PROJECT INITIATION. In this toolkit: University Project Office toolkits
|
|
|
- Jonah Cooper
- 9 years ago
- Views:
Transcription
1 PROJECT INITIATION It is important to get project initiation right; this establishes the foundations for the project and can make the difference between a successful and unsuccessful project. There is a lot to consider during project initiation which can be overwhelming. This toolkit has been designed to guide you through this process, one step at a time. The purpose of project initiation is to get the project off to the best start, by talking to relevant stakeholders and gathering the right information to start planning the project in more detail. The project initiation process will allow the Project Board and Authority Group to decide whether or not the project should continue to the implementation stage, based on the forecasted benefits and whether or not it is aligned with the corporate or programme strategy. In this toolkit: The purpose of project initiation Project initiation activities IT considerations Top tips The final output of the initiation process should be a Project Initiation Document (PID). This will pull together all of the information gathered, and once approved should be a static reference document, to be updated only through an authorised change management process. The PID then acts as a baseline against which to assess progress. 1
2 Activities There are a number of things that the Project Manager and project team need to consider during initiation. The diagram below shows the areas that require planning during initiation; there may be other things to consider depending on the type of project you are about to undertake. 2
3 Business Case & Benefits A business case setting out why the project should be approved should already have been drafted by this stage; it is during initiation that this is refined further based on the information a Project Manager gathers. As a project manager, you should also consider the benefits gained by undertaking the project. The Business Case should have already identified the key benefits, but now is the time to consider how these benefits will be measured and when they will be realised. A Benefits Monitoring Plan is a useful to tool to keep track of the expected benefits and this should be reviewed regularly throughout the project to ensure that the project is on target to deliver those expected benefits. For more information, please see the Benefits Realisation toolkit. Project Organisation A Project Manager is normally identified by the Project Executive during the start up of a project, as well as the creation of the Project Board. Ideally, the next step is for the Project Manager & Project Executive to meet up and select who should be part of the Project Team. However, it is important to acknowledge that this isn t always the case; sometimes a Project Team has already been identified and it the role of the Project Manager to lead this team and ensure that each member of the team understands their role and what is expected of them during the project. Project Scope It is important to clearly define the project scope during initiation. Failing to do so can jeopardise the success of the project, as scope creep can lead to an increase in costs, a longer than planned project schedule and/or a decrease in quality of the finished product. 3
4 Project Risks Although identifying and assessing risk is a continuous task throughout a project, initiation is an ideal time to get the project team together to identify and evaluate project risks, decide who should own them, how best to manage them, and how they should be monitored. Again, reviewing lessons from similar previous projects is a good place to start when identifying risks to a project. It is at this point that a risk register should be created, if it hasn t already been done so during start-up. For more information, please see the Managing Risk toolkit. Project Controls It is during initiation that the Project Manager should agree the level of control required during the project by the Project Board. Project Controls include Frequency and format of reports does your Project Board want a formal monthly report or weekly updates? Number of project stages your Project Board will need to approve the end of each stage and the plans for the next stage; the more complex a project, the more stages there normally are Tolerances (e.g. time,cost, quality) are your Project Board happy to let you continue if you go a week/month over schedule or do they want to be informed as soon as the project is running a day late? Is there an agreed contingency in the budget for an overspend of 10%? Mechanism to escalate exceptions how does your Project Board want to be informed of issues that need escalating? By telephone, or emergency board meeting? Project Costs Both project and post project costs should be specified wherever possible, along with the funding source. Training and media/publicity costs are often forgotten during initiation so make sure these are included where relevant. Any estimated costs should be realistic and clearly stated that they are subject to change. 4
5 Project Plan/Timescale A project plan should establish the timescale and resource requirements of the project. The project manager should not develop a project plan in isolation; both the users(s) and supplier(s) need to be closely involved. A planning workshop can often be very useful to get all relevant stakeholders together in order to identify the products required, the tasks need to achieve them, and any dependencies between them. For more information, see the Planning for your Project toolkit. Key Deliverables These are the products or services that are created as a result of the project e.g. a recommendations report, a new IT system, a new high performance computing service - and the quality criteria, quality checking method, and responsibility for sign off should be clearly stated for each one. Staff Resources Managing staff resource during a project can be a challenge, especially when most project team members have a day job to do as well as having work to do for a project. Team members often have divided loyalties, and it is up to the Project Manager to make sure that this does not have a negative impact on the project. A good working relationship with a team member s line manager is essential, as negotiation is often required to free up resource in order to carry out the required project work. Stakeholders A stakeholder is anyone who will affect, or be affected by, the project. Stakeholders should be identified as early on in a project as possible, and this should be the responsibility of the project team, not just the project manager. Stakeholders will often contribute towards the planning of the project, and different groups of stakeholders will have to be managed in different ways depending on what they need from you and what you need from them. For more information, please see the Identifying Stakeholders and Stakeholder Engagement toolkit. 5
6 Communications Once all of your stakeholders have been identified, you can then work out the best means of communicating with each individual stakeholder or stakeholder group. This means thinking about the type of communication required and its frequency. Post project communications also need to be planned; often a project comes to an end with no thought as to how the new product/service/system will be publicised to the end users, despite them being the main beneficiaries. IT Considerations A large number of University projects have an IT component of some sort. Most are either IT projects commissioned specifically by IT Services and therefore fully resourced by IT Services staff Corporate Services or College projects with an IT element to them these often have a member or IT Services on the project team In both cases, the Project Manager should consider the IT staff resource requirements, and gain approval from the relevant line manager as soon as possible to ensure that the staff they need to carry out the work are available at the right time. The Project Manager should also ensure that the Data Centre team have been consulted (if hardware is to be located in one or both Data Centres) an IT Checklist has been completed where necessary a Carbon Assessment form has been completed 6
7 Decision Time! Once all the project initiation process is complete, it is up to the Project Board and/or the Authority Group to decide whether or not the project should be approved to move forward into implementation. They will base their decision on the information presented to them by the Project Manager; if the Business Case is still valid, and the value of the benefits outweigh the cost & risk associated with the project then implementation will normally be given the go ahead to proceed. Project Office top tips The process should include input from all relevant stakeholders, including the Project Board, project team and customers/end users; it should not be something the Project Manager undertakes alone Make your Communications plan a top priority! If you can get this right you will avoid a lot of the problems that failing projects encounter. A good communications plan will also ensure that all relevant stakeholders are involved in the initiation process When planning your project during initiation is it always useful to see if there are any lessons learnt available to review from other similar projects. These can be invaluable if you haven t undertaken a similar kind of project before, and can prevent you from repeating mistakes that have been made in past projects When in doubt, contact the Project Office! We are here to offer support and advice, and in many cases can put you in touch with other Project Managers who have worked on similar projects who will be able to share their knowledge with you For more information and advice contact the Project Office: [email protected] 7
Prince 2 Health Check
Prince 2 Health Check Start-up Was there a Project Mandate? Was the Project Board designed/appointed before initiation was authorised? Was a Project Brief produced? Is the Project Brief to PRINCE standards?
ESKITP7145.01 Manage IT service delivery performance metrics
Overview This sub-discipline covers the competencies required to manage the monitoring, analysis and communication of IT service delivery performance metrics. Monitoring service level performance is a
WHAT IS PRINCE2? Benefits There are many benefits of using PRINCE2 but primarily it:
WHAT IS PRINCE2? Introduction PRINCE2 (Projects in a Controlled Environment) is a structured project management method that can be applied regardless of project scale, type, organisation, geography or
Quality Impact Assessment. Executive summary
Report to Public Trust Board 28 th February 2013 Title Sponsoring Executive Director Author(s) Purpose Previously considered by Quality Impact Assessment Director of Quality and Safety/ Chief Nurse Director
Retained Fire Fighters Union. Introduction to PRINCE2 Project Management
Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type
Project Management Fact Sheet:
Project Management Fact Sheet: Project Documentation Version: 2.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that
SFJ EFSM14 Manage the performance of teams and individuals to achieve objectives
Manage the performance of teams and individuals to achieve objectives Overview This standard is about making the best use of your team and its members so that they can achieve your organisation's objectives.
Future Council Programme Evaluation Framework
Future Council Programme Evaluation Framework Overview of the Evaluation Framework for the Future Council Programme DRAFT v0.7 August 2015 Contents 1. Evaluation Framework Overview 2. Evaluation Framework
To be used in conjunction with the Invitation to Tender for Consultancy template.
GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small
The Gateway Review Process
The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible
Setting SMART Objectives
Setting SMART Objectives Whilst line managers are responsible for ensuring that objectives are set it is important that, wherever possible, objectives are jointly agreed, between staff and line manager,
www.ronrosenhead.co.uk Joining Instructions for 3 day project management event
Joining Instructions for 3 day project management event To: All Participants We are looking forward to working with you to develop your project management skills and to discuss their application to current
BENEFITS MANAGEMENT AND REALISATION
COSTS BENEFITS BENEFITS MANAGEMENT TOOLKIT BENEFITS MANAGEMENT AND REALISATION This toolkit has been designed to help you to identify, manage and realise your project benefits effectively. Remember In
Major Project Governance Assessment Toolkit
Major Project Governance Assessment Toolkit Mark Ritchie, University of Edinburgh Pauline Woods-Wilson, Lancaster University Project and Change Management Group Project and Change Management Group Established
Purpose: Content: Definition: Benefits: outputs outcomes benefits Business Case dis-benefit Key Responsibilities: Approach: Executive Developed
Key Learning Points The Swirl Logo is a trade mark of the AXELOS Limited. Is used by the Project Board throughout the project to verify its continued viability:- Is the investment in this project still
BUY ONLINE AT: http://www.itgovernance.co.uk/products/1748
PRINCE2 FOR DUMMIES Introduction About This Book Foolish Assumptions How This Book is Organised Part I: How PRINCE Can Help You Part II: Working Through Your Project Part III: Help with PRINCE Project
PRINCE2 Introduction PRINCE2 Introduction
Managing Successful Projects with PRINCE2 PRINCE2 Introduction PRINCE2 Introduction A Summary of PRINCE2 Managing Successful Projects with PRINCE2 OGC/APM Group Accredited Event UKAS/APMG Certificate 001
Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification
II. Figure 5: 6 The project cycle can be explained in terms of five phases: identification, preparation and formulation, review and approval, implementation, and evaluation. Distinctions among these phases,
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT ACCOUNTABLE SIGNATURE AUTHORISED for implementation SIGNATURE On behalf of Chief Executive
Project Management Framework
Information Services Project Management Framework October 2003 Document ID No. Page 1 of 1 Contents 1. Introduction Page 3 2. Use of Framework Page 3 3. Project Register and Monitoring Page 4 4. Project
Measuring the Impact of Volunteering
Measuring the Impact of Volunteering Why is measuring the impact of volunteering important? It is increasingly important for organisations or groups to describe the difference that volunteering makes to,
TECHNICALS LEVEL 2016 3 BUSINESS
2016 Suite Cambridge TECHNICALS LEVEL 3 BUSINESS Unit 16 Principles of project management M/507/8163 Guided learning hours: 60 Version 2 - Revised content - March 2016 ocr.org.uk/business LEVEL 3 UNIT
AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?
1 Overview of Audit Process The flow chart below shows the overall process for auditors carrying out audits for IMS International. Stages within this process are detailed further in this document. Scheme
Title. Learning from Incidents, Complaints and Claims. Description of Document
Title Description of Document Scope Author and designation Equality Impact Assessment (EIA) Associated Documents Supporting References Learning from Incidents, Complaints and Claims This policy identifies
Project Management Policy and Procedure
Project Management Policy and Procedure Author(s): Laura Graham Peter Griggs Approved SMT: October 2006 Issue Date: October 2006 Policy Review Date Ref: Contents: 1. Purpose and Scope 2. Aims and Objectives
Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee
Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have
Section Five Learning Module D:
Section Five Learning Module D: the Project 5.1 Module D: Objectives At the conclusion of this module you will be able to: implement a project plan; keep control of a project plan; effectively review a
APPENDIX C. Internal Audit Report South Holland District Council Project Management
APPENDIX C Internal Audit Report South Holland District Council Project Management Date: 20th December 2012 Contents Introduction and Scope 1 Executive Summary Assurance Opinion Key Messages 2 3 Management
Shell Mentoring Toolkit
Shell Mentoring Toolkit A reference document for mentors and mentees Human Resources LEARNING 25/07/2007 Copyright: Shell International Ltd 2006 CONTENTS What is Mentoring? 4 The Mentor s Role The Role
BUSINESS OCR LEVEL 3 CAMBRIDGE TECHNICAL. Cambridge TECHNICALS BUSINESS PROJECT MANAGEMENT CERTIFICATE/DIPLOMA IN K/502/5459 LEVEL 3 UNIT 18
Cambridge TECHNICALS OCR LEVEL 3 CAMBRIDGE TECHNICAL CERTIFICATE/DIPLOMA IN BUSINESS BUSINESS PROJECT MANAGEMENT K/502/5459 LEVEL 3 UNIT 18 GUIDED LEARNING HOURS: 60 UNIT CREDIT VALUE: 10 BUSINESS PROJECT
PLANNING FOR YOUR PROJECT
PLANNING FOR YOUR PROJECT This tool kit has been designed to provide an introduction to planning. It will help you to think about the reasons behind why you should plan, what to plan and the variations
PRINCE2:2009 Glossary of Terms (English)
accept (risk response) acceptance acceptance criteria activity agile methods approval approver assumption assurance A risk response to a threat where a conscious and deliberate decision is taken to retain
44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam
44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION
Social Return on Investment
Social Return on Investment Valuing what you do Guidance on understanding and completing the Social Return on Investment toolkit for your organisation 60838 SROI v2.indd 1 07/03/2013 16:50 60838 SROI v2.indd
Fundraising for Success
Fundraising for Success A Guide for Small and Diaspora NGOs Ajay Mehta INTRAC PEER LEARNING PROGRAMME Introduction Fundraising is one of the most important pieces of the organisational jigsaw. Quite clearly,
An Introduction to PRINCE2
Project Management Methodologies An Introduction to PRINCE2 Why use a Project Methodology and What Does PRINCE2 Enable? PRINCE - PRojects IN Controlled Environments - is a project management method covering
Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce
Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO
Project Risk Analysis toolkit
Risk Analysis toolkit MMU has a corporate Risk Management framework that describes the standard for risk management within the university. However projects are different from business as usual activities,
NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY
NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20
Effective objective setting provides structure and direction to the University/Faculties/Schools/Departments and teams as well as people development.
Effective objective setting provides structure and direction to the University/Faculties/Schools/Departments and teams as well as people development. The main purpose of setting objectives is to reflect
Business Continuity Management Framework 2014 2017
Business Continuity Management Framework 2014 2017 Blackpool Council Business Continuity Framework V3.0 Page 1 of 13 CONTENTS 1.0 Forward 03 2.0 Administration 04 3.0 Policy 05 4.0 Business Continuity
Objectives. Project Management Overview. Successful Project Fundamentals. Additional Training Resources
Project Management for Small Business Moderator: Maria Mancha Frontline Systems, Inc. Objectives Project Management Overview Successful Project Fundamentals Additional Training Resources Project Management
ILM Level 3 Certificate in Using Active Operations Management in the Workplace (QCF)
PAGE 1 ILM Level 3 Certificate in Using Active Operations Management in the Workplace (QCF) CONTENTS Qualification Overview: ILM Level 5 Award, Certificate and Diploma in Management APPENDICES Appendix
Planning and conducting a dissertation research project
Student Learning Development Planning and conducting a dissertation research project This guide addresses the task of planning and conducting a small research project, such as an undergraduate or masters
GUIDE ON DEVELOPING SERVICE STANDARDS
GUIDE ON DEVELOPING SERVICE STANDARDS Contents 1. Background... 3 2. Why the Guide/ Toolkit?... 4 3. Service Delivery Planning Value Chain Components... 4 4. Definition and types of Service Standards...
DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY
DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1
ITIL Introducing service transition
ITIL Introducing service transition The goals of service transition Aligning the new or changed service with the organisational requirements and organisational operations Plan and manage the capacity and
Explaining the difference your project makes A BIG guide to using an outcomes approach. Sara Burns and Joy MacKeith Triangle Consulting October 2006
Explaining the difference your project makes A BIG guide to using an outcomes approach Sara Burns and Joy MacKeith Triangle Consulting October 2006 Explaining the difference your project makes Stock code
Contracts, agreements and tendering
Contracts, agreements and tendering 1) Introduction This guidance note provides an overview of the types of contracts and other agreements you might need to use in setting up and running a local energy
Developing a Project. Management System. Using Project Agency Template. Approach. - the Process and the Benefits
Developing a Project Management System Using Project Agency Template Approach - the Process and the Benefits Project Agency June 2008 Developing your own Project Management System. Project Agency has worked
HOW OUTSOURCING CAN WORK FOR YOUR BUSINESS
HOW OUTSOURCING CAN WORK FOR YOUR BUSINESS WITH THE RIGHT OUTSOURCE PARTNER, OUTSOURCING CAN GROW YOUR COMPANY IN KEY AREAS. IT IS AN OPPORTUNITY TO CAPITALISE ON YOUR STRENGTHS AND TO FIND WAYS TO WORK
5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name]
231 5.2 Template for IT Project Plan Name of the Tool: Source: Usage: Description: Template for IT Project Plan GIZ This template has been designed as a tool to support the planning of IT projects for
UoD IT Job Description
UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management
Current Employment Opportunities Full Time Staff
Current Vacancies: I. Senior Project Manager - Project Management Unit (PMU)... 2 II. Human Development and Social Inclusion Consultant and Senior Consultant... 6 I. Senior Project Manager - Project Management
Developing an Implementation Plan
Initiative October 2013 / V1 Guidance Note: 3 Developing an Implementation Plan Introduction A key requirement of an application to join CoST is an implementation plan. The implementation plan should respond
Find your perfect office space, in three easy steps.
Find your perfect office space, in three easy steps. 1 We are Instant, the global specialists in flexible offices, and our goal is to fulfill your need for the perfect workplace. We make sense of the huge
Complaints Policy. Complaints Policy. Page 1
Complaints Policy Page 1 Complaints Policy Policy ref no: CCG 006/14 Author (inc job Kat Tucker Complaints & FOI Manager title) Date Approved 25 November 2014 Approved by CCG Governing Body Date of next
APMP. The APM Project Management Qualification. Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6 th edition
The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment
NSW Government ICT Benefits Realisation and Project Management Guidance
NSW Government ICT Benefits Realisation and Project Management Guidance November 2014 CONTENTS 1. Introduction 1 2. Document purpose 1 3. Benefits realisation 1 4. Project management 4 5. Document control
NOTTINGHAMSHIRE OFFICE OF THE POLICE AND CRIME JOB DESCRIPTION. Project Manager ECINS Development and Implementation 1 year project
NOTTINGHAMSHIRE OFFICE OF THE POLICE AND CRIME JOB DESCRIPTION Job title: Department/Location: Responsible to: Manager Responsible for: Project Manager ECINS Development and Implementation 1 year project
Process Improvement Program Project Process
Process Improvement Program Project Process 1 P a g e 12/3/2014 The Process Improvement Program is part of the City of Fort Lauderdale s FL 2 STAT Approach to Exponential Improvement. Its objective is
Business Continuity Policy. Version 1.0
Business Continuity Policy Version.0 January 206 Contents Contents Version control Foreword Policy. Scope.2 Aim and objectives.3 Methods and standards.4 Responsibilities.5 Governance.6 Training and exercises
stakeholder communications
stakeholder communications t h e t o o l k i t Stakeholder engagement plans cannot work without stakeholder communications. Every time you engage or communicate with stakeholders, there are implications
ScottishPower Competency Based Recruitment Competency Guidelines External Candidate. pp077682 ScottishPower [Pick the date]
ScottishPower Competency Based Recruitment Competency Guidelines External Candidate pp077682 ScottishPower [Pick the date] Aims and Objectives This document will give you an overview of the selection process
Information Commissioner's Office
Information Commissioner's Office IT Procurement Review Ian Falconer Partner T: 0161 953 6480 E: [email protected] Last updated 18 June 2012 Will Simpson Senior Manager T: 0161 953 6486 E: [email protected]
Module 1 Study Guide
Module 1 Study Guide Introduction to OSA Welcome to your Study Guide. This document is supplementary to the information available to you online, and should be used in conjunction with the videos, quizzes
The Needs and Strengths Assessment. Step 2. Social workers
Step 2 The Needs and Strengths Assessment WL 12249 Child, Youth and Family: a service line of Ministry of Social Development August 2006 Document your actions and close the case Onward referral to another
Project Management. What is Project Management?
Project Management Project Management enables your business to proceed with new initiatives in a way that allows: Costs to be controlled Agreed outcomes to be measured and confirmed Timescales to be met
REPUTATION MANAGEMENT SURVIVAL GUIDE. A BEGINNER S GUIDE for managing your online reputation to promote your local business.
REPUTATION MANAGEMENT SURVIVAL GUIDE A BEGINNER S GUIDE for managing your online reputation to promote your local business. About Main Street Hub: Main Street Hub is the voice for more local businesses
Conducting Formative Research
Conducting Formative Research 1 The foundation of any sound sanitation marketing program is formative research. Formative research follows a process and includes a set of tools that can be used to help
Step by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
ISO 20000-1:2005 Requirements Summary
Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service
PERSONAL DEVELOPMENT PLAN (PDP)
Date of PDP: Review Date of PDP: PERSONAL DEVELOPMENT PLAN (PDP) PERSONAL DETAILS Name.. Current Address.. Telephone Numbers Work.... Mobile E-mail Address... Qualifications (with dates)... Dental School/University.
IT Project Management
IT Project Management IT Project Management provides a structured approach to making things happen and in doing so, enables initiatives (projects) to be delivered to time, quality and budget. www.business.wales.gov.uk/superfastbusinesswales
The Foundation Examination
The Foundation Examination Sample Paper 2 January 2013 Release Multiple Choice 1-hour paper Instructions 1. All 75 questions should be attempted. 2. 5 of the 75 questions are under trial and will not contribute
Hertsmere Borough Council. Data Quality Strategy. December 2009 1
Hertsmere Borough Council Data Quality Strategy December 2009 1 INTRODUCTION Public services need reliable, accurate and timely information with which to manage services, inform users and account for performance.
University Mission. Strategic Plan. Organisation Structure. Jobs
Introduction The main purpose of any job description is to outline the main duties and responsibilities that are involved in a particular job. Additional information is often requested in order that one
Government Communication Professional Competency Framework
Government Communication Professional Competency Framework April 2013 Introduction Every day, government communicators deliver great work which supports communities and helps citizens understand their
White Paper. Making the case for PPM
Introduction There are many reasons why organizations decide to implement project portfolio management solutions, but typically it is to help senior management confidently and consistently answer questions
Governance, Risk and Best Value Committee
Governance, Risk and Best Value Committee 2.00pm, Wednesday 23 September 2015 Internal Audit Report: Integrated Health & Social Care Item number Report number Executive/routine Wards Executive summary
Job Description. Applications Analyst (BI) (BISRID_033)
Job Description Job Title: Reports to: Team: Location: Applications Analyst (BI) (BISRID_033) SAP Applications Leader BIS Nelson Job Purpose Responsible for the provision of the overall management of BI
Delivering Excellence in Insurance Claims Handling
Delivering Excellence in Insurance Claims Handling Guide to Best Practice Delivering Excellence in Insurance Claims Handling Contents Page 1. Introduction 1 2. Executive Summary 2 3. Components of Best
The Scottish Wide Area Network Programme
The Scottish Wide Area Network Release: Issued Version: 1.0 Date: 16/03/2015 Author: Andy Williamson Manager Owner: Anne Moises SRO Client: Board Version: Issued 1.0 Page 1 of 8 16/04/2015 Document Location
PROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
ESKITP714401 Implement procedures and standards relating to metrics for IT service delivery
Overview This sub-discipline covers the competencies required to perform performance metrics. Monitoring service level performance is a complex task requiring collection of data, detailed analysis, and
At the end of this chapter. Project Charter. What is a Project Charter? What is a Project Charter? Why is a Project Charter used?
At the end of this chapter Project Charter Describe what a project charter is and why it is critical to project success. Explain what a project scope statement is and why it is important. List the various
QUALITY MANAGEMENT POLICY & PROCEDURES
QUALITY MANAGEMENT POLICY & PROCEDURES Policy Statement Cotleigh Engineering Co. Limited specialises in the recruitment of engineering & technical personnel in the oil & energy, rail, civil engineering,
STRATEGIC PLANNING Guide for Managers
STRATEGIC PLANNING Guide for Managers 1 Strategic Planning Basics for Managers In all UN offices, departments and missions, it is critical that managers utilize the most effective approach toward developing
ICT Service Desk Creation
ICT Service Desk Creation Project Initiation Document Document: ICT Service desk Creation: PID Issue Date: 26 th November 2010 Version: 0.1 Draft Version Number: 1.0 Change Control Quality Assurance Document:
Completing the competency based application form
Completing the competency based application form For the HEO/SEO cohort, you will be required to provide evidence of how you meet the following competencies: This involves completing and submitting a competency
1. Trustees annual report
1. Trustees annual report Accounting and reporting by charities Overview and the purpose of the trustees annual report 1.1. The primary purpose of the trustees annual report (the report) is to ensure that
Topic 1 Introduction. to the Fundamentals of Project Management INTRODUCTION LEARNING OUTCOMES
Topic 1 Introduction to the Fundamentals of Project Management LEARNING OUTCOMES By the end of this topic, you should be able to: 1. Describe the nature of projects; 2. Identify the project life cycle;