Section 000 Organization of an Engineering District (Construction)
|
|
- Flora Willis
- 7 years ago
- Views:
Transcription
1 Table of Contents 1. General Policies and Provisions District Executive Assistant District Executive Design Assistant District Executive Maintenance Assistant District Executive Construction Assistant Construction Engineer Structure Control Engineer Materials Engineer Construction Services Engineer Proposal and Work Order Review Inspector-in-Charge Inspectors Labor Compliance/EEO Coordinator Finals Unit Geotechnical Engineer PennDOT Publication i
2 This Page Left Intentionally Blank PennDOT Publication ii
3 1. General Policies and Provisions This chapter addresses general policies and provisions regarding the organization of an engineering district. The Pennsylvania Department of Transportation divides the Commonwealth into eleven Engineering Districts, each headed by a district executive. The district executive is assisted in the operation of the Engineering District by the following individuals and their staff: assistant district executive design, assistant district executive maintenance, assistant district executive construction, community relations coordinator, district fiscal control officer, and district human resources officer. A typical District is organized along the following lines, however it should be noted that several districts have organizational variances under the ADEs for instance one has the contract management unit in construction other units are under different ADEs depending on the District. One District has a fourth ADE. PennDOT Publication
4 2. District Executive The district executive is in charge of all work performed in the District. This includes all functions, including design, construction and maintenance of highways and bridges, coordination with municipalities, and issuance of permits for access to state highways and design of traffic signals. The district executive s responsibility also includes programming, budgeting, personnel assignments, and performance review. It is the district executive s responsibility to ensure that all contracts for work within the District are fulfilled as written, including compliance with the specifications, drawings, special provisions, and standard drawings. PennDOT Publication
5 3. Assistant District Executive Design The assistant district executive (ADE) design is responsible for coordinating all activities in the District concerning the design of highways and bridges. The activities include those related to geotechnical issues, structures, planning organizations, and plan and contract development. Surveying, utility relocations, and right-of-way also come under the jurisdiction of the ADE design. PennDOT Publication
6 4. Assistant District Executive Maintenance The assistant district executive (ADE) maintenance is responsible for coordinating all activities related to accidents, traffic, roadside maintenance, municipal services, access and hauling permits, and maintenance of roadways and bridges (including snow removal). County maintenance managers and their staff report to the ADE maintenance. PennDOT Publication
7 5. Assistant District Executive Construction The assistant district executive (ADE) construction is responsible for coordinating all activities related to contract construction work. To accomplish this, the ADE has a staff that includes a support services engineer, assistant construction engineers, materials engineers and individuals responsible for safety, equal employment opportunity (EEO), labor compliance, work orders, finals, and audits. The safety, EEO, and labor compliance functions are often assigned to one individual. PennDOT Publication
8 6. Assistant Construction Engineer The assistant district construction engineer (ACE) is responsible for overseeing and monitoring several construction projects within the District. This ACE is the immediate supervisor of the inspector-in-charge and functions as a coordinator between the inspector-incharge and district units to assist in resolving issues and problems. The ACE chairs the pre-construction meeting, conducts final inspections, and monitors the progress of the project (including estimates). The ACE also assists the inspector-in-charge in resolving compliance issues with the contractor and in obtaining assistance in resolving project issues. PennDOT Publication
9 7. Structure Control Engineer The structure control engineer is responsible for providing specialized engineering guidance and direction relating to structures. The structure control engineer should inspect all bridge foundations during construction, review deck placement procedures, review falsework submissions, and be consulted whenever non-routine construction problems are encountered. In some Districts, an ACE also serves as the structure control engineer. PennDOT Publication
10 8. Materials Engineer The materials engineer is responsible for approval and monitoring of aggregate sources, bituminous concrete plants, and Portland cement concrete plants. This responsibility includes plants established on the project sites. The materials engineer and staff members review quality control plans for the various facilities and project-specific plans for paving operations. The staff provides inspection and monitoring at bituminous and concrete plants, as well as periodic sampling, inspection, and testing of aggregate sources. They are also available for assistance with project-related issues. PennDOT Publication
11 9. Construction Services Engineer The construction services engineer is responsible for a number of functions. These include: monitoring contractors compliance with labor requirements (such as wage rates, and trainees), monitoring contractors safety plans, monitoring contractors compliance with EEO requirements; and processing work orders and other information related to construction contracts. Duties assigned to the construction services engineer may vary by District. PennDOT Publication
12 10. Proposal and Work Order Review One individual in the District Construction Unit is responsible for work order and proposal review. He or she reviews proposals for construction projects prior to bid, with an emphasis on items such as clarity, completeness, constructability, and bidability, then provides comments to the design project manager to ensure that the highest-quality plans are provided for bid to contractors. During the construction of projects, conditions sometimes require adjustments to quantities or additional items not anticipated in the design process. Also, the Department sometimes finds it necessary to have the contractor perform the work using the force account procedure. In such instances, work orders must be generated by the project inspection staff and submitted to the District for review and approval. PennDOT Publication
13 11. Inspector-in-Charge The inspector-in-charge of a project is responsible for all inspection work on a project, and for providing direction and guidance to the inspectors. He or she monitors the various contractor activities, visits field operations, reviews reports and other records, and monitors sampling and testing of materials. The inspector-in-charge is responsible for explaining to a property owner how the project will affect the owner s property. He or she should not discuss damages or indicate what settlement the property owner will receive; the right-of-way administrator provides this information. The inspector-in-charge, however, is responsible for notifying the contractor not to trespass or do any work on private property unless the contractor has written permission from the property owner. If the inspector-in-charge finds that a structure or slope will extend beyond the right-of-way limit, he or she should report this to the assistant district construction engineer before construction is started. He or she should also report any condition that will require more work or material than indicated in the contract. The inspector-in-charge also ensures that the contractor s maintenance and protection of traffic efforts are in compliance with the approved plans, and directs appropriate changes when required. If a detour is utilized, the inspector-in-charge is responsible for monitoring the detour conditions. PennDOT Publication
14 12. Inspectors Inspectors are assigned to a construction project to assist the inspector-in-charge in monitoring the contractors operations. Inspectors have various levels of experience and carry titles and responsibilities accordingly. Inspectors monitor the contractor s work for compliance with the contract, observe and document quality control testing, record information, and document quantities for completed work. PennDOT Publication
15 13. Labor Compliance/EEO Coordinator Department construction contracts contain two requirements relative to the contractor s workforce: Wage rates for various classifications of employees, including laborers, operators, carpenters, and flaggers. A commitment by the contractor to have a certain portion of the work performed by Disadvantaged Business Enterprises (DBE), Women s Business Enterprises (WBE), or Minority Business Enterprises (MBE). The construction inspection staff is responsible for monitoring wage rates through interviews and payroll reviews. Contractor payrolls are also submitted to the district labor compliance officer for review and approval. If the project staff identify a problem, the district labor compliance officer assists in its resolution. At the time the contractor submits a bid, he or she commits to subcontracting a percentage of the work to DBE, WBE, or MBE firms. During the course of construction, this percentage is closely monitored via payrolls and estimates. The district EEO coordinator will periodically visit the project site for spot reviews or to assist the inspection staff in resolving issues. PennDOT Publication
16 14. Finals Unit The finals unit conducts a final audit of the project records after the completion of construction. Duties for this unit vary by District. Staff is usually available to assist in setting up project records and may perform periodic audits to ensure conformance. PennDOT Publication
17 15. Geotechnical Engineer The geotechnical engineer is responsible for all work related to geology and associated engineering. He or she is responsible for oversight of geotechnical research and design for foundations, slopes, and other issues in the design phase. The geotechnical engineer also assists with construction related issues, such as foundations, sinkholes, slides, and unstable material. PennDOT Publication
18 This Page Left Intentionally Blank PennDOT Publication
HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL
HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL Pennsylvania Department of Transportation PUB 412 (12-05) TABLE OF CONTENTS FOREWORD 3 DISCLAIMER 3 1.0 Doing Business with PennDOT 4 1.1 Contractor Requirements
More informationCONSTRUCTION COST ESTIMATES
Chapter 8 CONSTRUCTION COST ESTIMATES SCDOT BRIDGE DESIGN MANUAL April 2006 Table of Contents Section Page 8.1 PROGRAMMING ESTIMATES...8-1 8.1.1 Bridge Replacement Projects...8-1 8.1.2 Other Projects...8-1
More informationThe Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed.
CONSTRUCTION STATUS The Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed. Depending on the type of completion date shown in the
More informationI-84 Construction Oversight and Audit Services Task 1 Industry Evaluation
I-84 Construction Oversight and Audit Services Task 1 Industry Evaluation Connecticut Department of Transportation July 10, 2007 Contents Page I. Introduction... 1 II. Industry Overview and Basis for Selection...
More informationLOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST
LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST The following checklist has been developed to ensure that all required aspects of a project approved for Federal funding have been addressed and a responsible
More information1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
More informationCHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES
CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES 15.1 OVERVIEW To effectively assure Equal Employment Opportunity (EEO), the Federal Highway Administration (FHWA) requires
More informationWork Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management
The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified
More informationREQUEST FOR PROPOSAL/QUALIFICATIONS VILLAGE ENGINEER
VILLAGE OF NEWTOWN 3537 Church Street Newtown, Ohio 45244 (513)561-7097 ~ Fax (513)561-7555 Established 1792 REQUEST FOR PROPOSAL/QUALIFICATIONS VILLAGE ENGINEER REQUEST FOR PROPOSAL/QUALIFICATIONS Contract
More informationAirport Safety and Construction Management Under The FAA
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Quality Management for Federally Funded Airport Construction Projects Date: DRAFT Initiated by: AAS-100 AC No.:
More informationBureau of Recreation and Conservation (BRC) Administrative Policy/Grant Guidelines
COMMONWEALTH OF PENNSYLVANIA Department of Conservation and Natural Resources Bureau of Recreation and Conservation (BRC) Administrative Policy/Grant Guidelines SUBJECT: Development Project Management
More informationWork Breakdown Structure Element Dictionary Construction
Initiation CON 5.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope, including the solicitation for a contractor
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2014 THROUGH 2016
NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2014 THROUGH 2016 The New Jersey Department of Transportation (NJDOT) has established a Disadvantaged
More informationWork Breakdown Structure Element Dictionary. Final Design
Initiation FD 4.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope. The lead office develops these project parameters
More informationGetting Connected with the Colorado Department of Transportation (CDOT)
Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding
More informationINDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM
1/1/13 INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM The purpose of the Qualified Laboratory and Technician Program is to establish policies, procedures, and guidelines
More informationInternal Audit RFP 2013 Questions and Answers
Question set 1: 1. What do you like about your current outsource IA arrangement and what has prompted your consideration of alternative providers? IIT policy requires periodic placement of IA business
More informationCONTRACTOR COMPLIANCE
CONTRACTOR COMPLIANCE The Arkansas State Highway and Transportation Department is committed to equal employment opportunity. This commitment includes working cooperatively with highway construction contractors
More informationChapter IV - Labor Compliance (LC) Program Oversight and Procedures (FHWA-1273 IV.,V.)
Chapter IV - Labor Compliance (LC) Program Oversight and Procedures (FHWA-1273 IV.,V.) 1. Labor Compliance Program Objectives The NMDOT Labor Compliance (LC) Program is established under the guidance and
More informationLOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONTRACT COMPLIANCE PROGRAM MANUAL DECEMBER 2013 EQUAL EMPLOYMENT OPPORTUNITY PROGRAM CONTRACT COMPLIANCE PROGRAM LOUISIANA DEPARTMENT OF TRANSPORTATION
More informationMarion County Public Works
Marion County Public Works Federally Funded Transportation Program Title VI Annual Accomplishment Report Fiscal Year 2014/15 Marion County Public Works Department Introduction The Marion County Department
More informationUtility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way
Public Works Department Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way October 2015 HillsboroughCounty.org HILLSBOROUGH COUNTY Office of the County
More informationCIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY. Field Procedures Manual
New Mexico Department of Transportation Office of Equal Opportunity Programs CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY Field Procedures Manual Americans with Disabilities Act (ADA) Program Disadvantaged
More informationFinal Audit Follow-up As of January 31, 2014
Final Audit Follow-up As of January 31, 2014 T. Bert Fletcher, CPA, CGMA City Auditor Compliance with the City s MBE Program Policy and Federal DBE Policy for Selected Capital Construction Projects (Report
More informationCONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division
CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division Contractor: Complete this checklist. Attach all required documentation and send to the NDOT Contract
More informationNew Hope-Solebury School District REQUEST FOR PROPOSAL
INTENT New Hope-Solebury School District (the District) is soliciting proposals from qualified licensed law firms to represent the district in basic legal matters and litigation, excluding litigation handled
More informationINTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7
INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006 Control Objectives Example Control Activities Audit Procedures 1. INTERNAL AUDITS Management should periodically
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationCHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
More informationDate. Resubmit this form during the year if there are changes in your company ownership or financial standing.
COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor
More informationNotes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive
Jacobs Contract performance Tracking spreadsheet = Excellent 2 = Meets performance standards 1 = Improvement needed 0= Unsatisfactory Report for the time period: Annual report 210 Total average score 2.86
More informationGENERAL. This manual addresses five local programs that are funded under the current Highway Act:
OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal
More informationUNITED STATES DISTRICT COURT NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION
UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION UNITED STATES OF AMERICA ) No. ) v. ) Violations: Title 18, United States Code, ) Sections 2, 1001(a)(2), and 1341 AZTECA SUPPLY
More informationAppendix A Alternative Contracting General Engineering Consultant RFP. Appendix A
Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement
More informationGUILFORD COUNTY SCHOOLS JOB DESCRIPTION JOB TITLE: EXECUTIVE DIRECTOR FACILITIES AND CONSTRUCTION MANAGEMENT GENERAL STATEMENT OF JOB
GUILFORD COUNTY SCHOOLS JOB DESCRIPTION JOB TITLE: EXECUTIVE DIRECTOR FACILITIES AND CONSTRUCTION GENERAL STATEMENT OF JOB Under limited supervision, performs responsible Facility Services work to carry
More informationReasons for Change Orders
T E X A S D E PA R T M E N T O F T R A N S P O R TAT I O N A change order is defined in the 2004 Standard Specification Book as a written order to the Contractor detailing changes to the specified work,
More informationChapter 10 - Contract Completion
Chapter 10 - Contract Completion Construction Manual 1-1000 General This Chapter contains guidelines that are followed on projects inspected and administered by the Department and its construction engineering
More informationWelcome to the City of Chicago. Department of Procurement Services. Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer
Welcome to the Bid & Bond Room Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer The remains committed to the growth and development of small, minority and women-owned business enterprises and
More informationStructures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.
More informationRoadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
More informationQuality Assurance Program for Design-Bid-Build Projects. January 2016. 2016 by Texas Department of Transportation 512/506-5802 All Rights Reserved
Quality Assurance Program for Design-Bid-Build Projects January 2016 2016 by Texas Department of Transportation 512/506-5802 All Rights Reserved TABLE OF CONTENTS SECTION 1 - INTRODUCTION... 4 1.1 Overview...
More informationDesign-Build Mississippi Gate Additional Lane
Design-Build Mississippi Gate Additional Lane Buckley Air Force Base, Colorado Completion Date: December 2010 Client: United States Army Corps of Engineers Omaha District Project Reference: Jennifer McQueen,
More informationREQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT
REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Table of Contents I. Events Calendar. 1 II. Introduction.. 2 III. Inquires.
More informationTOWNSHIP OF BLOOMFIELD PUBLIC NOTICE FOR THE SOLICITATION OF PROFESSIONAL SERVICE CONTRACTS FOR FINANCIAL ADVISORY SERVICES
TOWNSHIP OF BLOOMFIELD PUBLIC NOTICE FOR THE SOLICITATION OF PROFESSIONAL SERVICE CONTRACTS FOR FINANCIAL ADVISORY SERVICES NOTICE IS HEREBY GIVEN that sealed submissions will be received by the Township
More informationCHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (03/12) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE MDOT PROJECT MANAGER JOB NUMBER (JN)
More informationSTATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION
STATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION TITLE GRADE EEO-4 CODE RIGHT-OF-WAY SUPERVISOR 39 A 7.412 SERIES CONCEPT Right-of-Way Agents appraise,
More informationPennsylvania Asphalt Improvement Network (PASIN) Hot Mix Asphalt Industry Baseline Assessment Report. December 2006
Pennsylvania Asphalt Improvement Network (PASIN) Hot Mix Asphalt Industry Baseline Assessment Report December 2006 Table of Contents INTRODUCTION... 4 SECTION 1: EXECUTIVE SUMMARY... 4 1. Methodology...4
More informationMaster Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope
Activity Code 24010 B-1 Planning Considerations Estimating System Survey (ICR) Purpose and Scope The major objectives of this audit are to: Evaluate the adequacy of and the contractor s compliance with
More informationCertified Payrolls Certified Payrolls Submittal Requirements Notice of Delinquent Certified Payroll
Certified Payrolls Certified Payrolls Weekly certified payrolls covering the s and sub s workforce shall be submitted to the engineer on all MDOT-let contracts. Certified payrolls are required for all
More informationPatrece Richardson, Minority Business Officer REVISED 04/092015 PAGE 1
DALLAS COUNTY MINORITY/WOMEN OWNED BUSINESS ENTERPRISE DISADVANTAGED BUSINESS ENTERPRISE AND HISTORICALLY UNDERUTILIZED BUSINESS PROGRAM SPECIFICATIONS Patrece Richardson, Minority Business Officer REVISED
More informationPrequalification Application for IL HSR Tier 2 EA:
Prequalification Application for IL HSR Tier 2 EA: Project Name: Business Name of Applicant Contractor Number Business Address (Street or P.O. Box) City State Zip Code Telephone ( ) Telefax No. ( ) E-Mail
More informationWork Type Definition and Submittal Requirements
Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials
More informationProject Accidents. Section. Responsibilities of the Inspector-in-Charge
Section 10 Project Accidents Responsibilities of the Inspector-in-Charge A ccidents happen. By paying attention to your surroundings, remembering safe working habits and practicing all that you ve learned,
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More informationChapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationCounty Insurance. #296 Risk Management
#296 Risk Management Fund Overview The Risk Management Division of the Department of Finance oversees the County Insurance Fund. Its mission is to ensure the health and safety of County residents, employees,
More information5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN
5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN NOTE: This document is generally written in the imperative mood. The subject, "the Contractor" is implied. Also implied in this language are "shall",
More informationSTATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION ALASKA CLEAN WATER FUND & ALASKA DRINKING WATER FUND
STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION ALASKA CLEAN WATER FUND & ALASKA DRINKING WATER FUND DISADVANTAGE BUSINESS ENTERPRISES OVERVIEW The loan recipient, consultant and contractor of
More informationConstruction Management Program
Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of
More informationPITTSBURG UNIFIED SCHOOL DISTRICT
PITTSBURG UNIFIED SCHOOL DISTRICT New Construction and Modernization Projects PRE-QUALIFICATION PROGRAM QUESTIONNAIRE FOR PROJECTS $20 MILLION AND OVER TABLE OF CONTENTS PAGE NO. GENERAL INFORMATION.......i
More informationFrequently Asked Questions Concerning the Public Bidding and Prevailing Wage Requirements of New Jersey Charter Schools
Frequently Asked Questions Concerning the Public Bidding and Prevailing Wage Requirements of New Jersey Charter Schools 1. Are charter schools required to comply with New Jersey public bidding requirements
More informationCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT Characteristic of Construction Industry One of the biggest sector as * total turnover is more than $3,9 trillion annually * 7 million employee (USA) Affects vast and different industries:
More informationQUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park
QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract
More informationScope of Work Construction Inspection and Materials Testing Services
Glenwood Resident Engineer 202 Centennial Drive Glenwood Springs, CO 81601 Scope of Work Construction Inspection and Materials Testing Services Estimated Start Date: November 1, 2015 Region 3 Project:
More informationPROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES
CHAPTER 5 - Construction Project Management Contents Introduction... 2 Construction Contract Management... 2 CEI Contracts... 3 Community Awareness Plan... 7 Alternative Contracting Methods... 8 Warranty
More informationRFP-10-20 Courier and Logistics Services For the Indiana State Department of Health
RFP-10-20 Courier and Logistics Services For the Indiana State Department of Health Contacts: Shelley Harris, In Department of Administration sharris@idoa.in.gov 317.233.3105 Secretary of State Charles
More informationDESIGN-BUILD QUALITY MANAGEMENT PLAN OUTLINE
DESIGN-BUILD QUALITY MANAGEMENT PLAN OUTLINE DESIGN-BUILD PROJECT In developing its own QMP, the Design-Builder is encouraged to follow the organization and format of this QMP Outline. The Design-Builder
More informationCHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE
Bridge Inspection Handbook 5-1 CHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE 5.1 QUALITY CONTROL and QUALITY ASSURANCE are integrated into all aspects of bridge inspection. They contain the essential
More information15-213. Procurement practices of school districts and charter schools; definitions
ARIZONA AUTHORITY 15-213. Procurement practices of school districts and charter schools; definitions A. The state board of education shall adopt rules prescribing procurement practices for all school districts
More informationNothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time.
S13100A, page 1 Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time. DUTIES Serves as an Equal Business Opportunity Specialist
More informationConstruction Management Standards of Practice
Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388
More informationMobile Highway Construction App. Improving State Operations. Contact: Phil Tomassini, CIO. Pennsylvania Department of Transportation.
Mobile Highway Construction App Improving State Operations Contact: Phil Tomassini, CIO Pennsylvania Department of Transportation 400 North Street Harrisburg, PA 17105 717-783-2026 ptomassini@pa.gov Project
More informationCQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES
1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction
More informationSection 100 Contractor Quality Control Program
7/21/2014 AC 150/5370-10G Section 100 Contractor Quality Control Program 100-01 General. When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and
More informationLOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL
LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...
More informationCONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015
CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015 The Code of Federal Regulations (CFR) Title 23, part 112, and 23 CFR
More informationPUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN
PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN FOR THE VILLAGE OF HUNTLEY, ILLINOIS 2015 Contents Introduction 1 Purpose 1 Officials Responsible for Implementation 2 Public Notice 2 Grievance Procedure
More informationContract Administration
Chapter 5 Contract Administration Section 3 Change Orders 5-301 General 5-302 Change Order Policy 5-303 Purpose of Change Orders 5-304 Initiation of Change Orders 5-305 Preliminary Considerations 5-306
More informationHIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES
Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines
More informationprocedures, disputes, etc. Signs Notice to Proceed, and COTR letters, and other types as applicable. Notifies unsuccessful firms of award decisions.
S12101, Page 1 Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time. FUNCTIONAL DUTIES Serves as Contracts Manager, Phase
More informationCONTRACT ADMINISTRATION. Procedures
CONTRACT ADMINISTRATION Procedures Check the Capital Project Delivery web site to ensure this is the current version. Index Section Page Introduction 1 Contract Administration Final Design PS&E / Advertising
More informationCity of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E.
City of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E. GENERAL PURPOSE Under direction, manages, oversees, evaluates,
More informationThe Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH
The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH ONE ASHBURTON PLACE, ROOM 1819 BOSTON, MASSACHUSETTS 02108 A. JOSEPH DeNUCCI AUDITOR TEL. (617) 727-6200 NO. 2008-1461-3A INDEPENDENT STATE
More information225 statewide business consultants, 15 transportation consultants and 8 former CDOT engineers available to help you immediately!
SUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway! Connect2DOT Colorado Small Business Development Center Network (SBDC) program funded by CDOT Free training, consulting, and resources for small
More informationHow To Get Paid At A Public Work Project
I. PUBLIC WORK A. What is Public Work? In determining whether a construction project is public work, two conditions must be fulfilled in order for the provisions of Article 8 to apply to the project: 1.
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationCharacteristics of the Position
COUNTY OF COOK Bureau of Human Resources 118 N. Clark Street, Room 840 Chicago IL 60602 Job Code: 0081 Job Title: Director Salary Grade: 24 Bureau: Finance Department: Office of Contract Compliance Dept.
More informationTop 10 Compliance Risks For GSA Schedule Contractors
Top 10 Compliance Risks For GSA Schedule Contractors October 31, 2013 12pm EST Albert B. Krachman, Esq. Partner Blank Rome LLP 600 New Hampshire Ave, NW Washington, D.C. 20037 Tel: 202.772.5812 Krachman@BlankRome.com
More informationAppendix U. Environmental Compliance Monitoring Plan
RUBY PIPELINE PROJECT PLAN OF DEVELOPMENT Appendix U. Environmental Compliance Monitoring Plan U-1 June 2010 Environmental Compliance Monitoring Plan Ruby Pipeline Project May 2010 Table of Contents
More informationMetropolitan Nashville Airport Authority
Metropolitan Nashville Airport Authority MEMORANDUM TO: CC: FROM: Robert R. Wigington, President and CEO Douglas E. Kreulen, Senior Vice President and COO Stan Van Ostran, Vice President and CFO Davita
More informationCHAPTER 23. Contract Management and Administration
Date Issued: June 12, 2009 Date Last Revised: September 28, 2015 CHAPTER 23. Contract Management and Administration Table of Contents CHAPTER 23. Contract Management and Administration... 23-1 23.1 Policy...
More informationEngineering Department. Project Delivery. Roles and Responsibilities
Engineering Department Project Delivery Roles and Responsibilities 1/8/2013 Project Delivery TOC TABLE OF CONTENTS III. PROJECT DELIVERY 1 1.0 ROLES 1 1.1 DESIGN DIVISION (DD) 1 1.2 ENGINEERING MANAGEMENT
More information7.2.0 Appropriate Level of Fund Balance
NUMBER PRACTICES AGENDA DATES 2.9.0 Capitalization of Fixed Assets 11/14/2007 2.11.0 Investment Management 11/14/2007 2.13.0 Capital Expenditure 11/14/2007 2.14.0 Debt Service Payment Settlement 11/14/2007
More informationBRIEFLY DESCRIBE THE REVISIONS YOU ARE MAKING: Name: E-mail:
OMB CONTROL NO. 2030-0020 APPROVED: 06/30/2014 APPROVAL EXPIRES: 06/30/2017 U.S. ENVIRONMENTAL PROTECTION AGENCY MBE/WBE UTILIZATION UNDER FEDERAL GRANTS AND COOPERATIVE AGREEMENTS PART I. (Reports are
More informationADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH
Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct
More informationAn ordinance amending Chapter 82 of the Saint Paul Administrative Code revising the City s prevailing wage ordinance.
An ordinance amending Chapter 82 of the Saint Paul Administrative Code revising the City s prevailing wage ordinance. THE COUNCIL OF THE CITY OF SAINT PAUL DOES ORDAIN: Section 1 Chapter 82 of the Saint
More informationREQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT
REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT DUE: January 9, 2015 @ 5:00 PM Lopez Island School District 86 School Road Lopez Island, WA 98261 Contact: Bill Evans, Superintendent
More informationCHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
More informationDocument Comparison. AIA Documents A134 2009 and A131CMc 2003
Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections
More informationREQUEST FOR QUOTATIONS MEDICAL CODING AUDITING SERVICES 90-14-187-RFQ
MARICOPA COUNTY SPECIAL HEALTH CARE DISTRICT MARICOPA INTEGRATED HEALTH SYSTEM REQUEST FOR QUOTATIONS MEDICAL CODING AUDITING SERVICES 90-14-187-RFQ DATE OF ISSUE: MAY 5, 2014 DATE & TIME QUOTATIONS DUE:
More information