1 Originator:Andrew Windress Tel: Report of the Chief Planning Officer PLANS PANEL CENTRAL Date: 29 th January 2009 Subject: APPLICATION 08/06093/FU MULTI-LEVEL DEVELOPMENT UP TO 14 STOREYS IN TWO PHASES, COMPRISING OFFICES, FITNESS CENTRE AND SHOP WITH 13 STOREYS OF CAR PARKING APPLICANT DATE VALID TARGET DATE LEEDS PROPERTIES LTD 17/11/08 16/2/09 Electoral Wards Affected: City & Hunslet Ward Members consulted (referred to in report) Specific Implications For: Equality and Diversity Community Cohesion Narrowing the Gap POSITION STATEMENT ONLY 1.0 INTRODUCTION: Members may recall this proposal last being presented to them at the preapplication stage in October Following further negotiations a full planning application has been submitted and is now presented to Panel as a position statement and Members are requested to provide comment. This large site is owned by the Council and previously benefited from a permission for a similar leisure development; this permission expired in April This application is presented at the same time as planning application 07/04522/FU that relates to the adjacent site at Quarry Hill with a frontage along Eastgate. This development proposes two hotels, serviced apartments, casino, bars and restaurants. The car parking for the hotels, plus public car parking to replace the surface car parking at Quarry Hill, will be provided by the development covered in this report therefore the applications are closely linked and are presented together.

2 2.0 PROPOSAL: This is a full planning application for a building up to 14 storeys that includes offices, gym, A1 retail unit and multi-storey car park (MSCP). The building will be constructed in two phases with the construction of the MSCP and retail unit being phase one and office and gym phase two. The undeveloped area within phase one (i.e. the phase two offices in the western portion of the site) will be landscaped and provide an area of public open space until work on phase two commences. The MSCP built in the first phase is located in the eastern half of the site and will provide 694 car parking spaces, inclusive of 39 disabled spaces. 339 of these spaces will be public car parking to mitigate for the loss of the existing surface car parking at Quarry Hill. 165 spaces are available for the office use. 190 spaces will serve the hotels that form part of the adjacent development; 120 spaces for the 219 bedroom 4* hotel and 70 spaces for the 125 bedroom 2* hotel. Until the phase two offices are constructed, the parking allocation for the offices will be provided as public parking. All public parking will be controlled by a tariff to discourage long stay commuter parking. Vehicular and one of the pedestrian access points to the car park is at the eastern end of the building adjacent to the landing of the A64 footbridge with an additional pedestrian access also available at the southwest corner of the phase one building. The 200sq m ground floor retail unit in the southern elevation is also constructed in phase one. The western portion of the site that is undeveloped at phase one will be landscaped providing an area of open space. 19,535sq m of offices and 1,560sq m gym will be constructed adjacent to and on top of the phase one MSCP. The gym is located in the western portion of the site at the lowest level with offices above. The top three levels of the office extend over the top of the MSCP. The building form is directly influenced by the adjacent hotel development with a gently curving outer edge to the New York Road slip road (northern elevation). This elevation also has a plinth in ceramic granite with striated features, horizontal banding to the main body of the building and wavy roof on top. The car park element is horizontally clad in a panelling system that will vary between solid, perforated and mesh panels. The office element alternates between glass and ceramic stone. A recessed shadow gap provides the break between the MSCP cladding and the office element. The curving office element returns into Quarry Hill at the existing access road before a copper frame breaks the curve as the building enters Quarry Hill. To respect the other forms of development within Quarry Hill the building becomes stepped and more angular and includes some double height overhangs above the footpath. This part of the office element will be fully glazed at all levels. The entrance to the offices is located adjacent to the southern pedestrian entrance to the car park referred to above. Opposite this area a pedestrian crossing point will be introduced to provide a safe route across the access road and toward the centre of Quarry Hill and the Playhouse. A vertical copper clad component highlights the end of the office element before the same three varying panels begin to define the southern elevation of the car park. The A1 retail unit below the car park is in double height glazing.

3 The stair tower at the eastern end of the car park is framed in a ribbed copper composite with glazing panels in the north and south elevations and glazing inserts in the eastern elevation. The application is supported by the following documents: Design and Access Statement. Planning Statement. Flood Risk Assessment. Travel Plan. Sustainability Statement. Waste Management Strategy. Noise Assessment. Land Contamination Report. Transport Assessment. 3.0 SITE AND SURROUNDINGS: This application relates to the primarily grassed area at the northern end of the Quarry Hill site to the west of the A64 footbridge and Quarry House. The New York Road slip road bounds the site to the north whilst the access road within Quarry Hill bounds the site to the south and west. The site contains a steep grassed bank plus a number of trees. There are some areas of hardstanding within the site. The eastern end of the site adjacent to Quarry House is 7m above the western end. The site is within the Prestige Development Area as allocated within the UDP Review where innovative building design and high quality materials are expected. Office uses are acceptable within the PDA. Quarry Hill presently contains a mix of building types and uses and has benefited from a masterplan outlining its redevelopment since RELEVANT PLANNING HISTORY: Applications 20/321/01/OT (approved 29/4/03) and 20/20/04/RM (approved 10/9/04) were granted outline and reserved matters approvals for a part 10, part 11 storey office development with A1 and A3 units and multi-level car parking on this site. This proposal was of a similar scale to that proposed under the current application but with a more angular form. The parking was in the basement and provided 327 spaces allocated to the offices only. On the remainder of the Quarry Hill site are a series of vacant and cleared sites which have now been considered by Members and a resolution to approve has be given for a mixed use scheme for offices residential and leisure uses. At the time of considering this scheme Members expressed concern over the level of car parking which would be present on Quarry Hill for the use by WYPH and as a result a multi storey car park next to Quarry House was included within the scheme. This car park was to make a minimum of 350 spaces available after 1800hrs for general public use which would include use by patrons of the WYPH. Quarry Hill benefited from a masterplanning exercise that culminated in the production of the Farrell masterplan in This masterplan promoted a multistorey car park on this site.

4 5.0 HISTORY OF NEGOTIATIONS: As outlined above the whole of Quarry Hill has benefited from a masterplan since 1990 and there have been outline and reserved matters approvals for a similar development to have recently expired in April As part of the continued development of the adjacent hotel proposal the basement parking at the hotel site was relocated to this site and placed within the above ground car park. To ensure both developments can continue to progress and the public parking provision be retained, the principle of this approach was accepted and both schemes were progressed before being presented to Members as a preapplication proposal in October At this presentation Members raised a number of matters, these are provided below with a comment added to each. The area around the footbridge requires improving to make this a more inviting and safe area. Some Members thought the money spent on the landscaping of the phase two site would be better spent on the area around the footbridge. The area around the landing of the footbridge is outside the developers control and therefore does not form part of the application at this stage. However, officers are continuing to discuss with colleagues in Property Services, and the developer, to ensure this area will be appropriately landscaped and maintained. When the application is presented for determination it is intended that this issue will be resolved and a solution presented to Members. There was concern that phase two may never happen and therefore the roof over the car park not materialise. This has been borne in mind throughout the design development to ensure the phase one building and landscape area provides the design quality required at a PDA. Assurances cannot be given as to when phase two will be commenced. The north elevation appeared like the back of the building and did not complement the gateway location. Improvements have been made to the overall design of the building with a particular focus on how the building will appear on the approach to the city centre. The stair tower and eastern elevation been simplified in terms of its overall appearance but with interesting features added such as the horizontal and vertical glazed slots. The wavy roof now has a neater finish like that to the hotel and therefore the square end of the offices on top of the car park has been removed. The northern elevation now includes further curved levels to the office and the wavy roof now floats over more of this elevation therefore providing a neater elevation similar to that off the hotel. The variation in solid, perforated and mesh panel plus the open slots will provide interest to the car park elevation and lighting of the plinth will highlight interest lower down. The land has been left undeveloped and untidy for a long time therefore the principle of development was supported. The developments must assist in linking Quarry Hill to the nearby communities. The general development of Quarry Hill and the facilities this will provide will provide an interesting destination and point of connection to and from the surrounding communities as opposed to the current uninviting situation. In particular the enhancement of the landscaping around the footbridge will

5 make this area more appealing whilst the activity in the area will make it safer. Negotiations continue regarding the design, highway implications and landscaping at the footbridge. 6.0 PUBLIC/LOCAL RESPONSE: Site notices were posted 26/11/08 and an advert was placed in the Leeds Weekly News on 18/12/08. Letters have been received by the WYPH, Leeds Civic Trust and on behalf of the developer for the other remaining site at Quarry Hill, Caddick Developments Ltd. West Yorkshire Playhouse: The WYPH believes the relocation of the disabled parking spaces into the separate MSCP will disadvantage disabled visitors in view of the distances of these spaces from the Playhouse and the adequacy of the linking routes. Response A full detailed response to the concerns raised by the WYPH is addressed within the appraisal section below. Leeds Civic Trust: The proposed building is inoffensive but its scale and massing do not relate to the other developments proposed within Quarry Hill. The Trust agree with the concerns of Caddick Developments that the proposal is substantially higher than the Caddick scheme and the increased logistical and highway problems due to the relocation of the car park and also reiterate concerns of the Playhouse. Response The issues regarding the design and support for the issues concerning the Playhouse are discussed in detail in the appraisal section whilst their support for those issues raised within the letter from Caddick Developments is discussed below. Caddick Developments Ltd: Objections raised are as follows. The principle of the MSCP is objected to as the MSCP was originally required to be located under the hotel. The Caddick development was required to provide a MSCP to address the wider Quarry Hill requirements. The location of the Leeds Properties car park is adjacent to the Caddick MSCP and therefore will highlight highway implications. There is no need for the extent of car parking proposed by Leeds Properties. The design of the car park entrance will result in backing up problems. The hotel parking should be located under the hotel and not in another location. The proposal is higher than the previous approval and higher than the adjacent Caddick buildings, does not include public open space and uses poor materials. The phasing of the scheme will result in the development appearing unfinished and it would be very difficult to construct the second phase if the remainder of Quarry Hill has been developed. The small retail unit is not viable and such uses are located in the Caddick scheme. Response

6 Whereas it was original intended to provide the public car parking in the hotel basement the principle of relocating public car park on the adjacent site was accepted by officers and presented to Members in October This approach maintains the required level of public car parking at Quarry Hill and with the pedestrian routes shown on plans maintains good connectivity across Quarry Hill. The public parking levels have been set by previous Panel resolutions. There are some outstanding highway implications that are further accentuated by the changing Caddick scheme. However, these issues are being investigated further by highways officers to find an acceptable solution. The proposal is similar to the height of the previously approved scheme at this site and it was always intended that the higher buildings would be located on the edges of Quarry Hill to create a bowl effect. A large public open space is provided as phase one and 586,000 has already been contributed by the developer for the refurbishment of Centenary Steps. It is not considered that this scheme would impose any significantly unorthodox construction requirements by being constructed in two phases and the first phase design has been considered as a finished building. The external design and materials are considered to create a building of quality. The small retail units have always formed part of this proposal to ensure an active frontage to the car park element. 7.0 CONSULTATIONS RESPONSES: Statutory: Highways: The principle of the MSCP providing hotel and public car parking in addition to the offices are acceptable as necessary facility for the viability of the area. The Quarry Hill site and surrounding area can accommodate the levels of traffic indicated. However, the best solution as to how the various vehicle movements relating to both this and the Caddick development at Quarry Hill can be accommodated in the area around the car park entrance has yet to be determined. Non-statutory: Transport Policy: The majority of the measures provided in the Travel Plans are acceptable. Minor changes are being made to the TPs and revisions will be provided prior to Panel where any further comments can be presented verbally. Contaminated Lane Team: The previous uses of the site and submitted reports do not highlight any concerns. Standard conditions requested. Access: Flat and level access is required at all entrance points, gradients across the site and landscape area should be minimised and/or agreed and full height glazing/glass doors should have appropriate manifestations. Mains Drainage: A Flood Risk Assessment has been presented and recommendations made. Standard conditions requested plus one requiring finished floors levels to be 300mm above the adjacent ground level. City Services: Refuse collection arrangements are acceptable. Public Rights of Way: The site is outside the coverage of the definitive map and no known claimed rights of way are affected.

7 Metro: City centre developments are generally supported by Metro. The car park provision could encourage car use; no more than 339 spaces should be allocated as public parking. Design should prevent vehicles stacking onto the highway and encourage access toward the bus station. Some of the modal split generations and target figures for minimising car use are unexpected. The developer should be required to provide real time displays and a public transport contribution in accordance with SPD5. Public Transport Contribution: A contribution of 285,708 is required in accordance with SPD5. Neighbourhoods and Housing: As the applicant does not know the end office user and therefore cannot confirm compliance with relevant noise standards a more detailed noise report should be required by condition and sound insulation measures agreed. Alternatively a post-construction sound test could be carried out with remedial measures introduced. The area in question will probably experience air quality close to, or exceeding the objective limit for an Air Quality Management Area (AQMA) to be declared. However as the proposal does not include residential accommodation the development would not, therefore, be a particular issue for annual average exceedances. Standard conditions requested. Police Architectural Liaison Officer: The site is within a high crime area of the city and car parks are notorious for being problematic in terms of their potential for crime. Secured By Design principles and recommendations are laid out and advice offered. 8.0 PLANNING POLICIES: Regional Spatial Strategy: The RSS for Yorkshire and Humber was adopted in May The vision of the RSS is to create a world-class region, where the economic, environmental and social well-being of all people is advancing more rapidly and more sustainably than its competitors. Particular emphasis is placed on the Leeds City Region. UDPR Designation: Prestige Development Area. GP5: Proposals should resolve detailed planning considerations. GP11, GP12 (Sustainable Design). BD2: New buildings should complement and enhance existing skylines, vistas and landmarks. BD4: Seeks to minimise impact of plant and machinery. BD5: Seeks to ensure a satisfactory level of amenity for occupants and surroundings. T2: Development proposals should not create new, or exacerbate existing, highway problems. T5: Satisfactory provision for pedestrians and cyclists. T6: Satisfactory disabled access. T24: Parking to reflect detailed UDP parking guidelines. A4: Development and refurbishment proposals should be designed to secure a safe and secure environment, including proper consideration of access arrangements. SA9, SP8: Promote development of City Centre role and status.

8 CC4: High quality design and appropriate scale at city centre gateway locations. CC27: Proposal areas within the City Centre. CC31: Uses appropriate within Prestige Development Areas (incl. hotels, conference, leisure). S1: The role of the CC as the regional centre will be promoted. LD1: proposals should allow sufficient space around buildings to retain existing trees in healthy condition & allow new trees to grow to maturity. N12: Fundamental priorities for urban form. N13:requires all new buildings to be of high quality and have regard to character and appearance of surroundings. Supplementary Planning Guidance City Centre Urban Design Strategy September 2000 Seeks to reinforce the positive qualities of character areas, re-establish urban grain, provide enclosure to streets, create visual interest, encourage excellent design, improve pedestrian connections, develop a mixture of land uses, promote active frontages and promote sustainable development. It is considered that the proposals would meet these objectives as described in the Appraisal section below. National Planning Guidance PPS1 General Policies and Principles PPG13 Transport 9.0 MAIN ISSUES i. Principle of the development. ii. Design. iii. Landscaping. iv. Highways v. Disabled Parking. vi. Section APPRAISAL i. Principle of the Development As previously highlighted this site formed part of the Quarry Hill masterplan of 1990 and was subject to previous outline and reserved matters approval for a multi-level office development with basement parking and A1/A3 unit that expired in April The scale of the current proposal reflects the previous permission, albeit in a different form and also reflects the scale and form of the adjacent hotel proposal. As such it is considered that the principle of the uses and general scale of the development have been established in the past and subsequently considered through pre-application. The proposed uses are compatible with the Prestige Development Area. ii. Design The scale of the building reflects the previous approval whilst the curved form generally reflects that of the hotel along the northern elevation and across the roof but with angular elements facing into Quarry Hill to reflect other existing and proposed developments adjacent to this site. The northern elevation incorporates a strong plinth in composite granite that includes projecting horizontal granite bands plus breaks in the granite provided by glazing in the office element and mesh panels or openings in the car park element. This both serves to provide a strong base to the building but also a quality material and level of interest toward the slip road.

9 The horizontal emphasis continues above with the paneling to the car park laid horizontally, but also in a random manner, and the more conventional horizontal arrangement to the offices. This common theme helps to link the two otherwise distinct car park and office elements. The offices extend up and over the car park but maintain the curve of the lower levels. The wavy roof then flows over the offices in a similar manner to the roof to the hotel. To provide a clear finish to this horizontal emphasis and wavy roof the stair tower to the car park is simply framed in a ribbed copper faced cladding with flat roof and glazed side elevation. The eastern elevation is an important elevation as this is viewed from distance on the approach into the city. The curve to the car park and offices will be visible eventually but initially the side of the stair tower and car park will appear prominent. As mentioned the stair tower is clad in a ribbed copper but vertical slots have been added that will allow light penetration through to provide an interesting tower feature. Beyond the stair tower the side of the car park elevation steps backs and is clad in an aluminum faced cladding with horizontal slots returning to provide the finer detail. The south elevation facing into Quarry Hill includes the same mix of horizontally banded solid, perforated and mesh panels, with some open slots sat above the active units on the ground floor that provide activity and interest at the lower level. The pedestrian access into the car park and offices are located directly opposite the north-south pedestrian route through the Caddick scheme and therefore will enhance this route. Another vertical copper clad element provides the break between the car park and office on this southern elevation. These feature provides a further point of attraction along this north-south pedestrian route. The offices facing into Quarry Hill are fully glazed and begin to step back before turning the corner and meeting the curved northern elevation. At this junction a slim copper frame provides the break between the straight glass and curved stone/glass. To ensure some continuity between these two approaches, the stronger horizontal bands from the plinth and upper levels in the northern elevation are continued through the glazing and there are set backs to the upper floor of the offices. iii. Landscaping The submitted landscaping is submitted as an indicative layout only and will be fully conditioned to ensure and appropriate open space is provided that enhances the other open spaces within Quarry Hill. iv. Highways Many of the principles associated with this development are accepted. However, there are still issues relating to how this development can be serviced when the adjacent Caddick development is borne in mind. As with all issues relating to this proposal, the implications on the wider Quarry Hill operators and development proposals must be fully considered therefore a resolution to suit everyone is to be sought before the application is brought to Members for a decision. The S106 will set the car park charges for the public car park to ensure the pricing acts as a deterrent for its use as long stay commuter car parking. The structure will change in the evening to allow visitors to the WYPH cheaper parking. Until the offices are constructed, the spaces allocated to the offices will be available for the public at the same tariff.

10 v. Disabled Parking At present there are 8 disabled parking spaces within Playhouse Square and a further 23 spaces on the remainder of Quarry Hill. During phases b and c referred to above, the location of disabled parking within Playhouse Square is undetermined and it is hoped this will be resolved and be presented verbally to Panel. Upon completion of the hotel development 20 public disabled parking would be located within the MSCP constructed adjacent to the hotel development. Under the previous permission, these 20 spaces were located under the hotel. The Playhouse is concerned regarding the distance visitors will have to travel from the MSCP to the Playhouse and would prefer disabled parking to be located within the hotel basement. The developer has both licensing and management problems regarding providing a small number of public disabled spaces within a private car park. vi. Section 106 The heads of terms for a joint S106 for both the hotel and office/mscp proposal has been agreed with the developer and will include the following: Commitment not to occupy either of the hotel development or MSCP until both developments are complete. Car park pricing/management plan. The 8 hour price for the public car will be 10% above the average for other city centre car parks. Public transport contributions of 125,000 for the hotel and 285,708 for the office development. Travel Plans with monitoring fee of 9,615 for the hotel development and 9,640 for the office development. Reference to the provision of Leeds City Council Car Club (WhizzGo) parking spaces and free trial membership package of 20,082 for the office development. Standard training initiatives. 600 monitoring fee for each clause that requires admin/management/monitoring CONCLUSION Members are asked to note the above position statement and provide comment on the proposals. Negotiations continue regarding the design, highway implications and landscaping at the footbridge. Specifically, officers would appreciate confirmation that; 1) the height, scale, massing and external appearance of the building is acceptable, 2) the two phased approach is acceptable, 3) the access points for vehicles and pedestrians is acceptable, 4) the occupation clauses regarding the hotel and MSCP as noted in the section 106 heads of terms above are acceptable. It is intended to bring a formal recommendation to the February Panel, where the proposal will hopefully address all the outstanding issues and any comments made on this position statement. Background Papers: Application file and history files 20/321/01/OT and 20/20/04/RM. Notice has been served on Leeds City Council.

11 08/06093/FU CITY CENTRE PANEL I Scale 1/1500 PRODUCED BY COMMUNICATIONS, GRAPHICS & MAPPING, LEEDS CITY COUNCIL This map is based upon the Ordnance Survey's Digital data with the permission of the Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office. (c) Unauthorised reproduction infringes Crown Copyright and may led to prosecution or civil proceedings. (c) Crown Copyright. All rights reserved. Leeds City Council O.S. Licence No

Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY.

Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY. Originator: Victoria Hinchliff Walker Tel: 39 51343 Report of the Chief Planning Officer PLANS PANEL EAST Date: 28 th October 2010 Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE,

More information

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Application No. 09/00389/LP - 51-61 Whytecliffe Road South, Purley, CR8 1. SUMMARY 1.1 This report concerns

More information

05 AREA/SITE SPECIFIC GUIDELINES

05 AREA/SITE SPECIFIC GUIDELINES 05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid

More information

Introduction. Welcome. 358-364 London Road, Mitcham

Introduction. Welcome. 358-364 London Road, Mitcham Introduction View from the southern junction of London Road and Cricket Green Welcome Thank you for attending our public exhibition and viewing the latest proposals for 358-364 London Road. As you may

More information

Alter and change of use to form restaurant from shop

Alter and change of use to form restaurant from shop + D I N BVRG H + THE CITY OF EDINBURGH COUNCIL Item no 7 Report no Full Planning Application at 8 Alexander Drive Edinburgh EHII 2RH Development Quality Sub-Committee of the Planning Committee Proposal:

More information

7-8 Waterloo Street, City Centre, Birmingham, B2 5PQ

7-8 Waterloo Street, City Centre, Birmingham, B2 5PQ Committee Date: 22/01/2015 Application Number: 2014/09031/PA Accepted: 09/12/2014 Application Type: Full Planning Target Date: 10/03/2015 Ward: Ladywood 7-8 Waterloo Street, City Centre, Birmingham, B2

More information

Manchester City Council Item 6 Planning and Highways Committee 8 May 2014

Manchester City Council Item 6 Planning and Highways Committee 8 May 2014 Application Number 104843/FO/2014/N1 Date of Appln 28th Feb 2014 Committee Date 8th May 2014 Ward Moston Ward Proposal Location Applicant Agent Change of use of ground floor to a hot food takeaway (Fish

More information

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON Page 1 of 57 PLANNING COMMITTEE REPORT Agenda Item 5.4 PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON 4 September 2007 Division Sustainability and Regulatory Services

More information

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

FIRST STREET NORTH CREATING PLACES FOR PEOPLE About This Consultation Manchester City Council and Ask Property Developments are seeking to develop First Street North, a 2.2 acre site to the north of the Number One Building, within the 20 acre First

More information

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

Manchester City Council Planning and Highways Committee 2 June 2011

Manchester City Council Planning and Highways Committee 2 June 2011 Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to

More information

3.0 Planning Policies

3.0 Planning Policies 3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The

More information

21 Plumbers Row, London, E1 1EQ

21 Plumbers Row, London, E1 1EQ Committee: Development Date: 19 th October 2011 Classification: Unrestricted Agenda Item No: Report of: Corporate Director of Development and Renewal Case Officer: Shahara Ali-Hempstead Title: Planning

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

Executive 29 October 2015

Executive 29 October 2015 Executive 29 October 2015 Report of the Assistant Director - Finance, Property & Procurement Portfolio of the Executive Member for Finance and Performance The Future of York s Guildhall & Riverside Summary

More information

Supplementary Planning Document. Radlett. District Centre Key Locations. Planning brief. March 2011. Hertsmere Borough Council

Supplementary Planning Document. Radlett. District Centre Key Locations. Planning brief. March 2011. Hertsmere Borough Council Supplementary Planning Document Radlett District Centre Key Locations Planning brief March 2011 Hertsmere Borough Council Large print and languages Hertsmere Borough Council aims to provide information

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

Oliver House. 51-53 City Road, EC1. Design & Access Statement Addendum Oliver House

Oliver House. 51-53 City Road, EC1. Design & Access Statement Addendum Oliver House 51-53 City Road, EC1 01 Introduction 02 Revised Plans 03 Revisions to height & appearance 04 Summary Statement 01 Introduction 01 Introduction This document forms an addendum to the previous Design &

More information

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn. P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes

More information

Richmond upon Thames College. Draft Planning Brief. May 2008

Richmond upon Thames College. Draft Planning Brief. May 2008 Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of

More information

Report to Planning applications committee Item Date 6 March 2014 Head of planning services

Report to Planning applications committee Item Date 6 March 2014 Head of planning services Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:

More information

Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET. New Detached Double Garage Block with Integrated Garden Store and Loft Storage Area.

Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET. New Detached Double Garage Block with Integrated Garden Store and Loft Storage Area. Application No: 13/2596N Location: Proposal: Applicant: Expiry Date: Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET New Detached Double Garage Block with Integrated Garden Store and Loft Storage

More information

Originator: Tel: 0113 2474461. Report of the Chief Planning Officer CITY PLANS PANEL. Date: 7 th JULY 2016

Originator: Tel: 0113 2474461. Report of the Chief Planning Officer CITY PLANS PANEL. Date: 7 th JULY 2016 Originator: Ian Cyhanko Tel: 0113 2474461 Report of the Chief Planning Officer CITY PLANS PANEL Date: 7 th JULY 2016 Subject: PREAPP/16/00272 Proposal for 215 Apartments, with ancillary ground floor commercial

More information

APPLICATION NO. 15/P/00168 RECEIVED: 27-Mar-2015. Change of use of shop to residential flat (first floor) and shop alterations

APPLICATION NO. 15/P/00168 RECEIVED: 27-Mar-2015. Change of use of shop to residential flat (first floor) and shop alterations DATE OF COMMITTEE: 12-May-2015 APPLICATION NO. 15/P/00168 RECEIVED: 27-Mar-2015 PROPOSAL: Change of use of shop to residential flat (first floor) and shop alterations LOCATION: APPLICATION TYPE: APPLICANT:

More information

WARDS AFFECTED: Bridge. Land At Corner Of Arkwright Street And Crocus Street, Nottingham. 10/01839/PFUL3 for planning permission

WARDS AFFECTED: Bridge. Land At Corner Of Arkwright Street And Crocus Street, Nottingham. 10/01839/PFUL3 for planning permission WARDS AFFECTED: Bridge Item No: REPORT OF INTERIM DIRECTOR OF CITY PLANNING DEVELOPMENT CONTROL COMMITTEE 22nd September 2010 Land At Corner Of Arkwright Street And Crocus Street, Nottingham 1 SUMMARY

More information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular

More information

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Commercial, Professional Office, and Public Facility Developments Purpose This Guide offers examples to clarify and explain the

More information

AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS

AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS Page 1 of 22 PLANNING COMMITTEE REPORT Agenda Item 5.7 AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS 7 August 2007 Division Sustainability & Regulatory

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

1327 Stratford Road, Hall Green, Birmingham, B28 9HH

1327 Stratford Road, Hall Green, Birmingham, B28 9HH Committee Date: 08/01/2015 Application Number: 2014/03089/PA Accepted: 19/06/2014 Application Type: Full Planning Target Date: 14/08/2014 Ward: Hall Green 1327 Stratford Road, Hall Green, Birmingham, B28

More information

BASILDON BOROUGH COUNCIL

BASILDON BOROUGH COUNCIL BASILDON BOROUGH COUNCIL Report to: Planning Committee December 05 PLANNING APPLICATION NO. 5/00699/FULL DEMOLITION OF ALL EXISTING OUTBUILDINGS AND REMOVAL OF ASSOCIATED LAWFUL USES AND TWO NO. RESIDENTIAL

More information

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY

More information

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place. 15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places

More information

VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS

VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Planning Services, Civic Offices, New Road, Grays, Essex RM17 6SL VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Checklists to ensure prompt validation: Checklist 1 for ALL applications for planning

More information

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:

More information

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North STAFF REPORT December 20, 2004 To: From: Subject: North District Community Council Director of Community Planning - North Preliminary Report Respecting Revised Application OPA & Rezoning Application 01

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

LONDON ROAD SEVENOAKS

LONDON ROAD SEVENOAKS WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission

More information

Development Management Report

Development Management Report Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:

More information

Shaping Whanganui. Have your say, korero mai

Shaping Whanganui. Have your say, korero mai Shaping Whanganui Have your say, korero mai Outer Commercial Design Guidelines Discussion Document Background The Outer Commercial zone of the District Plan sits on the outside of the central shopping

More information

Welcome. Purpose of the exhibition

Welcome. Purpose of the exhibition Welcome Welcome to our exhibition, setting out plans for a redevelopment of Ten Broadway. It is currently the headquarters of the Metropolitan Police, which has made a decision to rationalise and relocate

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

3. The consent hereby granted does not include any external alterations.

3. The consent hereby granted does not include any external alterations. Keith WARD 23 02/00425/FUL 19th March 2002 Change of use of retail shop to form pool room at 150 Mid Street Keith Banffshire AB55 3BJ for Mr Gordon Maver Comments: This application is being referred to

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers FOR SALE On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers Land at Teville Gate, Teville Road, Worthing, West Sussex BN11 1AZ ibrochure - www.cbre-ibrochure.co.uk/worthing ENTER

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340. SITE DESCRIPTION The site is occupied by a large single dwelling house which was built in 2007. The building is surrounded by large trees and has a substantial rear garden. The land is allocated within

More information

Application for Planning Permission and conservation area consent for demolition in a conservation area. Town and Country Planning Act 1990

Application for Planning Permission and conservation area consent for demolition in a conservation area. Town and Country Planning Act 1990 Application for Planning Permission and conservation area consent for demolition in a conservation area. Town and Country Planning Act 1990 Publication of applications on planning authority websites. Please

More information

Manthorpe Grantham Conservation Area

Manthorpe Grantham Conservation Area U E N SO KES T VE Manthorpe Grantham Conservation Area TH N I CI L T D S CT C OU I R DESIGNATED DECEMBER 1970 APPRAISAL & AMENDMENT AUGUST 2007 1 MANTHORPE CONSERVATION AREA Location and context The village

More information

Car Club Strategy. London Borough of Richmond upon Thames

Car Club Strategy. London Borough of Richmond upon Thames Car Club Strategy London Borough of Richmond upon Thames December 2006 Page 1 of 16 Contents 1.0 Introduction 2.0 Policy Context 3.0 Sustainable Travel In Richmond 4.0 Car Clubs 5.0 Car Clubs in Richmond

More information

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL A division of Hudson Group Ltd ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1 Inner Business Zone Outer Business Zone PALMERSTON NORTH CITY COUNCIL 1 2 A division of Hudson Group Ltd Prepared

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE

PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE PLANNING PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE Introduction Foreword by Councilor Dave Smith - Chair of the Planning & Highways Committee. Planning Permissions B Owners of

More information

73 MAIN STREET SHIRLEY SOLIHULL

73 MAIN STREET SHIRLEY SOLIHULL 2014/58/S 73 MAIN STREET SHIRLEY Application No: Ward/Area: Location: 2014/58/S BLYTHE 73 MAIN STREET SHIRLEY SOLIHULL Date Registered: 13/01/2014 Applicant: Proposal: WILLIAM HILL ORGANIZATION LTD CHANGE

More information

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

Alternatives and Design Evolution: Planning Application 1 - RBKC

Alternatives and Design Evolution: Planning Application 1 - RBKC 3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan

More information

Transfer of 497 Richmond Street West to Build Toronto

Transfer of 497 Richmond Street West to Build Toronto STAFF REPORT ACTION REQUIRED Transfer of 497 Richmond Street West to Build Toronto Date: June 3, 2013 To: From: Government Management Committee Chief Corporate Officer Wards: Ward 20 Reference Number:

More information

Report To: The Planning Board Date: 2 April 2014. Report By: Head of Regeneration and Planning Report No: 14/0023/IC

Report To: The Planning Board Date: 2 April 2014. Report By: Head of Regeneration and Planning Report No: 14/0023/IC Agenda Item No. 2 Report To: The Planning Board Date: 2 April 2014 Report By: Head of Regeneration and Planning Report No: 14/0023/IC Local Application Development Contact Officer: Subject: Michael Martin

More information

WELCOME TO OUR EXHIBITION

WELCOME TO OUR EXHIBITION WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough

More information

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two. Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts Design and Development Guidelines Request for Qualifications and Expressions of Interest with Preliminary Development Plans Part

More information

Planning, Design & Access Statement

Planning, Design & Access Statement Planning, Design & Access Statement Hazell House, Burnthurst Lane, Princethorpe Client: Warwickshire & Northamptonshire Air Ambulance IG Land & Planning 1 Thornton Close, Crick, Northants, NN6 7GE Tel/Fax

More information

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable

More information

Department for Communities and Local Government

Department for Communities and Local Government Department for Communities and Local Government Permitted development for householders Technical Guidance April 2014 Department for Communities and Local Government Please note: This technical guidance

More information

Design and Access Statement. 141-145 Earls Court Road London SW5 9RH

Design and Access Statement. 141-145 Earls Court Road London SW5 9RH J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1

More information

CITY COUNCIL PACKET MEMORANDUM

CITY COUNCIL PACKET MEMORANDUM CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition Welcome to this public exhibition for Cherry Park, Westfield, Stratford. This exhibition has been organised to update residents on Cherry Park, the next phase of development in

More information

Decision Due Date: 15 April 2015. Site visit date: 12 & 25 March 2015

Decision Due Date: 15 April 2015. Site visit date: 12 & 25 March 2015 App.No: 150172 (PPP) Officer: Toby Balcikonis Decision Due Date: 15 April 2015 Site visit date: 12 & 25 March 2015 Ward: Upperton Type: Planning Permission Site Notice(s) Expiry date: 21 March 2015 Neighbour

More information

2051 Coventry Road, Sheldon, Birmingham, B26 3DY

2051 Coventry Road, Sheldon, Birmingham, B26 3DY Committee Date: 20/03/2014 Application Number: 2014/00456/PA Accepted: 23/01/2014 Application Type: Variation of Condition Target Date: 20/03/2014 Ward: Sheldon 2051 Coventry Road, Sheldon, Birmingham,

More information

713 Finchley Road London NW11 8DH

713 Finchley Road London NW11 8DH Home 713 Finchley Road London NW11 8DH Residential Development Opportunity Previous Page Summary Summary: An opportunity to acquire a freehold residential development site within close proximity to Hampstead:

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

P r o j e c t C a s e S t u d y

P r o j e c t C a s e S t u d y P r o j e c t C a s e S t u d y Mangrove Place Project: Mangrove Place Start Date: 2009 Completion Date: Ongoing Location: Al Reem Island, Abu Dhabi, UAE Industry: Residential Developer: Luxury Real Estate

More information

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015 HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015 May 2015 MAYOR OF LONDON Housing Standards: Transition Policy Statement. On 25 March 2015 through a written ministerial statement,

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

A Guide for Residents. Sutton Garden Suburb Conservation Area

A Guide for Residents. Sutton Garden Suburb Conservation Area A Guide for Residents Sutton Garden Suburb Conservation Area Introduction This leaflet is designed to provide residents with information and advice about living in the Sutton Garden Suburb Conservation

More information

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the

More information

Application No : 13/00389/FULL2 Ward: Bromley Town. Applicant : Bromley Conservative Club Objections : NO

Application No : 13/00389/FULL2 Ward: Bromley Town. Applicant : Bromley Conservative Club Objections : NO SECTION 2 Applications meriting special consideration Application No : 13/00389/FULL2 Ward: Bromley Town Address : Lancaster House 7 Elmfield Road Bromley BR1 1LT OS Grid Ref: E: 540487 N: 169009 Applicant

More information

Welcome & background. www.theperfumefactory.info

Welcome & background. www.theperfumefactory.info Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE

More information

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager 4(9) 09/161 Alteration and Extension to Existing Public House to Provide a New Bookmakers

More information

Site No 17 Former Weston Vinyls Site, Frome Location

Site No 17 Former Weston Vinyls Site, Frome Location Location Former Weston Vinyls site is situated on the A362 Vallis Road in the Western Part of Frome. The surrounding uses are primarily residential with residential to the North East and West. The Vallis

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

WELCOME WELCOME TO THE PUBLIC EXHIBITION FOR THE ILONA ROSE HOUSE REDEVELOPMENT. ILONA ROSE HOUSE www.ilonarosehouse.com

WELCOME WELCOME TO THE PUBLIC EXHIBITION FOR THE ILONA ROSE HOUSE REDEVELOPMENT. ILONA ROSE HOUSE www.ilonarosehouse.com WELCOME Manette Street from Charing Cross Road WELCOME TO THE PUBLIC EXHIBITION FOR THE REDEVELOPMENT. Corner of Charing Cross Road and Manette Street SOHO ESTATES Soho Estates began as a collection of

More information

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site. 1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises

More information

Designing Out Crime Assessment

Designing Out Crime Assessment Designing Out Crime Assessment New Flats (Affordable Housing) Yew Tree Road Moreton Wirral CH46 8UA Construction of flats complex. For Bernard Taylor Partnership Ltd o.iu@bernardtaylor.co.uk Tel 0161 443

More information

City Council Report for Information

City Council Report for Information City Council Report for Information Report to: Subject: Report of: Neighbourhood Scrutiny Committee Sustainable Development Assistant Chief Executive (Regeneration) Summary This report outlines measures

More information

www.bolton.gov.uk/merchantsquarter Shaping the Future of Bolton

www.bolton.gov.uk/merchantsquarter Shaping the Future of Bolton Merchant s Masterplan: Supplementary Planning Document www.bolton.gov.uk/merchantsquarter Shaping the Future of Bolton Summary This document is a Supplementary Planning Document (SPD). It provides further

More information

Previous Committee This application was previously considered by Committee on 06.06.2012

Previous Committee This application was previously considered by Committee on 06.06.2012 DIN RGH+ ltemno 19 Report no THE CITY OP EDINBURGH COUNCIL Planning Permission 12/002381FUL at 236 Gorgie Road Edinburgh EH112PL Development Management Sub-Committee of the Planning Committee Previous

More information

Change of use of an existing vacant office building to a Bed & Breakfast Guest House (Use Class C1) with proprietor's accommodation.

Change of use of an existing vacant office building to a Bed & Breakfast Guest House (Use Class C1) with proprietor's accommodation. Item 4a Case Officer Ward Proposal Location Applicant 13/00168/FUL Caron Taylor Adlington And Anderton Change of use of an existing vacant office building to a Bed & Breakfast Guest House (Use Class C1)

More information

Handsworth Library, Soho Road, Handsworth, Birmingham, B21 9DP

Handsworth Library, Soho Road, Handsworth, Birmingham, B21 9DP Committee Date: 2/08/204 Application Number: 204/064/PA Accepted: 07/03/204 Application Type: Listed Building Target Date: 02/05/204 Ward: Lozells and East Handsworth Handsworth Library, Soho Road, Handsworth,

More information

VEHICLE CROSSOVER INFORMATION PACK

VEHICLE CROSSOVER INFORMATION PACK VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)

More information

Warwick Quadrant, London Road, REDHILL DESIGN & ACCESS STATEMENT February 2011

Warwick Quadrant, London Road, REDHILL DESIGN & ACCESS STATEMENT February 2011 Warwick Quadrant, London Road, REDHILL DESIGN & ACCESS STATEMENT February 2011 CONTENTS 1.0 Introduction Scope & Purpose 2.0 Site Context Local Context Local History The Site Consultations Evaluation 3.0

More information