Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water"

Transcription

1 1 Foreword 1.1 Thank you for choosing one of the range of AEON's BS standard valves. For safety purposes, the user shall read this instruction to fully understand the operation of the product. 2 AEON Design Criteria 2.1 The BS valves are designed in accordance with various BS standards, which ensures that the valve has sufficient strength to accommodate the pressure-temperature rating. The valve has various sealing materials in accordance with BS standards, which are used to avoid corrosion where necessary. The materials and components are designed and assembled to prevent the risk of failure. The Valve is designed to accommodate a hand wheel, gear operator or electric actuator according to its size, torque, and operation requirements. 2.2 What action the user shall take General In any occurrence, first ensure personnel safety Make sure that the selected valve materials are corrosion/wear resistance to the service fluid Where the service fluid is flammable/explosive, to limit the working temperature When performing Repair/maintenance operations, make sure that the valves are always depressurized, vented and drained For actuator operated valves, make sure all supply lines (Electrical, hydraulic, Air) are disconnected before starting any operation When performing Repair/maintenance operations, do not smoke, do not use any portable no-ex-proof electrical device in the area and do not use open fire without a valid work permit Valve must periodically be checked: -Tightness of bolted connection (body/bonnet, gland, flange connection).-corrosion/wear damages (crack, pitting, thickness of the valve). Ensure valves are fully opened and fully closed to confirm operability.

2 3 Scope and Technical Parameters: 3.1 Scope: The series valves are widely used in Water and waste water industries for shut off or connection of pipeline. 3.2 Application Standard: Design standard: BS5163 Flange dimension: EN1092-2, BS4504 Structure length: BS5163 Valve testing: EN12266, EN Valve Structure DN50 DN Body 2 Seat Ring 3 Disc 4 Stem Nut 5 Stem 6 Bonnet Gasket 7 Bonnet 8 Holding Ring 9 Seal Ring 10 O-Ring 11 Gland Bonnet 12 Dust Ring 13 Hand Wheel

3 DN350 DN600 1 Body Disc 3 Bonnet 4 Stem 5 Stem Nut 6 Holding Ring 7 Seal Ring 8 Holding Ring 9 Seat Ring 10 Gland 11 Hand Wheel 1 12 Bonnet Gasket 13 Bonnet Bolts 14 O-Ring 15 Seal Ring DN700 DN Body Bonnet 3 Disc Stem Nut 5 Stem Seat Ring 7 Bolts 8 Nuts 9 Washer 10 Bolts 11 Yoke 3 12 Packing 13 Gland 14 Bolts 15 Coupling 16 Gearbox

4 4 Maintenance: 4.1 Dismantling and Servicing Instructions for Gate Valves: Loosen the body/bonnet joint stud/nuts and remove from body, loosen the eye bolt nuts, rotate the hand wheel in clockwise direction. Wedge will come down to closed position. Further rotate the hand wheel in same direction, bonnet assembly will rise in upward direction. Continue the same till spindle comes out of threaded portion of yoke sleeve. Lift the bonnet assembly to separate it from body. Hold the spindle portion above body with left hand and pull it upward by hammering gently on topside of body surface beyond gasket area. The spindle along with wedge will come out of body. Observe the condition of seat portion and interior portion of body. Clean body interior portion and seat surface thoroughly with suitable cleaning liquid check up for any scratches on seat ring surfaces. Minor scratches should be removed by lapping with emery paste with the help of body seat lapping fixture. 4.2 Gate assembly and maintenance procedure: If the scratches are deep which cannot and cannot be removed by lapping, further machining may be required. Where seat rings are seal insert to the body, the complete body should be loaded on to the machine for further rectification. Similarly minor scratches on wedge surface should be removed by lapping with emery paste. Deep scratches should be rectified by machining and lapping. In case the wedge surface is heavily damaged the entire seat surface which should be fully machined or replaced by a new seat ring 4.3 Remove the old gland packing from bonnet stuffing box: Clean the bonnet surface from inside; lap the degree surface of back seat bush with suitable tools or by using the spindle itself. Clean the threaded portion of the spindle. Polish the non-threaded portion of spindle on a lathe machine or dress if required. 4.4 Change the body bonnet joint gasket and assemble the valve: Put new gland packing of required size and quality into the stuffing box with open end 180 degrees with respect to each other. Tighten nut equally on both sides. Lubricate the spindle-threading portion and operate the valve 2~3 times. 4.5 Stem Repair: Valve stems should be repaired due to the following reasons: Straightness (bent, not straight) Damage to head and threads, Corrosion, Pitting and taper in the portion that slides through the packing.

5 4.6 Straightness: Minimum clearance for the length of the stem when measured from a straight edge laid along side the stem, while rotated 360 degrees. The stem should be press straightened if necessary or should be re-machined on a centre less grinder. 4.7 Threads and head: Thickness and smoothness of threads must ensure smooth operation within the stem nut. The head must adequately engage the disc or plug. 4.8 Packing slide area: The area that passes through packing should be free from pits and have a smooth finish. Polishing or turning of the sliding surface within pre-decided limits can achieve this. Also the taper on the stem should be removed. If the pits wear, taper or previous machining results in a reduction of the stem outside diameter beyond the acceptable limit from the original size; then the stem must be replaced by a new one. 5 Valve Operation and Maintenance: 5.1 After installation and for the pressure test of the pipeline or the system, the wedge must be fully opened or fully closed. It is not recommended to partly open the valve for adjustment of flow rate or emergent pressure relief blow-off. AEON is not responsible for damage, loss or expense arising out of such usage. 5.2 Dust, grease and medium residual may accumulate at the surfaces of body, and the moving parts such as stem, gearbox, the guide of yoke etc. can cause wear and erode the valve, and even generate friction heat that is dangerous in explosive atmosphere. These components be cleaned frequently according to the working conditions. 5.3 After being put into service, the valve shall be checked and maintained periodically especially for the condition of the sealing surfaces and wear and tear, the age of the packing and the corrosion of body. In case of such situation, the valve shall be repaired or replaced. It is suggested that inspection and maintenance of valve shall be performed every three if the medium is water and every month or to local law if the medium is corrosive. After reparation, valve shall be re-assembled and adjusted using recommended torque as follows. After reassembly, the valve shall be pressure tested.

6 6 Routine valve inspection 6.1 The valve shall be checked regularly, including the attrited quantity of seat, wedge and stem s thread, the body and the bonnet s corrosive quantity. The packing and the gasket usually shall be replaced after checking as a basic maintenance. 6.2 Valve removal (1) The valve shall be removed in accordance with the accepted drawings. (2) Carry out the following prior to removal: a) The valve s position and condition shall be accurately recorded prior to removal of the valve from the pipeline to prevent operator error. Records shall be kept and maintained. b) Record all relevant information including cast numbers, serial numbers and all details of the failure mode prior to removal. 7 Potential Failure and Troubleshooting Failure (risk) Cause Troubleshooting Leakage of packing 1. Gland flange nuts loose 2. Rings of packing not enough 3. Packing aged or failure 4. Stem sealing damaged Leakage between sealing 1. Dirties between sealing surfaces surfaces 2. Sealing surfaces damaged Operation failure 1. Packing too tight 2. Thread of stem nut over worn 3. Stem bent 4.Foreigner existence between stem and stem nut or gland or gland flange Leakage between bonnet 1. Bonnet bolts loose 2. Bonnet gasket flanges failure Body and bonnet broken 1. Water hammer 2. Fatigue 3. Freezing and leaked broken 1. Equally tighten eyebolt nuts 2. Add packing 3. Replace packing 4. Stem shall be maintained periodically 1. Clean sealing surface 2. Repair the sealing surfaces 1. Proper loose gland flange nuts 2. Replace stem nut 3. Rectify or replace stem 4. Clean foreign matter 1. Proper tighten bonnet nuts 2. Replace bonnet gasket 1. Carefully operation to prevent suddenly stopping pumping and rapidly shutting. 2. Replace valve that exceeds

7 8 Precautions to be taken Whenever the gland packing is required to be replaced under full working pressure, ensure that back-seating arrangement is present and is functioning properly. While opening and closing of the valve please check direction of turn for open and close(operation in opposite direction may damage the yoke sleeve). When body bonnet joints are unbolted do not forget to use a new gasket when refitting. 9 Valve Transportation 9.1 Check the package of valve before transportation is in accordance with the related standard. Rotating the hand wheel should be avoided when the valve has been packaged. 9.2 Actuator and valve shall be packaged separately. 9.3 The valve is heavy, suitable lifting equipment shall be used during transporting. When lifting the valve, the cord shall be tied to the yoke, do not tie to the hand wheel or the stem. Handle the valve carefully to avoid any damages. 9.4 The paint, name plate and the sealing face of flange shall be protected during the transportation. Do not drag the valve along the ground, especially on the flange sealing face. 9.5 The valve shall be stored safely to prevent rain, dust and grease contamination prior to installation. Ensure the valve is in the fully closed position. If the valve is accidently opened, the sealing face of the seat and wedge shall be cleaned, then the valve should be closed. 10 Valve Storage 10.1 The valve shall be stored in ventilated and dry storehouse for protection. It is not permitted to store the valve outdoors in any situation. Valve end flanges shall be blanked with covers Don t mark the stem when moving the valve. The packing box must not be in contact with the shelf if the valve is stored on the shelf. It is recommended not to store the valve on the ground directly The valve shall be stored with the gate closed. The seal face must be kept clean to avoid scratching when the valve is stored for long time periods. Checking / cleaning of the valve if the valve has been stored for over six months. Repeat pressure tests must be completed prior to installation if the valve has been stored over twelve months.

8 11 Valve Installation 11.1 Carefully check valve identification against valve specifications before installation Check the inside of bore and the sealing surface before installation, any debris shall be removed with a clean soft cloth Check the sensibility of actuator to prevent seizure before installation Valve operation device is recommended to be installed at location 1.2m from the ground for convenience of operation. Where the centre of the valve and the hand-wheel is over 1.8m from the ground, a platform shall be built for the frequently operated valve. For pipeline with numbers of valves, valves shall be installed on the same platform as likely as possible for convenient of operation. For single valve installed at location over 1.8m and less operated, apparatus may be used such as chain-wheel, extension bar, move platform and move ladder etc. Where valve is to be installed underground, extension bar or ground-well shall be set. For safety reasons, the ground-well shall be covered For valve installed on horizontal pipeline, the stem must be in the upright position; or the downward stem shall be difficult for operation and maintenance, as well the valve being liable to corrosion. If the ground valve is slant installed, the operation and maintenance shall also be difficult. If the valve will be installed horizontally, the purchaser shall put forward definitely at the spec book for purchasing, or else AEON will not take responsibility for the expense which cause by installing horizontally When valves are installed in pipeline side by side, enough space shall be considered for operation, maintenance and disassembly. The clearance of hand-wheels shall not less than 100mm; in case of narrow clearance, valves shall be installed interleaving.

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES GATE VALVE O.S. & Y 1.0 Periodic Inspections 1.1 The valve stem packing should be inspected at least monthly. If the stem packing shows signs of leakage, simply tighten the adjusting nuts to compress the

More information

NEWCO VALVES Newmans Inc., Newmans Valve Ltd. NEWCO/OIC Cast Valve Operation & Maintenance Manual

NEWCO VALVES Newmans Inc., Newmans Valve Ltd. NEWCO/OIC Cast Valve Operation & Maintenance Manual NEWCO VALVES Newmans Inc., Newmans Valve Ltd. NEWCO/OIC Cast Valve Operation & Maintenance Manual TABLE OF CONTENTS 1. Introduction and Safety Information... 1 1.1. Introduction... 1 1.2. Safety Information...

More information

Fire Hydrant Troubleshooting

Fire Hydrant Troubleshooting Fire Hydrant Troubleshooting Pulsation or chatter during opening and flow of water from hydrant. Loose condition in stem at lower valve plate nut. Tighten lower valve plate nut and secure with SS lock

More information

Installation, Operation and Maintenance Manual for the HP Series

Installation, Operation and Maintenance Manual for the HP Series Installation, Operation and Maintenance Manual for the HP Series High Performance Butterfly Valve "Double Offset" CONTENT 1. INTRODUCTION 1.1 GENERAL NOTE 1.2 STRUCTURE & TYPE 1.3 OPERATION 2. INSTALLATION

More information

CRYOGENIC AND LOW TEMPERATURE SERVICE TRIAD SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL

CRYOGENIC AND LOW TEMPERATURE SERVICE TRIAD SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL Date: August 2011 / Page 1 of 6 CRYOGENIC AND LOW TEMPERATURE SERVICE TRIAD SERIES BALL VALVES (FP2000/FP3000 and SP2000/SP3000 WITH CRYO OR LOW TEMP EXTENSION) INSTALLATION - MAINTENANCE MANUAL DESIGN

More information

FLANGED FLOATING BALL VALVES

FLANGED FLOATING BALL VALVES Page: 1 of 11 INSTALLATION, OPERATION & MAINTENANCE MANUAL KF SERIES F/FE FLANGED FLOATING BALL VALVES Page: 2 of 11 CONTENTS BILL OF MATERIALS ----------------------------------------------------------------------------------------------------------------------------------------

More information

GATE VALVES ASAHI AV VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1

GATE VALVES ASAHI AV VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1 Serial No. H-V011-E-11 GATE VALVES Type P (Standard: Plug) Type S (Soft Seal) Contents (1) Be sure to read the following warranty clauses of our product 1 User s Manual (2) General operating instructions

More information

SEMPELL INTERVALVE PRESSURE SEAL GATE VALVES STYLE A

SEMPELL INTERVALVE PRESSURE SEAL GATE VALVES STYLE A Installation and maintenance instructions for cast gate valves pressure seal Style A Wedge gate and parallel slide configuration SECTION 1 - VALVE STORAGE CONTENTS 1 Valve storage 1.1 Preparation and preservation

More information

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

DeZURIK 3-20 BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT Instruction D10386 August 2013 Instructions These instructions provide installation, operation and maintenance information for BAW Butterfly Valves.

More information

ABC Made in USA FLOATING BALL VALVE INSTALLATION, MAINTENANCE, REPAIR MANUAL

ABC Made in USA FLOATING BALL VALVE INSTALLATION, MAINTENANCE, REPAIR MANUAL Made in USA FLOATING BALL VALVE INSTALLATION, MAINTENANCE, REPAIR MANUAL Corporation 3245 S. Hattie Oklahoma City, Oklahoma 73129 Telephone: (405) 677-3321 Fax: (405) 677-3917 Email:Balon@balon.com www.balon.com

More information

BSM PUMP CORPORATION INSTALLATION AND OPERATION MANUAL

BSM PUMP CORPORATION INSTALLATION AND OPERATION MANUAL INSTALLATION AND OPERATION MANUAL I. INTRODUCTION Properly selected, installed, and maintained, BSM Pumps will provide many years of trouble-free service. Improper selection and installation account for

More information

OPERATION AND MAINTENANCE MANUAL

OPERATION AND MAINTENANCE MANUAL OPERATION AND MAINTENANCE MANUAL NUTRON BALL VALVE Model T3 ½ FP 4 RP 150# - 2500# ¼ FP 4 RP 1000 WOG 6000 WOG FLANGED, FNPT and WELD END For technical questions, please contact the following: Engineering

More information

FCT. Installation and Maintenance Instructions Ball valves, trunnion mounted, side entry.

FCT. Installation and Maintenance Instructions Ball valves, trunnion mounted, side entry. FCT Ball valves, trunnion mounted, side entry. Section 1 - Valve Storage 1.1 Preparation and Preservation for Shipment All valves are properly packed in order to protect the parts that are subject to deterioration

More information

1. While unpacking the valve, confirm that the valve and any accessories were not damaged during transportation.

1. While unpacking the valve, confirm that the valve and any accessories were not damaged during transportation. 1. INTRODUCTION The purpose of this manual is to ensure that the valves supplied are properly stored, installed, operated and maintained. Proper installation and maintenance of the product will aid in

More information

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller January 2013 AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller Milliken Valve Company 190 Brodhead Avenue, Suite 100 Bethlehem, PA 18017 Phone: (610) 861-8803 Fax:

More information

DeZURIK CYLINDER OPERATED G-SERIES ACTUATOR USED ON PFW & PTW TAPERED PLUG VALVES

DeZURIK CYLINDER OPERATED G-SERIES ACTUATOR USED ON PFW & PTW TAPERED PLUG VALVES CYLINDER OPERATED G-SERIES ACTUATOR USED ON PFW & PTW TAPERED PLUG VALVES Instruction D10191 July 2016 Instructions These instructions provide information about G-Series Cylinder Actuators. They are for

More information

Do not locate the pump unit in a pit unless provisions have been made for proper drainage and ventilation.

Do not locate the pump unit in a pit unless provisions have been made for proper drainage and ventilation. Chemical Gear Pumps Installation Operation Repair Maintenance Installation Principal of Operation All Oberdorfer Chemical Gear pumps are the positive displacement type. A definite amount of liquid is displaced

More information

OPERATION AND MAINTENANCE MANUAL

OPERATION AND MAINTENANCE MANUAL OPERATION AND MAINTENANCE MANUAL NUTRON BALL VALVE MODEL B3 1 ½ FP 6 RP 150# - 2500# For technical questions, please contact the following: Engineering Department 2125-64 Avenue Edmonton, Alberta, Canada

More information

These instructions are applicable to the following model: ARI 2040

These instructions are applicable to the following model: ARI 2040 INSPECTION & MAINTENANCE BULLETIN ARI 2040 Bottom Outlet Ball Valve These instructions are applicable to the following model: ARI 2040 Only AAR class F facilities are certified to recondition, repair,

More information

This instruction is valid for all ACD pump models shown on page 2

This instruction is valid for all ACD pump models shown on page 2 Screw pumps ACD Maintenance and Service Instruction This instruction is valid for all ACD pump models shown on page 2 Contents Page List of components 2 Exploded view/ordering code 3 Service intervals

More information

DeZURIK CYLINDER OPERATED G-SERIES ACTUATOR USED ON PEC ECCENTRIC VALVES

DeZURIK CYLINDER OPERATED G-SERIES ACTUATOR USED ON PEC ECCENTRIC VALVES CYLINDER OPERATED G-SERIES ACTUATOR USED ON PEC ECCENTRIC VALVES Instruction D10022 August 2012 Instructions These instructions provide information about G-Series Cylinder Actuators. They are for use by

More information

OpTB. Trunnion Ball Valve. Product Instruction Manual INTRODUCTION SAFETY INFORMATION

OpTB. Trunnion Ball Valve. Product Instruction Manual INTRODUCTION SAFETY INFORMATION Product Instruction Manual Leading Technologies For Control OpTB Trunnion Ball Valve TABLE OF CONTENTS INTRODUCTION Scope of Manual... pg. 1 Safety Information...pg. 1 Unpacking... pg. 2 INSTALLATION/OPERATIONS...

More information

Fig B34 and Fig B36 'T' Type or Basket Type Strainers

Fig B34 and Fig B36 'T' Type or Basket Type Strainers 1610250 / 1 IM-S60-24 ST Issue 1 Fig B34 and Fig B36 'T' Type or Basket Type Strainers Installation and Maintenance Instructions 1. Safety information Basket type Designed for fitting into a horizontal

More information

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions 4057250/8 IM-P405-16 AB Issue 8 ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4 Operation

More information

TECHNICAL SERVICE MANUAL

TECHNICAL SERVICE MANUAL TECHNICAL SERVICE MANUAL General Purpose SPECIAL mounted Pumps SERIES 75 AND 475 SIZES G - HL SECTION TSM 320.2 PAGE 1 of 9 ISSUE E CONTENTS Introduction....................... 1 Interchangeability....................

More information

Trunnion-Design Ball Valves

Trunnion-Design Ball Valves Trunnion-Design Ball Valves 12" 20" (DN 300 500) Series 7150 12" (DN 300) Series 730S 12" 20" (DN 300 500) Series 7300 14" 24" (DN 350 600) Series 9150 14" 24" (DN 350 600) Series 9300 Installation, Maintenance

More information

BRAKE SYSTEM Volvo 960 DESCRIPTION BLEEDING BRAKE SYSTEM ADJUSTMENTS BRAKE PEDAL HEIGHT PARKING/EMERGENCY BRAKE STOPLIGHT SWITCH

BRAKE SYSTEM Volvo 960 DESCRIPTION BLEEDING BRAKE SYSTEM ADJUSTMENTS BRAKE PEDAL HEIGHT PARKING/EMERGENCY BRAKE STOPLIGHT SWITCH BRAKE SYSTEM 1994 Volvo 960 1994 BRAKES Volvo Brake System - Disc 960 DESCRIPTION All models use front and rear disc brakes with 3 makes of calipers: ATE, Bendix (DBA) and Girling. Service brakes are hydraulically-operated

More information

Installation, Operation & Maintenance Manual Model 570 Duplex Basket Strainer

Installation, Operation & Maintenance Manual Model 570 Duplex Basket Strainer Read all the following information and instructions prior to installing and operating the equipment. Failure to comply with these instructions could result in bodily injury or property damage. TABLE OF

More information

2-42 Flanged Vacuum Breaker. Operation, Maintenance and Installation Manual

2-42 Flanged Vacuum Breaker. Operation, Maintenance and Installation Manual Manual No. VB-OM1-1 2-42 Flanged Vacuum Breaker Operation, Maintenance and Installation Manual INTRODUCTION... 1 RECEIVING AND STORAGE... 1 DESCRIPTION OF OPERATION... 1 INSTALLATION... 2 DRAWING SS-1381...

More information

INSTALLATION, OPERATION & MAINTENANCE MANUAL

INSTALLATION, OPERATION & MAINTENANCE MANUAL INSTALLATION, OPERATION & MAINTENANCE MANUAL Flanged Disk Check Valve with Strainer Ref. GENEBRE: 2450 2451 2452 1 INSTRUCTIONS FOR INSTALLATION, OPERATION & MAINTENANCE MANUAL 1. Spare parts... 3 1.1

More information

Series # Flanged Cast Steel Gate Valve Features

Series # Flanged Cast Steel Gate Valve Features Series 35114 150# Flanged Cast Steel Gate Valve Features SHARPE - SERIES 35114 150# Flanged Cast Steel Gate Valve Full port Outside screw and yoke Bolted bonnet Flexible wedge, fully guided integrated

More information

STEERING SYSTEM - POWER RACK & PINION

STEERING SYSTEM - POWER RACK & PINION STEERING SYSTEM - POWER RACK & PINION 1994 STEERING Volvo - Power Rack & Pinion 960 1994 Volvo 960 DESCRIPTION 960 may be equipped with either a ZF gear with an integral housing or a cam gear steering

More information

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification... OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS INTRODUCTION...1 Scope...1 Description...1 Valve Identification...2 1.0 VALVE INSTALLATION...2 2.0 VALVE MAINTENANCE...3 Actuator Disassembly...3

More information

Air Release Valve Series 38, 45, 50 (Compound Lever Type)

Air Release Valve Series 38, 45, 50 (Compound Lever Type) Manual No. ARCL-OM1-1 Air Release Valve Series 38, 45, 50 (Compound Lever Type) Operation, Maintenance and Installation Manual INTRODUCTION... 1 RECEIVING AND STORAGE... 1 DESCRIPTION OF OPERATION... 1

More information

MODEL 842 AIR HYDRAULIC PUMP INSTRUCTION

MODEL 842 AIR HYDRAULIC PUMP INSTRUCTION MODEL 842 AIR HYDRAULIC PUMP INSTRUCTION Jackco Transnational Inc. 2009 South El Monte, CA 888-452-2526 www.jackco.com FOR YOUR SAFETY Read all instructions, warnings and cautions carefully. Follow all

More information

INSTALLATION, OPERATION, MAINTENANCE MANUAL. Series Ball Valve EN. Revision: 1.1

INSTALLATION, OPERATION, MAINTENANCE MANUAL. Series Ball Valve EN. Revision: 1.1 INSTALLATION, OPERATION, MAINTENANCE MANUAL Series 9410 Ball Valve 70-16-45-06-EN Revision: 1.1 Contents 1. General... 1 1.1 Introduction to Valves... 1 2. Storage... 1 3. Installation... 2 4. Operation...

More information

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap 1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

BOWIE PUMPS OPERATION - MAINTENANCE

BOWIE PUMPS OPERATION - MAINTENANCE BOWIE PUMPS OPERATION - MAINTENANCE PUMPING PRINCIPLE: The meshing owieeof the gears cause a slight depression, with the resulting enmeshing of the gears causing a vacuum drawing the fluid being pumped

More information

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide: LO TORC Plug Valve The high value, dependable performance, and low maintenance requirements of Halliburton Lo Torc valves can help reduce overall operating costs and help cut downtime. These features have

More information

TECHNICAL SERVICE MANUAL

TECHNICAL SERVICE MANUAL TECHNICAL SERVICE MANUAL HEAVY-DUTY PUMPS SERIES 4195 AND 495 SIZES GG - AL SECTION TSM 144 PAGE 1 of 10 ISSUE D CONTENTS Introduction....................... 1 Safety Information.................... 2

More information

Drive shaft, servicing

Drive shaft, servicing Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,

More information

Service Manual Crown Pallet Jack

Service Manual Crown Pallet Jack R 2000 Service Manual Crown Pallet Jack Models: and 50 Developed by Generic Parts Service This manual is intended for basic service and maintenance of the Crown pallet jack. The pallet jacks you are servicing

More information

Maintenance and Service Instruction

Maintenance and Service Instruction Screw pumps E4 Maintenance and Service Instruction E4 1 IMO AB This instruction is valid for all E4 pump models shown on page 2 Contents Page List of components 2 Exploded view/ordering code 3 Service

More information

BEWARE; METAL SURFACES ARE EXCELLENT HEAT CONDUCTORS.

BEWARE; METAL SURFACES ARE EXCELLENT HEAT CONDUCTORS. 1. SPECIAL HAZARDOUS AREAS The Rack & Pinion pneumatic actuators manufactured by Radius are designed to be used in the following potential explosive zones: Zone 1 & 2 for gases and Zone 21 & 22 for dust.

More information

Maintenance Information

Maintenance Information 16606105 Edition 2 May 2014 Air Drill 551 Series Maintenance Information Save These Instructions Product Safety Information WARNING Failure to observe the following warnings, and to avoid these potentially

More information

Armstrong Python Series 1100 Control Valve Installation and Maintenance

Armstrong Python Series 1100 Control Valve Installation and Maintenance This bulletin should be used by experienced personnel as a guide to the installation and maintenance of the Armstrong Python Control Valve. Selection or installation of equipment should always be accompanied

More information

HYDRAULIC LIFT TABLE CART 2200-LB.

HYDRAULIC LIFT TABLE CART 2200-LB. HYDRAULIC LIFT TABLE CART 2200-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other

More information

Char-Lynn Hydraulic Motor. Repair Information. 4000 Compact Series

Char-Lynn Hydraulic Motor. Repair Information. 4000 Compact Series Char-Lynn Hydraulic Motor Repair Information 4000 Compact Series Disc Geroler Motor 001 4000 Compact Series Disc Motors Plate Exclusion Guard Bearing Back-up Washer Shaft Key Bearing and Shaft Assembly

More information

Worm Gear Manual. /// Page 2 Design of the worm gear. /// Page 3 Mounting instructions. /// Page 4 Operating instructions and choice of oil

Worm Gear Manual. /// Page 2 Design of the worm gear. /// Page 3 Mounting instructions. /// Page 4 Operating instructions and choice of oil Worm Gear Manual /// Page 2 Design of the worm gear /// Page 3 Mounting instructions /// Page 4 Operating instructions and choice of oil /// Page 5 Unique gear number /// Page 6 Spare parts diagram ///

More information

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19 Table of Contents Overview 1 Pump Disassembly 2 Control Disassembly / Reassembly 7 Pump Reassembly 13 Adjustment Procedures DR Control 19 Adjustment Procedures DRG Control 20 Adjustment Procedures DFR

More information

INSTALLATION AND OPERATION MANUAL FOR SBWG SERIES WORM GEAR ACTUATORS

INSTALLATION AND OPERATION MANUAL FOR SBWG SERIES WORM GEAR ACTUATORS INSTALLATION AND OPERATION MANUAL FOR WORM GEAR ACTUATORS Thank you for purchasing our SBWG Worm Gear Actuator. Before installing or operating actuator, please carefully read this manual. The contents

More information

Service Manual Rol-Lift

Service Manual Rol-Lift R 2000 Service Manual Rol-Lift Series: T and E Developed by Generic Parts Service This manual is intended for basic service and maintenance of the Rol-Lift pallet jack. The pallet jacks you are servicing

More information

SERIES 909 RIGH ANGLE TUBE ROLLER

SERIES 909 RIGH ANGLE TUBE ROLLER 909-1600 909-1700 SERIES 909 RIGH ANGLE TUBE ROLLER OPERATING INSTRUCTIONS & SERVICE MANUAL Rev: A, 2/26/2007 TO REDUCE THE RISK OF INJURY AND EQUIPMENT DAMAGE USER MUST READ AND UNDERSTAND OPERATOR S

More information

Unique DV-ST UltraPure - Manuel: for valve sizes DN8 to DN80 (¼ to 3 )

Unique DV-ST UltraPure - Manuel: for valve sizes DN8 to DN80 (¼ to 3 ) Instruction Manual Unique DV-ST UltraPure - Manuel: for valve sizes DN8 to DN80 (¼ to 3 ) ESE01752-EN4 2014-02 Original manual Table of contents The information herein is correct at the time of issue

More information

PBX Series Quick Fit Connector Bimetallic Steam Traps

PBX Series Quick Fit Connector Bimetallic Steam Traps 6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions FJ2 2 Ton Trolley Floor Jack Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. This manual provides important information on proper operation & maintenance.

More information

Float and Thermostatic Traps Series H, C and X

Float and Thermostatic Traps Series H, C and X Hoffman Specialty Installation & Maintenance Instructions HS-(E) and Thermostatic Traps Series H, C and X Series C & NPT Series C NPT Series X NPT Series C NPT Series H Ratings Maximum Max. Operating NPT

More information

PROFLEX Control Valves

PROFLEX Control Valves PROFLEX Control Valves Globe Control Valves 3-way Control Valves Pneumatic Diaphragm Actuators, Type T Pneumatic Diaphragm Actuators, Type S Pneumatic Screw-in Temperature Controllers Operating Instruction

More information

DeZURIK CYLINDER OPERATED G-SERIES ACTUATOR USED ON PEF 100% PORT ECCENTRIC VALVES

DeZURIK CYLINDER OPERATED G-SERIES ACTUATOR USED ON PEF 100% PORT ECCENTRIC VALVES CYLINDER OPERATED G-SERIES ACTUATOR USED ON PEF 100% PORT ECCENTRIC VALVES Instruction D10455 August 2012 Instructions These instructions provide information about G-Series Cylinder Actuators. They are

More information

3 Screw Pump Type. SEIM - PCX Model Users Manual

3 Screw Pump Type. SEIM - PCX Model Users Manual 3 Screw Pump Type SEIM - PCX Model Users Manual Main Index 1.0 Foreword 1.1 Notes about the manual 1.2 Symbols used 1.3 Pump identification 1.4 Product Warranty 1.5 General notes on delivery 2.0 Plant

More information

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008) Rear Wheel/Brake/Suspension 13. Rear Wheel/Brake/Suspension Service Information 13-1 Troubleshooting 13-2 Rear Wheel 13-3 Rear Cushion 13-4 Rear Swing Arm 13-7 Service Information General Safety If the

More information

Model E / E3 DN100 (4"), DN150 (6"), DN200 (8") Wet Alarm Valve with E2 Euro Stainless Steel Trim

Model E / E3 DN100 (4), DN150 (6), DN200 (8) Wet Alarm Valve with E2 Euro Stainless Steel Trim Information on Set-up, operation, service and maintenance Model E / E3 DN100 (4"), DN150 (6"), DN200 (8") Wet Alarm Valve with E2 Euro Stainless Steel Trim Model E/E3 with Stainless Steel Euro Trim Approval

More information

Turntable / 5 th Wheel

Turntable / 5 th Wheel INSTALLATION INSTALLATION, MAINTENANCE Turntable / 5 th Wheel Note: TPJD = Two Piece Jaw Design (nonadjustable) SPJD = Single Piece Jaw Design (adjustable) The Installation shall be strictly in accordance

More information

DiscPlus DX195 and DX225 Air Disc Brakes

DiscPlus DX195 and DX225 Air Disc Brakes Revised 11-04 Technical Bulletin Revised 1 Technical 11-04 Bulletin DiscPlus DX195 and DX225 Air Disc Brakes Inspection, Installation and Diagnostics Air Disc Brake Inspection Intervals and Procedures

More information

OPERATION & MAINTENANCE MANUAL. for VERTICAL INLINE PUMPS

OPERATION & MAINTENANCE MANUAL. for VERTICAL INLINE PUMPS OPERATION & MAINTENANCE MANUAL for VERTICAL INLINE PUMPS PATTERSON PUMP COMPANY A SUBSIDIARY OF THE GORMAN-RUPP COMPANY PO Box 790 9201 Ayersville Road Toccoa, Georgia 30577 Telephone: 706-886-2101 SAFETY

More information

BRAKE SYSTEM Volvo 850 DESCRIPTION BLEEDING BRAKE SYSTEM ADJUSTMENTS BRAKE PEDAL HEIGHT PARKING/EMERGENCY BRAKE

BRAKE SYSTEM Volvo 850 DESCRIPTION BLEEDING BRAKE SYSTEM ADJUSTMENTS BRAKE PEDAL HEIGHT PARKING/EMERGENCY BRAKE BRAKE SYSTEM 1995 Volvo 850 1995-96 BRAKES Volvo Brakes - Disc 850 DESCRIPTION All models use front and rear disc brakes with 3 makes of calipers: ATE, Bendix (DBA) and Girling. Service brakes are hydraulically-operated

More information

HYDRAULIC TABLE CART 500-LB.

HYDRAULIC TABLE CART 500-LB. HYDRAULIC TABLE CART 500-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic

More information

Table of contents. Exploded view. Plug/O-ring. Screw, 12pt 17. Shuttle/relief valve Parts shown Enlarged below. Spring. 10 Shims 9

Table of contents. Exploded view. Plug/O-ring. Screw, 12pt 17. Shuttle/relief valve Parts shown Enlarged below. Spring. 10 Shims 9 Table of contents Contents Exploded view 2 Parts list for standard and wheel motor 3 Disassembly, standard and wheel motor 5 Reassembly, standard and wheel motor 7 Disassembly, bearing pack 9 Reassembly,

More information

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Instruction Manual 1052 Size 20 Actuator (F & G) Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Contents Introduction... 1 Scope of manual... 1 Description... 1 Specifications...

More information

Caution: Safety Precautions: Installation, Operation & Maintenance Manual. For Modentic Two Way Ball Valves

Caution: Safety Precautions: Installation, Operation & Maintenance Manual. For Modentic Two Way Ball Valves Installation, Operation & Maintenance Manual For Modentic Two Way all Valves aution: Please read these instructions carefully and completely before installation. With the correct installation and maintenance,

More information

Power-assisted steering, servicing

Power-assisted steering, servicing Volkswagen Passat B4 - Power -assisted steering, servicing Page 1 / 20 48-2 Power-assisted steering, servicing Delivery pressure of power steering pump, checking If pump is malfunctioning no. 16. Troubleshooting

More information

1000-LB. TRAILER JACK OWNER S MANUAL

1000-LB. TRAILER JACK OWNER S MANUAL 1000-LB. TRAILER JACK OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious

More information

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997 Char-Lynn Hydraulic Motor October, 1997 Repair Information Geroler Motor Two Speed 001 27 Retainer inside bore of valve plate bearingless motors only 4 15 16 3 6 35 Parts Drawing 25 2 2 1 19 17 36 40 47

More information

."//&01-2/&3/ 4#/5"0&/-362& .47/-/&4"6/16#8//-"45 #2-"16#9# ://1/05.47/ 1994 BRAKES Suzuki Brake System. Swift

.//&01-2/&3/ 4#/50&/-362& .47/-/&46/16#8//-45 #2-16#9# ://1/05.47/ 1994 BRAKES Suzuki Brake System. Swift !"" #$%!& '()!)((*(+,)- 1994 BRAKES Suzuki Brake System Hydraulically operated brake system uses a tandem master cylinder, with a vacuum-assisted power brake booster and single piston, sliding caliper

More information

2007 Hummer H3. 2007 BRAKES Disc Brakes - H3. Fastener Tightening Specifications Specification Application

2007 Hummer H3. 2007 BRAKES Disc Brakes - H3. Fastener Tightening Specifications Specification Application 2007 BRAKES Disc Brakes - H3 SPECIFICATIONS FASTENER TIGHTENING SPECIFICATIONS Fastener Tightening Specifications Specification Application Metric English Backing Plate Bolts 135 N.m 100 lb ft Brake Hose

More information

LUCAS GIRLING SYSTEM COMPONENTS and INFORMATION

LUCAS GIRLING SYSTEM COMPONENTS and INFORMATION LUCAS GIRLING SYSTEM COMPONENTS and INFORMATION HYDRAULIC BRAKE DRUMS CONSIST OF: BACKING PLATE TWO BRAKE SHOES & LINING ASSEMBLIES ADJUSTER PARK LINED SHOE BACKING PLATE RETAINING CLIP & SCREW ADJUSTER

More information

Series # Flanged Cast Steel Gate Valve Features

Series # Flanged Cast Steel Gate Valve Features Series 31 10# Flanged Cast Steel Gate Valve Features SHARPE - SERIES 31 10# Flanged Cast Steel Gate Valve Full port Outside screw and yoke Bolted bonnet Flexible wedge, fully guided Integrated seats Rising

More information

ZF Vane Pumps. Types Repair Manual ZF-FRIEDRICHSHAFEN AG GESCHÄFTSBEREICH LENKUNGSTECHNIK. D Schwäbisch Gmünd

ZF Vane Pumps. Types Repair Manual ZF-FRIEDRICHSHAFEN AG GESCHÄFTSBEREICH LENKUNGSTECHNIK. D Schwäbisch Gmünd ZF Vane Pumps Types 7681-7686 Repair Manual ZF-FRIEDRICHSHAFEN AG GESCHÄFTSBEREICH LENKUNGSTECHNIK D- 73522 Schwäbisch Gmünd Telefon (07171)31-0 Telex 7248801 Telefax (07171)31-4396 Telex 7248825 for Customer

More information

Apollo Top Entry Ball Valves Installation, Operation, & Maintenance Guide

Apollo Top Entry Ball Valves Installation, Operation, & Maintenance Guide I969500.A M13859 Apollo Top Entry Ball Valves Introduction This manual presents guidelines for the Installation, Operation and Maintenance of Apollo Top Entry Ball Valves. Review the entire manual before

More information

- ISO Pneumatic Cylinder

- ISO Pneumatic Cylinder Installation, Operation and Maintenance January 2000 - Series P1E (Lightweight Aluminum Design) 32 mm through 100 mm Index Introduction... 1 Technical Specifications... 1 Constructive Specifications...

More information

Release Date: 05/01/2003 Revision:

Release Date: 05/01/2003 Revision: SPM Well Service Pumps & Flow Control Products Safety Iron Inspection and Maintance Procedure Document P/N: Copyright S.P.M. Flow Control, Inc. 2013. All rights reserved. The manual must not be copied

More information

1 High pressure washer 2 Wheel 3 Inlet connector 4 Outlet connector 5 Handle 6 Trigger gun 7 Detergent bottle. Technical Data:

1 High pressure washer 2 Wheel 3 Inlet connector 4 Outlet connector 5 Handle 6 Trigger gun 7 Detergent bottle. Technical Data: 1 High pressure washer 2 Wheel 3 Inlet connector 4 Outlet connector 5 Handle 6 Trigger gun 7 Detergent bottle Technical Data: Rated pressure Permissible pressure (max.) Inlet (max.) Rated flow Max. flow

More information

BRAKE DRUM AND ROTOR SERVICE INFORMATION

BRAKE DRUM AND ROTOR SERVICE INFORMATION SERVICE INFORMATION To achieve maximum drum life and optimum performance, proper brake maintenance and brake balance are essential. Consult your truck or trailer manufacturer s maintenance manual for proper

More information

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS SETTING UP THE PRESS FOR OPERATION For shipping convenience, the gauge, pump handle, hoist crank, screw nose and base angles

More information

Section 6 Brake Drum Failure Analysis. Brake Drum Wear Conditions. What is Normal Wear? What is Deep or Excessive Wear? WARNING. Deep, Uniform Wear

Section 6 Brake Drum Failure Analysis. Brake Drum Wear Conditions. What is Normal Wear? What is Deep or Excessive Wear? WARNING. Deep, Uniform Wear Section Brake Drum 6 Failure Analysis WARNING To prevent serious eye injury, always wear safe eye protection when you perform vehicle maintenance or service. Figure 6.1 ASBESTOS AND NON-ASBESTOS FIBERS

More information

Baumann 24000SB Barstock Control Valve

Baumann 24000SB Barstock Control Valve Instruction Manual 24000SB Valve Baumann 24000SB Barstock Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Maintenance... 3 Installation... 3 Air Piping... 4 Disassembly...

More information

RIDEWELL VEHICLE AIR SUSPENSION AND RELATED PARTS SPECIFICATIONS, AIR BAGS, SHOCKS, HEIGHT CONTROL VALVE PARTS NUMBERS AND ADJUSTMENTS

RIDEWELL VEHICLE AIR SUSPENSION AND RELATED PARTS SPECIFICATIONS, AIR BAGS, SHOCKS, HEIGHT CONTROL VALVE PARTS NUMBERS AND ADJUSTMENTS RIDEWELL VEHICLE AIR SUSPENSION AND RELATED PARTS SPECIFICATIONS, AIR BAGS, SHOCKS, HEIGHT CONTROL VALVE PARTS NUMBERS AND ADJUSTMENTS AIR SPRING/BAG PARTS NUMBERS FOR '82 FC35RB; 8992 PREFERRED or 8997(LONG

More information

2004 Toyota RAV BRAKES Disc & Drum - RAV4

2004 Toyota RAV BRAKES Disc & Drum - RAV4 1. If master cylinder is rebuilt or reservoir is empty, bleed master cylinder first. Bleed wheels in sequence. Start on wheel with longest hydraulic line, and work toward wheel with shortest hydraulic

More information

Safety and Operation Rx 30, 50, 70

Safety and Operation Rx 30, 50, 70 Safety and Operation Rx 30, 50, 70 Self Reversing Tapping Attachments Safety and Operation Rx 30, 50, 70 Self Reversing Tapping Attachments Safety and Operation Rx 30, 50, 70 Self Reversing Tapping Attachments

More information

Installation Instructions

Installation Instructions 8/18/2004 Dodge Torque Converter 1 DODGE TORQUE -CONVERTER Installation Instructions BD Part # Trans. Application Power Level Truck Year 1060210X 518/618 Non/L N/A 1988-1993 *1070215X 47RH/RE

More information

PROPELLER SHAFT AND UNIVERSAL JOINTS

PROPELLER SHAFT AND UNIVERSAL JOINTS PROPELLER SHAFT AND UNIVERSAL JOINTS 16-1 GROUP 16 PROPELLER SHAFT AND UNIVERSAL JOINTS CONTENTS Page Ball and Trunnion Universal Joint.,... - 4 Center Bearing (SY-1). 8 Center Bearing Height (SY-1)...

More information

RUBBER SLEEVE KNIFE GATE VALVE

RUBBER SLEEVE KNIFE GATE VALVE RUBBER SLEEVE KNIFE GATE VALVE The model knife gate is a wafer valve designed for a wide range of industrial applications. The double-seated design provides bi-directional shut off. The design of the valve

More information

Cast Steel, Bolted Bonnet Gate, Globe & Check

Cast Steel, Bolted Bonnet Gate, Globe & Check 6 5 4 Cast Steel, Bolted Bonnet Gate, Globe & Check DISC NUT Tack We SECTION F-F SCALE 1 : 4 F-14 -ISO 5210 Mounting Flange DETAIL B "Disc Nut retention to Disc " DISC 18.0 457 21 20 eld 10 F F C G 4 17

More information

Truck Maintenance and Servicing Checklist CHECKLIST NUMBER 1. CHECKING FUEL TANK, FUEL LEVEL AND CHANGING FUEL FILTERS Fuel Tanks

Truck Maintenance and Servicing Checklist CHECKLIST NUMBER 1. CHECKING FUEL TANK, FUEL LEVEL AND CHANGING FUEL FILTERS Fuel Tanks Truck Maintenance and Servicing Checklist CHECKLIST NUMBER 1 CHECKING FUEL TANK, FUEL LEVEL AND CHANGING FUEL FILTERS Fuel Tanks 1. Open drain cocks on bottom of tanks and drain off any water present 2.

More information

Instruction Manual MJ522 Mobile Hydraulic Scissor Lift Table 1100 lbs. (500 kg)

Instruction Manual MJ522 Mobile Hydraulic Scissor Lift Table 1100 lbs. (500 kg) Instruction Manual MJ522 Mobile Hydraulic Scissor Lift Table 1100 lbs. (500 kg) Warning! Read this operation manual carefully and understand fully the operating instructions. Improper use of this unit

More information

Instructions and precautions. Fork Height. Visit our website at: http://www.harborfreight.com

Instructions and precautions. Fork Height. Visit our website at: http://www.harborfreight.com Pallet Jack Item 68760 / 68761 Instructions and precautions Specifications Capacity Control Lever Fork Height Fork Length Fork Width Maximum Minimum Width over Forks Steering Wheel Dia. 2-1/2 Ton (5,000

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17) 17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure

More information

1U-5230 (See 4002) ER (See 4002) SINGLE-STAGE AND TWO-STAGE HYDRAULIC HAND PUMP. Max. Pressure: See Pump Data Plate

1U-5230 (See 4002) ER (See 4002) SINGLE-STAGE AND TWO-STAGE HYDRAULIC HAND PUMP. Max. Pressure: See Pump Data Plate SPX Corporation 655 Eisenhower Drive Owatonna, MN 55060-0995 USA Phone: (507) 455-0 Tech. Serv.: (800) 533-67 Fax: (800) 955-839 Order Entry: (800) 533-67 Fax: (800) 83-8665 International Sales: (507)

More information

Wort Cooler Plate Heat Exchanger, Stainless Steel

Wort Cooler Plate Heat Exchanger, Stainless Steel Specifications 057.110.500 057.110.1000 057.110.2000 Number of plates 21 27 37 Construction Fully stainless steel AISI Fully stainless steel AISI Fully stainless steel AISI 316 316 316 Gaskets Nitrile

More information

SINGLE STAGE INLINE FIRE PUMP

SINGLE STAGE INLINE FIRE PUMP MODEL 383 SINGLE STAGE INLINE FIRE PUMP INSTRUCTION AND REPAIR MANUAL NOTE! To the installer: Please make sure you provide this manual to the owner of the equip ment or to the responsible party who maintains

More information