1 Wayne County Airport Authority Contractor Outreach for the Public Open House Marriott Flynn Drive Romulus, Michigan March 31, 2015
2 Agenda WCAA Procurement Overview SBE Program DBE Program Prevailing Wage Policy Runway 4L/22R Program Sustainability Other Construction Bid Opportunities Comments and Questions
3 WCAA Procurement Overview Register on the Michigan Inter-Governmental Trade Network (MITN) at Pre-Solicitation Information and Questions Pre-Solicitation Meeting Modifications /Addenda Response to Solicitation Exceptions Cancellation/Rejection Bid Signatures No Responses (No Bid)
4 SBE Program Business Headquarters Air Trade Area (ATA) Genesee Macomb Washtenaw Lapeer Monroe Wayne Lenawee Oakland Livingston St. Clair 3-Year Average Gross Receipts Federal Small Business Administration (SBA) Size Standards Business Period of Operation At least 1 year More info on the SBE Program at:
5 Disadvantaged Business Enterprise (DBE) Program Disadvantaged Business Enterprise (DBE) WCAA is a recipient of USDOT federal funds. As such WCAA is required to have and monitor a DBE Program wherein percentage goals are set to level the playing field so that certain ethnic and women business owners, that are presumptively economically or socially disadvantaged, can participate on contracts. Michigan Unified Certification Program (MUCP) a. Must be certified with Michigan Certifying Agency: Detroit Department of Transportation (DDOT); Michigan Department of Transportation (MDOT); or Wayne County Human Relations. b. The MUCP directory is a list of Michigan-certified DBE and ACDBE firms and is available at
6 Disadvantaged Business Enterprise (DBE) Program Requirements for DBE Participation a. Genuine Participation b. No Pass-Through c. Must meet the standard of a Commercially Useful Function How Participation Can Be Achieved a. Contractor b. Subcontractor c. Supplier d. Trucker e. Joint Venture f. Mentor-Protégé Program Good Faith Efforts- Adequate documentation that supports a DBE commitment is lower than the DBE goal despite efforts otherwise
7 WCAA Prevailing Wage Policy & Davis-Bacon Act WCAA Prevailing Wage Policy/Davis-Bacon Act (DBA) Requirements Non-Federally Funded Construction Projects valued over $50,000 Require WCAA Prevailing Wage Policy Compliance Federally Funded Construction Projects valued over $2,000 Require DBA Prevailing Wage Compliance Applies to non-salaried Skilled Trades only General Decision for Prevailing Wage/Fringe values Submit Certified Payrolls weekly for compliance review Wage Rate Interviews conducted to verify compliance
8 Airfield Overview
9 Overall Project
10 Overall Project 460,000 SY of 17 thick Portland Cement Concrete Demolition 217,230 CY of New PCC Pavement 462,000 SY of Bituminous Concrete Milling 223,500 SY of Bituminous Shoulder Demolition 145,000 Tons of New Bituminous Concrete Pavement 15,000 LFof New AOA Chain Link Security Fence 1,008 New LED Lights 59 Miles of Airfield Lighting Cable 141,700 CY of Earthwork 89 Acres of Topsoiling / Seeding 155,000 SF of Painted Pavement Markings 135,300 LF of New Underdrain Pipe
11 Overall Project Three Construction Bid Packages 2015 Temporary AOA Fence (Non-Federally Funded) 2016 Large Scale Paving Project (Federally Funded) 2017 Smaller Scale Paving Project (Funding Source TBD)
12 Fence Project NEW ACCESS GATE NEW ACCESS GATE NEW SECURITY FENCE
13 Large Paving ASPHALT SHOULDER RECONSTRUCTION PCC PAVEMENT REPLACEMENT
14 Large Paving UNDERDRAIN IMPROVEMENTS
15 Large Paving SAFETY AREA GRADING
16 Small Paving ASPHALT SHOULDER RECONSTRUCTION PCC PAVEMENT REPLACEMENT
17 Small Paving UNDERDRAIN IMPROVEMENTS SAFETY AREA GRADING
18 Airfield Electrical Improvements NEW GUIDANCE SIGNS NEW RUNWAY CENTERLINE AND EDGE LIGHTS NEW TAXIWAY CENTERLINE AND EDGE LIGHTS RUNWAY GUARD LIGHTS, TOUCHDOWN ZONE LIGHTS
19 Existing Pavement Section 17 PCC 9 BITUMINOUS BASE 18 CRUSHED AGGREGATE BASE
20 Existing Pavement Section 17 PCC 9 BITUMINOUS BASE 18 CRUSHED AGGREGATE BASE 5-10 ASPHALT SHOULDER 9 AGGREGATE BASE
21 Pavement Demolition REMOVE 17 PCC 3 MILL BITUMINOUS BASE FULL DEPTH SHOULDER REMOVAL AND EXCAVATION
22 Proposed Pavement Section UNDERDRAIN IMPROVEMENTS NEW 5 ASPHALT SHOULDER NEW 9 AGGREGATE BASE
23 Proposed Pavement Section NEW 17 PCC NEW 3 BITUMINOUS BASE OVERLAY UNDERDRAIN IMPROVEMENTS NEW 5 ASPHALT SHOULDER NEW 9 AGGREGATE BASE
24 Summary Portland Cement Concrete Demolition New PCC Pavement Bituminous Concrete Milling / Demolition New Bituminous Concrete Pavement New AOA Chain Link Security Fence New LED Lights Earthwork Underdrain Airfield Pavement Markings 2015 Fence (AOA) 2016 Large Paving (non-aoa) 2017 Smaller Paving (AOA)
25 Commitment to Sustainability Sustainability Management Plan implementation Potential Runway 4L/22R Initiatives: LED Lighting Stormwater reuse Encourage Landfill Diversion Potential Public Involvement
26 OVERALL 2015 CONSTRUCTION PROJECTS MAP
27 Other Construction Bid Opportunities Airfield Airfield Pavement Rehabilitation Roadways, Bridges, Infrastructure 2015 Roadway Improvement Program 2015 Bridge Improvement Program East Service Drive Utility/Roadway Improvements Delta Hangar Parking Lot Rehabilitation Green Lot Parking Lot Rehabilitation Select Big Blue Deck Surface Parking Lot Rehab
28 Other Construction Bid Opportunities Facilities Parking Deck Improvements Fueling Facility and Fuel Management System at DTW and YIP Public Safety Magazine Storage Canopy McNamara Garage Parallel Walkway Building Demolitions (Berry Terminal, Bldg s 715, 358, 466, 355) New Airport Administration Building Terminals Checkpoint Podium North Terminal Curbside Improvements and Roof Ladders
29 Thank You Comments and Questions
SMALL BUSINESS ENTERPRISE (SBE) CERTIFICATION APPLICATION
SMALL BUSINESS ENTERPRISE (SBE) CERTIFICATION APPLICATION Published April 2015 SBE Program Eligibility Requirements: 1. Business headquarters or principal place of business is located within the Air Trade
More informationADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH
Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
More informationDOING BUSINESS WITH CDOT
DOING BUSINESS WITH CDOT Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges One of the largest state government agencies with an annual budget of $1.2 billion Primarily
More informationMICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018
MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics Airport Capital Improvement Plan 20142018 Prepared for: West Michigan Regional Airport Holland, Michigan August 2013 Contact: Mr.
More informationGetting Connected with the Colorado Department of Transportation (CDOT)
Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding
More informationPrequalification Application for IL HSR Tier 2 EA:
Prequalification Application for IL HSR Tier 2 EA: Project Name: Business Name of Applicant Contractor Number Business Address (Street or P.O. Box) City State Zip Code Telephone ( ) Telefax No. ( ) E-Mail
More informationHOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1. June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: 14-00000-01-GM
HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1 June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: 14-00000-01-GM This addendum consists of the following clarification: 1. Addendum #1 is attached and
More information225 statewide business consultants, 15 transportation consultants and 8 former CDOT engineers available to help you immediately!
SUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway! Connect2DOT Colorado Small Business Development Center Network (SBDC) program funded by CDOT Free training, consulting, and resources for small
More informationDate. Resubmit this form during the year if there are changes in your company ownership or financial standing.
COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor
More information1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
More informationThe Michigan Department of Transportation s (MDOT s) Small Business Program
The Michigan Department of Transportation s (MDOT s) Small Business Program MDOT s Small Business Program (SBP) is a race- and gender-neutral program designed to provide contracting opportunities for small
More informationNOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
More informationRunway 12R-30L Lambert St. Louis International Airport
CASE STUDY Runway 12R-30L Lambert St. Louis International Airport Reconstruction of Runway 12R-30L Lambert St. Louis International Airport Sponsor: City of St. Louis Design: Crawford, Murphy and Tilly
More informationDallas/Fort Worth International Airport Contractor Open House 12.7.2015
Dallas/Fort Worth International Airport Contractor Open House 12.7.2015 Dallas/Fort Worth International Airport Contractor Open House Opening Remarks 12.7.15 Khaled Naja Executive Vice President Airport
More informationSPECIFICATIONS, TERMS AND CONDITIONS FOR PAVING PROJECT
SPECIFICATIONS, TERMS AND CONDITIONS FOR PAVING PROJECT Sealed Bids DUE DATE: Tuesday, June 21, 2016 3:00 pm LOCATION: District Office: 2000 West State Street Coal Township, PA 17866 INSTRUCTIONS TO BIDDERS
More informationSmall Business Development Program April, 1, 2015. Kimberly Mitchell-Phillips Small Business Development Program Manager
Small Business Development Program April, 1, 2015 Kimberly Mitchell-Phillips Small Business Development Program Manager 1 Presentation Overview Ports Small Business Program Overview & Updates - Minority,
More informationRiverside County Transportation Department Summary of Bids
Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,
More informationPublic Access Users Guide Transportation Project Management Database (TPMD)
Public Access Users Guide Transportation Project Management Database (TPMD) The TPMD public access tool provides a quick and convenient way to look at transportation projects planned for Southeast Michigan
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationDescription Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
More informationTHE SAN JOAQUIN REGIONAL RAIL COMMISSION (SJRRC)
THE SAN JOAQUIN REGIONAL RAIL COMMISSION (SJRRC) FFY 2014-2016 DISADVANTAGED BUSINESS ENTERPRISE GOAL AND GOAL-SETTING METHODOLOGY REPORT SJRRC BOARD OF COMMISSIONERS APPROVAL: SUBMITTED TO U.S. DEPARTMENT
More informationSection 000 Organization of an Engineering District (Construction)
Table of Contents 1. General Policies and Provisions... 000-1 2. District Executive... 000-2 3. Assistant District Executive Design... 000-3 4. Assistant District Executive Maintenance... 000-4 5. Assistant
More information2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA
2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA Issued on January 7, 2015 1 ADVERTISEMENT FOR BIDS 2014/2015 ROADWAY PATCHING PROJECT JASPER COUNTY, GEORGIA Separate,
More informationLos Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
More informationCertification Programs Overview
Certification Programs Overview Disadvantaged Business Enterprise (DBE) Airport Concession Disadvantaged Business Enterprise (ACDBE) Minority and Women Business Enterprise (MB/WBE) Small Business Enterprise
More informationKANSAS DEPARTMENT OF HEALTH & ENVIRONMENT DIVISION OF ENVIRONMENT BUREAU OF WATER
Appendix E-1 Page 1 of 4 July 2008 KANSAS DEPARTMENT OF HEALTH & ENVIRONMENT DIVISION OF ENVIRONMENT BUREAU OF WATER KANSAS PUBLIC WATER SUPPLY LOAN FUND KANSAS WATER POLLUTION CONTROL REVLOVING LOAN FUND
More informationWayne County Airport Authority Board Meeting DRAFT AGENDA. Detroit Metro Airport Marriott Hotel 30559 Flynn Drive, Romulus, MI 48174 (734) 729-7555
Wayne County Airport Authority Board Meeting DRAFT AGENDA Detroit Metro Airport Marriott Hotel 30559 Flynn Drive, Romulus, MI 48174 (734) 729-7555 Thursday, 3/20/2014 2:00-4:30 PM ET I. ROLL CALL II. CONSENT
More informationCITY OF COOS BAY CITY COUNCIL Agenda Staff Report
CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public
More informationAPPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationSECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
More informationRICHMOND METROPOLITAN AUTHORITY RICHMOND EXPRESSWAY SYSTEM DECK REHABILITATION 2014 NORTHBOUND POWHITE OVER THE JAMES RIVER **********
RICHMOND METROPOLITAN AUTHORITY RICHMOND EXPRESSWAY SYSTEM DECK REHABILITATION 2014 NORTHBOUND POWHITE OVER THE JAMES RIVER ********** February 11, 2014 DESCRIPTION The Invitation to Bid and Very High
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationFLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
More informationLOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST
LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST The following checklist has been developed to ensure that all required aspects of a project approved for Federal funding have been addressed and a responsible
More informationChapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationTabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14
Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:
More informationSUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:
September 22, 2009 Updated November 16, 2009 SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: 1. DESCRIPTION: The cross slopes of the roadway are to be constructed as detailed in the plans and within
More information2014 Inlet Rehab Project II Various Locations
2014 Inlet Rehab Project II Various Locations in the City of Sioux Falls, South Dakota Bid Request No. 14-1078 Prepared by: Engineering Division 224 West 9 th Street Sioux Falls, SD 57104 TABLE OF CONTENTS
More informationSection 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES
Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge
More informationMonitoring Highway Assets with Remote Technology
Monitoring Highway Assets with Remote Technology For the Michigan Department of Transportation July 2013 DYE MANAGEMENT GROUP, INC. Project Scope Summary of Technologies Aerial Imagery with LiDAR Mobile
More informationCase Studies - Concrete Overlays
Case Studies - Concrete Overlays Lessons Learned - Concrete Overlays Purdue Road School March 6, 2013 Today s Topic 1. Overlays 2. New Full-depth 3. Pervious 4. Roller Compacted 5. Full Depth Patching
More informationCONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR
PH 231.946.5874 FAX 231.946.3703 WWW.gourdiefraser.com CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR Little Traverse Bay Bands of Odawa Indians Nine Mile Point Boat Launch Hayes Township, Charlevoix
More informationPermeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
More informationINDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS
INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: October 03, 2007 TIME OF LETTING: 10:00 AM EASTERN DST Sealed proposals for certain highway improvements as described
More informationCONNECTING THE WORLD TO CHICAGO
CONNECTING THE WORLD THE Conference University of Illinois February 24, 2015 1 Rahm Emanuel Mayor Michael D. Boland Acting Commissioner TODAY S PRESENTATION Chicago Department of Aviation Overview, O Hare
More informationWelcome to the City of Chicago. Department of Procurement Services. Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer
Welcome to the Bid & Bond Room Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer The remains committed to the growth and development of small, minority and women-owned business enterprises and
More informationTRANSPORTATION: ROAD CONSTRUCTION WARRANTIES. William E. Hamilton, Senior Fiscal Analyst
fiscal forum March 2001 A Legislative Briefing Mitchell E. Bean, Director P. O. Box 30014, Lansing, MI 48909-7514 517-373-8080! FAX 517-373-5874! www.house.state.mi.us/hfa TRANSPORTATION: ROAD CONSTRUCTION
More informationHow To Become A Disadvantaged Business Owner
Disadvantaged Business Enterprise (DBE) Program Certification Workshop Presented by: Zakiya Wright, Certification Specialist Shona Meadows, Certification Specialist DISADVANTAGED BUSINESS ENTERPRISE PROGRAM
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationMDOT Prevailing Wage Compliance
MDOT Prevailing Wage Compliance Introduction - MDOT Oversight / Labor Standards Statutes Chris Roe MDOT Prevailing Wage Compliance (517) 202-3716 roec@michigan.gov Contract Documents Wage Decisions Wage
More informationIf any work as a Project or Construction Manager does applicant carry an E & O policy? Yes No If yes, describe:
Member companies of Western World Insurance Group Western World Insurance Company Tudor Insurance Company Stratford Insurance Company Application For General Contractors Business Name Street Address City
More informationPreliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006
Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)
More informationDemo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts
SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required
More informationSUBCONTRACTOR Pre-Qualification Form
Please complete the form below and email (form and all attachments) to prequal@cswcontractors.com or fax to 602-266-7070. If all information is not provided and all attachments are not submitted this will
More informationCOMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION SMALL BUSINESS ENTERPRISE PROGRAM OVERVIEW OF THE VDOT SMALL BUSINESS ENTERPRISE PROGRAM
COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION SMALL BUSINESS ENTERPRISE PROGRAM OVERVIEW OF THE VDOT SMALL BUSINESS ENTERPRISE PROGRAM The Virginia Department of Transportation (VDOT) in accordance
More informationMetropolitan Nashville Airport Authority
Metropolitan Nashville Airport Authority MEMORANDUM TO: CC: FROM: Robert R. Wigington, President and CEO Douglas E. Kreulen, Senior Vice President and COO Stan Van Ostran, Vice President and CFO Davita
More informationCertification. Olivia Mendoza Office of Economic Development and International Trade Director, Minority Business Office
Minority & Women s Business Certification Olivia Mendoza Office of Economic Development and International Trade Director, Minority Business Office Certification Panelist Jim Kidd U.S. Small Business Administration
More information7. Do you perform any out of state work?... If yes, in what states and provide details of work performed
Applicant s Name* (*If more than one entity, attach separate sheet with description of each entity s operations, relationship to each other and ownership.) Contractors Application Agent Applicant Mailing
More information4/10/2011. April 18, 2010. Ken Weeden Laverne Hall Franklin Lee Donna Stevenson
April 18, 2010 of 1 Planning View Contract Compliance MBE Legal Perspective MBEconomic Outlook Ken Weeden Laverne Hall Franklin Lee Donna Stevenson 2 Moderator: Donna Stevenson Chief Executive Officer
More informationSECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK
13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,
More informationEmerging Business and Workforce Development Program Manual
Emerging Business and Workforce Development Program Manual September 5, 2014 Page Number Cover Page Paragraph EMERGING BUSINESS AND WORKFORCE DEVELOPMENT PROGRAM MANUAL - REVISIONS Revision Date Old Language
More informationConstruction Management of Multiple Projects within a Large Scale Program. Tim Mentel, PMP RDM Rick Hines, P.E. RDM. Agenda
Construction Management of Multiple Projects within a Large Scale Program Tim Mentel, PMP RDM Rick Hines, P.E. RDM Agenda Overview of Port Columbus Airport (CMH) 10R/28L Replacement Program Planning the
More informationCONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015
CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015 The Code of Federal Regulations (CFR) Title 23, part 112, and 23 CFR
More informationThis addendum is being issued to modify some sections of the RFB as well as to answer questions submitted by the question deadline.
REQUEST FOR BIDS (/RFB) FOR FIRE HYDRANT AND POST INDICATOR VALVES (PIV) INSPECTION, REPAIR / REPLACEMENT CONTROL No. 130071 ADDENDUM No. 1 ISSUE DATE: 08/15/2013 REVISED DEADLINE: 08/22/2013 AT 2:00 PM
More informationA mandatory pre bid walk through will be held on May 14, 2015 at 1:30 p.m. See Invitation to Bid for pre qualifications required to bid.
REQUEST FOR PROPOSALS (RFP) for CONSTRUCTION SERVICES at Hollywood Theater: Minimum Improvements and Add Alternates 2815 Johnson Street NE Minneapolis, MN 55418 Section 1: Introduction Out of the Past
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationDSBO Compliance Frequently Asked Questions (FAQ)
DSBO Compliance Frequently Asked Questions (FAQ) Office of Economic Development Division of Small Business Opportunity 201 W Colfax Ave, Dept 907 Denver, CO 80202 p: 720.913.1999 f: 720.913.1809 www.denvergov.org/dsbo
More informationNO ADDENDA ISSUED NAME OF BIDDER VIVIANO CONSTRUCTION LLC EARTHWORKS INC. BLACK ROCK ENTERPRISES, LLC
BID RESULTS AB2014-31B REBID LAWRENCE HOPEWELL TRAIL, TWIN PINES TRAIL, ROSEDALE LAKE, REED/BRYAN BARN ENTRANCE AND BALDPATE MOUNTAIN IMPROVEMENTS SEPTEMBER 23, 2014; NO BIDS RECEIVED AUGUST 22, 2014 WORK
More informationPlan of Construction Operations (PCO)
REQUEST FOR PROPOSAL APPENDIX G Plan of Construction Operations 13 006 A Taxi A Expansionn CLIENT: TradePort International Corporation, Operators of John C. Munro Hamilton International Airport (YHM) April
More information11-20-14 LETTING: 12-17-14 Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION 514126525 U077-018 KA 4101-01 CONTRACT PROPOSAL
11-20-14 LETTING: 12-17-14 Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION 514126525 U077-018 KA 4101-01 CONTRACT PROPOSAL 1. The Secretary of Transportation of the State of Kansas [Secretary] will accept
More informationCITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
More informationYou can connect with the State of Michigan s contracting office on through email by following this link:
1 You can connect with the State of Michigan s contracting office on through email by following this link: https://public.govdelivery.com/accounts/midepttmb/subscriber/new?topic_id=mid EPTTMB_309 or by
More informationOwner Controlled Insurance Program (OCIP) Overview
Owner Controlled Insurance Program (OCIP) Overview Prepared for Caltrans Oakland Touchdown Outreach Presented by: Willis One Bush Street, Suite 900 San Francisco CA 94104 (415) 981-1141 WHAT IS AN OCIP
More informationThe Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed.
CONSTRUCTION STATUS The Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed. Depending on the type of completion date shown in the
More informationNevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
More informationPavement Management Implementation: Success Stories for Maryland Counties
Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer
More informationINVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA
INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationFacilities Development Manual Chapter 19 Plans, Specifications and Estimates Section 5 Estimates
Facilities Development Manual Chapter 19 Plans, Specifications and Estimates Section 5 Estimates Wisconsin Department of Transportation FDM 19-5-1 General April 16, 2015 Section 5 of Chapter 19 is intended
More informationCONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
More informationCOST EFFECTIVE ROAD MAINTENANCE MARCH 2015
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on
More informationNevada Local Emerging Small Business (ESB) Program Frequently Asked Questions (Updated May 2014)
Nevada Local Emerging Small Business (ESB) Program Frequently Asked Questions (Updated May 2014) 1. Q: What is the ESB program and why should I participate? A: The ESB Program is designed to encourage
More informationOhio Department of Transportation Prebid Questions
Project No. 093005 Sale Date - 12/9/2009 Question Submitted: 11/10/2009 Are all underdrains to be replaced in both resurface and full depth areas? Where are the underdrains to be placed? In areas where
More informationCITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT
CITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT I. PROPOSAL INFORMATION AND SCORING These guidelines detail
More informationConstruction Management/ General Contractor Alternative Contracting Process
Clean Water State Revolving Fund Loan Program Construction Management/ General Contractor Alternative July 2011 Last Updated: 08/03/2011 By: Larry McAllister DEQ 11-WQ-027 Prepared by: Clean Water State
More informationCDOT Resources for Small Businesses
General Information Resources Civil Rights & Business Resource Center is responsible for promoting and maintaining equal opportunity and participation for highway construction contractors and consultants
More informationBidding and Contract Requirements:
CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the
More informationATTACHMENT A SHUTTLE SERVICE ROUTES
Page 1 of 32 Attachment A ATTACHMENT A SHUTTLE SERVICE ROUTES The shuttle service is detailed as follows: Employee Parking Lots Shuttle The Employee Shuttle transports Authority employees between the Employee
More informationEric Ross Federal Highway Administration Proposed Office of Performance Management
Life-Cycle Cost Analysis a Decision Making Tool Eric Ross Federal Highway Administration Proposed Office of Performance Management FHWA Tools Team Evaluation and Economic Investment Team development and
More informationPASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List
PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List At their Board meeting of August 21, 2013, the Trustees of the
More informationBuilding Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationSECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
More informationKIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General
More informationPRE BID MEETING AGENDA
PRE BID MEETING AGENDA Project Name: UCHC Academic Bldg. Addition & Renovation Meeting Location: UCHC, Farmington, CT Campus Project #: 901729 Meeting Date: December 10, 2014 1. Team Introductions: Construction
More information