AGENDA STAFF REPORT. Budgeted: Yes Current Year Cost: $695,000 Annual Cost: N/A
|
|
- Alexia Gregory
- 8 years ago
- Views:
Transcription
1 AGENDA STAFF REPORT Agenda Item ASR Control MEETING DATE: 10/22/13 LEGAL ENTITY TAKING ACTION: Board of Supervisors BOARD OF SUPERVISORS DISTRICT(S): 2 SUBMITTING AGENCY/DEPARTMENT: John Wayne Airport (Approved) DEPARTMENT CONTACT PERSON(S): Alan L. Murphy (949) SUBJECT: 15,000 Hour Maintenance Service with Bay City Equipment Industries, Inc. CEO CONCUR COUNTY COUNSEL REVIEW CLERK OF THE BOARD Pending Review Approved Agreement to Form Consent Calendar 3 Votes Board Majority Budgeted: Yes Current Year Cost: $695,000 Annual Cost: N/A Staffing Impact: No # of Positions: Sole Source: N/A Current Fiscal Year Revenue: N/A Funding Source: JWA Operating Fund 280: 100% County Audit in last 3 years No Year of Audit Prior Board Action: N/A RECOMMENDED ACTION(S): 1. Find that the project is Categorically Exempt from the California Environmental Quality Act (CEQA), Class 1, (Existing Facilities) pursuant to CEQA Guidelines Section CEQA CLEARANCE HAS BEEN SOUGHT FROM OCPW BUT HAS NOT YET BEEN RECEIVED. 2. Authorize the Purchasing Agent or designee to execute a one-time Contract with Bay City Equipment Industries, Inc., dba Bay City Electric Works to perform a 15,000 hour maintenance service on four (4) QSV91-G6 generators located at John Wayne Airport s Central Utility Plant, in an amount not to exceed $695, Without further Board action, authorize the Purchasing Agent or designee to exercise a contingency Contract cost increase not to exceed $35,000 for the entire term of the Contract, within the scope of work set forth in the Contract, pursuant to County policies and procedures. SUMMARY: John Wayne Airport (JWA) requests authorization for the Purchasing Agent or designee to execute a onetime Contract, CT , with Bay City Equipment Industries, Inc., dba Bay City Electric Page 1
2 Works, to perform a 15,000 hour maintenance on four (4) QSV91-G6 generators located at JWA s Central Utility Plant in the amount not to exceed $695,000. BACKGROUND INFORMATION: Central Utility Plant Description John Wayne Airport s (JWA) Central Utility Plant is composed primarily of four (4) natural gas powered generator sets and their associated emissions control equipment, three (3) centrifugal chillers, two (2) hot water absorption chillers, electronic control and power distribution systems, and associated infrastructure and utility equipment. When operating, this plant provides electrical service and chilled water for air conditioning for existing Terminals A, B, and C and electrical service for Parking Structures A1, A2, B2 and Parking Structure C. 15,000 Hour Service The four natural gas generators have been running since March of 2011, providing electricity for the Airport. At this point in their operating life cycle, a 15,000 hour service consisting of a major overhaul and parts replacement is required. Services shall include labor to remove and re-install cylinder heads, replacement of lubricating oils and coolant supplies, hazardous waste disposal, parts replacement, seals testing, a complete inspection, and other associated tasks. On completion of these tasks, the Contractor will re-tune the engines and run the engines on test before returning to service. For a complete list of tasks, please reference Exhibit A. A contingency amount of $35,000 is also requested in the event that unexpected repairs are identified during the 15,000 service inspection and rebuilding process. This amount will only be utilized in the event that unanticipated repairs are needed. Bid Summary On July 11, 2013 JWA issued an Invitation for Bid (IFB) to perform a 15,000 hour maintenance on four (4) QSV91-G6 generators. 693 vendors were notified of the IFB via the County s online bid system BidSync.com. Three (3) vendors attended the mandatory job walk on July 25, Two (2) bid responses were received. The following is a summary of the bid responses: Company Total Cost Bay City Equipment Industries, Inc., dba Bay City Electric Works $695,000 Duthie Electric Service Corporation $1,129,033 After reviewing the company profiles, references and pricing of the responding vendors, JWA determined that Bay City Equipment Industries, Inc., dba Bay City Electric Works is the lowest, responsive, responsible bidder. They have shown that they have the qualifications, experience, and technical expertise to meet the Airport s service needs. The Contract referenced in this agenda item does contain language which permits reductions or termination of the Contract immediately without penalty if approved funding or appropriations are not forthcoming. This Contract is filling a critical service need and approval to proceed is recommended. Page 2
3 CEQA COMPLIANCE: The proposed project is Categorically Exempt (Class 1), from the provisions of CEQA pursuant to Section 15301, because it provides for the exemption of projects involving the operation, maintenance and repair of existing public facilities. FINANCIAL IMPACT: There are adequate appropriations in the FY JWA Operating Fund to cover contract costs. STAFFING IMPACT: N/A EXHIBIT(S): Exhibit A: 15,000 Major Service Task List ATTACHMENT(S): Attachment A: Contract with Bay City Equipment Industries, Inc., dba Bay City Electric Works Page 3
4 Exhibit A 15,000 Hour Major Service Task Clean Lubricating Spin Oil Filter Replace Spark Plugs Replace Air Cleaner Element (Primary and Secondary Filters) Oil Sample (Analysis) of Used Oil Replace Air Cooler Intake Filter Check Flexible Hoses & Replace As Needed Check Supplemental Coolant Additives (SCA) Check Engine Mounts Check Engine Electrical Connections Replace Starter Motor and Batteries Replace Back-up Power Supply Batteries Check All Connections to Starter Motor and Batteries Measure Turbocharger Axial Clearance Measure Turbocharger Radial Clearance Replace Lubricating Oil and Filters Replace Air Cleaner Element for Evap Cooler Replace NG Fuel Filter Replace Crankcase Ventilation Re-Circulator Element Check Front Gear Train Backlash Check Generator Electrical Connections Clean Lubricating Oil Cooler Clean Aftercooler Drain Cooling System and Replace with New Coolant (Flush) Inspect Camshaft Inspect Push Rods or Tubes Inspect Tappet Assembly Inspect Generator Flexible Coupling & Replace Grease Inspect Control Panel Assembly Replace Coolant Thermostats Replace Lubricating Oil Thermostats Replace NG Fuel Line Seals Replace Cylinder Head Replace Fuel Regulator Replace Lubricating Oil Pump Replace Water Pump Replace Throttle Shaft Bearings Check All Lube Oil Lines Clean PMGs Assemblies and Grease Generator Bearings Change Gearbox Oil Check Gearbox Internal Parts Perform Alignment Checks for Engine, Gearbox, and Generator Inspect and Clean CO Catalyst & Reseal Open and Clean CAIN 1& 2 Heat Exchangers & Re-Seal Open, Check, and Clean Low Temperature Plate Heat Exchanger Open, Check, and Clean High Temperature Plate Heat Exchanger Service all Cooling System Bray Valves Remove, Clean, & Service Hot Water Flow Meter Notes SEI task Page 1 of 1
5 Page 1 of 21
6 Page 2 of 21
7 Page 3 of 21
8 Page 4 of 21
9 Page 5 of 21
10 Page 6 of 21
11 Page 7 of 21
12 Page 8 of 21
13 Page 9 of 21
14 Page 10 of 21
15 Page 11 of 21
16 Page 12 of 21
17 Page 13 of 21
18 Page 14 of 21
19 Page 15 of 21
20 Page 16 of 21
21 Page 17 of 21
22 Page 18 of 21
23 Page 19 of 21
24 Page 20 of 21
25 Page 21 of 21
AGENDA STAFF REPORT. ASR Control 15-000093
AGENDA STAFF REPORT Agenda Item ASR Control 15-000093 MEETING DATE: 03/03/15 LEGAL ENTITY TAKING ACTION: Board of Supervisors BOARD OF SUPERVISORS DISTRICT(S): 2 SUBMITTING AGENCY/DEPARTMENT: John Wayne
More informationMOTOR VEHICLE MECHANIC REPAIR CATEGORIES
Chapter 8: Motor Vehicle Mechanic Repair Categories Page 1 CHAPTER 8 MOTOR VEHICLE MECHANIC REPAIR CATEGORIES Section 8-1 REQUIREMENT Section 10 of the Motor Vehicle Service and Repair Act (MCL 257.1310)
More informationCylinder head gasket, replacement
"VCC065612 EN 20110604" 1(7) Cylinder head gasket, replacement Special tools: 999 5098 Disconnect battery earth lead Drain coolant Remove heat shield over exhaust manifold. (Only the two bottom bolts on
More informationKobelco Extended Warranty Program. www.kobelco-europe.com
Kobelco Extended Warranty Program www.kobelco-europe.com Kobelco Extended Warranty is a convenient, value added way to give your Kobelco customers added security and peace of mind. Benefits of the Kobelco
More informationSkills Standards MEDIUM/HEAVY DUTY TRUCK: DIESEL ENGINE REPAIR TECHNICIAN OD32151 ALIGNED WITH ASE/NATEF
Skills Standards MEDIUM/HEAVY DUTY TRUCK: DIESEL ENGINE REPAIR TECHNICIAN OD32151 ALIGNED WITH ASE/NATEF Competency-Based Education: OKLAHOMA S RECIPE FOR SUCCESS BY THE INDUSTRY FOR THE INDUSTRY Oklahoma
More informationREMOVAL AND INSTALLATION
303-01C-1 REMOVAL AND INSTALLATION Engine Body On Special Tool(s) Adapter For 303-D043 303-D043-02 or equivalent Special Tool(s) 303-01C-1 Turbocharger Lifting Bracket 303-1266 Wrench, Fan Clutch Nut 303-214
More informationEmission Control Systems Warranties
2004 Chevrolet TrailBlazer - 2WD Emission Control Systems Warranties This section outlines the emission warranties that General Motors provides for your vehicle in accordance with the U.S. Federal Clean
More informationTurbocharger system components, servicing
21-1 Turbocharger system components, servicing Engine codes: AAZ, 1Z, AHU Observe rules of cleanliness Page 21-10 Turbocharger hoses and lines, connecting Page 21-11 WARNING! Do not re-use any fasteners
More informationAUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District
AUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District Repairs and overhauls automobiles, buses, trucks, and other automotive vehicles: Examines vehicle and discusses with customer or
More informationBoiler and Burner Cleaning and Servicing Specifications
Boiler and Burner Cleaning and Servicing Specifications The Town of Groton of Public Works Department is requesting bids to provide manufacturers recommended maintenance, repairs and emergency service
More informationIntake Manifold: Service and Repair
2000 Chevy Truck S10/T10 P/U 2WD L4-2.2L VIN 4 Copyright 2008, ALLDATA 9.90 Page 1 Intake Manifold: Service and Repair Removal Procedure 1. Disconnect the battery negative cable. Refer to Battery Replacement.
More informationSTATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE AUTO 220 INTERNAL COMBUSTION ENGINES
STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE AUTO 220 INTERNAL COMBUSTION ENGINES Prepared By: BRANDON BALDWIN CANINO SCHOOL OF ENGINEERING TECHNOLOGY AUTOMOTIVE TECHNOLOGY
More informationPUMP MAINTENANCE SCHEDULE AND CHECKLISTS
PUMP MAINTENANCE SCHEDULE AND CHECKLISTS Providing a maintenance schedule defined specifically by run hours or yardage pumped serves only as a general guideline given the large amount of variables a unit
More informationEngine, Drive Train, and Hydraulic Repair Indicator Quick Reference Guide
Engine, Drive Train, and Hydraulic Repair Indicator Quick Reference Guide Planned Indicators Planned Indicators SM provide the best insight Service Meter Hours CAT Engine Repair Indicators Description
More informationSection 11 - System Diagrams
Section 11 System Diagrams Page 11-1 Section 11 - System Diagrams Section Contents Page Overview...11-3 Flow Diagram, Fuel System...11-4 Flow Diagrams, Lubricating Oil System...11-5 Flow Diagrams, Cooling
More informationSection 6 - System Diagrams
Section 6 System Diagrams Page 6-1 Section 6 - System Diagrams Section Contents Page Overview...6-3 Flow Diagram, Fuel System...6-4 Flow Diagrams, Lubricating Oil System...6-5 Flow Diagrams, Cooling System...6-8
More informationproducts 22 º C Ventilation Air Conditioning Refrigeration Energy & Cost Saving Products Inside PROVIDED BY HEINEN & HOPMAN
products > Energy & Cost Saving Products OUTSIDE 35 C HUMIDITY 90% 22 º C Inside PROVIDED BY HEINEN & HOPMAN Heating Ventilation Air Conditioning Refrigeration HVAC energy & COST SAVING POSSIBILITIES A
More informationAdjustment Data MAZDA - 626-2.0 Comprex D - RF-CX
Adjustment Data MAZDA - 626-2.0 Comprex D - RF-CX Engine (general) Engine code RF Capacity 1998 (cc) Idle speed 725 ± 25 Valve clearance Valve clearance Cold Inlet 0.25 (mm) Exhaust 0.35 (mm) Compression
More informationCOOLING SYSTEM Section Page
5 COOLING SYSTEM Section Page 5.1 COOLANT PRE-HEATER... 5-3 5.2 COOLANT PUMP NON-EGR ENGINE... 5-7 5.3 COOLANT PUMP EGR ENGINE... 5-13 5.4 FRONT CONNECTOR HOUSING NON-EGR ENGINE... 5-17 5.5 FRONT CONNECTOR
More information6-years/75,000 miles Comprehensive coverage Subsequent Owner Warranty $100 Deductible
LINCOLN PREMIER LIMITED WARRANTY 6-years/75,000 miles Comprehensive coverage Subsequent Owner Warranty $100 Deductible Comprehensive Coverage Because Lincoln has always been a brand you can trust and respect,
More informationInformation and Instructions
Information and Instructions This shop manual contains several sections each covering a specific group of wheel type tractors. The Tab Index on the preceding page can be used to locate the section pertaining
More informationWater Pump Replacement
1 of 8 2/5/2008 6:36 AM Document ID# 713637 2001 Cadillac Seville Print Water Pump Replacement Tools Required 1. J 38816-A Water Pump Remover & Installer 2. J 38185 Hose Clamp Pliers
More informationLancair Legacy Annual Condition Inspection Checklist
Lancair Legacy Annual Condition Inspection Checklist Performed by: Completion Date: Complete Maintenance/Inspection Item Comments Pre-Inspection Research AD and Service bulletins Inspect entire airframe
More informationHow To Fix A Car With A Carbide Engine
Section 12 Adjustment, Repair, and Replacement Page 12-1 Section 12 Adjustment, Repair and Replacement Section Contents Page Overview...12-5 Belts Belt Guard Removal/Installation...12-7 Belt Removal/Installation...12-11
More informationSpecifications for Volkswagen Industrial Engine
Volkswagen 1 industrial engine Specifications for Volkswagen Industrial Engine AFD 1.9 ltr. TDI diesel engine EURO 2 Volkswagen AG, Wolfsburg Volkswagen AG reserves the right to introduce amendments or
More informationMechanical Engineering Technician- Plant Technician
Mechanical Engineering Technician- Plant Technician A competent Mechanical Engineering Technician- Plant Maintenance is expected to: 1. Ability to plan and execute work in a safe and responsible manner
More informationRefrigeration & Air-conditioning Technician
Refrigeration & Air-conditioning Technician A competent Refrigeration & Air-conditioning Technician is expected to: 1. Make use of best practice principles based on theory and experience gained throughout
More informationActuator-Swirl Valve DESCRIPTION
US/Canadian 2007 Sprinter Diesel V6 Dodge Service Manual Swirl Valve Info Actuator-Swirl Valve DESCRIPTION The swirl valve linkage links the swirl valves in the intake manifold to the swirl valve actuator.
More informationAMENDMENT TO INCREASE PEST CONTROL SERVICES CONTRACT AMOUNT (ALL DISTRICTS) (3 VOTE)
January 05, 2016 The Honorable Board of Commissioners Housing Authority of the County of Los Angeles 383 Kenneth Hahn Hall of Administration 500 West Temple Street Los Angeles, California 90012 1-H January
More informationPorsche Approved Certified Pre-Owned. Limited Warranty
Porsche Approved Certified Pre-Owned Limited Warranty Porsche Approved. A guaranteed mark of quality. At Porsche, we re committed to exceptional performance. The inherent reliability and longevity of
More informationUDOT RPMS VEHICLE RECORDS, PREVENTIVE MAINTENANCE & SURVEILLANCE
UDOT RPMS VEHICLE RECORDS, PREVENTIVE MAINTENANCE & SURVEILLANCE VEHICLE RECORDS AND PREVENTIVE MAINTENANCE Prepared by: UTAH DEPARTMENT OF TRANSPORTATION OFFICE OF PLANNING AND PROGRAMMING IN COOPERATION
More informationTable V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.
Table V Troubleshooting Checklist for Refrigeration Systems TROUBLE POSSIBLE CAUSE CORRECTIVE MEASURE High condensing pressure. Low condensing pressure. Air or non-condensable gas in system. Inlet water
More informationOil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
More informationP7100 PUMP INSTALLATION INSTRUCTIONS Diesel Care & Performance Inc
P7100 PUMP INSTALLATION INSTRUCTIONS Diesel Care & Performance Inc Installation Timing Pin Location CAUTION: Before installing the injection pump, be sure that number 1 cylinder is at the Top Dead Center
More informationCDS TROUBLESHOOTING SECTION I. VACUUM. 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg)
CDS TROUBLESHOOTING SECTION I. VACUUM 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg) 1.1. Clogged hoses or wand tube. Disconnect hoses and carefully check for an obstruction. 1.2. Excessive
More informationFleet Technician I Fleet Technician II Fleet Technician III
Fleet Technician I Fleet Technician II Fleet Technician III DEFINITION Under general supervision (Fleet Technician I) or direction (Fleet Technician II and III), perform skilled repairs and preventive
More informationFederal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...
More informationCOUNTY OF EL PASO, TX REQUEST FOR BIDS Bus and Fleet Vehicle Maintenance and Repair Services (Supplement)
COUNTY OF EL PASO, TX REQUEST FOR BIDS Bus and Fleet Vehicle Maintenance and Repair Services (Supplement) The County of El Paso is currently under contract with several local vendors to provide routine
More informationC32 MARINE ENGINE (RXB)
SAFETY.CAT.COM C32 MARINE ENGINE (RXB) Maintenance Intervals Excerpted from Operation & Maintenance Manual (SEBU7908-09) 2009 Caterpillar All Rights Reserved SEBU7908-09 69 Maintenance Interval Schedule
More informationChris Clement 701 Bayou Lane Thibodaux, LA 70301 985.446.7320
Chris Clement 701 Bayou Lane Thibodaux, LA 70301 985.446.7320 Position: Facility Assistant Maintenance Manager B Date: May 17, 2010 - present 70% OF TIME- is spent on following duties. Assist the Facility
More informationEngine. 204-1890 Strobe light, 110V 204-1891 Strobe light, 220V 204-458 Replacement bulb. 204-1057 Compression gauge. 204-166 Dial indicator
The Strobe light checks the unit for: Balance of operating machinery RPM of motors, engine pulleys, fans, etc. Observe belt slippage Strobe light will stop action at speeds from 200 to 6000 RPM 204-1890
More informationAutomotive Technician-Advanced
Job Ready Assessment Blueprint Automotive Technician-Advanced Test Code: 4008 / Version: 01 Copyright 2006. All Rights Reserved. General Assessment Information Automotive Technician-Advanced Blueprint
More informationEveryTM. Coverage. North American Truck Coverages For 2013 ISL9 And ISB6.7 Engines.
EveryTM Coverage. North American Truck Coverages For 2013 ISL9 And ISB6.7 Engines. EveryTM Confidence. You can have confidence knowing that your Cummins 2013 engine is backed by the total coverage of Cummins
More informationREMAN ENGINES APPLICATION GUIDE
REMAN ENGINES APPLICATION GUIDE CNH REMAN ENGINES Today, there are more reasons than ever to choose CNH Remanufactured s for your equipment. From more engine choices to less downtime during installation,
More informationC18 ACERT Fire Pump Tier 3 448 bkw/600 bhp @ 1750 rpm
CATERPILLAR ENGINE SPECIFICATIONS I-6, 4-Stroke-Cycle Diesel Bore...145.0 mm (5.71 in) Stroke...183.0 mm (7.2 in) Displacement... 18.1 L (1,104.53 in3) Aspiration...Turbocharged Aftercooled Compression
More informationCompetency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6
Table of Contents (MEC 6)... 1 Function: Operate Vessel Machinery and Systems... 1 Diesel engines.... 1 Operational procedures.... 3 Operate and monitor a vessel s engines and auxiliary equipment.... 4
More informationEveryTM. Coverage. North American Truck Coverages For ISL9, ISC8.3 And ISB6.7 Engines.
EveryTM Coverage. North American Truck Coverages For ISL9, ISC8.3 And ISB6.7 Engines. EveryTM Confidence. You can have confidence knowing that your EPA 2010 engine is backed by the total coverage of Cummins
More informationMINNESOTA WEST COMMUNITY & TECHNICAL COLLEGE COURSE OUTLINE
MINNESOTA WEST COMMUNITY & TECHNICAL COLLEGE COURSE OUTLINE Faculty are required to have the outline submitted to the Academic Affairs Office. The course outline is the form used for approval of new courses
More informationLife Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany
Life Cycle Costing Analysis of Water-cooled Chillers Chillventa Nuremburg, Germany Spring 2012 Description Life Cycle Cost Analysis is a method of determining and comparing the total costs of investment
More informationTRAINING, EXAMINATION AND CERTIFICATION
TECHNICAL STANDARDS & SAFETY AUTHORITY TRAINING, EXAMINATION AND CERTIFICATION REFRIGERATION OPERATOR CLASS B CERTIFICATION & EXAMINATION GUIDE REVISED EDITION 2 CERTIFICATIONS PERSUANT TO THE OPERATING
More information1013 E. The engine for agricultural equipment.
1013 E. The engine for agricultural equipment.... -186 kw at 2300 rpm These are the characteristics of the 1013 E: Modern water-cooled 4- and 6-cylinder in-line engine Turbocharging with charge air cooling
More informationAGENDA REPORT. Honorable Mayor and Members of City Council Daniel Gho, Public Works Superintendent MEETING DATE: November 5, 2014
CITY OF PACIFIC GROVE 300 Forest Avenue, Pacific Grove, California 93950 Agenda No. 6A Page 1 of 2 AGENDA REPORT TO: FROM: Honorable Mayor and Members of City Council Daniel Gho, Public Works Superintendent
More informationDIESEL TRUCK MECHANIC 47.0605 GENERAL SKILLS. *A. 001 Define specific safety terms.
DIRECTIONS Evaluate the student by checking the appropriate box to indicate the degree of Competency. The rating for each task should reflect employability readiness rather than the grades given in class.
More information2005 MINI Cooper. 2002-05 MANUAL TRANSMISSIONS On-Vehicle Servicing. Cooper S Getrag 285
2002-05 MANUAL TRANSMISSIONS On-Vehicle Servicing APPLICATION MANUAL TRANSMISSION APPLICATIONS Application Transmission Model Cooper R65 Cooper S Getrag 285 LUBRICATION SERVICE INTERVALS Inspect fluid
More informationAprilia.no. RS 50 96-98 Eng.6M
01 Carburettor - oil pump 02 Drive shaft 03 Head - piston 04 Primary gear shaft 05 Gearbox driven shaft 06 Selector 07 Clutch 08 Clutch cover 09 Right crankcase 10 Left crankcase 11 Ignition unit RS 50
More informationCONTINUED COVERAGE FOR YOUR NEW, USED, OR CERTIFIED PRE-OWNED BMW.
BMW EXTENDED SERVICE CONTRACTS FEEL THE RUSH OF ASSURANCE. CONTINUED COVERAGE FOR YOUR NEW, USED, OR CERTIFIED PRE-OWNED BMW. Whether your original 4-year/50,000-mile BMW Warranty is coming to an end,
More informationClassification and Qualification STANDARDS
Classification and Qualification STANDARDS HVAC Series Classification Title Class Code Date Established Date Revised Operating Engineer Building Service Engineer Air Conditioning/Refrigeration Mechanic
More informationBR150 Pmi Baja Reaction 150cc Go Kart (VIN PREFIX L4VM)
Page 1 of 21 Product Information Baja Web > Product Information > Parts Lists > GOKART > BR150 Pmi Baja Reaction 150cc Go Kart (VIN PREFIX L4VM) BR150 Pmi Baja Reaction 150cc Go Kart (VIN PREFIX L4VM)
More informationMahindra USA, Inc. Limited Warranty Policy
Page 1 of 12 Mahindra USA, Inc. Limited Warranty Policy Effective January, 2015 Page 2 of 12 Mahindra USA, Inc. Limited Warranty for New Mahindra Products A. General Provisions The warranties described
More informationMicro-Turbine Combined Heat & Power Generators (CHP) Cold Climate Applications 2014 Polar Technology Conference Richard S.
Micro-Turbine Combined Heat & Power Generators (CHP) Cold Climate Applications 2014 Polar Technology Conference Richard S. Armstrong, PE DISTRIBUTED CO-GENERATION DEFINED Electricity and Heat production
More informationSolstice/Sky Water Pump Replacement
Solstice/Sky Water Pump Replacement The water pump on the Solstice/Sky is starting to need replacement on some vehicles. This guide will help in replacing the water pump while the engine is still in the
More informationService Parts. John Deere TO4039D 4039TL CD4039DF CD4039TF 4045DF 4045TF. Engine. Engine Models:
Service s Engine Engine Models: John Deere TO4039D 4039TL CD4039DF CD4039TF 4045DF 4045TF Generator Models: 20--40ROZJ/REOZJ 20--40DSJ/DSEJ 50/60ROZJ serial nos. 257821 and above 50/60REOZJ/REOZJB 50/60DSJ/DSEJ/DSEJB
More informationSeries 53, 71, 92 and 149 Engines
3.5 million two-cycle engines built since 1940 Nearly 500,000 still in operation around the world $100 million in parts inventory to cover your needs Series 53, 71, 92 and 149 Engines Over 2,500 factory
More information1/29/2008 DR70. Baja Motorsports Inc. P.O. Box 61150 Phoenix, AZ 85082 Toll Free: 888-863-2252 PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 43
DR70 Toll Free: 888-863-2252 PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 43 CYLINDER & CYLINDER HEAD 1 DR70-001 883099044472 CYLINDER 1 1 2 DR70-002 883099044489 GASKET, CYLINDER 1 1 3 DR70-003 883099044496
More informationCOVERING MILLIONS Preferred Protection Plan, a Service Group Company www.sgifs.com PO Box 26830, Austin, TX 78755-0800.
COVERING MILLIONS Preferred Protection Plan, a Service Group Company www.sgifs.com PO Box 26830, Austin, TX 78755-0800. 1-877-565-0816 PPP-308 0903 rev 0408 BENEFITS New and Pre-Owned Vehicles Preferred
More informationSERIES 60 SERVICE MANUAL
SERIES 60 SERVICE MANUAL The original air compressor is driven by the bull gear and water cooled. Engine coolant is fed to the compressor through a flexible hose tapped into the engine block water jacket
More informationThe successful bidder must give priority service, without appointment, to JCSO vehicles and must provide 24-hour emergency service.
INSTRUCTIONS TO BIDDERS FOR JCSO VEHICLE MAINTENANCE & REPAIR The JCSO maintains a vehicle fleet of approximately 190 vehicles most of which are manufactured by the Ford Motor Company but the fleet also
More informationSCREAMIN' EAGLE PRO TWIN CAM 110 (1800 CC) BOLT-ON CON- VERSION KIT
-J0 REV. 0-0-0 SCREAMIN' EAGLE PRO TWIN CAM 0 (00 CC) BOLT-ON CON- VERSION KIT GENERAL Kit Number 000 Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section
More informationCentrifugal Water Chillers. Scott Meyerkord
Centrifugal Water Chillers Scott Meyerkord Trane Account Manager Chilled Water System absorption centrifugal helical-rotary Centrifugal Water Chillers Centrifugal Water Chillers Components components of
More informationNYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
More informationFOXAIR 60/50 ALL MODELS
FOXAIR 60/50 ALL MODELS OPERATION AND SERVICE MANUAL UNIT WEIGHT - ALL MODELS APPROX. 300 POUNDS FOXTRONICS, INC. 38 L x 28 W x 24 H Love Field-Dallas TX MADE IN THE USA 3448 West Mockingbird Lane Dallas,
More informationPlan Number. 1624- A Cross Beam Dr. Charlotte, NC 28217 704.771.1020. www.charlottemechanical.com. Simplified Service Plan. Air Conditioning.
Plan Number 1624- A Cross Beam Dr. Charlotte, NC 28217 704.771.1020 www.charlottemechanical.com Simplified Service Plan Air Conditioning And Heating System PARTS, LABOR, & EMERGENCY REPAIR Effective Date:
More informationMaintaining the Beauty and Performance of Your Boxster
Maintaining the Beauty and Performance of Your Boxster The Porsche Multi-Point Inspection Report The Porsche Multi-Point Inspection Report is completed by our Factory-trained Porsche Technicians every
More informationHVAC Preventative Maintenance Basics. Presented by Mike Crawley
HVAC Preventative Maintenance Basics Presented by Mike Crawley Air Handlers/Package Units: Coils have to be clean! The main purpose of any coil is to absorb or reject heat If coils are dirty; air flow
More informationVolkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)
17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure
More informationRail 001 112 2 Canvas, folding top 001 101 3 Rear panel 001 102 4 Stip in window, left 001 106 dto. right 001 107
U 411 1 Rear view mirror, round, metall 13cm Ø 002 045 2 Raised airintake 002 060 3 Side panelling, front, left 002 030 Side panelling, front, right 002 031 4 Panelling left 002 051 dto. right 002 052
More informationFederal Wage System Job Grading Standard For Mobile Equipment Servicing, 5806. Table of Contents
Federal Wage System Job Grading Standard For Mobile Equipment Servicing, 5806 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 MOBILE EQUIPMENT SERVICES, GRADE-1...
More informationPalm Beach County Fleet Management Asset Maintenance History
Workorder: 34963 Meter Reading: 582 In Date: 02/18/2000 Close Date: 02/25/2000 R&R Seat Road And Bridge And Back. Charge: REPLACE SEAT 1.50 SEAT ASSY. HE1300 1.00 216.42 Charge: 67.50 Workorder: 39566
More informationMERCEDES FIRST EDITION - 2013
FIRST EDITION - 2013 CONTENTS Accessories... 1 Hydraulic Jacks Air Intake... 2 Air Filter Charger Charging System Intake Charger Hose Intake Manifold Intake Pipe Air Filter Intercooler Charger Aircondition...
More informationFuel Injection Pump, Rotary (005-014)
Fuel Injection Pump, Rotary View Related Topic Page 1 of 30 Fuel Injection Pump, Rotary (005-014) Table of Contents Summary General Information Preparatory Steps Remove Front Gear Train Rear Gear Train
More informationConvoy Application For Motor Oil Limited Warranty
Convoy Application For Motor Oil Limited Warranty PLEASE PRINT OR TYPE Vehicle owner last first middle initial Street address _ City/State/Zip Phone # ( ) Fax # ( _ ) _ Representative last first middle
More informationElectronic Diesel Control EDC 16
Service. Self-Study Programme 304 Electronic Diesel Control EDC 16 Design and Function The new EDC 16 engine management system from Bosch has its debut in the V10-TDI- and R5-TDI-engines. Increasing demands
More information2003 ACCORD - Automatic Transmission Removal
2003 ACCORD - Automatic Transmission Removal Special Tools Required Engine support hanger, A and Reds AAR-T-12566 Engine hanger balancer bar VSB02C000019 Front subframe adapter VSB02C000016 These special
More informationService Packages & Pricing
Service Packages & Pricing Silver Gold Motorcycle Service Packages Change oil & filter Change oil & filter Fuel system treatment $ 109.95 $ 129.95 Platinum Replace spark plugs Change oil & filter Fuel
More informationJUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES
JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES Main Courses Duration: 26 weeks 1. NVQ Level 2 Performing Process Operation in Replicating Environment 2. NVQ Level 2 Performing
More informationMAINTENANCE OF WHEELMOVE IRRIGATION SYSTEMS
MAINTENANCE OF WHEELMOVE IRRIGATION SYSTEMS F. Richard Beard, Agricultural Equipment, Structures and Electricity Robert W. Hill, Biological & Irrigation Engineering Boyd Kitchen, Uintah County Extension
More informationConsortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales
Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales SPECIFICATION FOR LAUNDRY EQUIPMENT MAINTENANCE Maintenance Module 32 March 2011 issue This document has been compiled by the Engineering
More informationApprenticeship Training Standard. Automotive Service Technician. Trade Code: 310S
Apprenticeship Training Standard Automotive Service Technician Trade Code: 310S Development Date: January 2003 Please Note: Apprenticeship Training and Curriculum Standards were developed by the Ministry
More informationADDENDUM NO. 1 TO THE BIDDING DOCUMENTS. HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport.
ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS DATE: May 6, 2016 HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport BIDS CLOSE: May 12, 2016, at 2:30 p.m., Local Time TO ALL BIDDERS
More informationSYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING
SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING INDEX 1. Introduction 3 2. Objectives 3 3. Employment Opportunity 4 4. Course Structure 4 5. Entry Qualification 4 6. List
More informationBackup Fuel Oil System Decommissioning & Restoration Plan
Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:
More informationWynn s Extended Care
Wynn s Extended Care Every car deserves to receive the very best care... especially yours. How Do You Keep Your Reliable Transportation Reliable? Count on Wynn s Because Wynn s has been caring for cars
More informationCONTRACT DATA SHEET DRAIN CLEANING SERVICE CONTRACT #: 0510-08 (4700006459) CONTRACT DATES: 06/18/08 06/30/12
CONTRACT DATA SHEET Monroe County Division of Purchasing 200 County Office Building, Rochester NY 14614 TITLE: DRAIN CLEANING SERVICE CONTRACT #: 0510-08 (4700006459) CONTRACT DATES: 06/18/08 06/30/12
More information912. The engine for construction equipment.
912. The engine for construction equipment....... 24-82 kw at 1500-2500 min -1 These are the characteristics of the 912: Air-cooled 3-, 4-, 5-, 6-cylinder naturally aspirated in-line-engines. Direct injection.
More informationRequest for Qualifications. For Heating, Ventilating and Air Conditioning Contractor Services
Request for Qualifications Request for Qualifications For Heating, Ventilating and Air Conditioning Contractor Services The Midcoast Regional Redevelopment Authority (MRRA) is a governmental agency created
More informationVehicle Maintenance Policies and Procedures
Vehicle Maintenance Policies and Procedures Adopted: 09/20/2011 1 Table of Contents Introduction:... 4 Goals and objectives:... 5 Goals:... 5 Objectives:... 5 Preventative Maintenance:... 6 Daily... 6
More informationIMPORTANT SAFETY NOTICE
IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will minimize your risk of injury. ITT Goulds
More informationAt Bently Nevada Corporation (BNC) we know one. Establishing a Lubricant Analysis Program. Joshua Hutton. John Kitchens.
Establishing a Lubricant Analysis Program Authored by: Rett Jesse Manager, North American Services Bently Nevada Corporation e-mail: rett.jesse@bently.com Joshua Hutton Summer Intern, BNC Student at Cal
More informationSection 7 Adjustment, Repair and Replacement
Section 7 Adjustment, Repair, and Replacement Page 7-1 Section 7 Adjustment, Repair and Replacement Section Contents Page Overview...7-5 Belts Belt Guard Removal/Installation...7-7 Belt Removal/Installation...7-11
More informationExtended Protection Plans for New and Pre-Owned Vehicles
Extended Protection Plans for New and Pre-Owned Vehicles Extended Protection you can count on from Old Republic Insured Automotive Services, Inc. (ORIAS) Your vehicle is a major investment. Next to your
More information