New 800MW STG Super Bloc

Size: px
Start display at page:

Download "New 800MW STG Super Bloc"

Transcription

1 New 800MW STG Super Bloc New 800MW STG Power Plant Summary All the major components of the above STG Power Plant and all necessary ancillary equipment are all in-situ, stored and maintained in new, un-used, condition as per the OEM power manufacturers specifications. Balance of Plant (BOP) equipment has been manufactured to OEM specifications and tested all ready to ship immediately The acquisition of the above plant will expedite installation time-line and commercial operation of the facility by approximately 2.5 to 3.5 years - the STG Boiler alone would take at least 2/3 years to build under normal circumstances likewise the switchyard components would take several years to build if ordered now - time is money. The annual projected revenue for this 800 MW plant is available based on an energy sale price of 4 cents per kwh. The expedited commercial operations date more than offsets the cost of the unit.

2 Major Equipment Status Turbine Generator and Accessories 100% delivered Steam Generator Engineer and Supply 100% delivered Steam Surface Condenser Stainless Steel tube blank plates and wide band coil tubing Condensate Pumps 100% delivered Switchyard completed and ready to ship HRSG Plant efficiency in excess of < 60% Designed to operate in high temperature environment Feedwater Heaters Stainless Steel tube strip coils and carbon steel ingots for forgings Boiler Feed Pumps, BFP Booster Pumps, 100% delivered S/U Pump & Salt water desalination plant for downstream water sales This particular Super Bloc is designed to run on several different fuel types, including, but not limited to Heavy Fuel Oil and Liquid Natural Gas. It is complete with electric generating unit comprising a nominal 800 MW GE steam turbine, tandem-compound 4-flow single reheat unit with throttle conditions of 3500 psig, 1050 F/1100 F. The Steam generator is rated at approximately 4,650,000 lbs per hour capable of burning natural gas. Custom fuel sources are also optional features of this particular design and are available at extra cost The plant design heat rate with this power block is 8725 BTU/kw-hr with turbine control valves wideopen (VWO) and average ambient conditions with a circular mechanical forced draft cooling tower, electrostatic precipitator, and a wet limestone flue gas desulphurization system. All cycle design has been incorporated into the equipment for sale, and cycle information is available for all other normally desired conditions. Included with the block procurement of the equipment listed for sale is the design documentation of the power block. This includes all drawings, specifications, calculations, 3D modeling, etc. at the stage that currently exists. For sale separately are the continued services of the engineer of record for this design.

3 A summary of the status & design is as follows. All the plant is this Power Bloc is brand new, fresh delivery, has commissioning cycles only, and is under manufacturer s warranty - this is the latest technology from General Electric and all its OEM Suppliers and Partners it is complete, ready to be transferred and produce power immediately. Financials Firm acquisition price for the unit is $550 million USD + Installation. The annual revenue for the 800 MW coal project is projected at $198,504,000. This is based on an annual availability of 85% and an energy sale price of 4 cents per kw. This is calculated by multiplying 800,000 kw times 8,760 hours per year, times 85% availability, times 4 cents per kwh. An improved availability would increase the revenue stream Downstream potable water availability for urban development The actual revenue generated is dependent on the PPA obtained from the purchaser of power. Full Financing is Available

4 How to the next Step Register Potential Buyer with ICA (USA) INC and schedule a site inspection of all equipment Should the potential Buyer wish to place a hold on the equipment, we can arrange for a deposit to be placed with our Escrow Lawyers in London in the amount of say $30m whilst inspecting same - that would then place an exclusive Hold on the equipment for say 30 days, possibly 60 days, if the value of the deposit is increased to say $50 million. The Buyer would inspect the equipment and have the negotiated timeframe to finalize the purchase. If the Seller is satisfied with the equipment and finalizes a commitment to purchase, the deposit is transferred in total to the Seller. If the potential Buyer decides not to purchase the equipment, then the deposit would be returned to the potential Buyer. Timeline The unit is immediately available - a site inspection can be scheduled to meet the Buyers schedule. Note, recent events in Japan are proving detrimental to the nuclear industry and there is a chance the owner may decide to withdraw the unit from the market and complete the originally planned installation. Additional Possible Services Feedwater schematic see attached.

5

6

7

8 Addendum miscellaneous ICA (USA) INC Group can install this 800MW STG Super Bloc tomorrow the entire project management is on standby ready to go at a moments notice our entire EPC+M team is RWA to go to Iraq/Libya/Burma/etc, and go to work immediately there is no 2/3 year build time required to build the steam boilers - that has already been accomplished the same applies to the switchyard. That has also been built & delivered - all the heavy lifting has already been done Please note this project is subject to prior sale Addendum/Notes

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW ISRAEL ELECTRIC OROT RABIN POWER STATION UNITS 1-4 4 x 350 MW COAL BOILER CONVERSION TO LOW NO X NATURAL GAS AND COAL FIRING BY PRIMARY AND SECONDARY MEASURES INSTALLATION Replacing the Burner Management

More information

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in

More information

Small Scale Coal Power Plant in Indonesia

Small Scale Coal Power Plant in Indonesia Small Scale Coal Power Plant in Indonesia Taufik Sastrawinata Director Technology and Business Development of PT. Advance Technology Indonesia and Secretary General of Indonesian Coal Society Indonesia

More information

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9 TABLE OF CONTENTS Description Page Number SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9 Indeck Keystone Energy, LLC. 5451 Merwin Lane, Suite 100 Erie,

More information

Thermal Coupling Of Cooling and Heating Systems

Thermal Coupling Of Cooling and Heating Systems This article was published in ASHRAE Journal, February 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not

More information

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT Atef M Al Baghdadi Water and Electricity Authority Abu Dhabi, U.A.E Keywords : Power Plant, Boiler Capacity, Electrical Power

More information

Natural Gas Conversions of Existing Coal-Fired Boilers

Natural Gas Conversions of Existing Coal-Fired Boilers White Paper MS-14 Natural Gas Conversions of Existing Coal-Fired s Authors: F.J. Binkiewicz Jr., P.E. R.J. Kleisley B.E. McMahon J.E. Monacelli D.A. Roth D.K. Wong Babcock & Wilcox Power Generation Group,

More information

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s Babcock & Wilcox Canada TSSG TM - SAGD-MC a n d I n d u s t r i a l A p p l i c a t i o n s w i t h M u l t i - C

More information

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain

More information

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency International Journal of Advanced Mechanical Engineering. ISSN 2250-3234 Volume 4, Number 1 (2014), pp. 1-8 Research India Publications http://www.ripublication.com/ijame.htm A Review on Power Generation

More information

University of Iowa Power Plant

University of Iowa Power Plant University of Iowa Power Plant Contents Purpose... 2 History... 3 Cogeneration... 6 Boilers... 7 Environmental Impact... 10 Steam Turbine Generators... 12 Modernization... 14 Biomass Fuel Initiative...

More information

Condensing Economizers Workshop Enbridge Gas, Toronto. MENEX Boiler Plant Heat Recovery Technologies. Prepared by: Jozo Martinovic, M A Sc, P Eng

Condensing Economizers Workshop Enbridge Gas, Toronto. MENEX Boiler Plant Heat Recovery Technologies. Prepared by: Jozo Martinovic, M A Sc, P Eng Condensing Economizers Workshop Enbridge Gas, Toronto MENEX Boiler Plant Heat Recovery Technologies Prepared by: Jozo Martinovic, M A Sc, P Eng MENEX Innovative Solutions May 15, 2008 MENEX INC. 683 Louis

More information

PRE-QUALIFICATION ANNOUNCEMENT

PRE-QUALIFICATION ANNOUNCEMENT Warsaw March 9, 2011 PRE-QUALIFICATION ANNOUNCEMENT The contracting authority 00-526 Warsaw, ul. Krucza 24/26, Poland Website: www.elektrowniapolnoc.pl Contact person: Mr. Marek Obuchowicz E-mail: [email protected]

More information

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal. 413 POWER PLANT ENGINEERING PART-A 1. Define Power. Power is the rate at which energy is used (or) Energy/time. 2. What are the types of fuels? Solid fuel Liquid fuel Gaseous fuel (Any one among the above

More information

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas Mark Schiffhauer, ATSI Engineering Services Cameron Veitch, Combustion and Energy Systems Scott Larsen, New York State Energy

More information

Skoda Supercritical Steam Turbine 660 MW

Skoda Supercritical Steam Turbine 660 MW Skoda Supercritical Steam Turbine 660 MW Jiri Fiala Head of Engineering Dept. Skoda Power s.r.o. 27th of October 2010 Vrnjacka Banja - Serbia ŠKODA History Establishment of the company in 1859 Mr. Emil

More information

Source: EIA Natural Gas Issues and Trends 1998

Source: EIA Natural Gas Issues and Trends 1998 7.0 System Redesign Analysis 7.1 Emissions Natural gas is a clean burning fossil fuel. It consists of a mixture of hydrocarbon gases, primarily Methane (CH 4 ). In analyzing the combustion process, it

More information

Committed to make a better world

Committed to make a better world Committed to make a better world 1. Higher Availability & Reliability 2. Highest Plant efficiency 3. Lower Heat Rate 4. Minimum Auxiliary Power Consumption 5. Minimum Emission of Pollutants Committed to

More information

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle INL/CON-05-00740 PREPRINT Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle Geothermal Resources Council Annual Meeting Greg Mines October 2005 This is a preprint of a paper intended for publication

More information

Overview of Heat Recovery Boiler Systems and Operating Costs Factors Effecting Blowdown Blowdown Heat Recovery The Energy Tank

Overview of Heat Recovery Boiler Systems and Operating Costs Factors Effecting Blowdown Blowdown Heat Recovery The Energy Tank Overview of Heat Recovery Boiler Systems and Operating Costs Factors Effecting Blowdown Blowdown Heat Recovery The Energy Tank Unbiased, Third-Party, Water & Energy Management Consulting Firm: - Not affiliated

More information

I. STEAM GENERATION, BOILER TYPES

I. STEAM GENERATION, BOILER TYPES I. STEAM GENERATION, BOILER TYPES and BOILER PLANT SYSTEMS 1 Steam Generation Water s Unique Properties: High Thermal Capacity (Specific Heat) High Critical Temperature Ideal Medium for Heat Delivery High

More information

Boiler and Steam Efficiency What does it mean?

Boiler and Steam Efficiency What does it mean? PACIA Carbon Solutions Forum 3-29 September 20 Boiler and Steam Efficiency What does it mean? Andrew Hook - Area Manager, Nalco 1 Purpose, Process, Payoff Purpose: To explain boiler and steam efficiencies

More information

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority 1 2 What is Efficiency? Efficiency: What you get divided by what you pay for Heatrate is a measure of plant efficiency

More information

TARIFF CODE and updates standard

TARIFF CODE and updates standard TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of

More information

Low grade thermal energy sources and uses from the process industry in the UK

Low grade thermal energy sources and uses from the process industry in the UK Low grade thermal energy sources and uses from the process industry in the UK Yasmine Ammar, Sharon Joyce, Rose Norman, Yaodong Wang, Anthony P. Roskilly Sustainable Thermal Energy Management in the Process

More information

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin Drying of Woody Biomass BioPro Expo & Marketplace / Atlanta, GA / March 14-16, 2011 Drying of Woody Biomass Conventional Direct Fired Dryer Technology Proprietary work of the Copyright Owner Issues with

More information

FLASH TANK ECONOMIZER PRODUCT GUIDE

FLASH TANK ECONOMIZER PRODUCT GUIDE FLASH TANK ECONOMIZER PRODUCT GUIDE Overview A flash tank is used to recover blowdown energy in the form of flash steam and blowdown. This can only be used with a deaerator or some other pressurized device.

More information

INTEC Engineering GmbH Heating Solutions for the Marine Industry

INTEC Engineering GmbH Heating Solutions for the Marine Industry INTEC Engineering GmbH Heating Solutions for the Marine Industry Thermal Oil Heaters Heating Solutions for the Marine Industry Compared to conventional plants using hot water or steam, thermal oil as a

More information

Pumping Solutions for Concentrated Solar Power

Pumping Solutions for Concentrated Solar Power Pumping Solutions for Concentrated Solar Power Innovation, Design, Manufacture + Aftermarket Services: Pumping solutions for a better world SPX - An Introduction SPX is a Fortune 500 multi-industry manufacturing

More information

OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS

OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS CONFERENCE PROCEEDINGS OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS by Edward K. Levy, Nenad Sarunac, and Carlos Romero Energy

More information

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN Authors: Presenter: T. Efrat, Yu Haimiao Tomer Efrat Deputy Manager, Thermal Process Dept. IDE Technologies

More information

UNDERSTANDING CENTRAL HEATING SYSTEMS

UNDERSTANDING CENTRAL HEATING SYSTEMS UNDERSTANDING CENTRAL HEATING SYSTEMS This advice guide is part of a series of free guides produced by the Association of Plumbing & Heating Contractors Ltd. which provide consumers with essential basic

More information

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation Steam Generator Boilers Compact Steam Boilers Rapid Start-Up Safe in Operation AB&CO TT BOILERS The boiler maker AB&CO TT BOILERS LTD. have since the middle sixties produced industrial boilers and heaters

More information

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools Heat Recovery Dehumidification (HRD) system Designed for municipal swimming pools A dehumidification and ventilation system with dynamic heat pump heat recovery to swimming pool water and air ENVIRONMENTAL

More information

Review of Potential Efficiency Improvements at Coal-Fired Power Plants

Review of Potential Efficiency Improvements at Coal-Fired Power Plants Review of Potential Efficiency Improvements at Coal-Fired Power Plants Introduction The Clean Air Markets Division, U.S. Environmental Protection Agency requested that Perrin Quarles Associates, Inc.,

More information

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...

More information

10 Nuclear Power Reactors Figure 10.1

10 Nuclear Power Reactors Figure 10.1 10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of

More information

Energy Efficiency in Steam Systems

Energy Efficiency in Steam Systems Energy Efficiency in Steam Systems Fundamentals of Energy Efficiency: An Introductory Workshop April 2008 John S. Raschko, Ph.D. Mass. Office of Technical Assistance www.mass.gov/envir/ota (617) 626-1093

More information

How To Understand Evaporator

How To Understand Evaporator SECTION 5 COMMERCIAL REFRIGERATION UNIT 21 EVAPORATORS AND THE REFRIGERATION SYSTEM UNIT OBJECTIVES After studying this unit, the reader should be able to Define high-, medium-, and low-temperature refrigeration.

More information

EJECTOR AIR REMOVAL SYSTEMS ENGINEERING DATA BULLETIN # PVS-80025201-ARS PAGE 1 OF 5

EJECTOR AIR REMOVAL SYSTEMS ENGINEERING DATA BULLETIN # PVS-80025201-ARS PAGE 1 OF 5 BULLETIN # PVS-80050-ARS PAGE OF 5 GENERAL Air Removal Systems generally consist of dual 00% (twin-element) ejecrs, single 00% surface-type inter- & aftercondensers, suction & discharge isolation valves

More information

www.universityquestions.in

www.universityquestions.in DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT: ME6701-POWER PLANT ENGINEERING YEAR/SEM: III/V UNIT-I COAL BASED THERMAL POWER PLANTS 1. What are the processes of rankine cycle?

More information

Forgotten savings: Heat recovery from surface blowdown

Forgotten savings: Heat recovery from surface blowdown Forgotten savings: Heat recovery from surface blowdown 1. Introduction The purpose of this article is to inform thermal plant operators of the interesting fuel savings that can be obtained by recovering

More information

Subject: Technology Collaboration for Fired Heaters (FH)

Subject: Technology Collaboration for Fired Heaters (FH) 1) Introduction: Subject: Technology Collaboration for Fired Heaters (FH) This Expression of Interest (EoI) seeks response from Original Equipment Manufacturers (OEMs), who are willing to be associated

More information

FURNACEPHOSPHORUS AND PHOSPHORICACID PROCESS ECONOMICS PROGRAM. Report No. 52. July 1969. A private report by. the

FURNACEPHOSPHORUS AND PHOSPHORICACID PROCESS ECONOMICS PROGRAM. Report No. 52. July 1969. A private report by. the Report No. 52 FURNACEPHOSPHORUS AND PHOSPHORICACID by GEORGE E. HADDELAND July 1969 A private report by. the PROCESS ECONOMICS PROGRAM STANFORD RESEARCH INSTITUTE MENLO PARK, CALIFORNIA CONTENTS 1 INTRODUCTION........................

More information

Energy Efficiency Improvement in Thermal Power Plants

Energy Efficiency Improvement in Thermal Power Plants International Journal of Innovative Technology and Exploring Engineering (IJITEE) ISSN: 2278-3075, Volume-2, Issue-1, December 2012 Energy Efficiency Improvement in Thermal Power Plants Genesis Murehwa,

More information

HOW DOES A NUCLEAR POWER PLANT WORK?

HOW DOES A NUCLEAR POWER PLANT WORK? HOW DOES A NUCLEAR POWER PLANT WORK? O n t a r i o P o w e r G e n e r a t i o n P U T T I N G O U R E N E R G Y T O U S G O O D E O N T A R I O P O W E R G E N E R A T I O N What a Nuclear Reactor Does

More information

HOW TO SELECT A LOW VOLUME (L.V ) BOILER

HOW TO SELECT A LOW VOLUME (L.V ) BOILER HOW TO SELECT A LOW VOLUME (L.V ) BOILER FREQUENTLY ASKED QUESTIONS OR COMMENTS ON BOILERS Dear Potential Customer: Low Volume Operator Exempt boilers have been marketed in Ontario to eliminate the requirement

More information

ALUMINUM. BestPractices Assessment Case Study. Alcoa North American Extrusions Implements Energy Use Assessments at Multiple Facilities.

ALUMINUM. BestPractices Assessment Case Study. Alcoa North American Extrusions Implements Energy Use Assessments at Multiple Facilities. ALUMINUM BestPractices Assessment Case Study August 2001 OFFICE OF INDUSTRIAL TECHNOLOGIES ENERGY EFFICIENCY AND RENEWABLE ENERGY, U.S. DEPARTMENT OF ENERGY BENEFITS Assesses core systems commonly found

More information

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2 WASTE HEAT BOILERS CONTENTS 1 INTRODUCTION... 3 2 CONCEPTION OF WASTE HEAT BOILERS... 4 2.1 Complex Solution...4 2.2 Kind of Heat Exchange...5 2.3 Heat Recovery Units and Their Usage...5 2.4 Materials

More information

Steam Generation Efficiency Module Blowdown Losses Section

Steam Generation Efficiency Module Blowdown Losses Section Steam End User Training Steam Generation Efficiency Module Blowdown Losses Section Slide 1 Blowdown Losses Module This section will discuss blowdown loss and its affect on boiler efficiency. [Slide Visual

More information

Solar Hot Water Heaters

Solar Hot Water Heaters Solar Hot Water Heaters Three High Vacuum Water inlet Stainless Steel screw Gel seal and insulation Water outlet Dust proof seals Non Pressure Models Details ASWH-1b ( Color Painted 304 ) ASWH-1c ( stainless

More information

Continuous flow direct water heating for potable hot water

Continuous flow direct water heating for potable hot water Continuous flow direct water heating for potable hot water An independently produced White Paper for Rinnai UK 2013 www.rinnaiuk.com In the 35 years since direct hot water systems entered the UK commercial

More information

Gas Condensing Boilers

Gas Condensing Boilers Gas Condensing Boilers www.johnsonandstarley.co.uk QuanTec Ultra Efficient Condensing Gas Boilers Including HR28C with Integral Passive Flue Gas Heat Recovery As market leaders and innovators, Johnson

More information

NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY Proceedings of the 18th Annual North American Waste-to-Energy Conference NAWTEC18 May 11-13, 2010, Orlando, Florida, USA NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED

More information

REGULATORS 175/153 Series

REGULATORS 175/153 Series 175/153 Series 175 HEATING 153 COOLING Watson McDaniel reserves the right to change the designs and/or materials of its products without notice. 2002 Watson McDaniel Company Revised 7/2002 175 / 153 Screwed

More information

Basics of Steam Generation

Basics of Steam Generation Helsinki University of Technology Department of Mechanical Engineering Energy Engineering and Environmental Protection Publications Steam Boiler Technology ebook Espoo 2002 Basics of Steam Generation Sebastian

More information

COGENERATION OF ELECTRICITY AT RADFORD ARMY AMMUNITION PLANT (AAP) - A CASE STUDY

COGENERATION OF ELECTRICITY AT RADFORD ARMY AMMUNITION PLANT (AAP) - A CASE STUDY COGENERATION OF ELECTRICITY AT RADD ARMY AMMUNITION PLANT (AAP) - A CASE STUDY Mohamed A. Masood, PE Value Engineer Production Base Modernization Activity Picatinny Arsenal, New Jersey ABSTRACT Oil crises,

More information

Piping Systems for Nuclear Power Industry. Prague, October 2011

Piping Systems for Nuclear Power Industry. Prague, October 2011 Piping Systems for Nuclear Power Industry Prague, October 2011 Introduction of the company Leading Czech supplier of piping systems for power engineering 60 years of experience in the field of power industry

More information

JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation 2012.11.14

JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation 2012.11.14 Presentation of Japanese technology of waste to energy JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation 2012.11.14 1 JASE-W established in Oct 2008 Introduction of JASE-world

More information

20,000 Barrel Per Day Crude Oil Refinery

20,000 Barrel Per Day Crude Oil Refinery 20,000 Barrel Per Day Crude Oil Refinery (For Sale) AT THE EXCEPTIONAL PRICE OF $39,500,000.00 PRICE INCLUDES SHIPPING AND INSTALLATION Includes 2- TEN T B/D DISTILLILATION UNITS (SELLER NEEDS TO SELL

More information

GreEnergy. Power Plants. ELECTRICAL POWER from CEMENT PLANT WASTE HEAT. for the Cement Industry

GreEnergy. Power Plants. ELECTRICAL POWER from CEMENT PLANT WASTE HEAT. for the Cement Industry ELECTRICAL POWER from CEMENT PLANT WASTE HEAT for the Cement Industry GreEnergy Power Plants Power Solutions from ORMAT to Increase the Eco-Efficiency of the Cement Industry Courtesy of Heidelberger Zement

More information

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley. Sample Questions REVISED FIRST CLASS PARTS A1, A2, AND A3 (NOTE: these questions are intended as representations of the style of questions that may appear on examinations. They are not intended as study

More information

ENERGY EFFICIENCY IN POWER PLANTS

ENERGY EFFICIENCY IN POWER PLANTS Plenary session Producing more with less: Efficiency in Power Generation ENERGY EFFICIENCY IN POWER PLANTS Frans van Aart, Wim Kok, Pierre Ploumen KEMA Power Generation & Sustainables ENERGY EFFICIENCY

More information

Gas Marketplace Work? July 9-13, 2007

Gas Marketplace Work? July 9-13, 2007 What Makes a Natural Gas Marketplace Work? July 9-13, 2007 Accra TOPIC I: Resource & Infrastructure Investment for Delivery Key value chain components Physical Infrastructure Gathering Removal of basic

More information

Progress on High Efficiency Coal Power Plants

Progress on High Efficiency Coal Power Plants CoalFleet for Tomorrow Progress on High Efficiency Coal Power Plants Dr. Jeff Phillips Sr. Program Manager, Generation McIlvaine Webcast March 1, 2012 CoalFleet for Tomorrow is a registered service mark

More information

Recover Heat from Boiler Blowdown Water

Recover Heat from Boiler Blowdown Water Prepared for California Energy Commission (CEC) Prepared By: Southern California Gas Company (A Sempra Energy Utility) E3M Inc. May 2012 i Disclaimer The CEC and its contractor, Southern California Gas

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 23 Rev: 01 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

Temperature control solutions to help you improve business performance

Temperature control solutions to help you improve business performance Temperature control solutions to help you improve business performance Our aim is to help businesses enhance their performance by using portable and modular process cooling and HVAC methods to overcome

More information

R ENEWABLE SOURCES CSP. Sustainable and cost-efficient solar thermal energy

R ENEWABLE SOURCES CSP. Sustainable and cost-efficient solar thermal energy R ENEWABLE SOURCES CSP Sustainable and cost-efficient solar thermal energy 2 Turning environmental challenges into sustainable opportunities Feranova GmbH was founded in 2005 as a project development company

More information

Power Plants. BENSON Once-Through Heat Recovery Steam Generator. Power Generation

Power Plants. BENSON Once-Through Heat Recovery Steam Generator. Power Generation Power Plants BENSON Once-Through Heat Recovery Steam Generator Power Generation BENSON Once-Through technology for Heat Recovery Steam Generators New application of proven technology Siemens development

More information

POWER GENERATION: GAS TURBINES, CO- GENERATION, COMBINED CYCLE PLANTS, WIND POWER GENERATION, AND SOLAR POWER:

POWER GENERATION: GAS TURBINES, CO- GENERATION, COMBINED CYCLE PLANTS, WIND POWER GENERATION, AND SOLAR POWER: POWER GENERATION: GAS TURBINES, CO- GENERATION, COMBINED CYCLE PLANTS, WIND POWER GENERATION, AND SOLAR POWER: Computer Simulation, Selection, Applications, Operation, Maintenance, Performance Monitoring,

More information

Specific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound.

Specific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound. Steam Tables What They Are How to Use Them The heat quantities and temperature/ pressure relationships referred to in this Handbook are taken from the Properties of Saturated Steam table. Definitions of

More information

Design Approach, Experience and Results of 1MW Solar Thermal Power Plant

Design Approach, Experience and Results of 1MW Solar Thermal Power Plant Design Approach, Experience and Results of 1MW Solar Thermal Power Plant Solar Thermal Power Plant and Testing Facility Project funded by Ministry of New and Renewable Energy, GoI, New Delhi Prof. j k

More information

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL Siniša Stojan, Ph.D. student Damir Dražić, Ph.D. student Brodotrogir, HR - 21220 Trogir, Croatia [email protected],

More information

The Lodi Energy Center, owned

The Lodi Energy Center, owned Lodi s 300MW Flex 30 plant ushers in a new era for the US By Junior Isles The Siemens Flex Plant 30 at Lodi designed to deliver 200MW of power to the grid within 30 minutes of startup is capable of daily

More information

SPECIFICATIONS FOR STEEL PIPE

SPECIFICATIONS FOR STEEL PIPE SPECIFICATIONS FOR STEEL PIPE Published pipe standards serve three functions. 1. They dictate manufacturing and testing requirements and prescribed methods of measuring the required mechanical and physical

More information

Your Partner for Concentrated Solar Power Generation The Heart of Your Process

Your Partner for Concentrated Solar Power Generation The Heart of Your Process 1 Sulzer Pumps Your Partner for Concentrated Solar Power Generation The Heart of Your Process 2 Experience and Solutions You Can Rely on Around the world, the power industry is taking on the challenge

More information

Turbine Inlet Cooling

Turbine Inlet Cooling Section 2 Turbine Inlet Cooling Reference Charts 32 Relative system costs for an F-class combined cycle 33 Change in power output with ambient air temperature 34 Example of MS7001 design heat rate, flow

More information

Boiler Blowdown. Boiler Blowdown Benefits. Best Operating Practices for Boiler Blowdown

Boiler Blowdown. Boiler Blowdown Benefits. Best Operating Practices for Boiler Blowdown Boiler Blowdown Even with the best pretreatment programs, boiler feedwater often contains some degree of impurities, such as suspended and dissolved solids. The impurities can remain and accumulate inside

More information

Improved Modern Control Station for High Pressure Bypass System in Thermal Power Plant

Improved Modern Control Station for High Pressure Bypass System in Thermal Power Plant Improved Modern Control Station for High Pressure Bypass System in Thermal Power Plant P.Karthikeyan 1, A.Nagarajan 2, A.Vinothkumar 3 UG Student, Department of EEE, S.A. Engineering College, Chennai,

More information

ROLLED STAINLESS STEEL PLATES, SECTIONS AND BARS

ROLLED STAINLESS STEEL PLATES, SECTIONS AND BARS STANDARD FOR CERTIFICATION No. 2.9 ROLLED STAINLESS STEEL PLATES, SECTIONS AND BARS OCTOBER 2008 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD (DNV) is an autonomous

More information

Some Criteria for Choosing a Steam Boiler for a Microbrewery

Some Criteria for Choosing a Steam Boiler for a Microbrewery Some Criteria for Choosing a Steam Boiler for a Microbrewery Jack Coe Rite Engineering and Manufacturing Corporation Breweries rely on steam heating for a number of functions, primarily to heat the brew

More information

Steam Turbine Concepts for the Future Volatile Power Market

Steam Turbine Concepts for the Future Volatile Power Market Steam Turbine Concepts for the Future Volatile Power Market Power-Gen Europe June 12 14, 2012 Michael Wechsung Thomas Loeper Radim Znajda Siemens AG - Energy Sector Fossil Power Generation Agenda Situation

More information

A Case Study on Coal to Natural Gas Fuel Switch

A Case Study on Coal to Natural Gas Fuel Switch A Case Study on Coal to Natural Gas Fuel Switch by Brian Reinhart, P.E. Presenter Alap Shah Mark Dittus Ken Nowling Bob Slettehaugh Black & Veatch December 12, 2012 INTRODUCTION In the United States, natural

More information

Guidelines for Preparing for a Temporary Steam Plant

Guidelines for Preparing for a Temporary Steam Plant Guidelines for Preparing for a Temporary Steam Plant Trailer-Mounted Boilers Skid Mounted Boilers Mobile Boiler Rooms Mobile Feedwater Vans Mobile Steam Plants Emergency Preparedness Plan Table of Contents

More information

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines Content Introduction...5 Standard ambient matched engine...5 Operating at high seawater with standard matched engine...6 Non-standard

More information

Mechanical Engineering Technician- Plant Technician

Mechanical Engineering Technician- Plant Technician Mechanical Engineering Technician- Plant Technician A competent Mechanical Engineering Technician- Plant Maintenance is expected to: 1. Ability to plan and execute work in a safe and responsible manner

More information

Alfa Laval in brief Alfa Laval is a leading global provider of specialized products and engineering solutions.

Alfa Laval in brief Alfa Laval is a leading global provider of specialized products and engineering solutions. Alfa Laval in brief Alfa Laval is a leading global provider of specialized products and engineering solutions. Our equipment, systems and services are dedicated to helping customers to optimize the performance

More information

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Combined heat and power (CHP) is an efficient and clean approach to generating power and thermal energy from a single

More information

Building Energy Systems. - HVAC: Heating, Distribution -

Building Energy Systems. - HVAC: Heating, Distribution - * Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center

More information

COGENERATION. This section briefly describes the main features of the cogeneration system or a Combined Heat & Power (CHP) system. 36 Units.

COGENERATION. This section briefly describes the main features of the cogeneration system or a Combined Heat & Power (CHP) system. 36 Units. COGENERATION 1. INTRODUCTION... 1 2. TYPES OF COGENERATION SYSTEMS... 2 3. ASSESSMENT OF COGENERATION SYSTEMS... 10 4. ENERGY EFFICIENCY OPPORTUNITIES... 14 5. OPTION CHECKLIST... 16 6. WORKSHEETS... 17

More information

A Primer on Protecting Idle Boilers By Howard Benisvy, Member ASHRAE

A Primer on Protecting Idle Boilers By Howard Benisvy, Member ASHRAE The following article was published in ASHRAE Journal, December 2002. Copyright 2002 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes

More information

Steam turbines for solar thermal power plants. Industrial steam turbines. Answers for energy.

Steam turbines for solar thermal power plants. Industrial steam turbines. Answers for energy. Steam turbines for solar thermal power plants Industrial steam turbines Answers for energy. Power without carbon dioxide The advantage of solar energy is that the fuel is free, abundant and inexhaustible.

More information

GLOBACON 05 HVAC Systems for Cogen

GLOBACON 05 HVAC Systems for Cogen GLOBACON 05 HVAC Systems for Cogen Track 2, Session 2B Advanced HVAC and Building Systems Date: March 24th, 2005 Gearoid Foley President Integrated CHP Systems Corp. Integrated CHP Systems Corp. Electricity

More information

Best Practice in Boiler Water Treatment

Best Practice in Boiler Water Treatment Best Practice in Boiler Water Treatment Boiler Water Treatment Part 2 Internal Treatment Objectives of Internal Water Treatment 1 To control the level of total dissolved solids (TDS) within the boiler

More information

Facility Support Services

Facility Support Services Facility Support Services The Precision Group has a breadth of experience delivering innovative, first class facility support service solutions to clients across the public and private sectors. Our expert

More information

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application.

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. 1) Introduction This Expression of Interest (EoI) seeks response

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

Lessons Learned, Best Practices and Observations. 2014 2016 Plant Winterization Visits

Lessons Learned, Best Practices and Observations. 2014 2016 Plant Winterization Visits Lessons Learned, Best Practices and Observations 2014 2016 Plant Winterization Visits EQUIPMENT PROTECTION: Although some of the observations and practices were unique to an entity, the following can be

More information

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS Dr. Abhay Kumar Sahay, AGM(CC OS) Bijay Manjul, AGM( Operation) Kahalgaon Boiler has three inputs Steam generator 1. WATER 2. COAL 3. AIR Burner Air preheater

More information