1 APPLICATION OF GROUND ANCHORS TO SUPPORT DEEP EXCAVATION AND COMPACTION GROUTING FOR NATM TUNNEL CONSTRUCTION FOR DELHI METRO RAIL CORPORATION (DMRC) Authors: Jitendra Tyagi, CPM, Delhi Metro Rail Corporation, Mohan Gupta, Divisional Director, Mott MacDonald Pvt Ltd, Ashit Shah, Project Director, Mott MacDonald Pvt Ltd, Y. H. Krishna and B.C. Kanth, Keller Ground Engineering India Pvt. Ltd. ABSTRACT Metro rail construction is planned and is underway in several cities in India, including New Delhi, Mumbai, Chennai and Bengaluru. In New Delhi, the Delhi Metro Rail Corporation (DMRC) has successfully completed and commissioned the 1 st phase of the metro network covering 65 km. As part of its 2 nd phase, construction of about 121 km of metro network is almost complete. This includes an exclusive Airport Metro Express Line, which is under final phase of commissioning. As part of the Airport Metro Express Line, an underground metro station is planned next to the existing New Delhi Railway Station, which required deep excavations in range of 11 m to 19 m. A retaining wall system comprising of soldier pile walls and multi-level ground anchors was adopted to support the deep vertical excavation., A different geotechnical challenge was faced at one of the underground metro corridors near Saket Station. Here the presence of loose sandy silts along an abandoned Nallah channel posed problems with regard to effective soil arching, which is necessary for tunnel construction using the proposed NATM method. Compaction Grouting was used to increase the stiffness in the in-situ soils and to enable effective soil arching above the tunnel crown. This paper presents the construction methodology, QA/QC measures and performance testing results related to Ground Anchors and Compaction Grouting.
2 1. INTRODUCTION Delhi Metro Rail Corporation (DMRC) has successfully completed the 1 st 65 km phase of metro network in New Delhi. As part of its 2 nd phase, construction of about 121 km of metro network is almost complete. This includes an exclusive link, namely the Airport Metro Express Line, which is under final phase of commissioning. As a part of this project, an underground metro station, a multi-level car park and a cut-andcover tunnel have been constructed, which required 11 m to 19 m deep excavation. The designed retaining wall system includes soldier pile walls and multi-level ground anchors to support the vertical deep excavation. Fig. 1 shows part of the DMRC network and the location of the Airport Metro Express Line. Fig. 1: DMRC network showing Airport Metro Express Line and Saket Station On the link connecting Central Secretariat Station with Gurgaon, at one of the underground tunnel section (near Saket Station, Fig. 1) connecting Central Secretariat and Qutub Minar, the New Austrian Tunnelling Method (NATM) was adopted for tunnel construction. The presence of loose sandy silts along an abandoned Nallah channel posed problems with regard to effective soil arching, which is required for safe tunnel construction. To address this problem, compaction grouting was chosen to increase the stiffness of the in-situ soils to allow effective soil arching above the tunnel crown. 2. CASE STUDY 1: GROUND ANCHORS AT NEW DELHI METRO STATION 2.1 Introduction to Ground Anchors A ground anchor is a structural element installed in soil or rock that is used to transmit an applied tensile load (as a result of horizontal earth pressure) into the ground. The basic components of the anchor include (a) the anchorage, (b) the free (or un-bonded) length and (c) the fixed (or bonded or grouted) length. Depending on the application, the anchors may be classified as (a) permanent anchors, (b) temporary non-retrievable anchors or (c) temporary retrievable anchors.
3 Fig. 2 illustrates the schematic of the types of anchors according to method of installation (BS 8081, 1989). Fig. 2: Type of Anchors according to method of installation (BS 8081, 1989). (a) Straight shaft gravitygrouted anchors, (b) Straight shaft pressure grouted anchors, (c) Post grouted anchors (d) Underreamed anchors. In general anchor capacity and performance are influenced by four main factors, namely (a) the number of strands to achieve the desired structural capacity, (b) ground characteristics, especially shear strength, to achieve the desired geotechnical capacity, (c) installation techniques and (d) workmanship attained in the field. 2.2 Soil conditions In general site consists of silty clay (Delhi Silt Alluvium) with depth of bedrock varying from as low as 5m to as deep as 18m. The rock can be described as highly to moderately weathered Quartzite. The following profiles (Fig. 3) describe the general stratigraphy with respect to varying depth of bedrock. (a) Fig. 3: a) Typical soil profile at New Delhi Station b) Typical soil profile at cut & cover tunnel site (b)
4 2.3 Geotechnical problem For the construction of the underground metro station, multi-level car park and cut-and-cover tunnel on Airport Metro Express Line stretch, an 11 m to 19 m deep excavation was required. The site is next to the existing New Delhi Railway Station and is surrounded by other structures like hotels and hospitals. Therefore, deep vertical excavations were necessary. Fig. 4 shows the layout of station building & car park location. Fig. 4: Layout showing station building and multi-level car park To retain the soil of the 11 m to 19 m deep vertical excavation, a retention system comprising of soldier pile walls in combination with multi-level soil and rock anchors was proposed. Two to three levels of ground anchors (60 tons and 80 tons) were installed depending upon the depth of excavation. Where the rock level was high, only a single level of anchors was installed. Fig. 5 shows the schematic of the three levels of soil anchors and rock anchors. (a) (b) Fig. 5: a) Schematic showing three levels of soil and rock anchors at New Delhi Station site b) Schematic showing one level of strut followed by rock anchors at cut & cover tunnel site
5 2.4 Structural and Geotechnical Capacity of Anchors Structural Capacity To achieve the desired structural capacity of the anchors i.e., say 80 tons, the anchors are fabricated using 6 Nos. of each 12.7mm diameter steel strands (7 ply) LRPC confirming to IS: , clause-ii, were used as per the following calculations: Design capacity of the anchor = 80 T Capacity of each strand of 12.7mm dia. = T (As per IS 14268:1995 For 7 ply, 12.7 mm nominal dia., LRPC strands, clause II) No. of strands = 6nos (say) Total Structural capacity of the anchor = 18.74T x 6nos = T Factor of safety against STRUCTURAL capacity of the anchor = Theoretical capacity / design capacity = T / 80T = 1.41 > 1.4 (as per BS 8081: 1989) Geotechnical Capacity The main components of the geotechnical capacity of the anchor are free and fixed length, which are arrived at based on the following calculations: Design Capacity of the anchor Length of anchor in the active wedge zone Free length of anchor Fixed length of the anchor, L Geotechnical capacity of the anchor = 80T = 10.5m (as per to failure wedge analysis) = 12.5m (incl. 2m additional buffer length) = 9.5m (say) = π x D x L x τ f (Sandy silt) D, Dia of drill hole = 0.152m τ f (Sandy silt) is theoretical skin friction (> 400 kn/sq.m) for Sandy Silts having Consistency Index, I c =1.25, according to BS 8081: 1989, clause , Fixed Length in Type C Anchorages Considering, theoretical skin friction τ f (Sandy silt) = 400 kn/sq.m The ultimate geotechnical capacity of anchor = (π x x 9.5) x 400 = 1,815 kn ~ 182T Factor of safety against geotechnical capacity of the anchor = Theoretical capacity / design capacity = 182 T / 80T = 2.3 > 2 (as per BS 8081: 1989) Total length of the anchor = Free length + Fixed length = 12.5m + 9.5m = 22m
6 2.5 Installation method Installation of ground anchors consists primarily of drilling, installation of fabricated anchor, cement grouting and finally by pre-stressing after a curing period of 7 to 10 days. Fig. 6 shows anchor installation works in progress and construction of underground New Delhi metro station in full swing after the successful excavation to the desired depth. (a) (b) Fig. 6: a) Installation of ground anchors using Casagrande C6 Hydraulic drill rig b) Construction of underground New Delhi metro station after successful excavation to the desired depth (New Delhi railway station is also seen in the back ground) 2.6 Testing results After a curing period of 7 to 10 days, each and every anchor was tested / pre-stressed using a 100 ton multi-strand pre-stressing jack. The anchors are stressed to a test load of 1.1 times of the working load. The working loads were 60 tons at station building and 80 tons at cut-and-cover tunnel location. Every anchor was tested to confirm the respective design capacities. Fig. 7 shows the stressing activity in progress. Fig. 7: Pre-stressing using 100T capacity multi strand jack
7 2.7 Quality Assurance and Control State-of-the-art of anchor installation includes appropriate QA-QC procedures throughout the construction process. The following QA-QC parameters were monitored and recorded on site, during the installation of anchor: Drilling - Drilling logs consisting of type of soil encountered with depth were kept - (It must be ensured that the soil / rock encountered is not significantly different from the assumptions made during the design. Any significant deviations would trigger a design review.) Anchor fabrication parameters - Components such as fixed length, free length, length of grout pipes, etc. were checked before the anchor was installed in the drill hole Primary Grouting - Volume of the grout pumped in and the flow rate was recorded Secondary Grouting - Volume of the grout pumped in and the flow rate was recorded - Grout pressures (> 20kg/sq.cm) at which the grout is pumped was recorded Pre-stressing - All the ground anchors were pre-stressed (100% frequency) - All anchors were tested to 1.1 times the design load - Elongation of steel were recorded and checked to be under acceptable limits - Staged loading and deformations were recorded 2.8 Performance of Ground Anchors For the New Delhi Railway station excavation, multi-level carpark and cut-and-cover tunnel, a total of 600 ground anchors were installed. Excavation was completed successfully in before the middle of CASE STUDY 2: COMPACTION GROUTING FOR NATM TUNNEL AT SAKET 3.1 Introduction to Compaction Grouting The compaction grouting technique uses displacement and compaction to improve ground conditions. A very viscous (low-mobility), aggregate grout is pumped in stages, forming grout bulbs, which displace and densify the surrounding soils. Significant improvement can be achieved by correctly sequencing the grouting work from primary to secondary to tertiary grids. The compaction grouting method may be used for the improvement of non-cohesive soils, especially in cases, where soils of loose to medium density are encountered. This method is also used in fine-grained soils in order to install elements of higher strength and bearing capacity, thus improving the load bearing behaviour of the soil. 3.2 Soil conditions The soils at site generally consist of sandy silt fill to 5m depth. The abandoned Nallah channel was excavated and filled with locally available sandy silt to level the ground. SPT N values in the sandy silt fill were in the range of 4 to 17, indicating loose to medium dense. This was followed by medium dense to dense Delhi Silt alluvium layer, with SPT N values between 20 & 30 to about 26 m depth. This is underlain by moderately weathered Quartzite bedrock.
8 3.3 Geotechnical problem Tunnel excavation by NATM was proposed at a depth of about 9 m below existing ground level. The soil above the tunnel crown is fill material (along the Nallah alignment) consisting of sandy silt/silty sand in the top 5 to 6 m. This was followed by Delhi silt alluvium down to the tunnel crown. Fig. 8 illustrates the layout of the NATM tunnels and the alignment of Nallah channel. Fig. 8: Layout of the NATM Tunnels and abandoned Nallah channel NATM is a method where the surrounding rock or soil formations of a tunnel are integrated into an overall ring-like support structure, thus the supporting formations will themselves be part of this supporting structure. But the pre-improvement soil conditions (loose to medium dense sandy silt/silty sand) was not expected to allow effective arching. 3.4 Geotechnical Requirement Hence, in order to permit safe and stable NATM tunnel excavation and primary lining construction, it was necessary to carry out a combination of shallow and deep ground treatment by compaction grouting. An theoretical SPT N value profile between 10 and 18 with respect to depth was proposed by using the correlation, SPT N = Z, where, Z is depth, to form effective soil arching during tunnel construction. Fig. 9 illustrates the proposed NATM tunnels under a filled up soil strata at abandoned Nallah channel location along with the existing and required SPT N value profile. Fig. 9: Schematic of the NATM tunnels under an abandoned Nallah channel; the required and existing SPT N values are plotted on the right
9 3.5 Installation method Generally construction consists of drilling, installation of stinger rods and pumping the low slump grout mix from the bottom of the treatment depth to the working platform in steps. For compaction grouting, a low slump cement with a mix proportion of 1:3, water-cement ratio of 0.5 and admixtures like Bentonite and Glenium are used as a plasticizer to increase the workability of grout mix. The slump value of grout mix is about 120 to 150 mm. A truck mounted hydraulic drill rig was used to drill a nominal diameter hole of 90 mm to a depth of about 8 m through the over burden soils. After drilling, the grout mix was pumped through the stinger rods, to form a bulb like element in the loose soils, in stages (0.5 m each) from bottom to the top of the working platform. Fig. 10 shows the compaction grouting works at site. (a) Fig. 10: a) Picture illustrating the progress of compaction grouting works at site b) Measurement of slump as QA-QC procedures 3.6 Testing results Field trials were carried out to establish a suitable grid pattern to achieve the intended post compaction grouting SPT N values. Trials were carried using 2 m and 4 m square grids. Pre and post compaction grouting SPT N values were recorded and analysed. Fig. 11 illustrates the typical layout of the compaction grouting 2m and 4m square grid: (b) Fig. 11: Layout illustrating the compaction grouting grid 2 m and 4 m
10 Pre and post treatment analysis are also done to find the strength of the improved ground. Post treatment SPT N values in the filled up soil increased and ranged between 20 & 30. Both 2 m and 4 m grids were generally able to achieve the required design SPT N values. Fig. 12 shows the Comparison between Design SPT values with Pre and Post-improvement SPT values. Comparision of Design SPT values with Pre and Post SPT Values Depth (m) SPT N values Design SPT Idealised Post SPT on 4m grid Idealised Pre-SPT Idealised Post SPT on 2m grid Fig. 12: Comparison of Design SPT values with Pre and Post SPT Values 3.7 Quality Assessment and Control As with other ground improvement techniques, proper quality assurance and quality control (QA-QC) procedures were adopted. The working parameters (e.g depth, pressure, grout volume, heave etc) were maintained and recorded at each stage of compaction grouting process to determine the appropriate termination point. Termination of particular grouting stage was considered when one of the following conditions achieved: Pre-determined grout volume is achieved (in accordance with bulb diameter i.e., 0.5 m) Pre-determined grout pressure is achieved (in accordance with depth of treatment i.e., 12 kg/sq.cm to 18 kg/sq.cm) Mortar is overflowing from same grout hole collar Excessive ground heave is measured i.e. greater than or equals to 15 mm Working parameters (grout volume, pressure, depth, etc.) were monitored using automated quality control systems, which are recorded and printed real-time during the installation of the compaction grouting columns. 3.8 Performance of improved ground A total of 296 grout points were drilled with over 420 m 3 of grout pumped. 19 preimprovement and 17 post-improvement SPT boreholes were drilled. The NATM tunnel excavation was successfully completed in the middle of 2009.
11 4. CONCLUSIONS Soldier pile walls in combination with ground anchors as a retention system was successfully carried out to support the 11m to 19m deep excavations for the underground station and tunnelling works Delhi Metro Rail Project sites. This retention system facilitated the space for construction activities of the underground station and cut & cover tunnel. The construction of these underground structures is now complete (Fig. 13). (a) Fig. 13: Pictures illustrating the regular traffic movement over completed underground a) New Delhi Metro Station Building b) Cut & Cover Tunnel at Ram Manohar Lohia Hospital Similarly, Compaction Grouting proved to be effective in densifying the loose silty sandy deposits above the tunnel crown. This facilitated the construction of tunnel by NATM method as the loose silty sandy soils densified after the compaction grouting there by forming self arching which is required for NATM method of construction. This was for the first time Delhi Metro Rail Corporation has constructed a tunnel in loose deposits using NATM method. (b) References BS 8081: 1999, British Standard Code of Practice for Ground Anchorages, British Standards Institute, London. IS 14268: 1995, Specification for uncoated stress relieved low relaxation seven ply strand for prestressed concrete, Bureau of Indian Standards, New Delhi.
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
More informationGeotechnical Investigation Test Report
Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department
More informationMETHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
More informationHow To Design A Foundation
The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationGeotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples
Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com
More informationPILE FOUNDATIONS FM 5-134
C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics
More informationAppendix A Sub surface displacements around excavations Data presented in Xdisp sample file
Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Notation B1 = lowest level of basement slab c = cohesion E = drained Young s Modulus Eu = undrained Young s Modulus
More informationINTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1
INTRODUCTION TO SOIL MODULI By Jean-Louis BRIAUD 1 The modulus of a soil is one of the most difficult soil parameters to estimate because it depends on so many factors. Therefore when one says for example:
More informationAnirudhan I.V. Geotechnical Solutions, Chennai
Anirudhan I.V. Geotechnical Solutions, Chennai Often inadequate In some cases, excess In some cases, disoriented Bad investigation Once in a while good ones Depends on one type of investigation, often
More informationKWANG SING ENGINEERING PTE LTD
KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters
More informationDesign and Construction of Auger Cast Piles
Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN msmadi@geotill.com - www.geotill.com CONTENTS 1.
More informationMicropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com
More informationproduct manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer
HS-4210_MAN_09.08 product manual HS-4210 Digital Static Cone Penetrometer Introduction This Manual covers the measurement of bearing capacity using the Humboldt Digital Static Cone Penetrometer (DSCP).
More informationStructural Design Criteria & Design Loads on Delhi Metro Rail and Checking of Safety of Radial Joints in Tunnel Lining Segments
International Journal of Scientific and Research Publications, Volume 5, Issue 7, July 2015 1 Structural Design Criteria & Design Loads on Delhi Metro Rail and Checking of Safety of Radial Joints in Tunnel
More informationINSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!
In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationEurocode 7 - Geotechnical design - Part 2 Ground investigation and testing
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering
More informationMilan M5 metro extension the construction of Lotto station
Milan M5 metro extension the construction of Lotto station Giuseppe LUNARDI, Rocksoil S.p.A., Italy giuseppe.lunardi@rocksoil.com Luca MANCINELLI, Rocksoil S.p.A., Italy, luca.mancinelli@rocksoil.com Massimiliano
More informationBUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):
More informationDESIGNING STRUCTURES IN EXPANSIVE CLAY
DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers
More informationPRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
More informationDesign, Testing and Automated Monitoring of ACIP Piles in Residual Soils
Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore
More informationImprovement in physical properties for ground treated with rapid impact compaction
International Journal of the Physical Sciences Vol. 6(22), pp. 5133-5140, 2 October 2011 Available online at http://www.academicjournals.org/ijps ISSN 1992-1950 2011 Academic Journals Full Length Research
More informationValidation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2
Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 W.F. Bawden, Chair Lassonde Mineral Engineering Program, U. of Toronto, Canada J.D. Tod, Senior Engineer, Mine Design
More informationCIVL451. Soil Exploration and Characterization
CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
More informationSite Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions
This is an attempt to create a stand alone self learning module on site investigation. Fasten your seat belts. Sit back, relax and enjoy. 1 2 Site Investigation Some unsung heroes of Civil Engineering
More informationEVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND
EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND D.L. Avalle, Broons Hire (SA) Pty Ltd, Australia J.P. Carter, The University of Sydney, Australia Abstract Impact rolling, utilising a non-circular
More informationGUIDELINE FOR HAND HELD SHEAR VANE TEST
GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular
More informationModule 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives
Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives In this section you will learn the following Penetrometer Tests Standard penetration test Static cone penetration test Dynamic cone
More informationGeotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns
1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.
More informationTremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete
Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).
More informationComprehensive Design Example 2: Foundations for Bulk Storage Facility
Comprehensive Design Example 2: Foundations for Bulk Storage Facility Problem The project consists of building several dry product storage silos near an existing rail siding in an open field presently
More informationTunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
More informationPro-Lift Steel Pile Foundation Repair
Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the
More informationGround improvement using the vibro-stone column technique
Ground improvement using the vibro-stone column technique A. Kosho 1 A.L.T.E.A & Geostudio 2000, Durres, Albania ABSTRACT The vibro stone columns technique is one of the most used techniques for ground
More informationHow To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska
APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED
More information1.2 Advantages and Types of Prestressing
1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly
More information1.0 INTRODUCTION 1 2.0 SCOPE OF WORK 2 3.0 EXECUTION OF FIELD WORK 2 4.0 LABORATORY TESTS 8 5.0 FINDINGS OF THE GEOTECHNICAL INVESTIGATION 9
REPORT ON GEOTECHNICAL INVESTIGATION FOR LPG MOUNDED STORAGE AT VISAKHA REFINERY, MALKAPURAM, VISAKHAPATNAM (A.P) FOR HINDUSTAN PETROLEUM CORPORATION LIMITED CONTENTS SR.NO. DESCRIPTION PAGE NO. 1.0 INTRODUCTION
More informationAPPENDIX A PRESSUREMETER TEST INTERPRETATION
APPENDIX A PRESSUREMETER TEST INTERPRETATION PRESSUREMETER TEST INTERPRETATION Description of test The pressuremeter test, discussed in great detail by Martin (1977), Baguelin et al. (1978), Barksdale
More informationGEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design
GEOTECHNICAL ENGINEERING FORMULAS A handy reference for use in geotechnical analysis and design TABLE OF CONTENTS Page 1. SOIL CLASSIFICATION...3 1.1 USCS: Unified Soil Classification System...3 1.1.1
More informationc. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.
Design Manual Chapter 6 - Geotechnical 6B - Subsurface Exploration Program 6B-2 Testing A. General Information Several testing methods can be used to measure soil engineering properties. The advantages,
More informationPile test at the Shard London Bridge
technical paper Pile test at the Shard London Bridge David Beadman, Byrne Looby Partners, Mark Pennington, Balfour Beatty Ground Engineering, Matthew Sharratt, WSP Group Introduction The Shard London Bridge,
More informationUSE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch
USE OF MICROPILES IN TEXAS BRIDGES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch DEFINITION OF A MICROPILE A micropile is a small diameter (typically less than 12 in.), drilled and
More informationSystem. Stability. Security. Integrity. 150 Helical Anchor
Model 150 HELICAL ANCHOR System PN #MBHAT Stability. Security. Integrity. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair
More informationLymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load
Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Nature of Services The company has a long history of performance of tests of piles and pile groups under a variety
More informationEXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL
EXAMPLE DESIGN OF CANTILEVERED WALL, GRANULAR SOIL A sheet pile wall is required to support a 2 excavation. The soil is uniform as shown in the figure. To take into account the friction between the wall
More informationHow To Retaining Wall Guide
How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra
More informationHigh Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
More informationINDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode
INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance
More informationBRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for
More informationCHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
More informationGeotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
More informationFINAL REPORT ON SOIL INVESTIGATION
FINAL REPORT ON SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION AT SS-6B AREA AT HPCL VISAKH REFINERY VISAKHAPATNAM ANDHRA PRADESH J.J. ASSOCIATES(VISAKHAPATNAM) AETP(P) LIMITED #11-6-3, RockDale Layout,
More informationStep 11 Static Load Testing
Step 11 Static Load Testing Test loading is the most definitive method of determining load capacity of a pile. Testing a pile to failure provides valuable information to the design engineer and is recommended
More informationChittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme
Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Main Report Deliverable 02 Sub-Surface Properties of Soil Development in Rangamati, Bandarban and Khagrachari Municipality
More informationDynamic Load Testing of Helical Piles
Dynamic Load Testing of Helical Piles ANNUAL KANSAS CITY SPECIALTY SEMINAR 2014 JANUARY 10, 2014 Jorge Beim JWB Consulting LLC Pile Dynamics, Inc. Main Topics Brief description of the Dynamic Load Test
More informationCaltrans Geotechnical Manual
Cone Penetration Test The cone penetration test (CPT) is an in-situ sounding that pushes an electronic penetrometer into soil and records multiple measurements continuously with depth. Compared with rotary
More informationENCE 4610 Foundation Analysis and Design
This image cannot currently be displayed. ENCE 4610 Foundation Analysis and Design Shallow Foundations Total and Differential Settlement Schmertmann s Method This image cannot currently be displayed. Strength
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
More informationGLOSSARY OF TERMINOLOGY
GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.
More informationSUGGESTION ABOUT DETERMINATION OF THE BEARING CAPACITY OF PILES ON THE BASIS OF CPT SOUNDING TESTS
SUGGESTION ABOUT DETERMINATION OF THE BEARING CAPACITY OF PILES ON THE BASIS OF CPT SOUNDING TESTS JóZSEF PUSZTAI About the authors Pusztai József Budapest University of Technology and Economics, Department
More informationEstimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
More informationCOMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2
(PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More informationA study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil
ISSN: 319-53 (An ISO 39: 00 Certified Organization) A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil Utpal Kumar Das Associate Professor, Department
More informationHigh Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
More informationSettlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
More informationProject Portfolio. Tunnels & Shafts
Project Portfolio Tunnels & Shafts TUNNELS AND SHAFTS Southern Water Dover U.K. Foul water sewer interceptor tunnel, 1.6km long, turn key design and construct sub-contract using NATM technique value 1.1m
More informationAn Automatic Kunzelstab Penetration Test
An Automatic Kunzelstab Penetration Test Yongyuth Sirisriphet 1, Kitidech Santichaianant 2 1 Graduated student: Faculty of Industrial Education in and Technology. King Mongkut's University of Technology
More informationSoil behaviour type from the CPT: an update
Soil behaviour type from the CPT: an update P.K. Robertson Gregg Drilling & Testing Inc., Signal Hill, California, USA ABSTRACT: An initial application of CPT results is to evaluate soil type and soil
More informationEFFECT OF GEOGRID REINFORCEMENT ON LOAD CARRYING CAPACITY OF A COARSE SAND BED
International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 3, May June 2016, pp. 01 06, Article ID: IJCIET_07_03_001 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=3
More informationSection 02415. Installation of pipe and casing for sanitary sewer by methods of augering.
ITY OF PRLN UGRING PIP OR SING FOR SWRS Section 02415 UGRING PIP OR SING FOR SWRS 1.0 G N R L 1.01 STION INLUS Installation of pipe and casing for sanitary sewer by methods of augering. References to Technical
More informationTreatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole
An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water
More informationLocal Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire
More informationOptimised Design for Soil Nailed Walls 1
Optimised Design for Soil Nailed Walls 1 J A R Ortigao 1 and E M Palmeira 2 1 Federal University of Rio de Janeiro, Rio de Janeiro, Brazil 2 University of Brasília, Brasília, Brazil INTRODUCTION The first
More informationDead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)
Introduction Fugro LOADTEST Overview STATIC LOAD TESTING O-cell Bi-directional testing State of the art Dr Melvin England Fugro LOADTEST Static load tests Previous/existing technology Developments O-cell
More informationProceedings 2005 Rapid Excavation & Tunneling Conference, Seattle
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle EPB-TBM Face Support Control in the Metro do Porto Project, Portugal S. Babendererde, Babendererde Engineers LLC, Kent, WA; E. Hoek, Vancouver,
More informationCONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,
More informationFUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS
FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
More informationFOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples
FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to
More informationSECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
More informationSection 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
More informationAmendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
More informationGeotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur
Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was
More informationLife after 30! Innovative investigation and repair of the Overvaal railway tunnel. r a i l w a y s a n d h a r b o u r s PROJECT TEAM
Text Hannes Gräbe Spoornet (Technology Management) hannesg@spoornet.co.za r a i l w a y s a n d h a r b o u r s Life after 30! Innovative investigation and repair of the Overvaal railway tunnel 1 PROJECT
More informationSAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
More informationFigure A-1. Figure A-2. continued on next page... HPM-1. Grout Reservoir. Neat Cement Grout (Very Flowable) Extension Displacement Plate
Addendum HELICAL PULLDOWN Micropile (HPM) Introduction The HPM is a system for constructing a grout column around the shaft of a standard Helical Screw Foundation (see Figure A1). To begin the process,
More informationJune 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
More informationHAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT
HAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT CONE PENETRATION TESTS Cone resistance Local friction Porewater pressure Dissipations REPORT NO: RRM CONTRACT NO: GLOVER SITE INVESTIGATIONS
More informationCalifornia Department of Transportation Doyle Drive Test Program Contract No. 04A3362
California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,
More informationSYDNEY SANDSTONE AND SHALE PARAMETERS FOR TUNNEL DESIGN
Robert Bertuzzi Pells Sullivan Meynink, Unit G3 56 Delhi Road, North Ryde NSW 2113, Australia 1 BACKGROUND Inherent in any set of rock mass parameters are various assumptions regarding, amongst other things
More informationCone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell
Cone Penetration Testing in Geotechnical Practice Tom Lunne Peter K. Robertson John J.M. Powell BLACKIE ACADEMIC & PROFESSIONAL An Imprint of Chapman & Hall London Weinheim New York Tokyo Melbourne Madras
More informationComparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions
Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Peyman Amini Motlagh, Ali Pak Abstract Seismic retrofitting of important structures is essential in seismological
More informationJack-in Piling Environmental Friendly Piling System
Jack-in Piling Environmental Friendly Piling System Part 1 - Chris Loh 7 Nov 12 CSC HOLDINGS LIMITED Gracious Piling Environmental Friendly Low Noise No Vibration Jack-in Piling How Many Decibels? Permissible
More informationTime- Cost Benefit Analysis for Anchor Type Foundation in Transmission Towers
Time- Cost Benefit Analysis for Anchor Type Foundation in Transmission Towers 1 M.Harikrishnan, 2 R.Balagopal. 1 M-E CEM, Jerusalem College of Engineering, Chennai, Project Student CSIR-SERC. 2 Scientist,CSIR-Structural
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationWashington 98102-3699, mike.bailey@hartcrowser.com
LESSONS LEARNED FROM A STONE COLUMN TEST PROGRAM IN GLACIAL DEPOSITS Barry S. Chen 1, P.E., Member, Geo-Institute and Michael J. Bailey 2, P.E., Member, Geo-Institute ABSTRACT A stone column test program
More informationCARLOS FERNANDEZ TADEO & ASOCIADOS, S.L. Range of Services
1 CARLOS FERNANDEZ TADEO & ASOCIADOS, S.L. Range of Services Pile and deep foundations testing Geotechnical testing equipment supplier Geotechnical software supplier Geotechnical consulting Web page: www.fernandeztadeo.com
More information