1 Applications The NLAB panel provides protection for lightning and appliance circuits in commercial and industrial establishments. Services: AC Systems volt maximum 3 Phase 4 Wire with Neutral 1 Phase 3 Wire with Neutral 1 Phase 2 Wire with Neutral 3 Phase 3 Wire Interior: Branch circuit breakers to be bolted to bus All bus bar to be copper rated 1000 ampere per square inch Standard short circuit bracing for 10,000 AIC Underwriters Laboratories Inc. listed Fronts: Door and trim are flat gauge steel per code Flush catch and lock Continuous piano hinge Fronts bolted to box Standard painted finish ANSI 61 gray Directory card with plastic cover on back of door Boxes: Galvanized sheet steel per code gauge 3/4 inch flange for rigidity and fastening trim Blank ends Wire gutters meet or exceed UL/NEC requirements Applications: Filnor, Inc. is a leader in custom and commercial lightning and distribution panels for: Aerospace Banking Communications Data Processing Electronics Government Medical Military Petrochemical UPS Power/Distribution Utilities Waste Water/Sanitation Page 1 of 5
2 Specifications Furnish factory assembled NLAB panelboards complete with enclo sing cabinets as manufactured by F ilnor, Inc. where indicated on the drawings. Prov ide panelboards of dead front, circuit breaker type, 120/ 240 volt 1 phase 3 wire, 208Y/120 volt 3 phase 4 wire solid neutral, with main lugs or main switch/breaker as i n d i c a t e d. Circu it breakers shall be bolton-type, quick-make quickbreak, trip- free, thermal magnetic with a minimum interrupting capacity of 10, 000 amperes symmetrical at rated voltage. T ripped indication shall be clearly shown on the breaker handle taking a po sition between ON and OFF. Circuit breakers shall be equipped w ith individually insulated, braced and pro tected co nnecto rs. Branch breakers to be connected for sequence phasing, i.e. breakers 1 and 2 connected to phase a, breakers 3 and 4 to phase b, etc, to conform to branch circuit numbering system shown on drawing. Polarity or block phasing will not be acceptable. The front faces of all circuit breakers shall be flush with each other. Large permanent individual numbers shall be affixed ina uniform position. Prov isio ns for additio nal breakers shall be such that field addition of connectors or mounting hardware will not be required to add breakers to the panelboard. Where spaces are called for, panel bus shall be extended behind the space. Panelboard bus structu re and main lugs, main breaker or main switch shall have current ratings as shown on the panelboard schedule. Su ch ratings shall be established by heat rise tests with maximum hot spot temperature on any connector or bus bar. Heat rise test shall be conducted in accordance with UL 67. All bus bar shall be copper. Bus bar shall be rated for 1000 amperes per square inch m i n i m u m. The panelboard assembly shall be enclosed in a steel cabinet. The size of the wiring gutters and gauge of steel shall be in accordance with NEMA Standards Publication No. PB1 and UL Standards No. 67 for panelboards. The box shall be fabricated from galvanized steel or equivalent rust resistant steel. Enclosure to be for indoor or outdoor use as indicated. A ground bar is to be furnished in the box. Fronts shall include a door over the breaker handles with a tumbler-type lock with catch. The inner door shall be over the switch handles only. Doors over 48 inches in height shall be equipped with three-point catch and lock with vault handle. All panelboard locks to be keyed alike. A circuit directory card with clear plastic covering shall be provided on the inside of the inner door. Quality Assurance Reference Latest Standards: Underwriters Laboratories Inc. (UL) a. Panelboards - UL 67 b. Cabinets and boxes - UL 50 National Electrical Manufacturers Association (NEMA) a. NEMA -PB1 (latest revision) Federal Specifications a. Panelboards WP-115a b. Molded Case Circuit Breakers WP-375b National Fire Protection Association (NFPA) a. NFPA 70, National Electrical Code (NEC) Requirements of Regulatory Agencies: a. State Codes b. Local Codes and Ordinances Page 2 of 5
3 Catalogue No. & Option NLAB-3 1 Phase 3 Wire SN 1 20/240 Volts AC or DC 12 NLAB12-3L 100A NLAB14-3L 100A NLAB16-3L 100A NLAB18-3L 100A NLAB20-3L 225A NLAB22-3L 225A NLAB24-3L 225A NLAB26-3L 225A NLAB28-3L 225A NLAB30-3L 225A NLAB32-3L 225A NLAB34-3L 225A NLAB36-3L 225A NLAB38-3L 225A NLAB40-3L 225A NLAB42-3L 225A Pole Main Breaker Boxes 20 Wide 12 NLAB12-3AB 100A NLAB14-3AB 100A NLAB16-3AB 100A NLAB18-3AB 100A NLAB20-3AB 225A NLAB22-3AB 225A NLAB24-3AB 225A NLAB26-3AB 225A NLAB28-3AB 225A NLAB30-3AB 225A NLAB32-3AB 225A NLAB34-3AB 225A NLAB36-3AB 225A NLAB38-3AB 225A NLAB40-3AB 225A NLAB42-3AB 225A NLAB-4 3 Phase 4 Wire SN 120/208 Volts 12 NLAB12-4L 100A NLAB14-4L 100A NLAB16-4L 100A NLAB18-4L 100A NLAB20-4L 100A NLAB22-4L 100A NLAB24-4L 100A NLAB26-4L 100A NLAB28-4L 100A NLAB30-4L 100A NLAB32-4L 225A NLAB34-4L 225A NLAB36-4L 225A NLAB38-4L 225A NLAB40-4L 225A NLAB42-4L 225A Pole Main Breaker Boxes 20 Wide 12 NLAB12-3AB 100A NLAB14-3AB 100A NLAB16-3AB 100A NLAB18-3AB 100A NLAB20-3AB 225A NLAB22-3AB 225A NLAB24-3AB 225A NLAB26-3AB 225A NLAB28-3AB 225A NLAB30-3AB 225A NLAB32-3AB 225A NLAB34-3AB 225A NLAB36-3AB 225A NLAB38-3AB 225A NLAB40-3AB 225A NLAB42-3AB 225A Main Switch/Main Circuit Breakers: Mounted vertically. Branch Circuit Breakers: 20 amp. single pole, 120 volt, AC. 15 thru 60 amp. ratings for single pole breakers can be furnished at the same price when specified. Space Only or Provisions for Future Breakers: Figure panel for total number of poles, including spaces. Page 3 of 5
4 Options Mains: Increase bus capacity to 400 ampere Main breaker to 400 ampere Main fused disconnect switch Compression lugs Sub-feed lugs Asco remote control as main Interiors: To fit existing boxes Split bus or meter loop Remote control switches 200% rated neutral Time clock Sub-feed breakers Boxes: Aluminum Stainless steel Nema 3R Nema 4X Nema 12 Special drilling Special knockouts Increase gauge Increase gutters Painted Fronts: Door-in-door construction Trim hinged to box Special locks Metal directory frame Special painting Split Door Common trim over two boxes Circuit Breakers: Handle locking device Padlocking devices Increase interrupting capacity Shunt trip Undervoltage trip Others: Metering Insulated ground bar Ground lug bolted to box Nameplates Page 4 of 5
5 NLAB Panelboards Dimensions: A - Top and Bottom Gutter 100 ampere lugs - 6 inches 235 ampere lugs - 7 1/2 inches 400 ampere lugs - 12 inches 600 ampere lugs - 12 inches B - Branch Circuits 1 inch of height for each double branch circuit. C. - Neutral and Main Lugs 100 ampere - 3 inches 200 ampere - 3 inches 400 ampere - 4 inches 600 ampere - 5 inches D - Main Breaker 100 ampere - 10 inches 225 ampere - 10 inches 400 ampere - 15 inches 600 ampere - 15 inches Notes: The panelboards shown here are typical of general construction. Cabinet sizes have been standardized to provide more efficient service and manufacturing processes. Therefore, dimensions shown on the page are approximate and should be used for estimating purposes only - consult the factory for further details. Page 5 of 5
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
Mini Power-Zone Unit Substation Product Description. Product Description. Features. Typical Applications
Product Description Product Description The Mini Power-Zone Unit Substation from Schneider Electric is a miniaturized version of our Power-Zone Unit Substation. Included are: Circuit Breaker Sealed Step-Down
Submit shop drawings for equipment provided under this section Shop drawings shall indicate:
Section 16435 - SWITCHBOARDS Introduction Part 1 - General Reference The work under this section is subject to requirements of the Contract Documents including the General Conditions, Supplementary Conditions,
Mini Power-Zone Unit Substation
Catalog 7440CT0901 2009 Class 7440 CONTENTS Description............................................. Page Product Description...........................................2 General Information...........................................3
Learning Module 13: Panelboards and Switchboards. 101 Basic Series
Learning Module 13: Panelboards and Switchboards 101 Basic Series What You Will Learn We ll step through each of these topics in detail: Introduction 4 Definitions 4 Similarities Between Panelboards and
SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches
SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches PART 1 GENERAL 1.01 Scope Optional Standby Power Generator Systems A. Furnish and install automatic transfer switches
BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET
BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET Berthold Electric Company s Generator Connection Cabinet provides a quick and convenient station to connect a portable generator to a facility s main service
METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D
12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section
ELECTRIC METERING COMMERCIAL & INDUSTRIAL
ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS
SWITCHGEAR Section 16. SECTION INCLUDES This Section includes service and distribution switchboards rated 600 V and less.
PART 1 - GENERAL SECTION INCLUDES This Section includes service and distribution switchboards rated 600 V and less. RELATED SECTIONS Division 16 Section "Basic Electrical Materials and Methods" for general
Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers
Specification Guide for RVAC Direct Replacement AC Medium Voltage Circuit Breakers Table of Contents 1.0 General Work Scope...3 2.0 Standards...3 3.0 Supplier Qualifications...4 4.0 Circuit Breaker Element
8146/5 Series Breaker Panelboards
8146/5 Series Breaker Panelboards DISTRIBUTION BREAKER PANELBOARDS FOR HAZARDOUS & CORROSIVE ENVIRONMENTS Breaker Panels Features: Wide variety of Flameproof branch circuit breakers for Zone 1 & Division
Distribution Dry Type Transformers
8 TRASFORMERS Distribution Dry Type Transformers Table (Contact Sales office for List Price) (commonly used) 1a. 115 C Rise F 1b. 80 C Rise B 4. Wall Brackets1 W 6. Low noise XdB below std. LX Type bg
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
Secondary Unit Substations
14 SWITCHGEAR Secondary Unit Substations Overview Siemens offers a wide variety of unit substation designs to meet customer requirements. A unit substation consists of one or more transformers mechanically
Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services
Circuit Breakers and Switchgear Thomas Greer Director of Engineering TLG Services Presentation Outline Switchgear Definition Overcurrent Protection Devices Circuit Breaker Trip Curves and Coordination
Doc Ref: 2015.06.01.002. 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC
TM 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC TM D400E Data Module (60Hz) The EDGE D400E is designed to meet high power density requirements for both the HPC and Web Scale environments while
ASCO SERIES 185 Power Transfer Switches
ASCO SERIES 185 Power Transfer Switches 4-hour protection no matter when trouble strikes ASCO Series 185 Power Transfer Switches An Automatic Transfer Switch helps prevent... Your business or home from
Type 1, 3, & 3R Enclosures
Junction oxes Type 1 Screw over....................................................................... 50-53 Junction oxes Type 1 Hinge over........................................................................
MCC Ratings. Voltage Rating
MCC Ratings In addition to the various ratings of individual components used in motor control centers, the overall ratings of the motor control center must also be considered. Voltage Rating Motor control
Power Management Module 2. Installation
Power Management Module 2 30 300 kva Installation Table of Contents Safety... 1 Safety Instructions... 1 Certification Standards Three Phase... 1 Product Safety... 2 Special Precautions... 2 System Description...
SPEEDFAX TM 2011 Load Centers & Circuit Breakers Contents
SPEEDFAX TM 20 Load Centers & Circuit Breakers Contents Load Centers ing System -2 Siemens PL and ES Series Load Centers Introduction -3 PL Series Load Centers Features and Product Offering -4-5 PL Series
ELECTRIC UTILITY SERVICE EQUIPMENT REQUIREMENTS COMMITTEE, EUSERC
ELECTRICAL SERVICE REQUIREMENTS ELECTRIC UTILITY SERVICE EQUIPMENT REQUIREMENTS COMMITTEE, EUSERC TABLE OF CONTENTS TITLE SECTION NO. List of Approved Electric Utility Service Equipment Requirements Committee
PREFACE. Your comments or suggestions are welcome and appreciated. They should be sent to:
PREFACE UL developed the Dead-Front Switchboard Marking Guide for code authorities, electric utilities, contractors, installers, users, designers, and other interested parties to aid in understanding deadfront
SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.
2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to
Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems
Suitable for Emergency, Peak and Prime Power System Applications Low Voltage Automatic Transfer Switch Systems THE POWER AUTHORITY THE POWER AUTHORITY ASCO s experience and commitment to excellence in
Sample - No Commercial Use
COMPLETE REVISION October 2010 Electrical PIP ELSSG01 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort
Engineers Edge, LLC PDH & Professional Training
510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Interior
Metallic and Non-Metallic Air Conditioning Disconnects. A Complete Family of. Disconnects with Exclusive Time Saving Features
Metallic and Non-Metallic Air Conditioning Disconnects A Complete Family of Disconnects with Exclusive Time Saving Features Enclosed Molded Case Disconnect Switch Not-Fusible The preferred molded case
3.0 CHARACTERISTICS. AR Auxiliary Relay High Speed, High Threshold 41-759.3C
41-759.3C the magnetic core upon energizing of the switch. When the switch closes, the moving contacts bridge two stationary contacts, completing the trip circuit. Also during this operation two fingers
Bussmann. All-In-One Module. Bussmann Power Module Switch. How to configure Part Numbers: Step 1: Select Switch Amperage 1
How to configure Part Numbers: Step : Select Switch Amperage Power Module Switch Rating (Amps) Power Module Switch Catalog No. 30 3 60 6 00 200 2 400 4 Step 2: Select Options Needed 5 Bussmann Power Module
Heavy Duty Safety Switches
Features 15 3 2 20 9 11 16 17 1 18 6 19 13 5 SAFETY 8 1 12 7 1. Quick-make, quick-break operating mechanism that ensures positive operation. 2. Visible blade, double-break switching action. 3. Arc chutes
Introduction. Upon completion of Basics of Switchboards you should be able to: Explain the role of switchboards in a distribution system
Table of Contents Introduction... 2 Distribution Systems... 4 Switchboard Definition... 9 Switchboard Construction... 12 Service Entrance Equipment... 18 Service Section... 20 Switchboard Grounding...
TP-C2 Motor Operator CLEAVELAND / PRICE INC. Bulletin DB-111B12
Bulletin DB-111B12 TP-C2 Motor Operator CLEAVELAND / PRICE INC. 14000 Rt. 993, Trafford, PA 15085 (724) 864-4177 FAX (724) 864-9040 Email: [email protected] Cleaveland/Price Type TP-C2 Motor Operator
CAT ATC POWER BREAKER & POWER CASE SWITCH AUTOMATIC TRANSFER SWITCH
CAT ATC POWER BREAKER & POWER CASE SWITCH AUTOMATIC TRANSFER SWITCH Cat transfer switches are designed for a variety of standby power applications. They provide flexibility, reliability and value in a
Installation Instructions
READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4
CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,
101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION. Cutler-Hammer
101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION Cutler-Hammer WELCOME Welcome to Module 3, Fundamentals of Electrical Distribution. If you have successfully completed Module
B. Related Sections: 1. Section 26 05 33 - Raceway and Boxes for Electrical Systems.
SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes wall switches; wall dimmers; receptacles; multioutlet assembly; and device plates and decorative box covers. B. Related
3. TYPES OF SERVICE AVAILABLE. 3.1 Scope
3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled
SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL
SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL 1.1 SUMMARY A. This section describes the requirements for the installation of Power Monitors and associated
Circuit Breakers. Next Generation of Protection Capabilities
Circuit Breakers Next Generation of Protection Capabilities Circuit Breaker Offering Rockwell Automation offers a full line of Allen-Bradley circuit breakers and motor protection devices to help meet many
Multiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained
Overhead Meters TABLE OF CONTENTS D D Consumer Service Pole for Mobile Home Park Temporary Service -wire Single Phase D. Overhead Meter Installation - Single Phase D. Connection Diagram - Single Phase
Requirements for Electrical Installations
ARTICLE 110 Requirements for Electrical Installations INTRODUCTION TO ARTICLE 110 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS Article 110 sets the stage for how you ll implement the rest of the NEC. This
READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!
READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY! The main power to any existing system must be disconnected prior to the
FLB Series Circuit Breakers and Enclosures
FLB Series Circuit Breakers and s Applications: FLB circuit breakers and enclosures are used: F service entrance, feeder branch circuit protection f lighting, heating, appliance and mot circuits In areas
Contractors Guide Central Inverter System Installation
Contractors Guide Central Inverter System Installation Step By Step Procedures 2,200 Watt/VA 6 Step Installation 1. Mount Bottom Cabinet 2. Mount Top Cabinet 3. Install Batteries 4. Install Conduit 5.
Section 9: Power Distribution Equipment Bill Brown, P.E., Square D Engineering Services
Section 9: Power Distribution Equipment Bill Brown, P.E., Square D Engineering Services Introduction Power Distribution Equipment is a term generally used to describe any apparatus used for the generation,
Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000
Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000 Description Firetrol FTA1000 Full Voltage Fire Pump Controllers are intended for use with electric motor driven fi re pumps
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
Distribution Boards & Consumer Units
Distribution Boards & Consumer Units Enclosures for system pro M compact Distribution Boards & Consumer Units Contents General 2/ Distribution Boards Mini Center compact Mounting kits for compact accessories
Project Name: Nortrax Section 26 41 00 Project No: 13-013 SURGE PROTECTION DEVICES Page 1
Page 1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Divisions 1 Specification sections apply to
HPS Universal. Single and Three Phase Potted. Buck-Boost Transformers. Buck-Boost Applications & Standard Specification... 80
Buck-Boost Transformers Single and Three Phase Potted Buck-Boost Transformers Buck-Boost Applications & Standard Specification... 80 Selecting Buck-Boost Transformers... 81 Single Phase Selection Tables...
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation
Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers
SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS
SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating
Temporary Power Outlet Panels
Power Outlet Panel Types Available ATTENTION PLEASE Siemens is proud to present our new line of temporary power products. This section describes our new product line that that will be available to order
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
Electrical Grounding. Appendix C
Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment
Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling
Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling 250_P1 R10/7/2015 Copyright 2015 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS POWER DISTRIBUTION RACKS IN A MISSION CRITICAL SYSTEM MODULES IN A MISSION CRITICAL SYSTEM UPS Convertor Main Inverter Load Battery BPC UPS & BATTERY
Primary and Secondary Electrical Distribution Systems
Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility
Switchgear Capabilities. NexGear is a Division of PowerSecure NASDAQ: POWR
Switchgear Capabilities NexGear is a Division of PowerSecure NASDAQ: POWR Discussion Points Introducing PowerSecure Introducing NexGear Solutions Offered Scope of Services Examples of Work Q & A NexGear,
Continuous Power... Continuous Protection
Series 165 We Keep Your Power On Continuous Power... Continuous Protection An Automatic Transfer Switch helps prevent... Your business or home from losing power during bad weather or utility power equipment
12VDC MAGNETIC LED DIMMABLE POWER SUPPLIES SPEC SHEET DIGEST
12VDC MAGNETIC ED DIMMABE POER SUPPIES SPEC SEET DIGEST TM-30-DIM TM-50-DIM T-60-DIM TM100-DIM TM200-DIM TM300-DIM iring Diagram for TM-50-DIM and TM-100-DIM ED 12VDC MAGNETIC DIMMABE 30 POER SUPPY Smallest
HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12
SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications
INSTALLATION & SERVICE MANUAL. Display Panel
INSTALLATION & SERVICE MANUAL Display Panel The PowerLine EMS TM is a specialized power distribution and energy management system intended to be used in recreational vehicles. The Control Module is housed
Installation Instructions For Slider Casement Air Conditioners
Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems A. General This Net Metering Standard for Customer-Owned Grid Connected Electric Generating Systems sets forth the
Low Voltage Transformers Sealed, General Purpose, Dry Type
Low Voltage Transformers Sealed, General Purpose, Dry Type Catalog 7400CT9601R4/08 08 Class 7400 CONTENTS Description..............................................Page Introduction.................................................
3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance
SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132
MTE SERIES RLW. World REACTORS USER MANUAL PART NO. INSTR 030 REL. 090930. 2009 MTE Corporation
MTE SERIES RLW World REACTORS USER MANUAL PART NO. INSTR 030 REL. 090930 2009 MTE Corporation IMPORTANT USER INFORMATION NOTICE MTE Series RLW reactors are components designed to improve the reliability
UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Metering and Monitoring. Basis of Design
Basis of Design This section applies to the design, installation and integration of metering and monitoring equipment, including: hardware installed in the electrical service and distribution equipment,
SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines
PART 1 -- GENERAL 1.1 WORK OF THIS SECTION SECTION 16720 - City of San Diego, CWP Guidelines A. The WORK of this Section includes providing manual and automatic fire alarm and smoke detection systems meeting
Cable/Conduit Conversion
Cable/Conduit Conversion Busway can be used in many applications where cable and conduit are more commonly used. The question arises, Why use busway instead of conventional cable and conduit? Benefits
GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not
Commercial Gas Furnace Upflow
Commercial Gas Furnace Upflow Model G24-200 80% A.F.U.E. 200,000 Btuh Input Heating Cap. 7.5 or 10 Tons Nominal Add-On Cooling GUK FEATURES Certified by A.G.A./C.G.A. Laboratories. Heavy gauge painted
FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid
Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE
HVL 5 38 kv Load Interrupter Switchgear. The Standard for Performance, Protection and Dependability
HVL 5 38 kv Load Interrupter Switchgear The Standard for Performance, Protection and Dependability For a generation of engineers, Square D High Voltage Load (HVL ) Interrupter Switchgear by Schneider Electric
SECTION 22 LIGHTNING PROTECTION SYSTEM
SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for
Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components
Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education
25-kV Apparatus Bushings B Series (bolt-in) for Elbow to Air-Insulated Service 200 Amp, 600 Amp and 1250 Amp
Page 1 2015 Grounded Metal Equipment Plate Equipment Connection Bus Bar or Other Component 15 kv or 25 kv Separable Insulated Connector (elbow) Equipment Connection Power Cable Power Cable Grounded Metal
LCP Coordination Panel Operations & Maintenance Manual Table of Contents
LCP Coordination Panel Operations & Maintenance Manual Table of Contents 1. Overview 2. NEC Requirements Overview 3. LCP Coordination Panel Data Sheet 4. Class CC Littelfuse CCMR Current-Limiting Fuse
SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC EXTERNAL SIDEMOUNT SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671B SECTION 16671B
SURGE PROTECTIVE DEVICES (SPDs) EXTERNAL SIDEMOUNT UNITS LOW VOLTAGE AC SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION PART 1 GENERAL 01 02 03 SCOPE The Contractor shall furnish and install the Surge Protective
Switchboard system. NorLine 800
Switchboard system NorLine 800 NorLine 800 SWITCHBOARD SYSTEM 2 NorLine 800 Switchboard system Table of contents Subject Page Table of contents 2 Overview 2-3 NorLine 800 technical specifications 4 Structural
Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers
9229 Waterford Centre Dr. Bldg C, Suite 110 Austin, Tx 78758 Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers Current Version: 13 AC Modules are a new product
SECTION 26 29 23 VARIABLE FREQUENCY DRIVES
SECTION 26 29 23 VARIABLE FREQUENCY DRIVES PART 1 GENERAL 1.01 SCOPE A. Furnish and install individual freestanding variable frequency AC drives (VFD) as shown on the Drawings and specified herein. 1.02
Commercial Electric Water Heater
MODEL SE Commercial Electric Water Heater 6-120 Gallon Capacity, up to 58 KW in all Three Phase Voltages, Over 6 KW in all Single Phase Voltages Features Heavy Duty Construction Hydrastone cement lining
HM-W536 Install Guide
HM-W536 Install Guide 9/13/2013 IMPORTANT SAFETY INSTRUCTIONS Warning - When using electrical devices, basic safety precautions should be followed to reduce the risk of fire, electrical shock or injury.
Chapter 9. Bonding and Grounding
Chapter 9 Bonding and Grounding Objectives Describe why the cable should be bonded Describe bonding and grounding procedures Define Bonding and Grounding Explain Safety Benefits and intent of bonding and
Section 10 Electric Switchboards: 0 Through 600 Volts
Section 10 Electric Switchboards: 0 Through 600 Volts 10.1. Scope This section provides specific dimensions and details for service and meter equipment that is assembled by the manufacturer in freestanding,
270526-TC Grounding and Bonding for Telecommunications Systems
270526-TC Grounding and Bonding for Telecommunications Systems Part 1 - General Related Documents The following related sections of the OT standards shall also be applicable to this section. OT Engineer
TERMINATION ENCLOSURE OPTIONS
TERMINATION ENCLOSURE OPTIONS Add suffix: R - Reverse Stagger the Bus Bars (to run cable in from the top) CU - Copper NEMA Mount Bus Bars C - Plastisol Covers for Bus Bars DF - Dead Fronts T - Tin Plated
26 3213.13 Diesel Engine Driven Generators Page 1 of 6
Last Update: December 8, 2014 A. Description of System Consultant s Handbook Page 1 of 6 1. Provide a diesel engine driven electric generating unit, factory assembled, tested and certified to operate at
Dimensions, Inches (mm) No. of Poles Width Height Depth 2, 3 8.25 (210) 16 (407) 5.5 (140) 4 11.125 (283) 16 (407) 5.5 (140)
9-10N Supersedes Selection Data 9-10N, pages, 1-, dated dated March March 1995 1995 Mailed to: E, D, C/9-100A, 31-A, INTERRUPTING CAPACITY RATINGS IEC 947- Interrupting Capacity s➀ Interrupting Capacity