1 Balanced Flue Stove Technical Guide Document No: IN1105 EUROHEAT DISTRIBUTORS (H.B.S) LTD. 1

2 Hearth and Fireplace Requirements Do not be tempted to fit the stove into an unsuitable fireplace. Beyond the requirements of the building regulations and access to facilitate servicing the stove, providing a setting which will complement the stove is not a luxury, it is the practicality of making the most of an investment. A good builder will be able to transform even the most utilitarian of fireplaces, whether altering its proportions to those of the Golden Mean ideal, exposing a wooden lintel, stone or simply removing superfluous detailing for comparatively small costs, and the result will be a pleasure for many years. Golden Mean Side Profile 1/3 2/3 E A B Golden Mean Front View 1 2/3 2/3 D F C Minimum clearance from combustible materials Minimum clearance from non combustible materials A 12" 300mm** 9" 230mm B 6" 150mm** 4" 100mm C 1" 25mm** N/A D 2" 50mm** 2" 50mm E 6" 150mm** 4" 100mm F 12mm of non combustable material. 12mm of non combustable material. Curtains and furnishings should be a minimum of 1m from the stove. The stove can be placed on a combustible floor providing it can support the weight, and providing a non combustible hearth plinth with a minimum thickness of 12mm is utilized. ** The measurements provided are for guidance only. In all installations any surrounding flammable materials must not be allowed to exceed 80 C or a non combustible shield provided in accordance with current regulations. The stove must always stand perfectly level and have sufficient space allowing for service work. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 2

3 Balanced Flue Systems A balanced flue system utilizes a double concentric pipe, the inner one taking away the products of combustion and the outer one bringing the air supply to the stove. This system allows a gas stove to be installed where no flue exists, and because the flue needs very little vertical height to operate, it is often possible to route the flue through the room wall to the outside. With all the air necessary for combustion being supplied through the outer pipe directly from the outside, the room in which the stove is installed needs no ventilation specifically for the stove. The balanced flue system has been designed to give a huge range of installation options, terminating either horizontally or vertically, as illustrated in the diagram below. Deciding on which form the balanced flue should take will very much be constrained by the termination of the flue. Building Regulations lay out definitive guide lines for where a flue can terminate, see the diagram later in this document, and if the building is listed there may be constraints on the position of any terminal and advice should be sort from the appropriate regulatory authority. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 3

4 No Chimney No Problem This document will help you design and your qualified engineer install a suitable balanced flue system for your stove. Following the simple guide lines will allow a balanced flued stove to be fitted in most situations where a conventionally flued stove could not be fitted. Top to Horizontal High Level Flue Kit It is not necessary for the stove to be situated against the outside wall through which the flue will pass, as the versatility of the balanced flue system can allow for considerable lengths of horizontal run of the flue. Top to Vertical High Level Flue Kit The vertical balanced flue system is ideal in situations such as in a newly constructed conservatory where there are no walls through which to pass a horizontal flue. The flue will rise from the stove vertically passing through the roof where it will then terminate with a vertical terminal. Minimum height 2m maximum 30m. Rear to Horizontal Low Level The low level horizontal kit is probably the simplest method of installation and allows you to fit the stove against any suitable outside wall in any room in your property. Maximum horizontal length 440mm, minimum length 310mm. Existing Chimney Adapter Kit The flue kits are also designed to be able to utilize an existing chimney. Properties which are designed with a high thermal efficiency may not allow an air brick to be fitted to supply air to a stove over 7kW input, the balanced flue stove overcomes this requirement as it is a sealed appliance. In some cases the top section of a chimney may have been removed and the versatility of the balanced flue system allows you to use what remains of the chimney using the chimney adapter kit. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 4

5 Location of Outlets from Flues Serving Gas Balanced Flue Stoves. Minimum Separation Distances for Terminals in mm Location Balanced Flue A Below an opening Appliance rated heat input 0-7kw >7-14kw > 14-32kw >32 B Above an opening (1) 0-32kw >32kw C Horizontally to an opening (1) 0-7kw >7-14kw >14kw D Below gutters, soil pipes or drain pipes Minimum Separation Distances for Terminals in mm Location Balanced Flue E Below eaves 300 Q Above the highest point of F Below balcony or car port roof intersection with the roof R Flue should not penetrate shaded area 600 G From a vertical drain pipe or soil 300 pipe S Flue should not penetrate shaded area 200 Note (1) An opening means an openable element, such as an openable window, or a fixed opening such as an air vent. However, in addition, the outlet should not be nearer than 300mm to an opening into the building fabric formed for the purpose of accommodating a built in element, such as a window frame. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 5 H From an internal or external corner or to a boundry alongside the terminal 600 I Above ground,roof or balcony level 300 J From a surface or a boundary facing the terminal 600 K From a terminal facing the terminal 600 L M N From an opening in the car port into the building Vertically from a terminal on the same wall Horizontally from a terminal on the same wall P From a structure on the roof 1500

6 Calculating Flue Aspect Ratios The stove operates correctly only with air flow induced by the flue system being within the defined parameters. To achieve these, the vertical elements of the flue, which induce flue draught and increase the air supply to the stove, must be balanced against the horizontal elements of the flue, which offer resistance to flue draught and reduce the air supply to the stove. The ratio of vertical to horizontal lengths must be calculated to ensure the correct flue draught will be induced by the proposed flue. The difference in height between the top of the stove and the bottom of the terminal determines the vertical height to be used in the calculation. The flue run may necessitate the vertical elements to be separated by several horizontal runs, this is not important, only the total height gain is needed. The horizontal length is often more tedious to determine, but again, it is the total length which needs to be determined, regardless of their being continuous or in stages. Any 90 degree change of direction within the flue will offer resistance to flue draught and each change of direction will offer the same resistance to the flue draught as a horizontal run of 1000mm. For every 45 degree change in direction the resistance is that of a horizontal run of 500mm. BALANCED FLUE ASPECT RATIO DYNAMICS ILLUSTRATED Depending on which direction your flue configuration will take and the model of the stove, a flue reduction plate (FRP) may or may not be required. See pages 24 & 25 for details m vertical = 7m horizontal max m vertical = 3.5m horizontal max. 0 For 1m vertical rise a flue may have a maximum horizontal run of 7m. For each 90 degree bend introduced the horizontal run must be reduced by 1m. For each 45 degree bend introduced the horizontal run must be reduced by 500mm EUROHEAT DISTRIBUTORS (H.B.S) LTD. 6

7 Basic Principle of Balanced Flue Ratios Illustrated Top to Horizontal High Level Example 'A' For a 1m vertical rise a flue can have a maximum of 7m horizontal length Example 'B' Each additional 90 degree bend creates a draught resistance equal to 1m of horizontal length. Therefore in example 'B' the introduction of 2 x 90 degree bends, in a horizontal plain, reduces the maximum horizontal length by 2m. Rear to Horizontal Low Level Example 'C' Flue spigot 0 Min 310mm/ Max 440mm The rear exit flue may have a maximum horizontal run of 440mm from the flue spigot, the minimum length 310mm. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 7

8 Example 1: Top to Horizontal High Level Kit Using the standard top to horizontal high level flue kit only. Cavity wall Standard kit 90 degree long bend Ceramic rope or Fraxfill sealant to prevent draughts 12mm Terminal guard (accessory) Standard kit terminal length T2 Standard kit starter length T1 Sleeve kit (accessory) Minimum 50mm Components used Description Part No. Top to 150mm 180mm HorizontalHigh Level Kit MS91102 MS91103 Sleeve liner MS91065 MS91066 Terminal guard FP767 FP767 Closure bezel MS91033 MS91040 Closure bezel The closure bezel fits around the flue pipe covering the hole through a solid wall giving the installation a clean finish both inside and outside. Solid wall EUROHEAT DISTRIBUTORS (H.B.S) LTD. 8

9 Example 2: Top to Horizontal High Level Kit Taking the attached diagram as an example we can calculate the flue parameters for a top to horizontal flue system. Total Height = A Total Horizontal = B In this example A = 2.8 Metres B = 1.75 Metres Three x 90 degree bends have been used one of which (C) is the standard supply kit bend. This bend is ignored from the calculation as it is presumed it will always be used. The two remaining 90 degree bends increase the horizontal length by two metres. (one metre extra horizontal length per additional 90 degree bend). Total Height A = 2.8 Metres Total Horizontal B = 1.0 Metres In this example there is sufficient vertical rise for the horizontal run, as shown in the graph on page 6. B+B= Total Horizontal B B Standard kit terminal length T2 Accessory 250mm length within wall Accessory short 90 O bend Accessory 1metre length Standard kit long 90 O bend Wall band Accessory short 90 O bend Accessory 500mm length Components used A Total height A Standard kit starter length T1 Description Part No. Quantity Top to 150mm 180mm HorizontalHigh 1 Level Kit MS91102 MS metre length MS91028 MS mm length MS91029 MS mm length MS91030 MS short bend MS91031 MS Wall band MS91052 MS EUROHEAT DISTRIBUTORS (H.B.S) LTD. 9

10 Example 3: Top to Vertical High Level Kit The ratio of vertical to horizontal lengths must be calculated to ensure the correct flue draught will be induced by the proposed flue. Taking the ratio diagram as an example we can calculate the flue parameters for a top to vertical flue system. Total Height = A Total Horizontal = B In this example A = 3.5 Metres B = 1.5 Metres Two x 90deg bends have been used. The two 90 degree bends increase the horizontal length by two metres. (One metre extra horizontal length per additional 90 degree bend). Total height A = 3.5 Metres Total Horizontal B =0.9 Metres In this example there is sufficient vertical rise for the horizontal run, as shown in the illustration on page 6. (accessory) (accessory) Components used Description Part No. Quantity Top to Vertical 150mm 180mm High Level Kit MS91100 MS metre length MS91028 MS mm length MS91029 MS short bend MS91031 MS Wall band MS91052 MS EUROHEAT DISTRIBUTORS (H.B.S) LTD. 10

11 Example 4: Top to Vertical High Level Kit This example incorporates two 45 degree bends, a situation commonly encountered when having to route flue pipe around an obstacle such as a beam. When calculating the horizontal run the 45 degree bends equate to an additional 500mm per bend. Taking the ratio diagram as an example we can calculate the flue parameters for a top to vertical flue system. Total Height = A Total Horizontal = B In this example A = 4.5 Metres B = 1.5 Metres 2 x 45deg bends have been used. The two 45 degree bends increase the horizontal length by one metre. (500mm extra horizontal length per 45 degree bend). Total height A = 4.5 Metres Total Horizontal B = 2.0 Metres In this example there is sufficient vertical rise for the horizontal run, as shown in the illustration on page 6. (accessory) Components used Description Part No. Quantity Top to Vertical 150mm 180mm High Level Kit MS91100 MS metre length MS91028 MS Adjustable length MS91045 MS short bend MS91054 MS Wall band MS91052 MS Roof flashing MS91063 MS EUROHEAT DISTRIBUTORS (H.B.S) LTD. 11

12 Example 5: Top to Vertical High Level Kit The minimum vertical height for a top to vertical flue is two meters of flue and the top to vertical kit components. (accessory) Components used Description Part No. Quantity Top to Vertical 150mm 180mm High Level Kit MS91100 MS metre length MS91028 MS Wall band MS91052 MS Roof flashing MS91063 MS EUROHEAT DISTRIBUTORS (H.B.S) LTD. 12

13 Example 6: Through Ceilings and Roof Spaces Fitting a Top to Vertical High Level Flue Kit Through Ceilings and Roof Spaces When installing balanced flue pipe through a ceiling the use of a ceiling support and fire stop spacer are recommended. There should be no flue joints at any point as the flue passes through a ceiling. There should a minimum clearance of 25mm from the flue pipe to any combustible material. Weight of flue supported here. Roof flashing (accessory) Ceiling support Weight of flue supported here. No flue joints between fire stop spacer and ceiling support. Fire stop spacer Components used Description 150mm 180mm Ceiling support MS91056 MS91057 Fire stop spacer MS91058 MS91059 Roof flashing MS91063 MS91063 Wall band MS91052 MS91053 EUROHEAT DISTRIBUTORS (H.B.S) LTD. 13

14 Example 7: Existing Chimney Adapter Kit Vertical Termination Fitting an Existing Chimney Adapter Kit in Conjunction with a High Level Vertical Kit There are great advantages in converting an existing chimney into a balanced flue. The existing chimney adapter kit can convert either ceramic lined chimneys or an unlined chimney into a balanced flue system. By using this system combustion air is drawn from the outside rather than from the property greatly increasing overall efficiency. In addittion many houses chimney stacks have been removed and the roof tiled over. They are usually capped off at attic floor level. We have developed a kit which can bring these chimneys back to life using a gas balanced flue stove. It can also be used in modern properties which have heat replacement systems where normal ventilation requirements cannot be applied. The system requires the use of two flexible flue liners, one to run inside the other mimicking the standard balanced flue pipe. The inside pipe is for the evacuation of the products of combustion and the outer is the air supply for combustion. It is imperative that all the joints are sealed to make them air tight. There follows two examples of the system, one is showing an existing chimney breast and the system terminating in a vertical position (through the roof). The second is showing the system terminating in a horizontal position (through a gable end of a property perhaps). Existing chimney top adapter Using two sizes of flue liner to mimic the balanced flue pipe. Ensure the seal is tight to the adapter kit Flue system Inner liner Outer liner size 150mm 101mm / 4 153mm / 6 180mm 125mm / 5 178mm / 7 Existing chimney bottom adapter Depending on which direction your flue configuration will take and the model of the stove, a reduction plate may or may not be required. See pages 24 & 25 for details. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 14

15 Example 8: Existing Chimney Adapter Kit Horizontal Termination Fitting an Existing Chimney Adapter Kit in Conjunction with a Top to Horizontal Kit If this orientation is to be used then the standard 90 degree long bend from the top to horizontal kit MUST be used so that the last union before the terminal length T2 is a female (F) end. Accessory 1 metre length Existing chimney top adapter M F T2 Standard kit 90 long bend Standard kit terminal length T2 Existing chimney bottom adapter Clay liner Flexible liner Flue system Inner liner Outer liner size 150mm 101mm / 4 153mm / 6 180mm 125mm / 5 178mm / 7 Existing chimney top adapter M F T1 Standard kit starter length T1 Existing chimney bottom adapter 95mm 75mm 75mm 100mm 350mm 350mm The example above is showing an existing chimney adapter kit utilizing a existing clay liner, using a flexible liner to run inside the clay liner in order to expel the products of combustion but using the clay liner for the feed of combustion air. Ensure that the seals between flexible liner and the adapter are sound and the seal between the clay liner and the adapter are also sound. It can go through the long 90 bend (in the top to horizontal kit) and terminate through the gable end of the property. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 15

16 Example 9: Through a Combustible Roof Installation of Top to Vertical High Level Balanced Flue Pipe Through a Combustible Roof A 25mm gap of non combustible material must be used when you are passing the balanced flue pipe through any combustible material. Conservatories can come alive with the installation of a stove, but care should be taken when installing a stove into a conservatory because the modern ones can be made entirely from plastic (or PVC). Advise from your conservatory installer/manufacturer should be sought. The flue system should be supported. 600mm 600mm 600mm EUROHEAT DISTRIBUTORS (H.B.S) LTD. 16

17 Frequently Asked Questions Q. Can the stove be flued directly off the back? A. Yes, using the standard low level horizontal kit. Q. Can I use a bend directly off the top of the stove? A. No, the stove adapter is only designed to fit the telescopic starter length and straight lengths, bends will not seal to the flue outlet. Q. Can I fit the stove in the corner of a room? A. Yes, there is no problem in doing this using the top to horizontal flue kit, but it must be remembered that if the corner is also the corner of the property that the termination must be 600mm from any corner. See diagram page 5. Q. Can the vertical flue be passed through a combustible roof, such as a polycarbonate roof in a conservatory? A. Yes, as long as allowances are made for the type of roofing material and suitable insulation is provided. See the section on flueing through a combustible roof. Q. Can the stove be fitted into a bedroom? A. Yes, the stoves are room sealed and below 14kW input. Q. Can I cut the lengths of flue pipe? A. Yes, however the differential between the inner and outer length has to be maintained. It would be preferable to use an adjustable length Q. Does the flue terminal need to be guarded? A. If the flue terminal is to be sited less than two meters above level ground, a balcony or a flat roof where people have access, a guard must be fitted. Local by-laws may also require a further minimum height where the terminal is sited adjoining a public footpath. Q. If I have a high level horizontal kit can I then terminate it vertically? A. Yes, there is a vertical terminal with a crimped end which will fit to the flue system. Q. Do I need an air brick or other ventilation for supplying free air to the stove? A. No, the stove is room sealed and does not have any requirement for free air. Vertical terminal with crimped end Size Part No: 150mm MS MM MS91048 Q. Does it matter how far out of the wall the terminal is fitted on a horizontal flue kit? A. Yes, there should be 12mm of flue pipe visible before the start of the flue terminal. Any greater length can upset the balanced flues operation. Q. What colours are the flue pipe available in? A. The flue pipe is supplied in one colour, a matt grey finish, which closely matches the cast finished stoves and complements the enamel finished stove. It is possible to change the colour using heat resistant paint. Q. To what wind speed are the terminals tested to? A. The maximum wind used is 12.5 m/s with 10% error. (28mph). Q. What is the maximum length the flue can travel horizontaly from the rear outlet of the stove? A. The standard low level horizontal flue kit gives a maximum extension of 440mm. No additional lengths or bends should be fitted. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 17

18 Components of Top to Horizontal High Level Kit 150mm kit MS mm kit MS91103 This is a high level horizontal flue kit. Other sections may be added to achieve the desired termination. For additional lengths and accessories see pages 21 to 23. Telescopic terminal length (T2) T2 90 Long bend Clamp band Telescopic starter length (T1) which must be used as the first length of flue pipe from the stoves flue collar T1 Dimensions of standard 150mm flue kit Dimensions of standard 180mm flue kit Max: 555mm Min: 470mm The min can be reduced further by cutting 40mm off the T2 section 12mm T2 Max 555mm Min 445mm The min can be reduced further by cutting 40mm off the T1 section T1 EUROHEAT DISTRIBUTORS (H.B.S) LTD. 18

19 Components of Top to Vertical High Level Kit 150mm kit MS mm kit MS91101 This kit is used when the installation requires the termination to be through a roof. Further components will be required with this kit. For additional lengths and accessories see pages 21 to mm Vertical Terminal Locking Band 250mm T1 Adjustable Starter Pipe Adjustable Starter Pipe Toatal length Minimum Length for Calculations Maximum Length For Calculations 250mm 30mm 170mm EUROHEAT DISTRIBUTORS (H.B.S) LTD. 19

20 Components of Rear to Horizontal Low Level Kit 150mm kit MS mm kit MS91098 Only the standard kit may be used, additional bends and lengths MUST not be used as they will adversely effect the performance of the balanced flue and could be dangerous. Telescopic Module (horizontal adjustable) T1 Minimum Length 310 mm Maximum Length 440 mm Horizontal Terminal Terminal Guard Spacers and self tapping screws for wind shield Wind shield EUROHEAT DISTRIBUTORS (H.B.S) LTD. 20

21 Additional Flue Pipe System Accessories Each section of additional flue pipe is supplied with a locking band. 1 metre pipe 500mm pipe 250mm pipe 90 degree short bend 45 degree short bend Adjustable length 250mm Wall Band When calculating the amount of flue pipe required the usable length and not the overall length should be used, see the table below. Description 150mm 180mm Over all length Useable length 1 metre pipe MS91028 MS m 960mm 500mm pipe MS91029 MS mm 460mm 250mm pipe MS91030 MS mm 210mm 90 Degree bend MS mm vertical 170mm horizontal 90 Degree bend MS mm vertical 186mm horizontal Adjustable pipe MS91045 MS max length 85 min length 45 Degree bend MS91054 MS mm vertical 75mm horizontal 2 x 45 Degree bend off set MS91054 x 2 MS91055 x 2 340mm 150mm off set Wall band MS91052 MS91053 EUROHEAT DISTRIBUTORS (H.B.S) LTD. 21

22 Additional Flue System Accessories Ceiling Support & Fire Stop Spacers Required when a balanced flue kit passes through a ceiling. Ceiling Support Fire Stop Description Part No. 150mm Part No. 180mm Ceiling Support MS91056 MS91057 Fire Stop MS91058 MS91059 Existing Chimney Adapter Kit Allows an existing sound chimney to be used as part of the balanced flue. Description Part No. 150mm Part No. 180mm Existing Chimney Adapter Kit MS91085 MS91086 Sleeve Liner Required when flue pipe passes through a cavity wall. It can be cut down to size or an extender sleeve added. Max 360mm Min 240mm Outer diameter 150mm kit 165mm 180mm kit 195mm Extender sleeve Description Part No. 150mm Part No. 180mm Sleeve Liner MS91065 MS91066 Extender sleeve MS91067 MS91068 EUROHEAT DISTRIBUTORS (H.B.S) LTD. 22 Cavity

23 Additional Flue System Accessories Roof Flashing Required when a balanced flue kit passes through the surface of a roof, flat or pitched. Roof Flashing Description Part No. 150mm kits Part No. 180mm kits Roof Flashing MS91063 MS91063 Terminal Guard The terminal guard is suitable for High-Level Top to Horizontal kits only. The flue outlet should be protected with a guard if persons could come into contact with it or if it could become damaged. If a flue outlet is in a vunerable position, such as where the flue discharges within reach of the ground (less than 2m), or a balcony, veranda or an opening window. Terminal Guard Closure Bezel Closure Bezel The closure bezel fits around the flue pipe covering the hole through the wall and gives the installation a clean finish. Description Part No. 150mm kits Part No. 180mm kits Closure Bezel MS91033 MS91040 Terminal Guard FP767 FP767 Fraxfill Fraxfill is a pliable (tacky putty) white ceramic fibre gap fill supplied in a 300g cartridge for use with a sealant gun. Fraxfill is recommended for applications with operating temperatures of up to 1200 C. Description Part No. 150mm kits Part No. 180mm kits Fraxfill MS9045 MS9045 EUROHEAT DISTRIBUTORS (H.B.S) LTD. 23

24 Flue Reduction Plate (FRP) Before Installation Depending on which direction your flue configuration will take, a reduction plate may or may not be required. The choke plate is a circular plate which fits under the inner flue connection. The list below will advise which FRP will or will not be needed. Harmony 15 Stanford 15 (H15 & S15) Description Fuel Type FRP Top to horizontal high level kit with standard flue kit Natural Gas LPG 58mm 58mm Top to vertical high level kit Natural Gas LPG 40mm 45mm Rear to horizontal low level kit Natural Gas LPG No FRP No FRP Harmony 25 Stanford 25 (H25 & S25) Description Fuel Type FRP Top to horizontal high level kit with standard flue kit Natural Gas LPG 66mm 66mm Top to vertical high level kit Natural Gas LPG 50mm 50mm Rear to horizontal low level kit Natural Gas LPG No FRP No FRP EUROHEAT DISTRIBUTORS (H.B.S) LTD. 24

25 Top flue connection for top to horizontal high level kit and top to vertical kit Rear flue connection for rear to horizontal low level kit Harmony 35 (H35) Description Fuel Type FRP Top to horizontal high level kit with standard flue kit Natural Gas LPG 76mm No FRP Top to vertical high level kit Natural Gas LPG 55mm 55mm Rear to horizontal low level kit Natural Gas LPG No FRP No FRP Harmony 45 (H45) Description Fuel Type FRP Top to horizontal high level kit with standard flue kit Natural Gas LPG 70mm 70mm Top to vertical high level kit Natural Gas LPG 70mm 70mm Rear to horizontal low level kit Natural Gas LPG No FRP No FRP EUROHEAT DISTRIBUTORS (H.B.S) LTD. 25

26 Stove Technical Data Harmony mm Flue kit system and accessories 150mm Flue kit Top to horizontal high level kit Top to vertical high level kit Rear to horizontal low level kit Part No. MS91102 MS91100 MS91097 Harmony mm Flue kit system and accessories 150mm Flue kit Top to horizontal high level kit Top to vertical high level kit Rear to horizontal low level kit Part No. MS91102 MS91100 MS91097 Harmony mm Flue kit system and accessories 180mm Flue kit Top to horizontal high level kit Top to vertical high level kit Rear to horizontal low level kit Part No. MS91103 MS91101 MS91098 Harmony mm Flue kit system and accessories 180mm Flue kit Top to horizontal high level kit Top to vertical high level kit Rear to horizontal low level kit Part No. MS91103 MS91101 MS91098 Stanford mm Flue kit system and accessories ID mm Flue kit Top to horizontal high level kit Top to vertical high level kit Rear to horizontal low level kit Part No. MS91102 MS91100 MS91097 Stanford mm Flue kit system and accessories ID mm Flue kit Top to horizontal high level kit Top to vertical high level kit Rear to horizontal low level kit Part No. MS91102 MS91100 MS91097 EUROHEAT DISTRIBUTORS (H.B.S) LTD. 26

27 Fitting High Level Horizontal Flue Kit The flue system starter length should be sealed to the stove s flue spigot with a heat proof sealant, (we suggest fraxfill, part number MS9045). Apply a bead of heat resistant sealant to the inner face of the outer flue spigot and the outer face of the inner flue pipe. The clamp should be used to secure the first elbow or additional length and the appropriate heat proof tape used to secure the telescopic fitting. Heat proof sealant Heat proof sealant The guide giving the permitted flue configurations must be consulted to verify that a proposed flue is possible. The long 90 bend supplied as standard with the stove must be incorporated into the system to ensure a non crimped end at the last fitting before the termination length T2. Where the flue passes through a cavity wall, the hole must be sleeved for its entire length. Standard kit 90 long bend Standard kit 90 long bend Accessory 90 short bend Accessory 90 short bend Wall band Locking band All joints between the fixed lengths of flue must be secured with locking bands, and every meter in length horizontally or vertically must be supported. It is your responsibility to ensure that no part of the flue installation contravenes any gas or building regulations. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 27

28 Position of Flue Terminal on Outside Wall 12mm The position of the terminal on the outside wall should be 12mm from the edge of the terminal mesh to the face of the outside wall. If it protrudes further than 12mm it may be adversely affected by wind blowing across the terminal so upsetting the balanced flue operation. If it is fitted with less than 12mm clearance then the vented exhaust gases may be drawn back into the balanced flue primary air inlet so adversely effecting the operation of the balanced flue. The flue pipe passing through the wall should be angled slightly downwards (1 degree) towards the terminal so as to stop rain water entering and passing along the flue. 1 incline Horizontal Flue Passing Through a Combustible or Cavity Wall Ceramic rope or Fraxfill sealant to prevent draughts Sleeve liner 12mm 25mm air gap incorporated as part of the Flue System T2 Ceramic rope or Fraxfill sealant to prevent draughts T1 Seal the bezel part of sleeve liner to the outer face of the wall using a suitable sealant 50mm minimum Sleeve liner EUROHEAT DISTRIBUTORS (H.B.S) LTD. 28

29 Fitting the High Level Vertical Flue Kit The flue system starter length should be sealed to the stove s flue spigot with a heat proof sealant,(we suggest fraxfill, part number MS9045). Apply a bead of heat resistant sealant to the inner face of the outer flue spigot and the outer face of the inner flue pipe. The clamp should be used to secure the first elbow or additional length and the appropriate heat proof tape used to secure the telescopic fitting. Heat proof sealant Heat proof sealant The vertical terminal will only fit the male end of the flue pipe. Accessory 90 short bend Accessory 90 short bend Wall bands should be fitted to support the flue pipe. The telescopic starter length must be used so that the male end of the flue pipe connects to the vertical flue terminal. All joints between the fixed lengths of flue must be secured with locking bands, and every meter in length horizontally or vertically must be supported. It is your responsibility to ensure that no part of the flue installation contravenes any gas or building regulations. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 29

30 Fitting the Low Level Horizontal Flue Kit The horizontal flue kit starter length should be secured by means of a self tapping screw. If it is to pass through a cavity wall then a sleeve liner (150mm part No. MS mm part No. MS91066) should be fitted. The terminal section should be fitted with the snorkel pointing upwards and the wind shield to protect the terminal outlet. Only the standard kit may be used from the rear flue outlet. Secure starter length with a self tapping screw Flue should be sleeved if passing through a cavity wall Sleeve kit 150mm part No. MS mm part No. MS91066 Terminal snorkle The terminal length should be fitted with the snorkle pointing upwards. Apply a bead of heat resistant sealant (we suggest fraxfill, part number MS9045) to the inner face of the outer flue spigot and the outer face of the inner flue pipe. Wind Shield The wind shield should be fitted using the spacers so that it baffles the top holes in the horizontal terminal to protect it from the effects of the wind. The top holes are pre-drilled into the terminal however in some cases the lower holes may need to be drilled to complete the installation. Fitting of Flue Spigot to Rear of the Stove Remove the inner and outer spigot from the top of the stove. Remove the rear blanking plate and fit the inner and outer spigots and the flue reduction plate (FRP) if required, see pages 23 and 24, to the rear of the stove. Fit the blanking plate onto the top plate. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 30

31 Glossary of Terms Term Top to horizontal high level Top to vertical high level Low level horizontal T1 T2 FRP Sleeve liner Outlet Terminal Wall band Locking band Closure bezel Terminal guard Roof flashing Ceiling support Fire stop spacer Existing chimney adapter kit Terminal snorkle Wind guard Fraxfill (MS9045) Description The flue kit rises from the top of the stove, it includes a long sweeping 90 bend and terminates through the side wall of a property. The flue kit rises from the top of the stove and terminates vertically through a roof. The flue runs horizontally from the back of the stove and terminates through the side wall of a property. Telescopic starter length. The first section of the flue kit which can telescope into the section of flue to follow it. Top connection only. Telescopic terminal length. The last section of the top to horizontal flue kit which can telescope into the section of flue before it. Flue reduction plate. A choke plate fitted into the outlet of the stove to reduce the velocity of the flue gases. Telescopic sleeve, required when a flue passes through a combustible or cavity wall. Position of the flue terminal, which is governed by Building Regulations, see diagram on page 6. Fitted to the end of the flue system, supplied with the flue kits. Required to support every 1m in length vertically or horizontally of flue. Supplied in the kits and with every additional length of flue pipe to secure the joints between sections. The closure bezel fits around the flue pipe covering the hole through the wall and giving the installation a clean finish. A wire mesh guard required when the outlet is in a vulnerable position, such as where the flue discharges within reach of the ground (less than 2m), or a balcony, verandah or a opening window. Required when a vertical flue passes through a roof. A vulcanised rubber gaiter through which the flue pipe passes allowing a water tight seal to be made. A metal plate with locking band required when a flue passes through a ceiling. Fitting onto the floor above the ceiling through which it passes with a clamp to secure it to the flue pipe and support the weight of the flue. A metal plate which fits on the ceiling through which the stove passes which is required to conform to Building Regulations. The existing chimney adapter kit can convert either ceramic lined chimneys or an unlined chimney into a balanced flue system. By using this system combustion air is drawn from the outside rather than from within the property. The upturned inner pipe within the low level horizontal flue kit, that when fitted should be pointing upwards. This fits on the outside of the low level horizontal terminal, standing away from the body of the terminal guard, with spacers, so protecting the top holes of the terminal from the effects of wind blowing directly on them. Fraxfill is a pliable (tacky putty) white ceramic fibre gap fill supplied in a 300g cartridge for use with a sealant gun. Fraxfill is recommended for applications with operating temperatures of up to 1200 C. EUROHEAT DISTRIBUTORS (H.B.S) LTD. 31

32 When installing the stove this documnet should be used in conjunction with Euroheats Installation Instructions specific to the stove supplied. The gas stoves in the Euroheat range may only be installed by a suitably qualified Gas Safe technician using the appropriate fittings for the gas type being installed, and the stove must not be modified in anyway. Important The installer is responsible under the Health and Safety at Work Act 1974 vi the caustic nature of fire cement and the possibility of disturbing asbestos and other materials such as ceramic in existing installations and to suggest appropriate protection to be given to the person (s) carrying out the installation. The complete installation must be carried out with due reference to the British Standards, Codes of Practice and Building Regulations relevant to the fuel type being installed, and the manufacturers installation instructions. This document is a General Installation Guide only. It does not replace the installation instructions or building regulations. No installation should be undertaken unless the installer is suitably qualified. Information from the Euroheat Technical Team Euroheat and Nestor Martin have a policy of continual research and development and reserve the right to modify its appliances without prior notice. We make every effort to ensure that the information provided in this document is correct and accurate at the time of printing. Continued updates occur to adapt documents to customer requirements and appliance changes. For the latest editions of all Euroheat documentation visit our web site We would request that you inform Euroheat of information which you feel is not provided in this document which would assist other users in the future. The Euroheat Technical Team Euroheat Distributors (H.B.S.). Ltd., Unit 2, Court Farm Business Park, Bishops Frome, Reception: Worcestershire, Technical Support: WR6 5AYY. tech@euroheat.co.uk EUROHEAT DISTRIBUTORS (H.B.S) LTD. 32

Flue Installation. High Efficiency Condensing Boilers

Flue Installation. High Efficiency Condensing Boilers Flue Installation High Efficiency Condensing Boilers Table of contents INTRODUCTION 1 Instruction guidance...4 1.1 Product documentation...4 1.2 Explanation of symbols...4 1.3 Important Notes...4 INSTALLATION

More information

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING 6.CW.1A TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS wood or gas standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING The Fireplace Ltd is able to design and fabricate custom brick open masonry

More information

Gas Stoves. H15-10 Direct Vent Gas Stove. Model H15-NG10 H15-LP10. Approved Venting Systems

Gas Stoves. H15-10 Direct Vent Gas Stove. Model H15-NG10 H15-LP10. Approved Venting Systems H15-10 Direct Vent Gas Stove Model H15-NG10 H15-LP10 Fuel Type Natural Gas Propane Minimum Supply Pressure 5.0 W.C. (1.25 kpa) 12.0 W.C. (3.00 kpa) Manifold Pressure - High 3.8 W.C. (0.95 kpa) 11 W.C.

More information

Installation Instructions

Installation Instructions Installation Instructions Pedestal Models FS 500 LE FS 800 LE Insert Models IS 500 LE IS 800 LE Pecan Engineering Pty Ltd 13 Acorn Road Dry Creek South Australia 5094 Email info@pecan-eng.com.au Phone:

More information

GREENSTAR 60/100 HORIZONTAL FLUE

GREENSTAR 60/100 HORIZONTAL FLUE FLUE KIT INSTALLATION MANUAL 7 76 9 08 ROOM SEALED TELESCOPIC FLUE 7 76 9 7 ROOM SEALED LONGER TELESCOPIC FLUE 7 76 9 086 PLUME MANAGEMENT SYSTEM GREENSTAR 60/00 HORIZONTAL FLUE FOR WORCESTER GREENSTAR

More information

GC 3 (PF) (THREE OVEN) GAS FIRED POWER FLUE COOKER

GC 3 (PF) (THREE OVEN) GAS FIRED POWER FLUE COOKER GC 3 (PF) (THREE OVEN) GAS FIRED POWER FLUE COOKER Installation Instructions REMEMBER: when replacing a part on this appliance, use only spare parts that you can be assured conform to the safety and performance

More information

FREESTANDING CLEAN AIR WOODBURNER

FREESTANDING CLEAN AIR WOODBURNER Please read this booklet and keep for future reference for the safe installation of your: FREESTANDING CLEAN AIR WOODBURNER This fire conforms with Ecan Requirements All installations must be in accordance

More information

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark Spectrum Laboratories Ltd is accredited by International Accreditation New Zealand (formerly Telarc). The tests reported herein have been performed in accordance with the terms of our accreditation. This

More information

AZB 800. Vertical Flue Gas Ducting Ø60/100mm 7 719 001 884

AZB 800. Vertical Flue Gas Ducting Ø60/100mm 7 719 001 884 AZB 800 Vertical Flue Gas Ducting Ø60/100mm 7 719 001 884 Ø120 1310 Ø125 50 125 6 720 610 703-00.1O for Gas Condensing Boilers: OSW Contents Contents Safety instructions 2 Symbols 2 1 Use 3 1.1 General

More information

plumbing products guide

plumbing products guide plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly

More information

MAJESTIC. OUTDOOR / INDOOR WOOD FIREPLACES Model: ODSR36A OWNERS INSTALLATION & OPERATING INSTRUCTIONS. KEEP THESE INSTRUCTIONS FOR FUTURE REFERANCE.

MAJESTIC. OUTDOOR / INDOOR WOOD FIREPLACES Model: ODSR36A OWNERS INSTALLATION & OPERATING INSTRUCTIONS. KEEP THESE INSTRUCTIONS FOR FUTURE REFERANCE. MAJESTIC OUTDOOR / INDOOR WOOD FIREPLACES Model: ODSR36A OWNERS INSTALLATION & OPERATING INSTRUCTIONS. KEEP THESE INSTRUCTIONS FOR FUTURE REFERANCE. CONTENTS Part 1: Safety Information Part 2: Installation

More information

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS WARNING Improper installation, adjustment, alteration, service, or maintenance of this product can cause

More information

Flue Options. Ace Finest Finest Gold Best 30/40/50/60 Best 80. Flue Options Flue Options Flue Options Flue Options

Flue Options. Ace Finest Finest Gold Best 30/40/50/60 Best 80. Flue Options Flue Options Flue Options Flue Options Flue Options Ace Finest Finest Gold Best 30/40/50/60 Best 80 Flue Options Flue Options Flue Options Flue Options B r i t i s h M a d e B o i l e r s Halstead have been manufacturing boilers in the UK since

More information

ASX7-4-IOM-7 J30-08579

ASX7-4-IOM-7 J30-08579 INSTALLATION INSTRUCTIONS 4" COMBUSTION AIR INLET KIT TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS UNIT CONVERSION & CATEGORY III VENTING FOR SEPARATED COMBUSTION For 30,000 to 75,000 BTU/HR SUPPLEMENT

More information

Chimneys in Thatched Properties

Chimneys in Thatched Properties Chimneys in Thatched Properties Compliance with Building Regulations when installing or repairing a chimney or re-thatching a roof that abuts a chimney The increasing problem of thatch fires Over the last

More information

SPECIFICATION & INSTALLATION GUIDE FOR MASPORT LE4000 PROVINCIAL INSERT FIRE, NEW ZEALAND MODEL

SPECIFICATION & INSTALLATION GUIDE FOR MASPORT LE4000 PROVINCIAL INSERT FIRE, NEW ZEALAND MODEL SPECIFICATION & INSTALLATION GUIDE FOR MASPORT LE4000 PROVINCIAL INSERT FIRE, NEW ZEALAND MODEL Manufactured in New Zealand by: GLEN DIMPLEX AUSTRALASIA LIMITED PO Box 58-473 Botany Auckland 2163 Ph: 0800

More information

1 DESCRIPTION OF THE APPLIANCE

1 DESCRIPTION OF THE APPLIANCE 1 DESCRIPTION OF THE APPLIANCE 1.1 INTRODUCTION The cast iron SF boilers are a valid solution for the present energetic problems, since they can run with solid fuels: wood and coal. These series of boilers

More information

Pre-site Installation Instructions for Aga Electric Cooker Models Electric C Electric E

Pre-site Installation Instructions for Aga Electric Cooker Models Electric C Electric E Electric Cookers Pre-site Installation Instructions for Aga Electric Cooker Models Electric C Electric E PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLING YOUR AGA Consumer Protection As responsible manufacturers

More information

Morco House Riverview Road Beverley HU17 0LD. Retrofit or Upgrade a Water Heater in a Caravan Holiday home

Morco House Riverview Road Beverley HU17 0LD. Retrofit or Upgrade a Water Heater in a Caravan Holiday home Morco House Riverview Road Beverley HU17 0LD Morco Products Ltd Tel: 01482 325456 Fax: 01482 212869 Email sales@morcoproducts.co.uk Web www.morcoproducts.co.uk Retrofit or Upgrade a Water Heater in a Caravan

More information

Installation Instructions for AGA BF Gas Fired Cooker Models GC, GCB, GE and GEB

Installation Instructions for AGA BF Gas Fired Cooker Models GC, GCB, GE and GEB Gas Fired Cookers Installation Instructions for AGA BF Gas Fired Cooker Models GC, GCB, GE and GEB FOR USE IN GB & IE PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLING YOUR AGA Consumer Protection As responsible

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

Installation Instructions

Installation Instructions GC 3 (THREE OVEN) Installation Instructions REMEMBER: when replacing a part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require.

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

Making Your Home Ready For Solar Water Heating

Making Your Home Ready For Solar Water Heating Making Your Home Ready For Solar Water Heating During construction or a major renovation, making a home ready to use solar energy can be easy and inexpensive. When the time comes to install your solar

More information

Figure 22: Typical Individual Venting. Figure 21: Single Water Heater Venting

Figure 22: Typical Individual Venting. Figure 21: Single Water Heater Venting ING THE WATER HEATER The purpose of venting a gas or oil-fired water heater is to completely remove all products of combustion and to vent gasses to the outside air without condensation in the vent or

More information

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers.. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS OVENS MANUFACTURED BY: EARTHSTONE OVENS-6717 SAN FERNANDO RD GLENDALE CA 91201 TELEPHONE: 800-840-4915 818-553-1134 FAX: 818-553-1133

More information

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko INSTALLATION MANUAL Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko Ventilated Notified entity Building Technical and Research Institute Prague notification no. 1020 This instruction refers to double-layer

More information

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010 Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance

More information

Heating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008

Heating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008 Heating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008 Appendix: Guide to the Condensing Boiler Installation Assessment Procedure for Existing Dwellings CONTENTS PAGE

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

NRG 75 CRF NRG GREENBOARD WALL SYSTEM NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark

More information

Commissioning of Heat Producing Appliances Burning Solid Fuel

Commissioning of Heat Producing Appliances Burning Solid Fuel Building Control Technical Guidance Leaflet No. 15 This leaflet is one of a series produced by the Hertfordshire Building Control Technical Forum Commissioning of Heat Producing Appliances Burning Solid

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Installation, operation and maintenance manual TX 35A

Installation, operation and maintenance manual TX 35A Installation, operation and maintenance manual TX 35A Rev.10 may 2012 Page 1 of 18 1.0.0 Table of contents INSTALLATION, OPERATION AND MAINTENANCE MANUAL...1 1.0.0 TABLE OF CONTENTS...2 2.0.0 ILLUSTRATIONS...2

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

INFRARED QUARTZ WALL HEATER

INFRARED QUARTZ WALL HEATER INFRARED QUARTZ WALL HEATER MODEL NO: IQ2000 PART NO: 6939004 MOUNTING & OPERATION INSTRUCTIONS GC0715 INTRODUCTION Thank you for purchasing this CLARKE Infrared Wall Heater. Before attempting to use this

More information

4 Installation Requirements

4 Installation Requirements 4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming

More information

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table

More information

HOW MUCH FUEL DOES A GAS STOVE CONSUME AND HOW MUCH DOES IT COST TO OPERATE?

HOW MUCH FUEL DOES A GAS STOVE CONSUME AND HOW MUCH DOES IT COST TO OPERATE? WHAT IS A BTU? The standard energy measurement is the BTU (British Thermal Unit). Each BTU unit is determined by the amount of thermal energy required to raise the temperature of one pound of water by

More information

EH-20 20m antenna. By VE3RGW

EH-20 20m antenna. By VE3RGW EH-20 20m antenna By VE3RGW Equivalent circuit of EH-20 (prototype 2A) antenna system. Upper cylinder Lower cylinder Ground Counter pose Phasing coil Impedance transformer and tune circuit Tune coil Feed

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction

More information

CONTENTS 1 INTRODUCTION 2 POSSIBLE INSTALLATION DIFFICULTIES 3 OUTLINE OF THE ASSESSMENT PROCEDURE 4 PURPOSE OF THE ASSESSMENT PROCEDURE

CONTENTS 1 INTRODUCTION 2 POSSIBLE INSTALLATION DIFFICULTIES 3 OUTLINE OF THE ASSESSMENT PROCEDURE 4 PURPOSE OF THE ASSESSMENT PROCEDURE 1 Guide to the Condensing Boiler Installation Assessment Procedure for Dwellings CONTENTS 1 INTRODUCTION 2 POSSIBLE INSTALLATION DIFFICULTIES 3 OUTLINE OF THE ASSESSMENT PROCEDURE 4 PURPOSE OF THE ASSESSMENT

More information

Builder Specifications for Solar Ready Homes

Builder Specifications for Solar Ready Homes Builder Specifications for Solar Ready Homes This document specifies the essential elements required to make a new home ready for the future installation of roof-mounted solar domestic hot water and photovoltaic

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Installation Instructions

Installation Instructions Installation Instructions One-Piece Deep Wall Sleeve For Use with Packaged Terminal Units Please read these instructions completely before attempting installation. NOTE: Ensure that the unit is only installed

More information

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE FITTING YOUR KITCHEN GUIDE How to mark out a kitchen PAGE 1 Before starting on the installation, measure 870mm from the lowest point of the floor and mark a datum line around the room to indicate where

More information

Cooktop Low-Profile Ventilation Hoods

Cooktop Low-Profile Ventilation Hoods INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............

More information

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation Solar Pool Heating System Installation Manual Read the complete manual before beginning the installation 1. Sizing the System Visit www.techno-solis.com to size the system using the sizing calculator.

More information

Department for Communities and Local Government

Department for Communities and Local Government Department for Communities and Local Government Permitted development for householders Technical Guidance April 2014 Department for Communities and Local Government Please note: This technical guidance

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

HEAVY DUTY STORAGE GAS

HEAVY DUTY STORAGE GAS Multi-Fin flue technology Flue damper saves energy Electronic controls HEAVY DUTY STORAGE GAS Dependability The Rheem heavy duty gas range is the work horse of the industry having proved itself over many

More information

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major

More information

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions

More information

Isola Steel Gutters Strength and design for extreme climate!

Isola Steel Gutters Strength and design for extreme climate! Isola Steel Gutters Strength and design for extreme climate! Dry and healthy buildings Isola Steel Gutters Steeled against wind and weath The four seasons Wide temperature variations and highly variable

More information

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 -

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 - CONTENTS General conditions Material requirements 3 Terms 4 Estimating shingle requirements 4 Roof preparation 6 Shingle application 9 Shingle Shingle application application guide guide - - b a 3a 3b

More information

2010 Residential Water Heater Replacement Check List

2010 Residential Water Heater Replacement Check List 2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This

More information

Twin Pipe PVC / CPVC Venting options for Rinnai Ultra Series Condensing Tankless Water Heaters.

Twin Pipe PVC / CPVC Venting options for Rinnai Ultra Series Condensing Tankless Water Heaters. Twin Pipe PVC / CPVC Venting options for Rinnai Ultra Series Condensing Tankless Water Heaters. Purpose: The purpose of this presentation is to provide information concerning new venting options available

More information

Screw Patterns Roof & Walls 403-279-2766 TR-36 MD-36 TSM-32. PBR-Panel

Screw Patterns Roof & Walls 403-279-2766 TR-36 MD-36 TSM-32. PBR-Panel Screw Patterns Roof & Walls Overlap Underlap ¾ 9 TR-36 36 5/8 6 MD-36 36 ½ 8 TSM-32 32 1¼ 12 PBR-Panel 36 Bottom Edge Screw Pattern apply to every profile except for MD36 (1 screw beside every rib) High

More information

Rooflight INSTALLATION INSTRUCTIONS

Rooflight INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary

More information

Pre-Drywall Inspection Report

Pre-Drywall Inspection Report SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion

More information

Installation Instructions

Installation Instructions Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate

More information

Confort 26. Sliding Systems. Sapa Building System

Confort 26. Sliding Systems. Sapa Building System Confort 26 Sliding Systems Sapa Building System Confort 26 is Sapa s thermally insulated sliding system for windows and doors. Available as two- and three-rail solution. Among its features, there are

More information

Accessory Manual Ventilation Section Model Comfort Circle

Accessory Manual Ventilation Section Model Comfort Circle Accessory Manual Ventilation Section Model Comfort Circle Manual version:. R a Copyright and trademarks All the information and drawings in this manual are the property of Biddle and may not be used (other

More information

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

BILL OF QUANTITY FOR THE WORK OF REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP" Sl. 1 DISMANTLING WORK 1.1 Stripping off worn out plaster (outside and inside) and raking out joints

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes CANTEX INC. 301 Commerce Ste 2700 Fort Worth, Texas 76102 817-215-7000 Fax: 817-215-7001 Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes YOUR FULL

More information

One Year Warranty. Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches NATURAL GAS* Six Year Warranty

One Year Warranty. Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches NATURAL GAS* Six Year Warranty One Year Warranty ELECTRIC Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches Fused Ceramic Shield tank lining is corrosion-resistant for years of dependability. Adjustable

More information

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Services Enclosures and Protected Shafts - Maintaining Compartmentation Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

1. Description. 2. List of Accessories included A B C F G H

1. Description. 2. List of Accessories included A B C F G H 1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin. The unit will start automatically. Please pay particular attention to the following: Possible danger to

More information

SHINGLE APPLICATION GUIDE

SHINGLE APPLICATION GUIDE SHINGLE APPLICATION GUIDE CONTENTS 01. General conditions 01. Material requirements 02. Terms 07. Estimating shingle requirements 08. Roof preparation 10.Shingle application E version 2006 GENERAL CONDITIONS

More information

Installation Instructions

Installation Instructions VentilAire IV Whole-House Fresh Air Supply System Installation Instructions 914228 Flat Roof Kit 914229 Sloped Roof Kit 5" x 11' Class I Insulated Flexible Duct Plastic Clamps (2) Metal Clamps (2) Ceiling

More information

How to build a Pizza Oven in 4 days

How to build a Pizza Oven in 4 days How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY

More information

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery Part 3 Ancillary technologies Chapter CONTENTS SCOPE Clause Page DESIGN Design standards D1 1 Statutory requirements D2 1 System design D3 1 Building integration D4 2 Noise D5 2 Access and controls D6

More information

39HQ Airovision Air Handling Units

39HQ Airovision Air Handling Units 39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport

More information

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders

More information

sound reduction systems for commercial, educational and industrial environments

sound reduction systems for commercial, educational and industrial environments sound reduction systems for commercial, educational and industrial environments Tel: +44 ()14 3874 Fax: +44 ()14 38957 E-mail: info@soundreduction.co.uk Web: www.soundreduction.co.uk soundblocker Acoustic

More information

*Note: This document is an electronic (scanned) version of the original paper report and formatting may vary somewhat from the original.

*Note: This document is an electronic (scanned) version of the original paper report and formatting may vary somewhat from the original. Guideline No. 97-05 January 19, 1998 Version 1.0 Guideline for Stack Sampling Facilities* Prepared By: Kevin Reeve, B. Sc. Air Emission Specialist Environmental Operations Division Art Schultz, C.E.T.

More information

FIRES WITHOUT COMPROMISE EXCEPTIONAL FIRES JETMASTER INSET STOVE. Installation, Operating and Servicing Instructions JETMASTER MK6

FIRES WITHOUT COMPROMISE EXCEPTIONAL FIRES JETMASTER INSET STOVE. Installation, Operating and Servicing Instructions JETMASTER MK6 FIRES WITHOUT COMPROMISE EXCEPTIONAL FIRES JETMASTER INSET STOVE Installation, Operating and Servicing Instructions JETMASTER MK6 Please leave these instructions with the customer SERIAL NUMBER..... Contents

More information

Gas-Fired, Residential Storage Type Water Heaters

Gas-Fired, Residential Storage Type Water Heaters Consulting, Resource, Education, Training, and Support Services for Home Inspectors A candle loses no light when it lights another candle. Gas-Fired, Residential Storage Type Water Heaters Most inspectors

More information

HDA -----------------------------------------------------------

HDA ----------------------------------------------------------- ----------------------------------------------------------- Lightstrips ---------------------------------------------------------------------- Ceiling system for heating and cooling LIGHTSTRIPS LIGHTSTRIPS

More information

A new range of clean burning multifuel stoves

A new range of clean burning multifuel stoves A new range of clean burning multifuel stoves The New Range of Bohemia X Multifuel Stoves - approved for wood burning use in smoke control areas throughout the UK* Pevex Enterprises has been established

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

SMD Rework Station TABLE OF CONTENTS

SMD Rework Station TABLE OF CONTENTS SMD Rework Station Thank you for purchasing the Hakko 50B SMD Rework Station. The Hakko 50B is designed to solder and desolder surface mounted devices with hot air. Please read this manual before operating

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

Guidelines for Earthquake Bracing Residential Water Heaters

Guidelines for Earthquake Bracing Residential Water Heaters Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the

More information

SRP Pricelist 2015 Including VAT. Stoves for every home

SRP Pricelist 2015 Including VAT. Stoves for every home SRP Pricelist 2015 Including VAT Stoves for every home Valid from 01-10-2015 UK Contents Contura Stoves C400 Series... 2-4 C500 Series... 5-9 C600 Series... 10-13 C700 Series... 14-15 C800 Series... 16-17

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

Removing Moisture within Large Double Glazed Windows

Removing Moisture within Large Double Glazed Windows Removing Moisture within Large Double Glazed Windows Copyright: Max Cottrell www.mcottrell.co.uk This article gives the reasons and a method of removing accumulated moisture from double glazed windows,

More information

Saferand easierinstallation

Saferand easierinstallation EN 85-07 Saferand easierinstallation IföSigninstallationsystem andifösignbuilt-incistern www.ifosanitar.com/sign Aneffectivesolution withmanyadvantages. Ifö Sign installation system makes life a little

More information

HVAC Code Requirements

HVAC Code Requirements one and two family dwellings? Answer: SECTION 2001: GENERAL 2001.1 Air supply. Fuel-burning equipment shall be provided with a supply of air for fuel combustion, draft hood dilution and ventilation of

More information

Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version

Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version with operating bar with crank electrical version 1. Prerequisite for a correct installation of

More information

INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS

INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS FOR YOUR SAFETY, FOLLOW THE INSTALLATION DIRECTIONS GENERAL DESCRIPTION:

More information

A few good reasons to have a conservatory. The conservatory structure

A few good reasons to have a conservatory. The conservatory structure Conservatory styles A few good reasons to have a conservatory The conservatory structure PLAY FAMILY TIME In essence a conservatory is like a big jigsaw with all the pieces joining together to form a finished

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information