quality control shall be implemented SK12.15 NCR (non conformance report) Deviation reports, ISO9001 SK13 Maintenance document SK13.01 Maintenance manual Cable system The supplier s specific advice and instructions for operation and maintenance of cable system supplied.
19 SK Submarine cable Document/Item Description SK13.02 Method description cable laying The installation engineer's/supplier s method description, specific advice and instructions for laying and misc. handling of power cable supplied. SK13.03 Method description cable splicing The supplier s description as a basis for correct assembly of cable joints (spare parts) supplied SK13.04 Method description fault localisation equipment The supplier s operational description for fault localisation equipment supplied. SK13.05 Repair agreement Cable splicing A repair agreement shall be signed with the cable supplier to ensure rapid access to repair staff and resources in the event of a cable fault. SK13.06 List of spares The supplier shall draw up a list of all spare parts (cable, joints etc.) which have been supplied. The document shall also include instructions for storage and handling of the spare parts, as well as information about the predicted useful service life. Information about where the spare parts are stored shall also be included in the list. SK13.07 Operation and Maintenance Instruction for DTS system Where appropriate: The supplier s specific advice and instructions for operation and maintenance of DTS equipment supplied. The instruction shall include operation of the system. SK13.08 Traceability documentation Records which detail which cable lengths (unique number) are installed where, ID no. of all joints, etc. installed shall be set out. File type 2.5 Explanations for document list submarine cable Explanations and clarifications of certain of the points in the document list according to the above are provided below. SK02.03 General plan cable route A general plan shall function as an overall document which clearly shows the cable installation's route. The general plan shall refer to underlying drawings. The type and number of the various underlying drawings shall be clearly set out on the general plan. The general plan shall be according to scale and drawn up in such a way as to clearly set out the cable connection s geographic location. At abutments, any roads, buildings, etc. in the vicinity of the cable route shall be shown. At sea, any intersections with other infrastructure and similar shall be shown. If legibility requires it, the general plan shall be divided into a number of drawings. See example in appendix 1. In addition the cable route shall be entered onto the relevant nautical chart. For example, see appendix 6. SK02.05 General plan land/water intersection and transition joints The drawing shall present an outline of the areas where submarine cables meet land, as well as present design and arrangement of transition joint locations. The locations of the joint housings shall be set out, as well as other equipment such as junction boxes, boxes for PD measurement etc. Any concrete enclosures or chambers for these boxes shall also be shown. If a concrete slab or equivalent has been placed in the jointing pit, this shall be shown. Arrangement for mechanical casing (anchorage of the submarine cables reinforcement (so-called Hang-off ) shall be set out in the drawing. SK02.06 Cross sections of installation close to shoreline Sectional drawings which show the cable trench's dimensions and the power cables positions in the excavated cable trench in catchment areas close to the shoreline and in excavated trenches between shoreline and joint location for transition joints shall be produced for the different installation configurations which arise. Sectional drawing shall as a minimum show:
20 Trench depth Trench bottom width Dimensions of protective filling (cable sand or equivalent) Depth of filling above the cables The power cables positions, with reciprocal distance between cables. Location of cable protection and warning mesh or equivalent Type of backfill/cable sand Type of surrounding ground (moraine, earth, clay, sand, mud etc.) Any surface layer over the cable installation Any reinforced cable protection, for example concrete slabs or similar. Location of any earth wires. Location of any fibre-optic cables/empty pipes for communication Location of any fibre-optic cables for temperature measurement (DTS) Each sectional drawing shall be marked with coordinates (starting point) according to Svenska Kraftnät s technical guideline for surveying, TR08-06, and shall also be given an ID-number. Coordinates shall agree with coordinates entered for the cable installation. The sectional drawing s starting point and ID shall be set out in the general plan. Each sectional drawing shall apply until reference to another sectional drawing is made. Direction in relation to the next sectional drawing that applies is governed by the surveying. Sectional drawings for joint locations and intersections with another infrastructure are dealt with separately. If installation in ducting pipes takes place in connection with submarine cables meeting land, see the requirements for pipe laying under the section on underground cable above. SK02.07 Cross sections for submarine cable The cross sections shall show normal configurations for installation close to the shore and for installation at sea. Sectional drawing for pipe laying shall as a minimum show: Laying depth in sea/lake bottom (if relevant) Location of any cable protection (including reinforced) and markings Type of backfill/cable sand and/or type of surrounding bottom material Location of any fibre-optic cables/empty pipes for communication Location of any fibre-optic cables for temperature measurement (DTS) Each sectional drawing shall be marked with coordinates according to the same principle as described under SK02-06 above. SK02.08 Detailed drawings of intersections with other mains Specific sectional drawings shall be produced in points where the cable installation is crossed by other mains, submarine cables or similar installations on the lake bed. Sectional drawing of intersection with other mains and submarine cables shall, in addition to the specification under SK02.06 or SK02.07 above, as a minimum also show: Position/location for intersecting mains/submarine cable/other Distance between power cables and intersecting infrastructure Type of mains, mains dimension and material. Where appropriate, voltage level. Number of intersecting mains (if more than one).
21 Each sectional drawing shall be marked with coordinates according to the same principle as described under SK02-06 above. Drawings shall also be presented which show detailed design of any bridge structures and similar to deal with intersections. SK02.09 Detailed drawing of location of transition joints The detailed drawing shall, in addition to the specification for general plan according to SK02.05, also present the power cables location, any cross-connection cables, earthing cables, measurement cables, as well as earth wires/counterpoise wires. Location of any PD sensors shall be shown. Individual cables shall be ID marked. Specific detailed drawing shall be presented of arrangement for anchoring the submarine cables reinforcement (so-called Hang-off). SK02.14 Phase sequence diagram A phase sequence diagram shall be presented, where the location of phases L1, L2 and L3 is clearly set out along the entire cable route. Any transposition points shall be clearly shown, and the phases location before and after such transposition points shall be presented. Linear measurement in m at each transposition point shall be given. With any installation of submarine cables in triangle formation, the positioning of the phases within the respective cable group shall be shown on the cross section. For example, see appendix 4. SK02.15 Earthing diagram A diagram of the cable system's earthing system shall be produced. The diagram shall present earth wires/counterpoise wires, earth electrode, as well as cable shields' connections in all relevant connecting points, jointing points and similar. Dimensions of earthing cables shall be set out. Earthing points shall be drawn in and lengths in m to earthing points shall be indicated. Any cross-connection boxes and/or earthing boxes shall be drawn in and the cable shields /reinforcement's connections and interconnections in them shall be clearly set out. For example, see appendix Document list cable laid in tunnel In this technical guideline, power cables laid in tunnels refers to power cables laid in a drilled or excavated tunnel below ground level. Cables laid in culverts or similar at ground level are included under ground cable according to section 2.3 above. Cables laid in tunnels also include cables that are laid in bridge structures or similar. The reason for this is that installation/assembly of cables in bridges are most similar to installations in tunnels. Note that this document list only contains the documentation requirements related to the power cable system including its accessories and peripheral equipment, as well as the installation of the cable system including necessary assembly material (installation steel etc.). Tunnel installations including associated supply system are to be documented according to requirements in Svenska Kraftnät s technical guideline for tunnelling (not published at the time of writing). TK Cables laid in tunnels Document/Item Description TK00 Contents TK00.01 Document list Complete list of all documents and other items included in the documentation. Document name, revision no., issue/revision date shall be given. File type xls/xlsx
22 TK Cables laid in tunnels Document/Item Description File type TK01 Technical descriptions TK01.01 Technical description cable systems TK01.02 Technical description cable installation. The supplier s overall technical description of cable systems installed. The description shall present the system s fundamental structure and function, including main integral components and screen connection. Description of the installation's design. The description shall provide both a general and a more detailed account of how the installation system is designed and how the assembly/installation of the cable system is executed in the tunnel or bridge installation as a whole including any vertical shafts, or equivalent for bridges. TK01.03 Technical description DTS system The supplier s overall description of structure and function of system supplied for measurement of the cable temperature, DTS system (if installed). The description shall set out functional principle, as well as how and where measurement/monitoring takes place, installation of measurement fibre etc. TK02 Drawings TK02.01 Drawing list Complete list of drawings. Drawing number shall be indicated. Drawings shall be furnished with Svk drawing TK02.02 List of cancelled drawings in the Bank number TK02.03 General plan cable route The drawing shall present an overview of the cable installation's, i.e. the tunnel's (or bridge's) route and geographic location. See in addition description under section 2.3. TK02.04 General plan cable installation The drawing shall present an overview of the surveyed cables locations in plan and profile in the tunnel or bridge system. See in addition description under section 2.7. TK02.05 General plan station installation The drawing shall show location of cable terminations within station area. The drawing (which can be a site plan of the station) shall show other vital parts of the station. Wiring connected to the power cables shall be shown. TK02.06 General plan joint location The drawing shall present the joint location s design and arrangement. The drawing shall show the joint housings locations in plan and profile. See in addition under section 2.7. TK02.07 TK02.08 Detailed drawings/cross sections of the cable installation Detailed drawings steel structures for cable installation The drawings shall show the respective tunnel and bridge sections occurring, i.e. cross sections of the cables installation in tunnel or bridge spaces, both in the main tunnel/bridge section and, for example, in vertical shafts or bridge piers or similar. See in addition under section 2.7. The drawings shall show in detail the steel structures (uprights, frames, brackets, rails, beams, fixings, cable clamps etc.) that are used for the power cables assembly in the respective space. See in addition description under section 2.7. TK02.09 Detailed drawings cable mountings The drawings shall show cable clamps, or equivalent suspension or mounting solutions. xls/xlsx xls/xlsx TK02.10 Assembly drawing of cable termination The drawing shall show the cable termination fitted on its rack, as well as cable current transformers, junction boxes, PD-measuring boxes etc. and wiring and earthings. Location of PD-sensors shall be set out. TK02.11 Detailed drawing of joint location The detailed drawing shall present the joint location s complete design in more detail than the general plan. See in addition under section 2.7. TK02.12 Design drawings steel at cable terminations Design drawings for racks for cable terminations shall be presented, as well as design drawings for any assembly components for junction boxes etc. If adapters or similar are required for assembly of cable terminations on racks, design drawings for these shall also be presented.
23 TK Cables laid in tunnels TK02.13 Document/Item Design drawings steel for cable installations Description Design drawings for steel components for power cable installations and mountings, such as brackets, frames, beams, rails, suspensions etc. TK02.14 Detailed drawings cable joints This refers to the supplier s/manufacturer s detailed drawing of the cable joint s construction. TK02.15 Detailed drawings cable termination This refers to the supplier s/manufacturer s detailed drawing of the cable termination s construction. TK02.16 Detailed drawings cable clamps This refers to the supplier s/manufacturer s detailed drawing of the design of cable clamps supplied. TK02.17 Detailed drawings junction boxes etc. This refers to the supplier s/manufacturer s detailed drawings of junction boxes/link boxes or measuring boxes supplied. File type TK02.18 Phase sequence diagram See description under section 2.7. TK02.19 Earthing diagram See description under section 2.7. TK03 Situation documentation TK03.01 Coordinate lists and files The entire cable installation including vital parts such as joint locations with joint housings, etc. shall be entered and presented according to Svk s surveying instructions, see TR08-06 TK04 Technical specifications TK04.01 Technical specification power cable This refers to the supplier s technical specification (Design Report), partly in words, of design/construction of the cable, as well as data sheets which present electrical, thermal and mechanical data, as well as information about dimensions and weight and handling the cable. TK04.02 Technical specification cable joints This refers to the supplier s technical specification in words of the design of the cable joint supplied, as well as data sheets which present electrical, thermal and mechanical data, as well as information about dimensions and weight for complete joint housings. TK04.03 TK04.04 TK04.05 TK04.06 TK04.07 TK04.08 TK04.09 TK04.10 TK04.11 TK04.12 Technical specification cable termination Technical specification hoses/pipes for communication cables Technical specification fibre-optic chambers or any other chambers Technical specification fibre-optic cables Technical specification cable current transformers Technical specification junction boxes and earthing boxes Technical specification cable clamps Technical specification cable ties, stripes or ratchet straps for cables Technical specification equipment for temperature monitoring (DTS) Technical specification equipment for PD-measurement This refers to the supplier s technical specification in words of the design of the cable termination supplied, as well as data sheets which present electrical, thermal and mechanical data, as well as information about dimensions and weight for complete cable termination. The supplier s data sheet/technical specification for pipes and/or hoses supplied The supplier s data sheet/technical specification for fibreoptic cables supplied The supplier s data sheet/technical specification for fibreoptic cables supplied for communication or DTS The supplier's data sheet and drawings for component supplied The supplier s data sheet/technical specification for component supplied The supplier s data sheet/technical specification for cable clamps supplied (or equivalent component) The supplier s data sheet/technical specification for component supplied. The supplier s data sheet/technical specification for system solution supplied. The system s performance shall be specified. Shall be supplemented with a technical description. The supplier s data sheet/technical specification for solution supplied. Measurement performance etc. shall be specified. Shall be supplemented with a technical description TK05 Material specifications TK05.01 List of materials (MSDS) The supplier s summary of content declarations for relevant material included in cable and accessories. Mainly concerns insulating oil, any compound material, plastics, but also, for example, fire sealing material in firewalls etc. TK06 List of suppliers See TR08-06
24 TK Cables laid in tunnels Document/Item Description TK06.01 List of materials suppliers A list of qualified suppliers of critical materials, such as insulating oil, PEX-material, compound material joints etc. File type TK06.02 List of equipment suppliers A list of suppliers of accessories/equipment, such as SVLs, DTS systems etc. TK07 Photographs TK07.01 Photographic documentation cable installation Some representative photographs which show the cable installation should accompany the documentation. Examples of suitable locations to photograph are joint locations, typical tunnel/bridge sections, and firewalls etc. TK08 Earthing presentation TK08.01 Earthing description A comprehensive description of the earthing system s design. The description shall be sufficiently detailed to enable understanding of the technical construction. Integral components/equipment shall be specified. TK08.02 Earthing map Planimetric map in scale 1:2,000 of the cable installation, with earth wires and any earth electrodes drawn in. TK08.03 Measuring protocol for step and touch voltages If this is required: Protocol which shows results of measurements performed of step and touch voltages incl. mapping of low voltage network TK09 Calculations TK09.01 Capacity calculations The supplier s calculation results for the expected thermal fan out for cable systems supplied, under given/assumed conditions. Likewise, results from calculation of the cable system s short-circuit resistance shall be presented. Any calculations performed of air ventilation or thermal calculations linked to rock or tunnel spaces shall also be presented here. TK09.02 Mechanical calculations Any mechanical calculations performed within the framework of the project shall be presented here. It might, for example, concern calculations of the steel structures that will support the cable system, or calculations due to modifications or additions to original designs. JPEG TK10 Measurements (not incl. in testing) TK10.01 Measuring protocol sheath test after cable laying The results from sheath tests performed in connection with laying power cables (not to be confused with sheath test included in SAT) are to be presented here. TK10.02 Measuring protocol impedance measurement The results of measurements taken of cable joint s plus-, minus- and zero-sequence impedances after completion, but before commissioning, shall be presented here. To be performed by cable supplier or another party. TK11 Technical quality documentation TK11.01 Inspection record Records from surveys and inspections performed are to be presented here. Relevant inspections are checking steel fitted for cable termination and cable mountings, checking after laying cable, assembly work, as well as Final inspection, Operational inspection, Guarantee inspection TK11.02 Records Type Test Records of tests the supplier has performed on cable and all accessories included (cable joints and cable terminations). Type test of complete cable systems shall be presented. Type testing of junction boxes shall also be presented. The type test shall be performed according to applicable IEC standards. TK11.03 Records of Sample Test Test records from sample tests performed by the supplier. According to applicable IEC standard TK11.04 Routine test Records of routine tests performed by the supplier. According to applicable IEC standard TK11.05 After Installation Tests Records of Sheath Tests (included in SAT) Records of sheath tests (DC) of complete cable systems the supplier has performed, as well as crossconnection systems where applicable. According to IEC
25 TK Cables laid in tunnels Document/Item Description TK11.06 Records of Phase Sequence Tests Records of phase sequence tests the supplier has performed. According to customary standards. TK11.07 Records of PD measurement Test records from PD measurements on all accessories fitted with PD sensors. If PD sensors are installed and performed according to the supplier s standard. TK11.08 Records Impedance measurement Test records from measurements performed by the supplier of plus-, minus- and zero-sequence impedance data. TK11.09 Records of AC-test (Operational test) Records of AC tests performed by the supplier. The test is to be performed according to applicable IEC standards and/or according to agreement. File type TK11.10 Records TDR (Time Domain Reflectometry) Where appropriate: Records of TDR measurements performed by the supplier. TK11.11 ITP (inspection and test plan) Information test and quality control shall be implemented TK12.12 NCR (non conformance report) Deviation reports, ISO9001 TK12 Maintenance document TK12.01 Maintenance manual Cable system The supplier s specific advice and instructions for operation and maintenance of cable system supplied. TK12.02 Instructions cable laying The supplier s specific advice and instructions for cable laying and handling of power cable supplied. TK12.03 Method description cable splicing The supplier s description as a basis for correct assembly of cable joints (spare parts) supplied TK12.04 Method description Assembly of cable terminations The supplier s description as a basis for correct assembly of cable terminations (spare parts) supplied. TK12.05 Repair agreement Cable splicing A repair agreement shall be signed with the cable supplier to ensure rapid access to repair staff and resources in the event of a cable fault. TK12.06 List of spares The supplier shall compile a list of all spare parts (cable, joints, end parts etc.) which have been supplied. The document shall also include instructions for storage and handling of the spare parts, as well as information about the predicted useful service life. TK12.07 Operation and Maintenance Instruction for DTS system Where appropriate: The supplier s specific advice and instructions for operation and maintenance of DTS equipment supplied. The instruction shall include operation of the system. TK12.08 Traceability documentation Protocol presenting which cable lengths (unique number) are installed where, ID no. of all joints, cable terminations, etc. installed shall be set out. 2.7 Explanations for document list cable laid in tunnel Explanations and clarifications of certain of the points in the document list according to the above are provided below. TK02.03 General plan cable route A general plan shall function as an overall document which shows an overview of the tunnel installation's geographic route. The general plan shall refer to underlying drawings, e.g. drawings of tunnel or bridge sections and drawings in connection to vertical shaft etc. The type and number of the various underlying drawings shall be clearly set out on the general plan. The general plan shall be according to scale and drawn up in such a way as to clearly set out the cable connection s geographic location. If legibility requires it, the general plan shall be divided into a number of drawings. Supply tunnel's routes are often classified as more or less secret. How general plans of them
26 should be dealt with must therefore be agreed with the project management in each individual project. For example, see appendix 7. TK02.04 General plan cable installation The general plan shall cover the entire tunnel or bridge system including vertical shaft or equivalent (for bridge, e.g. bridge pier). If legibility requires it, the general plan shall be divided into a number of drawings. The drawing does not need to present details that do not affect the actual power cable installation, however, the tunnel/bridge space's dimensions shall be shown, steel structures for the cables mountings, the cables locations, cable clamps in the main tunnel/bridge section and shaft/upright where the cables are laid shall be set out in the drawing. TK02.06 General plan joint location The drawing shall present the joint location s design and arrangement. Joint housing's locations shall be shown (plan and profile), as well as other equipment such as any junction boxes, boxes for PD-measurement etc. Cable ladders, brackets and similar shall be shown, as well as (in outline) any fixings the joint housings might have and similar for the steel. TK02.07 Cross sections for tunnel or bridge installations Sectional drawings which show detailed cross sections of tunnel or bridge spaces shall be produced for the different tunnel/bridge sections and installation configurations which occur along the cable route. Including laying in trench, bridge pier or equivalent. Sectional drawing shall as a minimum show: Tunnel/bridge space's dimensions For tunnel: Design of floor/ground (material) Any drainage pipe and similar Any concrete trough or equivalent for control cables Steel structures, brackets (or equivalent), cable mountings The power cables positions, with reciprocal distance between cables. Joint housings and any junction boxes and similar (Applies at joint locations) Any other mains installations, cable ladders etc. in addition to the power cables Any firewalls or other walls incl. cable bushings (detailed) Location of earth wires. Location of any fibre-optic cables/empty pipes for communication Location of any fibre-optic cables for temperature measurement (DTS) Each sectional drawing shall be marked with coordinates (starting point) according to Svenska Kraftnät s technical guideline for surveying, TR08-06, and shall also be given an ID-number. Coordinates shall agree with coordinates entered for the cable installation. The sectional drawing s starting point and ID shall be set out in the general plan. Each sectional drawing shall apply until reference to another sectional drawing is made. Direction in relation to the next sectional drawing that applies is governed by the surveying. Breakpoint for production of new sectional drawing is when there is a significant change in the particular cross section, e.g.: Tunnel/bridge space's dimensions are significantly changed Start/end of joint location Firewall, other wall or similar
27 The power cables locations are changed (more than marginally) Any other mains installations' locations are significantly changed Any other installations are added or taken away. (Other installations can be, for example, distribution boxes, constructions to protect the power cables etc.) TK02.08 Cross sections for pipe laying In, for example, vertical shafts for tunnels, where a part of a larger steel structure is used for the power cables installation, the entire steel structure does not need to be presented in these drawings. It is sufficient if relevant parts are presented, so that the power cables mountings and locations in the resp. space are clearly shown. TK02.11 Detailed drawing joint location In addition to what is specified for general plan according to TK02.06, the detailed drawing shall also present the power cables locations, any cross-connection cables, earthing cables, measurement cables, as well as earth wires/counterpoise wires. Location of any PD sensors shall be shown. Individual cables shall be ID marked. TK02.18 Phase sequence diagram A phase sequence diagram shall be presented, where the location of phases L1, L2 and L3 is clearly set out along the entire cable route from station to station, through all tunnel and bridge sections resp., and past joint locations. Any transposition points shall be clearly shown, and the phases location before and after such transposition points shall be presented. Linear measurement in m at each transposition point shall be given. The phases positions within the respective cable group shall be shown in the cross section. For example, see appendix 4. TK02.19 Earthing diagram A diagram of the cable system's earthing system shall be produced. The diagram shall present earth wires/counterpoise wires, any earth electrodes, as well as the cable shields' connections in all relevant connecting points such as station connections, jointing points and earthing points. Dimensions of earthing cables shall be specified. Earthing points shall be drawn in and lengths in m to earthing points shall be indicated. Any crossconnection boxes and/or earthing boxes shall be drawn in and the cable shields connections and interconnections in them shall be clearly set out. For example, see appendix 5.
28 Appendices Sample drawings TR08-05 Appendix 1 General plan cable route
29 TR08-05 Appendix 2 Trench section drawing with pipe
30 TR08-05 Appendix 3 Shaft section drawing without pipe
31 TR08-05 Appendix 4 Phase sequence diagram
32 TR08-05 Appendix 5 Earthing diagram
33 TR08-05 Appendix 6 General plan submarine cable route
34 TR08-05 Appendix 7 Geological survey in tunnel
HV Submarine Cable Systems Design, Testing and Installation
HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications
Konti Skan Replacement of Cable 1
Konti Skan Replacement of Cable 1 Presentation of the project 1 Agenda Background for the project Scope of Work for the cable delivery Eletrical Requirements Type Test Route description Time Schedule 2
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Undergrounding high voltage electricity transmission. The technical issues
Undergrounding high voltage electricity transmission The technical issues This is an interactive PDF document with clickable links from the contents to all sections and back and also to URL and email links.
SECTION 18370 SIGNAL WIRE AND CABLE
SECTION 18370 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for all cable and wire required for signal and signal power system wiring to wayside shelters, junction boxes, and factory
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
AORC Technical meeting 2014
http : //www.cigre.org B1-1055 AORC Technical meeting 2014 220 kv Long Distance Underground HVAC Cable Circuit NAVEED RAHMAN Nexans Olex Melbourne, Australia SUMMARY In 2009, the Victorian state government
CABLE MONITORING SOLUTION
POWER CABLE MONITORING SOLUTION Kuljit Singh BSc Honours MIEE(IET,UK) Dan Watley Ph. D, B.A MEng (UK), MIEEE, UK 8-9 November 2011 PREDICT WITH CERTAINTY Definition DTS: Distributed Temperature Sensor
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Gulf Cable & Electrical Ind. Co.
CONTENTS INTRODUCTION PRODUCT RANGE I PRODUCT DATA TABLES XLPE INSULATED 600/1000V CABLES Two Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 1 Three Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 2 Four Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC
Ontario Electrical Safety Code - Info Sheet
Ontario Electrical Safety Code - Info Sheet The following are the Code requirements and explanatory material for buried electrical wiring that are applicable to most residential applications. 12-012 Underground
CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
Design and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
Removal of EP 20 10 00 02 SP High Voltage Cable
TN 018: 2014 Technical Note For queries regarding this document [email protected] www.asa.transport.nsw.gov.au TN 018: 2014 Issued date 12 March 2014 Effective dates 12 March 2014 Subject:
For business. Wiring your business for broadband. What happens when copper is required?
For business Wiring your business for broadband Your cabling requirements are dependent on the size and complexity of your business. Smaller businesses should follow the wiring recommendations for residential
An Introduction to High Voltage Direct Current (HVDC) Underground Cables
Page 1 An Introduction to High Voltage Direct Current (HVDC) Underground Cables Brussels, 10 October 2011 An Introduction to High Voltage Direct Current (HVDC) Underground Cables Page 2 Table of content
Underground Service Requirements and Instructions
This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page
CABLE ASSET MANAGEMENT PREDICT WITH CERTAINTY. Kuljit Singh BSc Honours MIEE(IET,UK) 5 June 2014
CABLE ASSET MANAGEMENT PREDICT WITH CERTAINTY Kuljit Singh BSc Honours MIEE(IET,UK) 5 June 2014 Definitions International Workshop 2014 DTS: Distributed Temperature Sensor DCR: Dynamic Cable Ratings (
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3
ITS specification Jointing chambers and pull pits (ITS-02-02)
ITS specification Jointing chambers and pull pits (ITS-02-02) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
M. GELDON Brugg Kabel CZ. Ing. D. RÚŽEK PREdistribuce. Switzerland Czech Rep. Czech Rep. Czech Rep., Switzerland Germany
21, rue d Artois, F-75008 PARIS Paper number CIGRE 2012 http : //www.cigre.org 6 characters (to be provided later) Correlation between calculated transmission capacity and actual one D. WALD* Eifelkabel
David O Brien, CMP Products ([email protected])
David O Brien, CMP Products ([email protected]) 1) Main Function of Cable Glands 2) Common Issues with Cable Glands 3) Compliance / Standards, changing times 4) How do we select Cable Glands?
Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.
Submarine Power Cables State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Reliable submarine power cables ABB is one of the world s most
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress
0611-048-Mep229 12/12/06 6:44 Page 22 State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress Reinhard SCHROTH, Chairman of SC B1 2002-2006 High
NSW Submarine Power. Cables for the future, delivered today.
Submarine Power. Cables for the future, delivered today. NorddeutSChe Seekabelwerke GmbH () for Renewable Energies The submarine competence center within the General Cable Group After was founded in by
Gas Explosion at a Subway Construction Site
Gas Explosion at a Subway Construction Site Apr. 8th, 1970, Osaka city KOBAYASHI, Hideo (Tokyo Institute of Technology) (Summary) On April 8th, 1970, a huge gas explosion occurred at the site of construction
Network Standard Advice No. 1420C 9/6/2011
Network Standard Advice No. 1420C 9/6/2011 TO: Customers, Service Providers and Ausgrid Staff. Advisory Note on Changes to the Use of 11kV Cable Types. Introduction This Network Standard Advice (NSA) provides
Section 21. Telecommunication Hardware. www.geindustrial.com BuyLog Catalog 21-1
Introduction...21-1 Fiber Closure Hardware...21-2 Cable Location Surge Protectors...21-4 Introduction GE has been manufacturing Telecommunication Hardware products for over 20 years and has become a leader
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
Lightning Protection Introduction
Lightning Protection Introduction Structural lightning protection design considerations BS 6651 (Protection of structures against lightning) clearly advises strict adherence to the provision of a conventional
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
Guidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: [email protected] 14685 Avion Parkway
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
Fault location on power cables. Fault location on power cables
Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 01. Introduction Fault location on communication and power cables
Specification for Pipe Coating Repairs Offshore
Specification for Pipe Coating Repairs Offshore Specification for Pipe Coating Repairs Offshore 1 of 6 Table of Contents 1.0 SCOPE... 3 2.0 REFERENCE DOCUMENTS... 3 3.0 MATERIALS... 3 4.0 EQUIPMENT AND
TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
Excerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
Pipelines and seabed intervention
Workshop on seabed habitats of environmental concern Jørn Spiten Content Pipeline - route design Seabed Intervention - Trenching - Ploughing - Dredging - Rock installation 2 Pipeline routes 3 Pipeline
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters
8 Appendix 4 of BS 7671 by Mark Coles Appendix 4, Current-carrying capacity and voltage drop for cables and flexible cords, has seen significant changes with the publishing of BS 7671:2008. This article
ELECTRICAL SAFETY Information Bulletin
ELECTRICAL SAFETY Information Bulletin January 2016 CEC-10 [rev-9] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current
12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting
12 SOLAR PHOTOVOLTAIC POWER by John Ware IT IS PLANNED for BS 7671:2008 to include a new Section 712 providing additional requirements for safety applicable to solar photovoltaic (pv) power supply systems.
NSW Submarine Power. Cables for the future, delivered today
NSW Submarine Power Cables for the future, delivered today NORDDEUTSCHE SEEKABELWERKE GMBH (NSW) The submarine competence center within the General Cable Group After NSW was founded in 1899 by Felten &
SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES
SnoTrace Surface Snow and Ice Melting INSTALLATION PROCEDURES SnoTrace INSTALLATION PROCEDURES Refer to the SnoTrace Cable Testing Report for required recording of test data and circuit information. Upon
Machine Foundation Design
Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other
SECTION 22 LIGHTNING PROTECTION SYSTEM
SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for
environment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
6720616592.00-1.SD. Flat roof. Rack Mounting. Installation instructions 6 720 647 036 (2010/11) AU
6720616592.00-1.SD Flat roof Rack Mounting AU Installation instructions 2 Contents AU Contents 1 Key to symbols and safety instructions....... 3 1.1 Explanation of symbols................ 3 1.2 Safety
HOW TO CORRECTLY CONNECT DEEP CYCLE BATTERIES AND CHOOSE THE RIGHT CABLE SIZING
HOW TO CORRECTLY CONNECT DEEP CYCLE BATTERIES AND CHOOSE THE RIGHT CABLE SIZING There are several ways to wire multiple batteries to achieve the correct battery voltage or capacity for a particular DC
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
Cold Room & Refrigeration System (Casserole Assembly) No of units: 1
Technical Specifications Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 For chiller storage of all sorts of items Chiller storage temperature: 2-5 C Provides excellent thermal efficiency
How To Monitor Water Penetration In A Cable Screen
Detection and location of high voltage cable sheath damage with Water Penetration Monitoring*) Purpose of Monitoring System The expected lifetime of high voltage underground cables is more than 40 years,
Underground Storage Tanks
Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation
**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT
**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT. YOU COULD PUT YOUR FAMILY AND WORLDLY POSSESSIONS IN DANGER!!!
MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4
CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,
hs2 Ground A non-technical guide
hs2 Ground Investigations A non-technical guide Contents HS2 ground investigations 1 Essential Q&A 2 2 In-ground investigation techniques 9 2.1 Cable percussion borehole 10 2.2 Rotary core borehole 12
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
E-Highway2050 WP3 workshop April 15 th, 2014 Brussels
E-Highway2050 WP3 workshop April 15 th, 2014 Brussels High voltage underground and subsea cable technology options for future transmission in Europe Ernesto Zaccone, Chairman Europacable High Voltage Systems
UFGS-02362 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.20 (April 2006) Change 2-11/14 ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-02362 (August 2004) UNIFIED FACILITIES
CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE
CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE 8.1 SYSTEM 8.1.1 Armoured, screened underground cables are used for control communication in electrified areas to limit induction effect. 8.2
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Optical Cable Pre-Construction Survey. Keywords Stationary Reel Method, empty innerducts, sub-ducts, microducts, Intermediate-feed manholes
Optical Cable Pre-Construction Survey Author John Peters Issued December 2012 Abstract Pre-construction site survey is one of the most important steps in the engineering and placement of a new optical
EARTHING SYSTEM CALCULATION
BAZIAN STEAL FACTORY S/S 132/11kV, 1x30/40MVA EARTHING SYSTEM CALCULATION Kurdistan Region Sulaimani May 2011 Bazian Steal Factory S/S 132/11kV, 1x30/40 MVA Contents: 1. Introduction... 3 2. List of references
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES
SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES 611-1 Description. This Section sets forth Contract acceptance procedures for installations of traffic control signals and devices
(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.
Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing
Distributed Temperature Monitoring of Energy Transmission and Distribution Systems
1 m 40000m0 range 61850 IEC spatial resolution Distributed Temperature Monitoring of Energy Transmission and Distribution Systems Ensuring a Reliable Supply of Electrical Power for Today s World www.en-sure.pro
Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw
4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and
MOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
Electrical Grounding. Appendix C
Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
INTERNATIONAL STANDARD
IEC 61892-7 INTERNATIONAL STANDARD Edition 2.0 2007-11 Mobile and fixed offshore units Electrical installations Part 7: Hazardous areas INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE XA ICS 47.020.60
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Unified requirements for systems with voltages above 1 kv up to 15 kv
(1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to
SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE
SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
Underground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
Volume 1 NJUG GUIDELINES ON THE POSITIONING AND COLOUR CODING OF UNDERGROUND UTILITIES APPARATUS
Volume 1 NJUG GUIDELINES ON THE POSITIONING AND COLOUR CODING OF UNDERGROUND UTILITIES APPARATUS PLEASE ENSURE THAT YOU READ THE LEGAL NOTICE AND DISCLAIMER WHICH APPEARS IN APPENDIX A OF THIS PUBLICATION
TIG INVERTER INSTRUCTION MANUAL
TIG INVERTER INSTRUCTION MANUAL Contents Warning General Description Block Diagram Main Parameters Circuit Diagram Installation and Operation Caution Maintenance Spare Parts List Troubleshooting 3 4 4
Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada
Whitepaper Modular Substation Cable Termination Design Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract The methods for cable penetrations into modular industrial substations are
Feasibility Study of Deep Water Power Cable Systems. Enrico Colombo CESI S.p.A
Feasibility Study of Deep Water Power Cable Systems Enrico Colombo CESI S.p.A Layout of Presentation The Study Context, Objectives, Participants Study Approach & Methodology Assessments and Findings Implementation
Enable Networks UFB Services Agreement Service Description for Central Office and POI Co-location Service
Enable Networks UFB s Agreement Description for Central Office and POI Co-location 1 Interpretation 1.1 The Central Office and POI Co-location described in this Description will be available from the date
TARIFF CODE and updates standard
TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of
Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety
Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground
The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables
The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing
FAQs-Main switchboard design criteria
FAQs-Main switchboard design criteria Q: What is the Australian standard for main switchboards? Current Australian standard is AS/NZS 3439.1: 2002 originating from IEC 60439. The new series of standard
INTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 62305-3 Edition 2.0 2010-12 colour inside Protection against lightning Part 3: Physical damage to structures and life hazard INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries