Building Electrical Infrastructure

Size: px
Start display at page:

Download "Building Electrical Infrastructure"

Transcription

1 Building Electrical Infrastructure Industrial & Commercial Connections, Industrial / Urban Residential Development, Asset Relocation, Street Lighting

2

3 Our Company Our vision is to combine electrical engineering and civil Infrastructure expertise to provide Electricity Network Connections which benefit our clients. In 1998, Peter Hocking set up as a sole trader building telecommunications network infrastructure before establishing Systems Construction Pty Ltd in In 2008, the company began trading as Syscon and started building electrical infrastructure for Accredited Service Providers (ASP s) with a small yet capable team. In 2010 the company became accredited by Trade and Investment as a Level 1 ASP and formed a team of professional people to undertake projects as the Principle Contractor. Based at Wyong on the Central Coast, we have over 200m2 of office space and 700m2 warehousing to accommodate all of our equipment and bulk storage of materials. Our team of construction, project management and electrical professionals has seen Syscon emerge as an industry specialist. We have an Integrated Business Management System (IBMS) for our Quality, Workplace Health and Safety and Environmental Management Systems. We have engaged SAI Global to Audit our management of these systems and will soon be Accredited to AS 4801, ISO 9001 & ISO Syscon has made a serious commitment to compliance through our quarterly Safety days and monthly Toolbox talks which communicate and action continuous improvement and this transmits into results for our clients, the community and Syscon. Syscon delivers results not excuses.

4

5 Capability Syscon offers total construction services, from managing the design information package, engaging a level 3 designer & gaining certification to construction and commissioning. We are accredited for the construction of overhead and underground power lines up to 33kV. Syscon owns and fastidiously maintains its own fleet of plant and equipment to enable these works. We have a good rapport with Ausgrid as we understand what they require from us and we are fully compliant with their procedures and network. With all projects, our aim is to complete network connections in a safe, timely, cost effective and accurate manner ensuring the integrity of existing network assets and the environment. Syscon has achieved a near perfect mark on all our project assessments received from Ausgrid. This achievement is a reflection of our quality workmanship and attention to detail. Construction Services: Construction planning, milestone and programming Detailed contract documentation Experienced site-specific management and supervision Contract administration and financial control Subcontractor selection and management Management of regulatory applications and approvals

6

7 Construction Syscon has a reputation for delivering results on complex and technically challenging projects. We provide our clients a project planning timeline of milestones that are required for the project, and we actively communicate project status on a regular basis. Our success with constructing electrical infrastructure stems from our experience and understanding of network infrastructure assets and services. Over the past 12 months, we have had no safety breaches or non-conformances or lost time injuries. Project Management: Our construction team is led by Senior Project Manager, Adrian Washington, who started his career with Integral Energy as an Electrical Fitter Mechanic, Linesman and Cable Jointer. Over the past 17 years working on Electrical Infrastructure, Adrian has gained extensive knowledge of the industry. Adrian has also completed a Diploma in Management which has proved beneficial to our project management. Adrian maintains open communication and consultation with our clients. Underground Construction: Excavation and pole boring Duct Installation Directional drilling Cable installation HV/LV Cable jointing including Paper Lead up to 66kV UGOH construction and termination Pad-mount substation / kiosk construction and commission LV Pillar Installation Earthing Street lighting Overhead Construction: Concrete and timber pole installation Construction of overhead lines up to 33kv Conductor stringing & augmentation Earthing Street lighting

8

9 Our projects Industrial & Commercial Connections Drummoyne commercial development; Chamber substation High Voltage connection Kincumber 7eleven; LV feeder for commercial development North Lakes Public School San Remo; Kiosk Substation including 2 High voltage Pole replacements Rutherford High School; Kiosk Substation Somersby Industrial connection Kiosk Substation replacement Newcastle City Council, Sportsground #2; Kiosk installation and Streetlight upgrade Kulnura Hanson Quarry; 750m of overhead /underground HV upgrade and 2 x Kiosk Substations Industrial / Urban Residential Developments (URD s) Toronto Industrial URD; Subdivision & Kiosk Substation Wadalba Settlement Drive Stage 10 AV Jennings; URD Subdivision & Kiosk Substation Wadalba Stage 14d URD; Subdivision & Kiosk Substation Asset Relocations Mosman; low voltage aerial mains installed underground Somersby; pole replacement and low voltage extension Street Lighting Network maintenance contract for Newcastle & Sydney Regions: - This contract includes service locations and site assessment for proposed location, direct buried and ragbolt footing (at times in solid rock), wiring lantern and standing new steel pole, electrically isolating the network for removal of existing and connecting of new light pole - This contract includes management of ROL s, DYBDs, Pedestrian & Traffic Control, Night Works, Live Works, Data Capture, As Built Diagrams and management of other utilities.

10

11 Our Clients

12 PO Box 66, Wyong NSW 2259 P F E info@syscon.net.au

ACCREDITATION OF PROVIDERS LEVEL 1 CLASS: OF CONTESTABLE SERVICES. Clause 26 Electricity Supply (Safety and Network Management) Regulation 2014

ACCREDITATION OF PROVIDERS LEVEL 1 CLASS: OF CONTESTABLE SERVICES. Clause 26 Electricity Supply (Safety and Network Management) Regulation 2014 ACCREDITATION OF PROVIDERS OF CONTESTABLE SERVICES CLASS: LEVEL 1 Clause 26 Electricity Supply (Safety and Network Management) Regulation 2014 March 2015 CONTENTS PART 1 1 Introduction 3 2 General Information

More information

ASSET SERVICES Your facility. Our responsibility.

ASSET SERVICES Your facility. Our responsibility. Asset Owner Engages CV Services directly to deliver either an outsourced facilities management service or specific technical services. Getting the best out of your facilities Third Party Facilities Manager

More information

Customer Installation Safety Plan. March 2015

Customer Installation Safety Plan. March 2015 Customer Installation Safety Plan March 2015 Document History Issue No. Date Approved By Summary of Changes 1 June 2014 Chief Engineer Updated and revised in line with requirement for biennial review under

More information

ES 4 Service Provider Authorisation

ES 4 Service Provider Authorisation ES 4 Service Provider Authorisation June 2015 WARNING It is the responsibility of the user of this document to ensure that only the current version is being used. Ausgrid may amend this document at any

More information

Document No Amendment No Approved By Approval Date Review Date NS112 DESIGN STANDARDS FOR INDUSTRIAL AND COMMERCIAL DEVELOPMENTS

Document No Amendment No Approved By Approval Date Review Date NS112 DESIGN STANDARDS FOR INDUSTRIAL AND COMMERCIAL DEVELOPMENTS Network Standard NETWORK Document No Amendment No Approved By Approval Date Review Date : : : : : NW000-S0041 1 Chief Engineer 26/10/2015 13/04/2018 NW000-S0041 NS112 DESIGN STANDARDS FOR INDUSTRIAL AND

More information

Ausgrid s Policy on Public Lighting - Contestable Projects. AUSPL CONPOL01 September 2012

Ausgrid s Policy on Public Lighting - Contestable Projects. AUSPL CONPOL01 September 2012 Ausgrid s Policy on Public Lighting - Contestable Projects AUSPL CONPOL01 September 2012 Ausgrid s Policy on Public Lighting - Contestable Projects September 2012 Contents 1 OBJECTIVE... 3 2 SCOPE AND

More information

SYDNEY S NORTH SHORE EXTENSION AND RENOVATIONS SPECIALIST

SYDNEY S NORTH SHORE EXTENSION AND RENOVATIONS SPECIALIST SYDNEY S NORTH SHORE EXTENSION AND RENOVATIONS SPECIALIST What We Do Barnett Building is Sydney s North Shore extension and renovations specialists. We are second generation builders, having grown up in

More information

ES 1 Premises Connection Requirements

ES 1 Premises Connection Requirements ES 1 Premises Connection Requirements July 2013 SCOPE This publication provides general information to assist with connection to Ausgrid s network. WARNING It is the responsibility of the user of this

More information

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services SpecialistS IN ELECTRICAL SUPPORT SERVICES TO MINING, UTILITIES & industry Ampcontrol is committed to supporting our customers to maintain efficient

More information

National Graduate Diploma in Electricity Supply (High Voltage Line Construction and Maintenance) (Level 7)

National Graduate Diploma in Electricity Supply (High Voltage Line Construction and Maintenance) (Level 7) 1618 Version 1 Page 1 of 6 National Graduate Diploma in Electricity Supply (High Voltage Line Construction and Maintenance) (Level 7) Level 7 Credits 210 Purpose This graduate diploma is for engineering

More information

Report on Orange and Rockland Utilities, Inc. s Implementation of the Electric Safety Standards For the 12-Month Period Ending on November 30, 2005

Report on Orange and Rockland Utilities, Inc. s Implementation of the Electric Safety Standards For the 12-Month Period Ending on November 30, 2005 Report on Orange and Rockland Utilities, Inc. s Implementation of the Electric Safety Standards For the 12-Month Period Ending on November 30, 2005 Case 04-M-0159 Pearl River, NY January 15, 2006 Table

More information

4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information

4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information 4. REQUEST FOR ELECTRIC SERVICE To establish an electric service, temporary or permanent, contact UI s Customer Care Center by calling: 1-800-722-5584 (7:00 a.m. 7:00 p.m., Monday Friday and 7:00 AM to

More information

V1.8 0 - N ovember 2015. Distribution Network Asset Data Available To Third Parties

V1.8 0 - N ovember 2015. Distribution Network Asset Data Available To Third Parties V1.8 0 - N ovember 2015 Distribution Network Asset Data Available To Third Parties How To Request Data LinesearchBeforeUDig (http://www.linesearchbeforeudig.co.uk) This service is available 24/7 365 days

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

CUSTOMER CONNECTION GUIDE

CUSTOMER CONNECTION GUIDE CUSTOMER CONNECTION GUIDE A GUIDE TO CONNECTING ELECTRICITY SUPPLY TO YOUR PROPERTY IN UNITED ENERGY S AREA Document No: UE4309 Issue: 4 Issue Date: 1 April, 2014 1 CUSTOMER CONNECTION GUIDE A GUIDE TO

More information

Connecting to the network information pack Version 2

Connecting to the network information pack Version 2 Connecting to the network information pack Version 2 Updated: Contents 1.0 What is a new connection or connection alteration?... 3 2.0 Connection enquiry... 3 3.0 Connection application... 3 3.1 Processing

More information

Attachment 20.27 SA Power Networks: Network Program Deliverability Strategy

Attachment 20.27 SA Power Networks: Network Program Deliverability Strategy Attachment 20.27 SA Power Networks: Network Program Deliverability Strategy Network Program Deliverability Strategy 2015-20 Regulatory Control Period SA Power Networks www.sapowernetworks.com.au Internal

More information

Considering UNDERGROUND. tampaelectric.com

Considering UNDERGROUND. tampaelectric.com Considering UNDERGROUND Electric Service? tampaelectric.com INTRODUCTION The majority of Tampa Electric s customers receive their electric service through overhead construction, which is the standard type

More information

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES overhead 23/11/04 2:28 PM Page 1 AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES ESB Code 9803203 overhead 23/11/04 2:28 PM Page 2 overhead 23/11/04 2:28 PM Page 3 Page 1 of 20

More information

Distribution Business Electrical Safety Performance Reporting Guidelines

Distribution Business Electrical Safety Performance Reporting Guidelines Distribution Business Electrical Safety Performance Reporting Guidelines 1. General The Electricity Safety Act 1998 (the Act) specifies that Energy Safe Victoria (ESV) has eleven functions. Two of the

More information

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6 Related To FEWA Electricity Network (Transmission & Distribution) Version 1.0 December 2014 TABLE OF CONTENTS Page I. Introduction 3 II. Contractor Pre-Qualification Criteria 4 III. Procedure for Application

More information

Hitech Electrical Automation Pty Ltd. Company Profile & Capability Statement

Hitech Electrical Automation Pty Ltd. Company Profile & Capability Statement ABN 51 095 559 836 5 Railway Court Glanmire Q 4570 Ph: 07 5481 1086 Fax: 07 5481 1067 www.hitechelec.com.au emailus@hitechelec.com.au Hitech Electrical Automation Pty Ltd Company Profile & Capability Statement

More information

The Electrical Safety Regulation (pre and post 1 January 2014)

The Electrical Safety Regulation (pre and post 1 January 2014) The Electrical Safety Regulation (pre and post 1 January 2014) The following table provides an overview comparison between the Electrical Safety Regulation 2002 (the ESR 2002) current as at 1 July 2013

More information

Appendix G West Australia

Appendix G West Australia Appendix G West Australia 1 Classifications and Wages Rates (FURTHER DISCUSSION AND AMENDMENT REQUIRED) 1.1 Classifications 1.1.1 The following classifications in this Part shall apply to Employees engaged

More information

Code of Practice Electricity transmission and distribution asset management. February 2009

Code of Practice Electricity transmission and distribution asset management. February 2009 Code of Practice Electricity transmission and distribution asset management February 2009 CONTENTS 1 PREFACE...4 2 APPLICATION AND OBJECTIVES...5 3 SCOPE...6 4 DEFINITIONS...7 5 DESIGN AND CONSTRUCTION...11

More information

Detection of Contact Voltage in Electric Distribution Systems

Detection of Contact Voltage in Electric Distribution Systems Detection of Contact Voltage in Electric Distribution Systems David Kalokitis CTO dkalokitis@powersurveyco.com Power Survey Company www.powersurveyco.com (888) PSC-2008 Who is Power Survey Company? Core

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

Standard: Distribution Design Manual Vol 4 Underground Cable Distribution

Standard: Distribution Design Manual Vol 4 Underground Cable Distribution Standard: Distribution Design Manual Vol 4 Underground Cable Distribution Standard Number: HPC-5DC-07-0004-2014 Document Control Author Name: Anthony Seneviratne Position: Standards Engineer Document Owner

More information

Document No Amendment No Approved By Approval Date Review Date NS130 SPECIFICATION FOR LAYING UNDERGROUND CABLES UP TO AND INCLUDING 11KV

Document No Amendment No Approved By Approval Date Review Date NS130 SPECIFICATION FOR LAYING UNDERGROUND CABLES UP TO AND INCLUDING 11KV Network Standard NETWORK Document No Amendment No Approved By Approval Date Review Date : : : : : NW000-S0088 1 Chief Engineer 02/07/2015 01/10/2016 NW000-S0088 NS130 SPECIFICATION FOR LAYING UNDERGROUND

More information

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877

More information

[ Fiber Optics ] [ Voice & Data Networks ] [ Underground Construction ] [ Engineering ] [ Emergency Fiber Optic Restoration ]

[ Fiber Optics ] [ Voice & Data Networks ] [ Underground Construction ] [ Engineering ] [ Emergency Fiber Optic Restoration ] [ Fiber Optics ] [ Voice & Data Networks ] [ Underground Construction ] [ Engineering ] [ Emergency Fiber Optic Restoration ] 224 N. 27th Street, Unit B, San Jose, CA 95116 tel: (408) 946-9011 fax: (408)

More information

DEVELOPERS HANDBOOK. Develop, Design and Construct Work

DEVELOPERS HANDBOOK. Develop, Design and Construct Work DEVELOPERS HANDBOOK Develop, Design and Construct Work Table of Contents 1. Purpose... 1 2. Definitions, Abbreviations and Acronyms... 1 3. References... 1 4. Scope... 1 5. Description of Eligible DD&C

More information

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Submarine Power Cables State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Reliable submarine power cables ABB is one of the world s most

More information

Phase Attribute Identification using GPS Technology

Phase Attribute Identification using GPS Technology Phase Attribute Identification using GPS Technology Date 11 June 2009 John Sinclair Power Quality Manager Slide 1 Topics of Discussion Remote Phase Identification How it works Principals of operation Benefits

More information

National Science Foundation Funds Request

National Science Foundation Funds Request University Corporation for Atmospheric Research National Science Foundation Funds Request 1. (NSF USE ONLY) 2. FACILITY NAME & LOCATION 3. PROJECT NAME 4. UCAR TRACKING NUM. NCAR Mesa Lab 15KV FEEDER REPLACEMENT

More information

RCP2 Portfolio Overview Document

RCP2 Portfolio Overview Document RCP2 Portfolio Overview Document Portfolio: Expenditure Class: Base Capex Expenditure Category: Grid Replacement & Refurbishment As at date: 15 November 2013 Expenditure Forecast Real 2012/13 NZ$ (m) 2015-2016

More information

Corporate Standard. Contractor Management

Corporate Standard. Contractor Management Corporate Standard Contents Purpose... 2 Scope... 2 Definitions... 2 Background... 3 Specific Requirements... 4 Responsibilities... 11 Review Date... 11 References... 11 Date Issued July 2010 Management

More information

POWER CORPORATION Requirements for Distribution Wires Access

POWER CORPORATION Requirements for Distribution Wires Access POWER CORPORATION Requirements for Distribution Wires Access Contact Information: ENMAX Power Corporation 8820 52 St SE Phone: 514-3700 Calgary, Alberta Fax: 514-3719 T2C 4E7 Version 3.0 January 2005 i

More information

ICM Project Underground Infrastructure and Cable

ICM Project Underground Infrastructure and Cable EB 0 00 Tab Schedule B ( pages) ICM Project Underground Infrastructure and Cable Handwell Replacement Segment (THESL) EB 0 00 Tab Schedule B I EXECUTIVE SUMMARY. Project Description 0 The handwell replacement

More information

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI 1 Vision 2050 An Asset Management Strategy Jaclyn Cantler Manager, Transmission Planning, PHI 2 Agenda Case for Change About Vision 2050 Status Closing System Design Cybersecurity Interface with distributed/dispersed

More information

Merrimac Municipal Light Department. Residential Developments Policy

Merrimac Municipal Light Department. Residential Developments Policy Merrimac Municipal Light Department Residential Developments Policy General: This document provides specific instructions for the provision of underground electrical facilities associated with the construction

More information

What is Ticket Management?

What is Ticket Management? What is Ticket Management? Ticket management is the process of managing incoming locate requests (tickets) from a One Call Center. Facility operators receive tickets from a One Call Center when excavation

More information

Tasmanian Transmission Revenue Proposal

Tasmanian Transmission Revenue Proposal Tasmanian Transmission Revenue Proposal An overview for Tasmanian electricity consumers Regulatory control period 1 July 2014 30 June 2019 Tasmanian Networks Pty Ltd About TasNetworks We are Tasmania s

More information

SERVICES 2015 ISO 18001

SERVICES 2015 ISO 18001 SERVICES 2015 A family business with a solid foundation of experience, we handle all aspects of site investigation.... Phase 1 Environmental Studies Phase 2 Intrusive Investigations Phase 3 Remediation

More information

SMSF gearing package. multiport.com.au. Issued 7 July 2014 Multiport Pty Ltd ABN 76 097 695 988 AFS Licence No. 291195

SMSF gearing package. multiport.com.au. Issued 7 July 2014 Multiport Pty Ltd ABN 76 097 695 988 AFS Licence No. 291195 SMSF gearing package multiport.com.au Issued 7 July 2014 Multiport Pty Ltd ABN 76 097 695 988 AFS Licence No. 291195 Contents Multiport s SMSF gearing package 1 An exciting new opportunity 2 How does it

More information

Customer connection enquiry form (For the connection of loads and generators)

Customer connection enquiry form (For the connection of loads and generators) Customer connection enquiry form (For the connection of loads and generators) Please provide as much detail as possible to ensure TasNetworks can meet your requirements. When completed please attach and

More information

Cockburn Electrical Company Western Australia

Cockburn Electrical Company Western Australia Company Profile Overview Cockburn Electrical Company (CEC) is a medium sized electrical contractor, which has been operating since 1976. Over those 40 years, the company has accumulated an extensive and

More information

Granger Bay Boulevard and Green Point Roundabout

Granger Bay Boulevard and Green Point Roundabout Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access

More information

COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS

COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS National Broadband Network - Fibre Ready Distribution Networks Industry Guideline Communications Alliance Ltd (formerly

More information

ScottishPower Distribution Cables & Equipment. Metal Theft

ScottishPower Distribution Cables & Equipment. Metal Theft ScottishPower Distribution Cables & Equipment Metal Theft April 2012 As an aid to deterring to metal theft this booklet has been put together to help identify the types of utility power cables and associated

More information

Transmission Foundations Case History : Helical piles Hydro One Networks Inc.

Transmission Foundations Case History : Helical piles Hydro One Networks Inc. Transmission Foundations Case History : Helical piles Hydro One Networks Inc. www.hubbellpowersystems.com Late in 2008, an aerial patrol discovered three 500kV towers with partially-collapsed foundations

More information

Networks. Code of Practice for Avoiding Danger from Overhead Electricity Lines

Networks. Code of Practice for Avoiding Danger from Overhead Electricity Lines Networks Code of Practice for Avoiding Danger from Overhead Electricity Lines CODE OF PRACTICE FOR AVOIDING DANGER FROM OVERHEAD ELECTRICITY LINES (FIRST EDITION SEPTEMBER 2008) Approved by the Health

More information

Networks. ESB Networks Ltd Basis of Charges for Connection to the Distribution System. Commercial and Customer Asset Management ESB Networks Ltd.

Networks. ESB Networks Ltd Basis of Charges for Connection to the Distribution System. Commercial and Customer Asset Management ESB Networks Ltd. Networks ESB Networks Ltd Basis of Charges for Connection to the Distribution System Revision Date: 14/01/20010 Revision No.: 1 Document No: DOC-10129-AXQ Issued by: ESB Networks Ltd Approved by : CER

More information

Tunnelling & Underground. Specialists

Tunnelling & Underground. Specialists Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering

More information

ESB Networks Ltd Statement of Charges

ESB Networks Ltd Statement of Charges ESB Networks Ltd Statement of Charges Revision Date: 9/2014 Revision No.: 11 Document No: DOC-101209-AXR Issued by: ESB NETWORKS LTD Approved by : CER Effective Date: 01/10/2014 Commercial and Renewable

More information

CUS TOMER INITIATED CAPITAL WORKS (CICW) MANAGEMENT PLAN

CUS TOMER INITIATED CAPITAL WORKS (CICW) MANAGEMENT PLAN ABN 85 082 464 622 CUS TOMER INITIATED CAPITAL WORKS (CICW) MANAGEMENT PLAN DOCUMENT NUMBER: NW-#30171121 DATE: MARCH 2011 This page should either be left blank or used for any disclaimers. Page 2 of 19

More information

Service and Installation Rules of New South Wales

Service and Installation Rules of New South Wales Service and Installation Rules of New South Wales The electricity industry standard of best practice for customer connection services and installations August 2012 Foreword This is the August 2012 edition

More information

Case Study: HV Cable Strike With Steel Pin Whilst Erecting A Marquee:

Case Study: HV Cable Strike With Steel Pin Whilst Erecting A Marquee: Case Study: HV Cable Strike With Steel Pin Whilst Erecting A Marquee: The above Image demonstrates the impact on an HV cable when a 910mm long steel pin was driven into the ground. The task was to erect

More information

Australia s regulator for broadcasting, the internet, radiocommunications and telecommunications. So you want to be a registered cabler?

Australia s regulator for broadcasting, the internet, radiocommunications and telecommunications. So you want to be a registered cabler? Australia s regulator for broadcasting, the internet, radiocommunications and telecommunications www.acma.gov.au So you want to be a registered cabler? A guide for prospective telecommunications cablers

More information

Distribution businesses performance against customer service indicators

Distribution businesses performance against customer service indicators Independent Pricing and Regulatory Tribunal Distribution businesses performance against customer service indicators For the period 1 July 2006 to 30 June 2011 Electricity Information Paper March 2012 Distribution

More information

High Voltage. Hazards

High Voltage. Hazards High Voltage Hazards HV Hazards Substations, Overhead Lines, Cables Safety Incidents Requirements for Designers, Constructors Construction Regs 2013 and other Legislation Codes of Practice Other Guidance

More information

Professional Resumé of Geoffrey Hokin

Professional Resumé of Geoffrey Hokin Professional Resumé of Geoffrey Hokin Personal Details Name: Location: Occupation: Geoffrey Hokin MSc (Hons.) Geology Toowoomba, QLD Geologist, Exploration Manager Career Summary In my Geology career I

More information

For business. Wiring your business for broadband. What happens when copper is required?

For business. Wiring your business for broadband. What happens when copper is required? For business Wiring your business for broadband Your cabling requirements are dependent on the size and complexity of your business. Smaller businesses should follow the wiring recommendations for residential

More information

Does your new building

Does your new building Does your new building need electricity? To save you time and money, talk to us early about your power supply. Our equipment will occupy ground space on your property. You need to consider the size and

More information

company profile SOUTH AFRICAN PRIDE. SWISS INGENUITY.

company profile SOUTH AFRICAN PRIDE. SWISS INGENUITY. company profile SWISS INGENUITY. SOUTH AFRICAN PRIDE. JHB : 086 154 2548 CPT : 021 424 4588 DBN : 031 705 1191 email: info@schmidhauser.co.za website: www.schmidhauser.co.za what being means to us Three

More information

Power products and systems. Intelligent solutions for power distribution Zone concept

Power products and systems. Intelligent solutions for power distribution Zone concept Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,

More information

Major Communications Projects

Major Communications Projects Major Communications Projects Project Name: Completion Date: SawNet SW Washington OSP Route SC2 Skamania County, WA Ongoing Construction of a fiber optic line that connects North Bonneville and Carson,

More information

businesses performance against customer service indicators in NSW

businesses performance against customer service indicators in NSW Independent Pricing and Regulatory Tribunal businesses performance against customer service indicators in NSW For the period 1 July 200 to 30 June 2010 Electricity Information Paper 2011 Distribution

More information

SEBENICO ATSI COMPANY OVERVIEW

SEBENICO ATSI COMPANY OVERVIEW Capability Statement SEBENICO ATSI Sebenico ATSI in line with our Aboriginal principles will implement solid processes and good governance to bring together Indigenous and Non indigenous people to work

More information

Working together. to prevent cable damage. a partnership for reliable and quality power

Working together. to prevent cable damage. a partnership for reliable and quality power Working together to prevent cable damage a partnership for reliable and quality power contents introduction...1 cable damage can be prevented...2 3 how you can help...4 7 good practices to do it right...8

More information

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

Electricity Network Performance Report 2012/13

Electricity Network Performance Report 2012/13 Electricity Network Performance Report 2012/13 Electricity Network Performance Report Contents INTRODUCTION... 1 1 PROFILE... 2 1.1 Overview... 2 1.2 Capital works program... 4 2 NETWORK MANAGEMENT...

More information

AMSC s Superconductor Cable Technologies for Electric Utilities

AMSC s Superconductor Cable Technologies for Electric Utilities International Workshop 2014 AMSC s Superconductor Cable Technologies for Electric Utilities Michael Ross, P.E. Managing Director of Superconductor Power Systems AMSC Corporate Facts Headquartered in MA,

More information

Distribution Substation Manual (DSM) Section I - Introduction

Distribution Substation Manual (DSM) Section I - Introduction (DSM) Section I - Introduction March 2007 Document release information Client Project name Western Power Distribution Substation Manual Document number 3463019 Document title Revision status Introduction

More information

Q: PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. A: Gerry Sheerin. Sheerin Technical, 25 Eastville Avenue, Toronto, Ontario Canada

Q: PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. A: Gerry Sheerin. Sheerin Technical, 25 Eastville Avenue, Toronto, Ontario Canada DIRECT TESTIMONY OF GERRY SHEERIN, P. ENG ON BEHALF OF PIEDMONT ENVIRONMENTAL COUNCIL BEFORE THE STATE CORPORATION COMMISSION OF VIRGINIA CASE NOS. PUE-00-0001 AND PUE-00-000 1 1 1 1 1 1 1 1 1 Q: PLEASE

More information

Australian Industry Participation (AIP) Plan for Midal Cables Aluminium Rod and Conductor Facility Tomago NSW

Australian Industry Participation (AIP) Plan for Midal Cables Aluminium Rod and Conductor Facility Tomago NSW Midal Cables International Pty Ltd Australian Industry Participation (AIP) Plan for Midal Cables Aluminium Rod and Conductor Facility Tomago NSW This Document Mailed From, VICTORIA COBURN Associate Director

More information

Document No Amendment No Approved By Approval Date Review Date NS143 EASEMENTS, LEASES AND RIGHTS OF WAY

Document No Amendment No Approved By Approval Date Review Date NS143 EASEMENTS, LEASES AND RIGHTS OF WAY Network Standard NETWORK Document No Amendment No Approved By Approval Date Review Date : : : : : NW000-S0084 0 Chief Engineer 26/06/2015 01/07/2018 NW000-S0084 NS143 EASEMENTS, LEASES AND RIGHTS OF WAY

More information

Aurora Energy Asset Management Plan 2011

Aurora Energy Asset Management Plan 2011 Aurora Energy Asset Management Plan 11 Prepared by Aurora Energy Ltd www.auroraenergy.com.au 1 Contents 1 Contents... 1 1. Introduction... Asset description... 18 3 Service levels... 4 4 Future demand...

More information

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions

More information

Bruce Gerald Flint. Liability limited by a Scheme approved under Professional Standards Legislation

Bruce Gerald Flint. Liability limited by a Scheme approved under Professional Standards Legislation ABN 65 103 438 277 It s all about money. PO BOX 249 South Hurstville NSW 2221 DX 11319 Hurstville Tel: 02 9584 1474 Fax: 02 9584 1475 E-mail: action@flintforensics.com.au Website: www.flintforensics.com.au

More information

ESBI Company Profile. ESB International. Bringing Energy Innovation to the World...

ESBI Company Profile. ESB International. Bringing Energy Innovation to the World... ESBI Company Profile ESB International Bringing Energy Innovation to the World... ESB International ESBI is one of Europe s most progressive and commercially focused electricity consultancy firms with

More information

GEOGRAPHIC INFORMATION SYSTEM ECG S EXPERIENCE

GEOGRAPHIC INFORMATION SYSTEM ECG S EXPERIENCE UPDEA 15 TH CONGRESS, JUNE 2005, ACCRA-GHANA GEOGRAPHIC INFORMATION SYSTEM ECG S EXPERIENCE Presented By: Ing Patrice Afenyo In This Presentation.. ECG Brief Components of a GIS Why ECG Needs GIS Our Approach

More information

The electrical energy produced at the gen

The electrical energy produced at the gen 300 300 Principles of Power System CHAPTER CHAPTER 12 Distribution Systems General 12.1 Distribution System 12.2 Classification of Distribution Systems 12.3 A.C. Distribution 12.4 D.C. Distribution 12.5

More information

Electrical Safety Products

Electrical Safety Products Electrical Safety Products Trelleborg Electrical Safety Products A safe working environment is important in all industries, but in the electrical generation and supply industry, it is paramount. Trelleborg

More information

Electricity supply to rural areas

Electricity supply to rural areas This document has been developed to inform people wishing to purchase rural properties or those people who currently own a rural property about the issues that need to be considered in connecting the property

More information

Wellesley Municipal Light Plant. Standard Requirements for Electric Service

Wellesley Municipal Light Plant. Standard Requirements for Electric Service Wellesley Municipal Light Plant Standard Requirements for Electric Service Index Section 1... General Information Section 2..General Requirements for Service Section 3. Types of Available Service Section

More information

15 th UPDEA CONGRESS THEME: GEOGRAPHIC INFORMATION SYSTEM: ECG S EXPERIENCE ABSTRACT. PATRICE AFENYO, Electricity Company of Ghana

15 th UPDEA CONGRESS THEME: GEOGRAPHIC INFORMATION SYSTEM: ECG S EXPERIENCE ABSTRACT. PATRICE AFENYO, Electricity Company of Ghana 15 th UPDEA CONGRESS THEME: GEOGRAPHIC INFORMATION SYSTEM: ECG S EXPERIENCE Author: PATRICE AFENYO, Electricity Company of Ghana ABSTRACT GIS (Geographic Information System) is an integrated system of

More information

Guide Document for Development of WHS Management Plans

Guide Document for Development of WHS Management Plans DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS

More information

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3

More information

Approved Meter Sockets and Cabinets

Approved Meter Sockets and Cabinets Single Unit Residential Guide 1 PHASE, 120/240 VOLT S METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to center of meter ± 100 mm ( 4

More information

Indianapolis Power & Light Company

Indianapolis Power & Light Company Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis

More information

Attachment 2.06. AER 2014-19 Technology Capital Expenditure Plan Overview. Ausgrid online media monitoring report

Attachment 2.06. AER 2014-19 Technology Capital Expenditure Plan Overview. Ausgrid online media monitoring report Attachment 2.06 Ausgrid online media monitoring report January 2015 AER 2014-19 Technology Capital Expenditure Plan Overview Ausgrid revised regulatory proposal attachment Ausgrid online monitoring report

More information

Lightning Protection & Earthing Engineers

Lightning Protection & Earthing Engineers Lightning Protection & Earthing Engineers Lightning Protection & Earthing Engineers 2 020 8371 0001 I www.cuttings.london Contents 1. Welcome 2. About Cuttings 3. Service Offering 4. Lightning Protection

More information

MasTec Government Solutions

MasTec Government Solutions MasTec Government Solutions The Nexus of Private Industry and Public Sector Infrastructure Projects. With 80 years of commercial expertise deployed for Government Solutions, MasTec markets its comprehensive

More information

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET

More information

Electric Service Guide. Residential Subdivision

Electric Service Guide. Residential Subdivision January 1, 2016 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website (www.mid.org) Electric Service Guide for the

More information

Arranging an Electricity Supply to your Business

Arranging an Electricity Supply to your Business Commercial Properties Arranging an Electricity Supply to your Business A guide for developers, commercial and industrial customers CitiPower and Powercor are electricity distributors. Our core business

More information

POWER NETWORKS. 2014-15 Electricity Network Tariffs and Charges and Future Price Trends

POWER NETWORKS. 2014-15 Electricity Network Tariffs and Charges and Future Price Trends POWER NETWORKS 2014-15 Electricity Network Tariffs and Charges and Future Price Trends August 2014 Power and Water Corporation Table of Contents 1 Business Characteristics... 3 2 2014 Network Price Determination...

More information

COMPANY PROFILE. The main markets serviced by Bahra Cables Company are Saudi Arabia and the countries belonging to the Gulf Cooperating Council (GCC).

COMPANY PROFILE. The main markets serviced by Bahra Cables Company are Saudi Arabia and the countries belonging to the Gulf Cooperating Council (GCC). Bahra Cables Company, with headquarters located in the industrial city of Bahra, is fast becoming one of the leading companies operating in the Kingdom of Saudi Arabia rapidly building a fine reputation

More information

POWER NETWORKS. 2015-16 Electricity Network Tariffs and Charges and Future Price Trends

POWER NETWORKS. 2015-16 Electricity Network Tariffs and Charges and Future Price Trends POWER NETWORKS 2015-16 Electricity Network Tariffs and Charges and Future Price Trends July 2015 Power and Water Corporation 1 Table of Contents 1 Business Characteristics 3 2 2014 Network Price Determination

More information