1 US GoM EPS FPSO OPERATORS PERSPECTIVE C. Mastrangelo & J. Daniel FPSO Research Forum - April 25th 2007 Theme Disconnectable FPSOs

2 TOPICS Operator objectives Safety Regulatory Environment Concept Selection Process FPSO Disconnectable Permanent Moored Internal Turret Design Premise Conclusion

3 OPERATOR OBJECTIVES SAFETY During design, Fabrication, Installation AND Operations: 1. Safety of Life 2. Safety of Environment 3. Safety of Asset Compliance with Local Regulations Minimum Overall Cost On schedule Optimize Production

4 WORLDWIDE FPU FLEET 1Q 2007 FPSO AND SEMI FPU FLEET PETROBRAS PETROBRAS WORLD WIDE IN OPERATION IN OPERATION # OF UNITS PERCENT OF WORLD FLEET # OF UNITS FPSO % SEMI % TLP SPAR FPSO & SEMI TOTAL % TOTAL FLEET % Quest Database 2007

5 SAFETY:ENVIRONMENT EIS RESULTS ON SPILLS MMS EIS 2001 pg.xv Based on the risk assessment, the risk of spills unique to FPSOs operations in the GoM is low risk of oil spills during offloading from the FPSO to the shuttle tanker is similar to that for lightering operations in the GOM, where there is a history of low spill frequency and small spill volumes. NOTE: Petrobras performed more than 3000 offloads in Brazilian waters with no spills

6 SAFETY:ENVIRONMENT EIS RESULTS ON SPILLS OF TOTAL FPSO SYSTEM RISK: SPILL IS 5% Approximately 94.4 percent of the volume of potential FPSO-unique spills is likely to be due to the transfer of oil from the FPSO to the shuttle tanker and from the shuttle tanker transit to shore percent of the volume of potential FPSO-unique spills is likely to be from shuttle tankers near port percent of the volume of potential FPSO-unique spills is likely to be from shuttle tankers in transit to port. 1.8 percent of the volume of potential FPSO-unique spills is likely to be from the transfer of oil from the FPSO to the shuttle tanker. However, this volume is comprised entirely of the smaller spill sizes (<1,000 barrels). 95% OF TOTAL RISK IS SIMILAR TO RISK OF OTHER DEEP WATER FLOATING PRODCUTION UNITS

7 REGS: FPSO REGS FOR US GoM Existing US Regulations are not entirely applicable to FPSOs. Several Operators have considered FPSO production systems, but only the Petrobras operated Cascade / Chinook field FPSO was submitted and the concept approved by regulators. Gaps exist in the concepts accepted by regulators. New concepts have to be justified prior to use in the GoM.

8 REGS: CONCEPTS VIEWED AS NEW TO US GoM For Cascade and Chinook: FPSO Disconnectable Turret FPSO Tandem Offloading Free Standing Hybrid Riser Some Optional New Concepts: Torpedo Piles (Petrobras Patent) Polyester Ropes (First GoM FPSO mooring with Polyester ropes)

9 Cascade Chinook CONCEPT OVERVIEW Cascade /Chinook Non DP-Internal Turret fully moored Disconnectable FPSO Producing from two fields 250 miles from New Orleans Shuttle Vessel FPSO 5 FSHR 4 Production 1 Gas Export line 4 Catenary Umbilicals Tandem Offloading Gas Export Pipeline Gas Export FSHR Dual PIP Production FSHR Flowlines Power Umbilical Boosting Tree Dual Flowlines Pump 4-Slot Manifold Boosting Pump Tree Control Umbilical

10 WHY AN FPSO? Items that drove selection to FPSO: Lack of Infrastructure EWT and EPS function Favorable CAPEX and OPEX Schedule driven project Versatility Reliability More than Adequate Deck Capacity

11 WHY DISCONNECTABLE SYSTEM? Mitigates risk to life and environment. FPSO disconnects and sails out of harm s way. Rapid build up of production if wells available Reduces potential production downtime by preventing storm damage. Capable of leaving for shore for unforeseen maintenance or repairs. Mooring System Design Criteria limit known. (design for known vs. unknown)

12 WHY PERMANENTLY MOORED? Disconnectable Turret / Dynamic Positioning Suitable for limited number of risers. Light mooring system for disconnected buoy Requires design for Emergency Disconnection Disconnectable Turret / Permanently Moored More flexible in number of risers. Permanent mooring system for disconnected buoy. Design for Planned Disconnection. Cascade / Chinook (5 FSHR & 4 umbilicals) DP light mooring 3X2 mooring lines. Non-DP Permanent Mooring 3X3 mooring lines.

13 OPTIONS FOR TURRET PERMANENTLY MOORED Disconnectable system configurations; Internal Turret / Submerged Buoy Turret Moored Submerged Buoy (STL / STP) Riser Turret Mooring (RTM) PAI evaluation shows: Limited difference in features and operations. All have several years operational experience. All are controlled disconnect & reconnect. All connection and disconnection is contained. All are considered suitable for use in the GoM.

14 INTERNAL TURRET / SUBMERGED BUOY Turret Access Structure Swivel Stack (red) Turret Decks Vessel Moonpool Submerged Buoy Mooring Lines Picture courtesy of SOFEC

15 Pictures courtesy of APL TURRET MOORED SUBMERGED BUOY

16 Picture courtesy of SBMAtlantia RISER TURRET MOORING (RTM)

17 WHY INTERNAL TURRET PREFERRED? Turret location adjusted for optimum location to minimize FPSO induced riser motions. (Location must ensure passive weathervaning.) Buoy does not travel through the wave /air interface during disconnection and connection. Reduced riser motions when disconnected, since the turret buoy submerged depth will be below the wave zone. Protected access to the top of turret buoy.

18 DESIGN PREMISE Process plant capable of producing in up to a 5yr Winter storm with a 1 yr Loop/Eddy condition. FPSO, Mooring and Utilities designed for 100yr Winter storm condition. Target: disconnect in <1 hr. at design wave height of 4.5 meters. (Riser excursion limit may govern some disconnects). Time to disconnect and sailing speed must be sufficient to move away from the path of a hurricane that may be born in the GoM.

19 EXAMPLE OF TURRET-BUOY INTERFACE Current Turret / Buoy interface has two (2) valves, a means for crude purge, blind flanges for isolation when buoy is disconnected. Location of Isolation Blind flanges To Closed Drain / Vent Purge Premise: Zero (0) Fluid Spill at Disconnect Fail Safe Actuator

20 POTENTIAL PLANNED DISCONNECT TIME LINE Production Stopped Cascade Chinook No Touch Period Up to 4 hrs. 5 Displace Production Fluids 2 Close Isolation Valve / Drain / Purge 1.5 Add Blinds Isolate Wells & Treat Trees Flush Well Jumpers Flush Subsea Pumps Prep Umbilical Connections Other Turret / Buoy preparations Prepare Vessel Propulsion System, etc. Displace Production Fluids Prep Buoy Connector 0.5 Flood Lower Turret 1.0 Disconnect Buoy Hours Production stopped anytime prior to 0 hrs. Unplanned would not include displacement of fluids.

21 CRITICAL WHAT IF? What if the primary disconnect system fails to disconnect? Safeguards to mitigate will be: Redundant disconnect system. Rigorous maintenance and testing program and design philosophy. On site testing w/o disconnect Appropriate SF in design. Design for Disconnect during Black-out. (Power from Emergency Generator)

22 CONCLUSION Disconnectable FPSOs provide a means to improve protection of life, environment and asset during GoM hurricanes All critical components of a disconnectable FPSO have been successfully proven in operations world wide EPS Disconnectable FPSO Can be considered a Reliable and Efficient Concept for the deep water fields in GoM Flexibility of a disconnectable FPSO facilitates the accommodation of uncertainties such as environment, fluid production, composition and deck loads.

23 US GoM EPS FPSO OPERATORS PERSECTIVE C. Mastrangelo & J. Daniel FPSO Research Forum - April 25th 2007 Theme Disconnectable FPSOs

24 DISCONNECT SIMULATION BUOY DISCONNECT SIMULATION FROM AN FPSO IN A 100 YR WINTER STORM. COURTESY OF DEEPSTAR. PREPARED BY TECHNIP.

Disconnectable FPSO for Deepwater Fields in the Gulf of Mexico

Disconnectable FPSO for Deepwater Fields in the Gulf of Mexico Disconnectable FPSO for Deepwater Fields in the Gulf of Mexico Yong Luo SBM Atlantia April. 25 2007 INTRODUCTION CONCEPT OVERVIEW VESSEL/TOPSIDES TURRET MOORINGS RISERS SUMMARY DISCONNECTABLE FPSO Confidential

More information

FPSO MOORING & OFFLOADING SYSTEM ALTERNATIVES FOR DEEPWATER WEST AFRICA

FPSO MOORING & OFFLOADING SYSTEM ALTERNATIVES FOR DEEPWATER WEST AFRICA FPSO MOORING & OFFLOADING SYSTEM ALTERNATIVES FOR DEEPWATER WEST AFRICA Oise Ihonde, MODEC International LLC, USA James Mattinson, FMC SOFEC Floating Systems, USA London T. England Jr., FMC SOFEC Floating

More information

Wet vs. Dry Tree Selection in Deepwater Developments MCE Deepwater Development 2015 London, UK

Wet vs. Dry Tree Selection in Deepwater Developments MCE Deepwater Development 2015 London, UK Wet vs. Dry Tree Selection in Deepwater Developments MCE Deepwater Development 2015 London, UK Robert Eichenlaub 2015 KBR Inc. All Rights Reserved. Introduction Wet Tree vs Dry Tree Completion Systems:

More information

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer HIPPS Application in the Gulf of Mexico Christopher Lindsey-Curran BP Senior Subsea Engineer Agenda Introduction and background HIPPS overview Codes and standards System design Regulatory issues Conclusions

More information

Risk Analysis and Real Options in Upstream Projects The Gulf of Mexico Case

Risk Analysis and Real Options in Upstream Projects The Gulf of Mexico Case Risk Analysis and Real Options in Upstream Projects using @RISK: The Gulf of Mexico Case RAFAEL HARTKE, MSc, ERP FINANCIAL PLANNING AND RISK MANAGEMENT PETROBRAS SEPTEMBER, 2011 1 DISCLAIMER FORWARD-LOOKING

More information

2005 Gas Lift Workshop. Petrobras. Technology Developments. Carlos Tadeu da Costa Fraga Petrobras R&D Center Executive Manager

2005 Gas Lift Workshop. Petrobras. Technology Developments. Carlos Tadeu da Costa Fraga Petrobras R&D Center Executive Manager 2005 Gas Lift Workshop Petrobras Technology Developments Carlos Tadeu da Costa Fraga Petrobras R&D Center Executive Manager 2005 Gas Lift Workshop Petrobras Overview Technology Development Main Achievements

More information

Conventional Buoy Mooring Systems. A safe, reliable and cost effective tanker loading / offloading solution

Conventional Buoy Mooring Systems. A safe, reliable and cost effective tanker loading / offloading solution Conventional Buoy Mooring Systems A safe, reliable and cost effective tanker loading / offloading solution Conventional Buoy Mooring (CBM) systems, sometimes referred to as Multiple Buoy Mooring (MBM)

More information

Total Subsea Solutions

Total Subsea Solutions Total Subsea Solutions Total Subsea Solutions Developing new energy reserves, managing, and improving producing fields means an unprecedented number of technical challenges. In partnership with our customers,

More information

Offshore Structures. Offshore Drilling Equipment

Offshore Structures. Offshore Drilling Equipment Offshore Structures Offshore Drilling Equipment The drill string is lowered through a conduit (riser). The drill string consists of a drill bit, drill collar and drill pipe. Drill pipe sections are added

More information

Oil and Gas Production and Exploration, Part II

Oil and Gas Production and Exploration, Part II Oil and Gas Production and Exploration, Part II American Translators Association 52th Annual Conference Boston, October 26, 2011 Presenter: Steven Marzuola 1 Progression 2 Water depths Shallow Up to 1000

More information

LNG TANDEM OFFLOADING SYSTEM

LNG TANDEM OFFLOADING SYSTEM 84b LNG TANDEM OFFLOADING SYSTEM Terry Boatman, Stephen Jones, and Ron Mack FMC Energy Systems 6677 North Gessner Road Houston, Texas 77040 Prepared 2003 AIChe Spring National Meeting: LNG & Gas Transportation

More information

Offshore Oil and Gas Technology

Offshore Oil and Gas Technology Offshore Oil and Gas Technology Steven Marzuola www.techlanguage.com/ata American Translators Association 54th Annual Conference San Antonio, November 7, 2013 1 Importance of oil and gas Oil is directly

More information

BRAZIL ENERGY CONFERENCE

BRAZIL ENERGY CONFERENCE BRAZIL ENERGY CONFERENCE October,2009 Gustavo Tardin Barbosa CFO Petrobras America 1 DISCLAIMER The presentation may contain forecasts about future events. Such forecasts merely reflect the expectations

More information

SSP Offshore. Well Containment. April 2011

SSP Offshore. Well Containment. April 2011 SSP Offshore Well Containment April 2011 Well Containment - Points to Discuss 2 Lessons Learned in the Aftermath of the Deepwater Horizon Incident The Containment Solutions : Interim MWCS and the MCV solution

More information

2001/073 OFFSHORE TECHNOLOGY REPORT. Failure modes, reliability and integrity of floating storage unit (FPSO, FSU) turret and swivel systems HSE

2001/073 OFFSHORE TECHNOLOGY REPORT. Failure modes, reliability and integrity of floating storage unit (FPSO, FSU) turret and swivel systems HSE HSE Health & Safety Executive Failure modes, reliability and integrity of floating storage unit (FPSO, FSU) turret and swivel systems Prepared by AEA Technology Engineering Solutions for the Health and

More information

Single Point Mooring System (SPM) for an Offshore LNG Terminal

Single Point Mooring System (SPM) for an Offshore LNG Terminal Single Point Mooring System (SPM) for an Offshore LNG Terminal GASTECH 2005, Session 7 - Technical Bilbao, March 15 th, 2005 Max Krekel Senior Naval Architect Bluewater Offshore Production Systems Neal

More information

Marine Terminals. Capability & Experience

Marine Terminals. Capability & Experience Marine Terminals Capability & Experience Capability Overview INTECSEA has participated in a significant number of terminal projects worldwide performing site surveys and system designs, preparing Invitation

More information

POTENTIAL REALISING OUR DEVELOPING THE TEN FIELD IN GHANA

POTENTIAL REALISING OUR DEVELOPING THE TEN FIELD IN GHANA SPECIAL FEATURE THE TEN PROJECT Construction workers in Jurong shipyard, Singapore REALISING OUR POTENTIAL DEVELOPING THE TEN FIELD IN GHANA Our Ghana operations began in 2006, and a year later we made

More information

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011 Subsea Technology Alain Marion, Senior VP Assets & Subsea Technology Investor Day in Brazil, October 4, 2011 Subsea Technology Technip s Commitment to Subsea R&D Technip Leadership Position Emerging Technologies

More information

The Dalian Developer A new approach to oil spill response

The Dalian Developer A new approach to oil spill response The Dalian Developer A new approach to oil spill response Presenter: Jim O Sullivan, Vice President Technip USA National Ocean Industries Association Scottsdale, Arizona, October 18, 2012 Contents Introduction

More information

Outlook for the U.S. Gulf of Mexico to 2020 Sustainable Growth Leveraged to Infrastructure

Outlook for the U.S. Gulf of Mexico to 2020 Sustainable Growth Leveraged to Infrastructure Outlook for the U.S. Gulf of Mexico to 22 Sustainable Growth Leveraged to Infrastructure Paul H. Hillegeist President & COO Quest Offshore Resources, Inc. Paul.Hillegeist@questoffshore.com December 12,

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering Hoannn@pidc.com.vn PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

CALM CALM. Our Activities

CALM CALM. Our Activities CALM CALM Our Activities 2 SBM Offshore CALM Brochure Catenary Anchor Leg Mooring (CALM) The CALM is the most popular and widely-used type of offshore loading terminal with more than 500 systems installed

More information

ANADARKO PETROLEUM CORPORATIOn

ANADARKO PETROLEUM CORPORATIOn ANADARKO PETROLEUM CORPORATIOn ANADARKO PETROLEUM CORPORATION Lucius Lighting the Way to a bright future Dec. 10, 2009 Discovery Jan. 27, 2010 May 28, 2011 Dec. 15, 2011 July 2, 2012 May 26, 2013 Jan 16,

More information

Offshore Pipelines and Risers

Offshore Pipelines and Risers Introduction to Offshore Pipelines and Risers 2009 Jaeyoung Lee, P.E. Introduction to Offshore Pipelines and Risers PREFACE This lecture note is prepared to introduce how to design and install offshore

More information

Why Pig subsea production flowlines? Illustration of single production line * Pazflor Miocene development Conclusions 12/04/2016

Why Pig subsea production flowlines? Illustration of single production line * Pazflor Miocene development Conclusions 12/04/2016 Pigging needs for subsea production lines Diane EL GEMAYEL / Christian FOUILLOUT AGENDA Why Pig subsea production flowlines? Illustration of single production line * Pazflor Miocene development Conclusions

More information

Disconnectable FPSO Technology to Reduce Risk and Add Flexibility. Prepared by

Disconnectable FPSO Technology to Reduce Risk and Add Flexibility. Prepared by Disconnectable FPSO Technology to Reduce Risk and Add Flexibility Prepared by Vidar Aanesland Jens P Kaalstad APL Inc APL Inc Contents Introduction STL and STP Technology Reliability Flexibility Conclusions

More information

Offshore platform/facility provider

Offshore platform/facility provider Engineering and technologies Your field development provider able to deliver all types of offshore fixed and floating facilities through our integrated network of regional locations Infrastructure to the

More information

Design and Construction of LNG Regasification Vessel

Design and Construction of LNG Regasification Vessel Design and Construction of LNG Regasification Vessel GASTECH 2005 March 14 17, 2005 Bilbao, Spain Hochung Kim, JungHan Lee Daewoo Shipbuilding & Marine Engineering Co. Ltd. (DSME) Gastech 2005 Design and

More information

Subsea Production Systems

Subsea Production Systems Subsea Production Systems An Enabling Component of Offshore Production Rice Global E&C Forum December 12, 2014 Photo: Oceaneering Presented by: Bruce Crager Executive Vice President, Expert Advisory Group

More information

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL December 3, 2014 Presenter: Mike Cargol Agenda Development Update HPHT Capping Stack Mudline Closure Device Divert and Flow System Well Kill

More information

Marine integrity monitoring Offshore oil and gas

Marine integrity monitoring Offshore oil and gas Marine integrity monitoring Offshore oil and gas Where will our knowledge take you? BMT has over 0 years experience in the design, procurement, integration and installation of monitoring systems worldwide.

More information

Conceptual benefits with a cylindrical hull for FPSO, FLNG, drilling and floating powerplant applications

Conceptual benefits with a cylindrical hull for FPSO, FLNG, drilling and floating powerplant applications 21st FPSO Research Forum April 23, 2008, Trondheim, Norway Conceptual benefits with a cylindrical hull for FPSO, FLNG, drilling and floating powerplant applications Fredrik Major, VP Bus. Dev/ R&D, Sevan

More information

Need for materials research related to subsea, deepwater and downhole equipment for oil and gas production

Need for materials research related to subsea, deepwater and downhole equipment for oil and gas production Need for materials research related to subsea, deepwater and downhole equipment for oil and gas production By Stein Ramberg/FMC Kongsberg Subsea Norges Forskningsråd Petromaks Materialseminar 27. April

More information

Hurricanes and the Offshore oil and Natural Gas Industry

Hurricanes and the Offshore oil and Natural Gas Industry Every year, hurricanes of varying strength lay siege to America s coasts. The images of wind-battered buildings and flooded lands are well-known - 2004 and 2005 were particularly destructive seasons. The

More information

Engineering and technologies Floating LNG

Engineering and technologies Floating LNG Engineering and technologies Floating LNG Major contracts confirm Technip's leadership Technip at a glance Technip is a world leader in project management, engineering and construction for the oil and

More information

26 th FPSO Research Forum Presentation Title 1

26 th FPSO Research Forum Presentation Title 1 26 th FPSO Research Forum Presentation Title 1 Presentation Title 2 FPSO Relocation and Life Extension Monaco March 23 rd, 2011 Antoine Le Cotty SBM Offshore - Monaco Location, Date FPSO Relocation and

More information

Kodiak Deepwater Project Challenges and Solutions

Kodiak Deepwater Project Challenges and Solutions Kodiak Deepwater Project Challenges and Solutions Marine Technology Society September 24, 2015 Deep Gulf Energy II, LLC Overview of Deep Gulf Energy Companies Deep Gulf Energy Background Exploration and

More information

Subsea structures: current state of the art. OTC 2015 May Whitepaper

Subsea structures: current state of the art. OTC 2015 May Whitepaper OTC 2015 May 2015 Subsea structures are an integral part of an overall subsea field development as they support and protect vital pressure containing piping and equipment. Operational conditions, installation

More information

Safe Offloading from Floating LNG Platforms (SAFE OFFLOAD) R. V. Ahilan Noble Denton Europe

Safe Offloading from Floating LNG Platforms (SAFE OFFLOAD) R. V. Ahilan Noble Denton Europe Safe Offloading from Floating LNG Platforms (SAFE OFFLOAD) R. V. Ahilan Noble Denton Europe Overview Background Project Objective Partners Work Scope Key Developments Deliverables Schedule Additional Participation

More information

Norsk Industri Olje og Gass Åsgard Subsea Compression Main Learnings

Norsk Industri Olje og Gass Åsgard Subsea Compression Main Learnings Norsk Industri Olje og Gass 21.04.16 Åsgard Subsea Compression Main Learnings Classification: Open 2014-10-28 Åsgard Subsea Compression 2 x 11,5 MW subsea compressors 40 km step out Water depth 270 meters

More information

Opportunities and challenges for global deepwater players

Opportunities and challenges for global deepwater players Content 66/67 Opportunities and challenges for global deepwater players An industry on the seach for new growth areas Rodolfo Guzman, Paola Carvajal, Ben Thuriaux-Alemán With fewer remaining easy-to-access

More information

Subsea Market Review. Subsea 2011 February 9 10, 2011. 2011 Quest Offshore Resources, Inc. 1

Subsea Market Review. Subsea 2011 February 9 10, 2011. 2011 Quest Offshore Resources, Inc. 1 Subsea Market Review Subsea 211 February 9 1, 211 211 Quest Offshore Resources, Inc. 1 Presentation Summary Quest Offshore Recent activity and trends Forecast activity Contractor s perspective 211 Quest

More information

13. FPSO Operational Problems Don Smith, OGP

13. FPSO Operational Problems Don Smith, OGP OGP Marine Risks Workshop Proceedings 13. FPSO Operational Problems Don Smith, OGP FPSO Operational Problems Don Smith OGP Analysis of Accident Statistics for Floating Monohull and Fixed Installations

More information

BOURI NEW FLOATING STORAGE OFFLOADING (FSO) PROJECT Engineering Procurement Installation Commissioning (EPIC)

BOURI NEW FLOATING STORAGE OFFLOADING (FSO) PROJECT Engineering Procurement Installation Commissioning (EPIC) MELLITAH OIL AND GAS B.V. BOURI NEW FLOATING STORAGE OFFLOADING (FSO) PROJECT Engineering Procurement Installation Commissioning (EPIC) PAGE 1 TABLE OF CONTENTS 1. PURPOSE 2 2. PROJECT DESCRIPTION AND

More information

Ceiba Field Early Production System. Cameron MOSAIC Systems

Ceiba Field Early Production System. Cameron MOSAIC Systems MOSAIC Certified Ceiba Field Early Production System Cameron MOSAIC Systems for the Ceiba Field Early Production System The Ceiba Field Early Production System Nigeria 0 100 KM Niger Delta C B D E Malabo

More information

Subsea Processing a new set of subsea building blocks

Subsea Processing a new set of subsea building blocks Subsea Processing Subsea Processing a new set of subsea building blocks The successful start-up and operation of Tordis, the first fullfield Subsea Separation, Boosting and Injection System, delivered

More information

Subsea Integrity: From thoughts to actions

Subsea Integrity: From thoughts to actions Subsea Integrity: From thoughts to actions Subsea Europe 2009 Robbie Williamson / Celso Raposo Subsea Assets What are we talking about? SURF Subsea equipment, Umbilical, Risers, Flowlines Non class Floaters

More information

Oil and Gas Offshore. www.shell.com/us/alaska

Oil and Gas Offshore. www.shell.com/us/alaska 3 C H A P T E R T h r e e : Oil and Gas Offshore Production www.shell.com/us/alaska Planning Piltun-Astokhskoye B a fixed production platform 7.5 miles off Sakhalin Island in 105 waters (2007). When exploration

More information

Oil and Gas Division

Oil and Gas Division HIGH PRESSURE ONSHORE AND OFFSHORE PIGGING SYSTEMS Oil and Gas Division ENGINEERED SOLUTIONS FOR INLINE CLEANING AND INSPECTION Dedicated to Quality and Excellence CLAMPTEC TM DESIGN SPECIFICATIONS Design

More information

Statoil Subsea Factory

Statoil Subsea Factory Contents Background Statoil s Subsea Factory Subsea Gas Technologies Statoil Technology Qualification The Subsea Cost challenge The future? Trondheim Gas Technology Conference Statoil Subsea Factory June

More information

World leaders in marine terminal operations and ship-to-ship

World leaders in marine terminal operations and ship-to-ship World leaders in marine terminal operations and ship-to-ship Corporate overview Fendercare provides marine terminal, subsea and ship-to-ship services to the oil and gas industry. We specialise in providing

More information

PETROBRAS E&P Projects and Investments

PETROBRAS E&P Projects and Investments PETROBRAS E&P Projects and Investments Platts 6 th Annual Crude Oil Summit May 13-14, 2013 London, UK Dr. Antonio Cláudio F. Corrêa PETROBRAS E&P London Office acfcorrea@petrobras.com.br Disclaimer The

More information

Pumps for the Booming FPSO Sector

Pumps for the Booming FPSO Sector Pumps for the Booming FPSO Sector In the last few years, several new offshore oil fields have been discovered. The current findings from Petrobras and other companies in the pre-salt province, located

More information

Subsea Market and Strategy. Christophe Armengol Vice President, Subsea Strategy and Market Analysis March 30, 2010

Subsea Market and Strategy. Christophe Armengol Vice President, Subsea Strategy and Market Analysis March 30, 2010 Subsea Market and Strategy Christophe Armengol Vice President, Subsea Strategy and Market Analysis March 30, 2010 Subsea market: Overview Significant slowdown in 2009, but Technip maintained its leading

More information

Subsea Drilling! 14 An Overview!

Subsea Drilling! 14 An Overview! Subsea Drilling! 14 An Overview! Introduction to Well Engineering - 14 - Subsea Drilling 1 Contents 1. Introduction 3 2. Drilling e Well 7 2.1 Positioning the Rig 7 2.2 Running the Temporary Guide Base

More information

MEK4450. Templates & Manifolds. 29 August 2012. 05 Templates and Manifolds. This module will cover:

MEK4450. Templates & Manifolds. 29 August 2012. 05 Templates and Manifolds. This module will cover: 29 MEK4450 05 Templates and Manifolds Templates & Manifolds This module will cover: Applicable Codes and Standards Templates - Purpose of a template Manifolds - Purpose of a manifold Foundations 2 1 29

More information

A Cost- Effective Computational Tool for Offshore Floater Design

A Cost- Effective Computational Tool for Offshore Floater Design Introduction A Cost- Effective Computational Tool for Offshore Floater Design Jang Whan Kim, Hyunchul Jang & Jim O Sullivan Technip Offshore floating platforms are complex engineering systems with numerous

More information

Abstract. 1. Introduction and Challenges

Abstract. 1. Introduction and Challenges IBP2718_10 CHALLENGES IN THE COMPLETION OF ULTRADEEPWATER, HIGH-PRESSURE GULF OF MEXICO FIELDS USING AN ELECTROHYDRAULIC OPERATED LANDING STRING Joe Scranton 1, Flavio Dias de Morais 2, Zulay Florez 3,

More information

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions Canada - US Northern Oil and Gas Research Forum Calgary, Alberta December 2 nd, 2010 An Overview An Overview Of Same Season

More information

Subsea Tie-in Systems

Subsea Tie-in Systems Subsea Tie-in Systems Subsea Tie-in Systems Subsea flowlines are used for the transportation of crude oil and gas from subsea wells, manifolds, off-shore process facilities, loading buoys, S2B (subsea

More information

Subsea Xmas Trees Vertical or Horizontal Implications / Issues for Insurers

Subsea Xmas Trees Vertical or Horizontal Implications / Issues for Insurers Subsea Xmas Trees Vertical or Horizontal Implications / Issues for Insurers John Reid Charles Taylor adjusting (Energy) 30 September 2010 Topics Vertical v Horizontal XT Evolution of subsea xmas trees

More information

02/09/2014. Introduction to Subsea Production Systems. Templates & Manifolds. Purpose of a template Designs Protection structures Foundations

02/09/2014. Introduction to Subsea Production Systems. Templates & Manifolds. Purpose of a template Designs Protection structures Foundations OIL & GAS Introduction to Subsea Production Systems 05 Templates and Manifolds September 2014 1 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER Templates & Manifolds This module will cover: Applicable

More information

Onshore Pipeline Engineering: Challenges

Onshore Pipeline Engineering: Challenges Onshore Pipeline Engineering: Challenges Oliver Sokoll Pipeline Lead Engineer IKT International Conference - Infrastructure Knowledge and Technology, Gelsenkirchen, 18.09.2014 Contents 1. Introduction

More information

MUX Control of subsea BOP without an Umbilical

MUX Control of subsea BOP without an Umbilical MUX Control of subsea BOP without an Umbilical Acoustic-based MUX for BOP control The challenges of subsea acoustics Benefits Objectives Example Design strategies Qualification Conclusions Subsea acoustics

More information

THE BALTIC SEA OFFSHORE PROJECTS

THE BALTIC SEA OFFSHORE PROJECTS OFFSHORE PROJECTS OFFSHORE PROJECTS 3 OFFSHORE PROJECTS The start of LUKOIL's offshore operations dates back to 1999, when the Company started exploratory drilling with its in-house ASTRA selfelevating

More information

SWIMMER. An innovative Subsea Intervention System for Deep Offshore Fields. Jean-Jacques QUESNEL CYBERNETIX S.A. Oil&Gas Division

SWIMMER. An innovative Subsea Intervention System for Deep Offshore Fields. Jean-Jacques QUESNEL CYBERNETIX S.A. Oil&Gas Division SWIMMER An innovative Subsea Intervention System for Deep Offshore Fields Jean-Jacques QUESNEL CYBERNETIX S.A. Oil&Gas Division 1 The next generation of Challenges 2 Asset Integrity Monitoring New Challenges

More information

M. Kevin McEvoy. CREDIT SUISSE 2013 Energy Summit February 5, 2013 Vail, CO. Oceaneering International, Inc. Safe Harbor Statement

M. Kevin McEvoy. CREDIT SUISSE 2013 Energy Summit February 5, 2013 Vail, CO. Oceaneering International, Inc. Safe Harbor Statement CREDIT SUISSE 2013 Energy Summit February 5, 2013 Vail, CO M. Kevin McEvoy President and CEO Oceaneering International, Inc. Safe Harbor Statement Statements we make in this presentation that express a

More information

Riser & Conductor Engineering. Houston Rio de Janeiro Aberdeen London Kuala Lumpur Perth Beijing

Riser & Conductor Engineering. Houston Rio de Janeiro Aberdeen London Kuala Lumpur Perth Beijing Riser & Conductor Engineering Houston Rio de Janeiro Aberdeen London Kuala Lumpur Perth Beijing About 2H Offshore 2H Offshore is a global engineering contractor specialising in the design, structural analysis

More information

Systems for the King Kong Field Development

Systems for the King Kong Field Development MOSAIC Certified Mariner Energy, Inc./Agip Petroleum King Kong Development Cameron MOSAIC Systems for the King Kong Field Development King Kong Development The King Kong Deepwater Gulf of Mexico Development

More information

28/08/2014. Introduction to Subsea Production Systems. Xmas Tree Systems. 04 Xmas Tree Systems

28/08/2014. Introduction to Subsea Production Systems. Xmas Tree Systems. 04 Xmas Tree Systems OIL & GAS Introduction to Subsea Production Systems 04 September 2014 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER Tubing Hanger 2 1 Goals Know purpose and basic function of a XT Understand the main

More information

Master Offshore Engineering

Master Offshore Engineering 1 Master Offshore Engineering 2 MSc Offshore Engineering Involves: Man-made structures or systems. On, in or under the sea. For the purpose of: - Winning a natural resource - Supporting a public facility.

More information

Electric heat tracing

Electric heat tracing PIPELINE DESIGN Figure 1. Shorter, more complex piping at a process plant. Electric heat tracing Neil Malone, Heat Trace, UK, discusses electric heat tracing of long pipelines. In considering electric

More information

A Hub Class Spar Production Platform for the Ultra-Deepwater Gulf of Mexico. Richard S. Mercier Shell Deepwater Development Systems Inc.

A Hub Class Spar Production Platform for the Ultra-Deepwater Gulf of Mexico. Richard S. Mercier Shell Deepwater Development Systems Inc. 13 th Annual Floating Production Systems Conference A Hub Class Spar Production Platform for the Ultra-Deepwater Gulf of Mexico Richard S. Mercier Shell Deepwater Development Systems Inc. Denby G. Morrison

More information

Introduction to Subsea Production System

Introduction to Subsea Production System Introduction to Subsea Production System 04 Xmas Tree Systems Bjørn Søgård Xmas Tree Systems This module will cover: Main codes for XT equipment XT Principles and functions Typical schematic Main types

More information

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS Augusto Bulte Project Manager Foster Wheeler C/Gabriel García Márquez 2 Las Rozas 28232 Madrid (Spain) ABSTRACT Several developments

More information

DELIVERY THROUGH TECHNOLOGY Parque das Conchas Project

DELIVERY THROUGH TECHNOLOGY Parque das Conchas Project DELIVERY THROUGH TECHNOLOGY Parque das Conchas Project Use this area for cover image (height 6.5cm, width 8cm) Marco Brummelhuis Development VP Upstream Brazil 11 May 2010 1 Disclaimer statement This presentation

More information

creating progress for the future

creating progress for the future CREATING PROGRESS OFFSHORE creating progress for the future CREATING PROGRESS SCANAOFFSHORE Scana Offshore group of companies will be present at the OTD in Stavanger, October 23-24 2013. The companies

More information

LOADING BUOYS FOR THE MANAVGAT RIVER WATER EXPORT PROJECT SOUTHERN TURKEY

LOADING BUOYS FOR THE MANAVGAT RIVER WATER EXPORT PROJECT SOUTHERN TURKEY Fourth International Water Technology Conference IWTC 99, Alexandria, Egypt 385 LOADING BUOYS FOR THE MANAVGAT RIVER WATER EXPORT PROJECT SOUTHERN TURKEY H. Denker*, S. AlHayari** and B. Maerten*** * EMT-AYDINER,

More information

Using the Proxy NPV Model for Value-Based Strategic Decisions

Using the Proxy NPV Model for Value-Based Strategic Decisions Using the Proxy NPV Model for Value-Based Strategic Decisions January 2011 Westney Consulting Group, Inc. www.westney.com The Importance of Value-Based Development Decisions The Influence Curve has long

More information

YOUR TRUSTED PARTNER FOR SUSTAINABLE SHIP DESIGN

YOUR TRUSTED PARTNER FOR SUSTAINABLE SHIP DESIGN YOUR TRUSTED PARTNER FOR SUSTAINABLE SHIP DESIGN Magnus Wikander FKAB Marine Design Will LNG change the way ships are bunkering? LNG fuel for shipping Introduction - Objective; to create discussion - Very

More information

Subsea School The training program

Subsea School The training program Subsea School The training program Table of Contents Welcome to the FMC Subsea School... 3 Training Schedules and Participation... 4 SS Subsea Technology Introduction... 5 MPS - Subsea Structures... 6

More information

The use of drag embedment anchors in offshore applications

The use of drag embedment anchors in offshore applications The use of drag embedment anchors in offshore applications by Senol Ozmutlu Vryhof Anchors BV Netherlands OTEO International Conference on Offshore Renewable Energy, 10-12 May 2012, Porto Contents Introduction

More information

Languages: : French (Mother tongue), English (Fluent), Portuguese (Basic Level)

Languages: : French (Mother tongue), English (Fluent), Portuguese (Basic Level) curriculum vitae Name: : Jeremy de BARBARIN Position: : Engineering Manager Date/Place of Birth: : 14 th of June 1973 in Marseille (France) Nationality: : French Languages: : French (Mother tongue), English

More information

Subsea On a Stick. Knut Engene, Senior Vice President Field Development and Modifications (FD&M)

Subsea On a Stick. Knut Engene, Senior Vice President Field Development and Modifications (FD&M) Subsea On a Stick Knut Engene, Senior Vice President Field Development and Modifications (FD&M) Norskehavskonferansen March 31 st 2016 From Subsea to Dry Tree Unmanned Wellhead Platform (UWP) Subsea on

More information

Guidelines for FEASIBILITY STUDY

Guidelines for FEASIBILITY STUDY Guidelines for FEASIBILITY STUDY INTRODUCTION This document describes the best practices to be followed during the preparation of a Feasibility Study for the Facilities Development of an upstream asset.

More information

Technip Presentation. Knut Bø, Nyttårsoil Seminar, Orkanger 14. januar 2009

Technip Presentation. Knut Bø, Nyttårsoil Seminar, Orkanger 14. januar 2009 Technip Presentation Knut Bø, Nyttårsoil Seminar, Orkanger 14. januar 2009 Contents I. II. III. IV Technip at a glance Market Position & Trends Financial Performance Strategy Going Forward V. 2 I. Technip

More information

Cost effective shallow water field developments Means to improve project economics

Cost effective shallow water field developments Means to improve project economics Cost effective shallow water field developments Means to improve project economics INTSOK Seminar Paris, 28th May 2015 Ingvar Grøtberg, Manager Field Development 6/3/2015 Footer Industry Challenge Subsea

More information

Structural Monitoring

Structural Monitoring Structural Monitoring The Pulse way Our systems and services allow safe and efficient operations in challenging environments. Pulse is the leading provider of marine structural monitoring services and

More information

Offshore Drilling. Deep Water Challenges

Offshore Drilling. Deep Water Challenges Offshore Drilling Deep Water Challenges Well Control Old movies sometimes had an oil rig where rig workers are running away from the derrick, excitedly yelling We hit a gusher! That is not an acceptable

More information

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components TITLE Pipelines and Terminals Manual/Volume 3 - SECTION 02: SUBJECT 20: PURPOSE AND SCOPE During the normal lifetime of a pipeline it becomes necessary to add or remove piping, modify existing piping or

More information

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities Master Class Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities What you will learn: Skills and competencies in E&I oil and gas engineering Knowledge of the latest technologies

More information

A DEEPER LOOK AT MODULARIZATION IN FACILITIES CONSTRUCTION. Stephen Whitfield Oil and Gas Facilities Staff Writer

A DEEPER LOOK AT MODULARIZATION IN FACILITIES CONSTRUCTION. Stephen Whitfield Oil and Gas Facilities Staff Writer A DEEPER LOOK AT MODULARIZATION IN FACILITIES CONSTRUCTION Stephen Whitfield Oil and Gas Facilities Staff Writer The Eagle Louisiana, a modular capture vessel (MCV), docked at the Marine Well Containment

More information

An industrial perspective of the role of R&D and innovation in frontier gas monetization projects

An industrial perspective of the role of R&D and innovation in frontier gas monetization projects An industrial perspective of the role of R&D and innovation in frontier gas monetization projects Philip Hagyard, Senior Vice President, Gas Monetization, 3 rd Trondheim Gas Technology Conference (TGTC-3).

More information

DET NORSKE VERITAS TM

DET NORSKE VERITAS TM DET NORSKE VERITAS TM APPENDIX B HAZID REPORT NO./DNV REG NO.: 2013-4091 / 17TLT29-5 REV 1, 11.06.2013 DET NORSKE VERITAS Table of Contents Page 1 BACKGROUND AND SCOPE OF WORK... 2 2 METHODOLOGY... 4 3

More information

Improving UPTIME for Drilling Rigs

Improving UPTIME for Drilling Rigs Improving UPTIME for Drilling Rigs Why Modular Control Systems Make Sense Margaret Buckley, DTC International, March 2013 IADC Reliability In general, reliability (systemic def.) is the ability of a person

More information

Subsea Standard & Rules What is Subsea?

Subsea Standard & Rules What is Subsea? Subsea Standard & Rules What is Subsea? MEK4450 Standards and Rules Bjørn Søgård, Anders Husby Goals General knowledge of subsea development and production systems Understand the building blocks forming

More information

OTC MS. Abstract

OTC MS. Abstract OTC-25754-MS Benchmarking and Dynamic Simulation of Direct Electrical Heating (DEH) Operations in a Subsea Flowline C.E. Rawsthorne, BP Norge, A.R. Hall, BP Exploration Operating Company Ltd., H. Dong,

More information

Rockwell Automation in Oil & Gas

Rockwell Automation in Oil & Gas Rockwell Automation in Oil & Gas November 14, 2013 Rev 5058-CO900E Copyright 2013 Rockwell Automation, Inc. All Rights Reserved. Copyright 2013 Rockwell Automation, Inc. All Rights Reserved. 2 2013 Oil

More information

30th September 2010 Venice IPLOCA FABIO BRAGA AZEVEDO

30th September 2010 Venice IPLOCA FABIO BRAGA AZEVEDO IPLOCA 20100 OFFSHORE RIGID PI PELINES ENGINEERING PETR ROBRAS FABIO BRAGA AZEVEDO AGENDA PETROBRAS ORGANIZATION CHAR OFFSHORE PIPELINE ENGINEERING AT PETROBRAS ORGANIZATIO PIPELINE DESIGN PHASE PROJECTS

More information