1 Drainage, Insulation, and Concrete Slabs UNIT Drainage After the foundation walls are erected and before the excavation outside the walls is backfilled (filled with earth to the finished grade line), footing drains, if indicated, must be installed. Footing drains are usually perforated plastic pipe placed around the footings in a bed of crushed stone, Figure If the site has a natural slope, the footing drains can be run around the foundation wall to the lowest point, then away from the building to drain by gravity. In areas where there is no natural drainage, the drain is run to a dry well or municipal storm drain. At one time, clay drain tile was the most common type of pipe for this purpose. However, perforated plastic pipe is used in most new construction. Plastic drain pipe is manufactured in 10-foot lengths of rigid pipe and in 250-foot rolls of flexible pipe, Figure An assortment of plastic fittings is available for joining rigid plastic pipe. When footing drains are to be included, they are shown on a wall section or footing detail, Figure A note on the drawing indicates the size and material of the pipe. If the floor drains are to be included in concrete-slab floors, they are indicated by a symbol on the appropriate floor plan, Figure If these floor Objectives After completing this unit, you will be able to perform the following tasks: Locate and explain information for control of groundwater as shown on a set of drawings. Locate and describe subsurface insulation. Determine the dimensions of concrete slabs and the reinforcement to be used in concrete slabs. FILTER FABRIC CRUSHED STONE OR GRAVEL Figure Footing drain. PERFORATED PLASTIC PIPE PITCHED TOWARD STORM SEWER, DRY WELL, OR SUMP Drainage, Insulation, and Concrete Slabs 89

2 Openmirrors.com Figure The floor drain is shown by a symbol. (Notice that the floor is pitched toward the drain.) Figure Plastic drain pipe. Figure Footing drains are shown outside the footing. 90 Unit 14

3 drains run under a concrete footing, the piping had to be installed before the footing was placed (see Unit 11). The riser (vertical part through the floor) and drain basin are usually set at the proper elevation just prior to placing the concrete floor. The floor plan may include a spot elevation for the finished drain, or it may be necessary to calculate it from information given for the pitch of the concrete slab. Pitch of concrete slabs is discussed later in this unit. Vapor Barriers Another technique often used to prevent groundwater from seeping through the foundation is coating the foundation wall with asphalt foundation coating. At this point, subsurface work outside the foundation wall is completed, but backfilling should not be done until the superstructure is framed. The weight and rigidity of the floor on the foundation wall help the wall resist the pressure of the backfill. If the backfilling must be done before the framing, the foundation walls should be braced. To retard the flow of moisture from the earth through the concrete-slab floor, the drawings may call for a layer of gravel over the entire area before the concrete is placed. A polyethylene vapor barrier is laid over the gravel underfill. The thickness of polyethylene sheeting is measured in mils. One mil equals 1/1,000 of an inch. For vapor barriers, 6-mil polyethylene is generally used. Insulation In cold climates, it is desirable to insulate the foundation and concrete slab. This insulation is usually rigid plastic foam board placed against the foundation wall or laid over the gravel underfill, Figure Like all materials, concrete and masonry expand and contract slightly with changes in temperature. To allow for this slight expansion and contraction, the joint between the concrete slab and foundation wall should include a compressible expansion joint material. Expansion joints can be made from any compressible material such as neoprene or composition sheathing material. This expansion joint filler is as wide as the slab is thick and is simply placed against the foundation wall before the concrete is placed. Concrete Slabs When the house has a basement, the floor is a concrete slab-on-grade. The areas to be covered with concrete are indicated on the foundation plan or basement floor plan. This is usually done by an area not giving the thickness of the concrete slab and any reinforcing steel to be used. To help the concrete resist minor stresses, it is usually reinforced with welded wire fabric. The specifications for welded wire fabric are explained in Figure Where Figure Rigid plastic foam insulation may be laid under the perimeter of the floor or against the foundation wall. Drainage, Insulation, and Concrete Slabs 91

4 Openmirrors.com Figure The callout for welded wire fabric explains the size and spacing of the wires. the slab must support bearing walls or masonry partitions, it may be haunched, as discussed in Unit 12. When floor drains are included or where water must be allowed to run off, the slab is pitched (sloped slightly). A note on the drawings indicates the amount of pitch. One-quarter inch per foot is common. When there is any possibility of confusion about which way the slab is to be pitched, bold arrows are drawn to show the direction the water will run, Figure When floor drains or forms are set for pitched floors, it is necessary to find the total pitch of the slab. This is done by multiplying the pitch per foot by the number of feet over which the slab is pitched. (See Math Review 8.) For example, if the note on a concrete apron in front of a garage door indicates a pitch of ½ inch per foot and the apron is 4 feet wide, the total pitch is 2 inches. The proper elevation for the form at the outer edge of the apron is 2 inches less than the finished floor elevation. Slab-on-grade installations may require electrical raceways to be installed in or just below the concrete slab in the crushed or gravel fill. These installations must be made so that they do not reduce the structural integrity of the concrete slab. An oversized raceway in the concrete slab may cause the slab to crack and settle unevenly. An electrician should be present during concrete placement to observe and correct any damage to these electrical raceways. All underground utility systems must be coordinated prior to starting installation, especially in commercial and industrial buildings, as discussed in Unit 11. The service entrance section may have up to six subdistribution sections or panels located throughout the building. Electrical feeders are required from the electrical service entrance section to these subdistribution sections or panels. This requires detailed coordination between the electrical installer and the other utility installers prior to starting the installation of the utility systems. The electrical installation must be laid out around the other utilities, with the other utility layouts normally having priority. The other utilities to be coordinated may include plumbing, fire sprinkler, heating and air conditioning, and specialty systems. This coordination must be done for both the underground and aboveground systems. 5" CONC. FLR. PITCH 1/8" PER FOOT Figure A bold arrow indicates the way that water will run off a pitched surface. 92 Unit 14

5 Some of the concrete work in the Lake House is of particular interest, because it is part of the passive solar heating system the Lake House uses. Section 1/4 and the lower-level floor plan 1/2 indicate that the area under the living room and dining room floors is a heat sink. A heat sink is a mass of dense material that absorbs the energy of the sun during the day and radiates it at night. The living room and dining room are on the south side of the Lake House. In the winter, when the leaves are off the deciduous trees, the sun shines in the large areas of glass in these rooms and warms the heat sink. At night, this heat is radiated into the house to provide additional heat when it is needed most. The floor over the heat sink is a concrete slab similar to that used in the playroom. Detail 2/5 helps explain this concrete slab. CHECK YOUR PROGRESS Can you perform these tasks? Describe the footing drains shown on a set of construction drawings. Name the material and its thickness when foundation insulation is shown. Describe any vapor barriers or foundation coating to be applied to the foundation or under concrete slabs. List the dimensions of any concrete slab floors shown on the drawings. Describe the reinforcement to be used in concrete slabs. Explain the pitch of a concrete slab to provide for drainage. ASSIGNMENT Refer to the Lake House drawings (in the packet) to complete this assignment. 1. What is the thickness of the concrete slab over the heat sink in the Lake House? What is the largest raceway (conduit) that could be installed in this slab? 2. Describe the reinforcement used in the concrete slab in the playroom of the Lake House. 3. How many square feet of 2-inch rigid insulation are needed for the Lake House heat sink? 4. What prevents moisture from seeping through the concrete slab floor in the Lake House? 5. What is the finished floor elevation of the Lake House garage? 6. What is the elevation of the floor drain in the utility room of the Lake House? 7. What is the purpose of the 8-inch-thick concrete haunch in the middle of the Lake House slab? 8. How many cubic yards of concrete are required for the garage floor? The basement floor? Drainage, Insulation, and Concrete Slabs 93

Residential Foundations and Basements

Residential Foundations and Basements Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article

More information

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope FOUNDATIONS STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION Build a Better Home Details are critical when constructing a sound building foundation that will withstand water and control dampness.

More information

R E S I D E N T I A L H O U S I N G

R E S I D E N T I A L H O U S I N G HL 252 Rev. April 1997 R E S I D E N T I A L H O U S I N G CONTROLLING EXTERNALWATER PROBLEMS FOR RESIDENCES I II III IV V Lot Drainage Gutter Water Management Foundation Waterproofing Floor Slab Waterproofing

More information

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION. WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:

More information

Foundation. Foundation

Foundation. Foundation Moisture Aside from structural concerns, the most important consideration for foundation design is moisture. No client wants a wet basement. No client wants a damp basement. No client wants mold in their

More information

Renovating Your Basement

Renovating Your Basement building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

Additions and Alterations

Additions and Alterations Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

Basement Moisture Problems

Basement Moisture Problems Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT During the last century, concern about the environment increased, as issues such as global warming and the Greenhouse Effect convinced us that the

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

Basements are Changing. Basements Part of the Enclosure. Basements. Energy Efficient, Durable, Healthy. Below grade enclosure

Basements are Changing. Basements Part of the Enclosure. Basements. Energy Efficient, Durable, Healthy. Below grade enclosure Basements are Changing John Straube, Ph.D., P.Eng Basements: New & Retrofit Energy Efficient, Durable, Healthy Increasingly used as living space Not a root /coal cellar anymore! High quality space expected

More information

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A TechSpecs A builder s blueprint for construction technologies January 2013 The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A C B A E D H G F A. Wood Floor Framing - p. 2 B. Foundation

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall TOWN of NEW BOSTON Bid Package Refurbishment and Upgrade of Basement of the New Boston Town Hall Your bid Envelope must be marked with Basement Upgrade at Town Hall and the due date and time. If you send

More information

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures Foundation Water Problems An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures This presentation was prepared and presented by Dwight Walker

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

Comment Form on Proposed Gut Rehabilitation Alternatives

Comment Form on Proposed Gut Rehabilitation Alternatives Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to energystarhomes@energystar.gov by October 10 th, 2012 with the subject line

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

4. ANCHOR BOLTS AND STRAPS a. ½ anchor bolts shall be embedded 7 into concrete a maximum of 6' on center and 12 from corners and ends of plates. GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement

More information

What you need to know about concrete block basement construction.

What you need to know about concrete block basement construction. Designing and planning your new residence is a vitally important process, which will have a great influence on the future enjoyment of your home. A successful process will ensure all areas of the home

More information

Foundation Drainage. Gable Roof Runoff. Hip roof Runoff. By: Brent Anderson, P.E. Moisture Control Engineering Leader STRUCTURAL TECHNOLOGIES

Foundation Drainage. Gable Roof Runoff. Hip roof Runoff. By: Brent Anderson, P.E. Moisture Control Engineering Leader STRUCTURAL TECHNOLOGIES Foundation Drainage By: Brent Anderson, P.E. Moisture Control Engineering Leader STRUCTURAL TECHNOLOGIES As a concrete contractor, I have a vested interest in how well the water on site is controlled.

More information

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability 1/9/13 By Brett T. Fagan, P.E. Presented by Marie Horan, P.E. Building Diagnostics, Inc. Building Diagnostics Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

TORO STEEL BUILDINGS. BOLTS: o - 0.635" diam. x - 0.75 " diam. x - 1.00 " diam. C.J. - Control Joints to minimize cracking.(0.

TORO STEEL BUILDINGS. BOLTS: o - 0.635 diam. x - 0.75  diam. x - 1.00  diam. C.J. - Control Joints to minimize cracking.(0. 100 ' 0 " out to out of steel C 1 ' 3.25 " B Keep This Distance 37 ' 5.5 " ll sections and bolts have been blown up for clarification of placement. They are to be centered as much as possible on pier.

More information

Foundation Facts, Basement Basics

Foundation Facts, Basement Basics exposed and all wiring connections are concealed. The main service entrance of wires and load center in most homes is in the utility area of the home nearest the point of entry of the electric service.

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

International Greenhouse Company

International Greenhouse Company Greenhouse Foundation Design As with any building, a good solid foundation is crucial for the long term durability and functionality of your greenhouse. A weak foundation will cause your greenhouse to

More information

Residential Building Permits

Residential Building Permits LANE COUNTY PUBLIC WORKS Residential Building Permits LAND MANAGEMENT DIVISION 3050 N. DELTA HWY, EUGENE OR 97408 i CONTACT PHONE NUMBERS: Building Program: (541) 682-4651 Inspection Requests: (888) 299-2821

More information

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule

More information

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3 TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete

More information

MATERIALS. Table 1 Mortar Proportions by Volume (Ref. 12)

MATERIALS. Table 1 Mortar Proportions by Volume (Ref. 12) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY BASEMENT WALL CONSTRUCTION TEK 3- Construction (200) Keywords:

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

State of Connecticut Department of Public Health RADON PROGRAM

State of Connecticut Department of Public Health RADON PROGRAM State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means

More information

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure

More information

Spring rains in eastern Kansas and sometimes in western Kansas cause

Spring rains in eastern Kansas and sometimes in western Kansas cause Dry Basements and Crawl Spaces Spring rains in eastern Kansas and sometimes in western Kansas cause some homes to have problems with water entry into the basement or crawl space. People wonder, Does this

More information

BASEMENTS MATERIAL IN THIS CIRCULAR BY R. A. JONES, W. H. KAPPLE, AND J. T. LENDRUM

BASEMENTS MATERIAL IN THIS CIRCULAR BY R. A. JONES, W. H. KAPPLE, AND J. T. LENDRUM BASEMENTS COPYRIGHT 1953 BY THE BOARD OF TRUSTEES OF THE u NIVERSITY OF ILLINOIS. All rights reserved. No part of this circular may be reproduced in any form without permission in writing from the Publisher.

More information

Site Grading and Drainage to Achieve High-Performance Basements

Site Grading and Drainage to Achieve High-Performance Basements Construction Technology Update No. 69 Site Grading and Drainage to Achieve High-Performance Basements By M.C. Swinton and T.J. Kesik Proper site grading and foundation drainage strategies are required

More information

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

What Causes Foundation Leaking?

What Causes Foundation Leaking? A home's foundation has the odds stacked against it from the day it's built. When a home is excavated to make room for the foundation walls, space is left between the outer edge of the foundation wall

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr. 117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This

More information

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill ENERGY STAR Qualified New Homes Thermal Enclosure Checklist & Water Management Checklist Eli Caudill ENERGY STAR Version 3 Tighter Standards Whole Home Approach Better, More Sustainable Construction Surpasses

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Engineered Wood Foundations

Engineered Wood Foundations Engineered Wood Foundations Emeraldfoundations.com 1 EWF Planning and Installation manual This manual will serve as a guide to planning and installing an Emerald Foundation system. This system is comprised

More information

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...

More information

Foundation Code compliance and Best Practices By Michael Coello

Foundation Code compliance and Best Practices By Michael Coello Foundation Code compliance and Best Practices By Michael Coello Background Graduated cum laude in 1992 with a Bachelor of Science degree in finance from University of Wisconsin - Parkside Started poured

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Metropolitan Builders Association Masonry & Concrete Standard

Metropolitan Builders Association Masonry & Concrete Standard Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.

More information

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01. Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition. DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which

More information

Best Basement Water Management Practices

Best Basement Water Management Practices Best Basement Water Management Practices Guide written by Patrick Sluss Sluss Construction (330) 224 5394 When a home owner is faced with a leaking basement there is a way to correct the problem and a

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

Waterproofing and interior insulation for basements takes new twist in technology.

Waterproofing and interior insulation for basements takes new twist in technology. Waterproofing and interior insulation for basements takes new twist in technology. Free report reveals how to stop all call backs for basements for the life of the structure by installing these 3 low cost

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall

More information

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

CITY OF SELMA, TEXAS Inspection Checklist: Commercial Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides

More information

Proposed Minimum Subterranean Termite Treatment Standards

Proposed Minimum Subterranean Termite Treatment Standards Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Chapter 9 Remedial Measures

Chapter 9 Remedial Measures [This is an annotated version of a chapter from the US Army Corps of Engineers book, Foundations in Expansive Soils. This book is in the public domain. This document is consists of an abbreviated and annotated

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

SUMP PUMP DISCHARGES INFORMATIONAL PACKET

SUMP PUMP DISCHARGES INFORMATIONAL PACKET DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION SUMP PUMP DISCHARGES INFORMATIONAL PACKET Background Many homes have sump pumps located in crawl spaces and basement areas. If it weren t for sump pumps

More information

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL 11 Featuring Highland Stone anchorwall.com TABLE OF CONTENTS 2 TABLE OF CONTENTS BEFORE YOU BEGIN............................

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

Renovation instructions

Renovation instructions 1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)

More information

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam

More information

MUNICODE SERVICES LTD.

MUNICODE SERVICES LTD. The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information