1 Renovation PART 1 - GENERAL 1.01 OVERVIEW A. This Section supplements Design Guideline Element D5000, with specific criteria for Projects involving construction of alterations to existing buildings. PART 2 - DESIGN CRITERIA 2.01 GENERAL A. The A/E is responsible for surveying existing buildings to determine if adequate space is available for electrical Work and equipment. A/E must not rely upon MD Anderson furnished as-built drawings alone. B. Early in the design phase, arrangements must be made with the MD Anderson Project Manager for access above ceilings to determine field conditions and to locate existing electrical components and utility services. C. Modification versus Replacement Where equipment must be modified to be physically utilized in a Project, the following must be evaluated: 1. Determine if one manufacturer must be used for final responsibility of the modified equipment. 2. Determine if a legitimate cost saving will be realized by modifying the existing equipment rather than installing new. If yes, then modification should be considered. D. Age and Physical Condition: 1. The length of time in service of the wiring, devices and equipment should be reviewed prior to considering reuse. 2. The equipment should be capable of remaining in use for a minimum of 10 years of additional life or having 40 percent of remaining life, if not the equipment shall be replaced. 3. Where equipment has been in operation for a number of years, MDACC shall, in cooperation with Engineer, conduct a physical inspection of terminals, insulation, switching contacts, control wiring etc.,, using recommendations offered by Engineer and other information it deems appropriate, determine what actions are to be included in the project scope.. E. Parts Availability: 1. After the Engineer s site survey s the availability of spare parts for existing equipment should be determined. ODG OF 5

2 Renovation 2. Where the Project involves extending an existing system but the existing equipment spare parts are not available, the Engineer should inform the MD Anderson Project Manager in writing. Specific directions will be given at that time. F. Conduit and Junction Boxes (Boxes): 1. Conduit and boxes in existing walls to be demolished shall be removed. 2. Conduit and boxes in existing walls to remain shall be abandoned in place (if not reused) and the boxes shall be provided with blank covers. 3. Conduit in existing or new ceilings that is not intended for reuse shall be removed back to the panel from where it originates. 4. Conduits that had been run in the existing concrete slab shall be saw-cut off as they enter the slab and then sealed to prevent moisture access. G. Conductors: 1. Conductors with deteriorated or damaged insulation shall be replaced. Conductors must be meggered to assure insulation integrity. 2. Conductors that are not to be reused shall be removed back to the nearest junction box. Where the entire circuit is to be removed, the conductors shall be removed back to the panelboard from which they emanate. 3. Disconnection and removal of telephone cabling may not be the responsibility of the Contractor. Verify with MD Anderson. 4. Disconnection and removal of communication, Nurse Call, Fire Alarm wiring, etc., shall be the responsibility of the Contractor. 5. Contractor shall not attempt to fish new conductors through an existing conduit with existing conductors. All conductors shall be replaced. H. Wiring Devices: 1. Remove devices that are not installed at reusable locations. Boxes shall be blanked. 2. Existing receptacles and switches in good condition, located at acceptable places, may be reused. Non-hospital-grade receptacles shall be replaced in all patient care areas, including but not limited to Exam and Treatment Rooms, with hospital-grade receptacles. I. Lighting Fixtures: 1. Lighting fixtures that cannot be reused shall be removed, including associated wiring to ceiling-mounted junction boxes. 2. Where fixtures are determined to be reusable in new or existing ceilings, they shall be taken down, cleaned and re-lamped prior to re-installation. An economic analysis of labor costs shall be made for reuse or replacement of fixtures. ODG OF 5

3 Renovation J. Panelboards: 1. Consider panelboards for reuse if physical condition, ratings and circuit capacity requirements are met. 2. Panelboards shall be installed in new or existing electrical closets. Corridor-mounted panel boards shall not be used without specific instructions. Refer to other articles of this Manual for closet requirements. 3. In major secondary distribution renovation projects, existing panelboard back boxes may be used as pull boxes for branch circuit transfer. All branch circuit conductors shall be tagged to identify which circuit number they are being transferred to in the new panel. Provide a requirement, in the Contract Documents, for the Contractor to develop and type an accurate Circuit Directory. 4. Provide in the Contract Documents for the Contractor to balance the loads during the branch circuit transfer. K. Owner Retained Equipment: 1. After consulting with MD Anderson, determine if the following items should be retained by the Owner: a. Disconnects of 100 A (amperes) Motors and larger b. Fire Alarm Devices c. Nurse Call System Components d. Panelboards and Circuit Breakers e. Lighting Fixtures f. Special Receptacles g. Transformers 2. Contractor is to properly dispose offsite equipment not to be retained by Owner. L. Concealed or Exposed: 1. Conceal all work wherever possible. Wherever it is physically impractical to conceal conduits due to economic considerations, the Engineer shall consult with the Owner to determine acceptable alternatives. 2. All conductors shall be installed in conduit or in surface metal raceway. 3. Where permission is granted, type AC cable (hospital grade) may be used to fish down to outlets in existing walls as long as lengths do not exceed 3 m (10 feet). Locate a junction box directly above ceiling for the conduit drop to the new outlet. This, however, is not permitted for emergency circuits. Emergency circuits are to be routed in conduit. ODG OF 5

4 Renovation 4. Surface metal raceways shall not be installed on the floor. Service to equipment in open areas shall be served from under the slab or through Tele/power poles wired from the ceiling. M. Continuity of Service: 1. Services passing through areas of remodeling shall be maintained throughout construction period. 2. Circuits that are modified as part of the remodeling Project, which serve areas adjacent to the construction area, shall be re-circuited as part of this Project. PART 3 - SPECIAL CONTRACT DOCUMENT REQUIREMENTS 3.01 GENERAL A. Required demolition of existing electrical systems must be indicated on the Drawings. B. Specific detailing of interfaces between alterations and existing to remain shall be clearly indicated on the Drawings. C. Where existing equipment must be modified to be physically used on a Project, evaluate if initial and operational cost savings will be realized by modifying the existing equipment rather than installing new. Provide recommendations. D. Provide Section(s) to resolve conflicts. Location of new equipment and services must be coordinated with all involved parties. Phasing of construction Work must be coordinated with all involved parties. Phasing of construction work must be coordinated with operation of the facility and MD Anderson staff and be accounted for in the design. E. If MD Anderson wishes to retain existing electrical equipment considered obsolete as a result of modification, A/E should note this on the demolition Drawings; otherwise, the Contractor in accordance with General Conditions of the Contract will dispose of it. F. Note on the Drawings if applicable to the Project, that services passing through areas of renovation shall be maintained throughout the construction period. G. Required demolition of existing electrical systems must be indicated on the Drawings. H. Specific detailing of interfaces between alterations and existing to remain shall be clearly indicated on the Drawings. I. Where existing equipment must be modified to be physically used on a Project, evaluate if initial and operational cost savings will be realized by modifying the existing equipment rather than installing new. Provide recommendations. J. Provide section(s) to resolve conflicts. Location of new equipment and services must be coordinated with all involved parties. Phasing of construction Work must be coordinated with all involved parties. Phasing of construction work must be coordinated with operation of the facility and MD Anderson staff and be accounted for in the design. ODG OF 5

5 Renovation K. If MD Anderson wishes to retain existing electrical equipment considered obsolete as a result of modification, A/E should note this on the demolition Drawings; otherwise, the contractor in accordance with General Conditions of the contract will dispose of it. L. Refer to Owner s Design Guideline Element D5010 Service and Distribution for the requirement of Coordination Study and Arc Flash Hazard Analysis, which may apply to some renovation projects. PART 4 - PRODUCTS 4.01 GENERAL A. New equipment shall be compatible with existing components and systems to which they interface. B. If existing equipment will be reused, the A/E shall check availability of spare parts. C. Refer to Owner s Master Construction Specifications. These are available on the Owner s Design Guidelines website: PART 5 - DOCUMENT REVISION HISTORY Issue Date Revision Description Reviser Initial Adoption of Element Rev Included sustainability requirements throughout document based upon TGCE's evaluation. (Paragraphs 2.01 D 2 & 2.01 D 3) Rev Added 3.01 L for the requirements of Coordination Study and Arc Flash Hazard Analysis. Rev. 3 JCD PL END OF ELEMENT ODG OF 5

Element D Services Electrical

Element D Services Electrical Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

Questions and Answers for Heating and A/C Contractors

Questions and Answers for Heating and A/C Contractors 1. How do we accomplish grounding of furnaces and / or water heaters on two wire circuits? 250.134 Equipment Fastened in Place or Connected by Permanent Wiring Methods (Fixed) Grounding. Unless grounded

More information

A. Shop Drawing submittals shall include, but not be limited to, the following:

A. Shop Drawing submittals shall include, but not be limited to, the following: SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical

More information

East Central College 14434.03 HANSEN HALL LEVEL 300/400 RENOVATIONS PACKAGE

East Central College 14434.03 HANSEN HALL LEVEL 300/400 RENOVATIONS PACKAGE SECTION 260519 - BUILDING WIRE AND CABLE PART 1 - GENERAL 1.1 WORK INCLUDES A. Base and Alternate Bids: 1. Contractor Provide: a. Building wire and cable as shown on drawings or specified including feeders,

More information

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval. Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's

More information

Homeowner Information Guide Electrical Safety. British Columbia Safety Authority

Homeowner Information Guide Electrical Safety. British Columbia Safety Authority Homeowner Information Guide Electrical Safety British Columbia Safety Authority The following information should be carefully reviewed before performing any electrical work. The information contained in

More information

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses.

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses. Lee Householder Project Homes 88 Carnation Street Richmond, VA 2325 Re: William Byrd Renovation, Addendum 01 August 24, 2015 Lee, Here are the questions from bidders received between August 17, 2015 and

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing

More information

26 0533 Raceway and Boxes for Electrical Systems Page 1 of 7

26 0533 Raceway and Boxes for Electrical Systems Page 1 of 7 Last Update: November, 2015 A. Conduits: Consultant s Handbook Page 1 of 7 1. All conductors for each and every electrical system shall be installed in a raceway except communications and A/V systems which

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT **ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT. YOU COULD PUT YOUR FAMILY AND WORLDLY POSSESSIONS IN DANGER!!!

More information

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.) Common Electrical Hazards in the Workplace Including Arc Flash Presented by Ken Cohen, PhD, PE & CIH (Ret.) 1 What s New In February 1972, OSHA incorporated the 1971 edition of the National Fire Protection

More information

ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)

ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D 12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section

More information

J 1 6 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0004 18 -Aug-2014

J 1 6 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0004 18 -Aug-2014 1. CONTRACT ID CODE PAGE OF PAGES J 1 6 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0004 18 -Aug-2014 6. ISSUED BY Code OPHA3 7. ADMINISTERED

More information

Exhibit C Design Review Guidelines

Exhibit C Design Review Guidelines Exhibit C Design Review Guidelines January 2015 Included in this Exhibit for Design Guidelines includes: Electrical Design Guidelines Electrical and Mechanical /Plumbing Construction Requirements Temporary

More information

Fire Alarm Systems Certification

Fire Alarm Systems Certification Fire Alarm Systems Certification The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive listing. 2.1 Submittal Preparation

More information

Top Commercial / Residential Electrical Requirements *

Top Commercial / Residential Electrical Requirements * Department of Community Development Building Division 4800 West 92 nd Avenue Westminster, Colorado 80031 For Information call (303) 658-2075 Fax (303) 706-3922 www.westminsterpermits.com Top Commercial

More information

The U.S. Department of Labor projects that electrician careers will grow to 698,200 by 2022.

The U.S. Department of Labor projects that electrician careers will grow to 698,200 by 2022. The U.S. Department of Labor projects that electrician careers will grow to 698,200 by 2022. Train now for affordable Electrician careers and get wired for success. Residential Electrician Diploma Program

More information

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 1, 2013. It is intended for information and reference purposes only.

More information

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY! READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY! The main power to any existing system must be disconnected prior to the

More information

B. Related Sections: 1. Section 26 05 33 - Raceway and Boxes for Electrical Systems.

B. Related Sections: 1. Section 26 05 33 - Raceway and Boxes for Electrical Systems. SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes wall switches; wall dimmers; receptacles; multioutlet assembly; and device plates and decorative box covers. B. Related

More information

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851 FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

MONTGOMERY COUNTY EXECUTIVE REGULATION Offices of the County Executive. 101 Monroe Street. Rockville, Maryland 20850

MONTGOMERY COUNTY EXECUTIVE REGULATION Offices of the County Executive. 101 Monroe Street. Rockville, Maryland 20850 Montgomery County Regulation on: ADOPTION OF THE 2008 NATIONAL ELECTRICAL CODE DEPARTMENT OF PERMITTING SERVICES Issued by County Executive Regulation # 15-09 Authority: Code Section 17-2 and 17-3 Supersedes:

More information

First Published in The Wichita Eagle on January 2, 2015 ORDINANCE NO. 49-897

First Published in The Wichita Eagle on January 2, 2015 ORDINANCE NO. 49-897 OCA #230100 First Published in The Wichita Eagle on January 2, 2015 ORDINANCE NO. 49-897 AN ORDINANCE AMENDING SECTIONS 4.A.080, 4.1.020, 4.1.110, 4.2.010, 4.2.070, 4.2.125, 4.2.170, 4.2.175 AND 4.2.220;

More information

Electrical Wiring Methods, Components and Equipment for General Use. Approved for Public Release; Further Dissemination Unlimited

Electrical Wiring Methods, Components and Equipment for General Use. Approved for Public Release; Further Dissemination Unlimited Electrical Wiring Methods, Components and Equipment for General Use Approved for Public Release; Further Dissemination Unlimited At the completion of this unit you shall be able to: 1. Utilize section

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS This guideline has been prepared to assist the owner/occupant of a single family dwelling with compliance to the requirements of the National Electrical

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER

More information

Beware; the Multiwire Branch Circuit

Beware; the Multiwire Branch Circuit eware; the Multiwire ranch ircuit The electrical industry has a formal ode, and it has unwritten rules-of-thumb, just as any other discipline involving construction. The ode changes every three years,

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Dana Ham, Facilities Manager, City of Cambridge Public Schools TIM MCINTOSH, VHB PROJECT MANAGER Ron Maniscalco, P.E. Electrical Engineer

Dana Ham, Facilities Manager, City of Cambridge Public Schools TIM MCINTOSH, VHB PROJECT MANAGER Ron Maniscalco, P.E. Electrical Engineer King Open School Electrical Service Evaluation TO: Dana Ham, Facilities Manager, City of Cambridge Public Schools TIM MCINTOSH, VHB PROJECT MANAGER FROM: Ron Maniscalco, P.E. Electrical Engineer DATE:

More information

ADOPTION OF THE NATIONAL ELECTRICAL CODE, 2005

ADOPTION OF THE NATIONAL ELECTRICAL CODE, 2005 ADOPTION OF THE NATIONAL ELECTRICAL CODE, 2005 That a certain code, three (3) copies of which are now on file and have been on file for a period of not less than 21 days in the office of the Village Clerk

More information

Solar Panel Installations

Solar Panel Installations Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.

More information

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor

More information

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: Signed completed Electrical Permit application form. Minnesota law requires all electrical work is to be performed by licensed,

More information

WISCONSIN DEPARTMENT OF SAFETY & PROFESSIONAL SERVICES

WISCONSIN DEPARTMENT OF SAFETY & PROFESSIONAL SERVICES Scott Walker Governor David Ross Secretary WISCONSIN DEPARTMENT OF SAFETY & PROFESSIONAL SERVICES 1400 E Washington Ave PO Box 8935 Madison WI 53708-8935 Email: dsps@wisconsin.gov Voice: 608-266-2112 FAX:

More information

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

PALM BEACH COUNTY AMENDMENTS TO THE NATIONAL ELECTRICAL CODE, 1999 EDITION

PALM BEACH COUNTY AMENDMENTS TO THE NATIONAL ELECTRICAL CODE, 1999 EDITION PALM BEACH COUNTY AMENDMENTS TO THE NATIONAL ELECTRICAL CODE, 1999 EDITION CODING: Words underlined are additions to the 1999 NEC Words stricken are deletions to the 1999 NEC Adopted by Ordinance 99-73

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin January 2016 CEC-10 [rev-9] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current

More information

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum

More information

POWER DISTRIBUTION. Power and Undercarpet Products POWER AND UNDERCARPET PRODUCTS. Chapter Summary

POWER DISTRIBUTION. Power and Undercarpet Products POWER AND UNDERCARPET PRODUCTS. Chapter Summary Power and Undercarpet Products POWER AND UNDERCARPET PRODUCTS AMPINNERGY Modular Power Distribution System................... 270 Raised Access Floor/Zone Wiring Distribution System................ 270

More information

The Association of Electrical and Medical Imaging Equipment Manufacturers Arc Fault Circuit Interrupter

The Association of Electrical and Medical Imaging Equipment Manufacturers Arc Fault Circuit Interrupter Arc Fault Circuit Interrupter SUCCESS STORIES AFCIs avert potential disaster in South Carolina I would like to take the time and thank you for the Arc Fault breaker, your product saved our lives and our

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

Electrical Contractors. and the. New Jersey. Rehabilitation Code

Electrical Contractors. and the. New Jersey. Rehabilitation Code Electrical Contractors and the New Jersey Rehabilitation Code Alan Chech Electrical Seminars 609-890-7072 www.alanchech.com Information is based on the presently adopted electrical subcode NEC 2005. Current

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

Residential Electrical Inspection. Checklist

Residential Electrical Inspection. Checklist 443 Lafayette Road N. St. Paul, Minnesota 55155 www.doli.state.mn.us Residential Electrical Inspection (651) 284-5064 1-800-DIAL-DLI Fax: (651) 284-5743 TTY: (651) 297-4198 Checklist Generally, Minnesota

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

REPAIRING ALUMINUM WIRING

REPAIRING ALUMINUM WIRING REPAIRING ALUMINUM WIRING U.S. Consumer Product Safety Commission Bethesda, MD www.cpsc.gov www.saferproducts.gov Publication 516 ALUMINUM WIRING The U.S. Consumer Product Safety Commission (CPSC) staff

More information

GENERAL WIRING RULES FOR HOUSES

GENERAL WIRING RULES FOR HOUSES GENERAL WIRING RULES FOR HOUSES 1. Romex has to be installed in drilled holes in joists or studs even above suspended ceilings - No stapling to bottom edges of joists or studs. You may staple wire to flat

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Residential Electrical Inspection. Checklist

Residential Electrical Inspection. Checklist Electrical Licensing and Inspection 443 Lafayette Road North St. Paul, Minnesota 55155-4342 www.doli.state.mn.us 651-284-5064 Fax: 651-284-5743 TTY: 651-297-4198 1-800-DIAL-DLI Residential Electrical Inspection

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices 1 Union County Public Schools Facilities Department Electrical Safe Work Practices 2 Purpose In accordance with OSHA Standards 1910.331-335, safety-related work practices shall be used by Union County

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

Water Leak 1: Intrusion Policy

Water Leak 1: Intrusion Policy Water Leak 1: Intrusion Policy {Non-Casualty) 1. Determine Source of Leak Roof Leak- 11 See roof leak" Pressured Pipe leak- 11 See pressured pipe leak" Water Intrusion- See 11 see Water Intrusion leak"

More information

Engineers Edge, LLC PDH & Professional Training

Engineers Edge, LLC PDH & Professional Training 510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Communication

More information

Residential Electrical Inspection Checklist

Residential Electrical Inspection Checklist Residential Electrical Inspection Checklist Based on the 2008 National Electrical Code Generally, Minnesota law requires all electrical work to be performed by licensed, bonded and insured electrical contractors

More information

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

IntelliBrite Controller (For IntelliBrite Pool, Spa and Landscape Lighting Fixtures) Installation and User s Guide

IntelliBrite Controller (For IntelliBrite Pool, Spa and Landscape Lighting Fixtures) Installation and User s Guide IntelliBrite Controller (For IntelliBrite Pool, Spa and Landscape Lighting Fixtures) Installation and User s Guide *619751* P/N 619751 - Rev C IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS

More information

Fire Protection Notice No. 9 ELECTRICAL SAFETY

Fire Protection Notice No. 9 ELECTRICAL SAFETY Fire Protection Notice No. 9 ELECTRICAL SAFETY Because electricity is one of the most controllable forms of energy it can also be one of the safest. But, as industry and commerce draw ever more heavily

More information

HEANEY General Contracting, Inc.

HEANEY General Contracting, Inc. HEANEY General Contracting, Inc. March 26, 2016 AAPS BID NO. 16-019-665 ADDENDUM NO. 03- PROJECT: DESCRIPTION: Ann Arbor Public Schools Mitchell Expansion Phase I Bid Pkg. 3 (MEP) Building Addition and

More information

Electrical Grounding. Appendix C

Electrical Grounding. Appendix C Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Article 10 - ADMINISTRATIVE SECTION

Article 10 - ADMINISTRATIVE SECTION Article 10 - ADMINISTRATIVE SECTION 10.1 TITLE These Administrative Regulations along with the requirements included in the 2011 Edition of the National Electrical Code (NFiPA-70-2011) as adopted by the

More information

SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES

SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES 611-1 Description. This Section sets forth Contract acceptance procedures for installations of traffic control signals and devices

More information

City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov

City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov PHOTOVOLTAIC PERMITTING GUIDELINES The information provided in this document is general and is intended only as a

More information

SINGLE FAMILY DWELLING ELECTRICAL SERVICES RATED 225 TO 600 AMPS

SINGLE FAMILY DWELLING ELECTRICAL SERVICES RATED 225 TO 600 AMPS SINGLE FAMILY DWELLING ELECTRICAL SERVICES RATED 225 TO 600 AMPS A. PURPOSE 1. The following information includes the basic permit application requirements for a 120/240 volt single phase Electrical Service

More information

Errata NFPA 70. Proposed 2014 Edition

Errata NFPA 70. Proposed 2014 Edition Errata NFPA 70 National Electrical Code (Report on Proposals) Reference: 12-109 (Log #1618) Panel Meeting Action Proposed 2014 Edition The National Electrical Code Technical Correlating Committee notes

More information

City of San Diego Residential Photovoltaic Systems Inspection Guidelines

City of San Diego Residential Photovoltaic Systems Inspection Guidelines City of San Diego Residential Photovoltaic Systems Inspection Guidelines The purpose of inspections by DSD staff is to ensure compliance with the California Electrical Code (CEC), other applicable codes

More information

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4 How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work Table of Contents Section 1 Introduction page 3 Section 2 Types of Methods of Measurements page 4 Section 3 Project Specific

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

Battery Charger For Nickel Cadmium and Nickel-Metal Hydride Rechargeable Batteries Model PSN Series

Battery Charger For Nickel Cadmium and Nickel-Metal Hydride Rechargeable Batteries Model PSN Series Battery Charger For Nickel Cadmium and Nickel-Metal Hydride Rechargeable Batteries Model PSN Series Operating Instructions WARNING CONCERNING THE REMOVAL OF COVER: CAUTION: TO PREVENT THE RISK OF ELECTRIC

More information

BASIC NEC CODE RULES AND DESIGN PRACTICE

BASIC NEC CODE RULES AND DESIGN PRACTICE BASIC NEC CODE RULES AND DESIGN PRACTICE Wire Ampacity and Size Circuit Breaker Size 1. Maximum loading for any branch circuit is 80% of rating of circuit for ampacity of wire for any load. NEC 220-2,

More information

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope 3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service

More information

SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S

SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S Including: 1. Heating, Ventilating and Air Conditioning (HVAC) 2. Irrigation Systems 3. Oil and Gas Burning Equipment 4. Signs and

More information

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Name of School: OPTIONAL INFORMATION Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Guidelines: This checklist

More information

UNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL

UNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL S 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 CUSTOMER RESPONSIBILITY FOR TOTAL TEMPORARY SERVICE 4.0 CUSTOMER RESPONSIBILITY FOR TEMPORARY SERVICE IN PERMANENT LOCATION 5.0 NVE RESPONSIBILITIES 6.0 GROUNDING

More information

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included

More information

SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES

SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES SnoTrace Surface Snow and Ice Melting INSTALLATION PROCEDURES SnoTrace INSTALLATION PROCEDURES Refer to the SnoTrace Cable Testing Report for required recording of test data and circuit information. Upon

More information

IMPROVING HEALTH FACILITY INFRASTRUCTURE (IHFI) Electrical Infrastructure Rehabilitation HUEH Hospital Emergency Ward Port-au-Prince, Haiti

IMPROVING HEALTH FACILITY INFRASTRUCTURE (IHFI) Electrical Infrastructure Rehabilitation HUEH Hospital Emergency Ward Port-au-Prince, Haiti IMPROVING HEALTH FACILITY INFRASTRUCTURE (IHFI) Electrical Infrastructure Rehabilitation HUEH Hospital Emergency Ward Port-au-Prince, Haiti Case Study December 2012 INTRODUCTION Built in 1918, the 540-bed

More information

WHITE PAPER: HOME REMODELING & AFCI PROTECTION

WHITE PAPER: HOME REMODELING & AFCI PROTECTION WHITE PAPER: HOME REMODELING & AFCI PROTECTION Remodeling with AFCIs/Page 2 Introduction Americans spent more than $235 billion on home remodeling in 2007 1, fueled in part by do-ityourself home centers,

More information

ELECTRICIAN TRADE REGULATION

ELECTRICIAN TRADE REGULATION Province of Alberta APPRENTICESHIP AND INDUSTRY TRAINING ACT ELECTRICIAN TRADE REGULATION Alberta Regulation 274/2000 With amendments up to and including Alberta Regulation 122/2014 Office Consolidation

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Electrical Wiring Technical Bulletin

Electrical Wiring Technical Bulletin Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will

More information

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document

More information

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5 White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC

More information

October Safety Subject

October Safety Subject October Safety Subject Electrical Hazards All electrical equipment should be kept in good repair. Replace defective equipment or have it repaired by a qualified person. Watch for wiring on appliances that

More information

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems 1.0 Purpose A. The following guideline provides the minimum standards and requirements for fire alarm systems. 2.0

More information

Electric Service Guide for Commercial Construction

Electric Service Guide for Commercial Construction Electric Service Guide for Commercial Construction Contents Contacting KCP&L... 2 Voltages... 2 Temporary Service... 2 Customer-Provided Temporary Service... 2 KCP&L-Provided Temporary Service.... 2 Current

More information

Requirements for Electrical Installations

Requirements for Electrical Installations ARTICLE 110 Requirements for Electrical Installations INTRODUCTION TO ARTICLE 110 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS Article 110 sets the stage for how you ll implement the rest of the NEC. This

More information