1 GWPC September 27, 2015 Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida Virginia Walsh, PhD, P.G. Miami-Dade Water and Sewer Department Ed Rectenwald, P.G. MWH Americas, Inc.

2 Presentation Outline Overview Objectives Preliminary Investigations Technical Design Anticipated Challenges

3 Overview

4 Miami-Dade Water and Sewer Department (MDWASD) Overview Overview Largest water and sewer utility in Florida, serving more than 2.2 million residents Water System: 3 large regional and 5 small water treatment plants Supplying an average of 304 million gallons per day 90% of the County s public water supply Per capita water use 137 gpcd 100 water supply wells Biscayne Aquifer Floridan Aquifer Aquifer Storage and Recovery 7,918 miles of pipes ( km) 38,381 fire hydrants 126,913 valves

5 MDWASD Overview Overview Wastewater System: 3 wastewater treatment plants 2 ocean outfalls (3 and 7 miles from coast) and 21 deep injection wells (~2,500 ft depth) Collecting, treating, and disposing 316 MGD 6,292 miles of mains and laterals 1,042 sewer pumps stations (operated) Reusing 10.2 MGD

6 Overview Ocean Outfalls Northwest Wellfield West Wellfield South West Wellfield Snapper Creek Wellfield & Wellfield & Wellfields Miami Springs Wellfields MDWASD Water & Wastewater Treatment Facilities & Wellfield & Wellfield & Wellfield Deep injection wells & Wellfield & Wellfield Wellfields

7 Overview 2008 Ocean Outfall Legislation Chapter , Laws of Florida Reduce nutrient loading to the ocean Meet Advance Wastewater Treatment (AWT) by Dec 31, 2018, or Reduce cumulative outfall loadings (from ) equivalent to AWT from December 31, 2025, stop using outfall and implement 60% reuse

8 Overview Current deep injection well Boulder Zone (within the FAS) Upper Cretaceous Formations - Potential Alternative to Lower Floridan Aquifer System Injection Anhydrite confining units (not carbonate units) Potential disposal zones within fractured interval (not in the FAS)

9 Objectives

10 Exploratory Well Objectives Objectives Permit as a Class V Exploratory Well Perform Standard and Petrophysical Geophysical Logs, Testing, and Coring Analyze for sufficient confinement above the Boulder Zone Analyze the sub-floridan confinement above the permeable Cretaceous Formations Analyze for adequate injection zone within Cretaceous Formations to approximately 10,000 feet bls Complete injection well within the Boulder Zone, Permit as Class I Industrial with Dual-Zone Monitor Well Preliminary Evaluation and Site Characterization for future disposal into the permeable Cretaceous Formations Reduce nutrient loading

11 If build AWT for nutrient removal 2018: 59,874,077 lbs Compliance with Ocean Outfall Legislation Centrate Deep injection well 2016: 60,015,437 lbs Reduce nutrient loading to the ocean Meet Advance Wastewater Treatment (AWT) by Dec 31, 2018, or Reduce cumulative outfall loadings (from ) equivalent to AWT from December 31, 2025, stop using outfall and implement 60% reuse

12 Objectives Virginia Key Landfill Interdepartmental Agreement with Miami-Dade Water and Sewer and Public Works and Waste Management to dispose of groundwater remediation leachate into adjacent Central District Plant Deep Injection Wells

13 Preliminary Investigations

14 Preliminary Investigations Preliminary seismic studies at Virginia Key in collaboration with USGS prior to drilling USGS Carbonate Aquifer Characterization Laboratory Davie, FL Seismic profiling at CDWWTP Miami-Dade County USGS PROVISIONAL DO NOT CITE

15 Preliminary Investigations Documented Deep Geology Caverns in Miami-Dade County Well 6 Central District WWTP Rebecca Shoal Reef Possible permeable zones for injection Well 52 Well 41 Miami-Dade CDWWTP Injection Well

16 Preliminary Investigations Documented Deep Geology Caverns in Miami-Dade County

17 Technical Design

18 Deep Exploratory Well Central District Wastewater Treatment Plant Virginia Key

19 Technical Design CDWWTP IW-1 Class V Injection Well Design Feet below land surface (bls) 0 Well IW-1 Actual Casing Depths to Date 74-inch Steel to 73 feet bls 66-inch Steel to 300 feet bls 56-inch Steel to 1,060 feet bls 46-inch Steel to 2,090 feet bls 36-inch Steel to 2,780 feet bls Well IW-1 Anticipated Casing Depths 24-inch FRP to 2,780 feet bls ,780 3,150 Base of USDW at 1,360 bls Boulder Zone Sub-Floridan Confinement Zone Well IW-1 Injection Zone 2,780 feet to 3,150 feet bls Permitted injection capacity is 19.9MGD ~1 MGD Centrate ~12 MGD Scrubber Blowdown ~5 MGD Effluent ~1 MGD Leachate , Potential Injection Zone

20 Geophysical Logging Technical Design Dipole Shear Sonic Nuclear Magnetic Resonance Formation Microimager Neutron Porosity Optical Borehole Imaging

21 Packer Testing Technical Design Obtain discrete water quality data Validate log-derived results Estimate confinement properties Target monitor zones Source: Baski, Inc.

22 Technical Design FRP Injection Tubing Installation Fiberglass Reinforced Plastic (FRP) injection tubing is installed with threaded connections and properly torqued by a Make-up Service Company

23 Technical Design Complex Injection Capacity Evaluations Need to understand buoyancy effects during testing. Injection zone TDS could be 300,000 mg/l Injectate TDS will be 1,000 mg/l. Need to properly analyze buoyancy effects in testing data sets. Goal is to predict injection capacity and wellhead pressure Observed Step 3 Wellhead Pressure 100 Calculated Wellhead Pressure (P) Calculated Wellhead Pressure (P+B) 50 Calculated Wellhead Pressure (P+B+F) Calculated Wellhead Pressure (P+B+F+T) Step 3 = 1,280 gpm for 5.94 hours Notes: P = Permeability F = Friction Losses Time of Step 3 Injection (hours) B = Buoyancy T = Turbulent Flow Effects Wellhead Pressure (psi) 270 psi Estimated Wellhead Pressure (psi) gpm gpm gpm gpm gpm 200 Transmissivity = 4,800 gpd/ft 100 Wellhead Pressure (psi) 900 gpm 800 gpm Injection Time (years) psi Pressure Data After Pressure Drop Observed Step 2 Wellhead Pressure Calculated Wellhead Pressure (P) 30 Calculated Wellhead Pressure (P+B) 20 Calculated Wellhead Pressure (P+B+F) 10 Step2 = 715 gpm for 5.16 hours Calculated Wellhead Pressure (P+B+F+T) Notes: Time of Step 2 Injection (hours) P = Permeability F = Friction Losses B = Buoyancy T = Turbulent Flow Effects Wellhead Pressure Permit Limit to be Tested (667 psi) Potential Retest Wellhead Pressure Limit 400 gpm Wellhead Pressure (P+B+F+T) 500 gpm Wellhead Pressure (P+B+F+T) 600 gpm Wellhead Pressures (P+B+F+T) 700 gpm Wellhead Pressure (P+B+F+T) 750 gpm Wellhead Pressure (P+B+F+T) 800 gpm Wellhead Pressure (P+B+F+T) 900 gpm Wellhead Pressure (P+B+F+T)

24 Conceptual Diagram of Stream Characterization Blended Wastestream ~1 MGD Centrate ~12 MGD Scrubber Blowdown ~5 MGD Effluent ~1 MGD Leachate Ammonia-N Total P Wastestream mg /L mg /L Digester Gas Scrubber Digester Gas Scrubber Centrate Secondary Effluent Phases Landfill Leachate Nutrient Reduction - Nitrogen averaged annual 6.3 million lbs Technical Design

25 Challenges

26 Challenges Large Diameter Boreholes Largest diameter borehole (46-inches) in Florida to a depth of 2,780 feet bls

27 Core Analysis Challenges

28 Cementing Large diameter mudded borehole 66 inch diameter borehole to 1,070 ft BLS Pilot hole vs. Reamed hole 5? 15 stages to back plug pilot hole from 3,500 ft BLS 56 stages to cement in 36 in steel casing from 2,780 ft BLS 8?

29 Feet below land surface (bls) Challenges Temporary Steel Casing Installation Base of USDW at 1,360 bls Boulder Zone Sub-Floridan Confinement Zone Potential Injection Zone

30 Challenges Formation Plugging and Precipitation Analysis Chemical Characteristics - Desktop Evaluation Preliminary Blended Waste Stream Evaluation Preliminary Blending of Combined Waste Stream with Groundwater Struvite NH 4 MgPO 4 6H 2 Blending Scenario 1 Blending Scenario 2 Parameters mg /L mg /L ph Ammonia-N Magnesium Total P Struvite Saturation Index Precipitation and Plugging Potential - Bench Scale Tests Blended waste streams Blended injectate with ambient aquifer water of injection zone

31 Challenges Permeability within Cretaceous Aged Formation Permeability/Transmissivity Fractures/Fissures Geochemistry Formation Native Water

32 Hydrocarbon Show Challenges

33 Challenges Corrosive Deep Saline Groundwater TDS could be 300,000 mg/l High H 2 S concentrations Potential permanent damage to drill pipe from long term exposure. Potential damage to geophysical logging equipment. Potential surficial aquifer contamination from spillage of super saline brine on ground.

34 Questions? For further project or technical information contact: Virginia Walsh and Ed Rectenwald

35 Thank You

36 REALLY LARGE SPIDERS Challenges

Update on Aquifer Storage and Recovery

Update on Aquifer Storage and Recovery Update on Aquifer Storage and Recovery Dean Powell Bureau Chief Water Supply Bureau Governing Board Workshop September 2013 Objectives Discuss the basics of aquifer storage and recovery (ASR) technology

More information

Shale Energy Fluids Management Practices

Shale Energy Fluids Management Practices Shale Energy Fluids Management Practices Forum on Hydraulic Fracturing Bogota, Colombia, December 1, 2014 Presented by Dave Yoxtheimer, PG Hydrogeologist Penn State Marcellus Center for Outreach and Research

More information

Underground Injection Wells For Produced Water Disposal

Underground Injection Wells For Produced Water Disposal Underground Injection Wells For Produced Water Disposal Rick McCurdy Sr. Engineering Advisor Chemicals and Water Reclamation Chesapeake Energy Corporation 6100 N. Western Avenue ı Oklahoma City, OK 76118

More information

Struvite Control without Chemicals -- A Case Study -- Michigan Water Environment Association Biosolids/IPP Joint Conference September 28, 2011

Struvite Control without Chemicals -- A Case Study -- Michigan Water Environment Association Biosolids/IPP Joint Conference September 28, 2011 Struvite Control without Chemicals -- A Case Study -- Michigan Water Environment Association Biosolids/IPP Joint Conference September 28, 2011 Jerald O. Thaler, P.E. Fishbeck, Thompson, Carr & Huber, Inc.

More information

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental Protection Sec. 22a-472 page 1 (4-97) TABLE OF CONTENTS Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental

More information

Certificate Programs in. Program Requirements

Certificate Programs in. Program Requirements IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: certificate@ihrdc.com Copyright International Human

More information

Marcellus Fast Facts

Marcellus Fast Facts 1 Marcellus Fast Facts Covers about 95,000 square miles in 6 states Occurs at depths of up to 9,000 feet Thickness of 250 feet or more Largest natural gas reservoir in North America (est. 500 TCF recoverable

More information

Clearwater s Groundwater Replenishment Program

Clearwater s Groundwater Replenishment Program Clearwater s Groundwater Replenishment Program. Potable Reuse for Florida: A Full Day Workshop for Elected Officials Orlando, FL March 22, 2013 Nan Benne(, P.E. Public U2li2es Assistant Director City of

More information

WATER SUPPLY FACILITIES WORK PLAN

WATER SUPPLY FACILITIES WORK PLAN City of Miami Water Supply Facilities Work Plans CITY OF MIAMI, FLORIDA WATER SUPPLY FACILITIES WORK PLAN Prepared By: City of Miami Planning Department April, 2010 April, 2010 i City of Miami Water Supply

More information

CONSTRUCTION AND START-UP OF THE CLEWISTON REVERSE OSMOSIS PLANT. 1.0 Introduction

CONSTRUCTION AND START-UP OF THE CLEWISTON REVERSE OSMOSIS PLANT. 1.0 Introduction CONSTRUCTION AND START-UP OF THE CLEWISTON REVERSE OSMOSIS PLANT Curtis Kurt A. Kiefer, P.E., BCEE, Vice President, CDM, Fort Lauderdale, FL Kevin McCarthy, Utilities Director, City of Clewiston, Clewiston,

More information

PRELIMINARY REPORT ON THE NORTHSTAR #1 CLASS II INJECTION WELL AND THE SEISMIC EVENTS IN THE YOUNGSTOWN, OHIO AREA

PRELIMINARY REPORT ON THE NORTHSTAR #1 CLASS II INJECTION WELL AND THE SEISMIC EVENTS IN THE YOUNGSTOWN, OHIO AREA PRELIMINARY REPORT ON THE NORTHSTAR #1 CLASS II INJECTION WELL AND THE SEISMIC EVENTS IN THE YOUNGSTOWN, OHIO AREA Tom Tomastik, Geologist, ODNR, Division of Oil and Gas Resources Management PURPOSE AND

More information

Sand Control Challenges and Solutions. Annabel Green OGT 2009 Solving your sand control challenges.

Sand Control Challenges and Solutions. Annabel Green OGT 2009 Solving your sand control challenges. Sand Control Challenges and Solutions Annabel Green OGT 2009 Solving your sand control challenges. Topics Why do we care about sand control? How and why sand production occurs Prevention is better than

More information

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED The Hydrocarbon E & P Process In the exploration process, a most probable hydrocarbon bearing rock structure is defined based on seismic

More information

Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico

Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico Daniel Yeh 1, Pacia Hernandez 1, Thomas Burke 2, Paul Stanek 2, Ken Stidham

More information

Extractive nutrient recovery represents a

Extractive nutrient recovery represents a FWRJ Extractive Nutrient Recovery is a Mature Option for Managing Phosphorus in Sidestreams Wendell O. Khunjar, Paul Pitt, Ronald Latimer, Enrique Vadiveloo, Katya Bilyk, Vivi Nguyen, Laurissa Cubbage,

More information

Lists of estimated quantities to be performed and prices Estimated quantities to be performed. Prices

Lists of estimated quantities to be performed and prices Estimated quantities to be performed. Prices Schedule No. 2 Payment Schedule Task number according to Schedule No. 1 Scope of task Lists of estimated quantities to be performed and prices Estimated quantities to be performed Prices Date of execution

More information

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001 Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical

More information

Deep Geothermal energy and groundwater in

Deep Geothermal energy and groundwater in Deep Geothermal energy and groundwater in the UK Jon Busby Deep Geothermal energy and groundwater in the UK Outline 1. UK geothermal 2. Deep saline aquifers 3. Engineered geothermal systems 4. Fractured

More information

Mid-Monroe Water System: Soluble Iron and Manganese Removal via Oxidation & Filtration

Mid-Monroe Water System: Soluble Iron and Manganese Removal via Oxidation & Filtration Mid-Monroe Water System: Soluble Iron and Manganese Removal via Oxidation & Filtration Daniel Rickard, P.E. Engineering Project Manager Pennsylvania-American Water Company Who Is American Water We are

More information

January 24, 2012. John E. Meyer, P.G. Texas Water Development Board Water Science and Conservation Innovative Water Technologies

January 24, 2012. John E. Meyer, P.G. Texas Water Development Board Water Science and Conservation Innovative Water Technologies January 24, 2012 John E. Meyer, P.G. Texas Water Development Board Water Science and Conservation Innovative Water Technologies State and regional water planning Recommended Water Management Strategies

More information

CCS Risk Analysis. Vanessa Nuñez Lopez. CEPAC - CSLF Capacity Building Workshop Porto Alegre, Brazil July 30 Aug 3, 2012

CCS Risk Analysis. Vanessa Nuñez Lopez. CEPAC - CSLF Capacity Building Workshop Porto Alegre, Brazil July 30 Aug 3, 2012 CCS Risk Analysis Vanessa Nuñez Lopez CEPAC - CSLF Capacity Building Workshop Porto Alegre, Brazil July 30 Aug 3, 2012 Leucadia Lake Charles Hastings Field Air Products Port Arthur West Hastings MVA area

More information

GROUND WATER CONTAMINATION INFORMATION

GROUND WATER CONTAMINATION INFORMATION Ohio Department of Natural Resources Division of Oil and Gas Resources Management GROUND WATER CONTAMINATION INFORMATION Presence of Salty Water The salt that is normally found in contaminated water wells

More information

Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility. Adam Zacheis, Project Manager Carollo Engineers

Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility. Adam Zacheis, Project Manager Carollo Engineers Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility Adam Zacheis, Project Manager Carollo Engineers Topics 1. Background - Mesa Water District (Mesa) Water

More information

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles. Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing

More information

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,

More information

Design Criteria & Service Goals

Design Criteria & Service Goals 4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on

More information

The Hydrologic Cycle

The Hydrologic Cycle SCS-2005-10 Water and Me Series The Hydrologic Cycle Monty C. Dozier Assistant Professor and Extension Water Resources Specialist To understand how contamination of groundwater and surface water occurs,

More information

2011 MAJOR PROJECTS UPDATE - EAST WELLFIELD EXPANDED HYDROGEOLOGICAL STUDY AND WASTEWATER TREATMENT PLANT ZERO IMPACT ANALYSIS

2011 MAJOR PROJECTS UPDATE - EAST WELLFIELD EXPANDED HYDROGEOLOGICAL STUDY AND WASTEWATER TREATMENT PLANT ZERO IMPACT ANALYSIS Council November 28, 2011 2011 MAJOR PROJECTS UPDATE - EAST WELLFIELD EXPANDED HYDROGEOLOGICAL STUDY AND WASTEWATER TREATMENT PLANT ZERO IMPACT ANALYSIS ISSUE As a component of the Town s 2011 Major Projects

More information

THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL

THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL ABSTRACT Timur Deniz, Ph.D., Thomas W. Friedrich, P.E.

More information

Wyoming Mining Association White Paper Re: Uranium In-Situ Recovery

Wyoming Mining Association White Paper Re: Uranium In-Situ Recovery Wyoming Mining Association White Paper Re: Uranium In-Situ Recovery In situ mining is a process by which uranium is extracted from porous and permeable host sands via wells completed into those sands.

More information

Shale Energy Produced Fluids Management and UIC Well Disposal Trends

Shale Energy Produced Fluids Management and UIC Well Disposal Trends Shale Energy Produced Fluids Management and UIC Well Disposal Trends Dave Yoxtheimer, PG Hydrogeologist Penn State Marcellus Center for Outreach and Research GWPC Annual Forum Seattle, WA October 8, 2014

More information

During the past decade, the city of

During the past decade, the city of An Advanced Pollution Control Facility s Conversion to Four-Stage Bardenpho to Improve Biological Nitrogen Removal Timur Deniz, Thomas W. Friedrich, and John Milligan During the past decade, the city of

More information

4 th & Carey Groundwater. Remediation Project and Reverse Osmosis Water Treatment System

4 th & Carey Groundwater. Remediation Project and Reverse Osmosis Water Treatment System 4 th & Carey Groundwater Remediation Project and Reverse Osmosis Water Treatment System Contaminated City Well Well #8 4 th and Carey Groundwater contamination from industry was discovered in the Southeast

More information

Guide To Good Practice. Water Supply Borehole Location, Construction and Headworks

Guide To Good Practice. Water Supply Borehole Location, Construction and Headworks Guide To Good Practice Water Supply Borehole Location, Construction and Headworks Water Supply Borehole Location, Construction and Headworks This guidance has been prepared by the Scottish Environment

More information

WINERY WASTEWATER TREATMENT***

WINERY WASTEWATER TREATMENT*** WINERY WASTEWATER TREATMENT*** by Edwin Haynes*, George Stevens*, and Paul Russell, Jr.** INTRODUCTION In 1969 experience with treatment of winery wastewaters in this Country was limited to one winery

More information

AQUIFER STORAGE RECOVERY

AQUIFER STORAGE RECOVERY AQUIFER STORAGE RECOVERY This continuing education unit has been created to acquaint the reader with the topic of Aquifer Storage Recovery. The International School of Well Drilling gratefully acknowledges

More information

TECHNOLOGY DETAIL FACT SHEET: Biological Aerated Filter (BAF)

TECHNOLOGY DETAIL FACT SHEET: Biological Aerated Filter (BAF) TECHNOLOGY DETAIL FACT SHEET: Biological Aerated Filter (BAF) DESCRIPTION In the BAF process, wastewater flows upwards through tanks (called cells) that are filled with media. The media within the filter

More information

Utility Systems Sanitary Sewer System Plan

Utility Systems Sanitary Sewer System Plan Utility Systems Sanitary Sewer System Plan The Comprehensive Sanitary Sewer Plan is intended to serve as a guide to completing the future sanitary sewer trunk system to serve future development as outlined

More information

Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas

Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas Brian A. Smith and Brian B. Hunt Barton Springs / Edwards Aquifer Conservation District, 1124 Regal Row,

More information

Appendix A Cost Evaluation

Appendix A Cost Evaluation Appendix A Cost Evaluation TABLE OF CONTENTS Appendix A. Cost Evaluation... A-1 A.1 Purpose and Scope... A-1 A.2 Method and Assumptions... A-1 A.2.1 Raw and Product Water Qualities... A-2 A.2.2 Recovery...

More information

PROPOSED RESOLUTION NO. 2015-R-28 RESOLUTION NO.

PROPOSED RESOLUTION NO. 2015-R-28 RESOLUTION NO. A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF PEMBROKE PINES, FLORIDA, OPPOSING THE OIL DRILLING PERMIT APPLICATION SUBMITTED BY KANTER REAL ESTATE LLC, A FLORIDA FOR PROFIT LIMITED LIABILITY CORPORATION,

More information

Drilling Problems. pull

Drilling Problems. pull Drilling Problems Pipe Sticking Lost Circulation Hole Deviation Pipe Failures Borehole Instability Mud Contamination Formation Damage Hole Cleaning H S General Equipment & Personnel Pipe Sticking Can not

More information

Water and Energy in Arizona. Bob Lotts Arizona Public Service Company

Water and Energy in Arizona. Bob Lotts Arizona Public Service Company Water and Energy in Arizona Bob Lotts Arizona Public Service Company Outline 91 st Avenue Wastewater Treatment Plant Palo Verde Water Reclamation Facility (WRF) 91st Avenue WWTP 91st Avenue Statistics

More information

Wastewater Reuse Considerations at a Petroleum Refinery

Wastewater Reuse Considerations at a Petroleum Refinery Virginia Water Environment Association 2012 Industrial Waste and Pretreatment Seminar Charlottesville, Virginia March 5, 2012 Wastewater Reuse Considerations at a Petroleum Refinery Presented by Lucy Pugh,

More information

Produced water from oil and gas production

Produced water from oil and gas production Produced water from oil and gas production Lisa Sumi Oil and Gas Accountability Project Presentation at the 2005 People s Oil and Gas Summit Farmington, New Mexico October 28, 2005 Produced Water Any water

More information

Getting to Know Your Watershed: Lewis Bay

Getting to Know Your Watershed: Lewis Bay Getting to Know Your Watershed: Lewis Bay Lewis Bay Watershed 101: How Does a Watershed Work? Cape Cod watersheds are the contributing areas to surface water bodies, and groundwater wells. They are defined

More information

Wastewater Collection Practice Test #3 Page 1 of 15

Wastewater Collection Practice Test #3 Page 1 of 15 Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85

More information

Introduction to Wastewater Treatment

Introduction to Wastewater Treatment Introduction to Wastewater Treatment Bruce J. Lesikar Professor Texas AgriLife Extension Service Overview What is wastewater? Why are we concerned about wastewater? The big picture. Goals for wastewater

More information

Growth Faulting, Associated Geologic Hazards, Economic & Regulatory Impact, and Methods of Investigation for the Houston, Texas Area

Growth Faulting, Associated Geologic Hazards, Economic & Regulatory Impact, and Methods of Investigation for the Houston, Texas Area Growth Faulting, Associated Geologic Hazards, Economic & Regulatory Impact, and Methods of Investigation for the Houston, Texas Area GSA / AEG-Tx Growth Fault Symposium Texas A&M University, College Station,

More information

PROJECTED AQUIFER DRAWDOWNS TILLMAN RIDGE WELLFIELD ST. JOHNS COUNTY, FLORIDA

PROJECTED AQUIFER DRAWDOWNS TILLMAN RIDGE WELLFIELD ST. JOHNS COUNTY, FLORIDA Professional Paper SJ94-PP4 PROJECTED AQUIFER DRAWDOWNS TILLMAN RIDGE WELLFIELD ST. JOHNS COUNTY, FLORIDA by David J. Toth, Ph.D., P.G. Q Professiorfa'l Geologist License No. PG110 February 18, 1994 Seal

More information

Energy Use at Water and Wastewater Treatment Plants

Energy Use at Water and Wastewater Treatment Plants Energy Use at Water and Wastewater Treatment Plants Larry W. Moore, Ph.D., P.E. University of Memphis Civil Engineering Department March 13, 2012 Energy Use at WTPs Energy Energy is the ability or capacity

More information

APPENDIX B. Geotechnical Engineering Report

APPENDIX B. Geotechnical Engineering Report APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

Innovative Water Technologies Programs. 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha

Innovative Water Technologies Programs. 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha Innovative Water Technologies Programs 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha The following presentation is based upon professional research and analysis

More information

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate AGENDA ITEM C9 DATE: February 2, 2015 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles Carden, Chief Operating Officer South Pasco Transmission Main Condition Assessment Services with Pure Technologies

More information

A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER

A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER ABSTRACT Leonard P. Seed, M.Sc., P.Eng., Enpar Technologies Inc. * Daren D. Yetman, A.Sc.T., Enpar Technologies

More information

Life Cycle Assessment of Three Water Scenarios: Importation, Reclamation, and Desalination

Life Cycle Assessment of Three Water Scenarios: Importation, Reclamation, and Desalination Life Cycle Assessment of Three Water Scenarios: Importation, Reclamation, and Desalination Erin Lyons, Peng Zhang, Troy Benn, Miles Costanza, Ke Li, John Crittenden Department of Civil and Environmental

More information

Groundwater Salinity with Depth from Oil & Gas Well Log Interpretation

Groundwater Salinity with Depth from Oil & Gas Well Log Interpretation Groundwater Salinity with Depth from Oil & Gas Well Log Interpretation Introduction In the preliminary stages of developing the Regional Scale Conceptual Model (RSCM) of groundwater flow for the SSFL Oil

More information

Christopher Harto Argonne National Laboratory

Christopher Harto Argonne National Laboratory Managing Water from CCS Programs Christopher Harto Argonne National Laboratory John A. Veil - Argonne National Laboratory Andrea McNemar - DOE/NETL GWPC Energy and Water Sustainability Symposium Pittsburgh,

More information

DeSoto County is not a water service provider and does not operate any

DeSoto County is not a water service provider and does not operate any Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are

More information

Ground Water in the Piedmont and Blue Ridge Provinces of North Carolina

Ground Water in the Piedmont and Blue Ridge Provinces of North Carolina Ground Water in the Piedmont and Blue Ridge Provinces of North Carolina Prepared by: R.L. Huffman Extension Agricultural Engineering Specialist Published by: North Carolina Cooperative Extension Service

More information

SITE SELECTION GORGON CARBON DIOXIDE INJECTION PROJECT. Greg Leamon Geoscience Australia

SITE SELECTION GORGON CARBON DIOXIDE INJECTION PROJECT. Greg Leamon Geoscience Australia SITE SELECTION GORGON CARBON DIOXIDE INJECTION PROJECT Greg Leamon Geoscience Australia Gorgon Project Joint Venture Participants Chevron (~47%) operator ExxonMobil (25%) Shell (25%) Osaka Gas (1.25%)

More information

Module 25: Introduction to Flowmeters Answer Key

Module 25: Introduction to Flowmeters Answer Key Module 25: Introduction to Flowmeters wer Key 1. If you have a channel that is 1 foot wide, the flow is 6 inches deep, and the velocity is 2.5 feet per second (fps), what is the volume in cubic feet per

More information

Broward County Water Resources Fact Book

Broward County Water Resources Fact Book Broward County Board of County Commissioners Broward County Water Resources Fact Book Environmental Protection & Growth Management Department Environmental Planning & Community Resilience Division June

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey IV. PROPOSED PLAN FOR AMD ABATEMENT GOALS AND OBJECTIVES Although the major natural resource in the Wyoming Valley is anthracite coal*, its importance to the present and future economy of the area is limited

More information

State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01

State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01 State of Rhode Island Department of Environmental Management Division of Site Remediation Policy Memo 95-01 Guidelines for the Management of Investigation Derived Wastes 1.0 Purpose The purpose of this

More information

A NEW SPIN ON LIQUID CHLORINATION

A NEW SPIN ON LIQUID CHLORINATION A NEW SPIN ON LIQUID CHLORINATION Michael Braden 1 and James W. Weishuhn 2 Abstract Liquid chlorination has historically utilized excess energy of an effluent pump to power a venturi to introduce sodium

More information

High Resolution Geophysical Surveys to Find Optimal Recharge Basin Sites

High Resolution Geophysical Surveys to Find Optimal Recharge Basin Sites ABSTRACT & POWERPOINT PRESENTATION High Resolution Geophysical Surveys to Find Optimal Recharge Basin Sites John Jansen, PhD, PGp Senior Managing Hydrologist Cardno ENTRIX Fort Meyers, Florida Managed

More information

B. Disinfection: Answer both question #4 and question #5 (30 points total)

B. Disinfection: Answer both question #4 and question #5 (30 points total) CEE 371 April 15, 2009 Exam #2 Closed Book, two sheets of notes allowed Please answer questions 4, 5, 9 and 10. In addition, answer two questions from 1-3 and two from 6-8. The total potential number of

More information

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum

More information

FACT SHEET STATEMENT OF BASIS HARLEY DOME 1 PRODUCED WATER TREATMENT FACILITY UPDES PERMIT NUMBER: UT0025917 NEW PERMIT MINOR INDUSTRIAL

FACT SHEET STATEMENT OF BASIS HARLEY DOME 1 PRODUCED WATER TREATMENT FACILITY UPDES PERMIT NUMBER: UT0025917 NEW PERMIT MINOR INDUSTRIAL FACT SHEET STATEMENT OF BASIS HARLEY DOME 1 PRODUCED WATER TREATMENT FACILITY UPDES PERMIT NUMBER: NEW PERMIT MINOR INDUSTRIAL FACILITY CONTACTS Mitch Burroughs, Operator Mailing Address 1716 E. Lincoln

More information

Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification

Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification Revised March 2003 The purpose of this study guide is to help

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

CENTRAL ARIZONA SALINITY STUDY ---- Phase I. Technical Appendix O. Municipal TDS Research

CENTRAL ARIZONA SALINITY STUDY ---- Phase I. Technical Appendix O. Municipal TDS Research CENTRAL ARIZONA SALINITY STUDY ---- Phase I Technical Appendix O Municipal TDS Research Introduction Water availability and quality are among the world s most important environmental issues. Demand for

More information

Pennsylvania s Carbon Capture Utilization and Storage Research

Pennsylvania s Carbon Capture Utilization and Storage Research Pennsylvania s Carbon Capture Utilization and Storage Research Kristin Carter, Assistant State Geologist PA DCNR, Bureau of Topographic & Geologic Survey Pittsburgh, PA www.dcnr.state.pa.us 1 Today s Focus

More information

A Consumer Guide For Well Construction

A Consumer Guide For Well Construction A Consumer Guide For Well Construction Introduction If you are planning to have a water well constructed, there are some facts concerning the well construction permit, the well installation, and the pump

More information

Regulatory Options for Membrane Treatment and Residuals Management

Regulatory Options for Membrane Treatment and Residuals Management Regulatory Options for Membrane Treatment and Residuals Management Background Over a period of several years, Colorado s Water Quality Control Division (Division) received requests for discharge permits

More information

Module 9: Basics of Pumps and Hydraulics Instructor Guide

Module 9: Basics of Pumps and Hydraulics Instructor Guide Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine

More information

The Water-Energy Nexus in Arizona Water Reuse at Palo Verde Nuclear Generating Station

The Water-Energy Nexus in Arizona Water Reuse at Palo Verde Nuclear Generating Station The Water-Energy Nexus in Arizona Water Reuse at Palo Verde Nuclear Generating Station Henry Day Water Resource Management Leader Arizona Public Service Company July 27, 2015 1 Arizona Public Service Company

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Section 1421 of SDWA tasks EPA with protecting USDWs for all current and future drinking water supplies across the country (see section 1.3 for the complete definition of a USDW). EPA s UIC Program

More information

Tampa Bay Seawater Desalination Plant

Tampa Bay Seawater Desalination Plant Tampa Bay Seawater Desalination Plant Project History How The Plant Works Desal Fun Facts 2575 Enterprise Road, Clearwater, FL 33763-1102 Phone: 727.796.2355 / Fax: 727.791.2388 www.tampabaywater.org Tampa

More information

WATER-SOURCE HEAT PUMPS*

WATER-SOURCE HEAT PUMPS* CHAPTER 62, ARTICLE X, DIVISION 7. WATER-SOURCE HEAT PUMPS* * Editors Note: At the request of the county, Ord. No. 85-33, adopted Oct. 8, 1985, has been included in this Code. As the ordinance was not

More information

Tim Johnson, Mike Truex, Jason Greenwood, Chris Strickland, Dawn Wellman: Pacific Northwest National Laboratory

Tim Johnson, Mike Truex, Jason Greenwood, Chris Strickland, Dawn Wellman: Pacific Northwest National Laboratory 3D Site Characterization and Autonomous Remedial Process Monitoring Using High Performance Electrical Resistivity and Induced Polarization Tomographic Imaging Tim Johnson, Mike Truex, Jason Greenwood,

More information

Well Control Simulation A Tool for Engineering and Operations. Abstract. Introduction. The Simulator. Fred Ng, Wild Well

Well Control Simulation A Tool for Engineering and Operations. Abstract. Introduction. The Simulator. Fred Ng, Wild Well Well Control Simulation A Tool for Engineering and Operations Fred Ng, Wild Well Abstract Well Control Simulation is becoming a very useful tool for managing risks and making critical well control decisions.

More information

ETV JOINT VERIFICATION STATEMENT

ETV JOINT VERIFICATION STATEMENT THE ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM ETV JOINT VERIFICATION STATEMENT TECHNOLOGY TYPE: APPLICATION: TECHNOLOGY NAME: Multiprobe 100 COMPANY: GROUNDWATER SAMPLING TECHNOLOGIES VOC-CONTAMINATED

More information

3. Basic Hydrology Part 2

3. Basic Hydrology Part 2 3. Basic Hydrology Part 2 West Virginia Water Resources Training Workshops Presented by the Interstate Commission on the Potomac River Basin Sponsored by the West Virginia Department of Environmental Protection

More information

Life After Getting a BS and MS Degree Working as a Professional in PA

Life After Getting a BS and MS Degree Working as a Professional in PA Life After Getting a BS and MS Degree Working as a Professional in PA Presented by: Mr. Brian Oram, PASEO Soil Scientist Professional Geologist B.F. Environmental Consultants Inc. 15 Hillcrest Drive Dallas,

More information

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS Shiwei William Guan, Ph.D. Vice President, R&D and International Business Madison Chemical Industries Inc. 490

More information

The SPE Foundation through member donations and a contribution from Offshore Europe

The SPE Foundation through member donations and a contribution from Offshore Europe Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as

More information

Corrosion Conditions and Mitigation in Reclaimed Water & Groundwater Treatment Facilities. Milt Larsen, PE Robert Ryder, PE

Corrosion Conditions and Mitigation in Reclaimed Water & Groundwater Treatment Facilities. Milt Larsen, PE Robert Ryder, PE Corrosion Conditions and Mitigation in Reclaimed Water & Groundwater Treatment Facilities Milt Larsen, PE Robert Ryder, PE West Basin Municipal Water District Formed in 1947 185 square mile service area

More information

SECTION DISINFECTION OF WATER DISTRIBUTION SYSTEMS

SECTION DISINFECTION OF WATER DISTRIBUTION SYSTEMS SECTION 02501 DISINFECTION OF WATER DISTRIBUTION SYSTEMS PART 1 GENERAL 2.1 SECTION INCLUDES A. Procedures for disinfecting new and repaired water distribution systems. All new water mains and repairs

More information

CITY OF POMPANO BEACH Broward County, Florida

CITY OF POMPANO BEACH Broward County, Florida RESOLUTION NO. 2015-399 CITY OF POMPANO BEACH Broward County, Florida A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, OPPOSING THE OIL DRILLING PERMIT APPLICATION SUBMITTED BY

More information

DETERMINING TOTAL DYNAMIC HEAD

DETERMINING TOTAL DYNAMIC HEAD DETERMINING TOTAL DYNAMIC HEAD The total dynamic head of a water system must be considered when determining the size of pumping equipment to be installed. It determines the various head losses that the

More information

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax) FIRE DEPARTMENT SANTA CLARA COUNTY 14700 Winchester Blvd., Los Gatos, CA. 95032-1818 (408) 378-4010 (408) 378-9342 (fax) www.sccfd.org STANDARD DETAILS & SPECIFICATIONS Spec. No. W-1 Rev. Date 08/10/11

More information

Marcellus Hydrofracture Flowback and Production Wastewater Treatment, Recycle, and Disposal Technologies

Marcellus Hydrofracture Flowback and Production Wastewater Treatment, Recycle, and Disposal Technologies The Science of Marcellus Shale January 29, 2010 Hosted by Lycoming College in Williamsport, PA Sponsors: Susquehanna River Heartland Coalition for Environmental Studies and Foundation for Pennsylvania

More information

2015 YEAR END REPORT WATER/WASTEWATER TREATMENT PLANTS

2015 YEAR END REPORT WATER/WASTEWATER TREATMENT PLANTS 2015 YEAR END REPORT WATER/WASTEWATER TREATMENT PLANTS Madison s water and wastewater treatment operations specialists are highly trained professionals who strive to give the citizens of Madison the best

More information

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009 Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009 Hydraulic Fracturing Operations Well Construction and Integrity Guidelines

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598 Lessons Learned from Large Diameter Sanitary Sewer Pipe Bursting Project: Conversion of Abandoned Gravity Sewer Main Into Upsized Sanitary Force Main South San Francisco, CA Kent Von Aspern,* Collins Orton**

More information

FLORIDA ATLANTIC UNIVERSITY

FLORIDA ATLANTIC UNIVERSITY 9 Supporting Data The purpose of the Element is to ensure the provision of public facilities and services required to meet the future needs of the University, including: Stormwater management, to protect

More information