ACCUMULATOR MANUAL. Form No. M1018-PO. Revision 2. April Page 1

Size: px
Start display at page:

Download "ACCUMULATOR MANUAL. Form No. M1018-PO. Revision 2. April Page 1"

Transcription

1 ACCUMULATOR MANUAL Form No. M1018-PO Revision 2 April 2000 Page 1

2 Accumulator Quick Reference Hammer Accumulator Tightening Screws Accumulator Fixation Screws Charge Model Qty. Description Part # Torque Qty. Description Part # Torque Pressure BRP 28 / /2 Bolt ft-lbs 14 1/2 Bolt ft-lbs 250 PSI 45 / 50 1 Cover ft-lbs 4 Side Rod ft-lbs 250 PSI 60 / 70 1 Cover ft-lbs 4 Side Rod ft-lbs 250 PSI 8 1/2 Bolt ft-lbs 8 1/2 Bolt ft-lbs 510 PSI /8 Bolt ft-lbs 4 Side Rod ft-lbs 190 PSI 10 1/2 Bolt ft-lbs 10 1/2 Bolt ft-lbs 510 PSI /4 Bolt ft-lbs 4 Side Rod ft-lbs 220 PSI 10 1/2 Bolt ft-lbs 10 1/2 Bolt ft-lbs 510 PSI /4 Bolt ft-lbs 8 7/8 Bolt ft-lbs 250 PSI 10 5/8 Bolt ft-lbs 10 5/8 Bolt ft-lbs 510 PSI /4 Bolt ft-lbs 8 7/8 Bolt ft-lbs 190 PSI 1 3/4 Bolt ft-lbs 10 5/8 Bolt ft-lbs 10 5/8 Bolt ft-lbs 510 PSI 140/ /4 Bolt ft-lbs 8 7/8 Bolt ft-lbs 220 PSI 1 3/4 Bolt ft-lbs 16 5/8 Bolt ft-lbs 16 5/8 Bolt ft-lbs 510 PSI BRH 38 /40 1 Cover ft-lbs 4 Side Rod ft-lbs 510 PSI 76 / 1 Cover ft-lbs 4 Side Rod ft-lbs 365 PSI 91 Side Rod ft-lbs /4 Bolt ft-lbs 10 3/4 Bolt ft-lbs 400 PSI / 16 3/4 Bolt ft-lbs 8 1 Bolt ft-lbs 465 PSI Bolt ft-lbs 501/ /4 Bolt ft-lbs 8 1 Bolt ft-lbs 465 PSI 620/ /4 Bolt ft-lbs 8 1 Bolt ft-lbs 465 PSI 600/ /8 Bolt ft-lbs 8 1 Bolt ft-lbs 510 PSI /4 Bolt ft-lbs 8 1 Bolt ft-lbs 510 PSI BRM /4 Bolt ft-lbs 8 1 Bolt ft-lbs 465 PSI BRV 1200/ /4 Bolt ft-lbs 8 1 Bolt ft-lbs 470 PSI V /8 Bolt ft-lbs 8 1 1/8 Bolt ft-lbs 725 PSI V /8 Bolt ft-lbs 8 1 1/8 Bolt ft-lbs 580 PSI V43/45/45MS 16 7/8 Bolt ft-lbs 8 1 1/8 Bolt ft-lbs 580 PSI V Bolt ft-lbs 8 1 1/8 Bolt ft-lbs 725 PSI 4 7/8 Bolt ft-lbs V /8 Bolt ft-lbs 8 1 1/8 Bolt ft-lbs 725 PSI 4 7/8 Bolt ft-lbs V /4 Bolt ft-lbs /4 Bolt ft-lbs 725 PSI Page 2

3 Table of Contents Contents Sommario 1 Pressure Check Vérification 4 2 Accumulator Repair Réparation de l accumulateur 5 3 Accumulator Inflation Gonflage de l accumulateur 7 4 Parts List Piéces Detachées 11 Page 3

4 1.1 - To check the HP accumulator nitrogen pressure, use the inflation tool. - When the kit has been installed and connected to the nitrogen bottle, turn the drain cock off. - Open the nitrogen bottle and set the pressure reducer to the required pressure. (Refer to accumulator part list). - When pressure indicated on the gauge (1) is stabilized, unscrew key (3) to open the inflating screw. - The pressure indicated on the gauge must not drop more than 3 bar. Otherwise, replace the accumulator diaphragm. - Using key (3), tighten the inflation screw. Turn the nitrogen bottle off. Turn the drain cock on (4) to relieve pressure from the tool. - Remove the inflation tool. - If the accumulator is in good condition, tighten the inflation screw to 16 ft-lbs. Accumulator Pressure Check Pour contrôler la pression de gonflage des accumulateurs HP, utilisez l appareil de gonflage. - Après montage de l appareil de gonflage (voir chapitre 3.1) et raccordement à la bouteille d azote, fermez le robinet de purge (4). - Ouvrez le robinet de la bouteille d azote et réglez le détendeur à la pression de gonflage de l accumulateur. (Voir la valeur sur la nomenclature). - Aprés stabilisation de la pression lue sur le manométre (1), ouvrez la vis de gonflage à l aide de la clé (3). - La pression lue sur le manométre (1) ne doit pas chuter de plus de 3 bar. Sinon remplacez la membrane. - Fermez la vis de gonflage à l aide de la clé (3). Fermez le robinet de la bouteille d azote. Ouvrez le robinet de purge (4) pour purger le montage. - Démontez l appareil de gonflage. - Selon le cas, rebloquez la vis de gonflage à 22 Nm. Page 4

5 2 REPAIRING Accumulator Repair 2 RÉPARATION Part Accumulators 2.1 Accumulateur en 2 parties - Loosen the inflation screw (A) to relieve nitrogen pressure. - Drill the safety nylon plugs (B) to loosen and remove the assembling screws (C). - Clean the upper and lower accumulator flanges (or the accumulator cover and the back head). - Clean diaphragm groove (D). Check all bores are not plugged with rubber. Clean if necessary. - Check ring seat on upper flange. Perfect seat only is acceptable. - Clean and check all bolt threads in the flange (or the back head). - Clean and check all bolts. - Install new diaphragm (E). - Lubricate the diaphragm upper face with silicon lubricant (Rhodorsyl). - Install the upper flange. Grease the fixing bolt (C) threads with a NLGI 2 grade grease. Do not use MOLYKOTE 1000 grease for this purpose. - Dévissez la vis de gonflage (A) pour décharger la pression d azote. - Percez les bouchons plastiques de sécurité (B) et dévissez les vis d assemblage (C). - Nettoyez les flasques supérieur et inférieur (ou le coevercle et la tête arrière). - Nettoyez la gorge de membrane (D). Vérifiez que les trous de la grille ne sont pas obstrués par des débris de caoutchouc. - Vérifiez la portée de la bague d étanchéité sur le flasque supérieur. Seule une surface parfaite est admissible. - Nettoyez et vérifiez les filetages du flasque (de la tête arrière). - Nettoyez et vérifiez toutes les vis. - Montez une membrane neuve (E). - Graissez la face supérieure de la membrane avec un lubrifiant silicone (Rhodorsyl). - Montez le flasque supérieur. Graissez le filtage des vis d assemblage (C) avec de la graissw grade NLGI 2. Ne pas utiliser de graisse MOLYKOTE 1000 pour cette application. Page 5

6 Accumulator Repair - Tighten the fixing bolts to the specified torque (refer to the accumulator parts list). - Use the tightening sequences described below. - Remount new safety plugs (B). - Mount new BS ring (F). - Mount a new inflation screw. - Re-inflate the accumulator. - Serrez le vis d assemblage au couiple indiqué. (Voir la nomenclature de l accumulateur). - Respectez l ordre de serrage des vis comme indiqué ci-dessous). - Remontez des bouchons plastiques de sécurité neufs (B). - Montez une vis de gonflage neuve. - Mount a new inflation screw. - Re-gonlez l accumulateur. Page 6

7 2 REPAIRING 2.1 Accumulators with threaded cover Accumulator Repair 2 RÉPARATION 2.1 Accumulateur avec couvercle vissé - Loosen the inflating screw (A) to relieve nitrogen pressure. - Loosen and remove the cover (B). - Clean the parts. - Clean diaphragm groove (C). Check all bores are not plugged with rubber. Clean if necessary. - Check ring seat on upper flange. Perfect seat only is acceptable. - Clean and check the thread of the cover. - Clean and check the thread of the accumulator body. - Mount a new diaphragm (D). - Lubricate the diaphragm upper face with silicon lubricant. - Grease the cover thread with "MOLYKOTE 1000" grease. - Tighten the cover to the specified torque. (Refer to the accumulator part list). - Mount a new " BS " ring (E). - Mount a new inflating screw. -Re-inflate the accumulator. - Dévissez la vis de gonflage (A) pour décharger la pression d'azote. - Dévissez le couvercle (B). - Nettoyez les pièces. - Nettoyez la gorge de membrane (C). Vérifiez que les trous de la grille ne sont pas obstrués par des débris de caoutchouc. - Vérifiez la portée de la bague d'étanchéité sur le flasque supérieur. Seule une surface parfaite est admissible. - Nettoyez et vérifiez le filetage du couvercle. - Nettoyez et vérifiez le filetage du corps. - Montez une membrane neuve (D). - Graissez la face supérieure de la membrane avec un lubrifiant silicone (Rhodorsyl). - Graissez le filetage du couvercle avec de la graisse "MOLYKOTE 1000". - Serrez le couvercle au couple indiqué. (Voir la nomenclature de l accumulateur). - Montez une bague "BS" neuve (E). - Montez une vis de gonflage neuve. - Re-gonfiez l'accumulateur. Page 7

8 3 INFLATION Accumulator Inflation 2 GONFLAGE For BRP H.P. Accumulators WARNING: Only use nitrogen to re-inflate accumulators. - Use the inflating tool. - Check the inflating screw is not tight. - Equip the tool flange with the gauge (1). - Mount the flange on the accumulator cover. Prior to tightening of the fixing screws (2), make sure the key (3) is well engaged on the inflating screw head. Note: Depending on the accumulator, 3 or 4 fixing screws are required. - Progressively tighten the fixing screws (2), checking the flange is resting properly on the cover. - Connect the flange to the nitrogen bottle pressure regulator using the provided hose. Turn the drain cock off (4). Using key (3), open the inflating screw. - Open the nitrogen bottle and set the pressure reducer to the required pressure. (Refer to the accumulator part list). - After the pressure is stabilized, tighten the inflating screw, using key (3). Shut the nitrogen bottle off. Turn the drain cock on (4) to relieve pressure from the tool. - Remove the inflating tool. - Tighten the inflating screw to 16 ft-lbs. Page 8 ATTENTION: N'utlisez que de l azote pour gonfler les accumulateurs. - Utilisez I'appareil de gonflage. - Assurez vous que la vis de gonflage de I'accumulateur n est pas bloquée. - Equipez la bride de gonflage avec le manomètre (1) fourni. - Montez I'appareil de gonflage sur le couvercle de l accumulateur. Assurez-vous avant serrage des vis de fixation (2) que la clé (3) est bien engagée sur la vis de gonflage. NB : 3 ou 4 vis de fixation sont utilisées selon I'accumulateur. - Serrez progressivement les vis (2) en veillant à ce que la bride de gonflage appuie de fagon régulière sur le couvercle. - Raccordez I'appareil de gonflage au détendeur de la bouteille d'azote avec le flexible fourni. Fermez le robinet de purge (4) Ouvrez la vis de gonflage à I'aide de la clé (3). - Ouvrez le robinet de la bouteille d'azote et réglez le détendeur à la pression de gonflage de I'accumulateur. (Voir la valeur sur la nomenclature). - Après stabilisation de la pression, fermez la vis de gonflage à I'aide de la clé (3). Fermez le robinet de la bouteille d'azote. Ouvrez le robinet de purge (4) pour purger le montage. - Démontez I'appareil de gonflage. - Bloquez la vis de gonflage à 22 Nm.

9 Accumulator Inflation Page 9

10 Accumulator Inflation For BRP M.P. Accumulators and All others WARNING: Only use nitrogen to re-inflate accumulators. - Use the inflating tool. - Check the inflating screw is not tight. - Mount the inflating tool on the accumulator. Make sure the key is well engaged on the inflating screw head. Use the key (1) to adjust the position. - Progressively tighten the fixing screws (2), check the flange is resting properly on the cover. - Connect the flange to the nitrogen bottle pressure regulator. Turn the drain cock (3) off, using key (1) open the inflating screw. - Open the nitrogen bottle and set the pressure reducer to the required pressure. (Refer to the accumulator part list). - After the pressure is stabilized, tighten the inflating screw, using key (1). Shut the nitrogen bottle off. Turn the drain cock on (3) to relieve pressure from the tool. - Remove the inflating tool. - Tighten the inflating screw to 16 ft-lbs.. ATTENTION: N'utlisez que de l azote pour gonfler les accumulateurs. - Utilisez I'appareil de gonflage. - Assurez vous que la vis de gonflage de I'accumulateur n est pas bloquée. - Montez I'appareil de gonflage sur I'accumulateur. Assurez-vous que la clé est bien engagée sur la vis de gonflage. Utilisez le réglage (1) pour régler la position. - Serrez progressivement les écrous (2) en veillant à ce que la bride de gonflage appuie de fagon régulière sur le couvercle. - Raccordez I'appareil de gonflage au détendeur de la bouteille d'azote Fermez le robinet de purge (3), ouvrez la vis de gonflage à I'aide de la clé (1). - Ouvrez le robinet de la bouteille d'azote et réglez le détendeur à la pression de gonflage de I'accumulateur. (Voir la valeur sur la nomenclature). - Après stabilisation de la pression, fermez la vis de gonflage à I'aide de la clé (1). Fermez le robinet de la bouteille d'azote. Ouvrez le robinet de purge (3) pour purger le montage. - Démontez I'appareil de gonflage. - Bloquez la vis de gonflage A 22 Nm. Page 10

11 Parts List 28 & & & & & & & & V32 & V V42-3 & V45 24 V V52 & V V55 26 Page 11

12 28/30 & 45/50 Accumulator Model 28 / 30 Accumulator / Accumulateur = 60 ft-lbs = 80 Nm = 250 PSI = 17 Bar Accumulator including: Accumulateur comp: Back head Tête arrière Diaphragm Membrane d'accumulateur Cover Flasque Inflating screw Vis de gonflage Ring Bague BS UNF 1/2" screw Vis CHc UNF 1/ Plug Bouchon conique rilsan Model 45 / 50 Accumulator / Accumulateur = 885 ft-lbs = 1200 Nm = 250 PSI = 17 Bar Page Accumulator including: Accumulateur comp: Lower flange Incl: Flasque inférieur comp: (Helicoil thread 5/8 (Filet rapporté 5/ Diaphragm Membrane d'accumulateur Cover Flasque Inflating screw Vis de gonflage Ring Bague BS

13 60/70 Accumulator Model 60 / 70 Accumulator MP / MP Accumulateur = 885 ft-lbs = 1200 Nm = 250 PSI = 17 Bar Accumulator including: Accumulateur comp: Lower flange Incl: Flasque inférieur comp: (Helicoil thread 5/8 (Filet rapporté 5/ Diaphragm Membrane d'accumulateur Cover Flasque Inflating screw Vis de gonflage Ring Bague BS Model 60 / 70 Accumulator HP / HP Accumulateur = 60 ft-lbs = 80 Nm = 510 PSI = 35 Bar HP accumulator including: Accumulateur HP comp: Back head Tête arrière Diaphragm Membrane d'accumulateur Cover Couvercle d'accumulateur Inflating screw Vis de gonflage Ring Bague BS UNF 1/2" screw Vis CHc UNF 1/2" Plug Bouchon conique rilsan Page 13

14 85 Accumulator Model 85 Accumulator MP / MP Accumulateur = 110 ft-lbs = 150 Nm = 190 PSI = 13 Bar MP accumulator including: Accumulateur MP comp: Upper cover Flasque supérieur Diaphragm Membrane d'accumulateur Lower flange including: Flasque inférieur comp: (Helicoil thread UNF 3/4" (Filet rapporté UNF 3/4" Plug Bouchon conique rilsan UNF 5/8"screw Vis CHc UNF 5/ Inflating screw Vis de gonflage Ring Sague BS Model 85 Accumulator HP / HP Accumulateur = 60 ft-lbs = 80 Nm = 510 PSI = 35 Bar Page HP accumulator including: Accumulateur HP comp: Back head Tête arrière Diaphragm Membrane d'accumulateur Cover Couvercle d'accumulateur Inflating screw Vis de gonflage Ring Bague BS UNF 1/2" screw Vis CHc UNF 1/2" Plug Bouchon conique rilsan

15 95 Accumulator BRP-95 Accumulator MP / MP Accumulateur = 220 ft-lbs = 300 Nm = 220 PSI = 15 Bar MP accumulator including: Accumulateur MP comp: Upper cover Flasque supérieur Diaphragm Membrane d'accumulateur Lower flange including: Flasque inférieur comp: (Helicoil thread UNF 3/4" (Filet rapporté UNF 3/4" UNF 3/4"screw Vis CHc UNF 3/ Plug Bouchon conique rilsan Inflating screw Vis de gonflage Ring Sague BS BRP-95 Accumulator HP / HP Accumulateur = 60 ft-lbs = 80 Nm = 510 PSI = 35 Bar HP accumulator including: Accumulateur HP comp: Back head Tête arrière Diaphragm Membrane d'accumulateur Cover Couvercle d'accumulateur Inflating screw Vis de gonflage Ring Bague BS UNF 1/2" screw Vis CHc UNF 1/2" Plug Bouchon conique rilsan Page 15

16 100 Accumulator BRP-100 Accumulator MP / MP Accumulateur = 220 ft-lbs = 300 Nm = 250 PSI = 17 Bar MP accumulator including Accumulateur MP comp: Upper cover Flasque supérieur Diaphragm Membrane d'accumulateur Lower flange Flasque inférieur UNF 3/4" screw Vis CHc UNF 3/4" UNF 3/4' screw Vis CHc UNF 3/4" Inflating screw Vis de gonflage Ring Bague BS BRP-100 Accumulator HP / HP Accumulateur = 110 ft-lbs = 150 Nm = 510 PSI = 35 Bar HP accumulator including Accumulateur HP camp: Back head including : Tête arrière comprenant: (Helicoil thread UNF 1" (Filet rapporté UNF 1 " Diaphragm Membrane d'accumulateur Cover Couvercle d'accumulateur Inflating screw Vis de gonflage Ring Bague BS UNF 5/8 screw Vis CHc UNF 5/8" Plug Bouchon conique rilsan Page 16

17 130 Accumulator BRP-130 Accumulator MP / MP Accumulateur = 220 ft-lbs = 300 Nm = 190 PSI = 13 Bar MP accumulator incl: Accumulateur MP comp: Upper cover Flasque supérieur Diaphragm Membrane d'accumulateur Lower flange Flasque inférieur UNF 3/4" screw Vis CHc UNF 3/4" UNF 3/4 ' screw Vis CHc UNF 3/4" Inflating screw M10 Vis de gonflage M Ring Bague BS BRP-130 Accumulator HP / HP Accumulateur = 110 ft-lbs = 150 Nm = 510 PSI = 35 Bar HP accumulator incl: Accumulateur HP camp: Back head including : Tête arrière comprenant: (Helicoil thread UNF 1" (Filet rapporté UNF 1 " Diaphragm Membrane d'accumulateur Cover Couvercle d'accumulateur Inflating screw M10 Vis de gonflage M Ring Bague BS UNF 5/8 screw Vis CHc UNF 5/8" Plug Bouchon conique rilsan Page 17

18 140/150 Accumulator BRP-140/150 Accumulator MP / MP Accumulateur = 220 ft-lbs = 300 Nm = 220 PSI = 15 Bar MP accumulator including Accumulateur MP comp: Upper cover Flasque supérieur Diaphragm Membrane d'accumulateur Lower flange Flasque inférieur UNF 3/4" screw Vis CHc UNF 3/4" UNF 3/4 screw Vis CHc UNF 3/4" Inflating screw M10 Vis de gonflage M Ring Bague BS BRP-140/150 Accumulator HP / HP Accumulateur = 110 ft-lbs = 150 Nm = 510 PSI = 35 Bar HP accumulator including Accumulateur HP camp: Back head including : Tête arrière comprenant: (Helicoil thread UNF 1" (Filet rapporté UNF 1 " Diaphragm Membrane d'accumulateur Cover Couvercle d'accumulateur Inflating screw M10 Vis de gonflage M Ring Bague BS UNF 5/8 screw Vis CHc UNF 5/8" Plug Bouchon conique rilsan From PN to : HP accumulator including Accumulateur HP camp: Back head including : Tête arrière comprenant: Page 18

19 38/40 & 76/91 Accumulator Model 38 / 40 Accumulator / Accumulateur = 885 ft-lbs = 1200 Nm = 510 PSI = 35 Bar Accumulator including: Accumulateur comp: Lower flange Flasque inférieur Diaphragm Membrane d'accumulateur Cover Flasque Inflating screw Vis de gonflage Ring Bague BS Model 76 / 91 Accumulator / Accumulateur = 885 ft-lbs = 1200 Nm = 365 PSI = 25 Bar Accumulator including: Accumulateur comp: Lower flange Flasque inférieur Diaphragm Membrane d'accumulateur Cover Flasque Inflating screw Vis de gonflage Ring Bague BS Page 19

20 125 & 470/625 Accumulator Model 125 Accumulator / Accumulateur = 220 ft-lbs = 300 m dan = 400 PSI = 27.5 Bar Accumulator including: Accumulateur comp: Lower flange Flasque inférieur Diaphragm Membrane d'accumulateur Cover Flasque Screw Vis Inflating screw Vis de gonflage Ring Bague BS Model 470 & Model 625 Accumulator / Accumulateur = 220 ft-lbs = 300 Nm = 465 PSI = 32 Bar Page Accumulator including: Accumulateur comp: Lower flange Flasque inférieur Diaphragm Membrane d'accumulateur Cover Flasque Screw UNF 3/4 Vis UNF 3/ Plug Bouchon Inflating screw Vis de gonflage Ring Bague BS

21 501/570 & 620/750 Accumulator Model 501 & 570 Accumulator / Accumulateur = 220 ft-lbs = 300 Nm = 465 PSI = 32 Bar Accumulator including: Accumulateur comp: Lower flange Flasque inférieur Diaphragm Membrane d'accumulateur Cover Flasque Screw UNF 3/4 Vis UNF3/ Plug Bouchon Inflating screw Vis de gonflage Ring Bague BS Model 620 & 750 Accumulator / Accumulateur = 220 ft-lbs = 300 Nm = 465 PSI = 32 Bar Accumulator including: Accumulateur comp: Lower flange Flasque inférieur Diaphragm Membrane d'accumulateur Cover Flasque Screw UNF 3/4 Vis UNF 3/ Inflating screw Vis de gonflage Ring Bague BS Page 21

22 600/700 Accumulator Model 600 & 700 Accumulator / Accumulateur = 110 ft-lbs = 150 Nm = 510 PSI = 35 Bar Accumulator including: Accumulateur comp: Lower flange Flasque inferieur Diaphragm Membrane d accumulateur Cover Flasque d accumulateur Screw UNF 5/8 Vis CHc UNF 5/ Plug Bouchon conique rilsan Inflating screw Vis de gonflage Ring Bague BS Page 22

23 900 & 1100 Accumulator Model 1100 Accumulator / Accumulateur = 220 ft-lbs = 300 Nm = 510 PSI = 35 Bar Accumulator including: Accumulateur comp: Lower flange Flasque inférieur Diaphragm Membrane d'accumulateur Cover Flasque Screw UNF 3/4 Vis UNF 3/ Inflating screw Vis de gonflage Ring Bague BS Model 900 Accumulator / Accumulateur = 220 ft-lbs = 300 Nm = 465 psi = 32 Bar Accumulator including: Accumulateur comp: Lower flange Flasque inférieur Diaphragm Membrane d'accumulateur Cover Flasque Screw UNF 3/4 Vis UNF 3/ Plug Bouchon Inflating screw Vis de gonflage Ring Bague BS Page 23

24 V32/1200 & V42-3/V45 Accumulator V32/1200 Accumulator HP / HP Accumulateur = 220 ft-lbs = 300 Nm = 470 PSI = 32.5 Bar Accumulator including: Accumulateur comp: Lower Flange Flasque inférieur Diaphragm Membrane d accumulateur Upper Flange Flasque Supérieur Screw CHc UNF 3/4 Vis CHc UNF 3/ Inflation Screw Vie de gonflage Ring Bague BS V42-3 & V45 Accumulator HP / HP Accumulateur = 370 ft-lbs = 500 Nm = 580 PSI = 40 Bar Page Accumulator including: Accumulateur comp: Lower Flange Flasque inférieur Diaphragm Membrane d accumulateur Upper Flange Flasque Supérieur Screw CHc UNF 7/8 Vis CHc UNF 7/ Inflation Screw Vie de gonflage Ring Bague BS

25 V45 & V1600 Accumulator V45 & V1600 Accumulateur Accumulator HP / HP = 370 ft-lbs = 500 Nm = 725 PSI = 50 Bar Accumulator including: Accumulateur comp: Lower Flange Flasque inférieur Diaphragm Membrane d accumulateur Cover Flasque Supérieur Screw UNF 7/8 Vis CHc UNF 7/ Inflation screw Vie de gonflage Ring Bague BS Page 25

26 V52-3 & V55 Accumulator V52 & V52-3 Accumulator HP / HP Accumulateur 12x = 480 ft-lbs 12x = 650 Nm 4x = 370 ft-lbs 4x = 500 Nm = 725 PSI = 50 Bar Accumulator including: Accumulateur comp: Lower Flange Flasque inférieur Diaphragm Membrane d accumulateur Upper Flange Flasque Supérieur Screw CHc UNF 1 Vis CHc UNF Screw CHc UNF 7/8 Vis CHc UNF 7/ Inflation Screw Vie de gonflage Ring Bague BS V55 (from serial number ) Accumulator HP / HP Accumulateur 12x = 480 ft-lbs 12x = 650 Nm 4x = 370 ft-lbs 4x = 500 m dan = 725 PSI = 50 Bar Accumulator including: Accumulateur comp: Lower Flange Flasque inférieur Diaphragm Membrane d accumulateur Upper Flange Flasque Supérieur Screw CHc UNF 1 Vis CHc UNF Screw CHc UNF 7/8 Vis CHc UNF 7/ Inflation Screw Vie de gonflage Ring Bague BS Page 26

27 V65 Accumulator Model V65 Accumulator / Accumulateur Tightening torque Couple de serrage Nitrogen pressure Pression de gonflage = 590 ft-lbs = 800 Nm = 725 psi = 50 bar Accumulator including: Accumulateur comp: Inflation screw Vis de gonflage Ring Bague BS Screw UNF 1-1/4 Vis CHc UNF 1-1/ Diaphragm Membrane d accumulateur Page 27

NÜVO REVO 270. 900 mm 810 x 810 x (660-860) No. Description

NÜVO REVO 270. 900 mm 810 x 810 x (660-860) No. Description REVO 70 Use these instructions for the following items / Suivez ces instructions pour les items suivants -7-4 007 Cabinet / Caisson Size / Dimension 900 mm 0 x 0 x (660-60) No. Description Qty / Qté. Upper

More information

Fire Pump Applications

Fire Pump Applications Fire Pump Applications Installation & Maintenance Manual Universal Joint Driveshafts www.cumminsfirepower.com Table of Contents Section 1 General 1.1 Introduction 1.2 Safety Precautions 1.3 Warranty Statement

More information

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17) 17 Engine-Lubrication system (Page GR-17) Lubrication system components, removing and installing Oil pan, removing and installing Oil pressure and oil pressure switch, checking Dynamic oil pressure warning

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17) 17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure

More information

767 Diagnostic System

767 Diagnostic System 767 Diagnostic System 3.5v 767 Wall Transformer Patent Pending Listed to: UL 60601-1 CSA C22.2 No. 601 Thank you for purchasing the Welch Allyn 3.5v 767 Wall Transformer. This manual is meant to provide

More information

Light, robust, versatile

Light, robust, versatile Light, robust, versatile The aluminium tube union Aluminium tube unions with the SERTO principle Union nut AW 6082 blue anodised lubricated Union body AW 6082 colourless anodised unlubricated Compression

More information

Step-by-step instructions:

Step-by-step instructions: Spark plug thread repair for Ford Triton cylinder heads Step-by-step instructions: Identification Installation Verification Specifically designed and tested for 4.6L, 5.4L, and 6.8L 2 and 4 valve heads,

More information

Fire Hydrant Troubleshooting

Fire Hydrant Troubleshooting Fire Hydrant Troubleshooting Pulsation or chatter during opening and flow of water from hydrant. Loose condition in stem at lower valve plate nut. Tighten lower valve plate nut and secure with SS lock

More information

Instruction Manual for Globe Price Computing Scale Models GS30 and GS30T

Instruction Manual for Globe Price Computing Scale Models GS30 and GS30T Model GS30 Model #: Serial #: Model GS30T NTEP Approved Meets NIST Handbook 44 Criteria Legal for Trade Instruction Manual for Globe Price Computing Scale Models GS30 and GS30T For Service on Your Scale

More information

Reduced Pressure Principle Assembly 3 Valve Procedure

Reduced Pressure Principle Assembly 3 Valve Procedure Reduced Pressure Principle Assembly 3 Valve Procedure A. Initial Setup 1. Flush test cocks by: a. opening test cock #4 to establish flow through the unit. (Leave this test cock open until others are flushed)

More information

Sun Enterprise Optional Power Sequencer Installation Guide

Sun Enterprise Optional Power Sequencer Installation Guide Sun Enterprise Optional Power Sequencer Installation Guide For the Sun Enterprise 6500/5500 System Cabinet and the Sun Enterprise 68-inch Expansion Cabinet Sun Microsystems, Inc. 901 San Antonio Road Palo

More information

INSTALLATION INSTRUCTION 776 - Vanities & Wall Sconce WS-77618

INSTALLATION INSTRUCTION 776 - Vanities & Wall Sconce WS-77618 WS-77618 WARNING IMPORTANT: NEVER attempt any work without shutting off the electricity. - Read all instructions before installing. - System is intended for installation by a qualified electrician in accordance

More information

Front axle components, overview

Front axle components, overview just a test. Front axle components, overview 40-1 General Information Load bearing components and parts of the suspension must not be welded or straightened. Vehicles without drive axle must not be moved,

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47) 47 Brakes - Hydraulic Components (Page GR-47) FS III front brake calipers, servicing Front brake caliper piston, removing and installing FN 3 front brake calipers, servicing Front caliper piston, removing

More information

Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW

Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW Installation, Operating and Maintenance Instructions 90/4.5.5 Rev. 0 Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW Table of Contents SECTION I... 2 INSTALLATION...

More information

OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT

OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT INDEX AMERICAN - DARLING 5-1/4 IN. B-84-B-5 FIRE HYDRANT OPERATION AND MAINTENANCE MANUAL OPERATION AND MAINTENANCE REPAIRS Operation and Maintenance...

More information

Owners Manual. RPM Professional 188 N Bluff Street Ste 100 St George, UT 84770 2012 V 2.9 All Rights Reserved

Owners Manual. RPM Professional 188 N Bluff Street Ste 100 St George, UT 84770 2012 V 2.9 All Rights Reserved Owners Manual RPM Professional 188 N Bluff Street Ste 100 St George, UT 84770 2012 V 2.9 All Rights Reserved TABLE OF CONTENTS Important Safeguards...3-4 Parts Description...5 Before First Use...6 Quick

More information

Trash Pumps Models: 56200, 562000, 56201, 562001, 56300, 563000, 56301, 563001

Trash Pumps Models: 56200, 562000, 56201, 562001, 56300, 563000, 56301, 563001 Trash Pumps Models: 56200, 562000, 56201, 562001, 56300, 563000, 56301, 563001 Specifically designed pumps for heavy duty applications Handles solids with eas and simple to open and clean Standard roll

More information

INSTRUCTIONS. FLHR/C/S (Road King) FRONT END LOWERING KIT 1WARNING -J03242 REV. 10-19-04. General. Removal (Left and Right Forks) Kit Number 54614-05

INSTRUCTIONS. FLHR/C/S (Road King) FRONT END LOWERING KIT 1WARNING -J03242 REV. 10-19-04. General. Removal (Left and Right Forks) Kit Number 54614-05 INSTRUCTIONS -J04 REV. 0-9-04 General FLHR/C/S (Road King) FRONT END LOWERING KIT This kit is designed for installation on 00 and later FLHR/C/S Model Motorcycles. Road King models use the conventional

More information

Instruction de montage de voûte ISOLHIS grande portée PCA 32mm

Instruction de montage de voûte ISOLHIS grande portée PCA 32mm Instruction de montage de voûte ISOLHIS grande portée PCA 32mm Mounting Instructions for continuous rooflight ISOLHIS with a large width PCA 32mm Outillage à prévoir Tools to be provided Visseuse 600 W

More information

Direct AC Wiring Option Installation Guide

Direct AC Wiring Option Installation Guide Revision A Direct AC Wiring Option Installation Guide The direct AC wiring option enables you to wire AC power directly in to the ADP InTouch. The option kit contains the following parts. 25mm 12mm Caution:

More information

Parts#MB003-003 Reverse Gear MAMBA (Monoblock for Cable operated) For 5 speed Trans., '87 to '06 Big Twin models (except '06 Dyna)

Parts#MB003-003 Reverse Gear MAMBA (Monoblock for Cable operated) For 5 speed Trans., '87 to '06 Big Twin models (except '06 Dyna) Installation Instructions Reverse Gear MAMBA (Monoblock for Cable operated) Read and become familiar with these installation instructions before start. Two Piece for H-D 5 Speed Trans., Cable operated

More information

Instructions. Complete RPS 2900 Pump Kit for RoadLazer RoadPak Line Striping System 3A1304A ENG. Pressure Relief Procedure.

Instructions. Complete RPS 2900 Pump Kit for RoadLazer RoadPak Line Striping System 3A1304A ENG. Pressure Relief Procedure. Instructions Complete RPS 2900 Pump Kit for RoadLazer RoadPak Line Striping System 3A1304A ENG Model 24G766 Important Safety Instructions For complete warnings and safety instructions see RoadLazer RoadPak

More information

Read this document before using this product.

Read this document before using this product. VistaMAX Series Safety Precautions Read this document before using this product. Download and read the full user manual for complete information (see the VistaMAX Support File Access document for download

More information

Note concernant votre accord de souscription au service «Trusted Certificate Service» (TCS)

Note concernant votre accord de souscription au service «Trusted Certificate Service» (TCS) Note concernant votre accord de souscription au service «Trusted Certificate Service» (TCS) Veuillez vérifier les éléments suivants avant de nous soumettre votre accord : 1. Vous avez bien lu et paraphé

More information

ACCUMULATOR INSTALLATION

ACCUMULATOR INSTALLATION 7001-7 ACCUMULATOR INSTALLATION BRAKE ACCUMULATORS I 308L93 Rae 7-59710 Issued 6-93 Printed in U.S.A 7001-8 Removal ACCUMULATOR VALVE 1. Park the machine on a level surface and lower the. loader bucket

More information

PVM Piston Pumps Service Manual

PVM Piston Pumps Service Manual PVM Piston Pumps Service Manual PVM018/020 PVM045/050 PVM057/063 PVM074/081 PVM098/106 PVM131/141 Table of Contents Service Parts Pump Description... 3 Basic pump Pump Operation Controls Types Part Identification...

More information

SUPPORTS DE TABLETTES SUR CABLES OU TIGES INOX CABLE AND ROD SUSPENDED DIPLAY SYSTEMS

SUPPORTS DE TABLETTES SUR CABLES OU TIGES INOX CABLE AND ROD SUSPENDED DIPLAY SYSTEMS SUPPORTS DE TABLETTES SUR CABLES OU TIGES INOX CABLE AND ROD SUSPENDED DIPLAY SYSTEMS FT789 0105 Ajouter 6 de chaque côté des pochettes porte-affiche pour déterminer la distance entre les câbles. Add 6

More information

Telescoping Post Indicator Wall Post KENNEDY VALVE ISO 9000 ISO 14001

Telescoping Post Indicator Wall Post KENNEDY VALVE ISO 9000 ISO 14001 Telescoping Post Indicator Wall Post KENNEDY VALVE ISO 9000 ISO 14001 Telescoping Post Indicator 2945 A 1" SQUARE STEM 9" MAX. = 10" MIN. = 7" FIELD ADJUSTMENT INSTRUCTIONS 1. Remove the top section from

More information

Trunnion-Design Ball Valves

Trunnion-Design Ball Valves Trunnion-Design Ball Valves 12" 20" (DN 300 500) Series 7150 12" (DN 300) Series 730S 12" 20" (DN 300 500) Series 7300 14" 24" (DN 350 600) Series 9150 14" 24" (DN 350 600) Series 9300 Installation, Maintenance

More information

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997 Char-Lynn Hydraulic Motor October, 1997 Repair Information Geroler Motor Two Speed 001 27 Retainer inside bore of valve plate bearingless motors only 4 15 16 3 6 35 Parts Drawing 25 2 2 1 19 17 36 40 47

More information

Universal Adjustable Fuel Pressure Regulator

Universal Adjustable Fuel Pressure Regulator Universal Adjustable Fuel Pressure Regulator Installation Instructions for: Part Numbers 25-302 U.S. Patent # 6,298,828! Due WARNING: to the fact that this installation deals with your fuel system this

More information

Float and Thermostatic Traps Series H, C and X

Float and Thermostatic Traps Series H, C and X Hoffman Specialty Installation & Maintenance Instructions HS-(E) and Thermostatic Traps Series H, C and X Series C & NPT Series C NPT Series X NPT Series C NPT Series H Ratings Maximum Max. Operating NPT

More information

IMMERSION. OEM Installation Guide. GE Lighting. imagination at work. LED Display Lighting. Refrigerated Vertical Cases RV40 Series

IMMERSION. OEM Installation Guide. GE Lighting. imagination at work. LED Display Lighting. Refrigerated Vertical Cases RV40 Series GE Lighting OEM Installation Guide IMMESION isplay Lighting efrigerated Vertical Cases V0 Series End Mullion Lights 8-inch: GELT0850E-SY/-S (6560/65606), GELT0850EL-SY/-S (6560/65607), GELT080E-SY/-S (65609/6561),

More information

L31125 4/96. Haldex INSTALLATION INSTRUCTIONS HALDEX PURE AIR PLUS EXTENDED PURGE KIT (DQ6027) HEAVY DUTY CANISTER KIT (DQ6028)

L31125 4/96. Haldex INSTALLATION INSTRUCTIONS HALDEX PURE AIR PLUS EXTENDED PURGE KIT (DQ6027) HEAVY DUTY CANISTER KIT (DQ6028) L31125 4/96 Haldex INSTALLATION INSTRUCTIONS HALDEX PURE AIR PLUS EXTENDED PURGE KIT (DQ6027) HEAVY DUTY CANISTER KIT (DQ6028) EXTENDED PURGE/HEAVY DUTY CANISTER KIT INSTALL ATION INSTRUCTIONS ' A WARNING

More information

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification... OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS INTRODUCTION...1 Scope...1 Description...1 Valve Identification...2 1.0 VALVE INSTALLATION...2 2.0 VALVE MAINTENANCE...3 Actuator Disassembly...3

More information

Fisher CV500 Rotary Globe Control Valve

Fisher CV500 Rotary Globe Control Valve Instruction Manual CV500 Valve Fisher CV500 Rotary Globe Control Valve Contents Introduction... 1 Scope of Manual... 1 Description... 1 Specifications... 2 Educational Services... 2 Installation... 3 Maintenance...

More information

DYNA RIDER FOOTBOARD KIT

DYNA RIDER FOOTBOARD KIT -J0 REV. 0-0-0 DYNA RIDER FOOTBOARD KIT GENERAL Kit Number 000 Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com (English

More information

Archived Content. Contenu archivé

Archived Content. Contenu archivé ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject

More information

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Instruction Manual 1052 Size 20 Actuator (F & G) Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Contents Introduction... 1 Scope of manual... 1 Description... 1 Specifications...

More information

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19 Table of Contents Overview 1 Pump Disassembly 2 Control Disassembly / Reassembly 7 Pump Reassembly 13 Adjustment Procedures DR Control 19 Adjustment Procedures DRG Control 20 Adjustment Procedures DFR

More information

ORTHOBLOC 3000. Drive systems. Installation. This manual is to be given to the end user. 3996 en - 2013.04 / k. R max - 5 mm.

ORTHOBLOC 3000. Drive systems. Installation. This manual is to be given to the end user. 3996 en - 2013.04 / k. R max - 5 mm. en - 01.0 / k 1 en This manual is to be given to the end user --> B7 (0 to 0 ) R max - mm R min + mm ORTHOBLOC 000 Installation LEROY-SOMER Ot 000 en - 01.0 / k NOTE LEROY-SOMER reserves the right to modify

More information

READ AND FOLLOW ALL SAFETY INSTRUCTIONS 1. DANGER RISK OF SHOCK DISCONNECT POWER BEFORE INSTALLATION

READ AND FOLLOW ALL SAFETY INSTRUCTIONS 1. DANGER RISK OF SHOCK DISCONNECT POWER BEFORE INSTALLATION UR Series LED Upgrade Kit Includes: 48" Linear Option IMPORTANT SAFEGUARDS When using electrical equipment, basic safety precautions should always be followed including the following: READ AND FOLLOW ALL

More information

Installation, Maintenance, & Repair Series 4000B/LF4000B

Installation, Maintenance, & Repair Series 4000B/LF4000B Installation, Maintenance, & Repair Series 4000B/LF4000B Reduced Pressure Zone Assemblies Sizes: 1 2" 2" (15 50mm) RP/IS-A-4000B 4000B/LF4000B Size: 3 /4"! WARNING Testing Read this Manual BEFORE using

More information

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This

More information

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY 82-13-1 O-Ring (Rear) The Lead Screw Assembly is shipped separately. Note: Install Electrical and Pneumatic Circuitry. Be Sure electrical and pneumatic

More information

Replace the Pump Tube Classic

Replace the Pump Tube Classic Entire document: 7 pages THIS DOCUMENT CONTAINS GENERAL INSTRUCTION FOR SERVICING STENNER PRODUCTS. PLEASE BE SURE TO READ ALL SAFETY INFORMATION. NOTICE: Indicates special instructions or general mandatory

More information

Type 3244-1 and Type 3244-7 Pneumatic Control Valves. Type 3244 1 (left) and Type 3244-7 (right) Mounting and Operating Instructions EB 8026 EN

Type 3244-1 and Type 3244-7 Pneumatic Control Valves. Type 3244 1 (left) and Type 3244-7 (right) Mounting and Operating Instructions EB 8026 EN Type 3244-1 and Type 3244-7 Pneumatic Control Valves Type 3244 1 (left) and Type 3244-7 (right) Mounting and Operating Instructions E 8026 EN Edition July 2014 Definition of signal words DNGER! Hazardous

More information

COMMISSION INTERNATIONALE DE KARTING - FIA

COMMISSION INTERNATIONALE DE KARTING - FIA FICHE D HOMOLOGATION HOMOLOGATION FORM Homologation N 3/P/ COMMISSION INTERNATIONALE DE KARTING - FIA PNEUMATIQUE / TYRE Manufacturier Tyre Manufacturer Reifenwerk Heidenau GmbH Marque Make MOJO Modèle

More information

> CABLE 3 MM / 3 MM CABLE COMPONENTS

> CABLE 3 MM / 3 MM CABLE COMPONENTS C3100 KIT POUR FIXATION SOL-PLAFOND (4 MÈTRES) - Fixation haute Ø 18,5 mm - Câble en acier inoxydable L. 4 m - Fixation basse avec tendeur (Clé Allen et vis fournies avec le Kit) FLOOR / CEILING FIXING

More information

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR REMOVAL/INSTALL OF WINDOW REGULATOR (741-644) Cadillac Escalade, Chevrolet Suburban, Chevrolet Tahoe, GMC Yukon, Chevrolet Silverado, GMC Sierra 2000 05 General Tech Tips: Use painter s tape rather than

More information

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks TITAN pt. no.: 03 0000 0120 Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS G e n e r a t i o n V Extended

More information

IF IT FLOWS THE BOWIE PUMP CAN PUMP IT

IF IT FLOWS THE BOWIE PUMP CAN PUMP IT IF IT FLOWS THE BOWIE PUMP CAN PUMP IT Bowie Industries, Inc. Bowie, TX 76230 USA Page 1 Bowie Pumps Manual General Pump Information..Page 2 300 Series Pumps.. Page 5 400 Series Pumps.Page 11 500 Series

More information

INSTALLATION INSTRUCTIONS. 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

INSTALLATION INSTRUCTIONS. 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113) INSTALLATION INSTRUCTIONS 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113) Thank you for purchasing a quality Hellwig Product. PLEASE

More information

DST & UST FIRST STAGE REGULATOR

DST & UST FIRST STAGE REGULATOR TECHNICAL SUPPORT DST & UST FIRST STAGE REGULATOR MAINTENANCE MANUAL FOR AUTHORISED TECHNICIANS Document No. AP5824 Issue 3 9/12/2005 APEKS MARINE EQUIPMENT LTD, NEPTUNE WAY, BLACKBURN, LANCASHIRE. BB1

More information

Archived Content. Contenu archivé

Archived Content. Contenu archivé ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject

More information

Cylinder head, removing and replacing

Cylinder head, removing and replacing 15-1 Cylinder head, removing and replacing WARNING! Do not re-use any fasteners that are worn or deformed in normal use. Some fasteners are designed to be used only once, and are unreliable and may fail

More information

The cylinder head bolts tightening stages have been updated as listed in Table 1.

The cylinder head bolts tightening stages have been updated as listed in Table 1. NUMBER: 07 EPA04 MBE 4000-6 S.M. REF.: 1.2.2 ENGINE: MBE 4000 DATE: November 2007 SUBJECT: CYLINDER HEAD BOLTS TIGHTENING STAGES PUBLICATION: 6SE412 The cylinder head bolts tightening stages have been

More information

Document Number TD- 002 Reviewed By Technical Director Drafted By. National Technical Commissioner V1-12 01 15 Immediate

Document Number TD- 002 Reviewed By Technical Director Drafted By. National Technical Commissioner V1-12 01 15 Immediate Technical Document No. TD- 002 Technical Regulations for KF2 Document Number TD- 002 Reviewed By Technical Director Drafted By Version Implementation Date National Technical Commissioner V1-12 01 15 Immediate

More information

SERVICE PARTS INSTRUCTIONS

SERVICE PARTS INSTRUCTIONS WACO MERITOR SERVICE PARTS INSTRUCTIONS Installing the Meritor WABCO System Saver 1000 and 1200 Series Air Dryers For Use on Tractors, Trucks and Buses with Air Brakes Installation Requirements 5 P/N 434

More information

Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water

Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water 1 Foreword 1.1 Thank you for choosing one of the range of AEON's BS standard valves. For safety purposes, the user shall read this instruction to fully understand the operation of the product. 2 AEON Design

More information

P8 MAXI-LUBE AIR OPERATED GREASE PUMP

P8 MAXI-LUBE AIR OPERATED GREASE PUMP PA92 1002 0004 P8 MAXI-LUBE AIR OPERATED GREASE PUMP INTRODUCTION INSTRUCTION MANUAL Thank you for purchasing a P8 Maxi-Lube Air Operated High Pressure Grease Pump. The P8 Maxi- Lube is an air operated

More information

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual Dive Rite 200 & 300 Bar Isolator Manifold Service Manual Principal Photography and Text by Pete Nawrocky Copyright 2003 Lamartek Inc. D/B/A Dive Rite 0 Warning This manual is only to be used as a guide

More information

Pneumatic Division Richland, Michigan USA FILTER / REGULATORS. 2FR100G Rev. 12 05E Economy, Installation & Service

Pneumatic Division Richland, Michigan USA FILTER / REGULATORS. 2FR100G Rev. 12 05E Economy, Installation & Service Pneumatic Division Richland, Michigan USA www.parker.com/pneumatics Bulletin Number FILTER / REGULATORS Bulletin Description 2100G Rev. 12 05E Economy, Installation & Service 2100G Rev. 12 06E B&C Compact,

More information

Strut Spring Compressor

Strut Spring Compressor Strut Spring Compressor Item 43753 Read this material before using this product. Failure to do so can result in serious injury. SAVE THIS MANUAL. When unpacking, make sure that the product is intact and

More information

Measuring Policing Complexity: A Research Based Agenda

Measuring Policing Complexity: A Research Based Agenda ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject

More information

CAD 302.02.10.1 SK 30 1 10 (ER 16) 100 32 302.02.16.1 SK 30 2 16 (ER 25) 100 42 302.02.20.1 SK 30 2 20 (ER 32) 100 50

CAD 302.02.10.1 SK 30 1 10 (ER 16) 100 32 302.02.16.1 SK 30 2 16 (ER 25) 100 42 302.02.20.1 SK 30 2 20 (ER 32) 100 50 Spannfutter für Spannzangen DIN 6499 (ISO 15488) System ER Collet chucks for collets DIN 6499 (ISO 15488) ER-system Mandrins à pinces pour pinces DIN 6499 (ISO 15488) système ER Verwendung: Zur Aufnahme

More information

MODEL G300 BRAKE BLEEDER

MODEL G300 BRAKE BLEEDER MODEL G300 BRAKE BLEEDER Installation, Operation & Repair Parts Information Branick Industries, Inc. 4245 Main Avenue P.O. Box 1937 Fargo, North Dakota 58103 REV060616 P/N: 81-0035G 1 THIS PAGE INTENTIONALLY

More information

Archived Content. Contenu archivé

Archived Content. Contenu archivé ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject

More information

Model RV-1 Pressure Relief Valve 2 to 8 Inch (DN50 to DN200), 250 psi (17,2 bar) Pilot-Operated, Globe and Angle Body Styles General Description

Model RV-1 Pressure Relief Valve 2 to 8 Inch (DN50 to DN200), 250 psi (17,2 bar) Pilot-Operated, Globe and Angle Body Styles General Description Technical Services 00-3-932 +-0-7-220 www.tyco-fire.com Model RV- Pressure Relief Valve 2 to Inch (DN50 to DN200), 250 psi (7,2 bar) Pilot-Operated, Globe and Angle Body Styles General Description The

More information

MANDATORY SERVICE BULLETIN

MANDATORY SERVICE BULLETIN 652 Oliver Street Williamsport, PA 17701 U.S.A. Tel. +1-800-258-3279 (U.S. and Canada) Tel. +1-570-323-6181 (International) Fax. +1-570-327-7101 www.lycoming.com MANDATORY SERVICE BULLETIN DATE: October

More information

ENABLING OBJECTIVE AND TEACHING POINTS. DRILL: 401.02 5. TIME: One 30 minutes period. 6. METHOD/APPROACH: a. demonstration; and. b. performance.

ENABLING OBJECTIVE AND TEACHING POINTS. DRILL: 401.02 5. TIME: One 30 minutes period. 6. METHOD/APPROACH: a. demonstration; and. b. performance. CHAPTER 4: LESSON SPECIFICATIONS COURSE TITLE: GREEN STAR COURSE ENABLING OBJECTIVE AND TEACHING POINTS CTS NUMBER: A-CR-CCP-116/PC-001 TRAINING DETAILS DRILL: 401.02 5. TIME: One 30 minutes period. 1.

More information

Instruction de montage de voûte ISOLHIS petite portée

Instruction de montage de voûte ISOLHIS petite portée Instruction de montage de voûte ISOLHIS petite portée Mounting Instructions for continuous rooflight ISOLHIS with a little width Outillage à prévoir Tools to be provided Visseuse 600 W 1600 Tr/mn Screwing

More information

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT POSEION 2-29, 2-25 & 2-22 POSEION 2-29, 2-25 & 2-22 XT Repair Manual Index A. Safety precautions 3 B. Technical data 4 C. Structure 5-6. Service / Repair 7-23 E. Tools 24 F. Function 25-26 G. Electric

More information

M A N U A L 13-10-05

M A N U A L 13-10-05 Documentation The following information sheets illustrate the description below: 12-WW01-4G-E Sectional view of the lance with main dimensions 12-W101-6G-E Sectional view of the head of the lance with

More information

User Guide. LXX35-LED Light Source. Luxxor LXX35-LED User Guide. Contents

User Guide. LXX35-LED Light Source. Luxxor LXX35-LED User Guide. Contents User Guide Luxxor LXX35-LED User Guide LXX35-LED Light Source Contents Symbol Descriptions... 3 Set Up... 6 Operation... 8 Mounting... 9 Cleaning... 10 Troubleshooting... 10 Ratings & Specifications...

More information

Drive shaft, servicing

Drive shaft, servicing Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,

More information

Fluid Regulator. Instructions Parts List 306563L LOW PRESSURE

Fluid Regulator. Instructions Parts List 306563L LOW PRESSURE Instructions Parts List LOW PRESSURE Fluid Regulator 306563L For accurate, positive control of fluid pressure to one spray gun, dispensing valve, or atomizing head. For professional use only. 250 psi (18

More information

Round Housing with Side Ports

Round Housing with Side Ports Power Steering Steering Control Unit (SCU) Parts and Repair Information 5 Series Steering Control Units 001 Square Housing with Side Ports Round Housing with Side Ports T E L RP Round Housing with End

More information

Professional Precharged Hunting Rifle

Professional Precharged Hunting Rifle TRIGGER ADJUSTMENT. The trigger is set at the factory, but some aspects can be adjusted to suit individual preferences. 1. This screw adjusts the weight of second stage trigger pull, to increase the weight

More information

Archived Content. Contenu archivé

Archived Content. Contenu archivé ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject

More information

Diesel Care & Performance Inc Care is at the center of everything we do

Diesel Care & Performance Inc Care is at the center of everything we do Service and Repair REMOVAL WARNING: RED-STRIPED WIRE HARNESS CARRIES 115V DC. SEVERE ELECTRICAL SHOCK MAY BE RECEIVED. DO NOT PIERCE. CAUTION: Do not pierce engine electrical wires or damage to the harness

More information

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V TITAN pt. no.: 02 0000 0143 Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS G e n e r a t i o n V Extended

More information

Product Notice. Safety Notice: Sales Hold

Product Notice. Safety Notice: Sales Hold Product Notice Ariens Company 655 W. Ryan St. Brillion, WI 54110 www.ariens.com Product Family: Ariens and Gravely 36 Power Brushes Subject: Sales Hold Inspect and Repair Dealer Action: SALES HOLD Do not

More information

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information Safety Safety Is Your Responsibility DANGER To avoid personal injury or death, carefully read and understand all instructions pertaining to the Anthony Liftgates product. Do not attempt to install, operate,

More information

Front brakes (FN- 3), servicing

Front brakes (FN- 3), servicing j a t Front brakes (FN- 3), servicing 46-1 Front brakes, servicing Note: Install complete repair kit. After replacing brake pads and before moving vehicle, depress brake pedal several times firmly to properly

More information

Spécifications techniques

Spécifications techniques www.farpi.com FARPI-FRANCE 06/2015 V1.20 Spécifications techniques - Petit Tonnage de J35AD à J180AD All Electric Servo Drive Injecon Molding Machine FARPI-FRANCE Z.I. le Chanay -BP 3-69720 SAINT BONNET

More information

3097 en - 2013.06 / e. This manual is to be given to the end user POULIBLOC 2000-3000. Shaft mount reducer. Installation

3097 en - 2013.06 / e. This manual is to be given to the end user POULIBLOC 2000-3000. Shaft mount reducer. Installation 097 en - 0.06 / e 8 en This manual is to be given to the end user POULIBLOC 000-000 Installation LEOY-SOME ISTALLATIO POULIBLOC 000-000 097 en - 0.06 / e This document complements the general instructions

More information

2" & 3" Poly Wet Seal Pump Instruction Manual

2 & 3 Poly Wet Seal Pump Instruction Manual Always place the pump as close to the liquid to be pumped as possible. Keep the suction line short and with few bends. Keep the pump and engine on a level foundation. A poor foundation and a heavy suction

More information

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors Char-Lynn Spool Valve Hydraulic Motors Repair Information W Series Geroler Motors with Parking Brake 004 Nut Key Ring, Retaining Bearing Ring, Retaining Ring, Retaining Washer (Thick), Pressure Washer,

More information

M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS

M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS (SPLIT IDLER) 1 # TABLE OF CONTENTS List of parts and tools................................................3 Installation of complete kit...................................................5

More information

R O A D M A S T E R, I N C.

R O A D M A S T E R, I N C. R O A D M A S T E R, I N C. ROADMASTER, Inc. 6110 NE 127th Ave. Vancouver, WA 98682 12 10 3 11 4 5 13 7 8 360-896-0407 fax 360-735-9300 www.roadmasterinc.com ITEM QTY NAME MATERIAL 1... 4...1/2 x 1 1/2

More information

Tri-Homo Style Operation and Maintenance Instructions

Tri-Homo Style Operation and Maintenance Instructions Tri-Homo Style Operation and Maintenance Instructions One Research Drive Stratford, CT 06615 (203) 375-0063 www.sonicmixing.com 1 Installation and Start-up Do not perform following adjustments without

More information

Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations

Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations Instruction Manual 1061 F & G Actuator Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications...

More information

TECHNICAL DATA. Dry 122a. November 12, 2013

TECHNICAL DATA. Dry 122a. November 12, 2013 Dry 122a 1. PRODUCT DESCRIPTION The Viking is a quick-opening device. When installed with the required external Anti-flood Device, the assembly is designed to increase the operating speed of Viking Model

More information

System Saver Series Single Cartridge Air Dryers

System Saver Series Single Cartridge Air Dryers Maintenance Manual 34 System Saver Series Single Cartridge Air Dryers System Saver Series 1200E, P, U 1800E, P, U 1200 Plus, MCP Revised 03-16 Service Notes About This Manual This manual contains maintenance

More information

SLP 1.85 Ratio Offset Rocker Arms with Valve Springs, LS3

SLP 1.85 Ratio Offset Rocker Arms with Valve Springs, LS3 PART #50190 SLP 1.85 Ratio Offset Rocker Arms with Valve Springs, LS3 PACKING LIST Before installation, use this check list to make sure all necessary parts have been included. ITEM QTY CHECK PART NUMBER

More information

System Saver 318 Air Compressor for Mack E-Tech and ASET Engines

System Saver 318 Air Compressor for Mack E-Tech and ASET Engines Maintenance Manual 31 System Saver 318 Air Compressor for Mack E-Tech and ASET Engines Revised 08-05 NON-THROUGH DRIVE THROUGH DRIVE Service Notes About This Manual This manual provides service and repair

More information

Manual for GlobePharma Mini-Press II Rotary Tablet Press

Manual for GlobePharma Mini-Press II Rotary Tablet Press 1 of 13 Preparing the Rotary Press 1. Make sure the rotary press is unplugged. 2. Open the bottom cabinet of the rotary press and take out the grey tool kit, and the beige box of punches and dies. 3. Take

More information

INSTALLATION INSTRUCTIONS. 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD IMPORTANT NOTES

INSTALLATION INSTRUCTIONS. 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD IMPORTANT NOTES INSTALLATION INSTRUCTIONS 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD Thank you for purchasing a quality Hellwig Product. PLEASE READ THIS INSTRUCTION SHEET COMPLETELY

More information