Konti Skan Replacement of Cable 1

Size: px
Start display at page:

Download "Konti Skan Replacement of Cable 1"

Transcription

1 Konti Skan Replacement of Cable 1 Presentation of the project 1

2 Agenda Background for the project Scope of Work for the cable delivery Eletrical Requirements Type Test Route description Time Schedule 2

3 Background The Konti Skan connection consists of a combination of HVDC overhead line,-land cable and submarine cable. The three cables between Jutland and Laesoe is configured such a way that cable 2 together with one conductor from cable 1 is used for the KS1 converter and cable 3 with one conductor from cable 1 is used for the KS2 converter. The new cable is to be used for the KS1 converter, and the existing cables 2 and 3 are to be connected in parallel for use in KS2 converter. 3

4 Scope of work # 1 Submarine Cable Cable type Cable Length : MIND (Mass Impregnated Non Draining) : 25 km (including 1,5 km spare cable) Accessories End terminations : 3 pcs (incl. one spare) Submarine repair joints : 4 pcs Other Installation of end terminations Basket for spare cable according to ENDK specifications 4

5 Scope of work # 2 Option for Transport and Laying of Submarine Cable The Cable manufacturer is obliged to give a price on the option for Transport and Laying of the submarine Cable Options for surveys and guard vessels Project Management Project meetings (at factory, in Denmark (both at site and at Energinet.dk) Monthly progress reports Etc. 5

6 Electrical Requirements Cable Voltage Rated DC Cable Voltage Max continuous DC Cable Voltage Lightning Impulse withstand Voltage Switching Surge withstand Voltage Rated current : 282 kv : 285 kv : 850 kv : 685 kv : 1347,5 A Under the following pretenses Thermal resistivity : 1 K*m/W Temperature of the surrounding soil : 20 C Burial depth: 1 m (sea); 1,3 m (land) Maximal fault current Conductor type Cross Section : 20 ka for 0.3 sec. : Profile/Keystone : 1200 mm² Cu 6

7 Type Test If no valid type test is present, the manufacturer needs to perform an accepted type test the year before delivery. E.g. if the cable is to be delivered in 2014, an accepted type test is to be performed before the end of A valid type test is a test that is not too old and has a similar design with a equal to or higher than the voltage level than for the project specified 285 kv DC. 7

8 Route #1 The new route is the blue route Length is approx. 23,5 km Max depth is around 30 m Landings Jutland: 400 m horizontal directional drilling m open trench to the station. Laesoe: 800 m horizontal directional drilling m open trench to the station 8

9 Route #2 9

10 Route #3 Conditions of the seabed A survey of the planned cable route will not be performed prior to or within the tender period. However Energinet.dk has in 2012 completed a seabed survey approximately nautical miles north of the planned cable route. The results from this survey will be submitted to the tenderers. A survey of the trace will be performed as a part of environmental investigations in the spring/summer of Approx 100 % sandy sea floor, with some minor obstacles (chalk mushrooms, made through bubbles of natural gas from the sea floor). From previous projects in the past we know that the sea floor is jettable, and that the submarine can be directly laid on the seafloor and that no pre-dredging is not needed. Landings will be done using HDD s at both ends (HDD s are not to be part of this tender) 10

11 Route #4 11

12 Time Schedule for the Project See the Time Schedule on the homepage 12

13 Time Schedule for the Project #1 13

HV Submarine Cable Systems Design, Testing and Installation

HV Submarine Cable Systems Design, Testing and Installation HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications

More information

Feasibility Study of Deep Water Power Cable Systems. Enrico Colombo CESI S.p.A

Feasibility Study of Deep Water Power Cable Systems. Enrico Colombo CESI S.p.A Feasibility Study of Deep Water Power Cable Systems Enrico Colombo CESI S.p.A Layout of Presentation The Study Context, Objectives, Participants Study Approach & Methodology Assessments and Findings Implementation

More information

An Introduction to High Voltage Direct Current (HVDC) Underground Cables

An Introduction to High Voltage Direct Current (HVDC) Underground Cables Page 1 An Introduction to High Voltage Direct Current (HVDC) Underground Cables Brussels, 10 October 2011 An Introduction to High Voltage Direct Current (HVDC) Underground Cables Page 2 Table of content

More information

HVDC Light Cables. Submarine and land power cables

HVDC Light Cables. Submarine and land power cables HV Light Cables Submarine and land s The HV Light s to offshore platform The light and robust HV Light s can be laid with very cost effecient methods HV Light System HV Light is a transmission system in

More information

E-Highway2050 WP3 workshop April 15 th, 2014 Brussels

E-Highway2050 WP3 workshop April 15 th, 2014 Brussels E-Highway2050 WP3 workshop April 15 th, 2014 Brussels High voltage underground and subsea cable technology options for future transmission in Europe Ernesto Zaccone, Chairman Europacable High Voltage Systems

More information

CIEMADeS 4th INTERNATIONAL CONFERENCE

CIEMADeS 4th INTERNATIONAL CONFERENCE CIEMADeS 4th INTERNATIONAL CONFERENCE Submarine Cable Connections - from concept to commissioning Puerto Rico, May 5th 2011 Vegar Syrtveit Larsen Nexans Norway AS Agenda Early phase What can typically

More information

CONFLEX ELECTRIC CABLE

CONFLEX ELECTRIC CABLE CONFLEX ELECTRIC CABLE CONFLEX - 0.6/1kV Flexible VSD/EMC Cables Applications WW VSD/EMC cables are manufactured for use where electrical interference distorts signal transmission in electric motors. Standard

More information

State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress

State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress 0611-048-Mep229 12/12/06 6:44 Page 22 State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress Reinhard SCHROTH, Chairman of SC B1 2002-2006 High

More information

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Submarine Power Cables State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Reliable submarine power cables ABB is one of the world s most

More information

8 Strait of Belle Isle Marine Cable Crossing

8 Strait of Belle Isle Marine Cable Crossing 8 Strait of Belle Isle Marine Cable Crossing Report by: E. Colombo, Ing. (CESI) A. Snyder, P. Eng. P. Wilson, P. Eng. 8.1 Introduction The Strait of Belle Isle (SOBI) cable crossing involves the placement

More information

Optimization of the coupled grid connection of offshore wind farms

Optimization of the coupled grid connection of offshore wind farms Optimization of the coupled grid connection of offshore wind farms Dirk Schoenmakers Graduation project at Evelop Netherlands BV Technical University of Eindhoven September 2008 Supervisors: TU Eindhoven

More information

By Manitoba Hydro, March 4 th 2013

By Manitoba Hydro, March 4 th 2013 Rebuttal to Bipole III Coalition underground cable report Potential Use of Underground Cables for Sections of the Planned 500 kvdc Bipole III Overhead Line in Manitoba By Manitoba Hydro, March 4 th 2013

More information

Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues

Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues J Egan, P O Rourke EirGrid Plc, Republic of Ireland john.egan@eirgrid.com paul.o rouke@eirgrid.com

More information

Cable Consulting International

Cable Consulting International Cable Consulting International Brian Gregory BSc, CEng, MIEEE, FIEE Technical Director www.cableconsulting.net Alan Williams BSc, CEng, MIEE Senior Consultant 1 FEASIBILITY STUDY for 500 kv AC UNDERGROUND

More information

Undergrounding high voltage electricity transmission. The technical issues

Undergrounding high voltage electricity transmission. The technical issues Undergrounding high voltage electricity transmission The technical issues This is an interactive PDF document with clickable links from the contents to all sections and back and also to URL and email links.

More information

Offshore Wind China 2010 Bergen, 15th March 2010. Olivier Angoulevant Nexans Norway AS

Offshore Wind China 2010 Bergen, 15th March 2010. Olivier Angoulevant Nexans Norway AS Offshore Wind China 2010 Bergen, 15th March 2010 Olivier Angoulevant Nexans Norway AS At the core of performance At the core of performance : a worldwide leader Worldwide leader in cables, cabling systems

More information

Q: PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. A: Gerry Sheerin. Sheerin Technical, 25 Eastville Avenue, Toronto, Ontario Canada

Q: PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. A: Gerry Sheerin. Sheerin Technical, 25 Eastville Avenue, Toronto, Ontario Canada DIRECT TESTIMONY OF GERRY SHEERIN, P. ENG ON BEHALF OF PIEDMONT ENVIRONMENTAL COUNCIL BEFORE THE STATE CORPORATION COMMISSION OF VIRGINIA CASE NOS. PUE-00-0001 AND PUE-00-000 1 1 1 1 1 1 1 1 1 Q: PLEASE

More information

Viking Link Interconnector

Viking Link Interconnector Viking Link Interconnector Public information event for Bicker Parish Why we re here today We re here today to introduce the Viking Link project, to explain what we want to build and to answer any questions

More information

Offshore Work Packages

Offshore Work Packages Rampion Offshore Wind Farm Offshore Work Packages Meet The Buyer Naren Mistry, Engineering Manager 26 th Feb 2014 Rampion Offshore Project Scope Design, manufacture, transportation and Installation: Up

More information

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV. tgood.com. Energy. Fast.

METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV. tgood.com. Energy. Fast. METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV tgood.com Energy. Fast. TGOOD produces over 5000 switchgear units annually for projects around the globe PRODUCT OVERVIEW Integral substation component

More information

A Deeper Insight into Fault Location on Long Submarine Power Cables

A Deeper Insight into Fault Location on Long Submarine Power Cables 21, rue d Artois, F-75008 PARIS B1-201 CIGRE 2014 http : //www.cigre.org A Deeper Insight into Fault Location on Long Submarine Power Cables Manfred BAWART, Massimo MARZINOTTO, Giovanni MAZZANTI BAUR GmbH

More information

EuroAsia Interconnector Project Submarine power cable

EuroAsia Interconnector Project Submarine power cable EuroAsia Interconnector Project Submarine power cable Feasibility study status Executive summary Presented by: Yakov (Yasha) Hain, Senior Executive VP Israel Electric Corporation Ltd. Doing business with

More information

XLPE Land Cable Systems User s Guide. Rev 5

XLPE Land Cable Systems User s Guide. Rev 5 XLPE Land Cable Systems User s Guide Rev 5 CONTENT XLPE Land Cable Systems Introduction... 3 Design, installation and testing... 4 XLPE cables... 4 Cable accessories... 4 Installation of XLPE cable systems...

More information

Introduction to The Trans Bay Cable Project

Introduction to The Trans Bay Cable Project Introduction to The Trans Bay Cable Project We ve come a long way 1 But thanks to the advances of two men and 2 The Battle of Currents 3 Utilities are able to choose the most effective and efficient means

More information

UGVCL/SP/591/11KV HT AB CABLE

UGVCL/SP/591/11KV HT AB CABLE TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) 1. SCOPE This specification covers requirements of XLPE insulated, 11 KV Aerial Bunched

More information

SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS

SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS Michael Hensel HIGHVOLT Prüftechnik Dresden GmbH 2 3 Content 1 Introduction Test parameters and their significance Differences

More information

LIPA. The. Long Island Power Authority links to the PJM Interconnection with an undersea/underground HVDC link. 20 www.tdworld.com.

LIPA. The. Long Island Power Authority links to the PJM Interconnection with an undersea/underground HVDC link. 20 www.tdworld.com. Prysmian cable-laying ship Giulio Verne. The LIPA By Christopher Hocker, Neptune Regional Transmission System; Richard M. Kessel, Long Island Power Authority; and John Duschang, Henningson, Durham & Richardson

More information

Hendrix Spacer Cable

Hendrix Spacer Cable Hendrix Spacer Cable What is Spacer Cable? Covered Conductor Withstands temporary branch contact Eliminates temporary faults Protects wildlife Less clearance issues Compact Configuration Multiple Circuits

More information

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4 CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,

More information

Svenska Kraftnät s requirements for documentation in cable projects

Svenska Kraftnät s requirements for documentation in cable projects UNIT, BUSINESS AREA AD, Plant documentation OUR DESIGNATION TR08-05 DATE CONSULTATION 2014-09-08 NT, NK, NL, AS, AFL, KI TECHNICAL GUIDELINES ISSUE 3 Td APPROVED Svenska Kraftnät s requirements for documentation

More information

Gulf Cable & Electrical Ind. Co.

Gulf Cable & Electrical Ind. Co. CONTENTS INTRODUCTION PRODUCT RANGE I PRODUCT DATA TABLES XLPE INSULATED 600/1000V CABLES Two Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 1 Three Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 2 Four Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC

More information

factsheet High Voltage Direct Current electricity technical information

factsheet High Voltage Direct Current electricity technical information factsheet High Voltage Direct Current electricity technical information Introduction High voltage direct current (HVDC) technology is one of the technical options National Grid can consider for the future

More information

The new 525 kv extruded HVDC cable system

The new 525 kv extruded HVDC cable system The new 525 kv extruded HVDC cable system World s most powerful extruded cable system Anders Gustafsson, Markus Saltzer, Andreas Farkas, Hossein Ghorbani, Tobias Quist, Marc Jeroense High Voltage Cables

More information

Curriculum Vitae Fredrik Rüter 1 December 2014

Curriculum Vitae Fredrik Rüter 1 December 2014 Name RÜTER Fredrik Date of Birth 8 May 1960 Nationality Position Languages Coordinates Swedish Senior Consultant Swedish: mother tongue English: fluent (business, conversation, reading, writing) German,

More information

Underground vs. Overhead Transmission and Distribution

Underground vs. Overhead Transmission and Distribution electric power engineering Underground vs. Overhead Transmission and Distribution Your Power System Specialists June 9, 2009 1 NATIONAL TRENDS Municipalities have passed laws requiring new distribution

More information

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site Developing Ocean Energy in Ireland Belmullet Wave Energy Test Site Where does our energy come from? Most of the energy we use in Ireland comes from fossil fuels such as oil, coal, peat and gas. We burn

More information

Fault location on power cables. Fault location on power cables

Fault location on power cables. Fault location on power cables Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 01. Introduction Fault location on communication and power cables

More information

High Voltage Systems. Today. The history of cables

High Voltage Systems. Today. The history of cables High Voltage Cables High Voltage Systems Today Prysmian Cables and Systems B.V. is part of the Prysmian Group, a leading player in the industry of high-technology cables and systems for energy and telecommunications,

More information

Brochure Introducing HVDC

Brochure Introducing HVDC Brochure Introducing HVDC ABB and HVDC The world s first commercial high-voltage direct current (HVDC) link, situated between the Swedish mainland and the island Gotland, was delivered by ABB already in

More information

Summary of Electric Transmission Assessment Report

Summary of Electric Transmission Assessment Report Summary of Electric Transmission Assessment Report January 2010 Assessment and Analysis of the State-Of-the-Art High-Voltage Electric Transmission Systems with Specific Focus on High-Voltage Direct Current

More information

Cable Laying and Repair - Cable Ship Operations

Cable Laying and Repair - Cable Ship Operations http://oceanexplorer.noaa.gov/explorations/03edge/background/sargassum/sargassum.html Cable Laying and Repair - Cable Ship Operations Dr. R.J. Rapp, Director, Industry & Marine Liaison, TE SubCom Submarine

More information

DEK-REL- 24/1/SEN. Extract from the online catalog. Order No.: 2964050

DEK-REL- 24/1/SEN. Extract from the online catalog. Order No.: 2964050 Extract from the online catalog DEK-REL- 24/1/SEN Order No.: 2964050 Relay terminal block for sensor, with soldered-in miniature relays, contact (AgNi+Au): small to medium loads, 1 N/O contact, input voltage

More information

Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective

Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective Introduction Global Marine Systems Limited (Global Marine) has a vast wealth of knowledge in designing planning and

More information

FLEXIBLE INDUSTRIAL CABLES H07RN-F TENAFLEX SR

FLEXIBLE INDUSTRIAL CABLES H07RN-F TENAFLEX SR FLEXIBLE INDUSTRIAL CABLES H07RN-F TENAFLEX SR Standards : CENELEC HD 22.4 NF C 32-102-4 DIN VDE 0282-1 and VDE 0282-4 BS 6007 and BS 6500 IEC 60245-4 Rated voltage Rated voltage: 450/750 V (Use up to

More information

VDE Information. Degree of Pollution, Clearances and Creepage Distances and Insulating Materials

VDE Information. Degree of Pollution, Clearances and Creepage Distances and Insulating Materials VDE Information General Information The voltage which can be applied to a terminal depends on the relevant regulations, the installation conditions and, of course, the dimensions and insulating materials

More information

MV CABLE TYPE C 33-226

MV CABLE TYPE C 33-226 MV CABLE TYPE C 33-226 Standards : CENELEC HD 620 C 33-226 Rated voltage Rated voltage : 12/20 (24) kv Design 1 Stranded aluminium, class 2 conductor 2 Extruded conducting screen on conductor 3 XLPE insulation

More information

Cable System Planning and Permitting: Business and Stakeholder Considerations

Cable System Planning and Permitting: Business and Stakeholder Considerations Cable System Planning and Permitting: Business and Stakeholder Considerations Submarine Cables in the Sargasso Sea: Legal and Environmental Issues in Areas Beyond National Jurisdiction The George Washington

More information

Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project

Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL is a national laboratory

More information

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)

More information

SUPERCONDUCTING CABLE SYSTEMS

SUPERCONDUCTING CABLE SYSTEMS SUPERCONDUCTING CABLE SYSTEMS INTRODUCTION An aging and inadequate power grid is widely seen as one of the greatest obstacles to the restructuring of power markets in the United States, Europe and elsewhere.

More information

RoHS APPROVAL SHEET. ituner 12V/6.6A SERIES NO. (E17) EA10953A. ( ) Edac Power Electronics (Suzhou) Co., Ltd. 59 No.59, Chang Sheng Road, Sheng Pu,

RoHS APPROVAL SHEET. ituner 12V/6.6A SERIES NO. (E17) EA10953A. ( ) Edac Power Electronics (Suzhou) Co., Ltd. 59 No.59, Chang Sheng Road, Sheng Pu, APPROVAL SHEET CUSTOMER ituner CUSTOMER P/N DESCRIPTION EDAC MODEL 12V/6.6A SERIES NO. (E17) EA10953A DATE 2010-06-22 REVISION 0 APPROVED DESIGN PREPARE RoHS CONCLUSION APPROVED CONDITON CUSTOMER S APP

More information

Arctic Fibre Submarine Cable System

Arctic Fibre Submarine Cable System Arctic Fibre Submarine Cable System Desktop Study & Cable Engineering 10 February 2012 Desktop Study: Phase 1 Scope Philosophy March 7, 2012 DTS Phase 1 Scope of Work Goal: Identify feasible marine survey

More information

Network Standard Advice No. 1420C 9/6/2011

Network Standard Advice No. 1420C 9/6/2011 Network Standard Advice No. 1420C 9/6/2011 TO: Customers, Service Providers and Ausgrid Staff. Advisory Note on Changes to the Use of 11kV Cable Types. Introduction This Network Standard Advice (NSA) provides

More information

For business. Wiring your business for broadband. What happens when copper is required?

For business. Wiring your business for broadband. What happens when copper is required? For business Wiring your business for broadband Your cabling requirements are dependent on the size and complexity of your business. Smaller businesses should follow the wiring recommendations for residential

More information

factsheet High Voltage Direct Current Electricity technical information

factsheet High Voltage Direct Current Electricity technical information factsheet High Voltage Direct Current Electricity technical information Introduction High voltage direct current (HVDC) technology is one of the technical options National Grid can consider for the future

More information

Electrical Considerations for HVDC Transmission Lines. Joe Mooney, PE

Electrical Considerations for HVDC Transmission Lines. Joe Mooney, PE Electrical Considerations for HVDC Transmission Lines Joe Mooney, PE POWER Engineers has met the standards and requirements of the Registered Continuing Education Program. Credit earned on completion of

More information

Cables, Cable Laying & Accessories Manual

Cables, Cable Laying & Accessories Manual Distribution Business Cables, Cable Laying & Accessories Manual Database ref: File Ref: Title Page & Revision Log For Cables & Access v4 - Nov 2003.doc Manual Name: Cables & Accessories Manual Version

More information

VIPERFLEX ELECTRIC CABLE

VIPERFLEX ELECTRIC CABLE VIPERFLEX Flexible Low Voltage Electric Cable - 0.6/1kV (Rubber insulated) H07 RN-F & H07 BN-F Single Core 2-Core 2-Core and Earth 3-Core and Earth 4-Core and Earth Multi-Core and Earth H07 RCN-F & H07

More information

AORC Technical meeting 2014

AORC Technical meeting 2014 http : //www.cigre.org B1-1055 AORC Technical meeting 2014 220 kv Long Distance Underground HVAC Cable Circuit NAVEED RAHMAN Nexans Olex Melbourne, Australia SUMMARY In 2009, the Victorian state government

More information

Pipelines and seabed intervention

Pipelines and seabed intervention Workshop on seabed habitats of environmental concern Jørn Spiten Content Pipeline - route design Seabed Intervention - Trenching - Ploughing - Dredging - Rock installation 2 Pipeline routes 3 Pipeline

More information

Max. Length of HTS Cables in the Future

Max. Length of HTS Cables in the Future Max. Length of HTS Cables in the Future K. Schippl, Nexans Deutschland Industries, Hannover, Germany TOPICS: Limitation of the cable design: 1. Physical limitations 2. Shipping limitations 3. Maintenance

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

Submarine Cables: Critical Infrastructure Supplier Perspective

Submarine Cables: Critical Infrastructure Supplier Perspective Submarine Cables: Critical Infrastructure Supplier Perspective Dr. Ronald J. Rapp Director, Cable Engineering & Technology Tyco Electronics Subsea Communications LLC (TE SubCom) The 34 th Annual COLP Conference

More information

Positive-guided relay outputs: 3 safety contacts (N/O), instantaneous. 1 auxiliary contact (N/C), instantaneous

Positive-guided relay outputs: 3 safety contacts (N/O), instantaneous. 1 auxiliary contact (N/C), instantaneous Safety relay for monitoring E-STOP pushbuttons. Approvals Unit features Positive-guided relay outputs: 3 safety contacts (N/O), instantaneous 1 auxiliary contact (N/C), instantaneous Safe separation of

More information

48.12. 2 pole, 8 A Safety relay. Screw terminal. 35 mm rail (EN 60715) mounting. 2 CO (DPDT) 8/15 250/400 2,000 500 0.37 8/0.65/0.

48.12. 2 pole, 8 A Safety relay. Screw terminal. 35 mm rail (EN 60715) mounting. 2 CO (DPDT) 8/15 250/400 2,000 500 0.37 8/0.65/0. 48 Series - Relay interface modules 8 A Features 48.12 2 Pole Safety relay interface modules, 15.8 mm wide 48.12-2 Pole 8 A (screw terminal) DC sensitive coils Relay with forcibly guided contacts according

More information

6 ELECTRICAL PARAMETERS

6 ELECTRICAL PARAMETERS 6 ELECTRICAL PARAMETERS For power, low voltage and medium voltage cables, cross section nominal areas are calculated in taking into account several parameters as: permissible current carrying capacities

More information

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems Safe energy distribution that meets the highest industrial requirements NATUS switchgear systems your advantages minimal use of insulant

More information

Ampacity simulation of a high voltage cable to connecting off shore wind farms

Ampacity simulation of a high voltage cable to connecting off shore wind farms Ampacity simulation of a high voltage cable to connecting off shore wind farms Eva Pelster 1, Dr. David Wenger 1 1 Wenger Engineering GmbH, Einsteinstr. 55, 89077 Ulm, mail@wenger-engineering.com Abstract:

More information

Grid connection of near shore wind farms

Grid connection of near shore wind farms Grid connection of near shore wind farms methods, preconditions and results Rene Starup 5. Marts 2015 1 Topics Methods Preconditions Technical and socio-economic analysis 5. Marts 2015 2 60, 150 and 400

More information

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines PART 1 -- GENERAL 1.1 WORK OF THIS SECTION SECTION 16720 - City of San Diego, CWP Guidelines A. The WORK of this Section includes providing manual and automatic fire alarm and smoke detection systems meeting

More information

High Voltage Cable Systems

High Voltage Cable Systems High Voltage Cable Systems Cables and Accessories up to 550 kv Completing the picture nkt cables part of a world, counting on reliable and available electrical power Today a world without electrical power

More information

Recent Siemens HVDC Activities Yuriy Kazachkov Siemens PTI

Recent Siemens HVDC Activities Yuriy Kazachkov Siemens PTI IEEE PES 2008 HVDC & FACTS Subcommittee Recent Siemens HVDC Activities Yuriy Kazachkov Siemens PTI 660MW 500kV in operation since July 2007 Commercial Operation Neptune RTS Costumer Project Name Location

More information

4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters

4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters 8 Appendix 4 of BS 7671 by Mark Coles Appendix 4, Current-carrying capacity and voltage drop for cables and flexible cords, has seen significant changes with the publishing of BS 7671:2008. This article

More information

NSW Submarine Power. Cables for the future, delivered today.

NSW Submarine Power. Cables for the future, delivered today. Submarine Power. Cables for the future, delivered today. NorddeutSChe Seekabelwerke GmbH () for Renewable Energies The submarine competence center within the General Cable Group After was founded in by

More information

Comparative study for cables and busbars

Comparative study for cables and busbars Comparative study for cables and busbars Preliminary considerations To compare the prices of two categories of product as different as traditional cables and busbars, it is necessary to make some preliminary

More information

ELEKTROTEHNI KO PODJETJE Leskoπkova cesta 12, 1000 Ljubljana, SLOVENIA

ELEKTROTEHNI KO PODJETJE Leskoπkova cesta 12, 1000 Ljubljana, SLOVENIA MRO Modularne Razdelilne Omare d.o.o. ELEKTROTEHNI KO PODJETJE Leskoπkova cesta 2, 000 Ljubljana, LOVENIA MC GENERAL When to use? MC - modular switchgear cabinets are type-tested, factory built switchgears,

More information

SURGE PROTECTIVE DEVICES

SURGE PROTECTIVE DEVICES SURGE PROTECTIVE DEVICES 1. INTRODUCTION In order to ensure safety of people, protection of equipment and, to a certain extent, continuity of supply, insulation co-ordination aims at reducing the likelihood

More information

NSW Submarine Power. Cables for the future, delivered today

NSW Submarine Power. Cables for the future, delivered today NSW Submarine Power Cables for the future, delivered today NORDDEUTSCHE SEEKABELWERKE GMBH (NSW) The submarine competence center within the General Cable Group After NSW was founded in 1899 by Felten &

More information

Transformer Bushings for GIS

Transformer Bushings for GIS Transformer Bushings for GIS Oil to SF6 Connections GARIP RTKG 725-55 kv SQS certified ISO 91 / ISO 141 Bushings RIP - Technology for SF6 / Oil - Bushings In modern metal enclosed switchgear SF6 -gas is

More information

HIGH-CAPACITY HIGH TEMPERATURE SUPERCONDUCTING POWER CABLES

HIGH-CAPACITY HIGH TEMPERATURE SUPERCONDUCTING POWER CABLES HIGH-CAPACITY HIGH TEMPERATURE SUPERCONDUCTING POWER CABLES Jean-Maxime SAUGRAIN NEXANS Corporate VP Technical IASS Workshop Postdam May 13, 2011 Rationale High-capacity High Temperature Superconducting

More information

Installation Instructions for Contractors. Connection Sets. Solar Twin Tube. Inox 1/2" Inox 3/4" 6 720 646 309 (2011/02) US/CA

Installation Instructions for Contractors. Connection Sets. Solar Twin Tube. Inox 1/2 Inox 3/4 6 720 646 309 (2011/02) US/CA Installation Instructions for Contractors Connection Sets Solar Twin Tube Inox 1/2" Inox 3/4" 6 720 646 309 (2011/02) US/CA Contents Contents 1 Explanation of symbols and safety information 3 1.1 Explanation

More information

48 SERIES Relay interface modules 10 A

48 SERIES Relay interface modules 10 A 48 Relay interface modules 10 A 1 CO relay interface modules, mm wide Ideal interface for PLC and electronic systems Type 48.P3 1 CO 10 A s Type 48.31 1 CO 10 A s AC coils or DC sensitive coils Supply

More information

Power supply 142. Couplers 143. Data interfaces 144. Accessories 145

Power supply 142. Couplers 143. Data interfaces 144. Accessories 145 KNX system units The system components are KNX devices, which assume higher-level functions, independent of the application. They guarantee the necessary infrastructure in the building, ensuring a flawless

More information

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3

More information

THE PATHWAY TO POWER HIGH-VOLTAGE CABLES

THE PATHWAY TO POWER HIGH-VOLTAGE CABLES THE PATHWAY TO POWER HIGH-VOLTAGE CABLES TABLE OF CONTENTS HIGH-VOLTAGE CABLES 3 Advantages of XLPE-insulated cable systems 3 PROPOSAL 4 Cable systems 4 Providing System Solutions 4 Continuous temperature

More information

CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE

CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE 8.1 SYSTEM 8.1.1 Armoured, screened underground cables are used for control communication in electrified areas to limit induction effect. 8.2

More information

HERZ-Thermal Actuators

HERZ-Thermal Actuators HERZ-Thermal Actuators Data Sheet 7708-7990, Issue 1011 Dimensions in mm 1 7710 00 1 7710 01 1 7711 18 1 7710 80 1 7710 81 1 7711 80 1 7711 81 1 7990 00 1 7980 00 1 7708 11 1 7708 10 1 7708 23 1 7709 01

More information

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS FEBRUARY 2008 PB POWER PB Power Page i EXECUTIVE SUMMARY General

More information

POWER TRANSMISSION FROM OFFSHORE WIND FARMS

POWER TRANSMISSION FROM OFFSHORE WIND FARMS POWER TRNSMISSION FROM OFFSHORE WIND FRMS Thorsten Völker University of pplied Sciences Bremerhaven Germany BSTRCT The future for wind power generation in Germany is offshore wind energy. The preferred

More information

49 Series - Relay interface modules 8-10 - 16 A. Features

49 Series - Relay interface modules 8-10 - 16 A. Features Features 1 & 2 Pole relay interface modules 5 µm Gold plate contacts for low level switching capability 49.31-50x0-1 Pole 10 A (screw terminal) 49.52-50x0-2 Pole 8 A (screw terminal) 49.72-50x0-2 Pole

More information

Lightning Arresters P30027 18 KVA P30038 10 KVA. Description & Installation

Lightning Arresters P30027 18 KVA P30038 10 KVA. Description & Installation Lightning Arresters P30027 18 KVA P30038 10 KVA Description & Installation Printed in USA 09/11 TO330 Rev. B Table of Contents Page 1.0 SCOPE 2 2.0 PRODUCT OVERVIEW 2 2.1 Intended Uses 2 2.2 Lightning

More information

Cable action plan. 132-150 kv grids March 2009

Cable action plan. 132-150 kv grids March 2009 Cable action plan 132-150 kv grids March 2009 Table of contents 1. Summary of the cable action plan 3 2. Introduction 7 3. Planning scenarios 8 4. Existing overhead lines 8 4.1 Economically optimal dismantling

More information

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw 4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and

More information

THE NEPTUNE REGIONAL TRANSMISSION SYSTEM 500 kv HVDC PROJECT

THE NEPTUNE REGIONAL TRANSMISSION SYSTEM 500 kv HVDC PROJECT 21, rue d Artois, F-75008 PARIS B4-118 CIGRE 2008 http : //www.cigre.org THE NEPTUNE REGIONAL TRANSMISSION SYSTEM 500 kv HVDC PROJECT E. STERN, J. NASH - NEPTUNE RTS, LLC (U.S.A.) C. SCHOENIGER, C. BARTZSCH

More information

QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room

QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room 1) When you click on the UTHSCSA Drawing the site takes you to the E-1 drawing no other. Will there be other drawings

More information

Why Submarine Cables?

Why Submarine Cables? Nalaka Siriwardena Engineer/SEA-ME-WE 4 Project Engineer/Projects Why Submarine Cables? Cost effective on large routes High bandwidth due to the evolution of technology such as DWDM High Quality with low

More information

Overview of Submarine Cable Route Planning & Cable Route Survey Activities. Graham Evans Director EGS Survey Group www.egssurvey.

Overview of Submarine Cable Route Planning & Cable Route Survey Activities. Graham Evans Director EGS Survey Group www.egssurvey. Overview of Submarine Cable Route Planning & Cable Route Survey Activities Graham Evans Director EGS Survey Group www.egssurvey.com Presentation Summary Submarine cable systems concept to reality Objectives

More information

SingleNet Single Cable Control System

SingleNet Single Cable Control System Single Cable Control System Economical, Reliable and Expandable Two-Wire Single Cable System DRIP/MICRO IRRIGATION PRODUCTS Single Cable Control System System Manager or Irrigation Controller Controls

More information

CATALOGUE SURGE PROTECTION LOW VOLTAGE

CATALOGUE SURGE PROTECTION LOW VOLTAGE CATALOGUE SURGE PROTECTION LOW VOLTAGE SALTEK, s.r.o. (limited liability company), is a Czech company specialising in the development and manufacture of surge protection devices (SPD). SALTEK offer a wide

More information