SANTA BARBARA, CURACAO LANDSIDE KARST AQUIFER PIT - A SUSTAINABLE SEAWATER INTAKE SOURCE

Size: px
Start display at page:

Download "SANTA BARBARA, CURACAO LANDSIDE KARST AQUIFER PIT - A SUSTAINABLE SEAWATER INTAKE SOURCE"

Transcription

1 SANTA BARBARA, CURACAO LANDSIDE KARST AQUIFER PIT - A SUSTAINABLE SEAWATER INTAKE SOURCE George A. Schlutermann, P.G., PB Americas, Inc., Orlando, FL William Conlon, P.E., DEE, F.ASCE,Doosan Hydro Technology, Inc., Tampa, FL Brian Megic, P.E., PB Americas, Inc., Orlando, FL Ing. Henry L. Demei, Aqualectra Production, Curaçao, N.A. Abstract The project was part of the newly constructed Seawater Reverse Osmosis Plant in Santa Barbara, Curacao, N.A. Initially, the plan was to construct a pump house near the sea edge, which involved excavating a pit to a depth of about 8 meters. The geological setting of the project site is a formation which is a complex coral limestone (calcilutite) with a young karst surface. For dewatering purposes, sheet piles were installed in a rectangular arrangement. Due to the large inflow of groundwater into the sheet pile area, the contractor believed that dewatering the pit would not be possible. Rather than construct a pumping station within the pit, it was decided to investigate the use of the pit as a sustainable seawater intake source. By the end of September 2004, several pump tests were carried out which showed that high pumping capacities would likely be feasible from the coral limestone pit. The remaining question was the sustainability of the supply which resulted in continued testing in October and November. A three-dimensional numerical groundwater flow model was developed to represent conditions in the vicinity of the test pit. This model was used due to the non-homogeneous lithology of the site. Each pumping rate was operated until steady-state conditions had been reached. A calibrated flow model was used to perform various simulations to test the effects of the different flow conditions on the drawdown inside the pit. Two of the simulations included lining the pit floor with concrete, a possible final design of the proposed seawater intake pit. The analyses results indicated that the intake pit would be sufficient to provide seawater for all proposed operational ranges for the projected 20-year life of the project, and would be sufficient to provide seawater up to 4.5 times the maximum pumping rate.

2 SANTA BARBARA, CURAÇAO LANDSIDE KARST AQUIFER PIT A SUSTAINABLE SEAWATER INTAKE SOURCE Background The production of all power and potable water for the Island of Curaçao, Netherlands Antilles is carried out by Aqualectra Production at its facility at Mundo Nobo, situated about 2 kilometers to the west of the capital, Willemstad. Aqualectra Production management made the decision to reduce their dependence on thermal desalination processes and to decentralize their thermal and reverse Figure 1. Location Map osmosis water treatment capacity from the existing location at Mundo Nobo. It has been determined that ultimately all Aqualectra water and power production capacity at Mundo Nobo would be relocated elsewhere on the island to make way for new tourist infrastructure on the present site. In addition, Aqualectra Production has been concerned over the rising cost of fuel for its thermal processes and the effects on its water tariff. The first such move towards decentralization was to commission the construction by Suez Degrémont of the 18,000 m3/day Santa Barbara Seawater Reverse Osmosis (SWRO) Plant adjacent to Fuikbaai in Santa Barbara approximately 13 km to the east of the capital, as shown in Figure 1. Initially, the plan was to construct a seawater pump house and use a seawater intake as the source of supply. This would have required the installation of an HDPE conduit pipe across Fuikbaai, through an inlet channel, across an environmentally sensitive reef, and down the sea slope with the intake about 600 meters off shore. In order to construct the original planned seawater pump house, a pit was excavated in the young karst limestone to a depth of approximately 8 meters. For dewatering Figure 2. A rectangular pit was excavated with sheet piles driven into the coral limestone.

3 purposes, sheet piles were installed in an 8 meter by 17 meter rectangular arrangement, as shown in Figure 2. Due to the large inflow of groundwater into the sheet pile area, it was determined by the contractor that dewatering the pit would not be possible with conventional means (a 700 m3/hr pump was attempted). General Geology Neogene and Quaternary calcareous sediments cover large parts of the surface of Curaçao, which were deposited dome-like over a series of much thicker Upper Cretaceous and Lower-Tertiary volcanics and sediments. The Neogene and Quaternary carcareous rocks were formed mainly as a result of reef growth in relatively restricted shallow areas of the seas. The geological setting of the project site, as shown in Figure 3, is in the Lower Terrace Formation, which is described as faintly dipping (2 degrees), approx 600 m (NE side) to 200 m (SW side) wide coastal zone of limestone rocks. The basal plane of the Lower Terrace limestones rapidly dips below sea level and the basal plane near the cliff fronts may be situated at a depth of 20 m (or even more) below the surface of the sea. The Lower terrace complex is maximum 35 m thick, the upper part of which are m above sea level. The Lower Terrace limestone of the island has almost everywhere a young karst surface. The Lower Terrace limestone is as a rule sufficiently permeable to drain the rain water in a vertical direction. Figure 3. Map of Sta. Barbara, Curaçao Local Project Site Geology The site is located near the Fuikbaai were the Lower Terrace Formation is present (Figure 4). From the borehole drilled at the location of the proposed pit, the geology is described as follows: One borehole has been sunk at the pump station site to a depth of m below ground surface. Here also moderately strong porous coral limestone is present with solution Figure 4. Geological Section of Sta. Barbara Region2

4 cavities up to 110 cm. The top 1.2 m is strong coral limestone (calcilutite). At several depths thin layers of much stronger coral limestone (calcilutite) are present too... 1 The Initial Challenges The initial challenges were two-fold: first, the inability to pump down the site for the seawater pump station; and second, there was difficulty in obtaining vital permits necessary for the source of supply and residuals disposal. Normally, permits are in place before a project is released for bidding. If the permits are not obtained, serious project delays and cost overruns can occur. It was initially assumed by the contractor and client that permitting for the designed intake and outfall lines would be routine and easy. After bidding and contractor selection, the construction began concurrently with the permitting efforts. Two adjacent property owners and five government agencies objected to the permitting associated with the intake line. Rather than constructing a pumping station within the pit and the planned intake line, it was decided to investigate the use of a karst aquifer pit as a sustainable seawater intake source. If feasible, this would resolve two problems; the inability to pump the pit down for the pump station construction and the issues related to obtaining an intake line permit. Pumping Test To investigate this alternative, a large scale pumping test was required. This pumping test was originally planned to start on September 21, 2004, but was abandoned a week later as the pumping capacity of 3,500 m 3 /hr (the future maximum capacity of the facility) could not be reached with the pumps available at the time of the test. Other pumps had to be located which was a time consuming operation, as only a few large capacity pumps are available on Curaçao. It was decided that all pump test efforts would be halted until the design capacity of 3,500 m 3 /hr was available, installed, and working properly. A testing program was prepared in the meantime by PB and GeoCom. Figure 5. George Schlutermann and a Suez Degremont employee estimate flow from the discharge pipes during the long term pumping test of the pit. Prior to October 18, 2004, a total of 10 pumps were installed, tested, and calibrated for their actual discharge capacity. The water flow from all pumps was measured using the Carpenter Square method 3 as shown in Figure 5. This empirical method was used daily to calculate flow. A magnetic flowmeter was provided and

5 installed by Aqualectra for several days on one of the discharge pipes. The flow recorded by the installed flowmeter was compared with the flow using the Carpenter Square method. The calibrated capacities of the pumps are given in Table 1. As a result of this comparison, measured flows from other pumps were calibrated. Figure 6. Location of Pumps and Suction Hoses during Pit Test The location plan of the ten pumps and the suction hoses are displayed in Figure 6. Prior to the pump test, the sheet pile construction was opened by cutting several holes into the sheet pile wall to allow free draining of water in and out of the sheet pile pit area. A total of five water level observation points were established: 1 inside the pit, 1 outside the pit, 2 monitoring wells located between the sea and the pit site, and 1 at the observed sea front. These points were marked with red paint, their heights surveyed, and distances relative to the seafront were tape measured. The pumping test started on October 18, Water level measurements and water quality sampling were taken 24 hours per day. Pumping was performed in four steps of 1200 (step 1), 2500 (step 2), 3100 (step 3), and 3500 m 3 /hr (step 4) until November 2, Each pumping rate was operated for a long enough period for steady-state conditions to have been reached, as shown in Figure 7. At the end of the pump test, a full scale recovery test was carried out until November 7, Afterward, a long-term pumping test was conducted at the initial design rate of 2,500 m 3 /hr (the current capacity of the facility) to monitor water quality on a long-term basis. It was observed that the difference in drawdown between each pumping rate was about 0.2 m in all four land side observation points. A maximum drawdown of 0.69 m was observed inside the pit at a pumping rate of 3,500 m 3 /h. The water elevation in the sea was not impacted by the pumping test. Following the pumping test, a recovery test was carried out. The objective of the recovery test was to record the time required for the groundwater at vicinity of the pit site to reach its initial head. Full recovery of the water level inside the pit was achieved approximately 8 hours after initiation of the test. After completion of the recovery test, it was noticed that the average water level inside the pit was similar to the average water level observed in the sea. Average water level elevations at both locations were approximately 0.2 m. This similarity appeared to be due to the proximity of both locations, which was approximately 90 m.

6 Groundwater Flow Model and Analysis PB developed a three-dimensional numerical groundwater flow model to represent conditions in the vicinity of the test pit. The finite-difference MODFLOW code of the U.S. Geological Survey (USGS) 4 was used to develop the flow model. A numerical model was used in lieu of an analytical model due to the nature of the layout of the pit site. Both the shape and size of the pit would not be accurately represented using an analytical solution as these solutions were typically developed to analyze borehole (cylindrical) wells and are not effective at representing large irregular open water bodies. Another limitation of using analytical procedures is that they are typically for homogeneous aquifers. It was felt that the young karst limerock aquifer at the test pit had a higher horizontal hydraulic conductivity than vertical hydraulic conductivity which can not be adequately represented by an analytical solution. MODFLOW allows the user to easily modify any parameter and evaluate its impact on the area of study. A dense horizontal and vertical grid was used in the model to simulate the horizontal and vertical water flows in the vicinity of the pit site. The total thickness of the unconfined aquifer was estimated to be approximately 30 m. Based on water level observations recorded at the seafront monitoring location during the pumping test, the average sea level was estimated to be 0.2 m above sea level. Water levels recorded at the seafront, in the test pit, and at monitoring wells 1 and 2 during periods of no pumping indicate that minimal to no hydraulic gradient exists between the pit and the sea front. Due to this, the starting heads of all cells in the model were set at 0.2 m. The vertical dimension of the groundwater flow model was represented by four layers, with a thickness of 5.8 m, 5 m, 5 m and 11.4 m for layers 1, 2, 3, and 4, respectively. The thickness of layer 1 was set at the approximate depth of the pit below the model starting head. The remaining 21.4 m of aquifer below the starting heads in the model was divided into three layers. The thickness of layers 2 and 3 were set at a thickness similar to layer 1 but smaller than layer 4 as to better simulate potential vertical flow that may be occurring near the test pit due to pumping. This was considered reasonable as layer 4 is likely deep enough below the pit as to not be a significantly active portion of the flow field. The horizontal model domain covered 10,200 m x 20,000 m, and cell sizes ranged from 100 m x 100 m at distance to 0.5 m x 0.5 m in the vicinity of the pit site. The model represents groundwater flow between the sea and the pit site, and the inland area surrounding the pit site. A constant head boundary of 0.2 m was used along the seawater front in layer 1 of the model. This layer was calculated as the average sea level observed at the ocean monitoring location during the pumping test. No-flow boundaries were used along the lateral sides of the grid as well as the inland area of model layer 1, except for one cell in each of the inland model corners, which were set as constant head. No-flow boundaries were chosen for the non-seawater front sides of the model as to not allow artificial flow from outside the model boundaries into the model domain. No-flow boundaries are a conservative boundary condition. The constant head boundaries set at the two inland corners of the model were chosen for model stability. No-flow boundaries were set for all model sides of layers 2, 3, and 4 for conservatism.

7 Initial horizontal conductivity values were assigned based on an estimated transmissivity calculated using the method of images (wells near boundaries) 5 and from the specific capacities (pumped flow/drawdown) calculated during the pump test. Transmissivity was converted to horizontal hydraulic conductivity using the assumed thickness of each layer. Transmissivity was assumed to be the same for each of the flow model layers. The excavated area of the test pit is effectively an open water body; therefore, a transmissivity value of 300,000 m 2 /d was assigned within the limits of the test pit in layer 1 to simulate a smooth water surface. Initial horizontal and vertical anisotropy ratios of 1 were assumed. The horizontal anisotropy factor represents the ratio of horizontal hydraulic conductivity in the two principle directions of the model, which in a homogenous or isotropic aquifer is equal to one. The vertical anisotropy factor represents the ratio of horizontal hydraulic conductivity to vertical hydraulic conductivity, which in a homogenous or isotropic aquifer is equal to one. The anisotropy factors were later adjusted to 10 as part of a sensitivity analysis of the hydraulic parameters. Horizontal and vertical conductivity values were adjusted during the model calibration to obtain a reasonable fit to head values observed at the four observation points. The leakance (or leakage coefficient ) is defined as the ratio of the vertical hydraulic conductivity of a semi-confining unit to its thickness. Leakance arrays were required in the model to represent the three semi-confining units between the four aquifer layers. It is important to note that there is not true confinement between the four modeled aquifer layers. However, MODFLOW requires a layer between the active horizontal layers for model stability. To simulate this system as accurately as possible a semi-confining unit of zero thickness was assigned between the aquifer layers. Leakance values for these units were calculated based on the vertical hydraulic conductivity and thickness of the active layers above and beneath the unit. This equation can be expressed as follows: L Z 2K 1 1 Z 2 2 v1 K v 2 where: L is the effective leakance, [T -1 ]; Z 1 is the thickness of Layer 1, [L]; Z 2 is the thickness of Layer 2, [L]; K v1 is the vertical hydraulic conductivity of Layer 1, [LT -1 ]; K v2 is the vertical hydraulic conductivity of Layer 2 [LT -1 ]. Leakance was then adjusted during model calibration based on calibration adjustments made to hydraulic conductivity. Rainfall at the site was collected during the pumping test; however, no estimates of evaporation or evapotranspiration (ET) at the test pit were available. Due to this, a net recharge (rainfall minus ET) to the aquifer could not be estimated. As previously discussed, there appears to be little to no hydraulic gradient between the pit site and the seafront. This

8 is an indication that rainfall is not contributing a significant amount of recharge to the groundwater system to cause a significant ambient hydraulic gradient. In addition, the test pit is close to and greatly influenced by the sea and (based on water quality testing) is significantly seaward of any saltwater/freshwater interface that exists in the aquifer landward of the test pit. For each of the above reasons, a recharge rate of zero was initially assigned to the model. The MODFLOW ET package was not used due to the lack of data. As part of model calibration, the test pit was simulated using the MODFLOW hydraulic flow barrier package to represent the sheet pile wall. Small openings in the hydraulic flow barrier were assigned to simulate the sheet piles that were removed prior to the pump test. During calibration, vertical water level variations within each model cell were computed and compared to the observed drawdown recorded at the test pit during the pumping test performed in October This was done by creating observation points in MODFLOW at the locations of the four land side monitoring locations in the test pit area. A steady state calibration was performed in the vicinity of the pit site using a pumping rate of 3,500 m 3 /h. The calibration was a reasonable representation of the observed head field between the seafront and the pit site. No observed data was available to perform a calibration of the model at the inland areas away from the pit site. Transmissivity values of 22,000 m 2 /d and 7,300 m 2 /d were estimated initially using horizontal anisotropy factors of 1 and 10, respectively. Transmissivity values of 39,600 m 2 /d and 22,000 m 2 /d were estimated using vertical anisotropy factors of 1 and 10, respectively. The anisotropy factors were varied as part of a sensitivity analysis because little information on the variation between horizontal and vertical hydraulic conductivities of the aquifer near the test pit was available. Anisotropy factors of 10 were chosen as an estimate that would provide a reasonable range of transmissivity values. It was assumed that horizontal hydraulic conductivity toward (perpendicular to) the sea was greater than horizontal hydraulic conductivity parallel to the sea and that horizontal hydraulic conductivity was greater than vertical hydraulic conductivity for the following reasons: The limestone aquifer is known to have been deposited in relatively horizontal layers, which is evident in the excavated area of the test pit. Fissures and areas of dissolution in the aquifer observed in the excavated test pit are predominantly horizontal. Though minimal, the groundwater gradient is toward the sea. A short pump test was performed before several of the individual sheet piles were removed from the sheet pile wall. During this pump test, drawdown in the test pit was approximately 2.3 m at a flow rate of 1,200 m 3 /h. This is significantly greater than the approximately 0.7 m of drawdown observed at a flow rate of 3,500 m 3 /h during the pumping test performed after several sheet piles were removed. This is a strong indication that the horizontal conductivity is greater than the vertical hydraulic conductivity (anisotropy factor > 1). For each of the reasons noted above, an anisotropy factor less than 1 was not simulated.

9 Pumping Test Performed at the Test Pit 1,200 m 3 /h 2,500 m 3 /h 3,100 m 3 /h 3,500 m 3 /h Recovery Test 10/17 10/18 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10/27 10/28 10/29 10/30 10/31 11/1 11/2 11/3 11/4 11/5 11/6 Step 1 Date Step 2 Step 3 Step 4 Figure 7. Water level elevation verses time. Seafront Well 2 Well1 Outside Pit Inside Pit W a t e r E le v a t io n ( m N M P )

10 Model Simulations to Assess Sustainability A calibrated flow model was used to perform various simulations to test the effects of the different flow conditions on the drawdown inside the karst aquifer pit. Below is a brief summary of the simulations performed: Simulation 1: This simulation was performed at a maximum proposed pumping rate of 3,500 m 3 /h and a horizontal anisotropy factor 1. For this simulation the horizontal flow barrier was removed assuming free flow of water from all four walls and the bottom of the pit. A transmissivity value of 22,000 m 2 /d was assigned, as found in the calibration runs. Simulation 2: This simulation was performed at a pumping rate of 15,772.5 m 3 /h (100 MGD) and a horizontal anisotropy factor 1. For this simulation the horizontal flow barrier was removed assuming free flow of water from all four walls and the bottom of the pit. A transmissivity value of 22,000 m 2 /d was assigned, as found in the calibration runs. Simulation 3: This simulation was performed at a maximum proposed pumping rate of 3,500 m 3 /h and a horizontal anisotropy factor of 10. For this simulation the horizontal flow barrier was removed assuming free flow of the water from all four walls and the bottom of the pit. A transmissivity value of 7,300 m 2 /d was assigned, as found in the calibration runs. Simulation 4: This simulation was performed at a pumping rate of 15,772.5 m 3 /h (100 MGD) and a horizontal anisotropy factor of 10. For this simulation the horizontal flow barrier was removed assuming free flow of the water from all four walls and through the bottom of the pit. A transmissivity value of 7,300 m 2 /d was assigned, as found in the calibration runs. Simulation 5: This simulation was performed at a maximum proposed pumping rate of 3,500 m 3 /h and a horizontal anisotropy factor of 1. For this simulation the horizontal flow barrier was removed assuming free flow of the water from all four walls of the pit. An impermeable barrier was assigned between layers 1 and 2, assuming no flow between the layers. This was done by assigning a leakance of 0 days -1 between model layers 1 and 2 in order to simulate the effect of lining the bottom of the pit with concrete. A transmissivity value of 22,000 m 2 /d was assigned, as found in the calibration runs. Simulation 6: This simulation was performed at a maximum proposed pumping rate of 3,500 m 3 /h and a horizontal anisotropy factor of 10. For this simulation the horizontal flow barrier was removed assuming free flow of the water from all four walls of the pit. An impermeable barrier was assigned between layers 1 and 2, assuming no flow between the layers. This was done by assigning a leakance of 0 d -1 between model layers 1 and 2 in order to simulate the effect of lining the bottom of the pit with concrete. transmissivity value of 7,300 m 2 /d was assigned, as found in the calibration runs. Simulations 5 and 6 include a concrete lined pit floor. This was done as a sensitivity analysis to bracket the solution. At the time this analysis was being performed the final pit could have been potentially designed with no further improvements to the bottom, with an impermeable lined bottom, or something in between. Simulating no lining and an impermeable lining in two different scenarios assists in bracketing the solution for a wide range of potential pit A

11 floor designs. Though these simulations were performed to assist the designers of the test pit, design of the pit is outside the scope of this analysis and no further consideration of the design of the pit was conducted. Results of the model simulations are summarized below. Simulation 1: Assuming horizontal conductivity values of 3,793 m/d, 4,400 m/d, 4,400 m/d and 1,930 m/d for layers 1, 2, 3 and 4 respectively (T=22,000 m 2 /d), a maximum drawdown of 0.65 m was simulated inside the pit for a pumping rate of 3500 m 3 /h. The results for simulation 1 are summarized in Table 1. Table 1. - Computed Results for Simulation 1 Observation Points Initial Water Elevation (m) Final Water Elevation (m) Drawdown (m) Inside Pit Outside Pit Well Well Simulation 2: Assuming horizontal conductivity values of 3,793 m/d, 4,400 m/d, 4,400 m/d and 1,930 m/d for layers 1, 2, 3 and 4 respectively (T=22,000 m 2 /d), a maximum drawdown of m was simulated inside the pit for a pumping rate of 100 MGD. The results for simulation 2 are summarized in Table 2. Table 2. - Computed Results for Simulation 2 Observation Points Initial Water Elevation (m) Final Water Elevation (m) Drawdown (m) Inside Pit Outside Pit Well Well Simulation 3: Assuming horizontal conductivity values of 1,259 m/d, 1,460 m/d, 1,460 m/d and 640 m/d for layers 1, 2, 3 and 4 respectively (T=7,300 m 2 /d), a maximum drawdown of m was simulated inside the pit for a pumping rate of 3500 m 3 /h. The results for simulation 3 are summarized in Table 3. Table 3. - Computed Results for Simulation 3 Observation Points Initial Water Elevation (m) Final Water Elevation (m) Drawdown (m) Inside Pit Outside Pit Well Well Simulation 4: Assuming horizontal conductivity values of 1,259 m/d, 1,460 m/d, 1,460 m/d and 640 m/d for layers 1, 2, 3 and 4 respectively (T=7,300 m 2 /d), a maximum drawdown of m was simulated inside the pit for a pumping rate of 100 MGD. The results for simulation 4 are summarized in Table 4.

12 Table 4. - Computed Results for Simulation 4 Observation Points Initial Water Elevation (m) Final Water Elevation (m) Drawdown (m) Inside Pit Outside Pit Well Well Simulation 5: Assuming horizontal conductivity values of 3,793 m/d, 4,400 m/d, 4,400 m/d and 1,930 m/d for layers 1, 2, 3 and 4 respectively (T=22,000 m 2 /d) and an impermeable liner at the bottom of the pit, a maximum drawdown of m was simulated inside the pit for a pumping rate of 3500 m3/h. The results for simulation 5 are summarized in Table 5. Table 5. - Computed Results for Simulation 5 Observation Points Initial Water Elevation (m) Final Water Elevation (m) Drawdown (m) Inside Pit Outside Pit Well Well Simulation 6: Assuming horizontal conductivity values of 1,259 m/d, 1,460 m/d, 1,460 m/d and 640 m/d for layers 1, 2, 3 and 4 respectively (T=7,300 m 2 /d), and an impermeable liner at the bottom of the pit, a maximum drawdown of m was simulated inside the pit for a pumping rate of 3500 m 3 /h. The results for simulation 6 are summarized in Table 6. Table 6. - Computed Results for Simulation 6 Observation Points Initial Water Elevation (m) Final Water Elevation (m) Drawdown (m) Inside Pit Outside Pit Well Well Simulations varying the vertical anisotropy factor were ultimately not performed since the transmissivity calculated from the calibration simulation with a vertical anisotropy factor of 10 was 1.8 times higher than calculated with a vertical anisotropy factor of 1. Therefore, use of a vertical anisotropy factor of 1 is a more conservative assumption. The following conclusions were made from the results of the theoretical modeling: A drawdown of 0.7 m is predicted inside the pit by simulating a pumping rate of 3,500 m 3 /h (well above the proposed pumping rate). This is 5.1 m above the bottom; therefore, the pit is expected to provide sufficient water for all operational pumping rates equal to or lower than the ultimate proposed pumping rate of 3,500 m 3 /h, even considering tidal fluctuations. The predictive groundwater flow modeling scenarios performed as part of this study were steady-state simulations (performed until water levels reached equilibrium at the

13 simulated pumping rate). Due to this, with the exception of any unforeseen or out of historically observed conditions, it is reasonable to assume that the test pit should be sufficient to provide water for the proposed operational range for the projected 20-year life of the project. A maximum drawdown of 4.6 m was simulated by assuming a pumping rate of 20,631 m 3 /hr (100 Million Gallons Per Day). This results in a water level approximately 1.2 m above the pit bottom. This flowrate is 4.5 times the maximum proposed pumping rate. Therefore, the total inflow coming into the pit appears to be sufficiently large to allow the withdrawal of water within and above the proposed operational pumping ranges. The water levels simulated in the groundwater flow model are average water levels. Tidal effects were removed from the modeling analysis for simplicity; however, it can not be neglected. During the pump test, water levels appeared to vary approximately 0.2 m about average sea level due to tidal fluctuations. PB was provided information from Aqualectra that the maximum observed historic fluctuation in sea level due to the tides was 0.4 m. Average sea level during the test also appeared to vary and was typically above 0 m. The average sea level assumed in the groundwater flow modeling was 0.2 m. Considering the above points, water levels could be up to 0.6 m lower than simulated in the modeling due to tidal effects. Considering this offset in the worst-case model simulation, the total drawdown in the pit would be approximately 5.2 m (compared to 4.6 m). The resulting water level is still above the pit bottom, but may be getting too close to the pump intake elevations to be operationally feasible. Assuming an impermeable lining between layer 1 and 2 (i.e., a concrete lined pit bottom) did not result in unacceptable drawdown in the test pit. This indicates that the inflow coming through the bottom of the pit appears to be considerably less than the horizontal flow coming through the walls. Conclusions Based on the water level analyses performed by PB the following general conclusion can be made about the sustainability of the karst aquifer on this project. The karst aquifer pit is predicted to be sufficient to provide seawater for all proposed operational ranges for the projected 20-year life of the project. The karst aquifer pit appears sufficient to provide seawater at up to 4.5 times the maximum pumping rate utilized during the pump test. The construction of the final pit and seawater pump station was completed in July, 2005 with follow-up performance testing in the fall of Figure 8 Figure 8 Completed Pit

14 shows the completed pit. The use of the pit commenced in early October, 2005 with official inauguration of the plant occurring on January 19, References: 1 Geonviro consultancy b.v., 22 November 2003, Geotechnical investigation for Reverse Osmosis Plant Santa Barbara, Curaçao (N.A.) 2 P.H. De Buisonjé, 1974, Neogene & Quaternary Geology of Aruba, Curaçao and Bonaire (Netherlands Antilles) 3 Fletcher G. Driscol, Carpenter Square method is described in Groundwater and Wells, 2 nd Edition, Appendix 16.E. 4 United States Geological Survey (USGS), 1996, Simulation Analysis of the Groundwater Flow System in the Portland Basin, Oregon and Washington. United States Geological Survey Water-Supply Paper 2470-B, Clark County, Washington. 5 Bear, J., Hydraulics of Groundwater. McGraw-Hill Series in Water Resources and Environmental Engineering. Biographical Sketches George Schlutermann, P.G. is a supervising hydrogeologist and project manager with PB Americas, Inc., in Orlando, Florida. George has been working as a consultant for 18 years, 14 with PB. His work experience involves leading hydrogeological studies, reclaimed water facilities design, water supply planning, large production well design, permitting, construction and testing, and groundwater monitoring wells systems design, construction, and permitting. George is a member of the NGWA (AGWSE), AWRA, ASCE, and the AWWA. George is a registered Geologist in the State of Florida and Arizona and a registered Geoscientist in the State of Texas. Address: 100 E. Pine Street, Suite 500, Orlando, FL Bill Conlon, P.E., DEE, F.ASCE is Senior Vice President and Chief Engineer for Doosan Hydro Technology in Tampa, Florida. Bill has been a consulting engineer for over 35 years. He is experienced in all areas of water and wastewater management, operations and design, and he has been a pioneer in the application of reverse osmosis, ultrafiltration, and membrane system components to municipal water treatment. He has initiated innovative plant designs that significantly reduced treatment plant operating costs. Bill is an internationally recognized specialist in the design and operation of membrane process treatment systems. Address: 9001 Brittany Way, Tampa, FL Brian Megic, P.E., is a water resources engineer and project manager with PB Americas, Inc. in Orlando, Florida. Brian has a broad-based background in civil and environmental

15 engineering. In his 7 years with PB he has worked on numerical and analytical groundwater modeling (natural systems analysis and modeling), water resources planning, reclaimed water and water system design, environmental permitting, aquifer performance testing and analysis, hydrogeologic investigations, site development, hydrologic design and analysis including stormwater master planning, cost estimating, pipe network and hydraulic analysis, and pipeline design. Brian is a registered professional engineer in both Florida and Texas. Address: 100 E. Pine Street, Suite 500, Orlando, FL Ing. Henry L. Demei has a mechanical engineering background (energy) in the position of Manager Projects Bureau at Aqualectra Production in Curaçao, Netherlands Antilles. In this position he is in charge of all technical projects ranging from desalination plant, power plants, civil and building projects, retrofitting of existing plants and components, innovative projects such as solar energy and cold water pipe. Furthermore, more he has a vast experience in the maintenance of power and desalination plants. Henry has more than 30 years experience in the aforementioned fields. Address: Rector Zwijssenstraat 1 P.O. Box 2097, Curaçao, N.A.

Principles of groundwater flow

Principles of groundwater flow Principles of groundwater flow Hydraulic head is the elevation to which water will naturally rise in a well (a.k.a. static level). Any well that is not being pumped will do for this, but a well that is

More information

ALL GROUND-WATER HYDROLOGY WORK IS MODELING. A Model is a representation of a system.

ALL GROUND-WATER HYDROLOGY WORK IS MODELING. A Model is a representation of a system. ALL GROUND-WATER HYDROLOGY WORK IS MODELING A Model is a representation of a system. Modeling begins when one formulates a concept of a hydrologic system, continues with application of, for example, Darcy's

More information

GROUNDWATER FLOW NETS Graphical Solutions to the Flow Equations. One family of curves are flow lines Another family of curves are equipotential lines

GROUNDWATER FLOW NETS Graphical Solutions to the Flow Equations. One family of curves are flow lines Another family of curves are equipotential lines GROUNDWTER FLOW NETS Graphical Solutions to the Flow Equations One family of curves are flow lines nother family of curves are equipotential lines B C D E Boundary Conditions B and DE - constant head BC

More information

Boundary Conditions of the First Kind (Dirichlet Condition)

Boundary Conditions of the First Kind (Dirichlet Condition) Groundwater Modeling Boundary Conditions Boundary Conditions of the First Kind (Dirichlet Condition) Known pressure (velocity potential or total heard) head, e.g. constant or varying in time or space.

More information

4 Water supply description

4 Water supply description 4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps

More information

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM DATE: December 04, 1996 This document is subject to change. If in doubt, verify current status with Technical Services

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

Groundwater Training Course SOPAC, April 2005. Electromagnetic (EM) Induction method for Groundwater Investigations

Groundwater Training Course SOPAC, April 2005. Electromagnetic (EM) Induction method for Groundwater Investigations Groundwater Training Course SOPAC, April 2005 Electromagnetic (EM) Induction method for Groundwater Investigations Electromagnetic (EM) Induction Method Basic principle: An AC electric current is applied

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

14.330 SOIL MECHANICS Assignment #4: Soil Permeability.

14.330 SOIL MECHANICS Assignment #4: Soil Permeability. Geotechnical Engineering Research Laboratory One University Avenue Lowell, Massachusetts 01854 Edward L. Hajduk, D.Eng, PE Lecturer PA105D Tel: (978) 94 2621 Fax: (978) 94 052 e mail: Edward_Hajduk@uml.edu

More information

How To Map A Lake In The North Of The Holland (Fiji)

How To Map A Lake In The North Of The Holland (Fiji) 1. Hydrogelogical mapping Jiri Sima Aim of HG map Groundwater and rocks qualitative permeability and quantitative potential of rock units aquifers / aquitards / aquiclides Water points (spatial distribution

More information

STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM

STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM Solid Waste Management Program Waste Management Division 103

More information

Information Request 14

Information Request 14 Information Request 14 Information Request 14 14-1 Responses to Information Request 14 Response to Information Request 14a Response to Information Request 14b Response to Information Request 14c Response

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

AQUIFER STORAGE RECOVERY

AQUIFER STORAGE RECOVERY AQUIFER STORAGE RECOVERY This continuing education unit has been created to acquaint the reader with the topic of Aquifer Storage Recovery. The International School of Well Drilling gratefully acknowledges

More information

Update on Aquifer Storage and Recovery

Update on Aquifer Storage and Recovery Update on Aquifer Storage and Recovery Dean Powell Bureau Chief Water Supply Bureau Governing Board Workshop September 2013 Objectives Discuss the basics of aquifer storage and recovery (ASR) technology

More information

3D-Groundwater Modeling with PMWIN

3D-Groundwater Modeling with PMWIN Wen-Hsing Chiang 3D-Groundwater Modeling with PMWIN A Simulation System for Modeling Groundwater Flow and Transport Processes Second Edition With 242 Figures and 23 Tables 4y Springer Contents 1 Introduction

More information

P02 Calibration of Density Driven Flow Model for the Freshwater Lens beneath the North Sea Island Borkum by Geophysical Data

P02 Calibration of Density Driven Flow Model for the Freshwater Lens beneath the North Sea Island Borkum by Geophysical Data P02 Calibration of Density Driven Flow Model for the Freshwater Lens beneath the North Sea Island Borkum by Geophysical Data H. Sulzbacher (LIAG), H. Wiederhold* (LIAG), M. Grinat (LIAG), J. Igel (LIAG),

More information

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey IV. PROPOSED PLAN FOR AMD ABATEMENT GOALS AND OBJECTIVES Although the major natural resource in the Wyoming Valley is anthracite coal*, its importance to the present and future economy of the area is limited

More information

Groundwater flow systems theory: an unexpected outcome of

Groundwater flow systems theory: an unexpected outcome of Groundwater flow systems theory: an unexpected outcome of early cable tool drilling in the Turner Valley oil field K. Udo Weyer WDA Consultants Inc. weyer@wda-consultants.com Introduction The Theory of

More information

CHAPTER: 6 FLOW OF WATER THROUGH SOILS

CHAPTER: 6 FLOW OF WATER THROUGH SOILS CHAPTER: 6 FLOW OF WATER THROUGH SOILS CONTENTS: Introduction, hydraulic head and water flow, Darcy s equation, laboratory determination of coefficient of permeability, field determination of coefficient

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida GWPC September 27, 2015 Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida Virginia Walsh, PhD, P.G. Miami-Dade Water and Sewer Department Ed Rectenwald, P.G. MWH

More information

Ground-Water-Level Monitoring and the Importance of Long-Term Water-Level Data U.S. Geological Survey Circular 1217

Ground-Water-Level Monitoring and the Importance of Long-Term Water-Level Data U.S. Geological Survey Circular 1217 Ground-Water-Level Monitoring and the Importance of Long-Term Water-Level Data U.S. Geological Survey Circular 1217 by Charles J. Taylor William M. Alley Denver, Colorado 2001 U.S. DEPARTMENT OF THE INTERIOR

More information

ATTACHMENT 8: Quality Assurance Hydrogeologic Characterization of the Eastern Turlock Subbasin

ATTACHMENT 8: Quality Assurance Hydrogeologic Characterization of the Eastern Turlock Subbasin ATTACHMENT 8: Quality Assurance Hydrogeologic Characterization of the Eastern Turlock Subbasin Quality assurance and quality control (QA/QC) policies and procedures will ensure that the technical services

More information

How To Build An Effluent Recovery Scheme

How To Build An Effluent Recovery Scheme NGEST Effluent Recovery Scheme tekopohjavettä jätevedestä 6.10.2010 / Suvi Niini NGEST Effluent Recovery Scheme Part of a larger Northern Gaza Emergency Sewage Treatment Project (NGEST) with several donors

More information

Construction sites are dewatered for the following purposes:

Construction sites are dewatered for the following purposes: 9. DEWATERING CONTROL OF GROUNDWATER Construction of buildings, powerhouses, dams, locks and many other structures requires excavation below the water table into water-bearing soils. Such excavations require

More information

Differentiation Summary. Revolutionizing Water Clean-Up Opportunities

Differentiation Summary. Revolutionizing Water Clean-Up Opportunities Differentiation Summary Revolutionizing Water Clean-Up Opportunities NanoClear is a water clean-up process that affordably and efficiently converts salt, brackish or waste water into pure, usable water.

More information

LAPLACE'S EQUATION OF CONTINUITY

LAPLACE'S EQUATION OF CONTINUITY LAPLACE'S EQUATION OF CONTINUITY y z Steady-State Flow around an impervious Sheet Pile Wall Consider water flow at Point A: v = Discharge Velocity in Direction Figure 5.11. Das FGE (2005). v z = Discharge

More information

Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506. Presented by:

Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506. Presented by: Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com A weir is basically an obstruction in an open channel

More information

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013 How to Estimate the Cost of Support of Excavation for Foundation Installation CPE Candidate No. 0113013 May 15, 2013 1 How to Estimate the Cost of Support of Excavation for Foundation Installation Table

More information

A History and Overview of the Barnett Shale

A History and Overview of the Barnett Shale A History and Overview of the Barnett Shale Drilling The Dale Operating / Fourth Street 'A' Gas Unit #1H, East Downtown Fort Worth, Texas October, 2006, Courtesy of Dale Operating, Photo by Mike Fuentes

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN)

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) *Reza Naghmehkhan Dahande 1 and Ahmad Taheri 2 1 Department of Civil Engineering-Water Management, Islamic Azad

More information

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting Coastal

More information

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department

More information

Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico

Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico Daniel Yeh 1, Pacia Hernandez 1, Thomas Burke 2, Paul Stanek 2, Ken Stidham

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

How Did These Ocean Features and Continental Margins Form?

How Did These Ocean Features and Continental Margins Form? 298 10.14 INVESTIGATION How Did These Ocean Features and Continental Margins Form? The terrain below contains various features on the seafloor, as well as parts of three continents. Some general observations

More information

Plate Tectonics: Ridges, Transform Faults and Subduction Zones

Plate Tectonics: Ridges, Transform Faults and Subduction Zones Plate Tectonics: Ridges, Transform Faults and Subduction Zones Goals of this exercise: 1. review the major physiographic features of the ocean basins 2. investigate the creation of oceanic crust at mid-ocean

More information

Foundation Underpinning Process and Relationship with Groundwater in West- Central Florida

Foundation Underpinning Process and Relationship with Groundwater in West- Central Florida Foundation Underpinning Process and Relationship with Groundwater in West- Central Florida Ahmed Said, PhD, PE Principal Engineering Consultant, Sinkhole Geotech, Inc. e-mail: admin@sinkholegeotech.com

More information

Design Criteria & Service Goals

Design Criteria & Service Goals 4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

WATER-SOURCE HEAT PUMPS*

WATER-SOURCE HEAT PUMPS* CHAPTER 62, ARTICLE X, DIVISION 7. WATER-SOURCE HEAT PUMPS* * Editors Note: At the request of the county, Ord. No. 85-33, adopted Oct. 8, 1985, has been included in this Code. As the ordinance was not

More information

Numerical Modelling of Water Flow (Seepage) in the Karun 4 Dam and Abutments (Steady State)

Numerical Modelling of Water Flow (Seepage) in the Karun 4 Dam and Abutments (Steady State) Numerical Modelling of Water Flow (Seepage) in the Karun 4 Dam and Abutments (Steady State) Mohammad Hosseiny Sohi 03 November 2015 Contents: Objectives Karun River & Karun 4 Dam in Iran Geology of dam

More information

Understanding Complex Models using Visualization: San Bernardino Valley Ground-water Basin, Southern California

Understanding Complex Models using Visualization: San Bernardino Valley Ground-water Basin, Southern California Understanding Complex Models using Visualization: San Bernardino Valley Ground-water Basin, Southern California Zhen Li and Wesley R. Danskin U.S. Geological Survey, zhenli@usgs.gov, wdanskin@usgs.gov,

More information

Deep Geothermal energy and groundwater in

Deep Geothermal energy and groundwater in Deep Geothermal energy and groundwater in the UK Jon Busby Deep Geothermal energy and groundwater in the UK Outline 1. UK geothermal 2. Deep saline aquifers 3. Engineered geothermal systems 4. Fractured

More information

Practice Problems on Boundary Layers. Answer(s): D = 107 N D = 152 N. C. Wassgren, Purdue University Page 1 of 17 Last Updated: 2010 Nov 22

Practice Problems on Boundary Layers. Answer(s): D = 107 N D = 152 N. C. Wassgren, Purdue University Page 1 of 17 Last Updated: 2010 Nov 22 BL_01 A thin flat plate 55 by 110 cm is immersed in a 6 m/s stream of SAE 10 oil at 20 C. Compute the total skin friction drag if the stream is parallel to (a) the long side and (b) the short side. D =

More information

Broad Crested Weirs. I. Introduction

Broad Crested Weirs. I. Introduction Lecture 9 Broad Crested Weirs I. Introduction The broad-crested weir is an open-channel flow measurement device which combines hydraulic characteristics of both weirs and flumes Sometimes the name ramp

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014 MILWAUKEE CITY HALL FOUNDATION RESTORATION Project Update November 12, 2014 Milwaukee City Hall Building History/Fast Facts - City Hall is a masonry and iron superstructure - Originally constructed from

More information

Experiment (13): Flow channel

Experiment (13): Flow channel Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface is therefore constant and

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

of Geothermal Studies Elizabeth Tavares Pimentel UFAM/ON

of Geothermal Studies Elizabeth Tavares Pimentel UFAM/ON Indications i of an Underground d River beneath the Amazon River: Inferences from Results of Geothermal Studies Elizabeth Tavares Pimentel UFAM/ON Supervisor: Dr. Valiya Mannathal Hamza ON Motivation Fluvial

More information

EXPLAINING GROUNDWATER AND WATER WELLS

EXPLAINING GROUNDWATER AND WATER WELLS EXPLAINING GROUNDWATER AND WATER WELLS This document aims to provide a non-technical description of groundwater: how it occurs, how it moves underground, and the basic principles behind constructing and

More information

Guidelines For Sealing Groundwater Wells

Guidelines For Sealing Groundwater Wells Guidelines For Sealing Groundwater Wells Government of Newfoundland and Labrador Department of Environment and Conservation Water Resources Management Division Government of Newfoundland and Labrador Department

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

Barometric Effects on Transducer Data and Groundwater Levels in Monitoring Wells D.A. Wardwell, October 2007

Barometric Effects on Transducer Data and Groundwater Levels in Monitoring Wells D.A. Wardwell, October 2007 Barometric Effects on Transducer Data and Groundwater Levels in Monitoring Wells D.A. Wardwell, October 2007 Barometric Effects on Transducer Data Barometric Fluctuations can Severely Alter Water Level

More information

Global Water Resources

Global Water Resources Global Water Resources Highlights from assessment activities over the past two decades, which are used to establish present and future water trends, reveal that: 1. Freshwater resources are unevenly distributed,

More information

Rain Gardens: Designing your Landscape to Protect Aquatic Resources. Curtis Hinman WSU Extension Faculty Watershed Ecologist chinman@wsu.

Rain Gardens: Designing your Landscape to Protect Aquatic Resources. Curtis Hinman WSU Extension Faculty Watershed Ecologist chinman@wsu. Rain Gardens: Designing your Landscape to Protect Aquatic Resources Curtis Hinman WSU Extension Faculty Watershed Ecologist chinman@wsu.edu Basic Design Characteristics Shallow landscaped depressions that

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

What are the controls for calcium carbonate distribution in marine sediments?

What are the controls for calcium carbonate distribution in marine sediments? Lecture 14 Marine Sediments (1) The CCD is: (a) the depth at which no carbonate secreting organisms can live (b) the depth at which seawater is supersaturated with respect to calcite (c) the depth at which

More information

SECTION 02401 SHEETING, SHORING AND BRACING

SECTION 02401 SHEETING, SHORING AND BRACING SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State

More information

TECTONICS ASSESSMENT

TECTONICS ASSESSMENT Tectonics Assessment / 1 TECTONICS ASSESSMENT 1. Movement along plate boundaries produces A. tides. B. fronts. C. hurricanes. D. earthquakes. 2. Which of the following is TRUE about the movement of continents?

More information

Groundwater Flooding: a UK Perspective

Groundwater Flooding: a UK Perspective Groundwater Flooding: a UK Perspective David Macdonald British Geological Survey Maclean Building Crowmarsh Gifford Wallingford OX10 8BB Tel 01491 838800 NERC All rights reserved Talk outline Definition

More information

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN Performed February 2003 Performed by: Dr. Lee E. Harris, Ph.D., P.E. Associate Professor of Ocean Engineering & Oceanography

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA.

BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA. BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA. Claus Brøgger 1 and Poul Jakobsen 2 The present paper presents measurements and results from a three year full scale Pilot Project with the

More information

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

Module 9: Basics of Pumps and Hydraulics Instructor Guide

Module 9: Basics of Pumps and Hydraulics Instructor Guide Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine

More information

Drinking Water Source Protection Area Delineation Guidelines and Process Manual

Drinking Water Source Protection Area Delineation Guidelines and Process Manual Drinking Water Source Protection Area Delineation Guidelines and Process Manual Division of Drinking and Ground Waters Source Water Assessment and Protection Program Revised December 2014 Table of Contents

More information

RISING GROUNDWATER LEVELS IN LONDON AND POSSIBLE EFFECTS ON ENGINEERING STRUCTURES

RISING GROUNDWATER LEVELS IN LONDON AND POSSIBLE EFFECTS ON ENGINEERING STRUCTURES Hydrogeology in the Service of Man, Mémoires of the 18th Congress of the International Association of Hydrogeologists, Cambridge, 1985. RISING GROUNDWATER LEVELS IN LONDON AND POSSIBLE EFFECTS ON ENGINEERING

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Modelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring

Modelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring Modelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring Giona Preisig*, Antonio Dematteis, Riccardo Torri, Nathalie Monin, Ellen Milnes, Pierre Perrochet *Center for Hydrogeology

More information

Water-Table and Potentiometric-Surface Altitudes in the Upper Glacial, Magothy, and Lloyd Aquifers Beneath Long Island, New York, April May 2010

Water-Table and Potentiometric-Surface Altitudes in the Upper Glacial, Magothy, and Lloyd Aquifers Beneath Long Island, New York, April May 2010 Prepared in cooperation with the Nassau County Department of Public Works, the New York City Department of Environmental Protection, the New York State Department of Environmental Conservation, the Suffolk

More information

Lars-Göran Gustafsson, DHI Water and Environment, Box 3287, S-350 53 Växjö, Sweden

Lars-Göran Gustafsson, DHI Water and Environment, Box 3287, S-350 53 Växjö, Sweden Alternative Drainage Schemes for Reduction of Inflow/Infiltration - Prediction and Follow-Up of Effects with the Aid of an Integrated Sewer/Aquifer Model Introduction Lars-Göran Gustafsson, DHI Water and

More information

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide.

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide. INTRODUCTION TO STORM SURGE Introduction to Storm Surge BOLIVAR PENINSULA IN TEXAS AFTER HURRICANE IKE (2008) What is Storm Surge? Inland Extent Storm surge can penetrate well inland from the coastline.

More information

Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas

Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas Brian A. Smith and Brian B. Hunt Barton Springs / Edwards Aquifer Conservation District, 1124 Regal Row,

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW

FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW Daniel J. Howes, P.E. 1 Charles M. Burt, Ph.D., P.E. 2 Brett F. Sanders, Ph.D. 3 ABSTRACT Acoustic

More information

PRECIPITATION AND EVAPORATION

PRECIPITATION AND EVAPORATION PRECIPITATION AND EVAPORATION OBJECTIVES Use historical data to analyze relationships between precipitation, evaporation and stream flow in the San Antonio River Basin TOPICS Water cycle Precipitation

More information

Open Channel Flow Measurement Weirs and Flumes

Open Channel Flow Measurement Weirs and Flumes Open Channel Flow Measurement Weirs and Flumes by Harlan H. Bengtson, PhD, P.E. 1. Introduction Your Course Title Here Measuring the flow rate of water in an open channel typically involves some type of

More information

Construction Dewatering and Ground Freezing

Construction Dewatering and Ground Freezing UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Construction Dewatering and Ground Freezing

More information

The Grand Miramare Hotel Santa Margherita (Portofino) Italy March 19 22, 2013. Inspiring Innovation and Excellence

The Grand Miramare Hotel Santa Margherita (Portofino) Italy March 19 22, 2013. Inspiring Innovation and Excellence The Grand Miramare Hotel Santa Margherita (Portofino) Italy March 19 22, 2013 Inspiring Innovation and Excellence About the IDA Desalination Academy The IDA Desalination Academy aspires to increase knowledge

More information

Protect Your Home From Flooding. A guide for Lethbridge Residents

Protect Your Home From Flooding. A guide for Lethbridge Residents Protect Your Home From Flooding A guide for Lethbridge Residents Every year, millions of litres of water flow into the City of Lethbridge s stormwater and wastewater collection systems from residential

More information

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer Background San Antonio, the seventh largest city in the United States, covers approximately 515 square miles of Bexar County in south central Texas.

More information

Scour and Scour Protection

Scour and Scour Protection Design of Maritime Structures Scour and Scour Protection Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and Development Center Waterways Experiment Station 3909 Halls

More information

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water

More information

APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY

APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY PORTLAND HARBOR RI/FS APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY DRAFT Prepared for The Prepared by Anchor QEA, LLC TABLE OF CONTENTS TABLE OF CONTENTS... I LIST OF FIGURES... II LIST OF TABLES...

More information