Section 000 Organization of an Engineering District (Construction)

Size: px
Start display at page:

Download "Section 000 Organization of an Engineering District (Construction)"

Transcription

1 Table of Contents 1. General Policies and Provisions District Executive Assistant District Executive Design Assistant District Executive Maintenance Assistant District Executive Construction Assistant Construction Engineer Structure Control Engineer Materials Engineer Construction Services Engineer Proposal and Work Order Review Inspector-in-Charge Inspectors Labor Compliance/EEO Coordinator Finals Unit Geotechnical Engineer PennDOT Publication i

2 This Page Left Intentionally Blank PennDOT Publication ii

3 1. General Policies and Provisions This chapter addresses general policies and provisions regarding the organization of an engineering district. The Pennsylvania Department of Transportation divides the Commonwealth into eleven Engineering Districts, each headed by a district executive. The district executive is assisted in the operation of the Engineering District by the following individuals and their staff: assistant district executive design, assistant district executive maintenance, assistant district executive construction, community relations coordinator, district fiscal control officer, and district human resources officer. A typical District is organized along the following lines, however it should be noted that several districts have organizational variances under the ADEs for instance one has the contract management unit in construction other units are under different ADEs depending on the District. One District has a fourth ADE. PennDOT Publication

4 2. District Executive The district executive is in charge of all work performed in the District. This includes all functions, including design, construction and maintenance of highways and bridges, coordination with municipalities, and issuance of permits for access to state highways and design of traffic signals. The district executive s responsibility also includes programming, budgeting, personnel assignments, and performance review. It is the district executive s responsibility to ensure that all contracts for work within the District are fulfilled as written, including compliance with the specifications, drawings, special provisions, and standard drawings. PennDOT Publication

5 3. Assistant District Executive Design The assistant district executive (ADE) design is responsible for coordinating all activities in the District concerning the design of highways and bridges. The activities include those related to geotechnical issues, structures, planning organizations, and plan and contract development. Surveying, utility relocations, and right-of-way also come under the jurisdiction of the ADE design. PennDOT Publication

6 4. Assistant District Executive Maintenance The assistant district executive (ADE) maintenance is responsible for coordinating all activities related to accidents, traffic, roadside maintenance, municipal services, access and hauling permits, and maintenance of roadways and bridges (including snow removal). County maintenance managers and their staff report to the ADE maintenance. PennDOT Publication

7 5. Assistant District Executive Construction The assistant district executive (ADE) construction is responsible for coordinating all activities related to contract construction work. To accomplish this, the ADE has a staff that includes a support services engineer, assistant construction engineers, materials engineers and individuals responsible for safety, equal employment opportunity (EEO), labor compliance, work orders, finals, and audits. The safety, EEO, and labor compliance functions are often assigned to one individual. PennDOT Publication

8 6. Assistant Construction Engineer The assistant district construction engineer (ACE) is responsible for overseeing and monitoring several construction projects within the District. This ACE is the immediate supervisor of the inspector-in-charge and functions as a coordinator between the inspector-incharge and district units to assist in resolving issues and problems. The ACE chairs the pre-construction meeting, conducts final inspections, and monitors the progress of the project (including estimates). The ACE also assists the inspector-in-charge in resolving compliance issues with the contractor and in obtaining assistance in resolving project issues. PennDOT Publication

9 7. Structure Control Engineer The structure control engineer is responsible for providing specialized engineering guidance and direction relating to structures. The structure control engineer should inspect all bridge foundations during construction, review deck placement procedures, review falsework submissions, and be consulted whenever non-routine construction problems are encountered. In some Districts, an ACE also serves as the structure control engineer. PennDOT Publication

10 8. Materials Engineer The materials engineer is responsible for approval and monitoring of aggregate sources, bituminous concrete plants, and Portland cement concrete plants. This responsibility includes plants established on the project sites. The materials engineer and staff members review quality control plans for the various facilities and project-specific plans for paving operations. The staff provides inspection and monitoring at bituminous and concrete plants, as well as periodic sampling, inspection, and testing of aggregate sources. They are also available for assistance with project-related issues. PennDOT Publication

11 9. Construction Services Engineer The construction services engineer is responsible for a number of functions. These include: monitoring contractors compliance with labor requirements (such as wage rates, and trainees), monitoring contractors safety plans, monitoring contractors compliance with EEO requirements; and processing work orders and other information related to construction contracts. Duties assigned to the construction services engineer may vary by District. PennDOT Publication

12 10. Proposal and Work Order Review One individual in the District Construction Unit is responsible for work order and proposal review. He or she reviews proposals for construction projects prior to bid, with an emphasis on items such as clarity, completeness, constructability, and bidability, then provides comments to the design project manager to ensure that the highest-quality plans are provided for bid to contractors. During the construction of projects, conditions sometimes require adjustments to quantities or additional items not anticipated in the design process. Also, the Department sometimes finds it necessary to have the contractor perform the work using the force account procedure. In such instances, work orders must be generated by the project inspection staff and submitted to the District for review and approval. PennDOT Publication

13 11. Inspector-in-Charge The inspector-in-charge of a project is responsible for all inspection work on a project, and for providing direction and guidance to the inspectors. He or she monitors the various contractor activities, visits field operations, reviews reports and other records, and monitors sampling and testing of materials. The inspector-in-charge is responsible for explaining to a property owner how the project will affect the owner s property. He or she should not discuss damages or indicate what settlement the property owner will receive; the right-of-way administrator provides this information. The inspector-in-charge, however, is responsible for notifying the contractor not to trespass or do any work on private property unless the contractor has written permission from the property owner. If the inspector-in-charge finds that a structure or slope will extend beyond the right-of-way limit, he or she should report this to the assistant district construction engineer before construction is started. He or she should also report any condition that will require more work or material than indicated in the contract. The inspector-in-charge also ensures that the contractor s maintenance and protection of traffic efforts are in compliance with the approved plans, and directs appropriate changes when required. If a detour is utilized, the inspector-in-charge is responsible for monitoring the detour conditions. PennDOT Publication

14 12. Inspectors Inspectors are assigned to a construction project to assist the inspector-in-charge in monitoring the contractors operations. Inspectors have various levels of experience and carry titles and responsibilities accordingly. Inspectors monitor the contractor s work for compliance with the contract, observe and document quality control testing, record information, and document quantities for completed work. PennDOT Publication

15 13. Labor Compliance/EEO Coordinator Department construction contracts contain two requirements relative to the contractor s workforce: Wage rates for various classifications of employees, including laborers, operators, carpenters, and flaggers. A commitment by the contractor to have a certain portion of the work performed by Disadvantaged Business Enterprises (DBE), Women s Business Enterprises (WBE), or Minority Business Enterprises (MBE). The construction inspection staff is responsible for monitoring wage rates through interviews and payroll reviews. Contractor payrolls are also submitted to the district labor compliance officer for review and approval. If the project staff identify a problem, the district labor compliance officer assists in its resolution. At the time the contractor submits a bid, he or she commits to subcontracting a percentage of the work to DBE, WBE, or MBE firms. During the course of construction, this percentage is closely monitored via payrolls and estimates. The district EEO coordinator will periodically visit the project site for spot reviews or to assist the inspection staff in resolving issues. PennDOT Publication

16 14. Finals Unit The finals unit conducts a final audit of the project records after the completion of construction. Duties for this unit vary by District. Staff is usually available to assist in setting up project records and may perform periodic audits to ensure conformance. PennDOT Publication

17 15. Geotechnical Engineer The geotechnical engineer is responsible for all work related to geology and associated engineering. He or she is responsible for oversight of geotechnical research and design for foundations, slopes, and other issues in the design phase. The geotechnical engineer also assists with construction related issues, such as foundations, sinkholes, slides, and unstable material. PennDOT Publication

18 This Page Left Intentionally Blank PennDOT Publication

HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL

HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL Pennsylvania Department of Transportation PUB 412 (12-05) TABLE OF CONTENTS FOREWORD 3 DISCLAIMER 3 1.0 Doing Business with PennDOT 4 1.1 Contractor Requirements

More information

CONSTRUCTION COST ESTIMATES

CONSTRUCTION COST ESTIMATES Chapter 8 CONSTRUCTION COST ESTIMATES SCDOT BRIDGE DESIGN MANUAL April 2006 Table of Contents Section Page 8.1 PROGRAMMING ESTIMATES...8-1 8.1.1 Bridge Replacement Projects...8-1 8.1.2 Other Projects...8-1

More information

The Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed.

The Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed. CONSTRUCTION STATUS The Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed. Depending on the type of completion date shown in the

More information

I-84 Construction Oversight and Audit Services Task 1 Industry Evaluation

I-84 Construction Oversight and Audit Services Task 1 Industry Evaluation I-84 Construction Oversight and Audit Services Task 1 Industry Evaluation Connecticut Department of Transportation July 10, 2007 Contents Page I. Introduction... 1 II. Industry Overview and Basis for Selection...

More information

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST The following checklist has been developed to ensure that all required aspects of a project approved for Federal funding have been addressed and a responsible

More information

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road. SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information

More information

CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES

CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES 15.1 OVERVIEW To effectively assure Equal Employment Opportunity (EEO), the Federal Highway Administration (FHWA) requires

More information

Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management

Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified

More information

REQUEST FOR PROPOSAL/QUALIFICATIONS VILLAGE ENGINEER

REQUEST FOR PROPOSAL/QUALIFICATIONS VILLAGE ENGINEER VILLAGE OF NEWTOWN 3537 Church Street Newtown, Ohio 45244 (513)561-7097 ~ Fax (513)561-7555 Established 1792 REQUEST FOR PROPOSAL/QUALIFICATIONS VILLAGE ENGINEER REQUEST FOR PROPOSAL/QUALIFICATIONS Contract

More information

Airport Safety and Construction Management Under The FAA

Airport Safety and Construction Management Under The FAA U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Quality Management for Federally Funded Airport Construction Projects Date: DRAFT Initiated by: AAS-100 AC No.:

More information

Bureau of Recreation and Conservation (BRC) Administrative Policy/Grant Guidelines

Bureau of Recreation and Conservation (BRC) Administrative Policy/Grant Guidelines COMMONWEALTH OF PENNSYLVANIA Department of Conservation and Natural Resources Bureau of Recreation and Conservation (BRC) Administrative Policy/Grant Guidelines SUBJECT: Development Project Management

More information

Work Breakdown Structure Element Dictionary Construction

Work Breakdown Structure Element Dictionary Construction Initiation CON 5.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope, including the solicitation for a contractor

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2014 THROUGH 2016

NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2014 THROUGH 2016 NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2014 THROUGH 2016 The New Jersey Department of Transportation (NJDOT) has established a Disadvantaged

More information

Work Breakdown Structure Element Dictionary. Final Design

Work Breakdown Structure Element Dictionary. Final Design Initiation FD 4.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope. The lead office develops these project parameters

More information

Getting Connected with the Colorado Department of Transportation (CDOT)

Getting Connected with the Colorado Department of Transportation (CDOT) Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding

More information

INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM

INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM 1/1/13 INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM The purpose of the Qualified Laboratory and Technician Program is to establish policies, procedures, and guidelines

More information

Internal Audit RFP 2013 Questions and Answers

Internal Audit RFP 2013 Questions and Answers Question set 1: 1. What do you like about your current outsource IA arrangement and what has prompted your consideration of alternative providers? IIT policy requires periodic placement of IA business

More information

CONTRACTOR COMPLIANCE

CONTRACTOR COMPLIANCE CONTRACTOR COMPLIANCE The Arkansas State Highway and Transportation Department is committed to equal employment opportunity. This commitment includes working cooperatively with highway construction contractors

More information

Chapter IV - Labor Compliance (LC) Program Oversight and Procedures (FHWA-1273 IV.,V.)

Chapter IV - Labor Compliance (LC) Program Oversight and Procedures (FHWA-1273 IV.,V.) Chapter IV - Labor Compliance (LC) Program Oversight and Procedures (FHWA-1273 IV.,V.) 1. Labor Compliance Program Objectives The NMDOT Labor Compliance (LC) Program is established under the guidance and

More information

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONTRACT COMPLIANCE PROGRAM MANUAL DECEMBER 2013 EQUAL EMPLOYMENT OPPORTUNITY PROGRAM CONTRACT COMPLIANCE PROGRAM LOUISIANA DEPARTMENT OF TRANSPORTATION

More information

Marion County Public Works

Marion County Public Works Marion County Public Works Federally Funded Transportation Program Title VI Annual Accomplishment Report Fiscal Year 2014/15 Marion County Public Works Department Introduction The Marion County Department

More information

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way Public Works Department Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way October 2015 HillsboroughCounty.org HILLSBOROUGH COUNTY Office of the County

More information

CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY. Field Procedures Manual

CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY. Field Procedures Manual New Mexico Department of Transportation Office of Equal Opportunity Programs CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY Field Procedures Manual Americans with Disabilities Act (ADA) Program Disadvantaged

More information

Final Audit Follow-up As of January 31, 2014

Final Audit Follow-up As of January 31, 2014 Final Audit Follow-up As of January 31, 2014 T. Bert Fletcher, CPA, CGMA City Auditor Compliance with the City s MBE Program Policy and Federal DBE Policy for Selected Capital Construction Projects (Report

More information

CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division

CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division Contractor: Complete this checklist. Attach all required documentation and send to the NDOT Contract

More information

New Hope-Solebury School District REQUEST FOR PROPOSAL

New Hope-Solebury School District REQUEST FOR PROPOSAL INTENT New Hope-Solebury School District (the District) is soliciting proposals from qualified licensed law firms to represent the district in basic legal matters and litigation, excluding litigation handled

More information

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7 INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006 Control Objectives Example Control Activities Audit Procedures 1. INTERNAL AUDITS Management should periodically

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive Jacobs Contract performance Tracking spreadsheet = Excellent 2 = Meets performance standards 1 = Improvement needed 0= Unsatisfactory Report for the time period: Annual report 210 Total average score 2.86

More information

GENERAL. This manual addresses five local programs that are funded under the current Highway Act:

GENERAL. This manual addresses five local programs that are funded under the current Highway Act: OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal

More information

UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION

UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION UNITED STATES OF AMERICA ) No. ) v. ) Violations: Title 18, United States Code, ) Sections 2, 1001(a)(2), and 1341 AZTECA SUPPLY

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

GUILFORD COUNTY SCHOOLS JOB DESCRIPTION JOB TITLE: EXECUTIVE DIRECTOR FACILITIES AND CONSTRUCTION MANAGEMENT GENERAL STATEMENT OF JOB

GUILFORD COUNTY SCHOOLS JOB DESCRIPTION JOB TITLE: EXECUTIVE DIRECTOR FACILITIES AND CONSTRUCTION MANAGEMENT GENERAL STATEMENT OF JOB GUILFORD COUNTY SCHOOLS JOB DESCRIPTION JOB TITLE: EXECUTIVE DIRECTOR FACILITIES AND CONSTRUCTION GENERAL STATEMENT OF JOB Under limited supervision, performs responsible Facility Services work to carry

More information

Reasons for Change Orders

Reasons for Change Orders T E X A S D E PA R T M E N T O F T R A N S P O R TAT I O N A change order is defined in the 2004 Standard Specification Book as a written order to the Contractor detailing changes to the specified work,

More information

Chapter 10 - Contract Completion

Chapter 10 - Contract Completion Chapter 10 - Contract Completion Construction Manual 1-1000 General This Chapter contains guidelines that are followed on projects inspected and administered by the Department and its construction engineering

More information

Welcome to the City of Chicago. Department of Procurement Services. Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer

Welcome to the City of Chicago. Department of Procurement Services. Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer Welcome to the Bid & Bond Room Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer The remains committed to the growth and development of small, minority and women-owned business enterprises and

More information

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Quality Assurance Program for Design-Bid-Build Projects. January 2016. 2016 by Texas Department of Transportation 512/506-5802 All Rights Reserved

Quality Assurance Program for Design-Bid-Build Projects. January 2016. 2016 by Texas Department of Transportation 512/506-5802 All Rights Reserved Quality Assurance Program for Design-Bid-Build Projects January 2016 2016 by Texas Department of Transportation 512/506-5802 All Rights Reserved TABLE OF CONTENTS SECTION 1 - INTRODUCTION... 4 1.1 Overview...

More information

Design-Build Mississippi Gate Additional Lane

Design-Build Mississippi Gate Additional Lane Design-Build Mississippi Gate Additional Lane Buckley Air Force Base, Colorado Completion Date: December 2010 Client: United States Army Corps of Engineers Omaha District Project Reference: Jennifer McQueen,

More information

REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT

REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Table of Contents I. Events Calendar. 1 II. Introduction.. 2 III. Inquires.

More information

TOWNSHIP OF BLOOMFIELD PUBLIC NOTICE FOR THE SOLICITATION OF PROFESSIONAL SERVICE CONTRACTS FOR FINANCIAL ADVISORY SERVICES

TOWNSHIP OF BLOOMFIELD PUBLIC NOTICE FOR THE SOLICITATION OF PROFESSIONAL SERVICE CONTRACTS FOR FINANCIAL ADVISORY SERVICES TOWNSHIP OF BLOOMFIELD PUBLIC NOTICE FOR THE SOLICITATION OF PROFESSIONAL SERVICE CONTRACTS FOR FINANCIAL ADVISORY SERVICES NOTICE IS HEREBY GIVEN that sealed submissions will be received by the Township

More information

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Michigan Department Of Transportation 5100B (03/12) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE MDOT PROJECT MANAGER JOB NUMBER (JN)

More information

STATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION

STATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION STATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION TITLE GRADE EEO-4 CODE RIGHT-OF-WAY SUPERVISOR 39 A 7.412 SERIES CONCEPT Right-of-Way Agents appraise,

More information

Pennsylvania Asphalt Improvement Network (PASIN) Hot Mix Asphalt Industry Baseline Assessment Report. December 2006

Pennsylvania Asphalt Improvement Network (PASIN) Hot Mix Asphalt Industry Baseline Assessment Report. December 2006 Pennsylvania Asphalt Improvement Network (PASIN) Hot Mix Asphalt Industry Baseline Assessment Report December 2006 Table of Contents INTRODUCTION... 4 SECTION 1: EXECUTIVE SUMMARY... 4 1. Methodology...4

More information

Master Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope

Master Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope Activity Code 24010 B-1 Planning Considerations Estimating System Survey (ICR) Purpose and Scope The major objectives of this audit are to: Evaluate the adequacy of and the contractor s compliance with

More information

Certified Payrolls Certified Payrolls Submittal Requirements Notice of Delinquent Certified Payroll

Certified Payrolls Certified Payrolls Submittal Requirements Notice of Delinquent Certified Payroll Certified Payrolls Certified Payrolls Weekly certified payrolls covering the s and sub s workforce shall be submitted to the engineer on all MDOT-let contracts. Certified payrolls are required for all

More information

Patrece Richardson, Minority Business Officer REVISED 04/092015 PAGE 1

Patrece Richardson, Minority Business Officer REVISED 04/092015 PAGE 1 DALLAS COUNTY MINORITY/WOMEN OWNED BUSINESS ENTERPRISE DISADVANTAGED BUSINESS ENTERPRISE AND HISTORICALLY UNDERUTILIZED BUSINESS PROGRAM SPECIFICATIONS Patrece Richardson, Minority Business Officer REVISED

More information

Prequalification Application for IL HSR Tier 2 EA:

Prequalification Application for IL HSR Tier 2 EA: Prequalification Application for IL HSR Tier 2 EA: Project Name: Business Name of Applicant Contractor Number Business Address (Street or P.O. Box) City State Zip Code Telephone ( ) Telefax No. ( ) E-Mail

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

Project Accidents. Section. Responsibilities of the Inspector-in-Charge

Project Accidents. Section. Responsibilities of the Inspector-in-Charge Section 10 Project Accidents Responsibilities of the Inspector-in-Charge A ccidents happen. By paying attention to your surroundings, remembering safe working habits and practicing all that you ve learned,

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

County Insurance. #296 Risk Management

County Insurance. #296 Risk Management #296 Risk Management Fund Overview The Risk Management Division of the Department of Finance oversees the County Insurance Fund. Its mission is to ensure the health and safety of County residents, employees,

More information

5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN 5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN NOTE: This document is generally written in the imperative mood. The subject, "the Contractor" is implied. Also implied in this language are "shall",

More information

STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION ALASKA CLEAN WATER FUND & ALASKA DRINKING WATER FUND

STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION ALASKA CLEAN WATER FUND & ALASKA DRINKING WATER FUND STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION ALASKA CLEAN WATER FUND & ALASKA DRINKING WATER FUND DISADVANTAGE BUSINESS ENTERPRISES OVERVIEW The loan recipient, consultant and contractor of

More information

Construction Management Program

Construction Management Program Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of

More information

PITTSBURG UNIFIED SCHOOL DISTRICT

PITTSBURG UNIFIED SCHOOL DISTRICT PITTSBURG UNIFIED SCHOOL DISTRICT New Construction and Modernization Projects PRE-QUALIFICATION PROGRAM QUESTIONNAIRE FOR PROJECTS $20 MILLION AND OVER TABLE OF CONTENTS PAGE NO. GENERAL INFORMATION.......i

More information

Frequently Asked Questions Concerning the Public Bidding and Prevailing Wage Requirements of New Jersey Charter Schools

Frequently Asked Questions Concerning the Public Bidding and Prevailing Wage Requirements of New Jersey Charter Schools Frequently Asked Questions Concerning the Public Bidding and Prevailing Wage Requirements of New Jersey Charter Schools 1. Are charter schools required to comply with New Jersey public bidding requirements

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT Characteristic of Construction Industry One of the biggest sector as * total turnover is more than $3,9 trillion annually * 7 million employee (USA) Affects vast and different industries:

More information

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract

More information

Scope of Work Construction Inspection and Materials Testing Services

Scope of Work Construction Inspection and Materials Testing Services Glenwood Resident Engineer 202 Centennial Drive Glenwood Springs, CO 81601 Scope of Work Construction Inspection and Materials Testing Services Estimated Start Date: November 1, 2015 Region 3 Project:

More information

PROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES

PROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES CHAPTER 5 - Construction Project Management Contents Introduction... 2 Construction Contract Management... 2 CEI Contracts... 3 Community Awareness Plan... 7 Alternative Contracting Methods... 8 Warranty

More information

RFP-10-20 Courier and Logistics Services For the Indiana State Department of Health

RFP-10-20 Courier and Logistics Services For the Indiana State Department of Health RFP-10-20 Courier and Logistics Services For the Indiana State Department of Health Contacts: Shelley Harris, In Department of Administration sharris@idoa.in.gov 317.233.3105 Secretary of State Charles

More information

DESIGN-BUILD QUALITY MANAGEMENT PLAN OUTLINE

DESIGN-BUILD QUALITY MANAGEMENT PLAN OUTLINE DESIGN-BUILD QUALITY MANAGEMENT PLAN OUTLINE DESIGN-BUILD PROJECT In developing its own QMP, the Design-Builder is encouraged to follow the organization and format of this QMP Outline. The Design-Builder

More information

CHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE

CHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE Bridge Inspection Handbook 5-1 CHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE 5.1 QUALITY CONTROL and QUALITY ASSURANCE are integrated into all aspects of bridge inspection. They contain the essential

More information

15-213. Procurement practices of school districts and charter schools; definitions

15-213. Procurement practices of school districts and charter schools; definitions ARIZONA AUTHORITY 15-213. Procurement practices of school districts and charter schools; definitions A. The state board of education shall adopt rules prescribing procurement practices for all school districts

More information

Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time.

Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time. S13100A, page 1 Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time. DUTIES Serves as an Equal Business Opportunity Specialist

More information

Construction Management Standards of Practice

Construction Management Standards of Practice Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388

More information

Mobile Highway Construction App. Improving State Operations. Contact: Phil Tomassini, CIO. Pennsylvania Department of Transportation.

Mobile Highway Construction App. Improving State Operations. Contact: Phil Tomassini, CIO. Pennsylvania Department of Transportation. Mobile Highway Construction App Improving State Operations Contact: Phil Tomassini, CIO Pennsylvania Department of Transportation 400 North Street Harrisburg, PA 17105 717-783-2026 ptomassini@pa.gov Project

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

Section 100 Contractor Quality Control Program

Section 100 Contractor Quality Control Program 7/21/2014 AC 150/5370-10G Section 100 Contractor Quality Control Program 100-01 General. When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and

More information

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...

More information

CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015

CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015 CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015 The Code of Federal Regulations (CFR) Title 23, part 112, and 23 CFR

More information

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN FOR THE VILLAGE OF HUNTLEY, ILLINOIS 2015 Contents Introduction 1 Purpose 1 Officials Responsible for Implementation 2 Public Notice 2 Grievance Procedure

More information

Contract Administration

Contract Administration Chapter 5 Contract Administration Section 3 Change Orders 5-301 General 5-302 Change Order Policy 5-303 Purpose of Change Orders 5-304 Initiation of Change Orders 5-305 Preliminary Considerations 5-306

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information

procedures, disputes, etc. Signs Notice to Proceed, and COTR letters, and other types as applicable. Notifies unsuccessful firms of award decisions.

procedures, disputes, etc. Signs Notice to Proceed, and COTR letters, and other types as applicable. Notifies unsuccessful firms of award decisions. S12101, Page 1 Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time. FUNCTIONAL DUTIES Serves as Contracts Manager, Phase

More information

CONTRACT ADMINISTRATION. Procedures

CONTRACT ADMINISTRATION. Procedures CONTRACT ADMINISTRATION Procedures Check the Capital Project Delivery web site to ensure this is the current version. Index Section Page Introduction 1 Contract Administration Final Design PS&E / Advertising

More information

City of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E.

City of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E. City of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E. GENERAL PURPOSE Under direction, manages, oversees, evaluates,

More information

The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH

The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH ONE ASHBURTON PLACE, ROOM 1819 BOSTON, MASSACHUSETTS 02108 A. JOSEPH DeNUCCI AUDITOR TEL. (617) 727-6200 NO. 2008-1461-3A INDEPENDENT STATE

More information

225 statewide business consultants, 15 transportation consultants and 8 former CDOT engineers available to help you immediately!

225 statewide business consultants, 15 transportation consultants and 8 former CDOT engineers available to help you immediately! SUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway! Connect2DOT Colorado Small Business Development Center Network (SBDC) program funded by CDOT Free training, consulting, and resources for small

More information

How To Get Paid At A Public Work Project

How To Get Paid At A Public Work Project I. PUBLIC WORK A. What is Public Work? In determining whether a construction project is public work, two conditions must be fulfilled in order for the provisions of Article 8 to apply to the project: 1.

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

Characteristics of the Position

Characteristics of the Position COUNTY OF COOK Bureau of Human Resources 118 N. Clark Street, Room 840 Chicago IL 60602 Job Code: 0081 Job Title: Director Salary Grade: 24 Bureau: Finance Department: Office of Contract Compliance Dept.

More information

Top 10 Compliance Risks For GSA Schedule Contractors

Top 10 Compliance Risks For GSA Schedule Contractors Top 10 Compliance Risks For GSA Schedule Contractors October 31, 2013 12pm EST Albert B. Krachman, Esq. Partner Blank Rome LLP 600 New Hampshire Ave, NW Washington, D.C. 20037 Tel: 202.772.5812 Krachman@BlankRome.com

More information

Appendix U. Environmental Compliance Monitoring Plan

Appendix U. Environmental Compliance Monitoring Plan RUBY PIPELINE PROJECT PLAN OF DEVELOPMENT Appendix U. Environmental Compliance Monitoring Plan U-1 June 2010 Environmental Compliance Monitoring Plan Ruby Pipeline Project May 2010 Table of Contents

More information

Metropolitan Nashville Airport Authority

Metropolitan Nashville Airport Authority Metropolitan Nashville Airport Authority MEMORANDUM TO: CC: FROM: Robert R. Wigington, President and CEO Douglas E. Kreulen, Senior Vice President and COO Stan Van Ostran, Vice President and CFO Davita

More information

CHAPTER 23. Contract Management and Administration

CHAPTER 23. Contract Management and Administration Date Issued: June 12, 2009 Date Last Revised: September 28, 2015 CHAPTER 23. Contract Management and Administration Table of Contents CHAPTER 23. Contract Management and Administration... 23-1 23.1 Policy...

More information

Engineering Department. Project Delivery. Roles and Responsibilities

Engineering Department. Project Delivery. Roles and Responsibilities Engineering Department Project Delivery Roles and Responsibilities 1/8/2013 Project Delivery TOC TABLE OF CONTENTS III. PROJECT DELIVERY 1 1.0 ROLES 1 1.1 DESIGN DIVISION (DD) 1 1.2 ENGINEERING MANAGEMENT

More information

7.2.0 Appropriate Level of Fund Balance

7.2.0 Appropriate Level of Fund Balance NUMBER PRACTICES AGENDA DATES 2.9.0 Capitalization of Fixed Assets 11/14/2007 2.11.0 Investment Management 11/14/2007 2.13.0 Capital Expenditure 11/14/2007 2.14.0 Debt Service Payment Settlement 11/14/2007

More information

BRIEFLY DESCRIBE THE REVISIONS YOU ARE MAKING: Name: E-mail:

BRIEFLY DESCRIBE THE REVISIONS YOU ARE MAKING: Name: E-mail: OMB CONTROL NO. 2030-0020 APPROVED: 06/30/2014 APPROVAL EXPIRES: 06/30/2017 U.S. ENVIRONMENTAL PROTECTION AGENCY MBE/WBE UTILIZATION UNDER FEDERAL GRANTS AND COOPERATIVE AGREEMENTS PART I. (Reports are

More information

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct

More information

An ordinance amending Chapter 82 of the Saint Paul Administrative Code revising the City s prevailing wage ordinance.

An ordinance amending Chapter 82 of the Saint Paul Administrative Code revising the City s prevailing wage ordinance. An ordinance amending Chapter 82 of the Saint Paul Administrative Code revising the City s prevailing wage ordinance. THE COUNCIL OF THE CITY OF SAINT PAUL DOES ORDAIN: Section 1 Chapter 82 of the Saint

More information

REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT

REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT DUE: January 9, 2015 @ 5:00 PM Lopez Island School District 86 School Road Lopez Island, WA 98261 Contact: Bill Evans, Superintendent

More information

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction

More information

Document Comparison. AIA Documents A134 2009 and A131CMc 2003

Document Comparison. AIA Documents A134 2009 and A131CMc 2003 Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections

More information

REQUEST FOR QUOTATIONS MEDICAL CODING AUDITING SERVICES 90-14-187-RFQ

REQUEST FOR QUOTATIONS MEDICAL CODING AUDITING SERVICES 90-14-187-RFQ MARICOPA COUNTY SPECIAL HEALTH CARE DISTRICT MARICOPA INTEGRATED HEALTH SYSTEM REQUEST FOR QUOTATIONS MEDICAL CODING AUDITING SERVICES 90-14-187-RFQ DATE OF ISSUE: MAY 5, 2014 DATE & TIME QUOTATIONS DUE:

More information