City of Kelowna Wastewater Master Plan Update

Size: px
Start display at page:

Download "City of Kelowna Wastewater Master Plan Update"

Transcription

1 City of Kelowna Wastewater Master Plan Update 44th BCWWA Annual Conference & Tradeshow May 2, 2016 Urban Systems Ltd. Jeremy Clowes, P.Eng. GeoAdvice Engineering Inc. Werner de Schaetzen, Ph.D., P.Eng. 1

2 Presentation Outline Model Development Model Calibration Hydraulic Capacity Analysis Modeling Lessons Learned Results Proposed Upgrades and Estimated Costs Conclusion and Recommendations Questions 2

3 Introduction Urban Systems and GeoAdvice updated the City s master plan in 2015 Original plan was prepared in 1997 Main objectives of the update were to: Convert to a new software to allow for dynamic simulation Update and calibrate model Review most current growth projections Identify costs to address capacity deficiencies over 50 year planning horizon 3

4 Infrastructure Overview The City has: 572 km of gravity sewers 21 km of forcemains 34 lift stations 2 treatment plants 4

5 5

6 Modeling Tool Utilized to Evaluate Options and to Identify Likely Hydraulic Restrictions in the Sanitary System Computer Representation of the City of Kelowna, BC Sewer System using InfoSWMM Why? Predict how the system will perform under stress Predict how the system will perform in the future Evaluate options and return on investment before committing funds 6

7 InfoSWMM Software Innovyze GIS environment (ArcGIS) Open channel flow and pressurized flow Assumptions: Hydrograph Flow attenuation Pipe storage Dynamic simulation EPA SWMM Version 5.0 Convert existing InfoSewer model to InfoSWMM 7

8 GIS vs. Model GIS Geospatial database with coordinates Polygons, lines and points Facility general locations Access to other data sets Model Manhole, wet well, gravity main and pump Operational control rules and temporal variables Load area polygons and connectivity Model updated from GIS 8

9 Field Data Collection Validate System Loadings Estimate groundwater inflow Validate sanitary loads allocation and distribution Establish the 24-hour diurnal flow Review Peak Wet Weather Flow Assess Rainfall Dependent Inflow and Infiltration Calibrate/Validate the Model Enhance Understanding of the System High Value for Minimal Investment 9

10 Field Data Collection Program 7 sites monitored throughout collection system for approx. 2 months 10

11 Model Development Import/Update InfoSewer Model: Allow for dynamic analysis Add about 70 km of new sanitary mains Loading Assumptions: Metered Parcels: City consumption records Unmetered Parcels: Rates adjusted to match Raymer flow records SF Residential Growth: 250 L/d/cap, MF Residential Growth: 230 L/d/cap ICI Growth: 150 L/d/cap Special cases: Kelowna General Hospital and YLW I&I Assumptions: Pipes within water table: 8,000 L/ha/day Pipes above water table: 5,000 L/ha/day 11

12 Model Calibration Confidence: Demonstrate the model s ability to reproduce existing conditions. Understanding: Confirm the understanding of the performance of the system. Trouble Shooting: Uncover missing information and misinformation or anomalies about the system. 12

13 Average Hourly Flow (L/s) Average Hourly Flow (L/s) Average Hourly Flow (L/s) Average Hourly Flow (L/s) Model Calibration Results Flow Monitoring Site #1 - Calibration Results Flow Monitoring Site #2 - Calibration Results Hour Hour Field Data Model Flow Field Data Model Flow Flow Monitoring Site #3 - Calibration Results Flow Monitoring Site #4 - Calibration Results Hour Hour Field Data Model Data Field Data Model Flow 13

14 Average Hourly Flow (L/s) Average Hourly Flow (L/s) Average Hourly Flow (L/s) Average Hourly Flow (L/s) Model Calibration Results Flow Monitoring Site #5 - Calibration Results Flow Monitoring Site #6 - Calibration Results Hour Hour Field Data Model Data Field Data Model Flow Flow Monitoring Site #7 - Calibration Results Raymer WWTP - Validation Results Hour Hour 14 Field Data Model Flow Field Data Model Flow

15 Model Calibration Limitations Sources of errors Input data errors System loading errors Elevation errors Operational control errors Poorly calibrated measuring equipment Outdated data 15

16 Modeling Lessons Learned -1- Model = Approximation of real world Dynamic simulation provides significantly more accurate results than that of steady-state simulation Most work involves data collection/checking GIGO: Garbage In = Garbage Out Good calibration leads to good decisions Always check modeling results to make sure they are reasonable Informed decisions save time and money 16

17 Modeling Lessons Learned -2- Modeler will interact with Senior Management Operations Engineering Planning Do you have these parties identified? 17

18 Modeling Lessons Learned -3- Modeling Practice Data Entry Frequent checking Trial runs to show major data entry errors Plan runs before you make them Try different scenarios and alternatives Keep good records Modeling Standards Modeling is an Iterative Process 18

19 Hydraulic Capacity Criteria Gravity Mains Criteria d/d HGL Velocity 19

20 Hydraulic Capacity Criteria (Continued) Criteria Lift Stations 20

21 Hydraulic Capacity Criteria (Continued) Criteria Lift Stations 21

22 Hydraulic Capacity Criteria (Continued) Criteria Forcemains 22

23 Hydraulic Capacity Criteria (Continued) Criteria Raymer WWTP Treatment Capacity => ADWF and AWWF Hydraulic Capacity => PWWF 23

24 Analysis Scenarios: Deficiency and Sizing Scenarios Scenarios Evaluated Existing System with: 2014 Population (194,000 people actual and equivalent) 2020 Growth (+23,200 people actual and equivalent) 2040 Growth (+76,000 people actual and equivalent) Recommendation Sizing Scenario: 2070 Growth (+149,000 people actual and equivalent) 24

25 Hydraulic Capacity Results Existing Gravity Main Capacity Analysis 25

26 Hydraulic Capacity Results (Continued) 2020 Gravity Main Capacity Analysis 26

27 Hydraulic Capacity Results (Continued) 2040 Gravity Main Capacity Analysis 27

28 Hydraulic Capacity Results (Continued) Lift Stations Pump Station 2014 HLos Rating 2020 HLos Rating 2040 HLos Rating Airport Lift Station D E E Gyro Lift Station A E E Hillsborough Lift Station A A D Highway 97 Lift Station A D D 28

29 Hydraulic Capacity Results (Continued) I&I Analysis Observed rates consistent with City s design rates 5,000 L/d/ha pipes not in water table 8,000 L/d/ha pipes in water table Reasonable target for I&I is 11,200 L/d/ha (refer to 2003 FCM Guideline) Current level of I&I is reasonable 29

30 Hydraulic Capacity Results (Continued) Raymer WWTP WWTP Components Mechanical Screens Raw Sewage Pump Station Grit Chamber Primary Clarifiers Bioreactors Secondary Clarifiers Tertiary Filters UV Disinfection Outfall SCENARIO Existing L/s MLD L/s MLD L/s MLD L/s MLD L/s MLD L/s MLD L/s MLD L/s MLD L/s MLD Existing ADF Treatment Capacity n/a n/a n/a n/a Existing MDF Treatment Capacity n/a n/a n/a n/a Existing Hydraulic Capacity ADF = 470 L/s, 41 MLD AWWF = 858 L/s, 74 MLD PWWF = 971 L/s, 84 MLD ADF = 526 L/s, 45 MLD AWWF = 907 L/s, 78 MLD PWWF = 1038 L/s, 90 MLD ADF = 654 L/s, 57 MLD AWWF = 1049 L/s, 91 MLD PWWF = 1198 L/s, 104 MLD ADF = 830 L/s, 72 MLD AWWF = 1206 L/s, 104 MLD PWWF = 1371 L/s, 118 MLD Notes: ADF = Annual average day flow MDF = Max day flow AWWF = Max day wet weather flow PWWF = Peak hour wet weather flow Deficient Deficient Deficient Deficient Deficient Deficient Deficient Deficient Deficient Deficient Deficient Deficient Deficient Deficient 30

31 Design Criteria for Sizing Proposed Gravity Mains Criteria Sizing Scenario Parameter Value 2070 PWWF Maximum d/d ratio d/d < 0.50 Hydraulic Grade Line Minimum Velocity Material HGL < Ground elevation v > 0.75 m/s PVC Roughness Coefficient Manning n = Minimum Diameter (Residential) Minimum Diameter (ICI) Slope 200 mm 250 mm Assume same slope as existing gravity main 31

32 Proposed Upgrades Infrastructure Upgrade Recommendations: Infrastructure Upgrade Recommendation Gravity Mains 6.5 km Forcemains 1.2 km Lift Stations 3 Comparison of InfoSWMM/InfoSewer Recommendations: Software InfoSWMM InfoSewer Recommendations 6.5 km of Gravity Mains 24.1 km of Gravity Mains 32

33 Proposed Upgrades (Continued) Gravity Main Upgrade Staging Scenario Pipe Size Range (mm) Pipe Length (km) Existing 375 to to to $14.3M total estimated cost for proposed pipes 33

34 Proposed Upgrades (Continued) Lift stations Item Description Cost Scenario Triggering Upgrade 1 Airport Lift Station Upgrade $809, Gyro Lift Station and Forcemain Upgrade $1,840, Hillsborough Lift Station Upgrade $653, Subtotal $3,302,000 Engineering and Contingency $1,321,000 Total (rounded) $4,623,000 34

35 Proposed Upgrades (Continued) Raymer WWTP Upgrade Schedule Scenario Upgrade Reason rd mechanical screen to be provided. For redundancy Primary clarifiers to be upgraded to accommodate 2070 flows Bioreactors to be upgraded to accommodate 2070 flows Secondary Clarifiers to be upgraded to accommodate 2070 flows Tertiary Filters to be upgraded to accommodate 2070 flows UV Disinfection System to be upgraded to accommodate 2070 flows. Treatment Capacity exceeded under AWWF Treatment Capacity exceeded under AWWF Treatment Capacity exceeded under AWWF Treatment Capacity exceeded under AWWF Treatment Capacity exceeded under AWWF 35

36 Proposed Upgrades (Continued) Raymer WWTP Item Description Cost Scenario Triggering Upgrade 1 Mechanical screen to be installed $238, Stage 2 Phase 2 expansion to be completed $24,169, Subtotal $24,407,980 Engineering and Contingency $13,026,620 Total (rounded) $37,450,000 36

37 Recommendations Complete flow monitoring for proposed developments Complete flow monitoring for all DCC and capital projects Install 2 additional permanent flow monitoring stations Integrate capacity driven upgrade needs with condition related upgrading needs 37

38 Thank You Questions? Contact GeoAdvice Engineering Inc. - Werner de Schaetzen Phone: werner@geoadvice.com Urban Systems Ltd. - Jeremy Clowes Phone: jclowes@urbansystems.ca 38

Master Planning and Hydraulic Modeling

Master Planning and Hydraulic Modeling Master Planning and Hydraulic Modeling Shay Ralls Roalson, PE Saša Tomić, Ph.D., PE, BCEE Collection Systems Webinar WEAT Collections Committee May 15, 2013 Why Prepare a Master Plan? Identify existing

More information

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8. Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that

More information

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No. Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment

More information

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper

More information

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans

More information

Class Environmental Assessment Schedule B Project File Report

Class Environmental Assessment Schedule B Project File Report R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,

More information

GIS in Wastewater Collection System Master Planning

GIS in Wastewater Collection System Master Planning Page 1 of 6 GIS in Wastewater Collection System Master Planning Brad Roeth, EIT Stanley Consultants, Inc. This paper presents the use of GIS in a wastewater collection system master plan. The master plan

More information

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT April 1, 2015 B. M. ROSS AND ASSOCIATES

More information

Sewer System Master Plan FINAL

Sewer System Master Plan FINAL Sewer System Master Plan February 2006 City of Waterford Sewer System Master Plan Final Report Prepared by: Water and Environment February 17, 2006 Table of Contents Chapter 1 Introduction...1-1 1.1 Background

More information

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values

More information

M6a: Open Channel Flow (Manning s Equation, Partially Flowing Pipes, and Specific Energy)

M6a: Open Channel Flow (Manning s Equation, Partially Flowing Pipes, and Specific Energy) M6a: Open Channel Flow (, Partially Flowing Pipes, and Specific Energy) Steady Non-Uniform Flow in an Open Channel Robert Pitt University of Alabama and Shirley Clark Penn State - Harrisburg Continuity

More information

Parkhill Road Sewage Pumping Station Class EA Study

Parkhill Road Sewage Pumping Station Class EA Study Parkhill Road Sewage Pumping Station Class EA Study Public Information Centre October 4, 2011 6:30 pm 8:30 pm Westmount Public School DRAWING ON EXPERIENCE BUILDING ON STRENGTH Sewage Pumping Station (SPS)

More information

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service. After the Flush Published: July 14, 2011 Sewage or wastewater is something we rarely think or talk about. The wastewater from our toilets, showers, washing machines and dishwashers quickly departs our

More information

Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers

Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers Andy Bell Infrastructure Engineer AECOM Canada Inc Vancouver, CANADA Andrew.Bell@aecom.com Introduction The Ministry of Environment

More information

City of Charlottetown Wastewater Treatment Expansion & Upgrading

City of Charlottetown Wastewater Treatment Expansion & Upgrading City of Charlottetown Wastewater Treatment Expansion & Upgrading Background As Canada s smallest provincial capital, the City of the Charlottetown has a population of approximately 34,000 residents and

More information

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS PLANTER BOXES 1. Determine the impervious area contributing flow to the planter box (see Chapter 4.2). 2. Assumption: Typical soil infiltration

More information

Executive Summary Consent Decree

Executive Summary Consent Decree OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

The Importance of Master Planning Ibrahim S. Nassar, P.E. Facilities Planning Department Saudi Aramco

The Importance of Master Planning Ibrahim S. Nassar, P.E. Facilities Planning Department Saudi Aramco The Importance of ning Ibrahim S. Nassar, P.E. Facilities Planning Department Saudi Aramco 12/03/2007 SAWEA WORKSHOP - 2007 1 Words of Wisdom We have met the enemy and he is us Walt Kelly Adventure is

More information

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM 3 Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM Eric White, James Knighton, Gary Martens, Matthew Plourde and Rajesh Rajan A geoprocessing routine was used for the development

More information

The value of the wastewater flow used for sewer design is the daily peak flow. This can be estimated as follows:

The value of the wastewater flow used for sewer design is the daily peak flow. This can be estimated as follows: This Section presents the theory of simplified sewer design. Firstly, in Section 2.1, the peak daily wastewater flow in the length of sewer being designed is described. Section 2.2 presents the trigonometric

More information

The Dynamic Master Planning Process Integrated and continuous updating and planning of sewer systems.

The Dynamic Master Planning Process Integrated and continuous updating and planning of sewer systems. The Dynamic Master Planning Process Integrated and continuous updating and planning of sewer systems. K.Fair 1, B.F Loubser 1, H.E.Jacobs 2 *, J van der Merwe 1 1 GLS (Pty) Ltd, 11 Electron Street, Technopark,

More information

Sanitary Sewer Design and Modeling Workshop

Sanitary Sewer Design and Modeling Workshop Sanitary Sewer Design and Modeling Workshop Featuring Bentley Systems SewerGEMS Slavco Velickov, PhD Bentley Systems Scope Steady hydraulics Model building Unsteady hydraulics Hydrology Dry weather loading

More information

CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities

CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities CHAPTER 10-2 SEWAGE COLLECTION AND TREATMENT FACILITIES Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities 1.1 SANITARY SEWER COLLECTION SYSTEM The City of Washougal operates

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

SANITARY SEWER MASTER PLAN

SANITARY SEWER MASTER PLAN SANITARY SEWER MASTER PLAN PREPARED FOR: VILLAGE OF GALENA, OHIO PREPARED BY: POGGEMEYER DESIGN GROUP, INC. 1168 NORTH MAIN STREET BOWLING GREEN, OHIO 43402 JOB NO. 3550-030 MARCH, 2006 TABLE OF CONTENTS

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

Unauthorized Discharges and Sanitary Sewer Overflows

Unauthorized Discharges and Sanitary Sewer Overflows TCEQ REGULATORY GUIDANCE Field Operations Support Division RG-395 Revised April 2011 Unauthorized Discharges and Sanitary Sewer Overflows What does this document cover? The Texas Commission on Environmental

More information

TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS

TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS Prepared for The Town of Lakeshore 419 Notre Dame Street, Belle River Ontario

More information

UDG Spring Conference Birmingham 2016

UDG Spring Conference Birmingham 2016 Use of Monitoring Equipment to Proactively Manage the Waste Water Network Presenters James Mason (RPS), Joanna Kelsey (Severn Trent Water) Contributors Andrew Bailey (RPS), John Hateley (RPS) Ruth Clarke

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

Collection Systems Technology Fact Sheet Sewers, Conventional Gravity

Collection Systems Technology Fact Sheet Sewers, Conventional Gravity United States Environmental Protection Agency Collection Systems Technology Fact Sheet Sewers, Conventional Gravity DESCRIPTION Sewers are hydraulic conveyance structures that carry wastewater to a treatment

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

TOWN OF CHESTERTON, INDIANA COMBINED SEWER OVERFLOW LONG TERM CONTROL PLAN

TOWN OF CHESTERTON, INDIANA COMBINED SEWER OVERFLOW LONG TERM CONTROL PLAN TOWN OF CHESTERTON, INDIANA COMBINED SEWER OVERFLOW LONG TERM CONTROL PLAN Prepared For: Town Of Chesterton Utilities Chesterton, Indiana Prepared By: Engineers Architects Scientists Planners Surveyors

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM SECTION 3.1 INTRODUCTION... 1 (a) Objectives...1 (b) Applicability...1 (c) Drafting

More information

Sewerage Design Principles

Sewerage Design Principles Sewerage Design Principles Prepared By: Sustainable Growth Planning Division Version 1.0 July 2009 Commercial-In-Confidence DOCUMENT DETAILS Document Title Sewerage Design Principles Document Version 1.0

More information

Aquatera 2015/16 Business Plan Highlights

Aquatera 2015/16 Business Plan Highlights Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality

More information

Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China

Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China Proceedings of 2013 IAHR World Congress Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China Anil Kumar Senior Engineer, ARUP, Level

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

Asset Management Answering the 5 Core Questions

Asset Management Answering the 5 Core Questions Asset Management Answering the 5 Core Questions by Timothy Taber, PE Barton & Loguidice Page 1 Drivers Asset Management Case Study 1. What is the current state of my assets? 2. What is my required sustainable

More information

ATTACHMENT 1. 2012 Annual Report. Water & Wastewater Treatment Branch

ATTACHMENT 1. 2012 Annual Report. Water & Wastewater Treatment Branch ATTACHMENT 1 2012 Annual Report Water & Wastewater Treatment Branch The Water Treatment Plant is responsible for the operation and maintenance of the City s Water Treatment Plant, Raw Water Intake and

More information

DeSoto County is not a water service provider and does not operate any

DeSoto County is not a water service provider and does not operate any Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are

More information

Modelling Impact of Extreme Rainfall on Sanitary Sewer System by Predicting Rainfall Derived Infiltration/Inflow

Modelling Impact of Extreme Rainfall on Sanitary Sewer System by Predicting Rainfall Derived Infiltration/Inflow 20th International Congress on Modelling and Simulation, Adelaide, Australia, 1 6 December 2013 www.mssanz.org.au/modsim2013 Modelling Impact of Extreme Rainfall on Sanitary Sewer System by Predicting

More information

SANITARY SEWER SYSTEM ASSESSMENT

SANITARY SEWER SYSTEM ASSESSMENT SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.

More information

Village of Newbury Asset Management Plan

Village of Newbury Asset Management Plan Village of Newbury Asset Management Plan 7 Candle Crescent, Kitchener Ontario, N2P 2K7 www.4roads.ca 7 Candle Crescent, Kitchener Ontario, N2P 2K7 May 14, 2014 Village of Newbury 22910 Hagerty Road, PO

More information

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001 Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical

More information

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by

More information

Sanitary Sewer Overflows Leave Telltale Signs in Depth-Velocity Scattergraphs

Sanitary Sewer Overflows Leave Telltale Signs in Depth-Velocity Scattergraphs Sanitary Sewer Overflows Leave Telltale Signs in Depth-Velocity Scattergraphs Patrick L. Stevens and Heather M. Sands ADS Environmental Services, Inc., Indianapolis, Indiana Sanitary sewer overflows (SSOs)

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

Energy Audits Waste Water Treatment Plants

Energy Audits Waste Water Treatment Plants Energy Audits Waste Water Treatment Plants Ohio Water Environment Association Conference June 20, 2012 Presented by: Samuel J. Morgan, P.E., LEED AP CT Consultants, Inc. World Energy Trend US Total Energy

More information

Murcia. Capital and most populous city of the Region de Murcia. Seventh largest city in Spain.

Murcia. Capital and most populous city of the Region de Murcia. Seventh largest city in Spain. SMART WATER Murcia. Capital and most populous city of the Region de Murcia. Seventh largest city in Spain. Population of the city: 450.000 inhabitants. (about one third of the total population of the Region).

More information

Altoona Water Authority. Infrastructure Overview

Altoona Water Authority. Infrastructure Overview Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater

More information

Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL

Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL What is JCW s strategy for meeting wet weather performance targets? SSO s Basement Back-ups Serving Johnson

More information

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)

More information

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)

More information

Small Wastewater Treatment Systems

Small Wastewater Treatment Systems Small Wastewater Treatment Systems By Michael Albanese, P.Eng. H2FLOW EQUIPMENT INC. www.h2flow.com Why do you need one? Typical Reasons Enviromental Regulations New Development Failing Septic Systems

More information

Ground Truthing Infiltration & Inflow

Ground Truthing Infiltration & Inflow Ground Truthing Infiltration & Inflow using Trenchwater Piezometers, Electro Scan and CCTV Presented by: Gordon Henrich, D.M. Robichaud Randy Kowal, D. M. Robichaud Nov. 30, 2015 Robichaud About D. M.

More information

Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December 2015. Prepared by:

Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December 2015. Prepared by: Breslau Settlement Plan Preliminary Servicing and Stormwater Management Report December 2015 Prepared by: SCS Consulting Group Ltd 30 Centurian Drive, Suite 100 Markham, ON, L3R 8B8 Phone 905 475 1900

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data

Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data ABSTRACT Patrick L. Stevens, PE ADS Environmental Services 9 S. Cloverdale St., Suite B Seattle, WA 988 It is a natural desire

More information

Flood risk assessment through a detailed 1D/2D coupled model

Flood risk assessment through a detailed 1D/2D coupled model CORFU Project Barcelona Case Study Final Workshop 19 th of May 2014 Flood risk assessment through a detailed 1D/2D coupled model Beniamino Russo Aqualogy Urban Drainage Direction Introduction and general

More information

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack

More information

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding May 26, 2011 Kyle Chambers, P.Eng. Environmental and Engineering Services Department City of London kjchambe@london.ca 519-661-2500

More information

Practice Tests Answer Keys

Practice Tests Answer Keys Practice Tests Answer Keys COURSE OUTLINE: Module # Name Practice Test included Module 1: Basic Math Refresher Module 2: Fractions, Decimals and Percents Module 3: Measurement Conversions Module 4: Linear,

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

Innovative I/I Analysis Leads to Sustainably Program

Innovative I/I Analysis Leads to Sustainably Program Innovative I/I Analysis Leads to Sustainably Program Heart of the Valley Metropolitan Sewerage District Kaukauna, Wisconsin Mark Surwillo, HOVMSD District Manager Tammy Kuehlmann, PE, Donohue & Associates

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP)

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Maine CWSRF Fiscal Sustainability Plan Requirements Starting October 1, 2014, a Fiscal Sustainability

More information

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy Prepared by: AECOM 410 250 York Street, Citi Plaza 519 673 0510 tel London, ON, Canada N6A 6K2 519 673 5975

More information

City of Pacifica Collection System Master Plan Final Report. Prepared by:

City of Pacifica Collection System Master Plan Final Report. Prepared by: City of Pacifica Collection System Master Plan Final Report Prepared by: October 2011 Table of Contents No table of contents entries found. Chapter 1 Introduction... 1-1 1.1 Background and Study Objectives...

More information

5.1 SIZING OF FACILITIES 5.2 PHASING CONSIDERATIONS

5.1 SIZING OF FACILITIES 5.2 PHASING CONSIDERATIONS SECTION 5: COST ESTIMATING PROCESS Section 5 As part of the alternatives development, conceptual (planning level) cost estimates were developed for the options being proposed. These estimates would be

More information

GIS APPLICATIONS IN URBAN DRAINAGE MASTER PLANNING. Robert J. Muir *

GIS APPLICATIONS IN URBAN DRAINAGE MASTER PLANNING. Robert J. Muir * GIS APPLICATIONS IN URBAN DRAINAGE MASTER PLANNING Robert J. Muir * ABSTRACT: In recent years, GIS applications in water resources management have become widespread and diverse in the Province of Ontario,

More information

PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING

PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING Our shared role in protecting local water resources 1 Goals for this presentation: Water Environment Protection? Clean Water What is it worth?

More information

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed

More information

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING 1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications

More information

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. 111 Wheatfield Drive, Suite 1 Milford, Pennsylvania 18337 (570) 296-2765 fax: (570) 296-2767 e-mail: mhepa@mhepc.com RICHARD D. McGOEY, P.E. (NY &

More information

Chapter 9 Sanitary Sewers

Chapter 9 Sanitary Sewers Chapter 9 Sanitary Sewers S:/Engineering/Design Standards/Chapter 9 12/29/2014 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow

More information

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT 2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the

More information

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet Basement Flood Risk Reduction City of Winnipeg Charles Boulet Outline Background Winnipeg Floodway Rain Events Winnipeg Sewer System Basement Flooding Flood Reduction Measures ICLR - BFRR Strategy 2 Where

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

City of Pitt Meadows 2015 Utilities Financial Plan December 11, 2014

City of Pitt Meadows 2015 Utilities Financial Plan December 11, 2014 City of Pitt Meadows 2015 Utilities Financial Plan December 11, 2014 Agenda Purpose of Today s Presentation Drainage 2015 Capital & Operating Budget Sewer 2015 Capital & Operating Budget Water 2015 Capital

More information

Integrated Water Management in Maryland. Anwer Hasan, Senior Vice President

Integrated Water Management in Maryland. Anwer Hasan, Senior Vice President Integrated Water Management in Maryland Anwer Hasan, Senior Vice President Discussion Topics State initiatives for water management o Stormwater management o Agriculture runoff o Enhanced Nutrient Removal

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

GIS Applications for Regulatory Compliance

GIS Applications for Regulatory Compliance 4 GIS Applications for Regulatory Compliance Uzair (Sam) M. Shamsi Many cities in the world especially in the United States and Canada are dealing with regulatory enforcement actions for sewer overflows,

More information

SSO Modeling and Calibration for SSO Case Studies

SSO Modeling and Calibration for SSO Case Studies Wastewater Master Plan DWSD Project No. CS-1314 SSO Modeling and Calibration for SSO Case Studies Technical Memorandum Original Date: January 17, 2003 Revision September 2003 Author: CDM September 2003

More information

Wastewater Collection Practice Test #3 Page 1 of 15

Wastewater Collection Practice Test #3 Page 1 of 15 Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85

More information

Sanitary Sewer Overflow Enforcement : A National Perspective

Sanitary Sewer Overflow Enforcement : A National Perspective Sanitary Sewer Overflow Enforcement : A National Perspective LOREN DENTON, CHIEF MUNICIPAL ENFORCEMENT BRANCH WATER ENFORCEMENT DIVISION U.S. ENVIRONMENTAL PROTECTION AGENCY Topics Covered 2 SSOs National

More information

Module 9: Basics of Pumps and Hydraulics Instructor Guide

Module 9: Basics of Pumps and Hydraulics Instructor Guide Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine

More information

5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT)

5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT) City Council Agenda: 10/13/14 5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT) A. REFERENCE AND BACKGROUND: City Council is asked to approve the City of

More information

2.1 Development of Risk-Based Asset Management Framework

2.1 Development of Risk-Based Asset Management Framework SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework

More information